0% found this document useful (0 votes)
105 views2 pages

Task Tracker

The document is a task tracker that lists several tasks related to cassette inverter and motor prototype testing. It shows the task title, status, priority, start and end dates, percentage completed, and any comments. One task testing a 4Tr cassette inverter prototype is 105% complete, meaning it has gone over schedule. Another task updating drawings and operating instructions for 1.5/2.0TR cassettes needs to be updated based on design changes. The task tracker also includes responsibilities and shows Chandan is responsible for updating a reliability test report presentation at 75% completion.

Uploaded by

anuj antal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views2 pages

Task Tracker

The document is a task tracker that lists several tasks related to cassette inverter and motor prototype testing. It shows the task title, status, priority, start and end dates, percentage completed, and any comments. One task testing a 4Tr cassette inverter prototype is 105% complete, meaning it has gone over schedule. Another task updating drawings and operating instructions for 1.5/2.0TR cassettes needs to be updated based on design changes. The task tracker also includes responsibilities and shows Chandan is responsible for updating a reliability test report presentation at 75% completion.

Uploaded by

anuj antal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

TASK TRACKER

% TASK STATUS PRIORITY


TASK TITLE STATUS PRIORITY START DATE END DATE COMMENTS
COMPLETE MENU MENU
Cassette Inverter 18K/22K Proto Report ü HIGH 8/18/2022 9/2/2022 100% sign-off of report pending ü HIGH

Cassette Fixed Speed 48K Proto Report û MEDIUM 7/7/2022 9/2/2022 90% Sign-off report make reliability post-schedule û MEDIUM

Cassette INV 3Tr Proto Testing û MEDIUM 0% check machine readiness C2 LOW

Cassette INV 4Tr Proto Testing û HIGH 8/30/2022 9/20/2022 105% Test Started

Cassette INV Drawing & OI update û MEDIUM 0% Ned to update as per change in 1.5/2.0TR

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100.00%
TASK TRACKER
% TASK STATUS PRIORITY
TASK TITLE Responsibility STATUS PRIORITY START DATE END DATE COMMENTS Resposibility
COMPLETE MENU MENU
WAC Reliability Test Report Update in PPT HIGH ü HIGH 8/18/2022 75% ü HIGH Chandan

WAC BLDC Motor Testing MEDIUM û MEDIUM 8/22/2022 0% û MEDIUM Navneet

TTW BLDC Motor Testing MEDIUM û MEDIUM 8/22/2022 0% LOW

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

100.00%

You might also like