TH GS1 Pro 19030 00 Eor03 Mec TCS 1002 - MMSVS - 20210420

This document is a technical compliance sheet for a supplier proposal for a dilution water booster pump for an enhanced oil recovery facility project. It includes information such as the project name and number, item description, tag number, and references the supplier name and proposal number.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views7 pages

TH GS1 Pro 19030 00 Eor03 Mec TCS 1002 - MMSVS - 20210420

This document is a technical compliance sheet for a supplier proposal for a dilution water booster pump for an enhanced oil recovery facility project. It includes information such as the project name and number, item description, tag number, and references the supplier name and proposal number.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

A

A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
1.0 SCOPE OF WORK AND SUPPLY n
v
GOODS i
d
e
Completed Dilution Water Booster Pumps (P-E3101) per reference [blank] [20-Apr-21] Please provide the response. See below See below d
1.1 datasheet “TH-GS1-PRO-19030-00-EOR03-MEC-DTS-1001” and Included, Qty 1 unit
specification, including but not limited to the following: OPEN

1.1.1 Horizontal Surface Pump Included Comply [20-Apr-21] Noted N CLOSED

Comply for Electric motor and VSD, Gear is not applicable for this
1.1.2 Driver unit including electric motor, Variable Speed Drive and Gear Included [20-Apr-21] Noted N CLOSED
proposal
Bearing temperature transmitter and Vibration transmitter at Thrust Comply, Bearing Temperature Transmitter and Vibration Transmitter
1.1.3 Included [20-Apr-21] Noted N CLOSED
chamber at Thrust Chamber will be provide by UAL
Comply, Bearing and Winding temperature transmitter for Surface
1.1.4 Bearing and winding temperature transmitters for motor Included [20-Apr-21] Noted N CLOSED
motor will be provide by UAL
Mechanical seals, seal flush plans, and all accessories (API seal plan
1.1.5 11/65A) including level switch at seal drain collection tank (seal leak Included Comply [20-Apr-21] Noted N CLOSED
detector)

1.1.6 Flexible Coupling complete with brass non-sparking guards Included Comply [20-Apr-21] Noted N CLOSED

1.1.7 Common base plate for mounting of pump, driver unit and seal system Included Comply [20-Apr-21] Noted N CLOSED

Baseplate lifting lugs/pad eyes for transportation, erection and


1.1.8 Included Comply [20-Apr-21] Noted N CLOSED
maintenance (Note: Lifting calculation shall be provided)
Two (2) SS316L Earthing bosses and with SS316 M10 stud, 2 Hex nuts
1.1.9 Included Comply [20-Apr-21] Noted N CLOSED
and 2 plain washers
2 mm-thick (minimum) SS316 nameplate, hazardous area certification
1.1.10 Included Comply [20-Apr-21] Noted N CLOSED
plates and tag plates.

1.1.11 Jack Screws – lateral & axial for motor Included Comply [20-Apr-21] Noted N CLOSED

1.1.12 SS316 Shim plates for alignment Included Comply [20-Apr-21] Noted N CLOSED

1.1.13 Holding bolt detailed drawing Included Comply [20-Apr-21] Noted N CLOSED

Inspection and Testing with reports complying with the requirements in this
1.2 Included Comply [20-Apr-21] Noted N CLOSED
document and reference documents

Specific witnessed test, including;


- Performance test
- Mechanical run test
1.3 - Sound level test Included Comply [20-Apr-21] Noted N CLOSED
- Vibration test
- NPSH test (if the difference between the NPSHA and NPSHR is less than
1 m)

1.4 Surface preparation, Cleaning and Painting Included Comply [20-Apr-21] Noted N CLOSED

Required lifting devices (“Four-leg wire rope sling with 4 shackles, 2


intermediate links and one master link” or “Certified spreader bar with
slings, links and shackles” or the other required lifting gears whichever
1.5 Included Comply [20-Apr-21] Noted N CLOSED
applicable) for transportation, erection and maintenance with 3rd party
certificate from DNV-GL / ABS / BV / LR / K2 Specialist / Intertek only
Note: Lifting arrangement drawing with calculation shall be provided.

