Leed Ebom 2009
Leed Ebom 2009
USGBC Membership
USGBC’s greatest strength is the diversity of our membership. USGBC is a balanced, consensus based nonprofit
with more than 18,000 member companies and organizations representing the entire building industry. Since its
inception in 1993, USGBC has played a vital role in providing a leadership forum and a unique, integrating force for
the building industry. USGBC’s programs have three distinguishing characteristics:
Committee-based
The heart of this effective coalition is our committee structure, in which volunteer members design strategies
that are implemented by staff and expert consultants. Our committees provide a forum for members to resolve
differences, build alliances, and forge cooperative solutions for influencing change in all sectors of the building
industry.
Member-driven
Membership is open and balanced and provides a comprehensive platform for carrying out important programs and
activities. We target the issues identified by our members as the highest priority. We conduct an annual review of
achievements that allows us to set policy, revise strategies, and devise work plans based on members’ needs.
Consensus-focused
We work together to promote green buildings, and in doing so, we help foster greater economic vitality and
environmental health at lower costs. We work to bridge ideological gaps between industry segments and develop
balanced policies that benefit the entire industry.
Contact the U.S. Green Building Council
2101 L Street, NW
Suite 500
Washington, DC 20037
(800) 795-1747 Office
(202) 828-5110 Fax
www.usgbc.org
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
i
Copyright
Copyright © 2009 by the U.S. Green Building Council, Inc. All rights reserved.
The U.S. Green Building Council, Inc. (USGBC®) devoted significant time and resources to create this LEED® Rating
System. USGBC authorizes individual use of the LEED Rating System. In exchange for this authorization, the user
agrees:
1. to retain all copyright and other proprietary notices contained in the LEED Rating System,
2. not to sell or modify the LEED Rating System, and
3. not to reproduce, display, or distribute the LEED Rating System in any way for any public or commercial
purpose.
Unauthorized use of the LEED Rating System violates copyright, trademark, and other laws and is prohibited.
Disclaimer
None of the parties involved in the funding or creation of the LEED Rating System, including the USGBC, its
members, its members, volunteers, or contractors, assume any liability or responsibility to the user or any third
parties for the accuracy, completeness, or use of or reliance on any information contained in the LEED Rating
System, or for any injuries, losses, or damages (including, without limitation, equitable relief) arising from such use
or reliance. Although the information contained in the LEED Rating System is believed to be reliable and accurate,
all materials set forth within are provided without warranties of any kind, either express or implied, including but
not limited to warranties of the accuracy or completeness of information or the suitability of the information for any
particular purpose.
As a condition of use, the user covenants not to sue and agrees to waive and release the U.S. Green Building Council,
its members, volunteers, and contractors from any and all claims, demands, and causes of action for any injuries,
losses, or damages (including, without limitation, equitable relief) that the user may now or hereafter have a right to
assert against such parties as a result of the use of, or reliance on, the LEED Rating System.
U.S. Green Building Council
2101 L Street, NW
Suite 500
Washington, DC 20037
Trademarks
USGBC®, U.S. Green Building Council® and LEED® are registered trademarks of the U.S. Green Building Council.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
ii
Acknowledgments
The LEED 2009 Rating System has been made possible only through the efforts of many dedicated volunteers,
staff members, and others in the USGBC community. The Rating System improvement work was managed and
implemented by USGBC staff and included review and input by many Technical Advisory Group (TAG) members
with oversight by the LEED Steering Committee. We extend our deepest gratitude to all of our LEED committee
members who participated in the development of this rating system, for their tireless volunteer efforts and constant
support of USGBC’s mission:
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
iii
Water Efficiency TAG
Neal Billetdeaux, Chair JJR
John Koeller, Vice-Chair Alliance for Water Efficiency
David Carlson Columbia University
Bill Hoffman H.W. Hoffman and Associates, LLC
Geoff Nara Civil & Environmental Consultants
Stephanie Tanner U.S. Environmental Protection Agency
Daniel Yeh University of South Florida
David Bracciano Tampa Bay Water
Robert Rubin NCSU-BAE and McKim & Creed
Winston Huff SSR Engineers
Robert Benazzi Jaros Baum & Bolles
Gunnar Baldwin TOTO USA, INC
Heather Kinkade Forgotten Rain, LLC
Shabbir Rawalpindiwala Kohler Company
Bill Wall Clivus New England, Inc.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
iv
Nancy Malone Siegel & Strain Architects
Kirsten Ritchie Gensler
Wayne Trusty Athena Sustainable Materials Institute
Denise Van Valkenburg MASCO Retail Cabinet Group
Gabe Wing Herman Miller, Inc.
The LEED 2009 for Existing Buildings: Operations & Maintenance Rating System builds on the work of those who
helped create previous version:
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
v
LEED 2009 for Existing Buildings: Operations & Maintenance Project
Checklist
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With
LEED Alternative Compliance
2009 for Existing PathsOperations
Buildings: For Projects Outside the U.S.
& Maintenance
vi
Credit 4 Sustainable Purchasing—Reduced Mercury in Lamps 1
Credit 5 Sustainable Purchasing—Food 1
Credit 6 Solid Waste Management—Waste Stream Audit 1
Credit 7 Solid Waste Management—Ongoing Consumables 1
Credit 8 Solid Waste Management—Durable Goods 1
Credit 9 Solid Waste Management—Facility Alterations and Additions 1
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
vii
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
viii
Preface i
Introduction xiii
I. LEED Green Building Rating System xiii
® ™
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
ix
Credit 3.1 Performance Measurement—Building Automation System 37
Credit 3.2 Performance Measurement—System-Level Metering 38
Credit 4 On-site and Off-site Renewable Energy 39
Credit 5 Enhanced Refrigerant Management 41
Credit 6 Emissions Reduction Reporting 43
ACP
Credit 1.4 Indoor Air Quality Best Management Practices—Reduce Particulates in Air Distribution 78
ACP
Credit 1.5 Indoor Air Quality Best Management Practices—Indoor Air Quality Management for
ACP
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
x
Innovation in Operations (IO) 97
Credit 1 Innovation in Operations 97
Credit 2 LEED Accredited Professional
®
99
Credit 3 Documenting Sustainable Building Cost Impacts 100
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xi
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xii
I. LEED® Green Building Rating System
Background on LEED®
Following the formation of the U.S. Green Building Council (USGBC) in 1993, the organization’s members quickly
realized that the sustainable building industry needed a system to define and measure “green buildings.” USGBC
began to research existing green building metrics and rating systems. Less than a year after formation, the members
acted on the initial findings by establishing a committee to focus solely on this topic. The composition of the
committee was diverse; it included architects, real estate agents, a building owner, a lawyer, an environmentalist, and
industry representatives. This cross section of people and professions added a richness and depth both to the process
and to the ultimate product.
The first LEED Pilot Project Program, also referred to as LEED Version 1.0, was launched at the USGBC Membership
Summit in August 1998. After extensive modifications, LEED Green Building Rating System Version 2.0 was released
in March 2000, with LEED Version 2.1 following in 2002 and LEED Version 2.2 following in 2005.
As LEED has evolved and matured, the program has undertaken new initiatives. In addition to a rating system
specifically devoted to building operations and maintenance issues (LEED for Existing Buildings: Operations &
Maintenance), LEED addresses the different project development and delivery processes of the U.S. building design
and construction market through rating systems for specific building typologies, sectors, and project scopes: LEED
for Core & Shell, LEED for New Construction, LEED for Schools, LEED for Neighborhood Development, LEED for
Retail, LEED for Healthcare, LEED for Homes, and LEED for Commercial Interiors.
Project teams interact with the Green Building Certification Institute (GBCI) for project registration and
certification. GBCI was established in 2008 as a separately incorporated entity with the support of the U.S. Green
Building Council. GBCI administers credentialing and certification programs related to green building practice.
These programs support the application of proven strategies for increasing and measuring the performance of
buildings and communities as defined by industry systems such as LEED.
The green building field is growing and changing daily. New technologies and products are being introduced into
the marketplace, and innovative designs and practices are proving their effectiveness. The LEED rating systems and
reference guides will evolve as well. Project teams must comply with the version of the rating system that is current
at the time of their registration.
USGBC will highlight new developments on its website on a continual basis; see www.usgbc.org.
Features of LEED®
The LEED Green Building Rating Systems are voluntary, consensus-based, and market-driven. Based on existing and
proven technology, they evaluate environmental performance from a whole building perspective over a building’s
life cycle, providing a definitive standard for what constitutes a green building in design, construction, and operation.
The LEED rating systems are designed for rating new and existing commercial, institutional, and residential
buildings. They are based on accepted energy and environmental principles and strike a balance between known,
established practices and emerging concepts. Each rating system is organized into 5 environmental categories:
Sustainable Sites, Water Efficiency, Energy and Atmosphere, Materials and Resources, and Indoor Environmental
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xiii
Quality. An additional category, Innovation in Design (or Operations), addresses sustainable building expertise
as well as measures not covered under the 5 environmental categories. Regional bonus points are another feature
of LEED and acknowledge the importance of local conditions in determining best environmental design and
construction practices.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xiv
The details of the weightings process vary slightly among individual rating systems. For example, LEED for Existing
Buildings: O&M includes credits related to solid waste management but LEED for New Construction does not. This
results in a difference in the portion of the environmental footprint addressed by each rating system and the relative
allocation of points. The weightings process for each rating system is fully documented in a weightings workbook.
The credit weightings process will be reevaluated over time to incorporate changes in values ascribed to different
building impacts and building types, based on both market reality and evolving scientific knowledge related to
buildings. A complete explanation of the LEED credit weightings system is available on the USGBC website, at
www.usgbc.org.
ACP
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xv
Materials and Resources (MR)
n
LEED 2009 for Existing Buildings: Operations & Maintenance certifications are awarded according to the following
scale:
Certified 40–49 points
Silver 50–59 points
Gold 60–79 points
Platinum 80 points and above
GBCI will recognize buildings that achieve 1 of these rating levels with a formal letter of certification.
When to Use LEED 2009 for Existing Buildings: Operations & Maintenance
LEED for Existing Buildings: Operations & Maintenance was designed to certify the sustainability of ongoing
operations of existing commercial and institutional buildings. All such buildings, as defined by standard building
codes, are eligible for certification under LEED for Existing Buildings: Operations & Maintenance and include
offices, retail and service establishments, institutional buildings (libraries, schools, museums, churches, etc.),
hotels, and residential buildings of 4 or more habitable stories.
LEED for Existing Buildings: Operations & Maintenance provides owners and operators of existing buildings an
entry point into the LEED certification process and is applicable to the following:
building operations, processes, systems upgrades, minor space-use changes, and minor facility alterations or
n
additions; and
buildings new to LEED certification as well as buildings previously certified under LEED for New
n
Construction, LEED for Schools, or LEED for Core & Shell; these may be either ground up new construction
or existing buildings that have undergone major renovations.
LEED for Existing Buildings: Operations & Maintenance encourages owners and operators of existing buildings
to implement sustainable practices and reduce the environmental impacts of their buildings over their functional
life cycles. Specifically, the rating system addresses exterior building site maintenance programs, water and energy
use, environmentally preferred products and practices for cleaning and alterations, sustainable purchasing policies,
waste stream management, and ongoing indoor environmental quality. LEED for Existing Buildings: Operations
& Maintenance is targeted at single buildings, whether owner occupied, multitenant, or multiple-building campus
projects. It is a whole-building rating system; individual tenant spaces are ineligible.
Many projects neatly fit the defined scope of only 1 LEED rating system; others may be eligible for 2 or more. The
project is a viable candidate for LEED certification if it can meet all prerequisites and achieve the minimum points
required in a given rating system. If more than 1 rating system applies, the project team can decide which to pursue.
For assistance in choosing the most appropriate LEED rating system, please e-mail [email protected].
Registration
Project teams interested in earning LEED certification for their buildings must first register the project with GBCI.
Projects can be registered on the GBCI website (www.gbci.org). The website also has information on registration
costs for USGBC national members as well as nonmembers. Registration is an important step that establishes
contact with GBCI and provides access to software tools, errata, critical communications, and other essential
information.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xvi
Certification & Recertification
To earn LEED certification, the applicant project must satisfy all the prerequisites and qualify for a minimum
number of points to attain the established project ratings as listed below. Having satisfied the basic prerequisites of
the program, applicant projects are then rated according to their degree of compliance within the rating system.
Any first-time certification application to the LEED 2009 for Existing Buildings: Operations & Maintenance
program is considered an initial LEED for Existing Buildings: Operations & Maintenance certification. This includes
applications for both buildings never certified under LEED and buildings previously certified under LEED for
New Construction, LEED for Schools, or LEED for Core & Shell. Any LEED for Existing Buildings: Operations
& Maintenance application for a building previously certified using LEED for Existing Buildings: Operations
& Maintenance is considered a LEED for Existing Buildings: Operations & Maintenance recertification. These
buildings can apply for recertification as frequently as each year but must file for recertification at least once every
5 years to maintain their LEED for Existing Buildings: Operations & Maintenance status; if projects do not recertify
at the 5 year mark, their next application will be considered an initial certification application. The project must
recertify all prerequisites but may drop previously earned credits or add new credits as desired.
For more information on the LEED certification process including LEED-Online, Credit Interpretation Requests
and Rulings, Certification, Appeals, and Fees please see the LEED Reference Guide for Green Building Operations &
Maintenance, 2009 Edition and visit www.usgbc.org or www.gbci.org.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xvii
Application Submittal upon Completion of the Performance Period
To ensure that certification is awarded based on current building performance data, LEED for Existing Buildings:
Operations & Maintenance certification applications must be submitted to GBCI for review within 60 calendar days
of the end of the performance periods. In the example on the previous page, the termination interval ends on April
26, 2010. The certification application therefore must be submitted on or before June 25, 2010.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xviii
area by at least 5% are eligible. Alterations or additions below these limits are considered repairs, routine
replacements, or minor upgrades and are ineligible to earn points under LEED for Existing Buildings: O&M.
The minimum applies to Materials and Resources (MR) Credits 3 and 9, and Indoor Environmental Quality
(IEQ) Credit 1.5.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xix
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
xx
SS Credit 1: LEED Certified Design and Construction
4 points
Intent
To reward environmentally sensitive building design and construction, thereby enabling high-performance building
operations to be achieved more easily.
Requirements
Choose 1 of the following options:
OPTION 1
Show that the building has previously been certified under LEED for New Construction and Major Renovations.
OR
OPTION 2
Show that the building has been previously certified under LEED for Schools.
OR
OPTION 3
Show that the building has previously been certified under LEED for Core & Shell Development.
AND
At least 75% of the floor area has also been certified under LEED for Commercial Interiors.
OR
OPTION 4
Show that the building has been previously certified under LEED for Retail: New Construction and
Major Renovations.
OR
OPTION 5
Show that the building has been previously certified under LEED for Healthcare New Construction and
Major Renovations.
OR
OPTION 6
Show that the building has previously been certified under any version of LEED for Existing Buildings and that
ongoing performance has been tracked during the entire recertification period (from initial certification until the
recertification application).
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
1
SS Credit 2: Building Exterior and Hardscape Management Plan
1 point
Intent
To encourage environmentally sensitive building exterior and hardscape management practices that provide a clean,
well-maintained and safe building exterior while supporting high-performance building operations.
Requirements
Employ an environmentally sensitive, low-impact building exterior and hardscape management plan that helps
preserve surrounding ecological integrity. The plan must employ best management practices that significantly
reduce harmful chemical use, energy waste, water waste, air pollution, solid waste and/or chemical runoff (e.g.,
gasoline, oil, antifreeze, salts) compared with standard practices. The plan must address all of the following
operational elements that occur on the building and grounds:
n Maintenance equipment.
n Snow and ice removal.
n Cleaning of building exterior.
n Paints and sealants used on building exterior.
n Cleaning of sidewalks, pavement and other hardscape.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
2
SS Credit 3: Integrated Pest Management, Erosion Control and Landscape
Management Plan
1 point
Intent
To preserve ecological integrity, enhance natural diversity and protect wildlife while supporting high-performance
building operations and integration into the surrounding landscape.
