Annex 1 Work Schedule
Annex 1 Work Schedule
Detailed Design Report of Municipal Level Agriculture and Livestock Services Center
Times in Weeks
S.No. Description Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Start
2 Team Mobilization
Field and Conceptual Design Phase
3 Desk Study
i.Review and approval of methodology
ii.Inventory Survey and Condition analysis
iii.Preparation of Inception Report
4 Field Investigation
i. Expert's Site Visit
ii. Consultation with Client and Local Government Officials
iii. Inventory Survey and Condition analysis
iv. Engineering Survey and Site Investigation
Topograpical Survey
Geotechnical Investigation
Hydrological and Metrological Study
Environmental Survey
Material Survey
Study on Land Acquisition and Resettlement
v.Conceptual Design Phase
Detail Engineering Design Phase
5 Detailed Engineering Design and Drawings
i.Architectural Planning and Design
ii.Structural Analysis and Design
iii.Electrical Design Drawings
iv.Design of drainage facilities
v.Sanitary/Plumbing/Water Supply Distribution/Fire Fighting Design
Drawings
vi. Detailed Landscaping Design
vii. Detailed Design Drawings
viii. Detailed Engineering Calculations, BoQ and Technical Specification