0% found this document useful (0 votes)
128 views

M.S Audio Visual

Uploaded by

cleevan143
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
128 views

M.S Audio Visual

Uploaded by

cleevan143
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 65
ypalegyyhd per Drake. 2 confuence aes 2» A tes [METHOD STATEMENT FOR TESTING & COMMISSIONING OF AUDIO VISUALSYSTEM(Rev.03) "RESPONSE TO CONSULTANT COMMENTS FOR DSLELTCMS-331 Rev SN. ‘CONSULTANT COMMENTS. DSI RESPONSE REMARKS check list for Pr-esting and Commissioning to le provided and attached in method statement Proststng and Commissioning Ca checklist atached tease note hat alate documents for AV system suchas approved shop drawing,elated 2 festcentiatesapproved schematic dagram.te| Comply lo be included inthe eck isto pre testing land commissioning Drawings and Test cerfeates details ‘re ncaded inthe checks andthe same willbe atached during the inspesion time with TR documents (Check list of pr testing and commissioning 3 [Ste yaa Tein spas oe comty | Dewisreincaed nthe Pre TAC ftding check ‘i Cormison check st. erated Pre ein check it check i soli es sa lo Betrataces ring ck it 4+ femettnetomsnangctenne | apy TCMS-31() comin bret wx For Submission IC conttuence pales asles | ppg aX Khatib & Alami Vy poco cone apa] Ms m 3 | aeouas | _ ma ‘eating and Commsoning DSLBL-TCMS-0831 Ma Shon sane hare hack Ws ef Tepiten end, Somuniivien Shan ld le [Reis anentmi — E— lady osha 6 5 {opditea, Teadiog_fPeaQir] bebe in rm feces ste oe ee rete Leen PP 05 Nov 208 Document No? DSUELTONS-T ad Drake & Scull LLC., Abudhabi, |Revsson nor Fa UAE. Daw” Sasaore FAIRMONT HOTEL & SERVICED APARTMENTS PACKAGE 2-MAIN WORKS ‘ABU DHABI, UAE. METHOD STATEMENT REF: DSH-EL-GEN-MS-331 REV: 01 DISCIPLINE: ORIGINATOR : Drake& Scull. LLC ELECTRICAL Tite METHOD STATEMENT FOR TESTING&COMMISSIONING OF AUDIO VISUAL SYSTEM REV pare | status REVISION DETAILS le | Submission for Approval Revise AResubmt ‘Status Code: FA: For Approval FI: For Infrmaton Fe: For Constucton Cefmmacen™ | attain | Tnncor | MePnoen | iCal | nano Distebution i | omZou © P0® Submission DosumentNor BELTON my Drake & Scull LLC |ein'he ar Srevivs AbuDhabi,UAE aoe FAIRMONT HOTEL & SERVICED APARTMENTS PACKAGE 2 -MAIN WORKS ‘ABU DHABI, UAE. METHOD STATEMENT REF DSLEL-TO-NS-94 ev 01 DISCIPLE: ‘ORGNATOR: DrakeBScul. LC ELECTRICAL The METHOD STATEMENT FOR TESTING& COMMISSIONING ‘OF AUDIO VISUAL SYSTEM. rev | pare | sravus REVISION DETALS 0 | aoa |e 2 Sutin Ao 0 | soa | ¢ RovtesResvont Sao FA For fool FV Fortomaton Fo For constnton RGPAKED wy ‘aucun {rPROWED mY eee onc heen rmoncrMACeR et KH | Se Distrouton: For Submission Dae HECTOR 9 Drake & Scull LLC jis: 1) rete AbuDhabi,UAE Page no : $0f21 coments ane oecipion Pen | nee ot aon oe 2 | scene oe «| reste o 5 | aponer «| exer et e 7 | cuenta a 2 | Tenge crming Pare oe 2 [comin ve oe 20 | _2rrcrnminng e oe co or 32 | seetrome o 13 | ss ri te ” a | vert ere » as | _Avnky Son i ” a6 | oan pre renee a 17 | _fekkecmre fs asin ” aa | retkeot = 1 | tna ty rose » 20 | ceri nd ae camer = 21 | nett tn 7" Fas a RTE a aT = ‘TACOFAVSYSTEM, Dos no? DSFEL-TONEST A Q Drake & Scull LLC Dae eecnie Grantee AbuDhabi,UAE Page no: Sef 1.0 PURPOSE ‘i visual consmisoning i a systematic, performance esting dd quay corto proces. Is designed to ‘erty that nanlyintalles equpmest and systems operate according to the intended design ond cients roads. Commissioning typical begins, once devices are stale, “he testing i cared out fr indviusldovies connected tothe AV eal system, These tts can cot that ital devies are opratana. The pooranmable devices ike AV cool processor, Data sever; AV Sucher wil be programmed at ste and tested Conmissorng at Falmant Hotel @Seniced Apartment Package 2,Abudhas UAE Enginer conduct commissioning and teste for every system before ts negated tothe main cn! unt AV Engines conduts conmisoning fr the fallowig systms Ay controler ‘aude video dtrbuton system, Vio Conference System ‘a DSP, Apters ad AV switchers ‘and AV sntchingceves. Al the AV equpmert’sareconvoled by one master AV corel 1+ Touch screen leyouts se prepared por clent requirement and contol seqsenes ae tested by canting te master AV coro. 3.0 REFERENCES 1. Agproved Stop Drawings 2 Aoproved Maral Submit 3. Dara shests 40. RESPONSIBILITIES 4. PROJECT MANAGEMENT RESPONSIBILITY PA wal be responsible for avril implementation of his metiad of statement, coodnation with the main freer and subcontractors to ensre efile exeaion of werks In accordance wth te project specteatons and mosuecture’s stuctens. 42 COMMISSIONING ENGINEER ‘The commissioning Engineer wll do the programming of the system based on design and testing wil be Cried out na esl be generate, ‘Ta.coFAVSySTEM ~—DSHEL-TEMS5IRe0 For Submission Dar DSCECTOWST er Drake & Scull LLC {rm rants’ AbuDhabi,UAE Page: Set2t aa Ay technica and helper wil on together o support programming Engnser to cme the eoniguraton of the system. 5.0 MANPOWER + Commisoning Engineer + AUDIO VISUAL Teemnidans 8 Heer 6.0 Equipment/ Specializing Too: Sito] _Emipment Kem User ‘quantity 1 | compe taxes Inset Ege 2 2 | Testa eaumerts Nutineters | iesedtoTeonicer + 3 | se meter Tse etncen 2 7.0 CLIENT NEEDS AND ANALYSIS ‘an analss ofthe systom and ts operation sequences wil be discussed and expldned to the det. This {rage te customer the Knowledge about he syste end how it sperats, als Fany suggestions from cent ‘wil be coidered if the system suppers the features a ts “The cet wil be shown a sample of the Touch sren layouts and design with thar oeration before atl onfigration ofthe actual system. Ts wl Map the custorer to have his customized and easy operate able ‘ouensaeen, “Te analysis dscusson points area blow. +O. al yt operation ofeach mestng reams and operation sequences of exh equipment. rach soon Grape layouts and its desi atonal entre that an be nas inthe system supported. + Cistomer acesance and cooing the