Requirements
Have an environmentally sensitive management plan in place for the site’s natural components. The plan must
employ best management practices that significantly reduce harmful chemical use, energy waste, water waste, air
pollution, solid waste and/or chemical runoff (e.g., gasoline, oil, antifreeze, salts) compared with standard practices.
The plan must address all of the following operational elements:
n Outdoor integrated pest management (IPM), defined as managing outdoor pests (plants, fungi, insects, and/or
animals) in a way that protects human health and the surrounding environment and that improves economic
returns through the most effective, least-risk option. IPM calls for the use of least toxic chemical pesticides,
minimum use of the chemicals, use only in targeted locations, and use only for targeted species. IPM requires
routine inspection and monitoring. The outdoor IPM plan must address all the specific IPM requirements
listed in IEQ Credit 3.6: Green Cleaning: Indoor Integrated Pest Management, including preferred use of
nonchemical methods, definition of emergency conditions and universal notification (advance notice of not
less than 72 hours under normal conditions and 24 hours in emergencies before a pesticide, other than a least-
toxic pesticide, is applied in a building or on surrounding grounds that the building management maintains).
The outdoor IPM plan must also be integrated with any indoor IPM plan for the building, as appropriate.
n Erosion and sedimentation control for ongoing landscape operations (where applicable) and future
construction activity. The plan must address both site soil and potential construction materials. The plan must
also include measures that prevent erosion and sedimentation, prevent air pollution from dust or particulate
matter and restore eroded areas.
Further, the plan must address the following operational elements, if applicable:
n Diversion of landscape waste from the waste stream via mulching, composting or other low-impact means.
n Chemical fertilizer use. The use of artificial chemicals can be minimized by the use of locally adapted plants
that need no fertilizer, less-polluting alternatives to artificial chemicals, or other low-impact maintenance
practices.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
3
SS Credit 4: Alternative Commuting Transportation
3–15 points
Intent
To reduce pollution and land development impacts from automobile use for commuting.
Requirements
Reduce the number of commuting round trips made by regular building occupants using single occupant,
conventionally powered and conventionally fueled vehicles. For the purposes of this credit, alternative
transportation includes at a minimum, telecommuting; compressed workweeks; mass transit; walking; bicycles or
other human-powered conveyances; carpools; vanpools; and low-emitting, fuel-efficient1 or alternative-fuel vehicles.
Performance calculations are made relative to a baseline case that assumes all regular occupants commute alone
in conventional automobiles. The calculations must account for seasonal variations in the use of alternative
commuting methods and, where possible, indicate the distribution of commuting trips using each type of alternative
transportation.
Points are earned for reductions in conventional commuting trips during the performance period according to the
following schedule:
1 Low-emitting vehicles and fuel-efficient vehicles are defined as vehicles that are classified as zero-emission vehicles (ZEVs) by the California
Air Resources Board or that have achieved a minimum green score of 40 on the American Council for an Energy Efficient Economy annual
vehicle-rating guide.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
4
OR
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
5
SS Credit 5: Site Development—Protect or Restore Open Habitat
1 point
Intent
To conserve existing natural site areas and restore damaged site areas to provide habitat and promote biodiversity.
Requirements
During the performance period, have in place native1 or adapted vegetation2 covering a minimum of 25% of the total
site area (excluding the building footprint) or 5% of the total site area (including the building footprint), whichever is
greater.
Improving and/or maintaining off-site areas with native or adapted plants can contribute toward earning this credit
provided the improvement and maintenance are documented in a contract with the owner of the off-site area. Every
2 square feet (0.2 square meters) off-site can be counted as 1 square foot (0.1 square meters) on-site.
Other ecologically appropriate features that contribute to this credit are natural site elements beyond vegetation
that maintain or restore the ecological integrity of the site, including water bodies, exposed rock, unvegetated ground
or other features that are part of the historic natural landscape within the region and provide habitat value.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
6
SS Credit 6: Stormwater Quantity Control
1 point
Intent
To limit disruption of natural hydrology by reducing impervious cover, increasing on-site infiltration, reducing or
eliminating pollution from stormwater runoff and eliminating contaminants.
Requirements
During the performance period, implement a stormwater management plan that infiltrates, collects and reuses
runoff or evapotranspirates runoff from at least 15% of the precipitation falling on the whole project site both for an
average weather year and for the 2-year, 24-hour design storm.
Implement an annual inspection program of all stormwater management facilities to confirm continued
performance. Maintain documentation of inspection, including identification of areas of erosion, maintenance
needs and repairs. Perform all routine required maintenance, necessary repairs or stabilization within 60 days of
inspection.
OR
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
7
SS Credit 7.1: Heat Island Reduction—Nonroof
1 point
Intent
To reduce heat islands1 to minimize impacts on microclimates and human and wildlife habitats.
Requirements
Note for Projects Outside the U.S.
For each option below, if SRI information is not available for the specified product, demonstrate compliance
using the SRI calculator in California’s Energy Efficiency Standards for Residential and Nonresidential Buildings
(California Code of Regulations, Title 24, Part 6; available at http://www.energy.ca.gov/title24/2008standards/
sri_calculator/SRI_Calculator_Worksheet.pdf). This calculator uses solar reflectance and thermal emittance to
determine the SRI of roofing materials.
1 Heat islands are defined as thermal gradient differences between developed and undeveloped areas.
2 The solar reflectance index (SRI) is a measure of the constructed surface’s ability to reflect solar heat, as shown by a small temperature rise. It is
defined so that a standard black surface (reflectance 0.05, emittance 0.90) is 0 and a standard white surface (reflectance 0.80, emittance 0.90)
is 100. To calculate the SRI for a given material, obtain the reflectance value and emittance value for the material. SRI is calculated according to
ASTM E 1980. Reflectance is measured according to ASTM E 903, ASTM E 1918 or ASTM C 1549. Emittance is measured according to ASTM E
408 or ASTM C 1371.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
8
OR
OPTION 2
Place a minimum of 50% of parking spaces under cover1. Any roof used to shade or cover parking must have
an SRI of at least 29, be a vegetated roof or be covered by solar panels that produce energy used to offset some
nonrenewable resource use. Implement a maintenance program that ensures all SRI surfaces are cleaned at least
every 2 years to maintain good reflectance. The top parking level of a multilevel parking structure is included in
the total parking spaces calculation but is not considered a roof and is not required to be an SRI surface.
1 For the purposes of this credit, under cover parking is defined as parking underground, under deck, under roof, or under a building.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
9
SS Credit 7.2: Heat Island Reduction—Roof
1 point
Intent
To reduce heat islands1 to minimize impacts on microclimates and human and wildlife habitats.
Requirements
Note for Projects Outside the U.S.
For each option below, if SRI information is not available for the specified product, demonstrate compliance
using the SRI calculator in California’s Energy Efficiency Standards for Residential and Nonresidential Buildings
(California Code of Regulations, Title 24, Part 6; available at http://www.energy.ca.gov/title24/2008standards/
sri_calculator/SRI_Calculator_Worksheet.pdf). This calculator uses solar reflectance and thermal emittance to
determine the SRI of roofing materials.
OPTION 1
Use roofing materials with a solar reflectance index (SRI)2 equal to or greater than the values in the table below
for a minimum of 75% of the roof surface.
Roofing materials having a lower SRI value than those listed below may be used if the weighted rooftop SRI
average meets the following:
[ ] [ ]
Area of SRI of Roof A SRI of Roof B
Roof A x ———————
Required SRI
+ Area of
Roof B x ———————
Required SRI
+ ... Total Roof
Area
0.75
Implement a maintenance program that ensures all SRI surfaces are cleaned at least every 2 years to maintain
good reflectance.
1 Heat islands are defined as thermal gradient differences between developed and undeveloped areas.
2 The solar reflectance index (SRI) is a measure of the constructed surface’s ability to reflect solar heat, as shown by a small temperature rise. It is
defined so that a standard black surface (reflectance 0.05, emittance 0.90) is 0 and a standard white surface (reflectance 0.80, emittance 0.90)
is 100. To calculate the SRI for a given material, obtain the reflectance value and emittance value for the material. SRI is calculated according to
ASTM E 1980. Reflectance is measured according to ASTM E 903, ASTM E 1918 or ASTM C 1549. Emittance is measured according to ASTM E
408 or ASTM C 1371.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
10
OR
OPTION 2
Install and maintain a vegetated roof that covers at least 50% of the roof area.
OR
OPTION 3
Install high-albedo and vegetated roof surfaces that, in combination, meet the following criteria:
Alternatively, a weighted average approach may be used to calculate compliance for multiple materials:
[ ] [ ]
Area of SRI of Roof A SRI of Roof B Area of
x ——————— + Area of
x ——————— Vegetated
Roof A Required SRI Roof B Required SRI
+ Roof
Total Roof
Area
———
0.75 0.5
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
11
SS Credit 8: Light Pollution Reduction
1 point
Intent
To minimize light trespass from the building and site, reduce sky-glow to increase night sky access, improve
nighttime visibility through glare reduction and reduce development impact from lighting on nocturnal
environments.
Requirements
Project teams must comply with the interior lighting requirement
AND
1 of the 3 options for exterior lighting.
INTERIOR LIGHTING
All nonemergency built-in luminaires with a direct line of sight to any openings in the envelope (translucent or
transparent, wall or ceiling) must be automatically controlled to turn off during all after-hours periods during
the performance period. The total duration of all programmed after-hours periods annually must equal or exceed
2,190 hours per year (50% of annual nighttime hours). Manual override capability may be provided for occasional
after-hours use.
Implement a program to ensure that the lighting control system is being properly used to adjust lighting levels
during all after-hours periods.
EXTERIOR LIGHTING
OPTION 1
If the project is certified under LEED for Schools or New Construction, show that SS Credit 8: Light Pollution
Reduction was earned. If the project is certified under LEED for Core & Shell Development and 75% of the floor
area is LEED for Commercial Interiors, show that SS Credit 8: Light Pollution Reduction was earned for both
systems.
OR
OPTION 2
Partially1 or fully shield2 all exterior fixtures 50 watts and over so that they do not directly emit light to the night sky.
1 Partially shielded means exterior light fixtures are shielded so that the lower edge of the shield is at or below the centerline of the light source or
lamp such that light emission above the horizontal plane is minimized.
2 Fully shielded means exterior light fixtures are shielded or constructed so that light rays emitted by the fixture are projected below the
horizontal plane passing through the lowest point on the fixture from which light is emitted.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
12
OR
OPTION 3
Measure the night illumination levels at regularly spaced points around the perimeter of the property, taking the
measurements with the building’s exterior and site lights both on and off. The building’s interior lights must be
in the same state during both measurements. At least 8 measurements are required at a maximum spacing of 100
feet apart (30 meters), so as to be representative of the illumination levels at the perimeter of the property. The
illumination level measured with the lights on must not be more than 20% above the level measured with the
lights off. This requirement must be met for each measurement point; averaging of all points is prohibited.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
13
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
14
WE Prerequisite 1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
Required
Intent
To reduce indoor fixture and fitting water use within buildings to reduce the burdens on potable water1 supply and
wastewater systems.
Requirements
Reduce potable water use of indoor plumbing fixtures and fittings to a level equal to or below the LEED 2009
for Existing Buildings: Operations & Maintenance baseline, calculated assuming 100% of the building’s indoor
plumbing fixtures and fittings meet the plumbing code requirements as stated in the 2006 editions of the Uniform
Plumbing Code (UPC) or International Plumbing Code (IPC) pertaining to fixture and fitting performance. Fixtures
and fittings included in the calculations for this credit are water closets, urinals, showerheads, faucets, faucet
replacement aerators and metering faucets.
The LEED 2009 for Existing Buildings: Operations & Maintenance water use baseline is set depending on the year of
substantial completion of the building’s indoor plumbing system. Substantial completion is defined as either initial
building construction or the last plumbing renovation of all or part of the building that included 100% retrofit of all
plumbing fixtures and fittings as part of the renovation. Set the baseline as follows:
n For a plumbing system substantially completed in 1994 or later throughout the building, the baseline is 120% of
the water use that would result if all fixtures met the codes cited above.
n For a plumbing system substantially completed before 1994 throughout the building, the baseline is 160% of
the water use that would result if all fixtures met the codes cited above.
If indoor plumbing systems were substantially completed at different times (because the plumbing renovations
occurred at different times in different parts of the building), Set a whole-building average baseline by prorating
between the above limits. Prorate based on the proportion of plumbing fixtures installed during the plumbing
renovations in each date period, as explained in the LEED Reference Guide for Green Building Operations
& Maintenance, 2009 Edition. Pre-1994 buildings that have had only minor fixture retrofits (e.g., aerators,
showerheads, flushing valves) but no plumbing renovations in or after 1994 may use the 160% baseline for the whole
building.
Demonstrate fixture and fitting performance through calculations to compare the water use of the as-installed
fixtures and fittings with the use of UPC- or IPC-compliant fixtures and fittings, as explained in the LEED Reference
Guide for Green Building Operations & Maintenance, 2009 Edition.
Develop and implement a policy requiring economic assessment of conversion to high-performance plumbing
fixtures and fittings as part of any future indoor plumbing renovation. The assessment must account for potential
water supply and disposal cost savings and maintenance cost savings.
1 Potable water is defined as water that is suitable for drinking and is supplied from wells or municipal water systems.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
15
Potential Technologies & Strategies
Reduce indoor plumbing fixture and fitting potable water usage through automatic water control systems. Install,
where possible, water-conserving indoor plumbing fixtures and fittings that meet or exceed the UPC 2006 or IPC
2006 fixture and fitting requirements in combination with high-efficiency or dry fixture and control technologies.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
16
WE Credit 1: Water Performance Measurement
1–2 points
Intent
To measure building and subsystem water performance over time to understand consumption patterns and identify
opportunities for additional water savings.
Requirements
OPTION 1. (1 point)
Have in place permanently installed water metering that measures the total potable water1 use for the entire
building and associated grounds. Meter data must be recorded on a regular basis and compiled into monthly and
annual summaries. Applicants are also encouraged to meter gray or reclaimed water supplied to the building.
OR
OPTION 2. (2 points)
Meet the requirements for Option 1 and have in place permanently installed metering for 1 or more of the
following water subsystems:
n Irrigation. Meter water systems serving at least 80% of the irrigated landscape area on the grounds. The
percentage of irrigated landscape area served must be calculated as the total metered irrigated landscape area
divided by the total irrigated landscape area. All landscaping areas fully covered with xeriscaping or native
vegetation that requires no routine irrigation must be excluded from the calculation entirely.
n Indoor plumbing fixtures and fittings. Meter water systems serving at least 80% of the indoor plumbing
fixtures and fittings described in WE Prerequisite 1, either directly or by deducting all other measured water
use from the measured total water consumption of the building and grounds.
n Cooling towers. Meter replacement water use of all cooling towers serving the facility.
n Domestic hot water. Meter water use of at least 80% of the installed domestic hot water heating capacity
(including both tanks and on-demand heaters).
n Other process water. Meter at least 80% of expected daily water consumption for process-type end uses,
such as humidification systems, dishwashers, clothes washers, pools and other systems using process water.
Meters must measure potable water use, but gray or reclaimed water use may also be measured to meet the
requirements of this credit. Metering must be continuous and data-logged to allow for an analysis of time trends.
The project must compile monthly and annual summaries of results for each subsystem metered.
