Built Up Rates 1

This document contains rates for various construction materials and labor in Malaysia, including: 1) Ready-mixed concrete prices ranging from RM550-RM695 per cubic meter depending on grade, including costs for materials, delivery, wastage, labor, and overhead. 2) Formwork prices listed as RM50-RM80 per square meter. 3) Reinforcing steel prices of RM4,613/ton for Sabah and RM4,927/ton for West Peninsular Malaysia, covering costs for materials, transport, wastage, labor, and overhead.

Uploaded by

Julian Kiting
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
440 views

Built Up Rates 1

This document contains rates for various construction materials and labor in Malaysia, including: 1) Ready-mixed concrete prices ranging from RM550-RM695 per cubic meter depending on grade, including costs for materials, delivery, wastage, labor, and overhead. 2) Formwork prices listed as RM50-RM80 per square meter. 3) Reinforcing steel prices of RM4,613/ton for Sabah and RM4,927/ton for West Peninsular Malaysia, covering costs for materials, transport, wastage, labor, and overhead.

Uploaded by

Julian Kiting
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BUILT UP RATE

BUILT OF RATE
Rate (RM)
Grade
Item Description Qty Unit 15 20 25 30 35 40 45 50

Concrete Works
(Supply Based on Av Price of 2 Quotations*) Lean con Lean con

43 Supply and delivery Readymixed (Ex Site) 1 M3 365.00 375.00 390.00 405.00 420.00 435.00 455.00 475.00
Transportation cost to site(.70/MT/KM) - - - - - - - -
Sub-total 365.00 375.00 390.00 405.00 420.00 435.00 455.00 475.00
Add Wastage 5 % 18.25 18.75 19.50 20.25 21.00 21.75 22.75 23.75
383.25 393.75 409.50 425.25 441.00 456.75 477.75 498.75
Pumping, hosting and Pouring 40.00 40.00 50.00 50.00 50.00 50.00 50.00 50.00
Labour 55.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00
478.25 488.75 514.50 530.25 546.00 561.75 582.75 603.75
Add Profit & Overhead 15 % 72.00 73.00 77.00 80.00 82.00 84.00 87.00 91.00

Cost/M3 550.00 562.00 592.00 610.00 628.00 646.00 670.00 695.00


Av of * 1. Expogaya 2. Elite Score, Lahad Datu
Item Description Qty Unit Rate

44 Formwork

Standard Market Rate 1 M2 50.00-80.00

Cost/M2 50.00-80.00
Region
45 Steel Reinforcement SDK Base WP29

Supply, inclusive tieing wire and others 1 Ton 2,800.00 3,000.00


Transport, Load & Unload 1 Ton 230.00 290.00
3,030.00 3,290.00
Add Wastage 5 % 151.50 164.50
3,181.50 3,454.50
Labour for fabricating & installation working 830.00 830.00
4,011.50 4,284.50
Add Profit & Overhead 15 % 601.73 642.68
Cost/Ton 4,613.00 4,927.00