schematic design and operation, Drake & Scull LLC [fer oN 4» ‘AbuDhabi,UAE Paso: Set 20 8.1. SITEVISITS FOR COMMISSIONING WORK (our expeenced deccated auto vial project managers ond project englnears werk say with ste staff to ‘make sur that he dolvered sem wil meet the lets requirement Project engncers work with architec, elecrcal contactors, general cantractrs, dan constants, near ‘corto and patil planers oer a cst flor fr you environment ad equreents. AV systems have fadity to nterconnact to other bung systems such as newer electrical, HVAC and bung automation o eeray conservation. AS AV systems provid completa operational functions forthe guerre peas ore ca Hae, desi, ond eon prods wil be “The document such as protzcls and interface module deta wil be cscussed and tested to maketh other party devices to cmuricte wih AV syste 9.0_ 11x COMMISSIONING WORKS During the process of 1st fi cable pulling, al the necessary cables for commissioning wal be ‘orecered. Sich a6 ado cables, speaker cables, control abies, Ethernet cables ar pulled to length {Sper the panteaton require ofthe Sse + When the rack setting completa, all the cates wil be terminsted and connected to respective ‘squoments Each eble vl eo be tested with 8 malt-meter to very contrat of the cable, The facts wil be powered en 10 check al the equipment geting proper rower, Te BTU of the aulpmentisclested and provides necessary cola. 9.1. OFF SITE COMMISSIONINGR TESTING 1+ The interfaces and processors fr iteration wth other system wl be tested ff ste to cove the system capablty and make 2 compete stugy of the Integraten. Ths wil be done by the Cxmmissonng Engineer and the report wil be forwarded to design and project management ‘deparomer. It the system has sme capa, wl be eddressed tothe customer and wil rase the qua fr change ofthe product system tation. 10.0 2°FIX COMMISSIONING WORKS uring the process of 2 fx the foloning vars wil be card oi by the crmisioning engineer 1) Thetnstalaton ofthe touch seven th the cabes connects behing the Crest connaction. 2} The connection behind the rack To the cormuniation cable to al the devs, @ Sf cant test vl be done tough the software to caf te connect to al the devices. 18 COFAV SYSTEM i” TEMS 01ReO4 For Sutnission Danae DEELTONSST Drake & Scull LLC Rev.n0 : ot poeeeee AbuDhabi,UAE, Page Frat 3) The otage check wll be dne to cot the operating wotage fale devices. 104 un “The canmisioning ofthe AV system wil be done by commiscning Engineer in step by step 35 describ bet ‘Asotware lenzes forthe respective equipment il be connected fom instalation tem “The IP port and cont wil be checked aed cntred wit) the Network enginae. TT ny specie Network configuration required for IP such VAN Te wil Ee informed to Network aanisotar to get he require. Bite eae for Vio overercesystam and oer display system wil entered and enabled. Internet conection avays require to endl the lense proces. Frmvare wl be upded for al he processors and Touch sons ‘Touch sere calreton and ID setng wil be done as per the design and commissioning procedures. hacking the connectivity o a the connections such aR part, RS232, HOM, OM and power cable Fst the Touch screen layouts prepared and uploaded tothe Touch see, ‘The logic forthe system operation Is presranmed using the sofware and uplended to the proceso. “Te testing of the system fs done ater every tine the processor Is prorenmed. Ts press peated til the reqarerent achieved ‘The QAQC Engineer il check the proocem and approve the system opt. ‘The DSP Diptal sound processors and lighting cortrl wil be programmed Ino the processor as integration and prosrammed tithe 3° pry devices et fo A cons >The final ung of MIC and Spebker wil be tested in presents ofthe clot to ter satisfaction, 11.0 QUALITY SYSTEMS MANUAL “The Qualty Systems Manual describes the quality sjstam operated by the Alb Dat. The company ensues thatthe range of serves provided mess the regarement of cuorersn ne with the Qualty Potcy of the company. Documented procedures ae dearly defines and nie an interpretation of how rqirments of the Quy ‘stam sandarés eto be applied tothe services sup bythe company. ‘Decuented pocedures fr each acy define the quality planning Le how the reqlrements for quay are ime. Wherenecesary, Qulty Pans meuang obecves wil be prepared to full the spec equements (of estomererdrsentrots and any applet reguatory requiremerts, 114 CONTROL DOCUMENTS - documenta procedure has been established and Is maintained to ensure contr of documents of ternal land efterel org. The docimented QMS i mace avaiable to CSS staff though controled copes, tainted by designated personne sled inthe “Ut of Carte Copy Holders this mena Electronic ‘apy of the cuaty mano aso oveable nthe network. The documents are confer and hence featicted to ners Creation within the compar. IMs! documents are reviewed ard athoiad by the ‘oling persons 18 CO AV SYSTEM © psem-nesssiney ot ‘AbuDhabi, UAE Prgeoo: fet ZX Drake & Scull LLC [ion ae Documents Reviewed & Approved | Issued by Quaty Systems Manual (SM) Operations mM yay Systm Procedures, at Opie essere Sede Operations ” Forme spscmens| ‘Operations Pm ‘Docent of intemal agin are revived and updated as outcomes of Internal gusty act and customer fendhck, The vail of GSM and procefures re reves In ttalty during management review meetings. It is ether revadate or appropiate changes ae inated. + Documents of extemal gn are identi, sted in Inmard register + Contrallas nad copies wl be cleey mare to avd unrtonded ws, “+ Uncantvled cpls issued fr any purpose shal be stably idente, orignal hard copes ofthe doounents rtanet after usdatng or obsolescence are marked as superseded, ‘oh Date fellows on ioe organization corespondence routing mthod. Tis mod of documertation opted fr Project Management, who con idee al incoming carespordence and ientiy the ection that ‘was taken, nad op ovlsble fo ll corraspondance in and out ofthe fice to ensue that all actors ‘re propery folowed up and aecountod for during the construction proces. 