Meters must be calibrated within the manufacturer’s recommended interval if the building owner, management
organization or tenant owns the meter. Meters owned by third parties (e.g., utilities or governments) are exempt.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
17
WE Credit 2: Additional Indoor Plumbing Fixture and Fitting Efficiency
1–5 points
Intent
To maximize indoor plumbing fixture and fitting efficiency within buildings to reduce the use of potable water1 and
consequent burden on municipal water supply and wastewater systems.
Requirements
During the performance period, have in place strategies and systems that in aggregate produce a reduction in
indoor plumbing fixture and fitting potable water use from the calculated baseline established in WE Prerequisite 1:
Minimum Indoor Plumbing Fixture and Fitting Efficiency.
The minimum water reduction percentage for each point threshold is as follows:
Percentage Reduction Points
10% 1
15% 2
20% 3
25% 4
30% 5
1 Potable water is defined as water that is suitable for drinking and is supplied from wells or municipal water systems.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
18
WE Credit 3: Water Efficient Landscaping
1–5 points
Intent
To limit or eliminate the use of potable water1, or other natural surface or subsurface resources available on or near
the project site, for landscape irrigation.
Requirements
Reduce potable water or other natural surface or subsurface resource consumption for irrigation compared with
conventional means of irrigation. If the building does not have separate water metering for irrigation systems,
the water-use reduction achievements can be demonstrated through calculations. The minimum water savings
percentage for each point threshold is as follows:
Percentage Reduction Points
50% 1
62.5% 2
75% 3
87.5% 4
100% 5
For buildings without vegetation or other ecologically appropriate features on the grounds, points can be earned by
reducing the use of potable water for watering any roof and/or courtyard garden space or outdoor planters, provided
the planters and/or garden space cover at least 5% of the building site area (including building footprint, hardscape
area, parking footprint, etc). If the planters and/or garden space cover less than 5% of the building site area, the
project is ineligible for this credit.
Three options are available to demonstrate compliance with the above requirements. Project teams that do not
separately meter their actual irrigation water use during the performance period must choose Option 2.
Choose 1 of the following options:
OPTION 1
Calculate the mid-summer baseline irrigation water use by determining the water use that would result from
using an irrigation system typical for the region and compare this with the building’s actual irrigation potable
water use, which can be determined through submetering. Use the baseline and actual water use values to
calculate the percentage reduction in potable water or other natural surface or subsurface resource use. More
detail about completing this calculation is available in the LEED Reference Guide for Green Building Operations
& Maintenance, 2009 Edition.
1 Potable water is defined as water that is suitable for drinking and is supplied from wells or municipal water systems.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
19
OR
OPTION 2
Calculate the estimated mid-summer irrigation water use by determining the landscape area for the project and
sorting this area into the major vegetation types. Determine the reference evapotranspiration rate (ET0 ) for the
region and determine the species factor (ks ), density factor (kd) and microclimate factor (kmc ) for each vegetation
type. Use this information to calculate the landscape coefficient (KL ) and irrigation water use for the design case.
Calculate the baseline case irrigation water use by setting the above factors to average values representative of
conventional equipment and design practices. Use the estimated and baseline case to determine the percentage
reduction in potable water or other natural surface or subsurface resource use. Factor values and other resources
for completing these calculations are available in the LEED Reference Guide for Green Building Operations &
Maintenance, 2009 Edition.
OR
OPTION 3
If independent irrigation performance and ranking tools are available from local, regional, state or national
sources, use such tools to demonstrate reductions in potable water or other natural surface or subsurface
resource for irrigation purposes.
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Reduce potable water (or other natural surface or subsurface water) consumption for irrigation compared with
conventional means of irrigation. If the building does not meter its irrigation systems separately, the water-use
reduction can be demonstrated through calculations. The minimum water savings percentage for each point
threshold is as follows:
Percentage Reduction Points
50% 1
62.5% 2
75% 3
87.5% 4
100% 5
For buildings without vegetation or other ecologically appropriate features (areas that require irrigation) on the
grounds, points can be earned by reducing the use of potable water for watering any roof or courtyard garden space
or outdoor planters, provided the planters or garden space covers at least 5% of the building site area (including
building footprint, hardscape area, parking footprint, etc). Projects whose planters or garden space covers less
than 5% of the building site area are ineligible.
Three options are available to demonstrate compliance with the above requirements. Project teams that do not
separately meter irrigation water use during the performance period must use Option 2.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
20
Choose 1 of the following options:
OPTION 1
Calculate the baseline by determining the water use that would result from using an irrigation system typical
for the region during the month with the highest evapotranspiration rate and compare this with the building’s
actual use of potable water (or natural surface or subsurface water) for irrigation, determined through
submetering. Use the baseline and actual water use values to calculate the percentage reduction in actual
water use for potable water or other natural surface or subsurface water. More detail about completing this
calculation is available in the LEED Reference Guide for Green Building Operations & Maintenance, 2009
Edition.
OR
OPTION 2
Calculate the estimated irrigation water use for the month with the highest evapotranspiration rate and
compare this with a baseline case. Sort the project’s landscape area into the major vegetation types. Determine
the region’s reference evapotranspiration rate (ET0 ) during the month with the highest rate and determine
the species factor (ks ), density factor (kd) and microclimate factor (kmc ) for each vegetation type. Use this
information to calculate the landscape coefficient (KL ) and irrigation water use for the design case. Calculate
the baseline use of potable water (or natural surface or subsurface water) for irrigation by setting the above
factors to average values representative of conventional equipment and design practices. Use the estimated
and baseline case to determine the percentage reduction in potable water or other natural surface or
subsurface resource use. Factor values and other information for completing these calculations are available
in the LEED Reference Guide for Green Building Operations & Maintenance, 2009 Edition.
OR
OPTION 3
Using independent irrigation performance and ranking tools from local, regional, provincial, state or national
sources, demonstrate reductions in the use of potable water (or natural surface or subsurface water) for
irrigation.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
21
WE Credits 4.1–4.2: Cooling Tower Water Management
1–2 points
Intent
To reduce potable water1 consumption for cooling tower equipment through effective water management and/or use
of nonpotable makeup water.
Requirements
WE Credit 4.1 (1 point): Chemical Management
Develop and implement a water management plan for the cooling tower that addresses chemical treatment,
bleed-off, biological control and staff training as it relates to cooling tower maintenance.
Improve water efficiency by installing and/or maintaining a conductivity meter and automatic controls to adjust
the bleed rate and maintain proper concentration at all times.
AND/OR
WE Credit 4.2 (1 point): Nonpotable Water Source Use
Use makeup water that consists of at least 50% nonpotable water, such as harvested rainwater, harvested
stormwater, air-conditioner condensate, swimming pool filter backwash water, cooling tower blowdown, pass-
through (once-through) cooling water, recycled treated wastewater from toilet and urinal flushing, foundation
drain water, municipally reclaimed water or any other appropriate on-site water source that is not naturally
occurring groundwater or surface water.
Have a measurement program in place that verifies makeup water quantities used from nonpotable sources.
Meters must be calibrated within the manufacturer’s recommended interval if the building owner, management
organization or tenant owns the meter. Meters owned by third parties (e.g., utilities or governments) are exempt.
1 Potable water is defined as water that is suitable for drinking and is supplied from wells or municipal water systems.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
22
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP
WE Credit 4.1 (1 point): Chemical Management
Develop and implement a water management plan for the cooling tower or evaporative condenser that
addresses chemical treatment, bleed-off, biological control and staff training as it relates to cooling tower
maintenance.
Improve water efficiency by installing and/or maintaining a conductivity meter and automatic controls to
adjust the bleed rate and maintain proper concentration at all times.
AND/OR
WE Credit 4.2 (1 point): Nonpotable Water Source Use
For cooling towers or evaporative condensers, use makeup water that consists of at least 50% nonpotable
water such as harvested rainwater, harvested stormwater, air-conditioner condensate, swimming pool filter
backwash water, cooling tower blowdown, pass-through (once-through) cooling water, recycled treated
wastewater from toilet and urinal flushing, foundation drain water, municipally reclaimed water or any other
appropriate on-site water source that is not naturally occurring groundwater or surface water.
Have a measurement program in place that verifies makeup water quantities used from nonpotable
sources. Meters must be calibrated within the manufacturer’s recommended interval if the building owner,
management organization or tenant owns the meter. Meters owned by third parties (e.g., utilities or
governments) are exempt.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
23
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
24
EA Prerequisite 1: Energy Efficiency Best Management Practices—Planning,
Documentation and Opportunity Assessment
Required
Intent
To promote continuity of information to ensure that energy-efficient operating strategies are maintained and
provide a foundation for training and system analysis.
Requirements
Document the current sequence of operations for the building.
Develop a building operating plan that provides details on how the building is to be operated and maintained. The
operating plan must include, at a minimum, an occupancy schedule, equipment run-time schedule, design set points
for all HVAC equipment, and design lighting levels throughout the building. Identify any changes in schedules or set
points for different seasons, days of the week and times of day. Validate that the operating plan has been met during
the performance period.
Develop a systems narrative that briefly describes the mechanical and electrical systems and equipment in the
building. The systems narrative must include all the systems used to meet the operating conditions stated in the
operating plan, including at a minimum, heating, cooling, ventilation, lighting and any building controls systems.
Create a narrative of the preventive maintenance plan for equipment described in the systems narrative and
document the preventive maintenance schedule during the performance period.
Conduct an energy audit that meets the requirements of the ASHRAE Level I walk-through assessment.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
25
EA Prerequisite 2: Minimum Energy Efficiency Performance
Required
Intent
To establish the minimum level of operating energy efficiency performance relative to typical buildings of similar
type to reduce environmental and economic impacts associated with excessive energy use.
Requirements
CASE 1. Projects Eligible for Energy Star Rating
For buildings eligible to receive an energy performance rating using the EPA’s ENERGY STAR® Portfolio Manager
tool, achieve an energy performance rating of at least 69. If the building is eligible for an energy performance
rating using Portfolio Manager, Option 1 must be used.
Have energy meters that measure all energy use throughout the performance period of all buildings to be
certified. Each building’s energy performance must be based on actual metered energy consumption for the
LEED project building(s). A full 12 months of continuous measured energy data is required.
Calibrate meters within the manufacturer’s recommended interval if the building owner, management
organization or tenant owns the meter. Meters owned by third parties (e.g., utilities or governments) are exempt.
OPTION 1
OR
OPTION 2
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
26
Use the alternative method described in the LEED Reference Guide for Green Building Operations &
Maintenance, 2009 Edition.
AND
Have energy meters that measure all energy use throughout the performance period of all buildings to be
certified. Each building’s energy performance must be based on actual metered energy consumption for
both the LEED project building(s) and all comparable buildings used for the benchmark. A full 12 months of
continuous measured energy data is required.
Calibrate meters within the manufacturer’s recommended interval if the building owner, management
organization or tenant owns the meter. Meters owned by third parties (e.g., utilities or governments)
are exempt.
Use the Portfolio Manager tool available on the ENERGY STAR website to benchmark the project even if it is
not eligible for an EPA rating: http://www.energystar.gov/benchmark
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP
OPTION 1. Benchmark Against Comparable Typical Building
CASE 1. National Energy Data Available
Demonstrate energy efficiency at least 19% better than the average for a typical comparable building by
benchmarking against national average source energy data from the national energy agency.
OR
CASE 2. National Energy Data Not Available
If national average source energy data are unavailable, benchmark against the energy data for at least three
comparable buildings, normalized for weather and building use (function and occupancy). Demonstrate
energy efficiency at least 19% better than the average source energy use of these buildings.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
27
EA Prerequisite 3: Fundamental Refrigerant Management
Required
Intent
To reduce stratospheric ozone depletion.
Requirements
Zero use of chlorofluorocarbon (CFC)-based refrigerants in heating, ventilating, air conditioning and refrigeration
(HVAC&R) base building systems unless a third-party audit (as defined in the LEED Reference Guide for
Green Building Operations & Maintenance, 2009 Edition) shows that system replacement or conversion is not
economically feasible or it is demonstrated that a phase-out plan for CFC-based refrigerants is in place.
Required economic analysis: The replacement of a chiller is considered not economically feasible if the simple
payback of the replacement is greater than 10 years. To determine the simple payback, divide the cost of
implementing the replacement by the annual cost avoidance for energy that results from the replacement and any
difference in maintenance costs. If CFC-based refrigerants are maintained in the building, reduce annual leakage to
5% or less using EPA Clean Air Act, Title VI, Rule 608 procedures governing refrigerant management and reporting,
and reduce the total leakage over the remaining life of the unit to less than 30% of its refrigerant charge.
Small HVAC&R units (defined as containing less than 0.5 pounds(228 grams) of refrigerant), standard refrigerators,
small water coolers and any other cooling equipment that contains less than 0.5 pounds (228 grams) of refrigerant
are not considered part of the base building system and are exempt.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
28
EA Credit 1: Optimize Energy Efficiency Performance
1–18 points
Intent
To achieve increasing levels of operating energy performance relative to typical buildings of similar type to reduce
environmental and economic impacts associated with excessive energy use.
Requirements
CASE 1. Projects Eligible for Energy Star Rating
Achieve energy efficiency performance better than the minimum requirements listed above; points are awarded
according to the table below.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
29
Have energy meters that measure all energy use throughout the performance period of buildings to be certified.
Each building’s energy performance must be based on actual metered energy consumption for the LEED project.
A full 12 months of continuous measured energy data is required.
Calibrate meters within the manufacturer’s recommended interval if the building owner, management
organization or tenant owns the meter. Meters owned by third parties (e.g., utilities or governments) are exempt.
OPTION 1
Demonstrate energy efficiency performance that is better than 71% of similar buildings (71st percentile or
better) by benchmarking against national source energy data provided in the Portfolio Manager tool as an
alternative to energy performance ratings. Follow the detailed instructions in the LEED Reference Guide for
Green Building Operations & Maintenance, 2009 Edition.
OR
OPTION 2
AND
Achieve energy efficiency performance better than the minimum requirements listed above; points are
awarded according to the table below.
Have energy meters that measure all energy use throughout the performance period of all buildings to be
certified. Each building’s energy performance must be based on actual metered energy consumption for
both the LEED project and all comparable buildings used for the benchmark. A full 12 months of continuous
measured energy data is required.
Calibrate meters within the manufacturer’s recommended interval if the building owner, management
organization or tenant owns the meter. Meters owned by third parties (e.g., utilities or governments)
are exempt.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
30
Use the Portfolio Manager tool available on the ENERGY STAR website to benchmark the project even if it is
not eligible for an EPA rating: http://www.energystar.gov/benchmark.
Percentile level above the national median
(for buildings not eligible for ENERGY STAR Points
energy performance rating
21 1
23 2
24 3
25 4
26 5
27 6
28 7
29 8
30 9
31 10
32 11
33 12
35 13
37 14
39 15
41 16
43 17
45 18
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
31
OR
OR
CASE 2. National Energy Data Not Available
If national average source energy data are unavailable, benchmark against the energy data for at least three
comparable buildings, normalized for weather and building use (function and occupancy). Demonstrate
energy efficiency at least 19% better than the average source energy use of these buildings.
Percentile level above three like buildings Points
21 1
25 2
29 3
33 4
37 5
41 6
45 7
49 8
54 9
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
32
Potential Technologies & Strategies
Existing building commissioning and energy audits will help identify areas of building operations that are not
efficient. Implement energy-efficient retrofits and energy-saving techniques to reduce the building’s energy use.
Energy-efficient equipment such as office equipment, maintenance equipment and appliances will aid in the
reduction of energy waste. Employ the use of meters on major mechanical systems to effectively monitor the energy
consumption of each.
