Project Scope Control
Project Scope Control
by Hervé Baron
Changes cannot be fully avoided during project execution, but they should be minimized to avoid disturbing the execution. One major
practical concern is the amount of changes that can be created by the Client, and which are too often not acknowledged. This leaves the
Contractor in a sometimes difficult conundrum. Yet it is essential for the Contractor to remain protected because a significant value
can be at stake. This Paper examines some good practices that should be implemented by Contractors to protect themselves.
© Hervé Baron and Project Value Delivery, 2014 Expert 2014-01 rev 0