11.2 RESPONSIBILITY ‘There fe designated and responsible Indlaual to overs tase tasks and to marian 8 database to keep trade of corresandence/dceurertatio, fs satus ts suspense, and the person or persons responsible for ‘even, esponse andor approval. General crespondence and carat cay ecrurencs sal be processed ‘sv ecorcance wih monagement “Te document department is responsible to generat Standard Operating Procedures poles fr the resp, handing, preparation orig of al rie, lal, day tay dosent 120. SAFETY CHECK 12.1 GENERAL SAFETY PROVISIONS Z oo + Staff ill nat bestowed to work without safety induction, SIO + Mlenplejeswiatend HSE oration nduton, |i sasernn | ‘TE COFAVSYSTEM DSL-EL-TCMSs31Re¥0t Das: 2as2016 7X Drake & Scull LLC fie 3" rebte AbuDhabi, UAE. Pageno : $of21 “+ Where there ssf cutting tos en hands had lowes wl be Wor, “+ Noone sal practoethowing of ose material rom high elevation + Noll of any chemical fel substances on ground, which may pote the envionment + Agood standard In housekeeping wl alvays be maintained. + Construction dei shal be enllets at dsinated places ony + Dats stored away rom the work place an as pr the Instructions of he superior ony. 4+ No fre wll bet on st, whatever the creumstances. + No overeating of any iting equpment. + Equpment vil be used only forthe purpose Intended. 422 PERSONAL PROTECTIVE EQUIPMENT + ter protective gear mentioned here wil ao be proved as per the rear + doesnt sop aden but ean hp to essen is ees. “+ Employers have 8 diy to elite the hazard and or contra the is, 3 far as Is reasonably prcteabe + PPE therefore represent line of fens for the nail. There are many types of PE, fom helmets to fotwear, each type designed protect ferent parts cf the body anaest spect hazards. ®) HEAD PROTECTION very india entering the ste must wea safety eet. ') FOOT AND LEG PROTECTION Softy footwear vith te! toe cap ae mi sol is essential at site to prevent crust injures to toes at to Stop sharp objects puncturing te sakes feet For Submission Date: | 14 COF AVSYSTEM DSL-HL-TEMS- SRO ? Duets ee ee Daw : 08201 a] ‘AbuDhabi,UAE Pagtoo: (©) HEARING PROTECTION Noise defined as an unwanted sound. Regu exposure to excessive els causes damage to the_ inner {ar and permanant los of hiring, A single exposure to avery laud nls can have the same effect. Many ‘pes of ear defenders are avlabl fm deposable earplugs to eo mis od safey Rees ncrpratng ‘or defenders and suitable potato canbe fund for every satan. ) EVE PROTECTION “There are many types of ee protectors and its important ta wear the correct ype to ae the potion. Pasene dong grinding works, aperating pavement beakers et, shoud Wear goge, and those valved Invweldng and eating works should weer Uted safety goggles. ©) HAND AND ARM PROTECTION + Gots give protection agalst cs, tsi or ietant chemi and dermatts. {Use of appropri doves gives protection agaist pater hazare one may face ‘Rube’ doves shou be used for electra wor. ) RESPIRATORY PROTECTION ‘There @ wide choles of respratary protection 13.0 STORAGE AND HANDLING MATERIALS 2. When string matral, employes shalt (1) Prevent creating hazards when storing materials by being aware of the matetals hehe and waht how access the stored moterals ae tote usr ~ consi the read for avait of the materi and the conden ofthe storage contanes.. A Mater stored in ere must be sacked, racked, biased, irfocked, o othevise Seoured to prevent sin or ealapse, (2) keep storage ares fre from accumulated mater that may cause sips, ps, fl, resort may conte to tarborng pests (3) possi, place bound materi on racks end secure Itby staking, locking, or iter= Tecing fo prevent rem sin, fling, or enlasig. (4) Stack lumber 0 more than 16 fet high i haned manual 2d no more han 20 feet Fang fore 18 Remove al nals om used hanber before stacking Stack and level lmber on suppated bacng _ ‘TACOFAV SYSTEM items sme bac": tavanie ete AbuDhabi,UAE Page no: Vfl | Zr Drake & Scull LLC fat: ee" (5) are stacks are stable and supporting. Observe height lintatons when stacking smoterals (6) stack bags and bunces in nterlckng rows ard tthe height ofthe stack to hep ‘hem secre, (7) sterols must nt be stored on scaflés or runways in quattes exceeding those ead for recat operations b, Adationel safe materi storage practces ince (2) Ensring shelves and rack are str adn god coe, (2) stacking all materi on a at base, (3) Ptacing heavier objects coer othe fac andlghtersmalr oto higher. (4) Not stacking toms so high that they could boc sprinklers (1 of dearance) or come In eortact wie overhead ight oes. (5) Using materahanding equipment oF 2 lar to place or rarove ems above your head (6) _Neverstanding ona shel ck owes, oF acai Hain contractors supposed to provide a storage location forthe sub-contract. 14.0 VERIFICATION AND TESTING. ‘Upon completion ofthe alton (prior to Acepkance Testing) the Contrcr shall perform ericson tasing of al ments ofthe stem as flo: 1, GENERAL PERFORMANCE VERIFICATION 2, Allcabl nes shal be tested er conn, phase; sldng, rope being, nd unessonable soa ls. b. Al equpment shall be tested for proper oparaten, such 3s tape transport functions, vdeo projector ‘S84, sites operating wth comesponding iors, ek 2 AUDIO PERFORMANCE VERIFICATION 1. Upon completion of the systoms testing, the onractor shall acs, and unfrmiy calibrate all in ojntments ofthe ado systems sd elated sytem doves. 