In addition to efficiency improvements, consider renewable energy options as a way to minimize the building’s
environmental impact.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
33
EA Credit 2.1: Existing Building Commissioning—Investigation and Analysis
2 points
Intent
Through a systematic process, to develop an understanding of the operation of the building’s major energy-using
systems, options for optimizing energy performance and a plan to achieve energy savings.
Requirements
OPTION 1. Commissioning Process
n Develop a retrocommissioning, recommissioning or ongoing commissioning plan for the building’s major
energy-using systems.
Conduct the investigation and analysis phase.
n
List the operating problems that affect occupants’ comfort and energy use, and develop potential operational
n
OR
OPTION 2. ASHRAE Level II Energy Audit
n Conduct an energy audit that meets the requirements of American Society of Heating, Refrigerating and Air-
Perform a savings and cost analysis of all practical measures that meet the owner’s constraints and economic
n
criteria, along with a discussion of any effect on operations and maintenance procedures.
List the identified capital improvements that will provide cost-effective energy savings and document the
n
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
34
EA Credit 2.2: Existing Building Commissioning—Implementation
2 points
Intent
To implement minor improvements and identify planned capital projects to ensure that the building’s major energy-
using systems are repaired, operated and maintained effectively to optimize energy performance.
Requirements
Implement no- or low-cost operational improvements and create a capital plan for major retrofits or upgrades.
Provide training for management staff that builds awareness and skills in a broad range of sustainable building
operations topics. This could include energy efficiency and building, equipment and systems operations and
maintenance.
Demonstrate the observed and/or anticipated financial costs and benefits of measures that have been implemented.
Update the building operating plan as necessary to reflect any changes in the occupancy schedule, equipment
run-time schedule, design set points and lighting levels.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
35
EA Credit 2.3: Existing Building Commissioning—Ongoing Commissioning
2 points
Intent
To use commissioning to address changes in facility occupancy, use, maintenance and repair. Make periodic
adjustments and reviews of building operating systems and procedures essential for optimal energy efficiency and
service provision.
Requirements
Implement an ongoing commissioning program that includes elements of planning, system testing, performance
verification, corrective action response, ongoing measurement and documentation to proactively address operating
problems.
Create a written plan that summarizes the overall commissioning cycle for the building by equipment or building
system group. The ongoing commissioning cycle must not exceed 24 months. This plan must include a building
equipment list, performance measurement frequency for each equipment item and steps to respond to deviation
from expected performance parameters.
Complete at least half of the scope of work in the first commissioning cycle (as indicated by the percentage of the
plan’s total budget) prior to the date of application for LEED 2009 for Existing Buildings: Operations & Maintenance.
Only work completed within 2 years prior to application may be included to show progress in the ongoing
commissioning cycle.
Update the building operating plan and/or systems narrative as necessary to reflect any changes in the occupancy
schedule, equipment run-time schedule, design set points, lighting levels or system specifications.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
36
EA Credit 3.1: Performance Measurement—Building Automation System
1 point
Intent
To provide information to support the ongoing accountability and optimization of building energy performance and
identify opportunities for additional energy-saving investments.
Requirements
Have in place a computer-based building automation system (BAS) that monitors and controls major building
systems, including at a minimum, heating, cooling, ventilation and lighting. Have a preventive maintenance
program in place that ensures BAS components are tested and repaired or replaced according to the manufacturer’s
recommended interval. Demonstrate that the BAS is being used to inform decisions regarding changes in building
operations and energy-saving investments.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
37
EA Credit 3.2: Performance Measurement—System-Level Metering
1–2 points
Intent
To provide accurate energy-use information to support energy management and identify opportunities for
additional energy-saving improvements.
Requirements
Develop a breakdown of energy use in the building, either through EA Credits 2.1 and 2.2 or by using energy bills, spot
metering or other metering to determine the energy consumption of major mechanical systems and other end-use
applications. This analysis of major energy-use categories must have been conducted within 2 years prior to the date
of application for LEED 2009 for Existing Buildings: Operations & Maintenance certification.
Based on the energy-use breakdown, employ system-level metering covering at least 40% or 80% of the total
expected annual energy consumption of the building. Permanent metering and recording are required. All types of
submetering are permitted.
Demonstrate that system-level metering is in place covering the percentage of total expected annual energy
consumption of the building as outlined in the table below.
Demonstrate that the number of the largest energy-use categories from the breakdown report outlined in the table
are covered by at least 80% (i.e., if energy use in the 2 or 3 largest categories is each 100 Btus/year, at least 80 Btu/year
in 1 or 2 of them must be metered).
System Level Metering Requirements
Percentage of Total Annual Energy Number of Largest Energy Use Categories
Points
Consumption to be Metered to be Covered by 80% or more
40% 1 of 2 1
80% 2 of 3 2
Metering must be continuous and data logged to allow for an analysis of time trends. The project team must
compile monthly and annual summaries of results for each system covered. Meters must be calibrated within the
manufacturer’s recommended interval if the building owner, management organization or tenant owns the meter.
Meters owned by third parties (e.g., utilities or governments) are exempt.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
38
EA Credit 4: On-site and Off-site Renewable Energy
1–6 points
Intent
To encourage and recognize increasing levels of on and off-site renewable energy to reduce environmental and
economic impacts associated with fossil fuel energy use.
Requirements
During the performance period, meet some or all of the building’s total energy use with on-site or off-site renewable
energy systems. Points are earned according to the following table, which shows the percentages of building energy
use met by renewable energy during the performance period.
Off-site renewable energy sources are defined by the Center for Resource Solutions Green-e Energy program’s
products certification requirements, or the equivalent. Green power may be procured from a Green-e Energy-
certified power marketer or a Green-e Energy-accredited utility program, or through Green-e Energy-certified
tradable renewable energy certificates (RECs) or the equivalent. For on-site renewable energy that is claimed for
LEED 2009 for Existing Buildings: Operations & Maintenance credit, the associated environmental attributes must
be retained or retired and cannot be sold.
If the green power is not Green-e Energy certified, equivalence must exist for both major Green-e Energy program
criteria: 1) current green power performance standards, and 2) independent, third-party verification that those
standards are being met by the green power supplier over time.
Up to the 6-point limit, any combinations of individual actions are awarded the sum of the points allocated to
those individual actions. For example, 1 point would be awarded for implementing 3% of on-site renewable energy,
and 3 additional points would be awarded for meeting 50% of the building’s energy load with renewable power
or certificates during the performance period. Projects must submit proof of a contract to purchase RECs for a
minimum of 2 years and must also make a commitment to purchase RECs on an ongoing basis beyond that.
Off-site renewable
On-site renewable energy Points
energy certificates
3% or 25% 1
4.5% or 37.5% 2
6% or 50% 3
7.5% or 62.5% 4
9% or 75% 5
12% or 100% 6
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
39
a provider that guarantees that a portion of its delivered electric power is derived from net nonpolluting renewable
technologies. If the project is in an open-market state, investigate green power and power marketers licensed to
provide power in that state. Grid power that qualifies for this credit originates from solar, wind, geothermal, biomass
or low-impact hydro sources.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
40
EA Credit 5: Enhanced Refrigerant Management
1 point
Intent
To reduce ozone depletion and support early compliance with the Montreal Protocol while minimizing direct
contributions to global climate change.
Requirements
OPTION 1
Do not use refrigerants in base building heating, ventilating, air conditioning and refrigeration (HVAC&R)
systems.
OR
OPTION 2
Select refrigerants and heating, ventilation, air conditioning and refrigeration HVAC&R equipment that
minimize or eliminate the emission of compounds that contribute to ozone depletion and climate change. The
base building HVAC&R equipment must comply with the following formula, which sets a maximum threshold for
the combined contributions to ozone depletion and global warming potential:
LCGWP + LCODP x 10 5
≤ 100 LCGWP + LCODP x 105 ≤ 13
Calculation definitions for LCGWP + LCODP x 105 ≤ 100 Calculation definitions for LCGWP + LCODP x 105 ≤ 13
(Imperial units) (Metric units)
LCODP = [ODPr x (Lr x Life +Mr) x Rc]/Life LCODP = [ODPr x (Lr x Life +Mr) x Rc]/Life
LCGWP = [GWPr x (Lr x Life +Mr) x Rc]/Life LCGWP = [GWPr x (Lr x Life +Mr) x Rc]/Life
LCODP: Lifecycle Ozone Depletion Potential LCODP: Lifecycle Ozone Depletion Potential
(lb CFC 11/Ton-Year) (kg CFC 11/(kW/year))
LCGWP: Lifecycle Direct Global Warming Potential LCGWP: Lifecycle Direct Global Warming Potential
(lb CO2/Ton-Year) (kg CO2/(kW/year))
GWPr: Global Warming Potential of Refrigerant ODPr: Ozone Depletion Potential of Refrigerant
(0 to 12,000 lb CO2/lbr) (0 to 0.2 kg CFC 11/kg r)
ODPr: Ozone Depletion Potential of Refrigerant GWPr: Global Warming Potential of Refrigerant
(0 to 0.2 lb CFC 11/lbr) (0 to 12,000 kg CO2/kg r)
Lr: Refrigerant Leakage Rate Lr: Refrigerant Leakage Rate
(0.5% to 2.0%; default of 2% unless otherwise demonstrated) (0.5% to 2.0%; default of 2% unless otherwise demonstrated)
Mr: End-of-life Refrigerant Loss Mr: End-of-life Refrigerant Loss
(2% to 10%; default of 10% unless otherwise demonstrated) (2% to 10%; default of 10% unless otherwise demonstrated)
Rc: Refrigerant Charge
Rc: Refrigerant Charge
(0.065 to 0.65 kg of refrigerant per kW of ARI rated or Eurovent
(0.5 to 5.0 lbs of refrigerant per ton of gross ARI rated cooling capacity)
Certified cooling capacity)
Life: Equipment Life
Life: Equipment Life
(10 years; default based on equipment type, unless otherwise
(default based on equipment type, unless otherwise demonstrated)
demonstrated)
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
41
For multiple types of equipment, a weighted average of all base building HVAC&R equipment must be calculated
using the following formula:
Imperial units Metric units
Small HVAC units (defined as containing less than 0.5 pounds (228 grams) of refrigerant), and other equipment
such as standard refrigerators, small water coolers and any other cooling equipment that contains less than
0.5 pounds (228 grams) of refrigerant are not considered part of the base building system and are not subject
to the requirements of this credit.
Do not operate or install fire suppression systems that contain ozone-depleting substances — such as CFCs,
hydrochlorofluorocarbons (HCFCs) or halons.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
42
EA Credit 6: Emissions Reduction Reporting
1 point
Intent
To document the emissions reduction benefits of building efficiency measures.
Requirements
Identify building performance parameters that reduce conventional energy use and emissions, quantify those
reductions and report them to a formal tracking program:
Track and record emissions reductions delivered by energy efficiency, renewable energy and other building
emissions reduction measures, including reductions from the purchase of renewable energy credits.
Report emissions reductions using a third-party voluntary reporting or certification program (e.g., U.S.
Environmental Protection Agency (EPA) Climate Leaders, ENERGY STAR or World Resources Institute / World
Business Council for Sustainable Development (WRI/WBCSD)) protocols).
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Identify building performance parameters that reduce conventional energy use and emissions, quantify those
reductions and report them to a formal tracking program:
Track and record emissions reductions delivered by energy efficiency, renewable energy and other building
emissions reduction measures, including reductions from the purchase of renewable energy carbon offsets.
Report emissions reductions using one of the following:
n Third-party voluntary reporting methodology, such as the Carbon Disclosure Project or an equivalent
governmental greenhouse gas registry.
n Certification program protocols, such as World Resources Institute / World Business Council for
Sustainable Development (WRI/WBCSD).
n International Organization for Standards (ISO) 14064-1:2006 Greenhouse gases, Part 1, Specification,
with guidance at the organization level for quantification and reporting of greenhouse gas emissions and
removals.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
43
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
44
MR Prerequisite 1: Sustainable Purchasing Policy
Required
Intent
To reduce the environmental impacts of materials acquired for use in the operations, maintenance and upgrades of
buildings.
Requirements
Have in place an Environmentally Preferable Purchasing (EPP) policy that includes, at a minimum, product
purchasing policies for the building and site addressing the requirements of MR Credit 1: Sustainable Purchasing—
Ongoing Consumables. This policy must adhere to the LEED 2009 for Existing Buildings: Operations & Maintenance
policy model (see Introduction). At a minimum, the policy must cover those product purchases that are within the
building and site management’s control.
Additionally, extend the EPP policy to include product purchasing policies for the building and site addressing
the requirements of at least 1 of the credits listed below. This extended policy must also adhere to the LEED 2009
for Existing Buildings: Operations & Maintenance policy model and specifically address the goal, scope and
performance metric for the respective credit:
n MR Credit 2.1: Sustainable Purchasing—Electric-Powered Equipment
n MR Credit 2.2: Sustainable Purchasing—Furniture
n MR Credit 3: Sustainable Purchasing—Facility Alterations and Additions
n MR Credit 4: Sustainable Purchasing—Reduced Mercury in Lamps
This prerequisite requires only policies, not ongoing actual sustainable performance.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
45
MR Prerequisite 2: Solid Waste Management Policy
Required
Intent
To facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills or
incineration facilities.
Requirements
Have in place a solid waste management policy for the building and site addressing the requirements of the waste
management credits listed below as well as recycling of all mercury-containing lamps. This policy must adhere to the
LEED 2009 for Existing Buildings: Operations & Maintenance policy model (see Introduction). At a minimum, the
policy must cover the waste streams that are within the building and site management’s control.
MR Credit 7: Solid Waste Management—Ongoing Consumables
n
This prerequisite requires only policies, not ongoing actual sustainable performance.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
46
MR Credit 1: Sustainable Purchasing—Ongoing Consumables
1 Point
Intent
To reduce the environmental and air quality impacts of the materials acquired for use in the operations and
maintenance of buildings.
Requirements
Maintain a sustainable purchasing program covering materials with a low cost per unit that are regularly used and
replaced through the course of business. These materials include at a minimum, paper (printing or copy paper,
notebooks, notepads, envelopes), toner cartridges, binders, batteries and desk accessories. Food and beverages are
excluded from this credit but are covered under MR Credit 5: Sustainable Purchasing - Food. For materials that may
be considered either ongoing consumables or durable goods (see MR Credits 2.1 and 2.2), the project team is free
to decide which category to put them in as long as consistency is maintained with MR Credits 2.1 and 2.2, with no
contradictions, exclusions or double-counting. Consistency must also be maintained with MR Credit 7.
A template calculator for MR Credit 1 is available in LEED-Online 3 as a credit submittal. One point is awarded to
projects that achieve sustainable purchases of at least 60%, of total purchases (by cost) during the performance
period. Sustainable purchases are those that meet one or more of the following criteria:
Purchases contain at least 10% postconsumer and/or 20% postindustrial material.
n
Purchases contain at least 50% materials harvested and processed or extracted and processed within 500 miles
n
Each purchase can receive credit for each sustainable criterion met (i.e., a $100 purchase that contains both 10%
postconsumer recycled content and 50% of content harvested within 500 miles (800 kilometers) of the project
counts twice in the calculation, for a total of $200 of sustainable purchasing).
Ongoing consumables must be purchased during the performance period to earn points in this credit.
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Maintain a sustainable purchasing program covering materials with a low cost per unit that are regularly used and
replaced through the course of business. These materials include at a minimum, paper (printing or copy paper,
notebooks, notepads, envelopes), toner cartridges, binders, batteries and desk accessories. Food and beverages are
excluded from this credit but are covered under MR Credit 5. Sustainable Purchasing - Food. For materials that may
be considered either ongoing consumables or durable goods (see MR Credits 2.1 and 2.2), the project team is free
to decide which category to put them in as long as consistency is maintained with MR Credits 2.1 and 2.2, with no
contradictions, exclusions or double-counting. Consistency must also be maintained with MR Credit 7.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
47
A template calculator for MR Credit 1 is available in LEED-Online 3 as a credit submittal. One point is awarded to
projects that achieve sustainable purchases of at least 60%, of total purchases (by cost) during the performance
period.
