Road Construction Cost Estimation Manual - 2015 - Part-1
Department of Public Works & Road, Philipines Road Construction Cost Estimation Manual – 2015 - part-1
Uploaded by
Mohaiminul Karim
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Road Construction Cost Estimation Manual – 2015 - ... For Later
Download
Save
Save Road Construction Cost Estimation Manual – 2015 - ... For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
100%
(1)
100% found this document useful (1 vote)
560 views
Road Construction Cost Estimation Manual - 2015 - Part-1
Department of Public Works & Road, Philipines Road Construction Cost Estimation Manual – 2015 - part-1
Uploaded by
Mohaiminul Karim
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Road Construction Cost Estimation Manual – 2015 - ... For Later
Carousel Previous
Carousel Next
Download
Save
Save Road Construction Cost Estimation Manual – 2015 - ... For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 140
Search
Fullscreen
ig ~ |Bureau of Construction Road Construction Cost Estimation Manual Department of Public Works and HighwaysFOREWORD To ensure uniformity in quantity take-off and the derivation of unit cost in the estimation of DPWH projects, three (3) manuals were prepared to serve as guidelines and/or reference materials to DPWH estimators. These manuals are: 1, Road Construction Cost Estimation Manual 2. Bridge Construction Cost Estimation Manual 2" Sullding Construction Cost Estimation Manual ‘The objective of these cost estimation manuals is to establish unit costs using standard cost sheets for all pay items of work In the DPWH Standard Specifications for Highways, Bridges and Airports, Volume 11 (Blue Book), This volume, Cost Estimation Manual for Road Construction, covers items of works in the construction, upgrading and repalr/rehablltatioryreconstruction of roads and roadside structures. This wil serve as guide to engineers and heads of DPWH Implementing Offices with the end in view of expediting the preparation and review of Program of Works (POW) and Approved Budget for the Contract (ABC). The standard cost sheets (or Detailed Unit Price Analysis) for the items of work included herein were formulated by the Bureau of Construction in collaboration with Regional Offices and District Engineering Offices, which have adopted the 2012 version of these cost sheets With positive results. With the adoption of these updated cost sheets throughout the country, there will be consistency in the format of presentation and uniform reference for materials cost, labor and equipment rental rates, This manual also advocates that cost estimators optimize materials and local resources complying with specifications, balance labor and equipment to yield greater production output at the minimum possible time, make certain that construction personnel are budgeted with the required compensation, and in so doing complete the project with the desired quality, on schedule, and at a reasonable cost, ‘These manuals shall aid the Department in sustaining its commitment to ensure that projects are always estimated and implemented at the right cost.UNITS AND ABBREVIATIONS Gaye gal ha hp km Is m min mm. pe Phe. psi toh yd? diameter inch foot percent ampere boerd-foot cubic foot per minute centimeter cylinder each foot cubic foot Gauge gallon hour hectare horsepower kilogram kllometer Neer lump sum meter square meter cube meter minute rnitimeter metric ton piece Philippine 2e50 pound per square inch ton per hour cubic yard ACRONYMS AASHTO American Asscelation of State Highway and ABC ACEL ASTM BOC BOD a cMPD cr CWN DEO bo DOLE DPWH BUPA ecc ECOLA EDC GI 10 NCR NWP ocM Per POW Pye RC RCCEM RCPC RO RPM RSB sss upmo. vaT vO ‘Transportation Officials Approved Budget for the Contvact Association of Carriers and Equipment Lessors, Inc. American Society for Testing and Materials Bureau of Construction Bureau of Design Curb Inlet Construction Materials Price Data Contractor's Profit Common Wire Nail District Engineering Office Department Order Department of Labor andl Employment Department of Public Works and Highways Detailed Unit Price Analysis Employer's Compensation Contribution Emergency Cost Of Living Allowance Estimated Direct Cost Galvanized Iron Implementing Office National Capital Region National Wages and Productivity Commission Overhead, Contingencies & Miscellaneous Portiand Cement Concrete Pavement Program of Works Polyvinyl Chloride Reinforced Concrete Road Construction Cost Estimation Manual Reinforced Concrete Pipe Culvert > Regional Office Raised Pavement Markers Reinforcing Steel Gar Social Seeurity System Unified Project Management Office Value Added Tax Variation OrderDEFINITION OF TERMS Program of Works (POW) ~ is the total estimated cost of the project which covers the Chil Works Cost, Engineering Supervision and Administrative Overhead, Road Right-of-Way Acquisition Cost, ‘Construction Contingency, etc, The POW shall include information about the project location and limits, quantity and unit cost for each item of work, construction duration, funding source, equipment requirements, etc, Approved Budget for the Contract (ABC) = Is the total estimated agency estimate (direct cost, indirect cost and ta) for civil works contract of infrastructure projeets, wherein it is the celling of award of contract for government locally-funded projects and reference for comparison of bid costs of contractors for both locally-funded and foreign-assisted projects. Detailed Unit Price Analysis (DUPA) ~ is the determination of reasonable unit cost of each item of work whieh reflects the breakdown showing the quantities of work items, unit prices of materials, equipment rental rates, labor rates and DPWH-prescribed indirect costs including taxes, Standard Labor Rates = are matrices prepared and issued by Department of Public Works and Highways (DPWH) periodically showing the required compensation for manpower workforce of different categories, which comprises the minimum wage as approved by the NVPC, DOLE plus the monetary benefits. ACEL Guidebook 2014 « 15 a guidebook where rental rates of commonly used equipment for Infrastructure projects are based, It is published by Association of Carriers and Equipment Le:isors, (ACEL) Ine. Construction Materials Price Data (CMPD) = ig a compilation of unit prices of construction materials updated quarterly per District Engineering Office to be used as reference in the pricing of materials component of the pay items of work In the preparation of DUPA, ABC & POW, including new Items of work involved in a VO. DPWH Standard Specifications for Public Works and Highways - 5 8 compilation of detailed descriptions of work items in eonstrueting public works and highways projects such as roads, bridges, bulldings, atc. In other words, a compilation of specifications of standard works acceptable to the DPWH.= specifications containing detailed description of the workmanship, material requirements, technical dimensions, materials proportion, datum lines end grades and other established references to follow or adhere to eg. AASHTO, ASTM, etc; basis of measurement, payment and unit of measure/messurement; basis of acceptance and special etalls that would give the user a clear view of the work to be done, oINTRODUCTION This manual covers the establishment of standard cost sheets for each pay Item of work for Road Construction with established quantity of materials component, manpower and equipment requirement which indicates the number and category of labor, number and types & capacity of equipment and its production output, This Includes setting of travel speed in hauling construction materials for each type of road surface condition and formula in calculating the total cycle time, Objectives 1. To provide a uniform reference/basis by the DPWH Implementing Offices ir erriving at the unit cost for each pay item in the preparation of the Program of Works (POW) and Approved Budget for the Contract (ABC) In the Implementation of varaus DPWH Infrastructure projects, 2. To minimize cost leakage of the project in line with the Department's policy in the Implementation of infrastructure projects to be a Right Project, at Alaht Gast and Right Quality. The following Direct Cost components are standardized: 1. Materials Component = established stendard quantity of component materials fer each pay item based on Its specifications taking Into consideration factors for wastage, shrinkage, swell and hauling east; 2. Labor Component = established the appropriate labor category, number and production output of manpower resources required for each pay item of work; and 3. Equipment Component ~ established the appropriate type, capacity and production ‘output of equipment resources required for each item of work. Price Data References 1. Materials Price ~ based on the price data of construction materials established by the DPWH District Engineering Offices and submitted to the DPWH Central Office Price Monitoring Committee in accordance with D.O. No. 71, Series of 2012; 2. Labor Rates — based on the labor rates established for each District Engineering Office, following the minimum labor wage as approved by the NWPC, DOLE, plus monetary benefits calculated in accordance with 0.0, No. 71, Series of 2012; and 3. Equipment Component ~ based from ACEL Equipment Guidebook of 2014, Edition 25, per Bepart ment Memorandum Circular No. 13, Series of 2045, duly signed by Secretary Rogelio L. Singson and D.O. No. 22, Series of 2015. For equipment not available in ACEL, rental rates shall be taken from the rates prepared by the Bureau of Equipment:‘The Standard Cost Sheet of Detailed Unit Price Analysis (DUPA) Is standard for each ay item based on normal conditions. The Implementing Office may vary the standard cost sheets if found not applicable based on certain conditions, provided a corresponding justification Is submitted t0 De supported with photographs, sketches/drawings and caleulation,3 4, % GENERAL NOTES ‘The capacity of equipment as presented in the standard cost sheet for each item of ‘work may be adjusted to a higher or lower capacity, provided the resulting unit cost Is more economical, Rental rates shall stil be based of ACEL Guldebook of 2014, Example: In hauling of materials, use of Dump Truck with higher capacity of fifteen (45) m? instead of ten (10) m? capseity as presented will result to a lower price, as the capacity gets bigger, the lower the resulting cost of PhP 45.46/m? of hauling cost from PhP §4.10/m’, Furthermore, the utilization of @ Payloader will be optimized. The capacity of ten (10) m’ for the Dump Truck as presented, may be reduced In casts ‘of extraordinary conditions) where the road has a very steep gradient, in a severely deteriorated condition of In cases of bridges with load limitations. Tt Is impractical during the actual hauling to load the full capacity of the Dump Truck. A proper ‘explanation/sustifcations shall be made, however, in the preparation of estimate. For items of work that involves hauling and disposal of materials where hauling distance was Indicated, in cases when actual hauling distance is sharter or longer than the assumed hauling distance of 3 km in the standard cost sheets, corresponding equipment hours for Dump Truck shall be adjusted based on the cycle time analysis. The actual