Functional skid lifting test (self-empty weight) with 100% visual inspection
1.6 Included Comply [20-Apr-21] Noted N CLOSED
after test

First fill (100%) of pump lubricant and consumables


Note: Lubricant shall be PTT products which are compatible for each
1.7 Included Comply [20-Apr-21] Noted N CLOSED
components. In case PTT products are not available, the proposed shall
be subject to COMPANY’s approval

[20-Apr-21] Refer to document "601 Spare Part List for


Spare parts for Erection, Commissioning & Startup. The spare parts list Commissioning and Start-up ", please provide more detail about
shall be provided and composed of the following items as a minimum: Comply "Item 2 COUPLING AND O-RING SETS FOR HSPS 675-9600 25 See below See below
- Pump consumable parts (e.g. gaskets, o-rings, etc.) STAGES". COMPANY has a query that should the coupling be
1.8 Included supplied as spare part for Erection, Commissioning & Startup,
- Pump lubricant (separated from first fill)
- Completed set of mechanical seal cartridge
The SUPPLIER shall indicate in the offer, if any other items are required.
OPEN

[20-Apr-21] Refer to document "603 - List of Special Tools", the


following tools are proposed.
- SKF laser alignment TKSA11
Comply - Rolling pump jacks See below See below
1.9 Special Tools for Erection, Installation, Operation and maintenance (if any) Included
Please share information and clarify the reason to keep as Special
tools.

OPEN

Packing, Preservation and Preparation for Shipment including temporary


1.10 Included Comply [20-Apr-21] Noted N CLOSED
nozzle covers, gasket, bolting and supports

Documentation as specified in Section "Minimum SUPPLIER Document


1.11 Included Comply [20-Apr-21] Noted N CLOSED
Submission" and Appendix III SUPPLIER Documentation Instruction

Transportation of all supplied items per agreed delivery term and location
1.12 (DAP at COMPANY’s worksite, Lankrabue, Kamphaengphet, Thailand, Included Comply [20-Apr-21] Noted N CLOSED
INCOTERMS 2010)

Pump performance and Mechanical guarantees including mechanical/


1.13 Included Comply [20-Apr-21] Noted N CLOSED
structural design, materials and workmanship
Optional Items

Additional completed Dilution Water Booster Pumps including inspection


1.14 & testing, documentation and transportation (Item refer to item no. 1.1 – Included as option, Unit rate provided for 1 - 3 Unit(s) Comply [20-Apr-21] Noted N CLOSED
1.4, 1.6 – 1.7 and 1.10 - 1.13) (Unit price shall be provided)

Required lifting devices (“Four-leg wire rope sling with 4 shackles, 2


intermediate links and one master link” or “Certified spreader bar with
slings, links and shackles” or the other required lifting gears whichever
applicable) for transportation, erection and maintenance with 3rd party
1.15 Included as option, Unit rate provided for 1 - 3 Unit(s) Comply [20-Apr-21] Noted N CLOSED
certificate from DNV-GL / ABS / BV / LR / K2 Specialist / Intertek only

Note: Lifting arrangement drawing with calculation shall be provided.


(Item refer to item no. 1.5) (Unit price shall be provided)

Spare parts for Erection, Commissioning & Startup.

The spare parts list shall be provided and composed of the following items
[20-Apr-21] Noted. Refer to discussion at 1.8.
as a minimum:
1.16 - Pump consumable parts (e.g. gaskets, o-rings, etc.) Included as option, Unit rate provided for 1 - 3 Unit(s) Comply N CLOSED
[ Note : No concern on cost impact due to optional items and no
- Pump lubricant (separated from first fill)
additional proposed price ]
- Completed set of mechanical seal cartridge
The SUPPLIER shall indicate in the offer, if any other items are required.
(Item refer to item no. 1.8) (Unit price shall be provided)

[20-Apr-21] Noted. Refer to discussion at 1.9.