15.0 AVINDUSTRIES STANDARDSBCODES Code and stander inerationaliatin efor have brought the various buligand elect Feauiements Coser than ever. AV system desgnars in countries ter than the US. and ‘Ta COFAV SYSTEM mete first | Deno DSTELTCHSHT 2X Drake & Scull LLC [Re 8 see ‘AbuDhabi,UAE Pageno Batt cenada may fe the lal cages ad standard fer interchanges to the requires set {ert by the organiza desorbed ints sate INPORTANT: The ensuing Ist of ecarzatons and documents not exhaustive. Ass the cas wth al bung and electri requemets, the AV Systm ‘esgners nd instars shoul always check with the lea autres for {he predominant sours ‘National Electrical Code® (NECB) “The Nacona crea! Code@® (NEC), published by Nelonal Fe Protection Associa (FPA), dines recommended bang codes tat pata to ec yt, nduclng ‘ements of AV sstams, and hasbeen adopted by most Nort American reso VaryND serecs. “The NEC provides guidlines fr: + Elec! power dstbuten irtaliaton, ‘cond use. + Winn compaston fr aiferet spaces within a structure. ‘nv Inaers shou determine the codes that pertain fo the specific area and follow the mast restive code hat overs Canadian Electrical (C8) Code ‘Te Caradon Standort Besocaton (CSA) I @ nonprofit membership-based asacaton ening busier, Industry, qoverment and consumes i Canada ara the ecb maresace, ‘eal (Cz) Cade update every fou yor. “ha net of CE Cade Prt sto estab safety standards for the installation and ‘mantennce of electrical equpment Including telcommunications. As wth the NEG be (CE Code Part Je 2 veluntary cas that may be adopted a enforced by prov ard ‘errtvalregdatory autores. The CE Cade Part 1's the Canadian equvaert ofthe Hecate iste of Berea sod Escrenc Engines, In (IEEE) Aatona! ‘lca Safty Code (WESC) the US. Environmental Issues Desgn conseraions need to account forthe enveenmentn whic the AV str wl be instaled and operated. This may nde, bu not ted to, sues such a temperate ‘anges, humid ranges, and susepity to naturel ocarences (2, Ruane oF cortqustes) ‘Americans with Disabilities Act(ADA) “The Amercas with sales Ac (ADA isa document establishing felt requremets farceablty acess. This document mos referenoad only for accessible dasn Censiderations (eg, specng between equpment and oor yous), but als conta: ‘egulatonsconsaming sans and sgrage It ko adresses mounting haghts and dae ard communication requirements applicable to AV designs and instalatins ‘T&COFAVSYSTEM et one": 2.062016 r Dae RE TCMETT Zr Drake & Scull LLC ffs" 2! renters AbuDhabi,UAE rage no: Bafa Telecommunications Industry Association (TIA) Standards “Feecommuniation Industry heocaten (TIA) nonprat wade assocton serving the ammniaton and inermatontecneoay inary nthe Unitod Sites. TIA soled ‘Sandardscevlopmen, anit members manufacture o supply the produ and saves ‘edn cmmuniatons Construction Codes Canatucton codes are goverment regains that define the constuction requirements for all aspects of balding coun, incudng Ste 1 Meters { Paming. 1 Bec onstruction cds are defined fr 2 pater sate cy, jrstion. The requements ‘Sefned by cone uc ces must be flowed by al persons warkng ena corstucin Projed, ncucing AV instars. “Te tnterationalBulng Cae (180 fs contruction coe develope bythe Itematoral Cade Counc (ICC). The BC often use by locales when dewloing te bln odes or parti scion. ‘Society of Motion Picture and Television Engineers (SMPTE) 7 the maten moging sty. SMPTE meaner te spread Uvoughout 88 eaueres. SOPTE publishes Amercan Natenal Standards Istiute (ANSI approved standards, recoenended Pradtess, and engineering guines. “American Society of Heating, Refrigeration and Air Conditioning Engineers (asinae) “The American Soc of Heating, Reigeaton and A Conditioning Engineers (ASHRAS), formed in 1959, 2 lebalargarzatinsating andar and quidenes end proving technical and edvestional formation for hean,verlting andar cntioning (HVAC) and refigeraton. Federal Communications Commission (FCC) ‘The rues ad regulations ofthe Feceral Concnuicatons Comission (FC) are cxf in Tile 4 of the Cade of FaderalRepustons (CPR). Te 47, Par Te—cableTalesion Sonic (47 CFR 76), adresses multichsnel vdeo and cable television (TV) service. Te ‘hs ad regulations of Par 4 provide forthe cteaton of cable TV systems ae thelr ‘operation conformity with stander or TV broadcast signals, eregram excusty, ‘ablecasing,acrss cannes, and relted matters Internationa! Power {Avaslgn a talon must tke nto caniration the electrical system ofthe utey In whch te ecuipment manufactured gd installed. Bec vltage standards and rower ‘igs vary by cunt. stL-1¢: For Submesion “TA COFAV SYSTEM 2% Drake & Scull LLC [ime me" AbuDhabi,UAE Fagen: ata “Tree primary power variables that AV desgrers shuld be anae of for intentional salts ae: Voge. «Frequency of poner generation {Type of eect pigs Fer ecampl, nthe US, ypc! powers 120 ots (V) 3t 60 her (using eter aft bide tachment plug or lt Bde plug wih a ound urn pi any eer cours, however, use higher vltage (220 to 20 V), a laver frequency 0H), Sd eerent types of ge, Converters moy be Used to stp-down veltage fam one amount to-anothe, whe rarstermers maybe naades to top-up lower ine votes i igh \eitage, equency cannot be converted (e, rom 5 60 2, ahough some equmant ‘nay be abl to handle the dferences in the fequeny. Dre types of phgs con uss be Fandled wit lag adres. InfoComm International® ‘rvocern ternational ste premier rade association specially adessng the {AV communicates dusty ts memberships rom 56 countries and mare than 53200 eompanies and vials. Infocomm proves edueaton ad carts for AV ‘ommuniations professionals including the Cxted Technology Specalt (CT) dasaton. REFERENCES {Canadian Standards Association. 2006. Canadian Electrical Code. Mississauga, ON: CSA. and. ‘Integration Process forthe AV and Construction Industries. alfax, VA: InfoComm. Construction Specifications Inetitute. 2005. The Project Resource Manual: CSI Manual of Practice, Sth eation. Alexandria VA: CSL. Federal Communications Commission. 1998. Code of Federal Regulations Tite 47, Part 76~Cable Television Sorvice. Washington, DC: FCC. {ntocomm international, 2008, Design Onli. Online course. Falrfax, VA: InfoComm. {International Code Council. 2006, International Bullding Code Falls Church VA: TCC. National Fire Protection Association. 