hauling distance should be the nearest possible disposal site determined by the Implementing Office prior to the preparation of the ABG/POW and shall be indicaced in the DUPA. For equipment utilization of less than one (1) day, the scheduled operating hours shell be paid at oporates cost per hour and the remaining hours of the minimum 8 hours @ day shall be considered for payment as bare rental rates. The utlization of equipment other than the equipment model and capacity presented in the standard cost sheets may be allowed, provided there is a corresponding justification In the substitution. Rental rates of equipment should be based from ACEL Guidebook or the Bureau of Equipment Rental Rates guidelines, ‘The presented DUPA fs based on a one (1) gang of labor and equipment with the specified output per unit, To increase the output, additional equipment and labor may be added or an equipment with a higher capacity may be adopted, ‘The application of Mark-Ulp (OGM and Profit) shall be In accordance with the ranges of - the Total Estimated Direct Cost (EDC) of the project as prescribed under 6.0. No. 22, ‘Series of 2015. vil10. ‘the cost of materlale component in the Standard Cast Sheets shall be based en the {atest Construction Materials Price Data submitted quarterly by the District Engineering Offices, which Includes payment of local taxes and hauling/delivery cost to sie. For Asphalting works, an allowance of Heating Time for 2 dally operation may be considered for additional time of Asphalt Batching Plant operation, ‘The cost of labor shell be based on the labor rates established for each District Engineering Office, following the minimum labor wage a5 approved by the NWPC, BOLE, plus monetary benefts calcuated in accordance with D.O, No. 71, Series of 2012. vil FL ul Gl mesmaROAD CONSTRUCTION COST ESTIMATION MANUAL TABLE OF CONTENTS: FOREWORD UNITS, ABBREVIATIONS AND ACRONYMS ~ DEFINITION OF TERMS -— INTRODUGTION GENERAL NOTES ~~ A. COST ESTIMATION PROCE:! B. STANDARD DETAILED UNIT PRICE ANALYSIS (DUPA) SHEETS B.1 Summary Table of Items of Work and Description Part G - Earthworks ~ Part D - Subbase and Base Course Part E - Surface Course —~ Part G - Drainage and Slope Protection Structures: Part H - Miscellaneous Structures ~ 131 186 €. CALCULATION OF CYCLE TIME FOR HAULING EQUIPMENT ~~ = 24d C.1 Estimated travel speed, loading/unioading time & allowance for delay ~ 242 C2 Formula for the calculation of dump truck trave! time ~ 22 €.3 Computation of cycle time -- 242 D, COMPUTATION OF LABOR RATES ---- 243 1 Basis of Computation == D.2 Condition for the usage of the labor rates 244 1.3 Sample tabulation of labor rates for NCR ~ 245 E, EQUIPMENT RENTAL RATES 246 E.1 Ust of equipment adopted in the standard DUPA with make, model and capacity ~~ 247SECTION A COST ESTIMATION PROCESSA, COST ESTIMATION PROCESS is the project within the limits of the DEO? ‘within the limits of thority delegated to Assistant Secretary Undersecretary Secretary District Engineering Office (DEO): 1. The Estimator shall determine the items of work involved based on the Approved Plans. 2. The Estimator shall prepare the BUPA, ABC & POW including its a:tachments applying the items of work Involved based on the latest stendard labor rates & CMPD, standard cost sheets and 0.0, No, 22, Series of 2015, 3, The District Engineer shall approve the ABC & POW, if the project is within the limits of authority delegated to him/her. 4. If beyond the authority of the DEO, forward the DURA, ABC & POW and Approved Construction Plans together with the required attachments to the Regional Office for Feviow/evaluation and approval, if the project Is within the limits of the delegated authority of the Regional Director, 5, If Planning and Design Division of the Regional Office will make an adjustment in the quantities and delete/add pay item/s in the submitted construction plans, the ABC & POW shall be adjusted accordingly by the District Engineering Office and resubmit the same for approval, Regional Office (RO): 1, The Estimator shall determine the items of work involved based on the Approved Plans. 2 The Estimator shall pregare the DUPA, ABC & POW including its attachments applying the items of work involved based on the latest standard labor rates & CMPD, standard cost sheets and 0.0, No. 22, Series of 2015, 3, The Regional Director shall approve the ABC & POW, if the project is within the ints of authority delegated to him/her,4. If beyond the authority of the RO, forward the DUPA, ABC & POW and Approved Construction Plans together with the required attachments to the Bureau of Construction (BOC) and Bureau of Design (BOD) respectively, for review/evaluation far approval of the Assistant Secretary for Technical Services, Undersecretary for Technical Services or Secretary depending on the limits of authority. 5, If Bureau of Design shall make an adjustment in the quantities and delete/add pay item/s in the submitted construction plans, the ABC & POW shall be adjusted accordingly by the Regional Office and resubmit the same for approval. Unified Project Management Office (UPMO): 1. The Consultant shall determine the items of work involved based on the Approved Plans. 2. ‘The Cangultant shall prepare the DUPA, ABC & POW Including its attachments applying the items of work involved, 3. The Project Director shall conduct review/evaluation of the proposed ABC & POW and recommends its approval to the authorized approving official concerned. 4. Forward the ABC & POW and Approved Construction Plans together with the required attachments to the Bureau of Construction (BOC) and Bureau of Design (BOD) respectively, for review/evaluation to be approved by the Assistant Secretary for ‘Technieal Services, Undersecretary for Technical Services or Secretary depending on the limits of authority, 5, If the Bureau of Design shall make an adjustment in the quantities and delete/add pay item/s in the submitted construction plans, the ABC & POW shall be adjusted accordingly by the concerned! UPMQ and regubmit the same for approval. Approval of the ABC & POW shall be based on the following: 1, Department Order No. 91, Serles of 2012 — Authority of the Assistant Secretary for Technical Services to Approve Plans, Program of Works and Approved Budget for the ‘Contract for CPWH Locally-Funded and Forelgn-Assisted Civil Works Projects Costing more than PhPSO Million up to PhP100 Million, 2. Department Order No, 95, Series of 2013 = Reissuance of 0.0. No. 9, 5. 2011 Re: Conduct of Pre-Procurement, Procurement, and Implementation Activities for DPWH ForeignsAssisted Civil Works Projects 3. Department Order No. 109, Series of 2014 - Approval of Plans, Program of Works (POW) and Approved Budget for the Contract for DPWH Locally-Funded Projects Costing PhP5O Million and below Implemented by Unified Project Management Offices. 4. Department Order No. 140, Series of 2014 - Increased Limits of Delegated Authority to Reglonel Directors to Approve Plans, Program of Work (POW) and Approved Budget for the Contract (ABC) of Locally-Funded Projects. 5, Department Order No, 54, Series of 2011 ~ Revised Limits of Responsibilities and Authorities of Concerned DPWH Offices and Officials in the Conduct of Pre- Procurement, Procurement, and Implementation Activities for DPWH Locally-Funded Civil Works Projects. 6. Department Order No. 114, Serles of 2015 - Revised Limits of Delegated Authority to Approve Program of Works (POW) and Approved Budget for the Contract (ABC) and Procure Projects,SECTION B STANDARD DETAILED UNIT PRICE ANALYSIS (DUPA) SHEETS5.1 SUMMARY TABLE OF ITEMS OF WORK AND DESCRIPTION _—TEMNo. DESCRIPTION PAGE NO, sal PaRTC — [EARTHWORKS 1001) [Ctoaring & Grunting (with Stripping) 4 1000 |Indivdua Remaval of Trees (small a, 150 mm @ up to 300 mm @) 15 100(3)b Individual Removal of Trees (small b, above 300 mm 6 up to $00 mm 6) 16 100¢4)a individual Removal of Troes (large a, above $00 mm @ up to 750 mm @) WT 10044) individual Removal of Trees (large b, above 750 mr @ up to 800 mm 8) 8 101(1) [Removal of Structures and Obstruction 19 10%(1}0—|Remaval of Concrow Srdge Structures 20 107(1)b [Removal of Steel Bridge Structures 2 10%(1}¢ [Removal of Stone Masonry Linad Drainage Structures 2 101(7}6 | Rethaval of Concrete Drainage Structures, 3 1012) Removal of RCPC (24* 8) - 610 mm @ mM 107(2)> Removal of RCPC (30° @) - 760 mm @ cay 101(2)¢ [Removal of RCPG (26° @) -910 mm @ Te 1012)d Removal of RCPG (42" ) - 1070 mm @ 2 1012)0 Removal of RCPG (48" @) - 1220 mmo 28 101(2 [Removal af RCPC (60" B) - 1620 mm @ 9 10129 [Removal of Pipes other than Pipa Culverts (FVCIGIiAsbesios, up to 200mm), L=10%| 30 101@)a1 — |Removal of Existing Concrote Pavement (0,23 m thk) mn 101@)a2 —_[Romoval of Existing PCC Pavement, 0.23 m thk (for Reblocking at internitent soction) | 32 404(3)b | Removal of Existing Asphalt Pavernent (100 mm thi) 3 101(3}¢_|Rornoval of Sidewalk (100 mm ihk) 4 1014) [Removal of Cus B wae iranomitcubecter SS”S*~<“—~*s*~‘~s~sCS 102(1) —_|Roadway Excavation (Unsulablo) a 5 Surry Table rs of Werk and BasenITEM NO, DESCRIPTION PAGENO, 1c2(2)0—_[Roadiray Excavation (Surplus Commen) 8 _| {cep [Ronaway Excavaion Surplus Commer) # [ 102(3)a [Roadway Excavation (Surplus Soft Rock) a0 102(3)0 Roadway Excavation (Surplus Soft Rock) a 102(3}¢ [Roadway Excavation (Surplus Hard Rock) - Blasting 42 “oatayd Roadway Excavaton (Gurus Had Rock - lasing Tunnel Excavator) 43 7021) [Readnay Excavation (Supus Unelasiog) | “eaitha [saute Exeavaon (Common Sot) 6 103(°}0 _|Sracturo Exeavation Set Roek) 48 103|4}¢ ‘Structure Excavation (Solid Rock) a7 103(2)0 |Briedge Excavation (Common Soll) LC ag 10a(2)b |2ridge Excavation (Sof Rock) 49 | TOE [erage Excavation (Sod Rock) 0 1032) “Tarage ‘Exeavation (Solid Rock) al 10343) \Foundation Fill 52 105(4) lExcavatign ordered below Plan Elevation 53 103(5)0 Shoring i AOS) Crbbing/Gofferdamming 5 10316) Pipe Culvert and Drain Excavation yf ! 56 YO4(t}a [Embankment (rom Bortew] 7 | qoeriia [Embankment rom Roady Excavation 88 1042) jolocted Borrow for topping , case 1 8 704(3) [Selected Borrow for topping caso 2 0 104) [Earth erm & 705(1) | Sudgrade Preparation (Gammon Matera) 2 7082) | Suborage Proparation (xstrg Pavement) e | 6 Summary Tab of tam of Work and Ceseiton: ~ITEMNO, DESCRIPTION PAGE NO. 105(3) _|Subgrade Proparaton (Unsuitable Material) 64 PARTD — |SUBBASE AND BASE COURSE = 200 lAgaregale Subbase Gourse | 200(1) |Aggregate Subbase Course (for Intermittent Rablocking) 8 . 20 [Aggrognt Gate Course a7 J aah 20i(1) |Aggregate Base Course (lor Rablocking) 68 ° 202 ICruahad Aggrogate Base Course cy 2 703 [Lime Stabilized Road Wik Base Course 0 | 204 \Portiand Cement Stabilized Road Mx Base Course a " 205 Asphalt Sablizod Road i Bano Coursa re at 7206 [Portand Gemon Toned Pant Mx Bose Course 7 7 PARTE [SURFACE COURSE = 20011) [Gravel Surace Course (Unerthos) / 74 7 3002) [Crushed Aggregate Surface Course 5 3 Wit) [Bituminous Prima Coat (MC Cut-back Asphalt) | 76 3012) __[Blumnavs Pro Goat (RG GubockAaphal) 7 4 802(1) [Bituminous Tack Coat (RC Cubback Asphalt) 8 a 2020) Btuminous Tack Coat (Emutsied Asphalt) 78 7 20317) [Btuminous Saal Goa! (Cover Aggregate) a 13 30912) [Btuminaus Seal Goat (UG Cutback Asphat}) at | 203) [Btuminaus Soni Cont (RC Gutiback Asphalt) 2 . 