0% found this document useful (0 votes)
270 views2 pages

Your Electric Bill

This electric bill from Meralco is for the billing period of December 16, 2022 to January 15, 2023 for the customer Jose Perez located in Baliwag Business Center, Bonga Menor, Bustos, Bulacan. The current meter reading is 1,358 kWh and the previous reading was 935 kWh, resulting in actual consumption of 423 kWh. The total amount due is ₱5,164.53 and is due by January 27, 2023.

Uploaded by

Deo Warren
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
270 views2 pages

Your Electric Bill

This electric bill from Meralco is for the billing period of December 16, 2022 to January 15, 2023 for the customer Jose Perez located in Baliwag Business Center, Bonga Menor, Bustos, Bulacan. The current meter reading is 1,358 kWh and the previous reading was 935 kWh, resulting in actual consumption of 423 kWh. The total amount due is ₱5,164.53 and is due by January 27, 2023.

Uploaded by

Deo Warren
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JOSE PEREZ BALIWAG BUSINESS CENTER

0109 FR(SERVI2) BONGA MENOR BGY J.P. RIZAL


BONGA MENOR BALIUAG
BUSTOS 3007 BULACAN TIN 000-101-528-000-VAT

10 P.W RI SIDE OF POLE VJ4-199 Billing Statement No.: 2113012902441


Meter No.: 33SHN75304
Route Seq.: 2110 34 0003 Print Seq.: 14945 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 0221573828 27 Jan 2023
16 Dec 2022 to 15 Jan 2023 15 Jan 2023
Date of Meter Reading Electric Meter Number
15 Jan 2023 33SHN75304 Please Pay
Date of Next Meter Reading Current Reading
15 Feb 2023
Customer Type -
1,358
Previous Reading
� 5,164. 53

Residential 935
=
Actual Consumption Bill Computation Summary
Your rate this month 423 kWh Remaining Balance from previous bill 0.00
� 12.10 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 5,164.53
Please see the back page of your bill for more details about your Generation 3,023.18
meter reading and consumption. Transmission 365.90
System Loss 267.97
Distribution (Meralco) 812.01
Subsidies 40.31
Your monthly consumption Government Taxes
Universal Charges
516.12
94.24
FiT-All (Renewable) 0.00
kWh Other Charges 44.80

Total Amount Due � 5,164.53

kWh 423 - - - - - - - - - - -

15 18 13 37 13 19 14 18 168 555 647 605

Your consumption explained Your typical consumption


This bill is 30% lower (-182kWh) vs 228 kWh 13.6 kWh � 165
previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is more than 100% higher consumption consumption cost this bill
(+408kWh) vs same period last year (last 11 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
423 kWh 0.3013 tCO * 2 14 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZf2ZjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZvH0ZlXZ accredited payment partner before the due date.
cczRVZQzcbR
5LoHNRuYTiX
S33RYhAnN70
0221573828 � 5,164.53
Zs:Z3FU7PYP
ucSZye;MGR8 BfZKEUJbwYFdeDwwUFUZbwYJUw
Payment made after 15 Jan 2023 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 23012915776 Local Application No.: 765195798 Billing Period: 16 Dec 2022 to 15 Jan 2023 Print Seq. 14945 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
16 Nov-15 Dec 2022 05 Jan 2023 Baliwag Business Ctr � 6,942.18 Missionary Elec for NPC-SPUG 423 kWh 0.1783 75.42
16 Oct-15 Nov 2022 05 Jan 2023 Baliwag Business Ctr � 7,209.05 Missionary Elec for REDCI 423 kWh 0.0017 0.72
16 Sep-15 Oct 2022 05 Jan 2023 Baliwag Business Ctr � 6,140.44 Environmental Fund 0.00
16 Aug-15 Sep 2022 05 Jan 2023 Baliwag Business Ctr � 1,671.35 NPC Stranded Contract Costs 0.00
16 Aug-15 Sep 2022 16 Sep 2022 Meralco Headquarters NPC Stranded Debts 423 kWh 0.0428 18.10
� 5.84 DU Stranded Contract Costs 0.00
16 Jul-15 Aug 2022 31 Aug 2022 Bayad - OTC � 10.29 Equalization Taxes & Royalties 0.00

What remains unpaid FiT-All (Renewable) 0.00%


FiT-All (Renewable)
0.00
0.00
No unpaid bill, thank you!
Energy Bill Amount
Base VAT
How your bill was computed VAT Sales
VAT Zero Rated
4,511.53
0.00
513.96

Service ID Number: 320792060101 Non-VAT 94.24


Contract Holder: PEREZ, JOSE Total Energy Amount 5,119.73
Service Address: 0109 FR(SERVI2) BONGA MENOR BONGA MENOR Other Charges
BONGA MENOR BUSTOS BULACA Reconnection Fee - 23010007421 1.00 40.0000 40.00
Other Meralco Charges 40.00 12.0000% 4.80
Metering Information Total Other Charges 44.80
Previous Current
Meter Number Reading Reading Multi Registered
Charges for this billing period � 5,164.53
33SHN75304 935 1358 1 423 kWh
Additional Bill Information
Rate Components Base Price Amount Voltage Level Class : Secondary
Generation 59.05% 3,023.18 Previous Service ID Number (SIN) : 254154901
Generation Charge (PhP/kWh) 423 kWh 7.1291 3,015.61 Your rate this month (price per kWh) is computed as Total Energy Amount
Power Act Reduction 0.00 divided by the Actual Consumption (in kWh)
ACRM Recovery (PhP/kWh) 423 kWh 0.0213 9.01
ICERA Refund (PhP/kWh) 423 kWh -0.0034 -1.44
Transmission 7.15% 365.90
Transmission Charge(PhP/kWh) 423 kWh 0.8650 365.90
System Loss 5.23% 267.97
System Loss Charge (PhP/kWh) 423 kWh 0.6335 267.97
Distribution (Meralco) 15.86% 812.01
Distribution Charge (PhP/kWh) 423 kWh 2.0941 885.80
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 423 kWh 0.3350 141.71
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 423 kWh 0.4979 210.61
Dist True-Up 2 (PhP/kWh) 423 kWh -0.1923 -81.34
Dist True-Up 4 (PhP/kWh) 423 kWh -0.8656 -366.15
Subsidies 0.79% 40.31
Lifeline Rate Subsidy (PhP/kWh 423 kWh 0.0952 40.27
Senior Citizen Subsidy 423 kWh 0.0001 0.04
Government Taxes 10.08% 516.12
Current RPT (PhP/kWh) 423 kWh 0.0051 2.16
Local Franchise Tax 0.00
VALUE ADDED TAX
Generation Charge 3015.61 11.2700% 339.86
Power Act Reduction 0.00
ACRM Recovery 9.01 7.8000% 0.70
ICERA Refund -1.44 17.3300% -0.25
Transmission Charge 365.90 11.1900% 40.94
System Loss Charge 267.97 11.2600% 30.17
Distribution Charge 812.01 12.0000% 97.44
Subsidies and Others 42.47 12.0000% 5.10
Universal Charges 1.84% 94.24

Tips for hassle free payment Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bills due date and remit the
Bring your electric bill every time you pay payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
these accredited ADA partners.
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Asia United Bank Philippine National Bank Robinsons Bank
Banco de Oro (BDO) Union Bank of the Philippines Citibank
Pay on or before due date Bank of the Philippine Islands (BPI) United Coconut Planters Bank Security Bank

Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph [email protected] 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like