2008. National Electrical Code®. Quincy, MA: NFPA. 15.1 ABBREVIATIONS -Ae ‘Ambient Inco sal, unwanted ight or sound. American Natlonal Standards Institute (ANSI) Crganizaten response for most standards Used for US audio-visual and computer eqoment Amplifier [Device which suppies poe to and strengthens an incosing signal for output — 1 eer : foie eee Dae. DSEEL-TEMST Drake & Scull LLC Rev.no : ot Srsbeee, AbuDhabi,UAE Pato Sa ‘Analog Represented as a continuous sna or quantity, continuous, opposed to dal rereseted by discrete umber wth an extrema wide range of values. ‘Anamorphic [typeof lans adapter designed to produce a wide Screen image fem an equal cndensed image onthe fi anst See Amercan National Standards Insti. ‘urate erst Coro detects ight intensity and kes the camera in optimum woking Conon a apps to igh put ‘Aspect Ratio ‘The proportions of proce picture area, Inthe US, standard video aspect rato units wide by 3 uns ‘hgh uel shown 43, ‘hudio-In Ing jock whch delivers a signal to plce of equipment ora jack tht receives 2 sal using a cable with the proper connects ‘audio-Out Ou Jock which beings an auco sia rom @ pce of equipment of one whch devers an audo signe eae wt the proper conmertor Autoteect.at ‘An S008 fie tht & automaticly executed when a computer is powered up The fle may contain ‘Commands to loed and run ther rograms and the Sse ‘Automatic Lave Contra (ALC) ‘Rerat used ao and vdeo recrders to contro the level ofthe record sgn automaticaly to provide Ufo lt! o the record nal what dsterton due to oveoadng, Aso called aut gain etl Beta RP inch video cassette format ins 2 Gxt current (OC) ora high fraquncy altering caret (AC) sal fed toa magnetic recording head ‘nt be Sudo ore to minimize dstron. AC ls rdnry provides high dey ‘BNC connector Dlcking type incur conector commen used in profesional video ster Boost ovals of srenathen the signal ‘TaCOFAV SYSTEM DT BEATTEWET er Drake & Scull LLC fis: 1 rape AbuDhabi,UAE Pageno 16021 _Achroaticntnsty, lative ightng wthout regard to color. Brightness Ratio “The cference between the brightest and dares res inan image. The wide he ightnes ati the wider the coast rate. Broad band [Noroat whch can operat oer 2 wide range of frequencies. An examples cable TV. tra bright mages which remiin onthe seface of camera tbe 35a ghas image when other images are boing shown oe cable Wizard ‘a InFocus product single cord connection to plug your compute video, au, mrior, nd mouse nto an Teoeus projector: The Unt Is Mac and PC compatible See Cable Ward n the Equipment guide for more lnfomaton C-Mount ‘Nene mounting system fr vdeo cameras and 16mm move cameras which aczops ean lenses. ‘Capachior ‘Neamponen in ceutry wich sores and releases vlage within the cut Aso a type of microphone. See also mrophones. 4360 DATAPOINT REQUIREMENT Some of the sytem (Paces, DSP) requre netwerk port. So multiple data pints wl be requied for ‘emmissioning, For Submission ‘Ta COF AVSYSTEM DSEEL-TCMS 310.01 Drake & Scull LLC [tor ee | Ze ‘AbuDhabi,UAE Paso: et isk assessment has 5 steps to follow as mentioned below. 1 dey the hazards, IL Deeide wn might be harmed and haw, i, raha he Hk and die on precaution. Iv. Reed the finns ad thelr iplementaion. ‘Review and update the assessment ‘Task: AUDIO VISUAL SYSTEMS HAZARDS. ety! cont sn Hazan etect eae ‘coe By | Reis Rsk Tsk Sip ion 7 Ses ave beady cord ‘afr ere oy. + Aste ave bs atop ‘Sania, quats boats Use css, + Ne enn altro eal by Se date 7 Sesh slret bs aad aA — | case ct | Banta eee is yer Wertingon | Sdleelte | Sie cals moxie arts we | de er Setolangs Fierunrt tr webyavanescrzcompeont | S2Ch CR | oy per (Safer Feene) Tae « Bonnell et soe tl, teh (er des stave eon oe ‘Sia oe hs een eve (DNL). + nab ak jor pea. 1 Scan fast bod ney wet, ‘tong rene rd HSE Dope haste |__| cantar atin een. —_| raat ~ Perel alo wk oe os ‘Beene | Tow ‘ealag endo. Festnan Pssomel |. fwotircaeoutite han 2metes at | Say Ofer (ore tl war Sty Fares ‘Seataora + Simting pa downco Re ses ges | Foenan ois sap sees ars bs ee Irma + He ak mies bnkatsarebbe | SieEnjer [Lov ee ‘Sxedonhe safl,fm aogne mane of | Fawn {alpen stlteimpweod (we! | Say Ofer pe gar ‘Soates + Enso Testsrs ae Sted aseatongs | Fowrsn ae =| eel “TC OF AV SYSTEM ©) sere sstRev01 Drake & Scull LLC AbuDhabi,UAE Doe ne) SSCEL-TCMSST a 082016 Page 0 Itt ra a ean aT «Pol acne a a Cte exh se srt nes eet nk Sacrst S| + Seca ane caaeteaeat | Since | tor Danae ‘Scan bas ae, cara, Frenan Setara | putinmedcy we Suara Or buotence ein ay carats. | “Sater « Pec atone at sooecceniee | Fewren {steer no wah oer ‘ose aman bay aye ‘hut rec) « Hatistetoa ie oon os pte fenfonteteetinaen naa wa ‘unten trte « Nn esp sot ‘tale nae elon see + hy eager hl epee Sane’ Setar Fowmen ort Soya has Teta ee IRA | SEER | He want | * cna = «panna aca et slot ete | ee soe ‘She ange anmesheteatine | Fon Ee THRE gaan] > We ig oe ea new | aE | — Tor Cooweny_ (No becca ocr fiat [SS BS) pw mustard nc |S Or ‘Shave be Omar a geese | "Sprtr mute pop P= Tane ident es + set maonoe cance so ‘opr tn cn spate 3 | Concrete ‘Eye, Lung and | + Al werhers must waar Rubber Boots, Safty ‘Ste Emjineor | Low opr eta | Strimee | " Ghaee scat gestern | _ Foote soae ni ssa rmerscan | « Bata bbe poet ty aety coun | ” cations Geractwin | « Enea a shed Stirnocs_| " Unmdhaasdncmietoncoee ns Dette] = apt a and bey a 5 foniToce |” eprom tom Maen | « Covowsten ae nee best raw |" srulucton tae 7 Higa ae aerate | Seigner | — tow Siege | * Greate orcumes ocean «Arnel tates | Sano | et Fo DSEEL-TEMS3Rev.at Drake & Scull LLC eae Date: on2016 AbuDhabi,UAE Pago: ef Wawa cacwe is Sr fase | SB ior revo | = Ra arias aay ae is aeae tachoeat |” tenuct aca sriyoaber | « aera pesomeltlterenooston | Sty Ofc Seecsee | " Bo aeasdiepene any pono eae aticLow — [TED Rien mote Taira, ly —| SWE | aw ‘atoge "| rtatatene | "Geno saagovsnnincnic wh | Fean tonfaaton re sity rs vit | « uti te posit wnt ey talnscn_| * snd pee Reicein | « pe naber gene dbo taanca te nn way |” fon wth oe