Layout Model
Layout Model
EXISTING CONDITIONS
Sto ne
CLUSTER 11 CLUSTER OUTLINE
Exi sting
H EXISTING SHALLOW WELLS
Pipe 13-1
EXISTING BORE WELLS
Pipe 13-3
Pipe 13-2
3
PT-1
EXISTING WATER TANK
23
22 EXCAVATION
R 16
Pip
STE
e
CLUSTER 14
08
from
Existing toilets to 32 -2
WETPOD (WP)
CLU
flow
House 20 to
gravity
wetland by 20 REFER TO WETPOD DETAIL
tank)
19 (no pressure
Pipe 11-1
36 PRESSURE TANK (PT)
01 35 K 39 REFER TO PRESSURE TANK DETAIL
Pipe 08-1
-1
e 14
Pip
SURFACE WETLAND
iv)
d (x
26 33 REFER TO WETLAND DETAIL
Pipe 12-6
lan
Wet
18 24 25 future
Pipe 12-3
REFER TO WETLAND DETAIL
dormitory
Pipe 16-1
Pipe 11-2
Pipe 16-2
PT-12
48 Pip
Pipe 06-5
53 Pipe 12-1
e
12 COMMUNAL SEPTIC TANK
(xvi)
-4
Pipe 12-1
21
Pipe 12-5
REFER TO SEPTICTANK DETAIL
Pipe 06-2
D Pipe 06-4
Pip
e
02 06
-3
Pipe 12-2
16 Ø100mm UPVC
Pipe 06-4
27B
Pipe 08-1
27A PRESSURE SEWER
17 42 PE100,40mm OD or
Pip
e 06
41 PE100,50mm OD PN16, SDR11
-1
PT-05 PT-11 if 2 more pipes joined together
CLUSTER 06 PT-06 Pipe 05-3
Pipe 05-5
40
Pipe 05-4
Pipe
05
-2 WETLAND PIPE
15 Pipe 05-1 Ø100mm PVC
03 pressure pipe
in drainage Rebuilt squatting
51
slab inside
49 Toilet IL: future GREYWATER PIPE
Existing = 1.7 Ø100mm PVC
30 31 New = 1.9
Wet Area
Pip
28A
e
Pipe 10-8
10
-7
08 50 Pipe 08-4 47 COVER DRAINAGE
07 28B REFER TO DRAIN TYPICAL DETAIL
04A
14 44
45
CLUSTER 10
14
CLUSTER 05
Pipe 10-1
04B Pipe 08-5
CONCRETE PRECAST GRATE
PT-15 G REFER TO DRAIN TYPICAL DETAIL
04C 39A
04D B future
connection
future FILTER DRAIN PIPE
51A allowance
planned
Ø100mm PVC
13 Pipe 15-4
04E house Pipe 10-6
Pipe 08-7
EXCAVATION AREA
shop ho ed
52
use
nn
Pipe 08-8
I
04 house under
future pla
10B construction
Pipe 15-1
11A
Pipe 10-5
09 J
12B future connection shop
A 11B allowance
future connection
Pipe 10-2
allowance
Pipe 10-3
Pipe 15-2
10A Pipe 08-6
Pipe 10-4
11C PT-08
06 PT-10
12A pressure pipe in
10-10
drainage
05 GARAGE
Pipe
11D Pipe
10-9
Wetland (vi)
shop
(xv)
Wetland
Existing Wall We
tlan
Wetland (xi) d (v
iii)
Wetland (xiii)
Wet
lan
d (x)