Sustainable purchases are those that meet one or more of the following criteria:
n Purchases contain at least 10% postconsumer and/or 20% postindustrial material.
n Purchases contain at least 50% rapidly renewable materials.
n Purchases contain at least 50% materials harvested and processed or extracted and processed within a radius
of 500 miles (800 kilometers) of the project.
For building materials or products shipped in part by rail or water, the total distance to the project is
determined by weighted average, using the following formula:
(Distance by rail/3) + (Distance by inland waterways/2) + (Distance by sea/15) + (Distance by means other
than rail, inland waterways or sea) ≤ 500 miles [800 kilometers]
n Purchases consist of at least 50% Forest Stewardship Council (FSC)–certified paper products.
n Batteries are rechargeable.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
48
MR Credits 2.1–2.2: Sustainable Purchasing
1–2 Points
Intent
To reduce the environmental and air quality impacts of the materials acquired for use in the operations and
maintenance of buildings.
Requirements
Maintain a sustainable purchasing program covering items available at a higher cost per unit and durable goods that
are replaced infrequently and/or may require capital program outlays to purchase. Materials that may be considered
either ongoing consumables (see MR Credit 1: Sustainable Purchasing—Ongoing Consumables) or durable goods,
can be counted under either category provided consistency is maintained with MR Credit 1, with no contradictions,
exclusions or double-counting. Consistency must also be maintained with MR Credit 8: Solid Waste Management—
Durable Goods.
OR
1 Gas-powered equipment include at a minimum, maintenance equipment and vehicles, landscaping equipment and cleaning equipment.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
49
n Standby power;
n Gallons of water per cycle;
n Energy use per year;
n Energy efficiency ratio; and
n Testing protocols.
For other commercial equipment, the following general topics must be addressed to demonstrate
equivalency with the relevant ENERGY STAR standard:
n Idle energy rate;
n Energy efficiency rate;
n Potable water use limit;
n Cooking energy efficiency rate;
n Maximum daily energy consumption;
n Energy use limit;
n Harvest rate;
n Testing protocols.
For computers and electronics, the following general topics must be addressed to demonstrate equivalency
with the relevant ENERGY STAR standard:
n Power supply efficiency;
n Efficiency and performance;
n Total energy consumption;
n Active power;
n Idle state;
n Operational mode efficiency;
n Digital front end efficiency; and
n Testing protocols.
The following equipment is included in the scope and must be accounted for in the credit calculation:
Appliances:
n Clothes washers, commercial or other;
n Dishwashers, commercial or other;
n Freezers, commercial or other;
n Refrigerators, commercial or other; and
n Water coolers.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
50
Other Commercial Equipment:
n Vending machines; and
n Commercial food service equipment, including fryers, griddles, hot food holding cabinets, ice
machines, kitchen packages and steam cookers.
Computers and Electronics:
n Audiovisual equipment;
n Battery chargers;
n Computers;
n Displays;
n Enterprise servers;
n External power adapters;
n Imaging equipment; and
n Televisions.
AND/OR
MR Credit 2.2 (1 point): Furniture
Achieve sustainable purchases of at least 40% of total purchases of furniture (by cost) during the performance
period. Sustainable purchases are those that meet one or more of the following criteria:
n Purchases contain at least 10% postconsumer and/or 20% postindustrial material.
n Purchases contain at least 70% material salvaged from off-site or outside the organization.
n Purchases contain at least 70% material salvaged from on-site, through an internal organization materials and
equipment reuse program.
n Purchases contain at least 50% rapidly renewable material.
n Purchases contain at least 50% Forest Stewardship Council (FSC)-certified wood.
n Purchases contain at least 50% material harvested and processed or extracted and processed within 500 miles
of the project.
Each furniture purchase can receive credit for each sustainable criterion met (i.e., a $100 purchase that contains
both 10% postconsumer recycled content and 50% of content harvested within 500 miles of the project counts
twice in the calculation, for a total of $200 of sustainable purchasing).
Durable goods must be purchased during the performance period to earn points in this credit.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
51
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP MR Credit 2.2 (1 point): Furniture
Demonstrate that the furniture purchased meets 1 of the following criteria:
n Purchases contain at least 10% postconsumer and/or 20% postindustrial material.
n Purchases contain at least 70% material salvaged from off-site or outside the organization.
n Purchases contain at least 70% material salvaged from on-site, through an internal organization
materials and equipment reuse program.
n Purchases contain at least 50% rapidly renewable material.
n Purchases contain at least 50% Forest Stewardship Council (FSC)–certified wood.
n Purchases contain at least 50% material harvested and processed or extracted and processed within
regional distances of the project site. Regional distances are defined by the following options:
OPTION 1
Within a radius of 500 miles (800 kilometers) from the project site.
OR
OPTION 2
For building materials or products shipped in part by rail or water, the total distance to
the project shall be determined by weighted average, whereby the portion of the distance
transported by Rail is divided by 3, the portion of the distance transported by Inland Waterways
is divided by 2, the portion of the distance transported by Sea is divided by 15, and added to the
portion of the distance transported by any other means other than by Rail, Inland Waterways,
Sea, or Road, provided the total weighted average distance does not exceed 500 miles (800
kilometers):
(Distance by rail/3) + (Distance by inland waterways/2) + (Distance by sea/15) + (Distance by
means other than rail, inland waterways or sea) ≤ 500 miles [800 kilometers]
For example, if a product is manufactured in City X, transported by rail 200 miles (300
kilometers) to Seaport Y, shipped 2,800 miles (4,500 kilometers) to Seaport Z, and transported
by truck 220 miles (350 kilometers) to the project site, the effective distance is 480 miles (750
kilometers):
200 miles/3 [300 kilometers/3] + 2,800 miles/15 [4,500 kilometers/15] + 220 miles [350
kilometers] = 480 miles [750 kilometers]
The effective distance is less than 500 miles (800 kilometers), and the purchase counts toward
the credit.
Potential Technologies & Strategies
When purchasing materials, supplies or equipment, specify products that meet 1 or more of the criteria. This credit
is eligible for exemplary performance if the project team uses Electronic Product Environmental Assessment Tools
(EPEAT)-rated desktop computers, monitors and notebooks.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
52
MR Credit 3: Sustainable Purchasing—Facility Alterations and Additions
1 Point
Intent
To reduce the environmental and air quality impacts of the materials acquired for use in the upgrade of buildings.
Requirements
Maintain a sustainable purchasing program covering materials for facility renovations, demolitions, refits and new
construction additions. This applies only to base building elements1 permanently or semipermanently attached to
the building itself. Materials considered furniture, fixtures and equipment (FF&E) are not considered base building
elements and are excluded from this credit. Mechanical, electrical and plumbing components and specialty items
such as elevators are also excluded from this credit.
A sample calculaton for this credit is available in the LEED Reference Guide for Green Building Operations
& Maintenance, 2009 Edition. Achieve sustainable purchases of 50% of total purchases (by cost) during the
performance period. Sustainable purchases shall meet 1 or more of the following criteria:
n Purchases contain at least 10% postconsumer and/or 20% postindustrial material.
n Purchases contain at least 70% material salvaged from off-site or outside the organization.
n Purchases contain at least 70% material salvaged from on-site, through an internal organization materials and
equipment reuse program.
n Purchases contain at least 50% rapidly renewable material.
n Purchases contain at least 50% Forest Stewardship Council certified wood.
n Purchases contain at least 50% material harvested and processed or extracted and processed within 500 miles
(800 kilometers) of the project.
n Adhesives and sealants have a VOC content less than the current VOC content limits of South Coast
Air Quality Management District (SCAQMD) Rule #1168, or sealants used as fillers meet or exceed the
requirements of the Bay Area Air Quality Management District Regulation 8, Rule 51.
n Paints and coating have VOC emissions not exceeding the VOC and chemical component limits of Green Seal’s
Standard GS-11 requirements.
n Noncarpet finished flooring is FloorScore-certified and constitutes a minimum of 25% of the finished floor area.
n Carpet meets the requirements of the CRI Green Label Plus Carpet Testing Program.
n Carpet cushion meets the requirements of the CRI Green Label Testing Program.
n Composite panels and agrifiber2 products contain no added urea-formaldehyde resins.
1 Base building elements include ,at a minimum, building components and structures (wall studs, insulation, doors, windows), panels, attached
finishings (drywall, trim, ceiling panels), carpet and other flooring material, adhesives, sealants, paints and coatings.
2 Composite wood and agrifiber products are defined as particleboard, medium-density fiberboard (MDF), plywood, oriented-strand board
(OSB), wheatboard, strawboard, panel substrates and door cores.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
53
Each purchase can receive credit for each sustainable criterion met (i.e., a $100 purchase that contains both 10%
postconsumer recycled content and 50% of content harvested within 500 miles (800 kilometers) of the project
counts twice in the calculation, for a total of $200 of sustainable purchasing).
Materials for alterations or additions must be purchased during the performance period to earn points in this credit.
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Maintain a sustainable purchasing program covering materials for facility renovations, demolitions, refits and
new construction additions. This applies only to base building elements1 permanently or semi permanently
attached to the building itself. Materials considered furniture, fixtures and equipment (FF&E) are not considered
base building elements and are excluded from this credit. Mechanical, electrical and plumbing components and
specialty items such as elevators are also excluded from this credit.
Achieve sustainable purchases of 50% of total purchases (by cost) during the performance period. Sustainable
purchases must meet 1 or more of the following criteria:
n Purchases contain at least 10% postconsumer and/or 20% postindustrial material.
n Purchases contain at least 70% material salvaged from off-site or outside the organization.
n Purchases contain at least 70% material salvaged from on-site, through an internal organization materials
and equipment reuse program.
n Purchases contain at least 50% rapidly renewable material.
n Purchases contain at least 50% Forest Stewardship Council–certified wood.
n Purchases contain at least 50% material harvested and processed or extracted and processed within regional
distances of the project site. Regional distances are defined by the following options:
OPTION 1
Within a radius of 500 miles (800 kilometers) from the project site.
OR
OPTION 2
For building materials or products shipped in part by rail or water, the total distance to the project shall
be determined by weighted average, whereby the portion of the distance transported by rail is divided by
3, the portion of the distance transported by inland waterways is divided by 2, the portion of the distance
transported by sea is divided by 15, and added to the portion of the distance transported by any other means
other than by rail, inland waterways, sea, or road, provided the total weighted average distance does not
exceed 500 miles (800 kilometers):
(Distance by rail/3) + (Distance by inland waterways/2) + (Distance by sea/15) + (Distance by means other
than rail, inland waterways or sea) ≤ 500 miles [800 kilometers]
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
54
For example, if a product is manufactured in City X, transported by rail 200 miles (300 kilometers) to
Seaport Y, shipped 2,800 miles (4,500 kilometers) to Seaport Z, and transported by truck 220 miles (350
kilometers) to the project site, the effective distance is 480 miles (750 kilometers):
200 miles/3 [300 kilometers/3] + 2,800 miles/15 [4,500 kilometers/15] + 220 miles [350 kilometers] = 480
miles [750 kilometers]
The effective distance is less than 500 miles (800 kilometers), and the purchase counts toward the credit.
Adhesives and sealants have a VOC content less than the limits listed in Table 1.
n
Paints and coatings have a VOC content less than the limits listed in Table 2.
n
Interior coatings VOC (g/l) Anticorrosive and antirust paints VOC Limit (g/l)
Nonflat 150 Gloss 250
Flat 50 Semigloss 250
Flat 250
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
55
n Noncarpet finished flooring constitutes at least 25% of the finished floor area and has maximum emissions
factors no greater than the following:
1. Formaldehyde, 1.65µg/m3 per hour
2. Acetaldehyde, 9 µg/m3 per hour
3. All other organic chemicals with established Chronic Reference Exposure Levels (CRELs) less than
or equal to 1/2 CREL as listed in the latest edition of the Cal/EPA OEHHA list of chemicals with
noncancer CRELs, available at http://www.oehha.ca.gov/air/chronic_rels/AllChrels.html.
The testing protocol must follow the ICC Evaluation Service (ICC-ES) Evaluation Guideline for
Determination of Volatile Organic Compound (VOC) Content and Emissions of Floor Covering Products –
EG107 (http://www.saveprogram.icc-es.org/guidelines/pdf/EG107.pdf).
n Carpet products meet the emissions test criteria of the CRI Green Label Plus Carpet Program (http://www.
carpet-rug.org/pdf_word_docs/071028_Carpet_GLP_Criteria.pdf). The testing protocol must follow the
ICC Evaluation Service (ICC-ES) Evaluation Guideline for Determination of Volatile Organic Compound
(VOC) Content and Emissions of Floor Covering Products – EG107 (http://www.saveprogram.icc-es.org/
guidelines/pdf/EG107.pdf).
n Carpet cushion products have maximum emissions factors no greater than those listed in Table 3.
Table 3. Maximum emissions factors for carpet cushion
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
56
MR Credit 4: Sustainable Purchasing—Reduced Mercury in Lamps
1 Point
Intent
To establish and maintain a toxic material source reduction program to reduce the amount of mercury brought onto
the building site through purchases of lamps.
Requirements
Develop a lighting purchasing plan that specifies maximum levels of mercury permitted in mercury-containing lamps
purchased for the building and associated grounds, including lamps for both indoor and outdoor fixtures, as well as
both hard-wired and portable fixtures. The purchasing plan must specify a target for the overall average of mercury
content in lamps of 90 picograms per lumen-hour or less. The plan must include lamps for both indoor and outdoor
fixtures, as well as both hard-wired and portable fixtures. The plan must require that at least 90% of purchased lamps
comply with the target (as measured by the number of lamps). Lamps containing no mercury may be counted toward
plan compliance only if they have energy efficiency at least as good as their mercury-containing counterparts.
Implement the lighting purchasing plan during the performance period such that all purchased mercury-containing
lamps comply with the plan. One point is awarded to projects for which at least 90% of all mercury-containing lamps
purchased during the performance period (as measured by the number of lamps) comply with the purchasing plan
and meet the following overall target for mercury content of 90 picograms per lumen-hour.
Exception: Screw-based, integral compact fluorescent lamps (CFLs) may be excluded from both the plan and the
performance calculation if they comply with the voluntary industry guidelines for maximum mercury content
published by the National Electrical Manufacturers Association (NEMA), as described in the LEED Reference Guide
for Green Building Operations & Maintenance, 2009 Edition. Screw-based, integral CFLs that do not comply with
the NEMA guidelines must be included in the purchasing plan and the performance calculation.
Performance metrics for lamps — including mercury content (mg/lamp), mean light output (lumens) and rated life
(hours) — must be derived according to industry standards, as described in the LEED Reference Guide for Green
Building Operations & Maintenance, 2009 Edition. Mercury values generated by toxicity characteristic leaching
procedure (TCLP) tests do not provide the required mercury information for LEED 2009 for Existing Buildings:
Operations & Maintenance and cannot be used in the calculation.
LEED 2009 for Existing Buildings: Operations & Maintenance addresses only the lamps purchased during the
performance period, not the lamps installed in the building. Similarly, LEED 2009 for Existing Buildings: Operations
& Maintenance does not require that each purchased lamp comply with the specified mercury limit; only the overall
average of purchased lamps must comply.
