100% found this document useful (1 vote)
104 views

Annex 1 Work Schedule

This document outlines the activity schedule for the detailed design report of an agriculture and livestock services center over 14 weeks. It involves team mobilization, field and conceptual design, detailed engineering design and drawings, preparation of a detailed project report, and important milestones including submission of an inception report in week 3, presentation of a draft report in week 6, presentation of the final design in week 12, and approval of the final report in week 14.

Uploaded by

surendramaharjan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
104 views

Annex 1 Work Schedule

This document outlines the activity schedule for the detailed design report of an agriculture and livestock services center over 14 weeks. It involves team mobilization, field and conceptual design, detailed engineering design and drawings, preparation of a detailed project report, and important milestones including submission of an inception report in week 3, presentation of a draft report in week 6, presentation of the final design in week 12, and approval of the final report in week 14.

Uploaded by

surendramaharjan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

ANNEX 1: Activity (Work) Schedule

Detailed Design Report of Municipal Level Agriculture and Livestock Services Center
Times in Weeks
S.No. Description Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Start
2 Team Mobilization
Field and Conceptual Design Phase
3 Desk Study
i.Review and approval of methodology
ii.Inventory Survey and Condition analysis
iii.Preparation of Inception Report
4 Field Investigation
i. Expert's Site Visit
ii. Consultation with Client and Local Government Officials
iii. Inventory Survey and Condition analysis
iv. Engineering Survey and Site Investigation
Topograpical Survey
Geotechnical Investigation
Hydrological and Metrological Study
Environmental Survey
Material Survey
Study on Land Acquisition and Resettlement
v.Conceptual Design Phase
Detail Engineering Design Phase
5 Detailed Engineering Design and Drawings
i.Architectural Planning and Design
ii.Structural Analysis and Design
iii.Electrical Design Drawings
iv.Design of drainage facilities
v.Sanitary/Plumbing/Water Supply Distribution/Fire Fighting Design
Drawings
vi. Detailed Landscaping Design
vii. Detailed Design Drawings
viii. Detailed Engineering Calculations, BoQ and Technical Specification

ix.Specifications and Bill of Quantities and Bidding Document


x.Implementation Schedule
xi. Construction Quality Controls Plan
xii. Preparation and Submission of Draft Report
6 Preparation of Detailed Project Report
i. Presentation and Discussion over the Draft Report
ii. Preparation and Submission of Final Report
iii. Discussion over the Final Report in Municipality
iv. Approval of Final Report by Municipality
Important Milestones
S.No. Reports
1 Inception Report Submission
2 Draft Report Presentation
3 Final Design Presentation
4 Approval of Final Report