Renovation of Maids Room Drawings-Palm Villa-230117
Renovation of Maids Room Drawings-Palm Villa-230117
MATERIAL SELECTIONS
SHOWER WC TOWEL HOLDER WASH BASIN
Zephyr Shower Column with Thermostatic Teatro Rimless Close Coupled WC Options Round Towel Ring Varifom Countertop Wash Basin
BDA-OPT-RO-705-CP GEB-500-779-01-2
Shower Mixer with Soft Close Slim Seat and Cover
BDM-ZEP-T513-CP COMP-000253
MIXER
Bidet Spray Toilet Roll Holder
Paloma Bidet Spray Set with Stop Valve Toko Toilet Roll Holder Revolution Mono Smooth Bodied Tall Basin Mixer
BOS-E57006-CP BDA-TOK-710-CP
BDM-REV-302S-CP
SANITARY SELECTIONS
KEY PLAN
□ NOTES
LEGEND
EXISTING
ELECTRICAL----
CABINET TO BE
CLAD WITH WOOD
VENEER
MARBLE
THRESHOLD
SHOWER GLASS----
ENCLOSURE
Client:
NOTE:
1. ALL EXISTING DOORS D-01 & D02 TO BE TO
RE-FINISH IN WOOD VENEER MATCHING THE
OTHER DOOR FINISH IN THE VILLA, THE
ARCHITRAVES AND FRAMES TO BE REPLACE CONFIDENTIAL
TO MATCH THE SAME FINISH
Project Title :
PALM VILLA A
PALM VILLA , DUBAI , U.A.E.
Discipline :
Drawing Title :
NANNIES ROOM
ANNOTATION
Designed : Date : Project Code :
El (MG) 09 - Feb - 2021 SF
Drawn : Coordinated : Project Number :
El (MG) El (MG) 200018
FLOOR FINISHES PLAN REFERENCE IMAGE Checked : Approved : Drawing Number:
El (MG) El (MG)
Scale 1: 50 M Scale : 1 : 50 Originator : ID-1700 R01
Copyright© 2019 - All Right Reserved, No P- Of The,e Drawing, May Be Reproduced In Aily Manner What so ever Without Permi5"ion, @A2 El
-====================================================================================================i7
■ KEY PLAN
+4.80
■ NOTES
+3.50 FCL
I
+
3.50m
s,: FCL .I slz
I
OI
<
DI
�I +2.80 DCL
+
slz + \ + 2.80m
r--
I 2.80m 2.80m
I sr: DCL FCL --f-- �_FCL___ +
r-\ \
I
I
I TOILET I
I ' I
I I I
I
I
I
CERAMIC TILES :
I - --FINISH I
I I
I WASHROOM! t----i------t-:
----?- □i
I
DI
I
&51
I
I
D
1 �
-e-----, ) ■ LEGEND
\ GLASS SHOWER �1
1
80mm (H) CORIAN--
NI i
>:
'
.- -----i
- ;,.=;,=I- - - -
N
I
------
1 -=
- = -= =I-HI-HI · -ENCLOSURE 1
I SKIRTING I �
c!;1 ( 1
I
MOSAIC FLOOR :
- i--
I l----'-,--------1
' ----- ----- --r-+�
I , 1 z TILES
1
�------ --l--
I
I
/ { i
s: ___ _Sl"_u-1°�0��--l
I
SIS TILE TRIM
_
I ,
I
I + O.OOm 1
FFL
+4 30 TERRACE
slz 0
Rev.
ISSUED FOR CONSTRUCTION
Description
08,02,2022 El
Date Drawn
El
Approv.
lWASHROOM I
---
I
_
I
I FOYER SPACE I I
I
I
I
I
�
Ul
I CONFIDENTIAL
D I
D
1g;
I
ltv
D
Project Title:
PALM VILLA A
PALM VILLA, DUBAI, U.A.E.
Discipline:
Drawing Title
NANNIES ROOM
ANNOTATION
Designed : Date : Project Code:
El (MG) 09 - Feb - 2021 SF
Drawn: Coordinated : Project Number :
El (MG) El (MG) 200018
ELEVATION @MODULE - B ELEVATION @MODULE - F Checked : Approved : Drawing Number:
El (MG) El (MG)
Scale 1: 50 M Scale 1: 50 M Scale: 1 : so Originator : ID-1701 R01
Copyright© 2019 All Right Reserved. No Parts Of These Drawings May Be Reproduced In Any Manner What so ever Without Permission. @A2 El
7
=====================================================================================□==============
KEY PLAN
=
Ill
X X
y)<X)<
+4.30 TERRACE FF LVL. xyx
C□
□ NOTES
+3.50 �FC�L �
'Cb
-
- CORIAN COUNTERTOP
PAINT FINISH SPLASHBOARD
(8284 OLIVE)
-
COUNTERTOP MOUNTED
----------WASHBASIN, Ref. Geberit VARIFOM
+ 0.00m
_ _FFL ___---
_ __ _SIii' GEB-500-779-01-2, Complete with
drain pipe and fixing accessories
550
"T
"T
20mm THK. CORIAN
COUNTERTOP
............. . ...................................................................... ................ ................
................
STEEL FRAME
313 237 0
ELEVATION @ MODULE - C LO
°'
N
N
n
-+-
�If--- - - - - - -- - - - - - - - - - - CERAMIC TILE
-
t- - -====±=i=====i===i Client:
/;
· - FRAMELESS GLASS
� -----j--- MOSAIC TILE
DOOR FLOOR FINISH
i ,
0
co FFL CONFIDENTIAL
+--+- ·- FIXED GLASS
PANELS
1�
I
//
FFL / ;/;
Project Title:
PALM VILLA A
PALM VILLA, DUBAI, U.A.E.
fI _ -17L _ ,f- _ 100 _ ,120�
1675
Discipline :
I I I
'------r
Drawing Title
NANNIES ROOM
DOORS SCHEDULE
Designed : Date : Project Code:
El (MG) 09 - Feb - 2021 SF
Drawn: Coordinated : Project Number :
BILL OF QUANTITIES
Rev 02 Page /1
PALM VILLA
Renovation of Nannies Bathroom
BILL OF QUANTITIES
Waterproofing
M Towel holder 2 Nr -
SUB-TOTAL (AED) -
Rev 02 Page /2
PALM VILLA
Renovation of Nannies Bathroom
BILL OF QUANTITIES
Additional Items
SUB-TOTAL (AED) -
Rev 1 Page /3
PALM VILLA
Renovation of Nannies Bathroom
BILL OF QUANTITIES
COLLECTION
Page /1 -
Page /2 -
Page /3 -
TOTAL (AED) -
Rev 0 Page /4