Mercury-containing lamps (or their high-efficiency counterparts) must be purchased during the performance period
to earn points in this credit.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
57
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Develop a lighting purchasing plan that specifies maximum levels of mercury permitted in mercury-containing
lamps purchased for the building and associated grounds, including lamps for both indoor and outdoor fixtures,
as well as both hard-wired and portable fixtures. The purchasing plan must specify a target for the overall average
of mercury content in lamps of 90 picograms per lumen-hour or less. The plan must include lamps for both indoor
and outdoor fixtures, as well as both hard-wired and portable fixtures. The plan must require that at least 90% of
purchased lamps comply with the target (as measured by the number of lamps). Lamps containing no mercury may
be counted toward plan compliance only if they have energy efficiency at least as good as their mercury-containing
counterparts.
Implement the lighting purchasing plan during the performance period such that all purchased mercury-
containing lamps comply with the plan. One point is awarded to projects for which at least 90% of all mercury-
containing lamps purchased during the performance period (as measured by the number of lamps) comply with
the purchasing plan and meet the following overall target for mercury content of 90 picograms per lumen-hour.
A sample calculation for this credit is available in the LEED Reference Guide for Green Building Operations &
Maintenance, 2009 Edition.
Exception: Screw-based, integral compact fluorescent lamps (CFLs) may be excluded from both the plan and the
performance calculation if they comply with the following specifications:
n CFLs that use less than 25 watts of electricity have a total mercury content less than or equal to 5 milligrams
(mg) per unit.
n CFLs that use 25 to 40 watts of electricity have a total mercury content less than or equal to 6 milligrams
(mg) per unit.
Screw-based, integral CFLs that do not comply with those specifications must be included in the purchasing plan
and the performance calculation.
Performance metrics for lamps—including mercury content (mg/lamp), mean light output (lumens) and rated life
(hours)—must be derived according to industry standards, as described in the LEED Reference Guide for Green
Building Operations & Maintenance, 2009 Edition. Mercury values generated by toxicity characteristic leaching
procedure (TCLP) tests do not provide the required mercury information for LEED 2009 for Existing Buildings:
Operations & Maintenance and cannot be used in the calculation.
LEED 2009 for Existing Buildings: Operations & Maintenance addresses only the lamps purchased during
the performance period, not the lamps installed in the building. Similarly, LEED 2009 for Existing Buildings:
Operations & Maintenance does not require that each purchased lamp comply with the specified mercury limit;
only the overall average of purchased lamps must comply.
Mercury-containing lamps (or their high-efficiency counterparts) must be purchased during the performance
period to earn points in this credit.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
58
MR Credit 5: Sustainable Purchasing—Food
1 Point
Intent
To reduce the environmental and transportation impacts associated with food production and distribution.
Requirements
Achieve sustainable purchases of at least 25% of total combined food and beverage purchases (by cost) during the
performance period. Sustainable purchases are those that meet 1 or both of the following criteria:
Purchases are labeled USDA Organic, Food Alliance Certified, Rainforest Alliance Certified, Protected Harvest
n
Each purchase can receive credit for each sustainable criterion met (i.e., a $100 purchase that is both USDA Organic
and is produced on a farm within 100 miles (160-kilometers) of the project counts twice in the calculation, for a total
of $200 of sustainable purchasing).
Food or beverages must be purchased during the performance period to earn points in this credit.
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Achieve sustainable purchases of at least 25% of total combined food and beverage purchases (by cost) during the
performance period. Sustainable purchases are those that meet 1 or both of the following criteria:
n Purchases are labeled USDA Organic, Food Alliance Certified, Rainforest Alliance Certified, Protected
Harvest Certified, Fair Trade or Marine Stewardship Council’s Blue Eco-Label, or are labeled organic by
any of the USDA Accredited Certifying Agents (ACAs) worldwide. ACAs are listed on the USDA National
Organic Program website, http://www.ams.usda.gov/AMSv1.0/ams.fetchTemplateData.do?template=Templ
ateJ&page=NOPACAs.
n Purchases are produced within a 100-mile (160-kilometer) radius of the site.
Each purchase can receive credit for each sustainable criterion met (i.e., a $100 purchase that is both USDA
Organic and is produced on a farm within 100 miles (160 kilometers) of the project counts twice in the calculation,
for a total of $200 of sustainable purchasing).
Food or beverages must be purchased during the performance period to earn points in this credit.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
59
MR Credit 6: Solid Waste Management—Waste Stream Audit
1 Point
Intent
To facilitate the reduction of ongoing waste and toxins generated by building occupants and building operations that
are hauled to and disposed of in landfills or incineration facilities.
Requirements
Conduct a waste stream audit of the building’s entire ongoing consumables waste stream (not durable goods or
construction waste for facility alterations and additions). Use the audit’s results to establish a baseline that
identifies the types of waste making up the waste stream and the amounts of each type by weight or volume.
Identify opportunities for increased recycling and waste diversion. The audit must be conducted during the
performance period.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
60
MR Credit 7: Solid Waste Management—Ongoing Consumables
1 Point
Intent
To facilitate the reduction of waste and toxins generated from the use of ongoing consumable products by building
occupants and building operations that are hauled to and disposed of in landfills or incineration facilities.
Requirements
Maintain a waste reduction and recycling program that addresses materials with a low cost per unit that are regularly
used and replaced through the course of business. These materials include at a minimum, paper, toner cartridges,
glass, plastics, cardboard and old corrugated cardboard, food waste, and metals. Materials that may be considered
either ongoing consumables or durable goods (see MR Credit 8: Solid Waste Management—Durable Goods) can
be counted under either category provided consistency is maintained with MR Credit 8, with no contradictions,
exclusions or double-counting. Consistency must also be maintained with MR Credits 1: Sustainable Purchasing—
Ongoing Consumables and 5: Sustainable Purchasing—Food.
Reuse, recycle or compost 50% of the ongoing consumables waste stream (by weight or volume).
Have a battery recycling program in place that implements the battery recycling policy adopted in MR Prerequisite 2:
Solid Waste Management Policy. The program must have a target of diverting at least 80% of discarded batteries from
the trash, and actual diversion performance must be verified at least annually. The program must cover all portable
dry-cell types of batteries, including single-use and/or rechargeables used in radios, phones, cameras, computers and
other devices or equipment.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
61
MR Credit 8: Solid Waste Management—Durable Goods
1 Point
Intent
To facilitate the reduction of waste and toxins generated from the use of durable goods by building occupants and
building operations that are hauled to and disposed of in landfills or incineration facilities.
Requirements
Maintain a waste reduction, reuse and recycling program that addresses durable goods (those that are replaced
infrequently and/or may require capital program outlays to purchase). Durable goods include at a minimum, office
equipment (computers, monitors, copiers, printers, scanners, fax machines), appliances (refrigerators, dishwashers,
water coolers), external power adapters, televisions and other audiovisual equipment. Materials that may be
considered either ongoing consumables (see MR Credit 7: Solid Waste Management—Ongoing Consumables) or
durable goods can be counted under either category provided consistency is maintained with MR Credit 7, with no
contradictions, exclusions or double-counting. Consistency must also be maintained with MR Credit 2.1: Sustainable
Purchasing—Electric-Powered Equipment and MR Credit 2.2: Sustainable Purchasing—Furniture.
Reuse or recycle 75% of the durable goods waste stream1 (by weight, volume or replacement value) during the
performance period.
1 Durable goods waste stream is defined as durable goods leaving the project building, site and organization that have fully depreciated and
reached the end of their useful lives for normal business operations. Durable goods that remain useful and functional and are moved to another
floor or building, etc. do not qualify. Leased durable goods returned to their owner at the end of their useful lives for normal business operations
do qualify.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
62
MR Credit 9: Solid Waste Management—Facility Alterations and Additions
1 Point
Intent
To divert construction and demolition debris from disposal to landfills and incineration facilities. Redirect recyclable
recovered resources back to the manufacturing process and reusable materials to appropriate sites.
Requirements
Divert at least 70% of waste (by volume) generated by facility alterations and additions from disposal to landfills
and incineration facilities. This applies only to base building elements permanently or semipermanently attached to
the building itself that enter the waste stream during facility renovations, demolitions, refits and new construction
additions. Base building elements include at a minimum, building components and structures (wall studs, insulation,
doors, windows), panels, attached finishings (drywall, trim, ceiling panels), carpet and other flooring material,
adhesives, sealants, paints and coatings. Furniture, fixtures and equipment (FF&E) are not considered base building
elements and are excluded from this credit. Mechanical, electrical and plumbing components and specialty items
such as elevators are also excluded.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
63
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
64
IEQ Prerequisite 1: Minimum Indoor Air Quality Performance
Required
Intent
To establish minimum indoor air quality (IAQ) performance to enhance indoor air quality in buildings, thus
contributing to the health and well-being of the occupants.
Requirements
CASE 1. Projects Able to Meet ASHRAE Standard 62.1–2007
Modify or maintain each outside air intake, supply air fan and/or ventilation distribution system to supply at least
the outdoor air ventilation rate required by ASHRAE Standard 62.1–2007 Ventilation Rate Procedure (with errata
but without addenda1) under all normal operating conditions.
AND
n Show compliance with the applicable requirement above (Case 1 or Case 2) through measurements taken at
the system level (i.e., the air-handling unit). For variable air volume systems, the dampers, fan speeds, etc.
must be set during the test to the worst-case system conditions (minimum outside air flow) expected during
normal ventilation operations. Each air-handler must be measured; sampling or grouping of air-handlers is
prohibited.
n Implement and maintain an HVAC system maintenance program to ensure the proper operations and
maintenance of HVAC components as they relate to outdoor air introduction and exhaust.
n Test and maintain the operation of all building exhaust systems, including bathroom, shower, kitchen and
parking exhaust systems.
Naturally ventilated buildings must comply with ASHRAE Standard 62.1-2007, paragraph 5.1(with errata but
without addenda1).
1 Project teams wishing to use ASHRAE approved addenda for the purposes of this prerequisite may do so at their discretion. Addenda must be
applied consistently across all LEED credits.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
65
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Modify or maintain each outside air intake, supply air fan and/or ventilation distribution system for mechanical
and natural ventilation. Each Air handling unit must comply with an acceptable requirement or standard under all
normal operating conditions.
or otherwise partially obstructed, calculate the openable area based on the free, unobstructed area.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
66
n If an interior space without direct openings to the outdoors is ventilated through an adjoining room,
the opening between the rooms must be permanently unobstructed and be at least 8% of the area of the
interior room or 25 square feet (2 square meters).
n Whenever the space is occupied, building occupants must have a readily accessible way to control the
opening.
If approved by the local authority, an engineered natural ventilation system need not meet the above
requirements for location and size of openings and accessible controls.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
67
IEQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control
Required
Intent
To prevent or minimize exposure of building occupants, indoor surfaces and systems to environmental tobacco
smoke (ETS).
Requirements
OPTION 1
n Prohibit smoking in the building.
n Prohibit on-property smoking within 25 feet (8 meters) of entries, outdoor air intakes and operable windows.
OR
OPTION 2
CASE 1. Non-Residential Projects
n Prohibit smoking in the building except in designated smoking rooms and establish negative pressure in the
operable windows.
Locate designated smoking room(s) to effectively contain, capture and remove ETS from the building.
n
At a minimum, the smoking room must be directly exhausted to the outdoors, away from air intakes
and building entry paths, away from air intakes and building entry paths, with no recirculation of ETS-
containing air to the nonsmoking area of the building; enclosed with impermeable deck-to-deck partitions.
The smoking room must be operated at a negative pressure (compared with the surrounding spaces) of at
least an average of 5 Pascals (Pa) (0.02 inch water gauge) and a minimum of 1 Pa (0.004 inch water gauge)
when the doors to the rooms are closed.
Verify performance of the smoking room differential air pressures by conducting 15 minutes of
n
measurement, with a minimum of 1 measurement every 10 seconds, of the differential pressure in the
smoking room with respect to each adjacent area and in each adjacent vertical chase with the doors to
the smoking room closed. Conduct the testing with each space configured for worst-case conditions for
transport of air from the smoking room (with closed doors) to adjacent spaces.
Prohibit on-property smoking within 25 feet (8 meters) of building entries, outdoor air intakes and
n
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
68
n Minimize uncontrolled pathways for ETS transfer between individual residential units by sealing
penetrations in walls, ceilings and floors in the residential units and by sealing adjacent vertical chases
adjacent to the units.
n Weather-strip all doors in the residential units leading to common hallways to minimize air leakage into the
hallway.1
Demonstrate acceptable sealing of residential units by a blower door test conducted in accordance with
ASTM-779-03, Standard Test Method for Determining Air Leakage Rate by Fan Pressurization, AND use the
progressive sampling methodology defined in Chapter 7 (Home Energy Rating Systems, HERS Required
Verification and Diagnostic Testing) of the California Residential Alternative Calculation Method Approval
Manual. Residential units must demonstrate less than 1.25 square inches of leakage area per 100 square feet
(8 square centimeters of leakage area per 10 square meters) of enclosure area (i.e., the sum of all wall, ceiling
and floor areas).
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP
CASE 2. Residential and Hospitality Projects
n Reduce air leakage between smoking and nonsmoking areas.
1 If the common hallways are pressurized with respect to the residential units then doors in the residential units leading to the common hallways
need not be weatherstripped provided that the positive differential pressure is demonstrated as in Option 2, Case 1 above, considering the
residential unit as the smoking room.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
69
IEQ Prerequisite 3: Green Cleaning Policy
Required
Intent
To reduce the exposure of building occupants and maintenance personnel to potentially hazardous chemical,
biological and particulate contaminants, which adversely affect air quality, human health, building finishes, building
systems and the environment.
Requirements
Have in place a green cleaning policy for the building and site addressing the following green cleaning credits and
other requirements:
Purchase sustainable cleaning and hard floor and carpet care products meeting the sustainability criteria
n
outlined in IEQ Credit 3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials.
Purchase cleaning equipment meeting the sustainability criteria outlined in IEQ Credit 3.4: Green Cleaning—
n
maintenance system will be consistently utilized, managed and audited. Specifically address cleaning to
protect vulnerable building occupants.
Develop strategies for promoting and improving hand hygiene, including both hand washing and the use of
n
building. Specifically address the training of maintenance personnel in the hazards of use, disposal and
recycling of cleaning chemicals, dispensing equipment and packaging.
Provide for collecting occupant feedback and continuous improvement to evaluate new technologies,
n
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
70
IEQ Credit 1.1: Indoor Air Quality Best Management Practices—Indoor Air Quality
Management Program
1 point
Intent
To enhance indoor air quality (IAQ) by optimizing practices to prevent the development of indoor air quality
problems in buildings, correcting indoor air quality problems when they occur and maintaining the well-being of the
occupants.
Requirements
Develop and implement on an ongoing basis an IAQ management program based on the EPA Indoor Air Quality
Building Education and Assessment Model (I-BEAM), EPA Reference Number 402-C-01-001, December 2002,
available at http://www.epa.gov/iaq/largebldgs/i-beam/index.html.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
71
IEQ Credit 1.2: Indoor Air Quality Best Management Practices—Outdoor Air
Delivery Monitoring
1 point
Intent
To provide capacity for ventilation system monitoring to help sustain occupant comfort and well-being.
Requirements
Install permanent, continuous monitoring systems that provide feedback on ventilation system performance to
ensure that ventilation systems maintain minimum outdoor airflow rates under all operating conditions
AND
CASE 1. Mechanical Ventilation Systems
Provide an outdoor airflow measurement device capable of measuring (and, if necessary, controlling) the
minimum outdoor airflow rate at all expected system operating conditions within 15% of the design minimum
outdoor air rate. Monitoring must be performed for at least 80% of the building’s total outdoor air intake flow
serving occupied spaces.
The outdoor airflow measurement device(s) must take measurements at the system level (i.e., the air-handling
unit). The device must be monitored by a control system that is configured to trend outdoor airflow in intervals
no longer than 15 minutes for a period of no less than 6 months. The control system must be configured to
generate an alarm visible to the system operator if the minimum outdoor air rate falls more than 15% below the
design minimum rate.