recat wah id Dascbe AV | = rapcanand no bb ny dogs nl | Sinner | Tow ‘eos repre ove Fo, een Itoscan | « Enaro were se aacinthesaeand | Sayer cearauelo | * camucn theese (ected tot 7 Apr io iegceghane | Se Engnee | Taw Fecicseck | *fngiton smuswerfondpowsandatobar | _Fxeen Poe ssi fear gh oage ‘gear shaste nengec ssl uy aust |» fader ad asp hal |S Enger Tow ‘aurea | ” bpd rena etyclote: | « Unnorusdpecnd stl berecreston | Sst Or Cgertes | ” tore anon ae say peor oni 17.2 REPORTING ACCIDENTS “The wccidents and indents occuring at ste wil be fered to HSE Engines a the earlest possble by the tte Engineer, These inosnces shal be reported i te Prebmiary Accdert Report, to ensure that al the cident ad nedets happening at ste sal be investigate. ‘Aer eceng information of accidents and near misses, nents wil be invstigated by the HSE Enginer at ‘Seto find ou the ook cause and othe conbutary causes tat lead to the acide, The format shall be Used to report such cancer and 2 copy of the sare wll be sent t RSC fr his necessary action. [rfermation shoul als reach tothe statutory euthortes/poce as pr the procedure ‘stable action plan wl be prepared by the HSE and wil be crcl to all ste ergineers trough section heads to implement the same at ste 50 a5 to avald such Incidnts and acide infutre at the ste. The trforeement actin il be supervised by HSE Lend at ste. Aer aking precausenary menses, copy ofthe ‘ame wil be sent RSC for his formation ond record. Al the lass sme inury eases occuring a ste wil De Feoorded inthe Fist Ald Reiter, which wil be manned byte ofc at ste Al such eases willbe ‘nated by the Ste Safety Engineer to find out the mejor area of cancer. This wl apn assessing the —_ Date”: 22042016 ar Drake & Scull LLC [ir te AbuDhabi,UAE Page vo aft accents and the severty of ites. An acton plan can be pepard based on ths report. Major dronbacks ‘an be ented and improves suggestod 180 190 10 na ‘TEST REPORT re Commissioning nd Commissioning Check Sheet HEALTH. VISIONS, All the safe practices wil be adopted during the ongoing works. ‘All the working platforms will be inspected by Site Safety Engineer. ‘All necessary personal protective equipment shall be used Proper access forthe labors and equipment will be provided to the place of works. Workers will adhere to proper PPE during the installation ‘OC'APPROVALS AND OTHER DOCUMENTS. Projet pectic Quality Plan shall be approved Project HSE Plan Al drawings conceming the ination shal be approved All elevant material approval sal be obtained prie to start the work ‘Approval Inspection Tet Pan ‘Approved Installation Check List Conimation of material sources RECORDS TO BE PRODUCED Inspection requests duly signed by the Constant Test CenifcatstChck st dl signed hy he Constant DISTRIBUTION Copies of his method statement shal be issued to the following for implementation. CConsrton Manager Projet Engineer HSE Engineer QAIQC Engineer 23,0 SITE. SAFETY ENGINEERS APPORVAI ZF] anosmsa Bho ‘Approved Subjected to compliance with the following rovesteomments Not Aumnoned - Reasons 240. RISK ASSESSMENT & CONTROL MEASURES. Arached 250 ENVIRONMENTAL ASPECT, IMPACT & CONTROL MEASURES + NIL For Submission | recor avsysrem statement Dac DSEECTEMSST Drake & Scull LLC Rev.no : Ot Sraptee AbuDhabi,UAE Pazoo: aa 260 LIST OF HAZARDOUS MATERIALS TO BE USED = NIL 270 LIST OF HAZARDOUS WASTE TO BE GENERATED * NIL 280 ATTACHMENTS ‘+ Pre commissioning Check list for Video System Performance(EL-TC-MS-331(1) ‘Commissioning Checklist & Repor for AV System(EL-TC-MS-331(2)) ‘Risk Assessment & Control Measures ot Submission | | ‘T&COFAVSYSTEM DSLHL-TEMS.S81Re01 WSS AN a Form ELTCMS81(1) FIRMONT HOTEL&APARTMENT PROJECT,ABUDHABI (CHECKLIST-PRE TESTING& COMMISSIONING OF AV SYSTEM ‘AppShopSebemate dg: | Tet Corie THR No S.No Description Remarks 070) ‘Verify the naan Fas Been done as par approved hap ‘roving, Sera agra ane the test ceieates q ack Italian ee wh the Rack Lavo T ‘eri atthe AV rec) proves the alow as reaured in the aca v fgumentation, Vert that the temperstire he AV rack Fas bean measured ads wit orances arf that cabes are not bene beyond thor minum bend ah 5 speaid abldata Set de fo mata Sa ‘erty hat al cab Terminations have ban compltod and dq supported so as to minmie ress on the conn fr eonvestr ‘Ver that cables are terminated propery Vert hatte lbe tex ona pancs and eamnecors inthe ‘sytem including Snitchers, DSPs, mers, amar, AV ‘trl are proper an Rave use fers, Varty tat al daplays have been tested as fndioning Independent of he syst. 0 erty that al npr devees have Been tested dependent nd found funcionst Vary that all motored roecionsoens re fanning Independent ofthe system. 2 ‘erly tat al speaker are tested ndependely and Youn funciona 3 Verify that al parpheral equipment hooked up a5 px flow agra: microprones, Tousspeakers, video mentors, Dojerters, Ps, AV swther, et a ‘erty that projected dpays are Yoeued, cred, and ven irinated ry ‘erly fat the contest ato of the projctad mage with “Enblet lgting norma operating mode FORM: EL-TEMS-51(1) PRE TACAV SYSTEM pag ra \ 16 ‘Verify that al cooled equipment propery cone wth T adresses, host aries, time sever, Gatekeeper ecresas, network conguratos, 2nd sues 3s appcable 7 Verity that a sytem connedions are operational and devices carmunieton coed 8 Vert that ll equipment nde the rack ning DSPS, ampli, mies, AV canivoler, CD payers et re SHITOAING ON ana theres 19 nofautindeaten, —_| Verfy that Carvel system usr itsface conterms to war | specie requrements andl paps ad buttons operate intend erty thot te wo opts of @ ml anna laudspeakar system ae assigned correct to dest outputs 38, Ht . fend inthe Pret. documento Van that phantom powers provided at Ue cored volage and covet ocatens be defined nthe proj Gooumentaten Variy that Bien programmes aesthetics ave beer approved Very tht Siren programmes hive Bear tstad ie ‘emulsion made ‘ery that mirophones are wred as dered the rise ooumentation. 