3903/4) [Bituminous Seal Goal (Asphalt Cemant Panatration Grade 120-150) 8g | 204(1) _[Buminous Suface Trntment (Aggregate Grading) & “Tl sua) [eturinows Suraco Treatment Asphalt Coment Penovaton Grado 120-180) 8 “I 304(2) | Buminous Surface Treatment (MC Cut-back Asphalt) 6 ona) [Bituminous Surface Treatment (RG Cut-back Asphalt) a7 ? Sarnnary Table fem of Work and DescriptionTEN No. DESCRIPTION PAGE NO. |- '304(8) [Bituminous Surtace Treatment Emusiled Asphelt) 88 r 305(1) [Bituminous Penetration Macadam Pavement (Aggregates) , 88 y 3052) | Bluminaus Penetration Macadam Pavernent (Asphalt Cement) 0 P 305(3) __[Bluminous Penatralion Macadam Pavernont (RC Cutoack Asphalt) a | f 3054) Bitumincus Penetration Macadam Pavernent (Emuisiied Asphell) 92 r 26%) | Bituminous Road Mx Surface Course el | 306%) __[ltuninous Read Mix Surface Course 4 208(1) Aggregates for Btuminaus Road Mix Surface Course ob - 506(2) —_[Bitunnous Matra for Barnes Road Mx urace Course 96 1 [ 307 Bituminous Pian Wix Surface Course-Ganeral (50 mm te) or 30a) [Gola Asphalt lant Mbc (60 rum thk) 98 0) _ [old anhalt Plant M50 thi) 0 [ 209 [Btuminous Plant Mix (Stockile Maintonance Mixture) +00 1010.1) [Bituminous Concrete Surface Course (30 mm thk) _ | im | [ 310(a.2) Biturninows Conereta Surface Course (40 mm thk) 102 1010.3) [Bituminous Concrote Suriace Gourso (60 rm thk) 103 [ 310(6.1) _ [ehuminous Concrete Surface Course (80 mm tht) im | | 31°02) [Buminous Concrete Surface Course (40 mm tk) we | 310(03) __[Bhuminous Concreia Surface Gaurso (60 mm thk) iz [ S11 (ja [PCC Pavement Plain) - Conventional Method, 160 mm the 107 311(t}a44 [PCC Pavement (Plan) - Conveniional Method, 150 mm thi we | if at (! ja2 [PCC Pavement Plain) - Convontional Method, 200 mm thk 109 | g44(tin2.1. |PCC Pavement Pain) - Conventional Method, 200 mm tk vo | | i: 414(1)a3 [PCC Pavement (Plain) - Conventional Mthod, 280 mm thik I, | [ 311(1)a3.1 [PCC Pavement (Pisin) - Conventional Method, 220 mm tk 112 [arta 4 fee Pavement (Piain) - Conventional ‘Method, 250 mm ink 113 temp of wark ans OoscrglonDESCRIPTION PAGENO, ariitja4.1 [PCC Pavement (Plain) » Conventional Method, 280 mm th v_| (jas |PGC Pavement (Plain) - Conventional Method, 280 mm thk 115 31(}a54 [PCC Pavement (lan) - Conventional Nethed, 280 mm hk rs_| Hag IPCC Pavement (Plain) - Conventional Method, 300 mm thk 47 Sti(t}a84 |PCC Pavement (Plain) - Conventional Method, 300 mr thk 118 anf)e1 [POG Paversent Pin) Using GoncatePavr, 230 ne the 49 NAA PCC Pavement (Plain) - Using Concrete Paver, 230 mm thk 120 Br(2 [PCC Pavement Pan) - Using Conerate Paver, 250 mm tk loa | (24 [POC Pavement Pain) Using Conerete Pava, 250 rm tk “ee SN1(1)6.3, IPCC Pavement (Plain) - Using Conerate Pavor, 280 mm thk 123 - 341(1)63.1 [PCC Pavement (Plain) - Using Concrote Pavar, 280 rhm thk 14° BN(t}e4 [PCC Pavement (Plain) - Using Conerata Pavar, 309 mm thc li35| ‘S10)bat |PCC Pi vent (Plain) - Using Gonerete Paver, 300 mm the 128 3t1[f}¢ [PCC Pavement (Plan) - Conventianal Method, 150 mm hk | iar | atitiet [PCC Pavement (Pin - Conventional Mathod, 10 mm tik 18 | SH [PCC Pavement Rainford), 390 mm the 129 Sy PGC Pavement (Reinforced), 300 mm thk 130 PARTG JORAINAGE AND SLOPE PROTECTION STRUCTURES 404 [Reinforcing Steel Bar, Grade 40 (Minor Structures) 131 405 [Structural Concrete Class A (Minor Structures) 132 ‘S00(1}a [Pipe Culverts, 619 mm @ (24" a) 133 500{1}b | Pipe Culverts, 760 mm @ (30° @) 1M ‘stO(t}e \Pipe Culverts, 910 mm @ (36" 2) 138 Pipe Culverts, 1070 mm @ (42" @) 138 Pipa Culverts, 1220 mm @ (48" @) 17 Pipe Cuivarts, 1820 mm @ 60" 2) ’ Surimary Table of tem of Wark ae DeseretITEM NO, DESCRIPTION 601(1) ——_[Undordrain 501{2) /atiné Crain 50113) [Granular Bact er mato for Underrans 522 Mable Pay tons 12 0 502 Imanhole!Catch Basiviniat 143 50 021) [Gonereie Covers a 0 502(3) | Motai Frames and Gretings 145 50 502(6) | Mtal Frames ane Covers (Creular) we) | a 525(a) _[Ovarage Stal Gratng wth Frome (675 mm x 976 nen Sup Graig) 7 0 703(0) _[Dranage Snel Grating wih Frame (715 mm x2000 mm Teench Grating) we | [oo S04(1j2 _[Rorovng, Cleaning, Stckpling Salvagad Guivert Pipe (24" 2) - B10 mm 149 G04(']5 [Removing Cleaning, Siockpting Salvaged Cava Pipe (0° 2) -760 nm @ 159 5 SoA(i}¢ | Removing, Clearing, Sockpling Selvagod Culver Pie (26° @) -940 m om | {6 5041118 [Removing leaning, Sockping Selvaged Clvrt Pipe (42) - 1070 mm @ |) [ m Soi(Hjo [Reming loaning, Stockpiling Salvagos Culver Pipe 48") - 1220 mm @ = | # 34a [Removing, Gearing and Resayng Sabagud Guvon Apo (24 @) -610.mm @ 14 60 204@0 [Removing Clearing and Re-aying Salvaged Culvert Pipe (0" 2) -760 nen @ ae | [an BO4(2}¢ (Removing, Clearing and Reaying Sanagod Cuber Pipe 26") 910 nem 186 ail 504(2)d |Removing, Cleaning and Ro-laying Salvaged Culvert | Pipe (42° @) - 1070 mm @ 157 5 S040 [Removing Cleaning and Rerleying Savagod Guber Pips (4" @) 1220 mm @ 168 at soa@ja (cl 159 51 {64(@)) [Gearing Gutvrt Pipe in plac (760 mm 2) - Halt ited 160 PAI 504(3)e [Cleaning Culvr Fie in place (210 mm @)- Hall ited wt | [oo 504(3}¢ [Cleaning Culvert Pipe in place (1070 mm @) - Malt Sted 162 601 504(3)2 [Cleaning Culvert Pipe in place (1220 rim @) - Half Sled 163 60 S043}! [Goaning Curt Pipe in plac (1820 men) - Ha Sted | [oo 0 Summary Table of ems of Work ane DexeiponI DESCRIPTION PAGE NO. s04(a) Reconditioning Orainage Stucturos 165 508(1) [Riprap (Class A) 188 505(2) |Riprap (Class B) 187 [as [Rerapcctass¢) | # S0K4) ——_|[Riprap (Glaas O) 169 £0618) aco Riprap (Class A) ~| 58) |Grouted Riprap (Class B) am 5057) | GrovtedRipap GiessC) 172 +508(8) |Grouted Riprap (Class D) 173 5059) [iter Layo of Granuiar Material id 508 |Stone Masonry 18 57 [Rubble Concrete 176 508 \Hand Laid Rock Embankment WwW 509(a) | Timber Sheet Pile 118 ‘503(b) |Siee! Shoot Pile (Slope Protection) 79 ‘508(c) |Gancrate Sheet Pile, fumighad and driven « 0.50 m x 0.35 m 180 a S100) [Pad Coune rar Watarat “iat | 81002) [Concrete Slope Protection 182 sii) [bine ia 5112) |Mattosses 194 511) [Filter Cloth 185 PARTH [MISCELLANEOUS STRUCTURES: 600!) [eoncrata ‘Curb (Cast in place) - 0.45 m x 0.1540.20 m 186 G02) \Conerote Gutter (Cast in place) + 0.50 m x 0.15 m 187 6003) \Concrete Curd and Gutter, Type A (Cast in placa) ~ National Road 188 O04) |Concrate Curb (Precast) 189 a summary Table of fers of Werk ne DeserntlanDESCRIPTION PAGE NO. [Concrole Gutter (Precast) 180 [Concrete Curb and Gutter (Precast) 181 Sidewalk (700 mm th) 192 501(b) | Sidewalk 100 mm thk) 193 802(4}a [Right-of-Way Monument 184 802(1)> | Right-of-Way Morumont (Procast) 185 802(2)a | Maintananice Marker Post 196 [soa | artonance Naor Pot Praca 197 | aoataja—_[atemoter Post 198 60203) | Klometr Post Precast i99 60244) | Guide Post 20 €03(1) | Cable Wire Guardra a 603(3)a Motal Guardiails (Metal Bear) including Concrate Post 22 | 603(3) [Metal Boam Ena Place 203 | sca) [ouarerancrinben 204 04(1) Fencing (Barbed Wire) = Type | 205 604(2) | Fencing (Chain Link Fence Fabre) - Type | 208 6048) __| Fencing (Post) - Type 207 804(4) | Fancing (Gataa) - (Height 3 m & Length 4 24 m) 208 €08()a ——_|DangerWamning Signs (60 em Trangia) 209 {__ 60511} [argerwaring Signs (20 em Tangle) * 210 605(2)a Regulatory Signs (60cm Triangle) a 808(2)0 [Regulatory Signs (80 em Trangia) 22 €05(2)2 | Roguatory Signs (60 em Getagon) m3 505(2)}4 [Regulatory Signs (90 em Octagon) 4 80543) |infornative Signs (12° x 24") 215 ‘Summary Table of hems of Work and DeserisonDESCRIPTION _ | race No 605(2)9 [informative Signs (12"x 48") 8 ~ 805(3}e [Informative Signs (18" x 24") ar GEG) [ntrmative Signs 16" 48°) ae | Fao) [Pavement arcing (remix Rtas) [20 (06(2ja [Pavement Markings (Relectorzed Traffic Paint - Write) 20 606(2}0 [Pavement Markings (Reflectorzed Trafé Paint- Yellow) 21 mc [esti Pavement studs 22 @07(2) | Reflective Pavement Studs (" RPM) ms €09(1) [Furnishing and Piacing Topsol 224 09(2) [Pacing Tonscit 225 608 \Sprigging 2B a0 [Sedtlng zt 614(1) [Treas Fumishing are Transplanting) 180 mm @ or ls Ea 611@) [Trees (Transplanting), 160 mm @ or loss m8 81211) [Retecorized Thermoplastic Pavement Markings (Whit) 230 812(2) | Rofectorized Thormoplastic Pavement Markings (Yellow) 231 | 6t8__ [Gow Jon Sn Hat Poured Est and Colle Tye) a a €20(a) | Chevron Signs (450 mm x 600 mn) 233 Te2to)—— |ohevon signs (600 mm x 890 min) a | oe 822(1)2 | Bio-Engineering Solutions (Coo-not) 235 622)» __[BlsEngnering Sots (Coco-ot 236 622(2)8 | Bio-Engineering Solutions (Coco-logs/Fascina) 27 22,2) _Plenaiieaing Solutions (Coco-ogsiFascine) a | @2{a}2 —_ |Blo-Enginering Solutons (Vegetation) 2 6223)” —_|Blo-Enginaaring Solutions (Vegetation) 240 b » Suny Tale of Hers Work nd Dsenoron FfDETAILED UNIT PRIGE ANALYSIS (DUPA) Wor NeJDessription = Uni of Measurement uit per hour 10041) he 0.05 ha Cleoring & Grubbing (wth Supping) er Unit ut, No. of Porson Designation No.of Hours | Heutly Rate Amount PHP) a [Tabor onuiruction Foreman 4 lb Untlag Labor 2 ub «Total for A 100 100 [soma Leber Roe, lay fate are vane por hgkerDinet Inerrr tage at acorved ty DOLE fer wt] | ae No, of Units ne and Capacity No.of ourls | Hourly Rate Amount (PRP) 8 Eqaprene a, Gump Fe (12 yo) 2 b, Fayloacier (1,50 m") 1 fs autdozor, OGM SERIES I P3030 1 Noto ‘Aasumed hauling elauarce (2 3 km it aero hauting astanca Is shorter er longer than 3 kr, tne navel time of Burp Truck wil bo adusted| laccordngly Soead on mo hauling cyclo tno} lanotys Assutied ogtn of vt iv 189 mm at limeughout A corresponding adlusiment in tre] loutput shat be computed oasod en the actual fot lneguroments Sub-Total for 8 4.00 1.00 Toial (a+ 8) — b, Suiput par hour = 0.05 ta. [Breet Unit Gost (C+ 5) Namo and Speeiieation Unit Guay | uate “Amount (eh) Tater Sub » Total fort UATE =F Dee ee rs Maconnnaoa (COR EEE TPRTROG of S corn et Races Tos WaT) [Fotat Uni Coat OBS of 5% of (G7 (G=He ies = Toner u ‘The presonied BUPA fe basad on a one (1) pinta of MOF anc the output, eccitional aquprent and labor may bs od, ypManE widy he spactied ouiput af 6.05 hal. all for cotowate |DETAILED UNIT PRICE ANALYSIS (OUPA) er Na/Dasaripter —;—00(8)aIndvidual Removal of Trees (smal, 160 mm @ up to 300 mn @) ot Measurement = pul par hour 00 fee Beslgnation Never Porwows | No.of Mouris | Hourly Reta ‘Amount PHP) a comueton Foreman 1 a3 SAREE nar : ya tm we Regi tl z= i Gan fetaman nape et mprnws ty O01 Fat He M crea aa an - Sub Tota for me ame and Capacity Ho, of Unitls | No. ofHourls | Hourly Rate ‘Amount (PRP) | 1 025 - |b: Dump Truck (+2 yay + on? e.cran san 1 on? ar Tai (9 of Late ont) ad Noe: ‘Aa! Boom Tack ¥ necassay for timing ln eta ares, Sub Tota for B ot al 8 ua peau on t nes - - Ameunt| = mip Unit ‘Unit Cont (pnp) aa JL fo tone, 17-5 uses ™ 20.00 psa ae ae pr RelarDut based - era ntng vr os ey we mt [mate cl oar he Daag! ot wen te mw Coszronen nacre free Oe | cnet qurary Corel en Pike vn ota fon ies OneCare + = iacaanwaun CEU) Experian i i OWN = Gane tala Goat Geis | | ‘ola. Th poured DUPA te baued ona one (1) garg of bor ard equapmant wih ie upecthod ouputor 1 D0 ea for 03a n. i yee and lor may in aco u Part © EarthworksDETAILED UNIT PRICE ANALYSIS (DUPA| ‘hem No/Descrption 100(3) Individual Removal af Trees (kal, above 300 men @ ur to GID a) 1 Unit of Mansuioment a Hl Ouipst 008 ‘ Dosignatlon No.of Person | No, of Hourin | Hourly Rate “Amount (PHF) [labor \ la, Construction Foreman 1 87 [b. siies Later 1 St (ater Atos aw vate ou ernie! bs lo. Unskited Labor 2 