Introduction
This RAMS template is broken into 3 steps and 8 sections and should be developed in line with the associated
guidance summarised below.
3 Step
Process Step 1 Step 2 Step 3
Follow the 3 Step Process to Initial Pre-Start Ongoing
ensure the RAMS contains Development Review Assessment
up to date information. Responsible person(s) on
behalf of the employer:
& Sign Off After work starts, if the work
activity changes significantly
- develops the RAMS, which Responsible person must due to:
should be based on local ensure that the RAMS is:
conditions and hazards - reviewed and agreed with - local issues,
associated with the work, the PSCS prior to starting - new hazards,
and work, - changes to the system of
- on completion of the - updated where required so work, and
RAMS, it is sent to the PSCS as to reflect local conditions, - training.
(where appointed) for any changes to the system Responsible person(s) must
review and comment. of work, equipment or amend the RAMS and go
personnel, and back to Step 2.
- signed off by all
stakeholders including
responsible person, PSCS
and worker(s).
RAMS
Template –
8 Sections Section 1 Contractor Details
Section 1
Contractor Details
Company Name:
Company Address:
Responsible Person:
Phone:
Email:
Phone: Email:
Section 2
Site and Work Activity Information
Project Title:
Estimated No of Workers:
PSCS Appointments
Section 3
Method of Work (include safety controls measures and equipment required)
*Statutory Certificates and Thorough / Weekly Examinations must be available locally. Tick where the information will be contained i.e. with the PSCS / in your equipment register, listed above or contained in
Section 8 Appendices. This list must be checked before the work starts by the responsible person and updated / reviewed on a regular basis
Excavations (AF3)
Scaffolding (GA3)
Work at Height Equipment (GA3) e.g. ladders, MEWP, handrails, netting, harnesses
Comments
Permit to Dig
Confined Spaces
Hot Works
Road Opening
Work at Height
Other
Storage Arrangements
Explosives Flammable Oxidising Gas Stored Corrosive Acute Health Serious Health Hazardous to
Under Pressure Toxicity Hazards Hazard the Environment
Asbestos
Silica Dust (e.g. Cutting concrete)
Wood Dust
Solvents (e.g. White spirit, acetone)
Mineral Fibres (e.g. Rockwool)
Fumes (e.g. Welding / Generators)
Isocyanates (e.g. Painting)
Section 4
Identify and Select Your Training Requirements
(Note this should be identified from your method of work as outlined in Section 3.0)
Please tick to confirm that training records have been checked and are in order
This information (name / card number / expiry / certificate) must be available locally (e.g. with the PSCS / in your training register or contained in Section 8 Appendices). This list must be updated and
checked on the day before the work starts
Section 5
Personal Protective Equipment (PPE). Tick if applicable
Rings, Watches,
Jewellery that
may become
entangled must
not be worn.
Long and loose
Foot Hearing High Head Eye Face Hand Protective Respiratory Safety hair must be
Protection Protection Visibility Protection Protection Protection Protection Clothing Protective Harness tied back
Equipment
Section 6
Emergency Procedures and Welfare Requirements
6.1: Rescue Plan e.g. Work at Height, Confined Spaces Tick if Applicable:
If required please include in appendix
Is this information already with the PSCS and / or covered in the site induction or populated on the site notice board?
Please tick to confirm
If Yes, continue to next section. If No, complete section below
Name: Phone:
Email:
Utility Providers
ESB Networks: 1800 372 999 Gas Networks Ireland: 1800 20 50 50 Irish Water: 1800 278 278
Contact Numbers:
Section 7
Risk Assessment Method Statement Sign Off
I have read or had it explained to me, and understood this RAMS. The RAMS reflects local on-site conditions and I am satisfied that it
is safe to start work. I will so far as is reasonably practicable ensure that the work will be carried out in accordance with the measures
outlined during the works. Where any significant changes are required the work will be stopped and the RAMS will be revised and
resubmitted for review by the PSCS before recommencing works.
Feedback
Section 8
Appendices / Additional Information Required (Should be available locally for reference and viewing)
Drawings / Sketches
Permits to Work
Temporary Works
Lift Plan
Rescue Plan
Section 8 Continued
Appendices / Additional Information Required (Should be available locally for reference and viewing)