Sr Section Particulars Time-limit
No.
13) Date appointed for coming Central Govt. shall appoint
into force of the Act by Cen- such date within 3 months of
tral Govt Presidential assent to the
LARR 2013
1A. Period for which non-land Minimum 3 years prior to
owning families should be de acquisition of land
pendent on land to qualify as
'affected families' under sec
tion 3(c)
2. 4(2), 2nd Central Govt. to ensure
Within a period of 6 months
proviso completion of SIA study trom commencement ie.
from the date of issue of
commencement notification
4(4), Environmental Impact Assess- Shall be carried out simulta-
proviso ment neously with SIA study
7(4)/(5) Making of recommendations Within 2 months from the
by Expert Group on SIA report date of constitution of the Ex
pert Group
4A. 11(5) Updation of land records by Within 2 months of issue of
the Collector notice but before declaration
u/s 19
AB. 12 Period of notice to occupier At least 7 days notice in Writ-
for entering building or en ing
closed court garden for pre
liminary survey of land
I4 Publication of Preliminary Within 12 montB.s from date
11
Notification under section of submission of Expert
Group report u/s 7 on SLIA
study
Time-limit extendable by ap-
propriate Govt. by 12 months
1-33
1-34
TIME LINES I-35 TIME LINES
Time-limnit
Particulars Sr. Section Particulars Time-limit
Section No.
Note : If time-limit violated
and no extension granted by place mentioned, a statement
of details of
appropriate Govt., Expert persons possess-
ing interest in the land
Group report shall be
deemed to have been lapsed 10. 25(1) Making of award by the Col-Within a period of 12 months
lector from the date of publication
Within 12 months from the
Declaration that land is re-
of the declaration under sec
19(7) u/s date of preliminary notifica-
quired for public purpose tion
tion 19. If no award is made
19-Publication of declaration within that period, the entire
that any particular land is Where no declaration is
proceedings for the acquisi-
needed for public purpose made under section 19 tion of the land shall lapse.
along with a declaration or an within 12 months from the
area identified as the Tesetuedate of preliminary notitica-
Note: The appropriate Gov-
ment area' tor the purposes of ernment shall have the
tion, then such notification
R&R of the affected families power to extend the period
shall be deemed to have been of 12 months if in its opinion,
rescinded
circumstances exist justity-
The appropriate Government ing the same.
shall have the power to ex-
tend the period of 12 months,
11. 33(1) Correction of awards by Col- Not later than 6 months from
lector where no reterence the date of the award
if in its opinion circum- made u/s 64
stances exist justifying the
same 12 33(1) Correction of awards by Col Before making of such a
lector where he is required too reterence
7. 15(1) Any person interested in any Within 60 days from the date
make a reference made u/s 64
land notified u/s 11(1) as be- of publication of preliminary
ing required or likely to be renotification 13 36(1) The appropriate Government At any time before the award
quired for a public purpose may call for any record of any is made by the Collector
may submit his written objec- proceedings (whether by way
tions to Collector regarding: of inquiry or otherwise) for the
() the area and suitability of purpose of satistying itself as
land proposed to be to the legality or propriety of
acquired; any findings or order passed
(b) justification offered for or as to the regularity of such
public purpose,
proceedings and may pass
(c) the findings of the
Impact Assessment report,
Social such order or issue such direc-
tion in relation thereto as it
8 21(1) Time to be allowed may think fit
notice to by public Not less than 30 days and not
persons interested in
the land for more than6 months after the 14. 38(1) Taking of possession of land by After making full payment of
appearing
ally or by agent person- date of publication of the Collector compensation and monetary
or
before the Collector toadvocate notice part of R&R
submit
their compensation claims
Within a period of 3 months
9 22(1) The Collector 15. 38(1) Full payment of compensation
from the date of the award
may also
require to be ensured by Collector
any such person to make Such time not being less made u/s 30
deliver or
30 than
to him, at a time and days after the date of req-
uisition
TIME LINES 1-36
1-37 TIME LINES
Time-limit
Particulars Sr. Section
Sr. Section Particulars Time-limit
No No.
Within a period of 6 months
16. 38(1) Full payment of monetary part from the date of the award
of R&R
6 weeks as above within a
made u/s 30 further period of 1 year if
Within a period of 18 months he is satisfied that there
Infrastructural entitlements of
17. 38(1), 1st from the date of the award was sufficient cause for
R&R package to be provided
proviso not filing it within 6 weeks.
of land 6 months prior to submer- 22 64(1) Reference to
18. 38(1), 2nd In case of acquisition Authority by Col- Within 30 days from the re-
for irrigation or hydel project, gence of the lands proposed lector on application by
proviso person ceipt of the application.
being a public purpose, the re to be so acquired interested who has not
habilitation and resettlement cepted the award
aC
shal be completed 23 73(1) Other persons interested in all Within 3 months from the
19 60(4) Disposal of reference u/s 64 Within 6 months from the the other land covered
by the date of the award of the Au-
by LARR Authority date of receipt of reference same preliminary notification
thority concerned
20. 60(5) Copies of award made by Within 15 days from date of under section 11, and who are
also aggrieved by the award of In computing the period of 3
LARR Authority to be deliv- such award months, the day on which the
the Collector may not have
eredto parties concerned made an application to the award was pronounced and
LARR Authority shall arrange the time requisite for obtain-
to deliver Collector to make a reference
to the
Authority-making of ing a copy of the award shall
21 64 be excluded.