ey —_|efaan ee sawed by OLE! For o4 Sub - Teal fora _| ‘Name and Capacity No.of Univs | No.efHour | Hourly Rate ‘Amount (PHP) [Equipment t ja, Bochrce (0.00 mm) 1 050 |b. Ours Truck (%2 ya) $ 033 Jc Chan Sam 1 033 Miner Took (0% of Labor Com) ot: “Add Boom Truck # acess fr timing in loan areas. _____ Sub-Total for 8 ¢, i ola (A + B) x 0. [Ouipea Foam — E [prastuntepar c= Bl = t Name and Specification Unit, ‘Quantity Unit Cost Amount (PhP) +, [aioe 1 i ls, Rope, 178-5 us ® 2000 | nce of marion vari a att nea ne ey Ivo a es ao hain ea 1 9 Maeno ote anata Pi lc eer by Cet Oo Pro Mo Gente i abot [er [Birent Una cost (e + FD é W lSeatacd, Cortngancion &Wiscolanooun GCA Exons aS 1 fcaniracers Pratt CP mot 1 J, ax (VAT) olen) Cried w {ed DUPA w baved on a one (1) gang of labor and equlpmant wi tho ‘To neranso tre output, addtienal equipment anc labor may be aided, ied output 1 00-00 for Ok oot Pact €-lathaorlsDETAILED UNIT PRIGE ANALYSIS (OUPA) Br oserption 100(4)0_ Incividual Removal of Trees (argo a. above S00 mm @ up io 780 mm gi) Ptotreasiremen: on Fini porte 40000 Designation No. of Ferson/s | No. of Hour/s: Hourly Rate Amount (Phe) “— (Cabo fh Fomnan \ of ' as wt ama EERE ee { 2 Gee ee [Scale cf ator Res _ = Sub Total or A Name anc Capactty No.of Units | No.of Hours | Hourly Rato Amount (PhE) [Eavspmert la. Backhoo (2.80 n?) 1 250 Dump Tuok (12 a") ' 487 c.Ca Saw 1 187 ior oe an cat v Par CatharsDETAILED UNIT PRICE ANALYSIS (DUPA) itom Hs Dorerpten 100(4)b Individual Removal of Trbaa (ange b, above 720 mm @ un to BOD em 2) Unt cf Blaser °. utp 10000 Designation No. of Personin | No, of Houris Hourly Rate ‘Amount (PHP a. |omir a. Constetion Foroman 1 ser > shted Labor 1 6.62 (lsner aoe ee sat on tb lc Unsited Labor 2 cer, ROR as sn appear $= Toa for ‘Name and Capacity ‘No, of Mourls Hourly Rate Amount (PnP 1, gaprent Jn uckere (0.80 mt) 1 6.00 amp Track (12 96") 1 333 a. Chain Sa 1 338 \Minar Toole (8% of Labor Coat) ee ‘Add Boom Tesh it necossey for tmmng aroun areas Sub-Total or 8 = “Taal BD D Saat 00 8 [Ores ome Gon (= 5) Name ane specification unt | Quantty | nitcont ‘Ameunt (Pht ators |s. Rope, 10-6 uses ™ 30.00 once narrate sr Rei Jnr moran wr pre ey ie lyme ng Paige iar we Cann ar etsaned wane by Cea! men en 5 wise Su - Toa for "Fae prevented DUPA is baned on wane (1 gang of abo” and equemneni wih He spctind avout oT1.00 eo Ter 6.87 ry ‘To increase the output, advan aquipeent and labor sty bo acted, “ Port C-FarthwerkeDETAILED UNIT PRIGE ANALYSIS (DUPA) jDeeciplos | 104(1) Removal of St.ctures and Obatnuation oasurnent te : 1.0018 = iiof measure ‘uenpsum’ as por Glue Book shall be based on the derived outputs af tha follwing: tem numbers: tte No. 101(1}a~ ot Conerate Beidge Structures, tam No, 101(1)8-Ramaval of Sioe! Bridge Structuran, itera No, 104(1}e-Removel ef Stone Natonry Amant Dminage Structures and item No. 101(1}d-Removal of Concrete Drainage ‘Structures: Fr Designation ‘No.of Porsonis | No.of Hourls | HeuHy Rate ‘Amount (PRP) eo _ Divi oI yen a ‘See derivations for Item Nos, 101(1)a to 101(1)d ~ . se [ Sup -Totn for 2 Namo and Capacity No.of Unive | Me. afHourm | Hourly Rate ‘Arnount (PHP) Eeinment ~ \See derivations for Item Nos. 101(1)a to 101(1)d en ant Sub Total fo B _| — = nas 8) ies Un =D we | aneard apeeiaton nw] Gomtty Une Gont | Amount rnm bade ever To's Pw =, See derivations for Item Nos. 101(1)a to 104(1)d = a a Total for F i [vernsd,Cortegenews & Mincalansois (OCW) Expanas_ a =BE onecors ec = — = Ad (osha a a tr eed 10 Part HartaDETAILED UNIT PRICE ANALYSIS (DUPA) tam to /Oosition —:101(1}8 Removal of Const Biage Seuctin & Unk et aire rt - bs uit per ho 110? a Designation No, of Moura | Hourly Rate ‘Amount (PRP) A aber A a. consineton Foroman 1 130 5 Bic L anor 2 120 [ater ten eae pr Ren ome Je Uae: Labor 4 og ‘|e wage a» set OU 0 Sub-Total for A Name ana Capacity Wo ofUnids | NovetHaurs | Hourly Rate | Amount 8, |faabrert A a, BoeRr oo wreak (080) 4 oso lp. Jucknarmer 2 1.00 \c, Air Comarossor (386 - 480 cfm) q 1.00 le. Dug Truck (12 ya) 1 026 lo. Payiondr (80) 1 0.26 I tuck Mounted Crave (34-8 mi 1 O26 ig. Curteg Out 1 4.00 Wt “Assured nautng datance fe kon Wf actual Inawiing clsiance fe sherter or longer than 3 ken, the rave! wma of Gump Thxck wii be adjusied| fccorangy) based on the having ie. tine janalyes. ‘Sub - Total for 8 “Foun (A + B) 6, jul par hour = 1, [Gireet Lin Cost E +B) Name ane specication Unit tity | Unit Coat A Ja oxyacenione wt 00 inn fmt vs sae oad tp Imai me at m fede tow nace, are Pa tse guney y Core Oc Pe [Sees | Sub Toa fe ova nt Soa +P) e [Oven Goningancon& tscloneavs [OCR Expanaas TA ATS fn 1, [Contracora Pratt (CP) Tie of it J, [Yate Add Tax VAT] Bi of AT) 4 ic [Foal Und Goat Gree 4 ‘Hate: The provonted DUPA fi baned en a ane (7) yang of labor and equernant win hws opecfied eutput or 1.00 F0/%, “To incroase the ouput, addtional equipment and ador may be seen, » an Geant . &t i DETAILED UNIT PRICE ANALYSIS (DUPA) Beraructeion : 0199s Roneutr sia bresctiee jf eaaurement 9 out "1900.0 kg Designation No.of Poraonls | No.otHourfe | Hourly Rate ‘Ament (PhP) [aor sp pf catucon roman 1 4.00 a ine) Billed Labor 2 4.00 [son Rei ae vere or ie at le Uroied Later ‘too fain may at aoe oy EOL at 4 yp =Total or A - "i Name and Gapaclty Hoof Units | No. afHourle | Hourly Rate Amount (PRP) mest | fa Tuck Mound Crna (31-35 mt) 1 10 Series Trl cango Truk (2-5 mi) H +09 Welding acting (200 A), Gaw/O¥eral Orvon 1 +00 |}. categ Out 1 +100 ino: Tools (0% of Labor Gomi El - Sub Towi for 8 3 i ipod Unit Quantity Unit Gout ‘Amount (PRP) js oxyacetane ot 0.00025 28 Ppl wortng Rod ko 1002 [Pigs rete ae vant ar Rep Dr as Sof Reve " ‘os fo the array ot ans re oe ah ra a [yee en Teor an hang or Be ret rae te” Ror fo hw Consveten Marat Poe Ct at Bow ematnee quay ty Conta ce Poe wont Inu shoring materials # raed based on canoe Jp prea tt contcn Sub - Toul for ina UT ean 2 Tend, Gon genes & Macalianaows (OGM) Expenses — TOT TS acre Pr "ioweh of — ut dod Tax (VAT). Balen) 4 Unt Cont (GeHeird Nate: The pretenfed DUPA Ts Baatd on & ano (1) gang of labor and aqulpmant wih he poweiad ouput at 1,000.00 Kh, Tolnereese the outpit, addhianal equipment and labor may bo added. 4 a Part © tart vatDETAILED UNIT PRICE ANALYSIS (DUPA) lim NesDeterpton ; 101)¢ Removal of lone Masonry Lined Cranage cto ee ro donut vat ued prhoue 70.00 i ‘Doxignation Hourly Rate Amount (PHP) A [Labor a Al s. ConsrustenForenan . tla Laer anna we sera pe ae ali Una Ua 2 400 mo ra tet | Soe k fab Tota tr Hama and Capnelty L No.of Unive | No.of Mouris | Hourly Rate ‘Amount (PAP) phen Ih a tachnoe a Brsnor (000m 1 oso j east (0.80 fr oan 1 aso I le: Bump Truck 12 1 4.00 \ Note: ‘Assumed hunang dance 3 hot it actual j ovis asics hater ortonger han 3. be fevtt ine at Bump. Track al be aud j are Saeed cn te having ete me I snsiyst I j Sys fet Taal 0, [Guiput per havr = 10.00 m e k fret Unit Gost (© * OY =— + | eft ro cauaminy | toot | Amoune (nr) | eh 1 sun-Tom tor rece i rns, Coir «ata OST TRS. Sj soniracior’s i (GPY TORY of G aa Tax (VATY et eTAa j ¢ [Fotsi Unit Set (Ge neie i Ke Tible’ Tho provoried DUPA ws baved af m one (1) gang of labor and equipment wilh ta speci eutput of 10.00 rw, i “To weraave the eutput, additonal equipment ane labor may be asec, nDETAILED UNIT PRIGE ANALYSIS (QUPA) NeJOouerption > -101(1}4 Removal of Gonorete Drainage Structures atteonerint ” errant 200 m* Designation No. of Person/s | No. of Hout Hourly Rate Amount (PhP) CcotuctonFeranan 1 10 ram we em Sled Labor 1 +09 ie wr vrata Rovoue! ont Iman tage os apcd Oy GGL Ro To fe Uma 2 oo (imum tage os emi ty “ $b Tota lor A Name and Capacity Mo,of Units | No.of Hourls | Hourly Rate ‘Amount (PHP) Eup a 4. Bein w roar (0.80) 1 080 seer (0.80) for ong 1 028 Ou Truck (12) 1 ogo ‘citing Out 1 1100, ba ‘Astumed howling datance (a 3 km It aztual ung csance ts sharororfongor than 3 ke, the | Wave lino of Cum Truck wit be adjusted] lncreingly based on the haul cycle tene| jana. Total for 8 aw (AB) igi por hour SS oat Ce Name ane Specification Unit Guantity nit Gost ‘amount (Ph) ae ls onpcomione vt 00 mca futon po Rohr asa one oveuing at peat nro ety es ret nmmert of ctx ae Hauing cou 19 pre tees 0 em Gonder Has Fre a loxalaies goatery 8 Cont! Oe Pike Mantra |r ub Toa for E in Coa (E = FY a (Gwstand, Coninganaed & Waecoaramun (OCW) Uxpenses TORT AS Prof (CP) ow ofS ue Alced Tax WAT) = Heal unt Cow (ewes “Thea: Tho reverted OUPA Ts baad o elneroase the out, adaltion ‘one (7) gang of bor and equipment wih the soectiad output of 2.60 ah ipo and labor may be added, 2 Pare tanthworksDETAILED UNIT PRICE ANALYSIS (DUPA) IM NosDescrstin —:T01(2)8 Removal of RCPC (24°) 10mm B bm Unitof Measurement: Unter ‘Ourput per hour : 6.00 08 ‘Output Designation No.of Person/s | No. of Hours | Hourly Rate ‘Amount (PRP) [tater ata '. Gonsirwsion Peroman 1 4.00 asc i late Roles ae tale go Met tae | '. Unskilac Labor 2 4.00 pee ects saan Suis Tosa for Name and Gapacity No. of nits | No.of Heuris | Hourly Rate ‘Amount (PhP) 2, [Eauiant ahem la. Buekhoe (0.0 m) 1 1.00 | lo. Boom Truek 2 5 me) 1 80 [Minor Toots (10 % oF Lab Cost) oie: 1 it Assunvod hauling distnco 1s 3 tem. H actual | lhauing dstonce fs sheer oF trgor than 3 km, tne | pow lraver me of Boom Truk wil be aqiuatoa| lav lacceruingy asec! on the Aaulng cyclo tire loco janet | enw | | | rest Unt Conte » Op Nemo and Specification tit Quantity Unit Gost ‘Amount (PHP) # Matra Sub-Total for F [Diet Unk Goat Fy ¥.[Overnad Centingoneioa & Niaz llmneoue (OCW) Expenses 7 eae 1 [Gentmetors ra Om o1G. 4. [Value Adios Tax Ec SUGESES) x.[ Foti Unit Goat (G=Htiedp ‘ote: Tho preworted UPA Is Daneel on a one (1) gang of labor and oqupmont wih fhe apeciied oulput aT 00 aah To increas ‘ho output, ecctional equigment and labor may be added, a ort C= tarthaorksDETAILED UNIT PRICE ANALYSIS (UPA) BrnaDeserpion —-101¢2)8 Removal of RPC (20° A) 760mm & Designation No.of Porsonls | No.of ours | HourlyRate | Amount (PRP) oma 1 1.00 vee 2 150 flair nt a vous apo seo [senna of are Rome No.of tnivs | No.of Hourls | Hourly Rate Amount (PHF) ‘Aswmed hauing stance Is 9 ke If actu! cstarca ia rir cr fonger than 2 kr, the | fe ine of Boon Truck wil bo adusted| verigly based an the hasing cyclo. teme Unit Gost Amount (PHP) Sub Total for F Ghote Contogenes & Mulnnonms (OCW) Expenses TARE eo Pat (CP 5 “ee ive Acco Tax (VAT ‘64 (Ge He ial Unt ont a-hole Nak. The reverted GUPA a Banad on 8 ona (F) gang of wor and eqapment win Tre species ouput o78.00 ah Telhrene th out, adlonalequlemant and labor may ba added, Fr are CartonsDETAILEO UNIT PRICE ANALYSIS (OUPA) mNo/Onscriion + 101(2K Removal ef ROFC (38°) B1Omn a ii Unter Mogmueront a Ougut py Output per nowt 5 4.00 00 oa een ee | +— Labo 1 1.00 ee lb: Unakilad Lator a 4.90 bua __Bub Teal for = |— Name ane Capacty Ne.ot univa | No.ofHouris | Mourly Rate ‘Amount (PH) 8.