All measurement devices must be calibrated within the manufacturer’s recommended interval.
CASE 2. Mechanical Ventilation Systems that Predominantly Serve Densely Occupied Spaces1
Have a CO2 sensor or sampling location for each densely occupied space and compare it with outdoor ambient
CO2 concentrations. Each sampling location must be between 3 and 6 feet (between 1 and 2 meters) above the
floor.
Test and calibrate CO2 sensors to have an accuracy of no less than 75 parts per million (ppm) or 5% of the reading,
whichever is greater. Sensors must be tested and calibrated at least once every 5 years or per the manufacturer’s
recommendation, whichever is shorter.
Monitor CO2 sensors with a system configured to trend CO2 concentrations in intervals no longer than 30
minutes. The system must generate an alarm visible to the system operator and, if desired, to building occupants
if the CO2 concentration in any zone rises more than 15% above that corresponding to the minimum outdoor air
rate required by ASHRAE Standard 62.1-2007 (with errata but without addenda2) (see IEQ Prerequisite 1: Energy
Efficiency Best Management Practices).
1 Densely occupied space is defined as an area with a design occupant density of 25 people or more per 1,000 square feet (40 square feet or
less per person). If the total square footage of all dense space is less than 5% of total occupied square footage, the project is exempt from the
requirements of this section. Rooms smaller than 150 square feet are also exempt.
2 Project teams wishing to use ASHRAE approved addenda for the purposes of this prerequisite may do so at their discretion. Addenda must be
applied consistently across all LEED credits.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
72
CO2 sensors may be used for demand-controlled ventilation provided the control strategy complies with
ASHRAE Standard 62.1-2007 (see IEQ Prerequisite 1: Energy Efficiency Best Management Practices, including
maintaining the area-based component of the design ventilation rate.
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Install permanent, continuous monitoring systems that provide feedback on ventilation system performance
to ensure that ventilation systems maintain minimum outdoor airflow rates under all operating conditions. The
outdoor airflow measurement device(s) must take measurements at the system level (i.e., the airhandling unit).
The device must be monitored by a control system that is configured to trend outdoor airflow intervals no longer
than 15 minutes for a period of no less than 6 months. The control system must be configured to generate an alarm
visible to the system operator if the minimum outdoor air rate falls more than15% below the design minimum rate.
All measurement devices must be calibrated within the manufacturer’s recommended interval.
AND
CASE 1. Mechanical Ventilation Systems
OPTION 1.
Provide an outdoor airflow measurement device capable of measuring (and if necessary, controlling)
the minimum outdoor airflow rate at all expected system operating conditions within 15% of the design
minimum outdoor air rate, as defined by Comité Européen de Normalisation (CEN) Standard EN 15251,
Indoor environmental input parameters for design and assessment of energy performance of buildings
addressing indoor air quality, thermal environment, lighting and acoustics, and CEN Standard EN 13779,
Ventilation for non residential buildings, Performance requirements for ventilation and room conditioning
systems. Monitoring must be performed for at least 80% of the building’s total outdoor air intake flow
serving occupied spaces.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
73
OR
OPTION 2.
Provide an outdoor airflow measurement device capable of measuring (and if necessary, controlling)
the minimum outdoor airflow rate at all expected system operating conditions within 15% of the design
minimum outdoor air rate, as defined by a local standard equivalent to ASHRAE Standard 62.1–2007
(with errata but without addenda1), by substituting appropriate benchmarks and metrics. The following
guidelines outline the methodology for establishing acceptable benchmarks and metrics pertaining to this
credit’s requirements. For more information, see the Reference Guide.
The following general topics must be addressed to demonstrate equivalency with the design minimum
outdoor air rate requirements of ASHRAE 62.1–2007 (with errata but without addenda1):
• Ventilation rate procedure
• Indoor air quality (IAQ) procedure
• Design documentation procedures
CASE 2. Mechanical Ventilation Systems that Predominantly Serve Densely Occupied Spaces1
Have a CO2 sensor or sampling location for each densely occupied space and compare it with outdoor
ambient CO2 concentrations. Each sampling location must be between 3 and 6 feet (between 1 and 2 meters)
above the floor.
Test and calibrate CO2 sensors to have an accuracy of no less than 75 parts per million (ppm) or 5% of the
reading, whichever is greater. Sensors must be tested and calibrated at least once every 5 years or per the
manufacturer’s recommendation, whichever is shorter.
Monitor CO2 sensors with a system configured to trend CO2 concentrations in intervals no longer than
30 minutes. The system must generate an alarm visible to the system operator and, if desired, to building
occupants if the CO2 concentration in any zone rises more than 15% above that corresponding to the minimum
outdoor air rate, as defined by Comité Européen de Normalisation (CEN) Standard EN 15251, Indoor
environmental input parameters for design and assessment of energy performance of buildings addressing
indoor air quality, thermal environment, lighting and acoustics, and CEN Standard EN 13779, Ventilation for
non residential buildings, Performance requirements for ventilation and room conditioning systems.
OR
Have a CO2 sensor or sampling location for each densely occupied space and compare it with outdoor
ambient CO2 concentrations. Each sampling location must be between 3 and 6 feet (between 1 and 2 meters)
above the floor.
Test and calibrate CO2 sensors to have an accuracy of no less than 75 parts per million (ppm) or 5% of the
reading, whichever is greater. Sensors must be tested and calibrated at least once every 5 years or per the
manufacturer’s recommendation, whichever is shorter.
Monitor CO2 sensors with a system configured to trend CO2 concentrations in intervals no longer than
30 minutes. The system must generate an alarm visible to the system operator and, if desired, to building
occupants if the CO2 concentration in any zone rises more than 15% above that corresponding to the
minimum outdoor air rate, as defined by a local standard equivalent to ASHRAE Standard 62.1–2007 (with
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
74
errata but without addenda1), by substituting appropriate benchmarks and metrics. The following guidelines
outline the methodology for establishing acceptable benchmarks and metrics pertaining to this credit’s
requirements.
The following general topics must be addressed to demonstrate equivalency with the design minimum
outdoor air rate requirements of ASHRAE 62.1–2007 (with errata but without addenda1):
n Ventilation rate procedure
n Indoor air quality (IAQ) procedure
n Design documentation procedures
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
75
IEQ Credit 1.3: Indoor Air Quality Best Management Practices—Increased
Ventilation
1 point
Intent
To provide additional outdoor air ventilation to improve indoor air quality (IAQ) for improved occupant comfort,
well-being and productivity.
Requirements
CASE 1. Mechanically Ventilated Spaces
Increase outdoor air ventilation rates for all air-handling units serving occupied spaces by at least 30% above the
minimum required by ASHRAE Standard 62.1-2007 (with errata but without addenda1).
OR
AND
OPTION 1
Show that the natural ventilation systems design meets the recommendations set forth in the CIBSE manuals
appropriate to the project space.
PATH 1. CIBSE Applications Manual 10: 2005, Natural Ventilation in Non-domestic Buildings
PATH 2. CIBSE AM 13:2000, Mixed Mode Ventilation
1 Project teams wishing to use ASHRAE approved addenda for the purposes of this prerequisite may do so at their discretion. Addenda must be
applied consistently across all LEED credits.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
76
OR
OPTION 2
Use a macroscopic, multizone, analytic model to predict that room-by-room airflows will effectively naturally
ventilate, defined as providing the minimum ventilation rates required by ASHRAE Standard 62.1-2007
Chapter 6 (with errata but without addenda), at least 90% of occupied spaces.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
77
IEQ Credit 1.4: Indoor Air Quality Best Management Practices—Reduce
Particulates in Air Distribution
1 point
Intent
To reduce exposure of building occupants and maintenance personnel to potentially hazardous particulate
contaminants, which adversely affect air quality, human health, building systems and the environment.
Requirements
In mechanically ventilated buildings, each ventilation system that supplies outdoor air shall comply with the
following during the performance period:
Particle filters or air cleaning devices shall clean the outdoor air at any location prior to its introduction to
n
occupied spaces.
These filters or devices shall be rated a minimum efficiency reporting value (MERV) of 13 in accordance with
n
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Have in place one of the following filtration media for all outside air intakes and inside air recirculation returns
during the performance period. Establish and follow a regular schedule for maintenance and replacement of these
filtration media according to the manufacturer’s recommended interval.
n Filtration media with a minimum efficiency reporting value (MERV) of 13 or higher, as determined by
ASHRAE Standard 52.2–1999 (with errata but without addenda).
n Equivalent filtration media Class F7 or higher, as defined by CEN Standard EN 779–2002, Particulate air
filters for general ventilation, Determination of the filtration performance.
n Equivalent filtration media with a minimum duct spot efficiency of 80% and greater than 98% arrestance on
a particle size of 3–10 µg.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
78
IEQ Credit 1.5: Indoor Air Quality Best Management Practices—Indoor Air
Quality Management for Facility Alterations and Additions
1 point
Intent
To prevent indoor air quality (IAQ) problems resulting from any construction or renovation projects to help sustain
the comfort and well-being of construction workers and building occupants.
Requirements
Develop and implement an IAQ management plan for the construction and occupancy phases:
n During construction, meet or exceed the recommended control measures of the Sheet Metal and Air
Conditioning National Contractors Association (SMACNA) IAQ Guidelines for Occupied Buildings Under
Construction, 2nd Edition 2007, ANSI/SMACNA 008-2008 (Chapter 3).
n If the building undergoes a tenant improvement, develop and implement an IAQ management plan for the
preoccupancy phases. Perform a flush-out procedure as follows: After construction ends and all interior
finishes have been installed, install new filtration media and flush out the affected space. The flush out must
be done by supplying a total outdoor air volume of 14,000 cubic feet per square foot (4,500 cubic meters per
square meter) of floor area while maintaining an internal temperature of at least 60°F (15°C) and maintaining
a relative humidity no higher than 60% where cooling mechanisms are operated. The affected space may be
occupied only after the delivery of at least 3,500 cubic feet of outdoor air per square foot (1,000 cubic meters
of outdoor air per square meter) of floor area and the space has been ventilated at a minimum rate of 0.3 cubic
foot of outdoor air per minute per square foot (0.1 cubic meter of outdoor air per minute per square meter)
or the design minimum outside air rate (whichever is greater) for at least 3 hours prior to occupancy until the
total of 14,000 cubic feet of outdoor air per square foot (4,500 cubic meters of outdoor air per square meter)
has been delivered to the space. The flush-out may continue during occupancy.
n Protect stored on-site or installed absorptive materials from moisture damage.
n If permanently installed air-handlers must be used during construction, filtration media with a minimum
efficiency reporting value (MERV) of 8 must be used at each return air grille, as determined by ASHRAE
Standard 52.2-1999 (with errata but without addenda1). Replace all filtration media immediately prior to
occupancy.
n Upon the completion of construction, HVAC and lighting systems must be returned to the designed or
modified sequence of operations.
1 Project teams wishing to use ASHRAE approved addenda for the purposes of this prerequisite may do so at their discretion. Addenda must be
applied consistently across all LEED credits.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
79
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Develop and implement an IAQ management plan for the construction and occupancy phases as follows:
n During construction or Tenant Improvements, address the following project-specific issues:
HVAC Protection
a. Avoid using permanently installed HVAC systems if possible. Use temporary systems where possible.
b. Store equipment in a clean, dry location. Protect ducts and equipment by sealing openings with plastic.
c. Clean air plenums before use.
Source Control
a. Avoid finish materials with high VOC and formaldehyde levels.
b. Recover, isolate and ventilate as appropriate when using any toxic materials or creating exhaust fumes.
c. Protect stored on-site and installed absorptive materials from moisture damage. Do not install
moisture-damaged materials unless they have been properly dried.
d. Implement measures to avoid the tracking of pollutants into work area and occupied portions of the
building.
Pathway Interruption
a. Isolate areas to prevent contamination of clean or occupied spaces using physical separatation and
depressurization.
Housekeeping
a. Implement practices to ensure a clean job site to control potential contaminants such as dirt, dust
and debris.
b. Clean up spills, and keep work areas dry.
Scheduling
a. Coordinate construction activities to minimize disruption of occupied spaces.
b. Carefully sequence construction activities to minimize IAQ issues.
Protect stored on-site or installed absorptive materials from moisture damage.
n
If permanently installed air-handlers must be used during construction, one of the following filtration media
n
must be used at each return air grille. Replace all filtration media immediately prior to occupancy.
a. Filtration media with a minimum efficiency reporting value (MERV) of 8 or higher, as determined by
ASHRAE Standard 52.2–1999 (with errata but without addenda).
b. Equivalent filtration media Class F5 or higher, as defined by CEN Standard EN 779–2002, Particulate air
filters for general ventilation, Determination of the filtration performance.
c. Equivalent filtration media with a minimum duct spot efficiency of 30% and greater than 90% arrestance
on a particle size of 3–10 µg.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
80
n Upon the completion of construction, HVAC and lighting systems must be returned to the designed or
modified sequence of operations.
n Perform a flush-out procedure as follows: After construction ends and all interior finishes have been
installed, install new filtration media and flush out the affected space. The flush out must be done by
supplying a total outdoor air volume of 14,000 cubic feet per square foot (4,500 cubic meters per square
meter) of floor area while maintaining an internal temperature of at least 60°F (15°C) and maintaining a
relative humidity no higher than 60% where cooling mechanisms are operated. The affected space may be
occupied only after the delivery of at least 3,500 cubic feet of outdoor air per square foot (1,000 cubic meters
of outdoor air per square meter) of floor area and the space has been ventilated at a minimum rate of 0.3
cubic foot of outdoor air per minute per square foot (0.1 cubic meter of outdoor air per minute per square
meter) or the design minimum outside air rate (whichever is greater) for at least 3 hours prior to occupancy
until the total of 14,000 cubic feet of outdoor air per square foot (4,500 cubic meters of outdoor air per
square meter) has been delivered to the space. The flush-out may continue during occupancy.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
81
IEQ Credit 2.1: Occupant Comfort—Occupant Survey
1 point
Intent
To provide for the assessment of building occupants’ comfort as it relates to thermal comfort, acoustics, indoor air
quality (IAQ), lighting levels, building cleanliness and any other comfort issues.
Requirements
Implement an occupant comfort survey and complaint response system to collect anonymous responses
n
about thermal comfort, acoustics, IAQ, lighting levels, building cleanliness and other occupant comfort issues.
The survey must be collected from a representative sample of building occupants making up at least 30% of
the total occupants, and it must include an assessment of overall satisfaction with building performance and
identification of any comfort-related problems.
Document survey results and corrective actions to address comfort issues identified through the surveys.
n
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
82
IEQ Credit 2.2: Controllability of Systems—Lighting
1 point
Intent
To provide a high level of lighting system control by individual occupants or groups in multi-occupant spaces (e.g.,
classrooms or conference areas) to promote the productivity, comfort and well-being of building occupants.
Requirements
For at least 50% of building occupants, use lighting controls that enable adjustments to suit the task needs and
preferences of individuals for at least 50% of individual workstations, and for groups sharing a multioccupant space
or working area for at least 50% of multi-occupant space in the building.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
83
IEQ Credit 2.3: Occupant Comfort—Thermal Comfort Monitoring
1 point
Intent
To support the appropriate operations and maintenance of buildings and building systems so that they continue to
meet target building performance goals over the long term and provide a comfortable thermal environment that
supports the productivity and well-being of building occupants.
Requirements
Have in place a system for continuous tracking and optimization of systems that regulate indoor comfort and
conditions (air temperature, humidity, air speed and radiant temperature) in occupied spaces. Have a permanent
monitoring system to ensure ongoing building performance to the desired comfort criteria as determined ASHRAE
Standard 55-2004, Thermal Comfort Conditions for Human Occupancy (with errata but without addenda1).
