PTW #: Location of work:RIG FLOOR Task Description: INSTALL T Piece Supervisor: TBRA #:D-111

The document summarizes a task-based risk assessment for installing a T-piece on a rig floor. The 3-step summary is: 1) The task involves picking up a T-piece using a crane or air tugger and connecting it to a stand pipe line while working at height. Potential hazards include dropped objects, failure of lifting equipment, and falling. 2) Corrective actions to control risks include securing the T-piece properly, using banks men for communication, checking lifting equipment, using fall protection, and barricading work areas. 3) Residual risks were reassessed after corrective actions and reduced, with the highest being a level 4D risk of

Uploaded by

Driller
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
131 views2 pages

PTW #: Location of work:RIG FLOOR Task Description: INSTALL T Piece Supervisor: TBRA #:D-111

The document summarizes a task-based risk assessment for installing a T-piece on a rig floor. The 3-step summary is: 1) The task involves picking up a T-piece using a crane or air tugger and connecting it to a stand pipe line while working at height. Potential hazards include dropped objects, failure of lifting equipment, and falling. 2) Corrective actions to control risks include securing the T-piece properly, using banks men for communication, checking lifting equipment, using fall protection, and barricading work areas. 3) Residual risks were reassessed after corrective actions and reduced, with the highest being a level 4D risk of

Uploaded by

Driller
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Task Based Risk Assessment Form

Rev: 25-Aug-20
TBRA #:D-111 PTW #: Location of work:RIG FLOOR

Task description: INSTALL T Piece


Supervisor: Tick off relevant energies that must be controlled
General comments: ‫امة‬:‫لع‬::‫لتعليقاتا‬::‫ا‬ X Energy in motion
Use of 5-Point Check, proper PPE and correct tools for the job at hand. Make sure proper tools are used
for inspection and watch hand and finger placement. Chemical
1. Is equipment being used for the purpose it was designed? Radiation
2. Is something being done differently from it was previously done?
3. Consider any potential dropped object. Electrical
X Gravity
100% Adherence to Seadrill Safe Actions:
Do it safely or not at all. There is always time to do it right Heat/Cold
TOFS, PPE, PTW, Working at Height, Lifting Operations, Energy Isolation, Confined Space, DROPS, Biological
Hands Free Oparation, Guards/Gratings and Handrails
Pressure
TEMPO is the optimum speed that work can be conducted at and is set by the team’s experience,
capacity of equipment and on-the-day conditions. New personnel to the operation will have a slower
tempo than an experienced team.

New Task Process : Plan, Identify, Manage, execute , Debrief, TOFS

Always Identify and record mitigating actions for all potential Dropped Objects & adhere to Red
Zones.Non Compliance to these Directive will not be tolerated , please be reminded that theses are zero
tolerance Polices

Energy in motion - What could DROP?


Identify potential dropped objects and any specific controls

Tasks in order of sequence Related hazard Risk before Corrective actions Responsible Risk after
corrective to for actions corrective
actions Eliminate / Control / Protect against the actions
hazard
Con Freq Risk
Con Freq Risk
(1-5) (A-E) level (1-5) (A-E) level
Prejob meeting discussed TBRA steps. NOT understand steps. 3 C 3C Explain every step cleary. Make an announcement for job. 4 D 4D

Prepare job tools for working at height Tools not ready 3 C 3C Check for tools in good condition and right ones. 4 E 4E

Pick the T Piece by crane to rig floor Drop T Piece. Bad communication. Damage 3 B 3B Secure the T Piece correctly by proper wire sling. Use 4 D 4D
the T Piece. Banks man for signals. Keep attention for not damage the
threads of the T Piece.

Pick the T Piece by proper air tugger bit Failure the air tugger. Conflict with rotary. 3 B 3B Check for air tugger condition and arranging the wire on 4 E 4E
by bit and keep it away from rotary Drop T Piece. Damage the T Piece body the drum. Keep attention for string move. Connecting the
table. T Piece correctly from right place
Connect the top end of the T Piece at Mis communication. Falling drom height. Bad 3 C 3C Use proper radio device. Use safety harness and lanyard. 4 D 4D
the stand pipe line from top and weather for working at height. Drop tools Check for weather condition. Barricade the rig floor area.
hammering the connection and secure it from height.

Has the TBRA been discussed at site with the Task Team (Yes/No):

Task Team signatures: Printed name Signature

Supervisor:
Other participants:

Other participants:

Other participants:

Other participants:

Other participants:

Other participants:

Other participants:

Other participants:

Other participants:
Safety officer:
(Optional)
Safety delegate:
(Optional)

Work commence
Printed name Signature Date and time
authorization:
Supervisor:
RISK MATRIX DOES NOT REQUIRE PRINTING AND ATTACHING TO HARD COPY OF TBRA