Special Tools for Erection, Installation, Operation and maintenance (if any)
1.17 Included as option, Unit rate provided for 1 - 3 Unit(s) Comply N CLOSED
(Item refer to item no. 1.9) (Unit price shall be provided) [ Note : No concern on cost impact due to optional items and no
additional proposed price ]

Spare parts for normal operation (priced list, separately quoted). The spare
parts list shall be composed of the following items as a minimum:
- Complete pump bundle
- Complete set of mechanical seal
Comply, Completed Pump, Mechanical Seals, Coupling, Pump
- Coupling
Consumables, 100% pump lubricant
1.18 - Pump bearings Included as option, price list provided [20-Apr-21] Noted. N CLOSED
- Throat bushing
N/A Throat Bushings and Pump Bearing
- Key
- Pump consumable parts (e.g. gaskets, o-rings, etc.)
- 100% of pump lubricant
The SUPPLIER shall indicate in the offer, if any other items are required

Field supervision SERVICES for Installation, Commissioning, and Start-up,


Performance test and Site Acceptance Test (SAT) at COMPANY’S
WORKSITE. SUPPLIER shall provide the unit rate separately.
- SUPPLIER shall provide service day rate and mobilization & Included as option, Day rate and mobilization & demobilization
demobilization cost. cost provided.
1.19 - Day rate shall be inclusive of daily transportation from/to the worksite, per Comply [20-Apr-21] Noted N CLOSED
diem, meal, accommodation, laundry, communication, and/or the other SUPPLIER to advise the number and position of personnel who
cost which related to site supervision. is/are required to complete the SERVIICES.
- Mobilization & Demobilization cost shall include day rate on the day(s) of
traveling, any transportation cost between point of origin and worksite,
accommodation and the others cost incurred during travelling

2.0 GENERAL REQUIREMENTS

[20-Apr-21] Please recheck for any deviation(s) has not been listed
Compliance with specifications and requirements of TH-GS1-PRO-19030- and complete the deviation list for discussion prior the completion of
00-EOR03-MEC-RFQ-1002, Requistion for Dilution Water Booster Pumps Comply this document. After that, please provide confirmation that all See below See below
(Horizontal Surface Pump) and related documents. deviations have been listed in topic of "OTHERS / DEVIATION" in
this Technical Compliance/Clarification Sheet (TCS).
All deviations shall be listed in this TCS in topic of "OTHERS /
Complied
2.1 DEVIATION". If any deviations are not mentioned specifically in the this
TCS format, then it will be considered that the SUPPLIER agrees to
comply with all requirements of tender packages.

This TCS will be the part of CONTRACT after awards which SUPPLIER Page 1 of 7
shall follow.
A

A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. Compliance with specifications
CHARACTERISTICS
and requirements of TH-GS1-PRO-19030- REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
00-EOR03-MEC-RFQ-1002, Requistion for Dilution Water Booster Pumps
a
c
(Horizontal Surface Pump) and related documents. tP
e
SUMMARY & CONCLUSION ri
All deviations shall be listed in this TCS in topic of "OTHERS / o
o
Complied
2.1 DEVIATION". If any deviations are not mentioned specifically in the this n
v
TCS format, then it will be considered that the SUPPLIER agrees to i
comply with all requirements of tender packages. d
e
OPEN
This TCS will be the part of CONTRACT after awards which SUPPLIER d
shall follow.

2.2 Design life ≥ 10 years Comply [20-Apr-21] Noted N CLOSED

2.3 Area classification Non-hazardous area. Comply [20-Apr-21] Noted N CLOSED

Complied with minimum qualification requirements as per Section


2.4 SUPPLIER's Key Personnel Comply [20-Apr-21] Noted N CLOSED
4.11 of TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002

Complied with minimum qualification requirements as per Section


2.5 Personal Protective Equipment (PPE) Comply [20-Apr-21] Noted N CLOSED
4.12 of TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002
3.0 TECHNICAL/ SPECIFICATION REQUIREMENTS
3.1 General Requirement

3.1.1 Code and standard design for Horizontal Surface Pump Complied as per 10008-STD-6-ROT-037-R00 Comply [20-Apr-21] Noted N CLOSED

The Net Positive Suction Head Available (NPSHa) shall exceed the Net
3.1.2 Positive Suction Head Require (NPSHr) by at least 1m throughout the Complied Comply [20-Apr-21] Noted N CLOSED
entire operating range.

