PT Gaya Baru Energi: Drill Pipe Inspection Tally Sheet

PT Gaya Baru Energi is an oil and gas supplier and NDT inspection company located in Bengkalis, Riau, Indonesia. They conducted an inspection of 14 pieces of 5" drill pipe for customer PT. Pilar Anggaraksa on November 23rd, 2022. The inspection was done according to specification DS1 Cat 3 and took place at the GJE yard. All 14 pieces of pipe met the minimum wall thickness requirements and passed inspection for classification as serviceable pipe.

Uploaded by

Robert Tirta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views

PT Gaya Baru Energi: Drill Pipe Inspection Tally Sheet

PT Gaya Baru Energi is an oil and gas supplier and NDT inspection company located in Bengkalis, Riau, Indonesia. They conducted an inspection of 14 pieces of 5" drill pipe for customer PT. Pilar Anggaraksa on November 23rd, 2022. The inspection was done according to specification DS1 Cat 3 and took place at the GJE yard. All 14 pieces of pipe met the minimum wall thickness requirements and passed inspection for classification as serviceable pipe.

Uploaded by

Robert Tirta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PT GAYA BARU ENERGI JL.

Gaya Baru No 409 RT 001 RW 003 Kelurahan Duri Timur


OIL & GAS , NDT OCTG INSPECTION AND SUPPLIER Kecamatan Mandau Kebupaten Bengkalis , Duri - Riau
HP : 0811 758 908 Email : [email protected]

CUSTOMER : PT. PILAR ANGGARAKSA DATE : 23-Nov-22


PO. NO. : INSPECTION SPECIFIATION : DS 1 CAT 3
JOB LOCATION : YARD GJE PAGE : 1 of 4
MATERIAL : DRILL PIPE 5''OD , 19.50 PPF , GRADE G-105 ,NC-50 , RANGE -2

DRILL PIPE INSPECTION TALLY SHEET


Tube Body and Upset Area Pin Connection ( Inch ) Box Connection ( Inch )
Total

Hardband
Condition

Condition

Condition
Thickness

Slip/Upse

Diameter

Diameter

Diameter
Tong

Shoulder
Pipe Final

Coating
Gauge

Width

Width
Plastic
Length Pin Tong CB

EMI 1
Remarks

Bevel
(mm)