|Enulpmaint [Eau la. Backhoe (9.80 m4) 1 4.00 a. Ba lb. Beem Truck (2 +8 wth 1 0.80 bBo Minor Tool (10 of Labor Geet) i a | pee ‘Aasyred having datance fe 9 kr If wot! Ve Inaing cate is shorter or fongr than 3k. the ied Havel ime cf Boon Truck wil be adjusted bee Jeccordig based an the faulng eyele time | ee lanai Su Total or 8 psy Sere oat aH 1 (Smut our = 2.60 08 oe 1 [Direct Writ amt (E =D) jist Name snd Speciation nit Quantity Unit Cost ‘Amount (PHF) ato = ‘Sub - Tota for F i, ea vik Gea e* aE - Mf [Overbeas. Goningoncies & Misceianaous (OCH) Exper Tw TS "eons Dam Cr] —— sOway of G 4. Walaa Acid Tax (VAT) aera eyed) a TP ad ce aw Ti) gong OTTAOT ard wave wa Te epaiTed extol of 400 o/h, ' Tree gop vnc eniprat ord abr ey bm * wid i |' Newescipton DETAILED UNIT PRIGE ANALYSIS (DUPA) 404(2}¢ Removal of RGPG (42" @)- 1070 mm @ fe Menurorert 0 out : 4.0000 Designation No, of Hourls Hourly Rate [ater 9 Conmructon Foreman .Uneied Lano 7 Sub-Total for A Name and Capacity 400 100 No, of Houris fora Back (0.80 m") Bef Boe Trick 2 = mi) Ice Toow (10% oF Labor Cort) fete | Assured hating lntance is 9 km. tt acta Iavng catance i aherir or langor than 3 km. the lvl tino ef Bocen Truck wil bo adjustod| lccrdngy based on the hauling cyclo tmne| lana Sub-Total for 8 oul A+ nur on inci Unt Gost (S= G) 1.00 5.80 ater rater av vanatre por Rgiaret tase on Jnwanun wage an antoved Oy DOLE Aorta |S a Laan ates Hourly Rato ‘Amount (PRP) at ame and Specification Unit Quantity Unit Cost Amount (@h) Sui Toi for F Poteet Ura Cont (e + FP id, Goningarnen & Wisnallaneoua (SGM) Expenses ze Z ral (CF Tax (VAT) Uni Goat f Ganey heise ‘ale The prosevied DUPA Ts based en @ one (1) gang of labor and aquipmant withthe apeofied output af 4.00 eam, nv Tolnronse ihe ouput, ational oquipmont anc labor may ba added, Pare C= artworksDETAILED UNIT PRIGE ANALYSIS (DUPA) hom No/Doseilion | 1010 Rome of REPC (48°) » 1220 mm mn seibewioion 1 THGiR, Rarer Ale Pan \ Output per hour 3.0000 t Besignation Novel Personis | No.otHourla | HourlyRate | Amount (en) A (seer fi J. Consructon Ferem 4 iis 2 100 (Lao snes ae wana po Ragone sm |rininurh wage a8 approved ty DOLE Refer 34 (enol Cat aa | Sub - Tota for A alt ‘Nama and Capacity No, of Unite No. of Hours: ‘Hourly Rate “Amount (PHP) 8. bre la, Backhoe (0.80 rm") % 4,00 Ib. Boom Truck (2- § mt) 1 0.50 [Minar Toole (10 % of Labor Coat) ete: ‘Asswned having olstanee is 3 km. Wf actual| vance ls str crfongar than 3 x,t liavel ime ef Boom Truck wil be wcfustod) Neccordiijly based on the having oyele time Jnaiyac sub to or L L Fata 8) yuipui pa’ hour = 3.00 a8 rect Unt Gost (G +O) + ‘Nama and Specification L unit ‘quantity Unit Gost L ‘Amount (PH? | [ater * sub» Tota for — ra (Bract Unit Goat = FD RRS Hi, [Gvarnond, Cont cian & Mincotancous (OGM) Expenses ERE 1. [Gortiactora Prom (CP) Tela at eae, 3 [aia Adiod Tax (VAT) Seo [Total Unit Goat ‘Now: Tho pres ied SUPA bawod ona one (1) gerd of aber sad aquipmant wih the specified oulput of 3.00 eat sen create me oulbul, addkiona epipmant and nner ay be aedod, B Par faribe4 DETAILED UNIT PRICE ANALYSIS (BUPA) aiDenzipton + 10102)! Removal of REPC (60) - 1820 mma Meant: o — Pososipr nour 20000 wae Designation No.of Personia | No.of Houris | Hourly Rate ‘Amount (PRP) 7 aber on arenes d ie [Leber Rete ave vadiatie per Reon based on| > fs, Unskiie Lat 2 ‘e [rims ego senor Oy DOLE. Alar 10 tal | [steal arias ate. =i ¥ _ Sub. Toul fA iy Name and Capacliy No, af Unive | No.of Mouris | Mourly Rate ‘Amount (PRP) uc (0.801) 1 190 — BBE sor trek 2-8 ty 1 080 ier Tee (10% cf Labor Cost Bp: ‘Atrumod hauing datance Is 3x, 1 wo rg lane Is sor 7 ng t 3 , tina of Boom Trask wil be actus Z tosod on the heting eyelet) anny. Sub -Toiafor 8 de oll (A+ 8) parkour e200 a > [Birt Unit Goat (e = B} Tgp tenssnd teatcaton un Guantty | Unt Goat | Amount PHP) ae “Bi ] . = su. To fo joa moar = = jen, Coningon si OE Epos mae Te 3 10% 8% of a 8% OG 2H aMCaa een ~ BP Ne: The rented BURA is based ona one (1 gang of ator and equipment with the panied ouput oT .09 ea i Tolerate the output, addtional aqupmant an lor may bo ic we » Pott ¢-arthwors= DETAILED UNIT PRICE ANALYSIS (DUPA) tam No /Deseiotion 10112) Removal of Pipes othr than Pipe Cuvert (PYC/GWASBestos, up to 200 mm @), La10 han s Uni a Maasurernont ta Output per nour 200 ea one _ Designation Parsowe | Wo of Hous | Hourly Rate ‘Amount (PRP) A Dabar a 9, Conatuction Foreman 1 108 I 2 |b. Uraktles Labor 2 1100 [dat tana rnd por RelrDi vot | | fnrewem ge av agreed By OLE Retr wt Sere ater ate ‘Sub Teulon |— Name and Gapackty No.of Unive | Neer Maurie | Woury Raxo ‘Amount (PHP) | Eaulpment 8, a. Backhoe (Hao! Type 0.28 m") 1 400 k lb. Cargo Truca (2 - 8 mi) 4 0.60 I Iino Toots (0% of Leber Cont) ' Wolo: ‘Assure! auing dsence ve 3 en, Hf ctu \ having distance ls shorter or orgor than 3 km, th] | rave! tine of Cargo Truck wil 68 acjuste| Wh sccorcingly based 07 the hauling 2/ci0 timo Ht Janay I} fe , ni ub Total B ) & ares [Samp par hae = 2.00 te rit Con(e= 0} A ‘Name and pacification Unit ‘Guantity Unit Coat Amount (PhP) | [EE Fata = } * | | | | Sup Total for E ject Uni Coat (E+ FY Tae 406! 0% BK [aiua Added Tax (VAT) 4 i 4 i i, [Fea Grit Cu (GeneTe 1 ‘Rota: tw prevented DUPA Ts buned on # bre (1) garg of labor and oqupmont wilh the speciTed ouiput of 2.00 eal, i ‘Fo merease the expat, adaiional equipment and labor may be added » are tartnworkee/Dosrion = PBitrerror 40.00 m* DETAILED UNIT PRICE ANALYSIS (DUPA) + 101{8)a1 Romoval of Exiting Concrete Pavement (0.23 m hk) 4 Hs a Danlgnation No.of Person's | No.of Hourfe | Hourly Rate ‘Arvount (PHP) " eraructon Foroman 1 1.00 $5_AAUR Urea Labor a 1100 at Rae a a Reroute pt a [wae toms = yp Tot or A ms Name and Copsey Wo oftnits | No.of Hours | Hourly Rate ‘sount (PhP) iment = 1ck0 w! Pavers Bronk (0,80) 1 1.90 fs Pafoadr (1.59), LXB0.26 4 4.00 ‘ 0.80 Dump Tuck (12 ye) Hirer Too (10% of Labor Coa) | Assumed touilng distance ia 3 km. Hf actual ¢ dstance shorar or fonger than 3 km. th "Production output for other thicknosa should io computed propartonatoyy to the output of 0.23] ‘Amount (PHP) paneer cued Cergndat X neslananis OGM) Eanes Tera re "vats Tra prosanted BURA w anes on on0 (1) pang of bor and equipment withthe speaiiod oulput of 40.00 mh Tolncronse the output, addtional aqipmont and laber hay be added, are tarenworksi J Se S| jy yy DETAILED UNIT PRICE ANALYSIS (DUPA) tomo /Sewcrnion — 101(Sin2Rmaval af Esaing PCC Pavement, 0:29 m He (or etiocking at iniarmiten! section) ton Unie Messuwerant + me Uni ‘uiput per hour 1 30.00 a out Dosignation No, of ours | Hourly Rate “Amount (PHP) Aa rT A a, Goratneion Foreman 1 4.09 | fb: Urktlag Latoe 2 1100 [lator Raton mow aril oar Reinet boa] | mime mage an apo Oy DOLE. ow Sis aerate, Sup Teta tor A || Name and Capaclty i of Unive | NeetHoure | Hourty Rae ‘Amount (PHP) 18, /Eaulpment 2,| la. Backhoe w/ Pavement Gronker (0.80 4 400 l ls. Payor (1.80 mr, LxB0-26 1 100 i lc: Dump Tauck (12 a) 1 050 , fs, Conevete Saw (75 hp), 14" Blade @ 1 0.50 q [Miner Tals (10% of Labor Com) ) ote: ‘Assured haudlog datonce ts 3. actual ) having cistance is shorter or longer than 3 kr, the K raea! time oF Dump Thuek wih ow adjusied i Jaccordiniy based an the hnulng eyele time i nays Froduciion output for othr thickness should e be computed proportionately to te output of 0.23 lk nthe POC. Sub Teta for B | et “ola A + 8) pe 1, [Sat parrGur = 9900 i © eeeurrcae =o Name and Specification ‘nit Quantity Unit Cost ‘Amount (PHP) |p fp » [Siar > a. Consrote Saw (Diamond Blade 14") pe 9.00015 } Js trata via a Heli Lineman ut co th oly wih Jmymon of tason ae hey oot Ue rot ta Eton Mat Pe ovoid cute by Goa Ofbe Pre ‘const ] | | | ‘sub «Total for ie [bi 4 HT oS i 1 Oe of 4. fae Aesiod Tax (VAT) 2% 01 (G4 6, Toma Unit Goat (Gentes Nola’ The presented DUFA w basod'on bone (1) gang of bor are AquipMant wih Ww specie’ output of 36.00 7h. N ‘Fe increase the PUL, atonal aquipmment and labor may be added, Fa Park tartinoisDETAILED UNIT PRICE ANALYSIS (UPA) BPP Meoeerction §— | 101) Romovol af Existing Asp Haaureront mW porto : 6,00 m* Pavornant (100 mm tk) uonis | No.of Hour's | Hourly Rate ‘Amount (PHP) : i i 1.00 [rc Su Tot or A 1100 fester aor ave vanate por Rpinicsane bane vane a [Sema of Lana ten oh approved by DOLE Name and Capacity Ne.ef Unive | No.ofHouris | Hourly Rate Amount (PHP) 1 Motorized Road Grader wi Searfor, G710A. 1 Pajoadr (1.80, Lxb0-26 1 Dung Tak (12) 1 er Tou (10% of Labor Cost 190 1.00 050 } Assumed having cetonce M8 3 ke, it actual lng tance i shavte o onger than 3 hm, the ne ne af Dump Truck wil be achusied oy based on the having cycle ime Prdiaion ouput for emer thickness shoul amputed propenionutaly to the output of 100) Pi Asphalt Pavement Sub Total for B Unit Quantity Unit Cost Amount PRP) ~ Bub Tota for bie Date + F “The praveried DUPA ls based on a Gre (1) gang of labor and equipment win Ti Tolnerease the ouput, addtional equipmont ard laber hay be add. Bpedliod output or Parec-tannwiornetem bo /Cesertion DETAILED UNIT PRICE ANALYSIS (DUPA) 101(3}6 Ramaval of Sidewalk (100 men hk) oF 7500 08 Designation Wf No. ormourw | woulyRate | Amount (PRP) | a abor a Cenauucton Forman 1 90 4 bled Labor tx) [air Pte evra pe aes : Isto appt yuan 9 Sted ornare Sub - Teta for A + Mama ond Capacity Nevotunive | Neverwoure | Moury rate | Amount Por) B,[Equioment 1 nant Bramkar (0.0 m*) 1.00 | xB 100 c, Dum Taek (12 ya 00 | ino ook (10% of Later Cost | | igumad having distance is 3 ken. i actuai| [hauling distance is sharter oF longer than 3 km, the | jravel dime of Dwnp Trvok will be edjuated| rcordingly based on the hauling cycle tre) sna Production utp for cer thks shou be camaute proportionately tho ouput O10 Ink idowah ‘Sub = Total for B. S a “Total (A+ 8) 0 (Gaisitporneur= 75.00 ne [Devo Ul Gout (@ =) Name and ‘Unit ‘Quantity Unit Cost Amount (PAP) + faite at a H, [Gvernan rT TERT RIO OF: 1 [een OI oF [al A Deaieere | [fot Unt Coat (Gene Ta increase the oulpu, ecconal equipment and labor may bo added, ” at ‘Nol’ The presented DUPA l based on a one (1) gang of labor and equipment withthe specified output of 75.00 nih. Bare Crt bDETAILED UNIT PRICE ANALYSIS (UPA) 101(e)a Removal of Curb toon i ‘00 : 18 | sass ub or i hepa ne wien a ree g Pronbanbc te Bud Total for A. seit nace Maori | Noatnane | Woven | Aron) aa : bal : as 4 i | Fi ens toe Bepeeet canines 2 a a Se dle est s.r _ . Toa As im eae | wae | anona gn 1 Con Boos ae eae | SS : - ace Sa asa ow aT Go OA TOT ee TOTO : sea 8 art C= artoDETAILED UNIT PRIGE ANALYSIS (DUPA) tem No./Deseription 4014a)o Removal of Gurb & Gurter tem _—_Upmornecetonint ' ve ‘Oulput par nour 30,00 m up. T Designation ‘io, of Poruorvt Vowry ate | Amount (Ph) Tabor alt |b cata rorn ‘ 0 sa au : ; aa oth ca pobre : (coe om rt reese | setse sere ss Toate 5 Tena caret mawune | hecinone | Hanya B [Equiomont = la. Backhoe wi Braker (0.80 Mm’) 1 0.80 Ib. Backhee (0.40 mm") 4 080 lb, \a. Dump Truck (12 ¥6") 1 0.80 |e. ey = ies ‘aseumed hauling aistance ie 3 kr If actual | lw acing astanes is ahomtar or fongor than 3 kr. the _ pe re a en ee neal iT In lnccordingly based on the hauling cyclo time {] fn \aron | [e | ub-Towtora 3 "Total [A + BY jt] * b. [Ganput per hour = 20,00 m- 0.[o 6 [Girwct Unit Goat (+B) [Oi tare are poaenion Goran [_vaneent [Aum ” [Mater - | - | Fr fu Tote L | G.