2 ‘Very tata oudipeies 8 izoshones are tstodto rau they al Fave correct polrty as defined nthe rjet documentation ideo danas bea dsb “asi. at auto a ‘carat vough the system as defred nthe poled ” ‘erly thatthe AV man uns are integrated with Fire ala ‘sjstam & Bulng Management Ste. “ip DST Eee Maia ContractoiATC) Namesign Date ‘Name'ign/Date ‘Constant Ene) ‘NimeSgnDate FORM: EL-TE-MS-351() PRETEC AV SYSTEM Page 2072 — que onrmacton ee hos |“ FAIRMONT HOTEL &APARTMENT PROJECT, ABUDHABI ‘CHECKLIST -TESTING& COMMISSIONING OF AV SYSTEM, Date ‘Drawing Sci Drwving Ree | Tet Certifntenr TREN ‘CHECK LIST-FUNCTIONALITY TEST [Ballroom combinable Room] SNe Description Remarks ‘Very tat al conta stan programing tale and | lop communtating wih te touch pane and ¥ ‘Sauipe’ tended. 2 | Wert thatthe Convl system user nteioce conforms to 7 tse or speed ecutements and all panes and buttons —| ‘erty thet the convo system wil estat and resine fa 5 | opertion flowing an unantited eying of AC power tO y ‘the contol syste, Very at equpmets The projector, screen ole are 44 | wotdng propery fam touch panel. v ‘ery that video audio systems ae tested [al pathways 5_| tested, allimercomectons marked as tested on craving) v ‘Very that the combined installation of proleetor and sean 4g _| roves deployed image hat fs corey aligned to the 7 tive proection Seren surface without malignant Very that ai dspiayed images are corey Toosed, have 7 | thecomect image geometry and are fee om dstorton q ‘erly thatthe combined ntaliaton of projector and sreen 2 | provides a dsplay tothe vewer tat moss the projet q equraments for uniformity of brightness >| Wanless) aay e) a resoatns reared 7 by project documentation on al dplays within the sto Te | Vey that aod sonasound eel beng unfomiy 7 tributed a defined nthe project documentation ci | Vey that any equred muting or operational change ofthe 7 Inca sound system(s) are accordance with cal ‘ery that adi system capable of performing above 12 _ | nominal operating levels without dstorton, as end inthe q ‘roject documentation, ca | Wei hata speakers are eked to sie yal have 7 coe polarity a5 define in be projet documentation ‘ety cabraton of mcrophones 1+ |ipetce ser Ser Fo; $lbmission | ome cangtemision | FoRIALTE NSD) NECAYSISTIN a 4 ‘Verify calbration of micophones so there & microphone Input eve! alignment as defined inthe project documentation between any input inal evel afer the fist. ‘Meating Room 2,283{combinable Rooms) Very that al oro system programming installed and ‘rope commanesting withthe touch panel and equipments intone. Verify thatthe Conta ye oer trace conforms to ‘se or specie requremen and ll pages and butons ‘Verity that the carr! estar wl restart and resume all ‘operation follwing an unatipated eyeing of AC power to {he contol system, ‘ety that equpmsts e projector, screen ete ae ‘working propery fom touch panel. ‘Very tat al video audio Systane are tested [al patways {esta erconnections marked as tested on drawing). ‘Very thatthe combined instalation of projector and screen proves adsplayed mage that corey aligned tothe ‘ete projection sean surface without mislgnmet ‘Very that al dplayed inages ae cred Tocaed, Fave ‘he correct mage geometry and are fee fem distortion ‘Very iat he combined instalation of projec and sce=n provises a dsl tothe Vewer that moots the project. ‘erty tat the system(s) deploys) ll resolutions required OR SSC a EPS TT Ue YS 10 ‘Very that audi signal sound eval being wnforiy sbi as defined Inthe project documentation a ‘erty that any requred muting or operational cange of ie Instaled sound system(s) ae m aceordance with eal "Very rat aio stem capable of performing above nominal operating levels without dot, a= dene inthe project documentation 2 ‘Verfy that a speokers are tested to ensure they al Fave corect polarty a: dined inthe project documentation 4 Very calibration of microphones so thre is microphone Input level algnment a5 define nthe project ooumentation between ay input inal eels ate the fst Meeting Room-s ‘Very that i corral aytam progrenming stalled and ‘rope communicating wth the touch panel and {equipments intended. ‘Vet that the Control ys user interface conforms to ‘seo peded requrements and al pages and buttons eS Fomust-reasss12) “rackvorstiat For Submission ‘ery thatthe corral system wl reitar and resume Yall ‘peration flowing an unripe eying of AC power to {he contel system. ‘ary that equipments Ws profctor, seen etc are ‘working propery rem touch pane. ‘Verity that al video aus aston retested al pathways ‘ested, al trconnecions marked as tested on dawn). ‘Very atthe combined instalation of projector and screen roves adsplayed mage that corey aligned tothe ‘etve projection seen surface vthout mislgnment ‘Very that al dplayed mages are coed Tocsed, Fave ‘he cotect mage geometry and are fee om distortion "Very a the combined italaion of projector and screen proves display t the Vewer tat moos the project, ‘Very tha He wytemis)dsplaya) al resoutins required by project documentation onal spay within the system ‘erly that audi signal sound teva s being uniformly dstribted as defined in the projec documentation ‘erty that ny required ming or operational ange ofthe Insole sound system(s) oe i ocenrdance wth cal ‘Ven that sci estan scape of performing above z nominal operating lve vhout atari, as dened rE project documentation. B ‘Vet that al speakers are tste to ensure they all Fave canret polarity 35 defined inthe projet documentation 1” ‘Very calibvation of microphones so there micophone Input evel agement as dined inthe project ‘documentation beeen a np signal evel after the Fist ‘commen tve juste ‘Meeting Room-586{Combinable Rooms) ‘Very tat al contro systen programing tala’ and propery communicating wa te ouch panel and ‘equipment’ tended. ‘erty thatthe Centro sytem ser inrace conor to User or specied requirements and all pages