Rated flow shall be within the region of 80 % to 110 % of best efficiency


3.1.3 Complied Comply [20-Apr-21] Noted N CLOSED
flowrate of the pump as furnished.

3.1.4 Head rise from rate point to shutoff shall be at least 10% Complied Comply [20-Apr-21] Noted N CLOSED

3.1.5 Thrust chamber bearing operating temperature shall be less than 80oC. Complied Comply [20-Apr-21] Noted N CLOSED

Guard protection shall be provided for the part which surface temperature
3.1.6 Complied Comply [20-Apr-21] Noted N CLOSED
exceeds 70oC.

The allowable forces and moments on pump nozzles due to piping


3.1.7 reactions shall be two times the values given in Nozzle loadings Table 2 of Complied Comply [20-Apr-21] Noted N CLOSED
API 610.
Suction and discharge nozzles shall be flanged with welding neck, raised
face with smooth finish. All flanges on the casing shall be rated the same
3.1.8 Complied Comply [20-Apr-21] Noted N CLOSED
as discharge flange and shall conform to ASME B16.5, Slip-on flange or
socket weld flange is not permitted.
[20-Apr-21] Please reconfirm the supply of Pump casing drain nozzle
Comply See below See below
Pump casing drain nozzle with valve & flange, blinded and terminated at with valve & flange, blinded.
3.1.9 Complied
the skid edge shall be provided.
OPEN

Material selection for all wetted parts shall be suitable for the pumped fluid.
3.1.10 Complied Comply [20-Apr-21] Noted N CLOSED
SUPPLIER shall confirm this in the tender
All piping onskid shall be complied in accordance with 10008-STD-6-PIP-
3.1.11 Complied Comply [20-Apr-21] Noted N CLOSED
001-R00 for piping design
Piping stress analysis shall be performed including small bore connections
3.1.12 Complied Comply [20-Apr-21] Noted N CLOSED
in accordance with pump design code
A fabricated steel base plate skid with drain rim shall be furnished and shall
3.1.13 Complied Comply [20-Apr-21] Noted N CLOSED
extend completely under both pump and driver
SUPPLIER shall take full responsibility to complete the Pump package for
design, engineering and manufacture so as to ensure that it can provide
3.1.14 the guaranteed capabilities in process service. The responsibility shall Complied Comply [20-Apr-21] Noted N CLOSED
cover to the specification of the parts and accessories sub-contracted by
the SUPPLIER

Welding, heat treatment, fabrication and non-destructive examination of all


3.1.15 mechanical components/equipment shall comply with PEGS-12060-FAB- Complied Comply [20-Apr-21] Noted N CLOSED
001 Rev.0-0, Welding of Pressure Containing Piping and Equipment

Details of repairs shall be recorded and reported to COMPANY, who shall


3.1.16 Complied Comply [20-Apr-21] Noted N CLOSED
be informed of the need for plugging prior to any repair being carried out

Non pressure parts attached to pressure parts by welding shall be the


3.1.17 Complied Comply [20-Apr-21] Noted N CLOSED
same material as the pressure part

3.1.18 Dissimilar material welding is not permitted Complied Comply [20-Apr-21] Noted N CLOSED

All bolting shall be complied in accordance with 10008-STD-6-COR-011-


3.1.19 Complied Comply [20-Apr-21] Noted N CLOSED
R00, Painting of Onshore structure and Facilities, section 7.8.3.5
Slip-on flange and thread connections on any parts / equipment are not
3.1.20 Complied Comply [20-Apr-21] Noted N CLOSED
permitted
Nameplates and rotation arrows shall be made of 316 stainless steel with
3.1.21 Complied Comply [20-Apr-21] Noted N CLOSED
2mm-thick
The maximum allowed noise level is 85 dBA measured at 1 m. from the
3.1.22 Complied Comply [20-Apr-21] Noted N CLOSED
surface of the equipment package.

