Quality System Procedure (QSP) : 1.0 Objective: 2.0 Scope
Quality System Procedure (QSP) : 1.0 Objective: 2.0 Scope
1.0 Objective: To ensure the standard labeling of instruments & equipments for
their easy identification.
2.0 Scope: This QSP is applicable to all the main instruments and / or
equipments with supportive instruments or equipments like
Pipettes, Centrifugesand Refrigerators etc.
5.0 Procedure:
and last two digits (Numeric and Bold) represents sequential increasing
numbers starting from 01. These numbers will increase up to 99 for
particular department and then after will be converted to three digits
after 99 i.e. 100, 101 etc.
5.2.2 Total five digits together will be divided by hyphen (-) in bold letters
without living the space in between.
MOL-01
Prepared By (QM / Asst. QM) Review & Approved By (Lab Owner) Issued By (QM / Asst. QM)
QUALITY SYSTEM PROCEDURE (QSP)
5.3.2 Total five digits together will be divided by hyphen (-) in bold letters
without living the space in between.
Prepared By (QM / Asst. QM) Review & Approved By (Lab Owner) Issued By (QM / Asst. QM)
QUALITY SYSTEM PROCEDURE (QSP)
Lab ID No.: CEN-01
Calibration Done on:
Agency: In-House
AMPLIGENE, AHMEDABAD
5.4 For Category (A) &(B), calibration records are maintained with their next
calibration due date of instruments&Equipments in Calibration Plan available
with QM & also on the label / sticker for easy reminder on daily basis.
6.0 Records:
Prepared By (QM / Asst. QM) Review & Approved By (Lab Owner) Issued By (QM / Asst. QM)