|Direct Urwi Goat ry aT oI. fi ica Giese eae So eit ,[Foval Unt cout GrHeis i ‘Note: The presented DUPA ib based on wane {1) gang of labor and equipment with the specified output ef 20.00 mn, ‘Na i ‘Te inerease the output, additional ‘equipment and Inbor may be added, 6 Parte -tarhworts102)1) Roady Eveavaton (Unsutabie) DETAILED UNIT PRICE ANALYSIS (BUPA) cb we Delanation No.of Personis | No.of How's | HourtyRae | Amount (PhP) | rato Forenan ); 4 4.00 ns 4 nor Rin er wis Are ts “ 3 2 |mnerizn wage ox aporcved by DOLE. Refer to the Bera ater ee Ab Totali — a a Capacity No.of Unive | Wo, of Wourte ‘Amount (PHP) Truk 12 yo) | 4.90 (02D } 4 10 | pic (30 a aia st 1 oo | ‘eae (10% of Late Cea) ‘igdiane ssi or rgar than 3 kr, th Kose of Cunp Trek wit be adjusted ‘baed on the having cycle time Quantity Unit Cent Amaunt (PAP) $i Teal for a = a Da oo ae — of GH] (Genel * Tolnerase the ouput, addtional equpmen| and labor may bo added, ” |B Ti pesoniad BUPA: banod on a one (3) gang of labor and equinmant wit the spectied output af 20.00 mh Part -farthworsDETAILED UNIT PRICE ANALYSIS (DUPA) ‘tom Ne/Deseripton —:—102(2)8-Rondway Excavation (Surplus Common) a Unit of Measurement om utput por nour 80.00 me Besignation No.of Persans | Ne.ot Haure | Hourly Rate ‘Amount (PHP) A [lator ya le. Gonstrucion Feroman 41.00 ly. Unalog Labor 2 100 juno Rats oe varie por aeration ot Sub-Total for A b ‘Namo and Capacity No.of Unita | No.ofHour/s | Houly Rate ‘Amount (PHP) 8. [Egmont a. uidocar, O9H SERIES |: PEOSOD lb, Bayou (1.5000) Je Payee (1.80 °) a daponal are 6, Dump Truck (12 yo) 3.00 oz i 1.90 f Noto: { ‘Asnumed haulng distance w 2 xm. factual t hauling stance is ahortr or longer than 3 ke, the | navel tna of Dump Tuck wit be aducted| i laccordingly batad en te owing cycle time arn. | { Sub Tot for B — tai A= BD ee [Bret Unt Gost ~b} Momo and Spectnication nit ‘Quantity Unit Gout ‘Amount (on) +. f ino al up «Total for E Tiisiarean SOR] Barats 7 a a“ 1 [Gora THs of q ‘SorG@eAsy ener ie ‘uput oF 8000 mr i. [Total Unit ‘oie: The prosonied DUPA la based on a one (¥) gang ot labor and aquinmant win the spo ‘To increase the exxput, adtonal equipement ard labor may bo aa . scree | LDETAILMD UNIT PRICE ANALYSIS (DUPA) nNo/Desciption —; 102(2)B Roadway Excavaten (Surplus Gonvnon) iMoaurerant + ne perfor } 80,00 Dosignation Ho, of Porsonis | No.of Wouris | Hourly Rate (tar 9 Cerrudn Foreman 1 1.00 HUriliad Labor 2 4.00 flavor ratan we unrncie por fiona oad on Jinan sage ax apnroved Oy OGLE. For Yl eras or tabr Rete. « Suh Total eA Namo aed Capacity io.of Unive | No.of Hours | HouryRato | Amount (HF) peaomont itor DAH SERIES 1 SEED 1 1.00 pyounter (1.50 WP) 4 1.00 Pent. a pon an 4 030 rp nex 12 1) a 4.00 Macehoe (0,80 1) 4 1.00 ‘Ansrdhovlng tence is hm, actual wuing atence ie shorter or longer ther 3 kn, the lime! me of Oump Tuck wii be adjusted iertgly based on the nauing cycle tne $00 Total for “ala A= 60, unit ‘Quantity Unit Gos Amount (PHP) By of (GSH) GeWeleyp Tha prniog BUPA fe baued Gn a Gn (7) pang ef labar and equismant wilh Iie speclied output G7 BO00 WT. ‘ ‘Tolacreate to autos, atonal equipment and labor may be added, % Parte sfannnoresDETAILED UNIT PRICE ANALYSIS [DUPA) hom Ne/Deserplion 1023}8 Roadway Excavation (Surplus Sof Rock) ten Unit of toasuremant m Voi ‘Output por hour 58.00m" uy Dosignation Ho, ef Persons | No.of Houris | Hourly Rate Amount (PHP) [Tabor A la. Consiructon Foreman a 400 lb. Unaites Late 2 1.00 {ator Rate we varate oar Roponeitetowwsi| |e Irma nope an aperved 97 DOLE. Mor et [ireavo oftanar Fats | Sub ~ Total for A ‘Name and Gapachty No.of Unis | No.of Houris | Hourly Rate [Amount (PhP) [Equant a. Buicozur w Ripper, DSH SERIES I PSOB/OD 1 1.00 le lb. Paylomder (1.50 me) i 4.00 bb le: Poylener (1.90 we) - ot wap al aro 1 0.28 le. Dum Ysuck (12 yh) 2 1.00 lo. Backree (0,80 mw ataehmone 1 100 hv Wore: Assumed having dlatence 16 3 Kn, factual bn Jhauina distance (a shorter oF gor than 3 km. the Ie lover time of Dump Truck wit be acqusted| ac lacceruingly tasec! on the haulng eyete time law lanai ‘Sub-Total for B & Total (A+ B) , [Oupot per hur = £6.09 me E. [Direct Unt Gost © = B) Namo and Specification Unit Quanity [Riera | Sup Total for E a TOWAK of 4. Nalso Asad tax (VAT) 5% of Gee Total Unit Coat GeHiey ‘Note: Tha prosonied BUPA i based on w one (7) gang of iabar and equipment wih the apeciiod cutput of $8.00 mR ‘To ineroaso tho oulpt, addtional equipment ard tater may be added, a0 Part tartwodsDETAILED UNIT PRICE ANALYSIS (DUPA) 102(3}0Roedway Excavation (Burp Soft Rock) m 4200 mt ‘No. of Person/s | No. of Hours Hourly Rate Amount (PAP) 1 1.00 a : 133 |i ns a wn ot ti ? lena Sassou oto Fo Snorer te nf o.of una | mo.ofHourm | HouiyRae | amount ne) 1 4.00 ' +00 1 020 2 +00 dance i ahortar or anger than 3 kn, the tire of Durip Truck wit be aduated Amour (Pn) otGsHei (CEEIER i; Tho prateried DUPATA bated on a one (1) gang of labor and equiameni wih tro speciied output 42 00 m7, Toincreasa the cutpu, addtional equipment an labor may be added, a Pvt canthaertsDETAILED UNIT PRICE ANALYSIS [DUPA) tm nc,Oestinion + A02(a)e Reaewny Excavetion (Surplus Hava Rood - Blasng ton Unit of Meamuremont m uniter uta pore 420m Oui Designation To.ofPorsonla | Nevet Hous | MeurlyR “Amount (PHP) [later 1 a: Construction Foronan (Crna) 1 040 Labor 2 0.40 fe, Unstied Labor 4 0.49 [abr fn avr er Heer 1. Constcion Foraman (Biasina) 1 fag fREnan ar ape A COL Rew [Sd Labor 1 020 = Unaked Labor 2 029 a, Conatruclicn Fereran |(Osposai) 1 ao > Ura Lor 2 040 ‘ub Total ford Name and Gepseky i »,|aarart ach (0,0 9) 1 030 be beyond: (1-0) 4 035 at Je Paslouda (1.80 4) - at spol area 1 008 ar Jo. ump Truck (1) 1 40 e:Pravrala Deir Machine 2 040 q I Ab Gornroaaor (16% 188 am) 1 040 a Ih Wow: Na ‘aseumea hautng distance Is 3 hn. # acti hauing slstrnay la aPoror oF engor than 34m, he rave tira of Gump Thick wl b0 achute Jccorangy, based on whe having oye Ue anais, sup Tot paras jolput per hours 420 rect UiheaWt(C =O) ‘Nama and Specification Unit, ‘Quantity ‘Unit Cost Amount (PhP) +, |Rfateriais: Dynamo is oso Detonation Cord m 2.00 |Prices af materials avo variable por MegioN/OAnal K Becraiae Me 308 Line ertng ot tet ay num Suto 9 ca RP ree oe tte Pe sae le" nw cotton ve Pe le lonn Go 36 0.40 [ase uatny oy Coral OP I. sme F ™ aso (orate Sub Total foe F TEATRO ofS Geese o eae GeHeis a) a auipmas a Te aoacted blput 4 0H ind GUFA Ta aed one on0 (1 pang oF Bor the cid, e6dHonalequpran! an fbor may be wed ca pare torteDETAILED UNIT PRICE ANALYSIS (DUPA) o/Descotn —¢ TDR9)YRondnay Excavalion (uxvivs Hard Rock) Basing (Funnolfxcavaton) atNeonrement ” rho 108 m? ie Designation No.of Person/s | Wo. of Hous | HourlyRaie | Amount (PhP) i or Goutnetion Foraman ‘Pntna) 1 400 [n Setled Labor 2 4.00 el [e Unakitid Labor 4 4.00 jeaber ie a variable par Socae meme et a jt. Constrtion Foreman (Blasting), 1 1,00 s Slee babor 4 | Ute ater 2 +00 ls Connection Foreman (@iponay 4 50 i Uited Later 2 ono | ‘Sub «Total for A _ ‘Name and Capacity ‘No, of Units, No. of Hours ‘Hourly Rate Amount (PnP) [faire {8 Dasckhow (0.80 mv") 1 0.50 [s Backhoo w Chipping Hammar (0.80 mm?) 4] 0.40 BE |e Sumo Truck (12 ya) 4 0.50 {Pama Ding Machin 2 4.00 (6. ArConreseor (1S = 18 ci) j 00 it Paytouder (1.80 mm?) 1 0.20 ajc (1.80 =a cine! avon 1 03 I Wate Trvl/Purp (16000 L) 1 008 ate: ff | sum houing arranc ix 4m. oct hag antance is ano of ger man 3h, | owt ta of ur track wit 66 aust ‘aod ‘on to nating eyo tine ne. Sub - Toval for . = Toil (A 6 a = _P caaaparreare tas ov jrasi Unit Goat (C+D) Pre Name and Specification unit ‘Quantity Unit Cent ‘Amount (PAP), Bp iiaeras ee) 2.00 oe fb oeonaten cov ™ 140 [pre oat wo ve 9 pana te 2 GP | vont a 200 [ore pecsny ose pes nn ee nn nce ° hah [Aemonken Sate 9 4.00 (fcr we overage Pew a co jo Blasting Cap be O48 Jersinotnterd casnteriy ay Comrat Oftce Price Montoring| fs Say Faas m 0.10 |conmnaten. Tap iit ted Ta ATT Tey fo Unt Cont = Heid “The proaoiied BUPA ls based on a ane (1) ‘gang of labor and equipmant with the snecified output of 1.65 mm. Toineronso the output, sccltonal equipment and Inbar may 8 a tartarDETAILED UNIT PRIGE ANALYSIS (DUPA| temtio/Ovwcrptinn —:102(4)—-Romdnay Excavation (Surpus Uncssited) tno Unket Moasuerons 7 Untat Me ‘Ourput per hour 50.00 | Oupet per | No. of Hours | Hourly Rate Amount (PAP| A aor or a, Const F 1 +00 |] |a.con " any sneer pines : Uruk Laer 2 1.00 [ttm ay wrt ey mmiereta|Je ne Sera aor howe Sub Tetater A name ane Capacity No.of unis | No.of Houria | Hourly Rate | Ament (Ph) | —}—— 2. |Elpment basa 1a a. Buldoesr, DSH SERIES 1 P8080 1 100 I Payfangor (1.59) 4 100 a orm fe. Paplonda (152 m= a pcs area 1 oo ,aaak Dump Trek 2 9a) 2 4.00 inet note: ‘Assumed haulng catance 6 Am if acta aug datanca Is snort ar onge than 3a the Ira! timo ci Our Trek i to aduatod lnssordeny Goad on the routing cyte tno lnatele & [uaa par ur .[Birect Unt Cost (G = D) q Name and Specification unit Quanity Unit Cont amount Pr || Biectus as | | iy Total for F } TURES > ain, Goningancen & Vncalaraoin [OGM] Expres ~~ BRAWN oro TOMY of G — Shel SH sas = I) SSS aT TTS eS a oO oa ‘To neronuo the Gul, addtional equpmant arbor may be actos fe une * aa are Eatont DETAILED UNIT PRICE ANALYSIS (OUPA) i NeyDasenpien + 100(1)8SVCIre Excavation (Common Bat) i \¢ Meanoment n i : 20.000 j signation No.of Personis | No.of Houris | Hourly Rute ‘Amnout (PHP) ls Consrction Foreman 4 1.00 Rates vale Ret aed pee a 100 ota an momen’ Op BOLE Re oa [Sec orcnor ote ; Sub-Total or A \ al Nath and Capacity No.of Univs | No.oftouris | Hourly Rate ‘Amount (PhP) |eeapme — rp Trak (12) 2 100 4 1 eth (80 0) 1 1.00 | fier ec (10% ot Labor Goat) j t i i | i Sub Total for = Total (AB) par oT 20. Uni Gon (=) Name and Spacitiaation unit Gunetty Unit Gon: ‘Amount (PRP) J i | ‘500 = Tow for ie | ‘& Miarelinnsoun (OGM) Uxponses ______RORITEAN of 018% ofa Bhan geste) 77 Garg 6 bor ard equipmant wih he apeeted output oF 20.00 mh } he Gulp, aceitional equipment and labor may be added, 4 Pare = arenasDETAILED UNIT PRICE ANALYSIS (DUPA) tomNo,Ceveripton | 103(1] Bucure Excavation (Set Rock) Unter Measurement | m= Output pat Nove 14.00. ‘Dosignailon Porson | No.ofHouris | Hourly Rate ‘Amount (PHP) atmo j \a. Construation Foreman a 100 lb. Unaitod Labor 3 4.00 ‘fabri om nse (seat ice Sub Total for A Name and Capacity | Necot nite: No, of Hours Hourly Rate Amount (PAP) 6. [Eaciomert a, Ours Tuck (18 yo) 2 100 |b, Backhoe (0,80 a) 4 0,50 lc, Backhoe w/ Breaker (0.00 on") 3 6.60 Miner Tools (10% af Labor Cost) Bub = Total for 8 } = — Teas Bh ‘ (Omit arnour= 740 E lpmeciustGosr ie eo Namo and Specification unit ‘Quanity Unit Gost L ‘Amousit PHP) +, ito T ‘ata for [presi eae Ree a con garaien © Uaeaianaan (OSM Eanes — Tare oH of @ 8DETAILED UNIT PRIGE ANALYSIS (DURA) mndo(Oercipton = 103(1}e._ Sructre Excavation (Sold Rock) Neeonerent nm ‘puiperhow 400m! lonation No.of Porson’ | No. of Mounts. | Hourly Rata aber +4 Sonnet Foreman 4 4.00 {buns ator a 1.00 i Sub Total or A ime and Capacity No, oftUnits | No.of Hours | Hourly Rate ‘Amount (PRP) aaa a Dump rk (2 yo) 4 1.00 Bacto (0180 1 028 kc uciio w Bronk (6.80 en) 1 ors hor Tek (10% of Labor Cont) Sub Tova for Toul (A+B) | Pasar in Unk Cost E = = = = Name and Specification nie Quanity Unit Gost ‘Amount (PHP) rane ub Tl tort antrgarees & Massianaoue (OGM) Exe za Pett (CP) ie FE H i] o(GsHe i sete) ie Tha prosnied CUPA Ws Basod on a one 1] gang of labor and eauipmont wilt he apociied ouiput of 400 mh ‘To reease Fe ouput, eclttonal euiomant and labo’ may be. ” Pare €-faethworse| DETAILED UNIT PRIGE ANALYSIS (DUPA) | teno,Oossiton “032M Brag aceon Common So) h m q he ‘Unit of Net : a T ‘Sulpul per nour 5 20.00 mr 4 f Designation No. of Parson's Hourly Rate Amount eH) | 7 A [taba a lccanenseen perms 1 4.00 | Sees ee i 120 (ar rams ae agente on 'e. Unsilod Lavor 2 soo FREER wn ewe op OL, re ‘au Total er } Tame ara Capacly e-otunive | Wo otmoure | HowiyRae | Anwt (Pf | i 8, [Einar |, sackinnf.89 1 100 bs oumo tack 2 9) 2 +100 [Minor Toots (10% of Labor Cost) up Tota for B e mn oial (A+B) . (Ouiput par hour = 30.00 0 E.