The vibration level shall be measured compliance with 10008-STD-6-ROT-


3.1.23 037-R00, ESP Base Horizontal Pump Package for Surface Pumping Complied Comply [20-Apr-21] Noted N CLOSED
Systems, or Manufacturer standard, whichever is more stringent

NDT shall be performed as required by material specification. In addition,


NDT shall be performed in accordance with minimum requirements as
3.1.24 Complied Comply [20-Apr-21] Noted N CLOSED
stated in table in section 5.1.19 of TH-GS1-PRO-19030-00-EOR03-MEC-
RFQ-1002

Casting defects shall not be repaired by welding, plugging, burning in, or


impregnating, except as follows
1) Weldable grade of steel casting may be repaired by welding in
accordance with respective material standards.
2) Repair welding procedure and welder’s qualification shall be in
accordance with ASTM A 488
3) Major weld repair shall be subjected to Company’s prior approval. Major
weld repair is defined as either a removal of more than 40% of the wall
3.1.25 Complied Comply [20-Apr-21] Noted N CLOSED
thickness, or length of more than 100mm in one or more direction, or a
total surface area of all repairs exceeding 20% of the total casting surface
area
4) Major weld repair shall be followed by suitable heat treatment
5) Weld repair shall be inspected according to the same quality standard
used to inspect the casting.

All other repairs shall be subject to the COMPANY’s prior approval

Where the configuration of the casting makes radiography impossible, it


3.1.26 Complied Comply [20-Apr-21] Noted N CLOSED
may be replaced by ultrasonic testing
Lifting lugs shall be performed with functional lifting test (self-empty weight)
3.1.27 Complied Comply [20-Apr-21] Noted N CLOSED
and 100% visual inspection after lifting tested

3.2 Process Requirement


[20-Apr-21] Please comfirm that the proposed pump is suitable for
Acknowledge See below See below
the process requirement or not.
3.2.1 Continuous / Intermittent Continuous
OPEN

[20-Apr-21] Please comfirm that the proposed pump is suitable for


Acknowledge See below See below
the process requirement or not.
3.2.2 Medium fluid Water with high chloride content

OPEN

3.2.3 Capacity (Min / Nor / Max (Rated)) 1,500 (SUPPLIER to confirm) / 5,000 / 9,500 (bpd) 1530@50Hz/5000/9500 [20-Apr-21] Noted N CLOSED

[20-Apr-21] Please comfirm that the proposed pump is suitable for


Acknowledge See below See below
the process requirement or not.
3.2.4 Density at pumping temperature 981 (kg/m3)

OPEN

[20-Apr-21] Please comfirm that the proposed pump is suitable for


Acknowledge See below See below
the process requirement or not.
3.2.5 Viscosity at pumping temperature 0.6 (cP)

OPEN

[20-Apr-21] Please comfirm that the proposed pump is suitable for


Acknowledge See below See below
the process requirement or not.
3.2.6 Vapour pressue at pumping temperature 1.39 (Psig)

OPEN

[20-Apr-21] Please comfirm that the proposed pump is suitable for


Acknowledge See below See below
the process requirement or not.
3.2.7 Tempurature (Min / Nor / Max) 30 / 60 / 80 (oC)

Page 2 of 7
A

A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
3.2.7 Tempurature (Min / Nor / Max) 30 / 60 / 80 (oC) o
o
n
v
OPEN i
d
e
d
[20-Apr-21] Please comfirm that the proposed pump is suitable for
Acknowledge to Min/Max Suction Pressure provided See below See below
the process requirement or not.

3.2.8 Suction Pressure (Min / Nor / Max) 1,000 / 1,500 / 1,600 (Psig)

OPEN

[20-Apr-21] Please comfirm that the proposed pump is suitable for


Acknowledge to Min/Max Discharge Pressure provided See below See below
the process requirement or not.
3.2.9 Design Discharge Pressure (Min / Nor / Max) 1,600 / 1,800 / 1,900 (Psig)

OPEN

[20-Apr-21] Noted.
317 PSI @30Hz to 900 PSI @50Hz See below See below
Please also update pump performance curve to show the curve at
3.2.10 Differential pressure at Minimum flow 200 (SUPPLIER to confirm) - 900 (Psi) 30Hz