and buttons operate as intended ‘erty thatthe contol systen wil estar and resume fu ‘operation foboning an unatlpated ling of AC power to the contol system, ‘Vesty that equipments We projector, seen etc are ern propery rom touch panel rowseatereasane) "HACAV SYSTEM | ‘Verify that al Video audio sts retested [al pathways tested, al itrconnections marked as tested on dawn). ‘erly thatthe combined ntaliaton of projector and sreen roles a dspayed image thats correct aged tthe chive projcin screen surface without misalignment Very that il spayed images ae corey Toused have ‘he eorect mage geometry and are fe fom dstorton ‘Very that the combined naliaion of proietr and sareen ‘rovdes a cspay to the viewer that meets the project Feuirerents for uniformity of brightness Very thatthe systems) asplays) al resolutions required by rojact documentation on all dipleys within the stom. wo ‘Verify at audi signalsound evel ela unory dstnbuted as defined Inthe project documentation ‘Very that any required muting or operational change ofthe Installed sound system(s) are in accordance with local regulations inthe evento ite safety or smiar 2 ‘Very tat aul systam is cape of performing above oma operating levels without ditrton, as dened inthe project documentation 3 ‘ery tat al speakers ae tasted to ensure hey all have ‘comes polrty defined in he project ocamentation ‘Very calibration f microphones s hares microphone Input level algrment as deed inthe project rc oleate the fst ‘Sommer lve austen ‘Meeting Room 7 ‘Very ha al contol yom programming tale and propery communicating wth the touch pan! and equipments tended Verity thatthe Corto ter user interface conforms to User or spedd requirements end al pages and buttons operate as intended Verity thatthe contr estan wil restart and resume fall ‘operation falowing an unatipated cng of AC power to te contal system. ‘ery that equipments Whe LED are working propery om touch pan ‘Verity that a Video audio sts are testd al pathways tested, al itrconnactons marked as tested on dawn), FoRELTEMS3310) rac av snot ‘Vary that al depayed mages are corey Toaused have 6 | the correct image geometry and ae re rom distortion 4 ‘Verify that the taaon of LED's provides a pay to the ewe that meets the project requirement or uniformity of : 7 | brighiness across the area ofthe display ‘Verity thatthe syste) dsl) al esolatons required 8 | by poke documentation onal pays within the sytem y ‘ery hat odio Sigal sound eels bang unory 9 | dstrbuted s denned i he project documentation y ‘Very iat any requred ming or operational change ofthe 10 | insta sound system(s) are m accordance wth cal y regulations inthe ever of fe sfey or smlor ‘Very at audio syst is capable of performing above 11 | nominal operating levels vthout dst, 3s dened nthe y project documentation. ‘erty that al speakers retested to ensure they all have 12 _| comet platy as defined in the project documentation 4 ‘Verify calibration of microphones so heres micophone Input evel abgrmentas defined inthe project 13 | documentation between any input sgn levels after the rst 1 ommon level achustnent. ‘Meeting Roan ‘Very that al contre sysem proaramaing Wntalod and 1 | propery communssting with he touch pane and 1 ‘Sauipe tended ‘Very that he Contol ston wer terface conforms to 2 | urer or speed requiements anda pages and buttons ’ ‘operate a Intended ‘Very tat the coil syst wal restart nd resume ull 3 | eperation folowing an cnantpatedoycing of AC power to 4 the contol system, erty that equipments ie LED's re working propery om a 4 | teen pane. ‘erty that al Video audio oysters are tested (al ptways 5 _| test, llintrconectons marked as tested on draving). q Verfy that a displayed images are corey focised have 6 | the correct image geometry andar re from aston q ‘erty thatthe instalation of LED provides a dply To the 7 | wewer that meets the project requreents for unfit of Y ghaness across the area ofthe pay ronsue-resesa10) a set Variy thatthe ssten(s) display) al esoaons required by project documentation onal pays within the syste Verly tat audi signal sound teva is bag uniformly dstrbuted as define in the project documentation. 10 ‘erty that any required muting or operational change of the Instaled sound system(s) are mn acordance with lea regulations nthe evento a Me safety or sine emergency. a erty that audio stan is capable of parfoming above nomial operating levels without dtrton, as defined inthe project documentation. 2 \Veety tata speaks are tested to ensure they al Fave cerrect polarty a8 dened inthe project documentation B ‘erly clation of microphones so tee & microphone Input level algnment a5 defined inthe projec. documentation between any input gna levels after the fist common level adjustment. MEETING ROOM-09 Vert tata contd systam programing ietaled ond propery communicating with the touch pane! and faupment’ intended. Vert thatthe Control stam user interface conforms to ser or sped equrements and al pages and buttons operate as intended ‘Very tat th contr! stan wil restart and resume ‘operation feboving an unatcipted cycling of AC power to the contol system, Vent that equipments We projector, sean cic re erlang propery fom touc panel, ‘Vast tata Vide audio systems are testa pathways testa, all interconnections marked as tested on rang). ‘Very thatthe combined wstaltion of projedor and seen roids a dsplayed image thats come algned tothe Bctve projection sere surface without msalgnment ‘erty that a spayed images are corecty focused, have the correct mage geometry andar fee rom distortion ‘Very thatthe combined instalation of projector and screen provides display to the ewe that mess the project Fequierents for unfrmity of brightness aro the area of the dsl. ‘erty thatthe ssten(s) dol) al esoaonsreqared Dy proc documentation onal splays wen the system. — = romus-reasi sac Sin ‘Vanity that audi signal Sound tvel is being unformly

You might also like