Practice Tasks - Module 2

1. The document provides instructions for creating a new project plan in Microsoft Project, including setting the start date and creating a non-working day exception in the project calendar. 2. Additional instructions specify entering title, manager, company and comment properties for the new project plan. 3. The summary identifies reviewing the Gantt chart view to locate the non-working day exception that was created.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views3 pages

Practice Tasks - Module 2

1. The document provides instructions for creating a new project plan in Microsoft Project, including setting the start date and creating a non-working day exception in the project calendar. 2. Additional instructions specify entering title, manager, company and comment properties for the new project plan. 3. The summary identifies reviewing the Gantt chart view to locate the non-working day exception that was created.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

1 ASM510 OFFICE SOFTWARE APPLICATIONS

MODULE 2 – START A NEW PLAN


PRACTICE TASKS
No practice files are necessary to complete the practice tasks in this chapter.

Important
If you are running Project Professional, Project Online Professional, or Project Online Premium, make sure
your Project desktop client is not connected to Project Web App but is instead set to Computer mode. For
more information, see Appendix C.

Create a new plan and set its start date


The scenario: Throughout this book, you play the role of a project manager at Lucerne Publishing, a
book publisher that specializes in children’s books. Lucerne is about to publish a major new book,
and you’ve been asked to develop a plan for the book launch. Start Project and perform the
following tasks:

1. Create a new plan based on the Blank Project template.


2. Set the new plan’s start date to January 9, 2023.
3. Save the new plan as Simple Plan.
2 ASM510 OFFICE SOFTWARE APPLICATIONS

Set nonworking days in the project calendar


The scenario: At Lucerne Publishing, you need to account for an upcoming date
on which the entire Lucerne staff will be unavailable to work on the book
launch project. Continuing in the Simple Planplan, perform the following task:

1. In the project calendar, create a nonworking day calendar exception


named Staff at moraleevent for January 25, 2023, which is illustrated
in Figure 3-5.
3 ASM510 OFFICE SOFTWARE APPLICATIONS

Enter the plan title and other properties


The scenario: You want to record top-level information about the new book launch
plan. These details don’t affect the overall schedule, but they relate to important
supplemental information you want to keep in the plan. Continuing in the Simple Plan
plan, perform the following task:

1. Give the Simple Plan the following properties:


• Subject: New book launch schedule
• Manager: Carole Poland
• Company: Lucerne Publishing
• Comments: New children’s book for spring release
2. Review the Gantt Chart view for this plan and, in the timescale, locate the
vertical currentdate line and the date for the morale event you created in the
previous section.
Notice that the morale event is shaded the same way as other nonworking time in the
timescale.

Tip
If you do not see the shading for nonworking time, check to make sure you are viewing the timescale by days
instead of by weeks or months.