OPEN

3.2.11 Differential pressure at Normal flow 200 (SUPPLIER to confirm) - 900 (Psi) 235 PSI @30Hz to 900 PSI @52.5Hz [20-Apr-21] Noted N CLOSED

3.2.12 Differential pressure at Rated flow 200 (SUPPLIER to confirm) - 900 (Psi) 370 PSI @43Hz to 900 PSI @58.5Hz [20-Apr-21] Noted N CLOSED

Acknowledge, Minimum Require at rated flow is 4.383 Meters (6.226


3.2.13 Minimum available NPSH 650 (Meters) PSI) so from NPSHa 650 M will be enough for suction pressure with [20-Apr-21] Noted See below CLOSED
no cavitation issues

Acknowledge, Minimum Require at rated flow is 4.383 Meters (6.226 [20-Apr-21] From Pump performance curve, this information should
See below See below
PSI) not correct. So, please recheck and reconfirm the value.
3.2.14 NPSHR @ Rated Capacity SUPPLIER to advise

OPEN

Acknowledge, Minimum Require at rated flow is 16.376 Meters


3.2.15 NPSHR @ End of Curve SUPPLIER to advise [20-Apr_21] Noted N CLOSED
(23.264 PSI)

Not exceed 1.2 times of the rated differential head


3.2.16 Pump shut-off head, m at Rated Flow: : 9500 BPD 906.62 m/681.61 m = 1.33 [20-Apr_21] Special accept for this project only. N CLOSED
(SUPPLIER to specify)

3.2.17 Suction Specific Speed (Nss) Shall not exceed 11000 (USC units) 3487 [20-Apr_21] Noted N CLOSED

3.2.18 Mechanical design pressure, barg SUPPLIER to advise 172.3 Barg (2500 PSI) [20-Apr_21] Noted N CLOSED

Pump Design temperature 200c


3.2.19 Mechanical design temperature, Deg C 100 oC Mechanical Seal Design Temperature 150c [20-Apr_21] Noted N CLOSED
System Temperature 150c

[20-Apr-21] Please specify Pump min and max continous flow for
stable operation (BPD) at the following conditions.
10.14@50Hz / 87.84@60Hz - Max speed See below See below
3.2.20 Pump min and max continous flow for stable operation (BPD) SUPPLIER to advise (Min / Max) - Same speed with rated capacity
- Min speed

OPEN

3.2.21 Efficiency (at Min / Nor / Rated / Max Flow), % SUPPLIER to advise 27 / 61 / 78 / 71 [20-Apr_21] Noted N CLOSED

3.2.22 Best efficiency point (BEP), % (SUPPLIER to advise) % at (SUPPLIER to advise) m3/h 78% at 9751BPD [20-Apr_21] Noted N CLOSED

3.2.23 Power absorbed (Min / Nor / Rated / Max), kW SUPPLIER to advise 64 / 125 / 150 / 173 [20-Apr_21] Noted N CLOSED

At EOC Total Max Power require at


3.2.24 Maximum power at rated impeller (EOC), kW SUPPLIER to advise [20-Apr_21] Noted N CLOSED
is 173kW for 25 stages

[20-Apr_21] The provided information is different from COMPANY's


5 mm (0.197") See below See below
experience (around 100 micron). So, please reconfirm the value.
3.2.25 Allowable maximum particle size SUPPLIER to advise
OPEN

3.3 Pump Construction

3.3.1 Suction Nozzle SUPPLIER to advise / 1500# (SUPPLIER to confirm) / RF / Side Comply, Suction 6" WNRF 1500CL [20-Apr_21] Noted N CLOSED

3.3.2 Discharge Nozzle SUPPLIER to advise / 1500# (SUPPLIER to confirm) / RF / End Comply, Discharge 4" LJRF 1500CL [20-Apr_21] Noted N CLOSED

[20-Apr_21] There is no drain nozzle shows on GA drawing, so


Comply See below See below
please reconfirm the supply of drain nozzle.
3.3.3 Drain Nozzle 1" / 1500# (SUPPLIER to confirm) / RF / Side
OPEN

[20-Apr_21] Please provide response for the following reqests;

Comply (1) Please advise size and type of vent connection. See below See below
3.3.4 Vent-Gland Nozzle SUPPLIER to advise / NPT / Valved with Plug
(2) Please confirm to supply valve with plug.