Bevel
Bent
Wall

Seal
MPI

Body
OD

CB
Number ID OD OD Class
t
( Length Space Depth.
Space
Feet )
1,1122 31,82 8 SVC 3-5/16" 6-9/16" 8-3/4" 4-1/2" SVC 6-3/8" 9-1/2" 5-5/16" 5/8" SVC P
2,1122 31,78 8,7 SVC 3-1/4" 6-7/16" 9-1/4" 4-1/2" SVC 6-3/8" 9-1/2" 5-5/16" 5/8" SVC P
3,1122 31,33 8,5 SVC 3-5/16" 6-9/16" 9" 4-1/2" SVC 6-7/16" 8-3/4" 5-5/16" 5/8" SVC P
4,1122 31,45 8,8 SVC 3-1/4" 6-9/16" 8-1/2" 4-1/2" SVC 6-9/16" 9" 5-5/16" 5/8" SVC P
5,1122 31,55 8,6 SVC 3-5/16" 6-9/16" 8-1/2" 4-1/2" SVC 6-3/8" 8-1/2" 5-5/16" 5/8" SVC P
6,1122 31,83 8,5 SVC 3-1/4" 6-7/16" 9" 4-1/2" SVC 6-7/16" 9-1/2" 5-5/16" 5/8" SVC P
7,1122 31,98 8,8 SVC 3-1/4" 6-3/8" 9" 4-1/2" SVC 6-7/16" 9-1/2" 5-5/16" 5/8" SVC P
8,1122 31,76 8,1 SVC 3-1/4" 6-9/16" 9" 4-1/2" SVC 6-3/8" 9-1/2" 5-5/16" 5/8" SVC P
9,1122 32 8,4 SVC 3-5/16" 6-9/16" 8-7/8" 4-1/2" SVC 6-7/16" 8-3/4" 5-5/16" 5/8" SVC P
10,1122 31,48 8,4 SVC 3-5/16" 6-7/16" 9" 4-1/2" SVC 6-7/16" 9-1/2" 5-5/16" 5/8" SVC P
11,1122 31,43 8,4 SVC 3-1/4" 6-3/8" 7" 4-1/2" SVC 6-3/8" 8-3/4" 5-5/16" 5/8" SVC P
12,1122 31,89 9,1 SVC 3-1/4" 6-3/8" 9" 4-1/2" SVC 6-9/16" 8-5/8" 5-5/16" 5/8" SVC P
13,1122 31,26 8,8 SVC 3-1/4" 6-3/8" 8-1/4" 4-1/2" SVC 6-9/16" 9-1/2" 5-5/16" 5/8" SVC P
14,1122 31,68 8.6 SVC 3-1/4" 6-7/16" 8-1/4" 4-1/2" SVC 6-9/16" 8-1/2" 5-5/16" 5/8" SVC P
15,1122 31,83 8,3 SVC 3-1/4" 6-7/16" 9" 4-1/2" SVC 6-9/16" 9-1/2" 5-5/16" 5/8" SVC P
16,1122 31,62 8,8 SVC 3-1/4" 6-3/16" 9" 4-1/2" SVC 6-3/8" 9-1/4" 5-5/16" 5/8" SVC P
17,1122 31,55 8,3 SVC 3-1/4" 6-9/16" 8" 4-1/2" SVC 6-3/8" 9-1/2" 5-5/16" 5/8" SVC P
18,1122 31,75 9,3 SVC 3-1/4" 6-7/16" 9" 4-1/2" SVC 6-7/16" 8-3/8" 5-5/16" 5/8" SVC P
19,1122 31,98 8,9 SVC 3-1/4" 6-9/16" 9" 4-1/2" SVC 6-7/16" 9-1/2" 5-5/16" 5/8" SVC P
20,1122 31,9 8,5 SVC 3-1/4" 6-9/16" 7-3/4" 4-1/2" SVC 6-7/16" 8-1/2" 5-5/16" 5/8" SVC P
REMARK / COMMENT: 20 Jts Drill pipe bove were full inspection As per DS 1 CAT 3 and were marked or identifiead as per each result of inspection ( white paint band on tool joint of connection servicable , Yellow paint band on
Tool joint of connection reject , 1 white band on center pipe of pipe bent and green paint band of tool joint for tool joint need to hard band )and all pipe were separated .

RESULT S : PREMIUM CLASS = 20 JTS 20 JTS READY TO USE JTS BOX REJECT JTS PIN REJECT JTS BOX X PIN REJECT JTS RECOMMENDED FOR HARDBAND JTS PIPE BENT /NEED TO STRIGHTENING

CLASS 2 = JTS JTS READY TO USE JTS BOX REJECT JTS PIN REJECT
JTS BOX X PIN REJECT JTS RECOMMENDED FOR HARDBAND JTS PIPE BENT /NEED TO STRIGHTENING

SCRAP/ JUNK = JT ENDS PIN CONNECTION REFACE ENDS BOX CONNECTION REFACE

Code Abbreviation
CR = Crack E = Elonggation TD = Thread Damage INSPECTOR'S
EP = external Pittinr RH = Recommended hardband TE = Thread Elongation
IP = Internal Pitting CB = Counter Bore GT = Galled Thread
SD = Shoulder Damage TPO = Thread Profile Out SB = Swollen Box
ECC = Eccentric PT = Pitting Thhread M = Mash
P = Premium PS = Pitting Seal 2 = Class Two

Robert Tirta Saputra


Inspector MT/PT Level II