[Brect urit Gas! [E = 5) ‘Name and Specification Unit ‘Quantity Unit ‘Amount (Pn?) F. |For eta’ Unit Coat Tata” The brevenied DUPATR based ova ana (i) garg sf aber and equpmant wih the wecfed ouput of 20.08 af. Te fnerango the cutout, adetonal equipment and labor may be added a art -tarthwatsDETAILED UNIT PRICE ANALYSIS (BUPA) { $ON@\b Belge Exeavation (Som Roe) m 4400" Besignation Naat Permows | Ne.ef Hours | Hourly Rate Arsaunt (PAP) Censinucten Format 1 1.00 1 1100 (str es are vate ot Me nano on 2 Joo [enum ge a8 ayproee by DOLE. Rr 1 a [Send of ator Run. Ship -Toia for A, ‘Name and Capacity No.of Unitis | No.of Hours | Hourly Rate Amount (PHP) __ Bac (0.80) 1 0.80 B sicko w Breaks (0.80) 1 0.80 ump Truck (2 ye") a 4.00 ‘ner Toot (10% of Labor Gost) Sub Tete, Total (A. 4 a TEER Uni Goal 6 =O) = Namo and Specification Unit Quantity Unit Gost ‘Amvount (PAP) totter oar coma ON ES TATE — —— i Hated tite; The prosbnied BUPA i baved on a one (1) gang of labar and equiamant wan tho wpeciiog cutput of 14.00 m7. = Toineroase tra output, addtional equipment anc bor ray be aldo. 9 Pare EatnacrtsDETAILED UNIT PRICE ANALYSIS (DUPA) tom tio esergton —:—-1042}e_ dge Excavation (Bald Rock) tee Unter Measurement « un uipu per tour 1 fou Designaiton io, of Persons | No.of Hourts | Hourly Rate AAliaber A |». Gomintion Foreman 1 100 bins Labor 1 +00 [ake uaa a trae fe: Unie Labor 2 foo [eee ve oo cee / _—__Bub = Teta or A Name ane Capacity ‘ho.of rive | No.of Houris | HourlyRate | Amount (Pn) 8, Eauiamant 8 a. ck (0.80 mt 1 080 Jo. Bho w Brook (0 80 100 fe. Dump Trek (2 ay 1 080 sine Teta (10% ef Later Gan) Name and Spesification unit Quantiy Unit Cost ‘Amount (P) F. [Rona ‘Sub - Total for [Biot Wali Com [E+ F) a I lesareaets rotos TO oT Note:The provenied DUPA w based on wane (7) ‘eineroase the ouput, aden equipment anDETAILED UNIT PRIGE ANALYSIS (BUPA) IpreDmatolon —¢ TOX2}e BregeKeeavalion Ect Rock) io vearenent | 7 bee {som — a o,f ours | Hour Rate ‘amount (HP) | a ‘Tolnerease the outoul, adlanal equiprnan! and lator may bo added Designation No. of Fersonis maa A toe bee ein eo id Labor 1 4.00 ar Rat 0 aan pet A ase -akllad Labor 2 100 ferro spewed LA L > Sus Tota tor A ame and Capacity Moet na | No. ofHous | Howry Rate ‘Ameunt (PN) 2 100 1 400 1 0.48 1 018 =Total for 8 iat A= 8) 7.50 Eo nit Unit Cost ‘Amount (PAP) TTR TS OWEN OFS fae ioc Tax VAT) Basie ue se = Wns The gaveried DUPA ls Eanod on a one (1) Gang of bor and equipment wih he apectTed output of 1 BO 0h — ark turthworhsDETAILED UNIT PRICE ANALYSIS (UPA) t hom No /Dencxption 403(3) Foundation Fil \ Unitof Measurement me ' Output ger hour : 1250° ‘ Designation ‘Wo. of Personfs | No, oftiowr/s | Hourly Rate A |Cabor la, Construction Fereman 190 Iv. Unaklled Labor 4 7.00 [Lato Rates are verte or RegrD. ar Sub-Total or A Ee, Name and Capacity No.of Unitis | No. ofHours | Hourly Rate et 2, Equpminar i a. Pate Compactor (5 he) 1 4.00 i 7 b. Watar TruaidPume (16000 L) 1 8at Minor Tao\s (10% of Labor Gost) a i | [Dred unit Cont (e =O} Name and Specification Unit ‘Quantity ‘Unit Cost [lator a, ning Matorais om 146 ul i i 3 fi i j Eat Sub - Tota for E Dirac Unit Ce oat Grid ‘Fh prosariod BUPA Ts Ba br ara quprvon! wih is epedied oulput 1.26 Hh Tohersace fe oaput nadie] equptnntana uber vey be eis, "i ‘Nate; a Pact €~farnwaas wd aDETAILED UNIT PRICE ANALYSIS (DUPA) esoeespton 199(4) Excavation ordared below Plan Elevation ct Weasuronon 7 par neue 2000 Designation Hourly Ra ‘Amount (PHP) [ator | niracion Former i fo Unwae Labor 3 labo Ree vara par Reheat Dated 0 Ine wae as petomd ty COLE Ralf the Sub Tot eek Name ard Capacity No. ef Unive | No.of Hous | Hourly Rate ‘Amount (PhP) wet S| up Trask 12 ¥) 2 chon (0.0) 4 Tools (10% of Labor Cost) Bub «Total for 8 Toul (A+ 8) ao por ur =20 0 UNE Coat (© + D) ame and Specification nit ‘Quanity Unit Gout ‘Amount (PhP) pea | oe Total for F i Miacelansovs (OGM) Enparaea TERT IAT ofS Ome of od La 5% of GH Unt Coa (astels ‘The proonied DUPA is Based on a one (1) gang of labor ond equlnment wih te apectied output of 20.00 mim ‘otncrame the ouput, addtional mquiomant and labor may be eccec.| | DETAILED UNIT PRIGE ANALYSIS (DUPA) | tem No /Daasrption 7036) Shoring Uni of Mewaurement ls Output 1008 —— Donignation Ne.otHourls | Hourly Rete ‘Amount (Pr) —_—— ‘a [iaber m Bub Total foc ame and Capacity Mo. of Univa | No. ofHiowi/s | Hourly Rate ‘Amount (PnP) ligament Su) «Total for 8 e s 0, (Guipat = 7.60. E (Biraci Unit Cont feed ean ut | away] oe +. assoc CEmnGnON Pay Rat la, 408 - Reinforcing Steal Bor cy £ b, #09 - Structural Concraio ne " [o, 608 - Stoel Shot Pte m : [S| Direct Une Coat oe H [Gvariwad, Gontingoncios & Macallansous (OCU) Rxpens ty of tema of work involved such as Items 494/405/809 at actual design of the shoring. +) Gontng af na item sa be based on the sandore Detaled Unt Price Anais (OUPA) o ts 40440500 is processed cornponant aay am 8 ort ¢=tarmwansDETAILED UNIT PRICE ANALYSIS (DUPA) £105) Crbdng/Corterdamming 4 ‘0 i No.of Peraonfa | No.of Hewr/s | Hourly R “amount (Pn) ' 160.00 } 2 Yeti) Ls” sen ptr Reece Ds 3 we0., mma as i j Toa for A ; Name and Gapacley Nevetunve | No-erwours | Woury Rate | Amount (PhP) caw Cano (940 mt : 180.00 : Hanna seaule Orato) 1 ‘eoce bg Nac 909A, Ganflasel Divon 1 2600 rg Out 1 #000 | Pur, 10 ruin i 18000 { i Sub-Total oe = Taal As 8) — = i =r sUiicon CB] = ame and Spesication wn ‘uanity | UnitCont ‘amount PHP) } ia Pe 0 9,120.09 i HBB nha ter, Dageas 0 742877 ima wv a input ase mcm (ia Nels Goa) we wcieag unt an fin ety hn ba at on ete bag cm po : "ir ie Soecon toto Pew En i lad cut bo’ Gre Pr eorg lem i j sure egeides& Macolaronns OEM paraae Bara = TORBT OF. =a CINE * : suse i ~ a) The assumed arn to ba provided with cofferdam is 12 m x 12 m square with Steel Shoat eth of 12 mal AB Agim * b) The uarity of comooniont materia roqukemert may vary depsindng on the actual esl of iting olor,DETAILED UNIT PRICE ANALYSIS (DUPA) lor NoJGoserption = 103(6) Pipe Culvert and Drain Excavation Unt of Meanurorrent mt ‘Output 90° hour 20.000" Designation No.of Personis | No.of Hours | Moury Rate ‘Amour (PH?) ‘6 [Caor J. constuction From 4 1.00 lb, Unskited Labor a 4.00 [Later ars ae wai or rata at finns zea. paroved 7 DOLE. Ro [smite tao ete a Su: Total foc Namo and Capacity No. of Units Hourly Rate B,|Eaunsiont a. Ouenp Truck (12 yo") 2 190 ', Bacio (0.60 ') 4 100 [Minor Toots (10% of Labor Gost) $a) Total for 8 = “Teta (A * 8) Lereqearmmuresneeet rat oat Cou + 0) Name and Spesfcation vit Quanity | Unit Goat Fates ze ew . a ova VATS Hi otoT ic [Faia ait cont (GsHris Hout” The protented DUPA ls based on one (1) gang of abor and equipment wilh the apastied ouiput of 20.00 wh. ‘To bicioane the cutput, adlilonal squlpmant and labor may bo added 46 ark -EorhwortDETAILED UNIT PRIEE ANALYSIS (BUPA) 104(1)2 Embankment (rom Boron) 7” “ £0.00 me m 4h Designation No.of Person's | No, of Hourls | Hourly Rate ‘Amnsuant (PhP) 1 4.00 ‘ae 1.00 [Labor Rtn ae vrabe ar Racer Bsa ot Inismam wage as agave by DLE Pele a [rm tata ws - Sub-Total for A no 10h ‘Name ane Gapacity No. of Unit | No.of Mourls | Hourly ‘Amount (PRP) id Rad Grade (40 hp), 7108 1 1490 5 bry Rll (10m), 8040006 1 4.00 TeuhPure (180001) 1 os Bub =Total for “Tela (A+B) fpr Roure BED unk ost = Dp Name and Spectieation Unit ‘Quantity Unie Cost Amount (PRP) Bore w/ 28% Shrinkage Pasion) = 1.08 lean 0 maw ae rs por rapes ase] + fro rewn t once the ary te [omen fx tate wr ahs nw iste, Retr te Comtucton stan Pree Eat lena cuarany oy Cara Ot Poe Marg ‘eonrtee Hare j The preaarded BUPA Te baved 64 a Gna (1) garg of labor and equipment wit the apecifed output of 50.00 m°™H. Terrereene the put, adltonal eigenen rebar may be added. ” Pane annsorns seamsern No 2axcription DETAILED UNIT PRICE ANALYSIS (DUPA) 408(1}b Embankment from Roadway Excavation Ustof Mamurement + ™ utp per nue S000 m* ry Dosignaion NoofPersonis| NaetHourm | wouriyRare | Amount Pa ig er Ecavaton Work a Constcton Forern 1 gs aceslaiiem i . 5 Unstted Labor 2 trate ote Rh ae spreading ar Compacton eS a. Constucton Ferran 1 4.00 ft Unehted Labor 2 +00 fib Yotalor A [ Mame and Capaaty | ne-aruniae | so. ot Hours | HouryRete | Amount «Equine Fer Excavaton Yor Je tutaozer, eH SERIES H PBDSIOO 1 oss . Payondor (180) 1 083 eum Track (29) 2 os lsereasina and Goma: I tasenzea Road Grace 140 hp), G7HOA + 1.00 le. Vieng Roter (10, 010000 + 188 [Wat Ture (00 4) + ons Sip Toater oath | Spr par haar 0.00 fed Un Gon (6D Name ane Spaeteation wn auontty | UneGon | Amount(enm inn su Tout or 3 nea RTC = 1 lovers, Coningonoen F eaianocis OCU) Ean SEs 1 [eons al Wai et 4. fess Rad Tax (AT Bit (oeeay ig Four on Com Grisly, ts” The rovoiee DUFR ie Davod daa Gru) gu ober and ejuprariwh He spect dp o1S0.00 ‘To ineroase tna eutput, tational equipment ane labor may be addod. Pare tanhDETAILED UNIT PRICE ANALYSIS [DUPA) iDescinlon ;—‘104(2) Selected Borew for topping . cone Memrement > = for 50.00 Designation ‘ef Pawonis | No.of ourie | WourlyRate | Amount (PnP) ‘armtectan foversan 1 100 b craton a vate par Rapnntict mtd uae % 160 rer geo agree te snr Res i Sub Toa for fame and Gapacky No.of Unive | Naot Houris | Hourly Rate | Amount PhP) ott Road Grader (149 hp). 7104 1 100 8 Yborny Rote (10 mi), 8010006 1 400 Wir Tuco (18000 L) 1 035 Quantity ‘Amount (PhP) [ Solecodomow (w! 28% Shrheago Factor) co 128 fics of neti ap erie oo eyo ret oa fr ie beating une paces te eat snc ice Joan a ca ane ar naling cow te arp jee Hobe Yo te Covaban waters Pew Da lutte cuntary by Ces! OM Peo Nero | sare Unk i baad on @ one (1) gang of labor and eauipment wih the bpocifed ouiput of B00 my. Tolnisoase the oui, additonal oquipmont and labor may bo add. Eo Part tartareDETAILED UNIT PRIGE ANALYSIS (UPA) Selected Borrow fcr topping , cae 2 fomlerousreten + $049) Vmattennuerent Ma 1 Sapulpa tr 00 0 Designation No, of Persenis | No. of Mouris Hourly Rate 7 Amount (PAP) | A, |taber ’ s. conuston Ferman 1 199 wos te wr agence |b, Unaktled Labor 2 4.00, [Labor gel Ey per wae oo 1 een a : o kaa |e otoroas Rent Grid (140 ph 710A 1 4.00 i | lb. Vicratory Roller (70 mt), BD10ODE a 1,00 > ar cue 1800) 1 ae sun stot “s ail) pore BOE [ore Uni Cost (@ = BY = Name and Specification Unit ‘Quantity, Unit Goat Es Amount (PhP +. pa — |s, Selacted Borrow (w/ 26% Shrinkage Factor) ci 1.26 ce opus ap Rae rn ote a yee cy coe a anes ies Pk ae tee oe me sup-tominet cca Ea ricoannane (OCU Ena ae Pia : cece fax [Vi of (Gens tp hear co Gi Band Ta Gra TOT a SAUTE weed BAPTA Tioie: Tho prosoniod OUT “Te inernnao to oulp.adainal cadpmant art aor may be adele, 6 Part C= earnvoDETAILED UNIT PRICE ANALYSIS (DUPA) /oescipion — YOKA) Kanth Ber nm 128m Designation No.of Porsonis | No. of Houris | Hourly Rato ‘Amount (PhP) 4 4.00 4 1100 [Lote Revs a vaste per Repu! boned a ores by DOE. Pw to up =Total tor A \ Name and Capacity Ho, of Unive | No.of Hourls | Hously Rate Amount (Pn) | pe compactor np) 4 1.00 ar TruckePurp (48000 L) ‘ oot Tone (10% of Lab Cost) Sub-Total fr B t Talal AE ep Rou = 1.25, IU ont (GD) =] Name and Specification Unit ‘Quantity Unit cost ‘Amount (PnP) ™ 138 [pono nvr oe vali par Hae st ase] Kn sn rong int oes ety oh ae ‘va mas and hasrg com the laure me Cran vr Pe lsuemres avery ty Cort ce Pras Moni ammion a (OC) Empanan { = a Geto he (1) gang ot labor ard quipmant with tho spectied output of 1,25 meh, Toircreano tha cutout, eccitonal equiarnent and labor may be added. art CatharsDETAILED UNIT PRICE ANALYSIS (DUPA) Item Ne.