PTW #: Location of work:RIG FLOOR Task Description: INSTALL T Piece Supervisor: TBRA #:D-111
PTW #: Location of work:RIG FLOOR Task Description: INSTALL T Piece Supervisor: TBRA #:D-111
Rev: 25-Aug-20
TBRA #:D-111 PTW #: Location of work:RIG FLOOR
Always Identify and record mitigating actions for all potential Dropped Objects & adhere to Red
Zones.Non Compliance to these Directive will not be tolerated , please be reminded that theses are zero
tolerance Polices
Tasks in order of sequence Related hazard Risk before Corrective actions Responsible Risk after
corrective to for actions corrective
actions Eliminate / Control / Protect against the actions
hazard
Con Freq Risk
Con Freq Risk
(1-5) (A-E) level (1-5) (A-E) level
Prejob meeting discussed TBRA steps. NOT understand steps. 3 C 3C Explain every step cleary. Make an announcement for job. 4 D 4D
Prepare job tools for working at height Tools not ready 3 C 3C Check for tools in good condition and right ones. 4 E 4E
Pick the T Piece by crane to rig floor Drop T Piece. Bad communication. Damage 3 B 3B Secure the T Piece correctly by proper wire sling. Use 4 D 4D
the T Piece. Banks man for signals. Keep attention for not damage the
threads of the T Piece.
Pick the T Piece by proper air tugger bit Failure the air tugger. Conflict with rotary. 3 B 3B Check for air tugger condition and arranging the wire on 4 E 4E
by bit and keep it away from rotary Drop T Piece. Damage the T Piece body the drum. Keep attention for string move. Connecting the
table. T Piece correctly from right place
Connect the top end of the T Piece at Mis communication. Falling drom height. Bad 3 C 3C Use proper radio device. Use safety harness and lanyard. 4 D 4D
the stand pipe line from top and weather for working at height. Drop tools Check for weather condition. Barricade the rig floor area.
hammering the connection and secure it from height.
Has the TBRA been discussed at site with the Task Team (Yes/No):
Supervisor:
Other participants:
Other participants:
Other participants:
Other participants:
Other participants:
Other participants:
Other participants:
Other participants:
Other participants:
Safety officer:
(Optional)
Safety delegate:
(Optional)
Work commence
Printed name Signature Date and time
authorization:
Supervisor:
RISK MATRIX DOES NOT REQUIRE PRINTING AND ATTACHING TO HARD COPY OF TBRA