The building must establish the following:
n Continuous monitoring of, at a minimum, air temperature and humidity in occupied spaces. The sampling
interval cannot exceed 15 minutes.
n Periodic testing of air speed and radiant temperature in occupied spaces. Using handheld meters is permitted.
n Alarms for conditions that require system adjustment or repair. Submit a list of the sensors, zone set-points
and limit values that would trigger an alarm.
n Procedures that deliver prompt adjustments or repairs in response to problems identified.
All monitoring devices must be calibrated within the manufacturer’s recommended interval.
OR
Alternative Compliance Path for Projects Outside the U.S.
ACP Have in place a system for continuous tracking and optimization of systems that regulate indoor comfort and
conditions (air temperature, humidity, air speed and radiant temperature) in occupied spaces. Have a permanent
monitoring system to ensure ongoing achievement of the comfort criteria as determined by International
Organization for Standardization (ISO) 7730, Ergonomics of the thermal environment, Analytical determination
and interpretation of thermal comfort using calculation of the PMV and PPD indices and local thermal comfort
criteria; and CEN Standard EN 15251, Indoor environmental input parameters for design and assessment of energy
performance of buildings addressing indoor air quality, thermal environment, lighting and acoustics.
1 Project teams wishing to use ASHRAE approved addenda for the purposes of this prerequisite may do so at their discretion. Addenda must be
applied consistently across all LEED credits.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
84
The building must establish the following:
n Continuous monitoring of at least air temperature and humidity in occupied spaces. The sampling interval
cannot exceed 15 minutes.
n Periodic testing of air speed and radiant temperature in occupied spaces. Use of handheld meters is
permitted.
n Alarms for conditions that require system adjustment or repair. Submit a list of the sensors, zone setpoints
and limit values that would trigger an alarm.
n Procedures that deliver prompt adjustments or repairs in response to identified problems.
All monitoring devices must be calibrated within the manufacturer’s recommended interval.
OR
Demonstrate performance that is equivalent to the above requirements by substituting appropriate benchmarks
and metrics that use a local standard for establishing a baseline, and measure performance relative to that baseline.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
85
IEQ Credit 2.4: Daylight and Views
1 point
Intent
To provide building occupants with a connection between indoor spaces and the outdoors through the introduction
of daylight and views into the regularly occupied areas of the building.
Requirements
Project teams must achieve the performance thresholds in either the daylight or views requirements below:
OPTION 1. Daylight
Through 1 of the 4 paths, achieve daylighting in at least 50% of all regularly occupied spaces1.
PATH 1. Simulation
Demonstrate through computer simulations that the applicable spaces achieve daylight illuminance levels of
a minimum of 10 footcandles (fc) (108 lux) and a maximum of 500 fc (5,400 lux) in a clear sky condition on
September 21 at 9 a.m. and 3 p.m.
Provide glare control devices to avoid high-contrast situations that could impede visual tasks. However,
designs that incorporate view-preserving automated shades for glare control may demonstrate compliance for
only the minimum 10 fc (108 lux) illuminance level.
OR
PATH 2. Prescriptive
For sidelighting zones:
n Achieve a value, calculated as the product of the visible light transmittance (VLT) and window–to-floor area
ratio (WFR) of daylight zone, of between 0.150 and 0.180.
n The window area included in the calculation must be at least 30 inches (0.8 meters) above the floor.
n In section, the ceiling must not obstruct a line in that extends from the window-head to a point on the floor
that is located twice the height of the window-head from the exterior wall as measured perpendicular to the
glass (see diagram on the next page).
1 Exceptions for areas where tasks would be hindered by the use of daylight will be considered on their merits.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
86
63°
H
ine
hisL
ov eT
Ab
ling
Cei
2H
n Provide glare control devices to avoid high-contrast situations that could impede visual tasks. However,
designs that incorporate view-preserving automated shades for glare control may demonstrate compliance
for only the minimum 0.150 value.
For toplighting zones:
n The toplighting zone under a skylight is the outline of the opening beneath the skylight, plus in each direction
the lesser of (see diagram below):
• 70% of the ceiling height,
• 1/2 the distance to the edge of the nearest skylight,
• The distance to any permanent partition that is closer than 70% of the distance between the top of the
partition and the ceiling.
35° 35°
Permanent
Partition
Hx0.7
Toplighting Zone
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
87
n Achieve skylight coverage for the applicable space (containing the toplighting zone) between 3% and 6% of the
total floor area.
n The skylight must have a minimum 0.5 VLT.
n A skylight diffuser, if used, must have a measured haze value of greater than 90% when tested according to
ASTM D1003.
OR
PATH 3. Measurement
Demonstrate through records of indoor light measurements that a minimum daylight illumination level of
10 fc (108 lux) and a maximum of 500 fc (5,400 lux) has been achieved in applicable spaces. Measurements
must be taken on a 10-foot (3-meter) grid and recorded on building floor plans.
Provide glare control devices to avoid high-contrast situations that could impede visual tasks. However,
designs that incorporate view-preserving automated shades for glare control may demonstrate compliance
for only the minimum 10 fc (108 lux) illuminance level.
OR
PATH 4. Combination
Any of the above calculation methods may be combined to document the minimum daylight illumination in
the applicable spaces.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
88
Potential Technologies & Strategies
Achieve a minimum daylight factor of 2% (excluding all direct sunlight penetration) in space occupied for visual
tasks.
Design alterations or additions to maximize interior daylighting. Strategies to consider include building orientation,
shallow floor plates, increased building perimeter, exterior and interior permanent shading devices, high-
performance glazing, and high ceiling reflectance values; additionally, automatic photocell-based controls can help
reduce energy use. Predict daylight factors via manual calculations or model daylighting strategies with a physical or
computer model to assess footcandle (lux) levels and daylight factors achieved.
Design alterations or additions to maximize daylighting and outdoor view opportunities. Strategies to consider
include lower partition heights, interior shading devices, interior glazing and automatic photocell-based controls.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
89
IEQ Credit 3.1: Green Cleaning—High-Performance Cleaning Program
1 point
Intent
To reduce the exposure of building occupants and maintenance personnel to potentially hazardous chemical,
biological and particulate contaminants, which adversely affect air quality, human health, building finishes, building
systems and the environment.
Requirements
Have in place during the performance period a high-performance cleaning program, supported by a green cleaning
policy (IEQ Prerequisite 3: Green Cleaning Policy), that addresses the following:
Provide an appropriate staffing plan.
n
Implement a training of maintenance personnel in the hazards, use, maintenance, disposal and recycling of
n
Use sustainable cleaning materials, products, equipment, janitorial paper products and trash bags (including
n
IEQ Credits 3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials.
Use cleaning equipment meeting the sustainability criteria outlined in IEQ Credit 3.4: Green Cleaning—
n
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
90
IEQ Credit 3.2: Green Cleaning—Custodial Effectiveness Assessment
1 point
Intent
To reduce the exposure of building occupants and maintenance personnel to potentially hazardous chemical,
biological and particulate contaminants, which adversely affect air quality, human health, building finishes, building
systems and the environment, by implementing, managing and auditing cleaning procedures and processes.
Requirements
Conduct an audit in accordance with APPA Leadership in Educational Facilities’ (APPA) “Custodial Staffing
Guidelines” to determine the appearance level of the facility.
n The facility must score 3 or less.
More information about the audit procedures is provided in the LEED Reference Guide for Green Building
Operations & Maintenance, 2009 Edition.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
91
IEQ Credit 3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and
Materials
1 point
Intent
To reduce the environmental impacts of cleaning products, disposable janitorial paper products and trash bags.
Requirements
Implement sustainable purchasing for cleaning materials and products, disposable janitorial paper products and
trash bags. Cleaning product and material purchases include items used by in-house staff or outsourced service
providers. One point is awarded if 30% of the total annual purchases of these products (by cost) meet at least 1 of the
following sustainability criteria:
n The cleaning products meet 1 or more of the following standards for the appropriate category:
• Green Seal GS-37, for general-purpose, bathroom, glass and carpet cleaners used for industrial and
institutional purposes.
• Environmental Choice CCD-110, for cleaning and degreasing compounds.
• Environmental Choice CCD-146, for hard surface cleaners.
• Environmental Choice CCD-148, for carpet and upholstery care.
n Disinfectants, metal polish, floor finishes, strippers or other products not addressed by the above standards meet 1
or more of the following standards for the appropriate category:
• Green Seal GS-40, for industrial and institutional floor care products.
• Environmental Choice CCD-112, for digestion additives for cleaning and odor control.
• Environmental Choice CCD-113, for drain or grease traps additives.
• Environmental Choice CCD-115, for odor control additives.
• Environmental Choice CCD-147, for hard floor care.
• California Code of Regulations maximum allowable VOC levels for the specific product category.
n Disposable janitorial paper products and trash bags meet the minimum requirements of 1 or more of the following
programs for the applicable product category:
• Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines for Janitorial Paper and
Plastic Trash Can Liners.
• Green Seal GS-09, for paper towels and napkins.
• Green Seal GS-01, for tissue paper.
• Environmental Choice CCD-082, for toilet tissue.
• Environmental Choice CCD-086, for hand towels.
• Janitorial paper products derived from rapidly renewable resources or made from tree-free fibers.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
92
n Hand soaps meet 1 or more of the following standards:
• No antimicrobial agents (other than as a preservative) except where required by health codes and other
regulations (e.g., food service and health care requirements).
• Green Seal GS-41, for industrial and institutional hand cleaners.
• Environmental Choice CCD-104, for hand cleaners and hand soaps.
The materials and products described above must be purchased during the performance period to count toward
the credit.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
93
IEQ Credit 3.4: Green Cleaning—Sustainable Cleaning Equipment
1 point
Intent
To reduce the exposure of building occupants and maintenance personnel to potentially hazardous chemical,
biological and particulate contaminants that adversely affect air quality, human health, building finishes, building
systems and the environment, from powered cleaning equipment.
Requirement
Implement a program for the use of janitorial equipment that reduces building contaminants and minimizes
environmental impact. The cleaning equipment program must require the following:
Vacuum cleaners are certified by the Carpet and Rug Institute “Green Label” Testing Program for vacuum
n
equipped with vacuums, guards and/or other devices for capturing fine particulates and operates with a sound
level of less than 70dBA.
Propane-powered floor equipment has high-efficiency, low-emissions engines with catalytic converters and
n
mufflers that meet the California Air Resources Board (CARB) or Environmental Protection Agency (EPA)
standards for the specific engine size and operate with a sound level of less than 90dBA.
Automated scrubbing machines are equipped with variable-speed feed pumps and on-board chemical
n
metering to optimize the use of cleaning fluids. Alternatively, the scrubbing machines use only tap water with
no added cleaning products.
Battery-powered equipment is equipped with environmentally preferable gel batteries.
n
Powered equipment is ergonomically designed to minimize vibration, noise and user fatigue.
n
Equipment is designed with safeguards, such as rollers or rubber bumpers, to reduce potential damage to
n
building surfaces.
Keep a log for all powered cleaning equipment to document the date of equipment purchase and all repair and
maintenance activities and include vendor specification sheets for each type of equipment in use.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
94
IEQ Credit 3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control
1 point
Intent
To reduce the exposure of building occupants and maintenance personnel to potentially hazardous chemical,
biological and particulate contaminants, that adversely affect air quality, human health, building finishes, building
systems and the environment.
Requirements
Employ permanent entryway systems (grilles, grates, mats) at least 10 feet (3 meters) long in the primary direction
of travel to capture dirt and particulates entering the building at all public entry points, and develop the associated
cleaning strategies to maintain those entryway systems as well as exterior walkways. Public entryways that are not in
use or serve only as emergency exits are excluded from the requirements, as are private offices.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
95
IEQ Credit 3.6: Green Cleaning—Indoor Integrated Pest Management
1 point
Intent
To reduce the exposure of building occupants and maintenance personnel to potentially hazardous chemical,
biological and particulate contaminants that adversely affect air quality, human health, building finishes, building
systems and the environment.
Requirement
Develop, implement and maintain an indoor integrated pest management (IPM) plan, defined as managing indoor
pests in a way that protects human health and the surrounding environment and that improves economic returns
through the most effective, least-risk option. IPM calls for using least-toxic chemical pesticides, minimum use of
chemicals, use only in targeted locations and use only for targeted species. IPM requires routine inspection and
monitoring. The plan must include the following elements, integrated with any outdoor IPM plan used for the site as
appropriate:
Integrated methods, site or pest inspections, pest population monitoring, evaluation of the need for pest
n
control and 1 or more pest control methods, including sanitation, structural repairs, mechanical and living
biological controls, other nonchemical methods, and if nontoxic options are unreasonable and have been
exhausted, a least-toxic pesticide.
Specification of the circumstances under which an emergency application of pesticides in a building or on
n
surrounding grounds being maintained by building management can be conducted without complying with
the earlier provisions.
A communications strategy directed to building occupants that addresses universal notification, which
n
requires advance notice of not less than 72 hours before a pesticide under normal conditions and 24 hours
after application of a pesticide in emergencies, other than a least-toxic pesticide, is applied in a building or on
surrounding grounds that the building management maintains.
Any cleaning products included in the integrated pest management policy must meet the requirements for IEQ
Credit 3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
96
IO Credit 1: Innovation in Operations
1–4 points
Intent
To provide building operations, maintenance and upgrade teams with the opportunity to achieve additional
environmental benefits achieved beyond those already addressed by the LEED 2009 for Existing Buildings:
Operations & Maintenance Rating System.
Requirements
Credit can be achieved through any combination of the Innovation in Operations and Exemplary Performance paths
as described below:
The proposed performance metrics to demonstrate compliance and the approaches (strategies) used to
n
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
97
Potential Technologies & Strategies
Implement and maintain during the performance period actions that provide added environmental benefits.
These can be either actions that substantially exceed an existing LEED 2009 for Existing Buildings: Operations
& Maintenance performance credit requirement or actions not addressed in LEED 2009 for Existing Buildings:
Operations & Maintenance that provide substantial added environmental benefits.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
98
IO Credit 2: LEED® Accredited Professional
1 point
Intent
To support and encourage the operations, maintenance, upgrade and project team integration required by LEED to
streamline the application and certification process.
Requirements
At least 1 principal participant of the project team shall be a LEED Accredited Professional (AP).
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
99
IO Credit 3: Documenting Sustainable Building Cost Impacts
1 point
Intent
To document sustainable building cost impacts.
Requirements
Document overall building operating costs for the previous 5 years (or length of building occupancy, whichever is
shorter) and track changes in overall building operating costs during the performance period. Document building
operating costs and financial impacts of all aspects of LEED 2009 for Existing Buildings: Operations & Maintenance
implementation on an ongoing basis.
Follow the detailed instructions in the LEED Reference Guide for Green Building Operations & Maintenance,
2009 Edition.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
100
RP Credit 1: Regional Priority
1–4 Points
Intent
To provide an incentive for the achievement of credits that address geographically specific environmental priorities.
Requirements
Earn 1 of the 6 Regional Priority Credits (credits identified by the USGBC Regional Councils and Chapters as having
additional regional environmental importance). A database of Regional Priority Credits and their geographic
applicability is available on the USGBC Web site, www.usgbc.org.
One point is awarded for each Regional Priority credit achieved. No more than 4 credits identified as Regional
Priority credits may be earned. The USGBC has prioritized credits for projects located in the U.S., Puerto Rico,
the U.S. Virgin Islands, and Guam. All other international projects should check the database for eligible Regional
Priority credits.
LEED 2009 for Existing Buildings Operations and Maintenance Rating System
With Alternative Compliance Paths For Projects Outside the U.S.
101