(Desoription 105(1) Subgrade Preparetion (Common Material) ‘Unit of Measurement mt ‘Output ser nour £ 300.00 m* Dosigration ‘No.of Hours | Hourly Rate ‘Amount (PH? a [Tabor ja Ganstnution Foreman 1 199 b, Ureilieg Labor 2 1.00 ay Toa for A ame and Gapasity Wo of Unita | Nevef Houle | Wout Rate | Amount ry (Cadament a. Metariaoa Rood Grader (10 ho), TAO 1 1.00 brary Rater (10 en, EDI990C 5 1.00 Jo Water TuckPump (160001) 1 ozs sub Tota for B iz Toul | Stapp Rar = 500.00 [Bear UNE Coste +O Name and Specification ‘nit Guantiy | Unitcost | ‘eno Pt ar | Sub Tot for F |. [Direct Unk Gest fe + F] * eee a Maallanaous (OGM) Expenses ae |Genwnctore Prot (CP) Towra BoC (G:Hei= sp ‘re one (7 gang aflabor and equipmant withthe apoctied output 300.00 07m. a Pac taroDETAILED UNIT PRICE ANALYSIS (UPA) 108(2)udgrade Proparaon (Existing Pavement) m ; 300.00 me Bonignation No.of Hours | Hourly Rae Amount (PhP) ‘0 1 4.00 eS if 2 1100 ——_|latr Raton re arate par Regier! oni of Ire wave a4 ateved by DOLE. Ate tthe [Behl Labor os Sun Tota for A = Name and Gapacity No.of Unitls | MovofHeurls | Hourly Rate ‘Aavount (PHF) = Rod Gmmaer (140 np). G710A 1 4.00 ny Rall (10 mi), BOTOODE 1 4:00 er TruckrPump (16000 L) 4 028 ‘Suds Total for 8 = Unit Suantlty Unit Goat ‘Amount (PHP) 3 ‘Sub - Toul for E = ala Conk» FY = i, Contngoncies & MncoTanaous (OCW) Expensae TETRA oe ars Profit {OP} eRe of B [i Ace Tex (VAT) 5% of (Ge Hey Unt Cet ‘The prevonied DUPA W Dapod on a ono (1) gang of aber and aqupmant wi fe ‘To Perens tho cutout, ational equloment and labor may be added, ort ¢ tartsDETAILED UNIT PRICE ANALYSIS (DUPA] iam Na /Deucrption 105@) Subgrade Preparation (Uneultanie Matera) Untef Measurement of ‘Supa par nor 390,00 a" Designation Wo, of Porson/a | Ha. of Heuris | Hourly Rate Amount (PHF) A,|tabor aA la. Construction Feeaman 1 1.00 Ib, Unekited Labor 2 1.00 [tater ats are wait tay Resin te Jism wage es aperored by OOLE. Ri Sond of Lat ate. Lt {Sub-Total for A Name and Capacity No.of Unit's | No.ofHourls | Hourly Rate ‘Amount (PHP) ,|Egapmane == a, Notsrizad Road Grader (140 Ne}, G740A 1 400 Jb. Vibratory llir (19 mt}, 5010006 1 4.00 Jc, Watue Truci/Pump (18000 L) 1 025 Sub Tet for 8 ca Total (A + BY 1. [ Stout pan hour = 900,00 ev tosses eo. ‘Nome and Specification nit ‘uatty [Natori Sub Tota for & [Skeet Unk Goat E+ F) Fe eee cia Rcaianaaue OEM) EaTaee ee 1. [eontaetera Profit la of, 3 ala Aad Tx Saleen i FFota tint Gost (Grnete ee aad GUPATa based ova (1 gang of abr and emer wih hv spate Bap aT s0000 WF ‘To reronse the ouput, addtional oaupmant ard labor ay be added “ Pan fartbwers200 Aggregnie Sutbane Cour im DETAILED UNIT PRICE ANALYSIS (DUPA) 4 90.00 m* Designation ‘ofPorsonia | No.of Houris | Hourly Rare umount (PHP) 1 1.00 2 4.00 |.soar avon are vavatie ner Mgt banat | Jinan vege 08 opirows) by DOLE, Peter t> al sama of Labor Ren, Sub - Total for A ‘Name and Gapacity No. of Unitis | No.of Hours | Hourly Rate “Ameunt (PhP) Noirtues Road Grader (340 hp), G7108 1 4.00 1 7.00 1 0.28 Unit Quantity Unit Cont “Amount (PhP) m 148 lence af mamvits wn vane per Ropu based] for ine mre ut ances te neat ere Hel Jnservat af oeal tava ent ing co 10 hw pre fate ts tha Consbutin Matte non Oui} lb Guia Oy Cen! Oe Pre Arto] [cemmiter om ‘Sub-Total lor = Wrote + FL joneies & MisGetaneous (CM) Dxpannan TERI IT TIO of G. TOA of a Saar cee CIEE Tia peaTied OPA Ws based on a one (7) ‘o'ncrnsa te output, adlivonal equipment and Inbor may be adced, ng of labor ard equipment withthe epeciied autjut ol 6 Tom Fe Subbine and Base Covese
You might also like
DPWH Cost Estimation Manual For Low Rise Buildings
PDF
90% (128)
DPWH Cost Estimation Manual For Low Rise Buildings
288 pages
Bridge Construction Cost Estimation Manual
PDF
88% (8)
Bridge Construction Cost Estimation Manual
111 pages
DO - 028 - s2019.pdf COST ESTIMATION MANUAL PDF
PDF
94% (17)
DO - 028 - s2019.pdf COST ESTIMATION MANUAL PDF
282 pages
Road Construction Cost Estimation Manual 2015-Part 1
PDF
91% (11)
Road Construction Cost Estimation Manual 2015-Part 1
140 pages
Unit Cost Analysis/Price Breakdown LGED, Bangladesh
PDF
75% (44)
Unit Cost Analysis/Price Breakdown LGED, Bangladesh
2,994 pages
DUPA Bridge Construction
PDF
No ratings yet
DUPA Bridge Construction
85 pages
Dupa - Road Construction 2015
PDF
88% (48)
Dupa - Road Construction 2015
928 pages
2015 DPWH Cost Estimation Manual
PDF
100% (10)
2015 DPWH Cost Estimation Manual
250 pages
Bridge Dupa PDF
PDF
100% (3)
Bridge Dupa PDF
116 pages
PSMM 8th Edition 2016
PDF
100% (1)
PSMM 8th Edition 2016
194 pages
DPWH Construction Materials Price Data 2019
PDF
85% (13)
DPWH Construction Materials Price Data 2019
197 pages
DPWH - Road Construction Cost Estimation Manual - (2015)
PDF
50% (2)
DPWH - Road Construction Cost Estimation Manual - (2015)
230 pages
Analysis Template - BWDB Updated
PDF
100% (5)
Analysis Template - BWDB Updated
761 pages
19PF0016 CCS and DUPA
PDF
100% (1)
19PF0016 CCS and DUPA
37 pages
How To Prepare Detailed Unit Price Analysis - V5 - Updated - Corrected
PDF
100% (7)
How To Prepare Detailed Unit Price Analysis - V5 - Updated - Corrected
33 pages
Dupa - Road Construction 2015
PDF
100% (2)
Dupa - Road Construction 2015
461 pages
Detailed Unit Price Analysis
PDF
100% (3)
Detailed Unit Price Analysis
1 page
Bridge Construction Cost Estimation Manual
PDF
100% (1)
Bridge Construction Cost Estimation Manual
116 pages
Bridge Construction Cost Estimation Manual 2
PDF
No ratings yet
Bridge Construction Cost Estimation Manual 2
116 pages
Item 204 - Portland Cement Stabilized Road Mix
PDF
100% (1)
Item 204 - Portland Cement Stabilized Road Mix
30 pages
DPWH Ext. BLDG
PDF
No ratings yet
DPWH Ext. BLDG
318 pages
Dupa
PDF
100% (3)
Dupa
79 pages
Method Statement For Aggregate Base Course
PDF
100% (3)
Method Statement For Aggregate Base Course
3 pages
BD - RHD General Specification - 3 - June - 2016
PDF
100% (2)
BD - RHD General Specification - 3 - June - 2016
310 pages
RHD, Bangladesh SoR Analysis 2018 Dhaka Mym Cumilla
PDF
73% (15)
RHD, Bangladesh SoR Analysis 2018 Dhaka Mym Cumilla
304 pages
DO - 207 - s2016 - Bridge Construction Estimation Manual PDF
PDF
100% (4)
DO - 207 - s2016 - Bridge Construction Estimation Manual PDF
2 pages
DPWH
PDF
100% (4)
DPWH
276 pages
DPWH Cost Estimation
PDF
92% (12)
DPWH Cost Estimation
67 pages
Estimating
PDF
No ratings yet
Estimating
72 pages
FLOOD CONTROL CONSTRUCTION COST ESTIMATION For Comment
PDF
No ratings yet
FLOOD CONTROL CONSTRUCTION COST ESTIMATION For Comment
71 pages
Road Construction Cost Estimation Manual - 2015 - Part-2
PDF
No ratings yet
Road Construction Cost Estimation Manual - 2015 - Part-2
117 pages
DPWH Cost Estimation
PDF
No ratings yet
DPWH Cost Estimation
63 pages
Road Construction Cost Estimation Manual 2015-Part 2
PDF
100% (4)
Road Construction Cost Estimation Manual 2015-Part 2
117 pages
Memo 097.7 - 051822 - Fuel and Oil Lubricant Consumption of Commonly Used Equipment
PDF
100% (1)
Memo 097.7 - 051822 - Fuel and Oil Lubricant Consumption of Commonly Used Equipment
14 pages
2018 DPWH Department Orders
PDF
No ratings yet
2018 DPWH Department Orders
883 pages
CEA - UserManual - v.1.0 - 101518
PDF
No ratings yet
CEA - UserManual - v.1.0 - 101518
97 pages
Construction of Water System Level 2, Salvacion, San Ramon, Alongong, Libon, Albay Detailed Unit Price Analysis (DUPA) FORM POW-2015-01D-00
PDF
100% (1)
Construction of Water System Level 2, Salvacion, San Ramon, Alongong, Libon, Albay Detailed Unit Price Analysis (DUPA) FORM POW-2015-01D-00
64 pages
DPWH Estimated Pricelist For Bridge Per Meter
PDF
No ratings yet
DPWH Estimated Pricelist For Bridge Per Meter
1 page
DPWH Cost Analysis
PDF
100% (1)
DPWH Cost Analysis
4 pages
Part C DUPA
PDF
No ratings yet
Part C DUPA
11 pages
Cost Estimation Manual 2019 - Popular Edition
PDF
No ratings yet
Cost Estimation Manual 2019 - Popular Edition
56 pages
Road Construction DUPA
PDF
No ratings yet
Road Construction DUPA
277 pages
Unit Cost Derivationconstruction Cost Engineering
PDF
No ratings yet
Unit Cost Derivationconstruction Cost Engineering
5 pages
Jolomaynon Solar Water System POW Revise
PDF
No ratings yet
Jolomaynon Solar Water System POW Revise
124 pages
Pow and Dupa Roads Siruma
PDF
No ratings yet
Pow and Dupa Roads Siruma
16 pages
Detailed Unit Price Analysis (Dupa)
PDF
No ratings yet
Detailed Unit Price Analysis (Dupa)
25 pages
New Dupa Roads - 2023
PDF
100% (1)
New Dupa Roads - 2023
69 pages
Jose V. Yap Sr. Access Road
PDF
No ratings yet
Jose V. Yap Sr. Access Road
3 pages
Name of Project: Construction of Demorok Bridge, Josefina, Zamboanga Del Sur
PDF
No ratings yet
Name of Project: Construction of Demorok Bridge, Josefina, Zamboanga Del Sur
49 pages
Title Detailed Unit Price Analysis (DUPA) FORM POW-2015-01D-00
PDF
100% (1)
Title Detailed Unit Price Analysis (DUPA) FORM POW-2015-01D-00
1 page
DPWH Bridge Structure Per Linear Meter
PDF
67% (3)
DPWH Bridge Structure Per Linear Meter
3 pages
Region 10 2nd Quarter C.Y. 2024 CMPD
PDF
No ratings yet
Region 10 2nd Quarter C.Y. 2024 CMPD
16 pages
Approved CMPD 4th Quarter 2023 - Region VII
PDF
No ratings yet
Approved CMPD 4th Quarter 2023 - Region VII
19 pages
Office of The Secretary
PDF
100% (9)
Office of The Secretary
150 pages
Road Construction Estimate
PDF
No ratings yet
Road Construction Estimate
306 pages
2014 Acel Rates: (Minimum Operation 8 Hrs. Per Day)
PDF
No ratings yet
2014 Acel Rates: (Minimum Operation 8 Hrs. Per Day)
4 pages
DO - 096 - s2016 Standard Pay Items
PDF
No ratings yet
DO - 096 - s2016 Standard Pay Items
157 pages
DPWH Minimum Test Requirements PDF
PDF
100% (4)
DPWH Minimum Test Requirements PDF
30 pages
Memo 097.7 - 033122 - Construction Materials Price Data (CMPD) For The 1st Quarter of CY 2022n
PDF
No ratings yet
Memo 097.7 - 033122 - Construction Materials Price Data (CMPD) For The 1st Quarter of CY 2022n
15 pages
Dupa
PDF
0% (1)
Dupa
58 pages
Dupa Page 41-100
PDF
No ratings yet
Dupa Page 41-100
63 pages
DPWH Department Order-72 Series of 2012
PDF
No ratings yet
DPWH Department Order-72 Series of 2012
6 pages
DPWH Department Order 72 Series of 2012 (ABC)
PDF
100% (3)
DPWH Department Order 72 Series of 2012 (ABC)
6 pages
Cost Estimation Manual For Low Rise Buildings: Acfl Nyms
PDF
No ratings yet
Cost Estimation Manual For Low Rise Buildings: Acfl Nyms
5 pages
Do 22 DPWH
PDF
No ratings yet
Do 22 DPWH
6 pages
2022 07 05 10 52
PDF
No ratings yet
2022 07 05 10 52
83 pages
Project Management Institute: Standard
PDF
No ratings yet
Project Management Institute: Standard
86 pages
EFFC Tremie Concrete Guide Final
PDF
No ratings yet
EFFC Tremie Concrete Guide Final
52 pages
BWDB Technical Specification For Civil Works, First Edition - 1995
PDF
No ratings yet
BWDB Technical Specification For Civil Works, First Edition - 1995
119 pages
RHD Schedule of Rates 2018
PDF
100% (1)
RHD Schedule of Rates 2018
18 pages
BWDB Technical Specification For Civil Works - Second Edition
PDF
0% (1)
BWDB Technical Specification For Civil Works - Second Edition
150 pages
Flowchart For Bridge Work
PDF
100% (2)
Flowchart For Bridge Work
1 page