proviso
Application to Collector for Application for reference
making a reference against the
written application by such
award to the LARR Authority
shall be made to the Col- persons to the Collector to re
lector within 6 weeks from determine compensation on
the date of the Collector's the basis of Authority's award
award if the person mak- on a reterence made by some
ing it was present or rep- other person interested
resented before the Col- 24. 74(1) Filing an appeal to the High Within 60 days from the date
lector at the time when he Court against award made by of Award. The High Court
madehis award. Authority u/s 69 may, if it is satisfied that the
If the person making the appellant was prevented by
application was not so sutticient cause from filing
present or so represented, the appeal within the said
application shall be made period, allow it to be filed
within 6 weeks of the re- within a further period not
ceipt of the notice from exceeding 60 days.
the Collector
under sec 25. 74(2) High Court shall endeavour to High Court shall endeavour
tion 21,
months from within
or
six dispose appeals against | to dispose appeals within 6
the date of
the Collector's award, Authority's orders expedi- months
whichever period shall tiously
first expire.
The
tain Collector
an may enter
the expiryapplication
of the after
period of
1-39 PACKAGE FOR LAND/PROPERTY OWNERs
be deducted from compensation payable to it [ltem 3 of
Second Schedule]
The company for whom land is being acquired may offer its
shares upto 25% of compensation amount.
Note : In case of irrigation project, cach affected family
PACKAGE FOR LAND/PROPERTY OWNERS owning agricultural land in the affected area and whose land
has been acquired or lost shall be allotted minimum one acre
of land on the command area of the project for which the land
WHOSE LAND OR PROPERTY 1S ACQUIRED is acquired. This allotment of land for lead shall be in lieu of
compensation to be paid for land acquired.
cOMPENSATION FOR LAND
MINIMUM R&R ENTITLEMENTS
Acomprehensive compensation package as per First Schedule FOR LAND OWNERS
(AS PER SECOND SCHEDULE)
-
(1) Market value of land as on date of preliminary
notification u/s 11 multiplied by factor of: Subsistence allowance-73,000 per month per affected family
ra 1.0 to
2.00as may be notified for arban land for 1 year
Ver,° 1.00for rural land Each affected family may opt for one of (a)/(b)/(c) below
-
(2) Value of assets attached to land p9 (a) Job to 1 family member (if project creates jobs)
-
(3) Solatium 100% of total compensation [ie. (1) plus
-
(b) R 5,00,000
(2)] (o)Annuity-73000pm. Ps avo pm 2 s)
-(4)Final award=(1) +(2)+(3) 50,000 -
transportation cost
Market value of land in (1) above to be determined as
of following three values: highest One-time resettlement allowance of 50009 s od
the market value, if I f a house is lost in rural areas, a constructed house shall be
any, specified in the Indian Stamp
Act, 1899 for registration of sale deeds
in the area where provided as per Indira Awas Yojana specitications. If a house
theland is situate Legt is lost in urban areas, a constructed house not less than 50 sq
y2ak
hiekaverage sal price for similar type of land situated in the
nearest village or nearest
mts plinth area shall be provided
olr Lod vicinity area MINIMUM R&R ENTITLEMENTS FOR LIVELIHOOD
compensation
of lands for
agreed upon u/s2(2) in case of acquisition LOSERS OTHER THAN LAND OWNERSs
private companies (AS PER SECOND sCHEDULE)
When land acquired
to be reserved &
for urbanisation, 20% of
developed land
offered to
tamilies in proportion to the arealand-owning' project-affected Subsistence allowance -7 3,000 per month per affected family
of their land
a
price equal to the cost of
acquired and at for 1 year
development. If offer accepted byacquisition and the cost of
any family, value of land Each affectedfamily may opt for one of (a)/(b)/(¢) below:
to
member (if project creates jobs)
I-38 (a) Job to 1family
PACKAGE FOR LAND/PROPERTY OWNERS L40
(b) 5,00,000
()Annuity R 3,000 p.m
-
2 sro f m (12- mophe
50,000 transportation cost
9se
One-time resettlement allowance of
Housing benefit as under:
50,000
- If a house is lost in rural areas, a constructed house shall
be provided as per Indira Awas Yojana specifications. If
DIV ISIO N 1
any affected family in rural areas so prefers, the
equivalent cost of the house may be offered in lieu of the
constructed house.
GUIDE TO RIGHT TO FAIR
-
If a house is lost in urban areas, a constructed house
not less than 50 sq mts plinth area shall be provided. Any
COMPENSATION AND
such family in urban areas which opts not to take the
house offered, shall get a one-time financial assistance
for house construction, which shall not be less than
TRANSPARENCY IN LAND
1,50,000.
The benefit shall also be extended to any affected family
ACQUISITION, REHABILITATION
which is without homestead land and which has been
residing in the area continuously for a period of not less
than 3 years preceding the date of notification of
the
&RESETTLEMENT ACT,2013
affected area and which has been involuntarily
from such area.
displaced
No family affected by acquisition shall be given more