OPEN

3.3.5 Drain Nozzle at drain pan 2" / 150# / RF / End Comply [20-Apr_21] Noted N CLOSED

MAWP for Pump is 3000PSI, MAWP for Suction Housing and


SUPPLIER to advise for pump and main components (e.g. Barrel
3.3.6 Maximum Allowable Pressure (Psig at 100oC) Mechanical Seal is 2500PSI, MAWP for Discharge Housing is 2500 [20-Apr_21] Noted N CLOSED
casing, suction housing, discharge nozzle, Mechanical seal)
PSI

3.3.7 Hydrostatic Test Pressure 1.5 x MAWP Comply [20-Apr_21] Noted N CLOSED

[20-Apr_21] From COMPANY's experience, there are totally two (2)


N/A for Horizontal Surface Pumping System journal bearings per each berrel on each side which can consider as See below See below
3.3.8 Rotor mount type Overhung overhung. So, please confirm rotor configuration.

OPEN

Angular contact ball bearings 7315 BECBM, single row. To handle


3.3.9 Bearing type (Radial / Thrust) SUPPLIER to advise / SUPPLIER to advise [20-Apr_21] Noted N CLOSED
maximum pump load at 7000 Lbs

[20-Apr_21] Please provide supporting information to confirm that


SDTC See below See below
SDTC, HDTC or XDTC SDTC type thrust chamber is suitable for this application.
3.3.10 Thrust Chamber Type
(SUPPLIER to specify)
OPEN

Comply, Basic dynamic load rating 132KN / Basic static load rating
3.3.11 Bearing max. allowable load (Radial / Thrust) (N) SUPPLIER to specify / SUPPLIER to specify [20-Apr_21] Noted N CLOSED
104KN

3.3.12 Pump thrust load (Radial / Thrust) (N) SUPPLIER to specify / SUPPLIER to specify Comply, 500N /13.3 KN [20-Apr_21] Noted N CLOSED

3.3.13 Pump MFG and country of origin SUPPLIER to specify UAL, Thailand [20-Apr_21] Noted N CLOSED

3.3.14 Pump Model SUPPLIER to advise Pump Model 675-9600 [20-Apr_21] Noted N CLOSED

3.4 Mechanical Seal

3.4.1 Manufacturer/ Model SUPPLIER to advise (Complied as per PTTEP AML) John Crane Type T8610 [20-Apr_21] Noted N CLOSED

3.4.2 Code and standard design Complied as per API 682 latest edition Comply [20-Apr_21] Noted N CLOSED

3.4.3 Seal Plan API plan 11/65A API Seal Plan 11/65A with Level Switch [20-Apr_21] Noted N CLOSED

3.4.4 Pressureized accessories Complied per ASME VIII Div.1. Comply per ASME VIII Div.1 [20-Apr_21] Noted N CLOSED

Mechanical seal shall be cartridge type, and flushing connections, as


3.4.5 Complied Comply [20-Apr_21] Noted N CLOSED
indicated on the data sheets. A shaft sleeve must be provided in this area

3.4.6 Flush pipe size shall be ¾” to 1” Complied Comply [20-Apr_21] Noted N CLOSED

The isolation valve between seal and seal plan system shall be provided
3.4.7 Complied Comply [20-Apr_21] Noted N CLOSED
and normally opened.

3.4.8 Pressure Indicator shall be provided at pipe end (after orifice) Complied Comply [20-Apr_21] Noted N CLOSED

Material of mechanical seal including piping plan shall be made from


3.4.9 Complied Comply [20-Apr_21] Noted N CLOSED
SS316L as a minimum
The mechanical seal construction shall be the single reversal spring design
3.4.10 Complied Comply [20-Apr_21] Noted N CLOSED
which is not exposed to the fluid condition.

Page 3 of 7
A

A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
n
v
The dynamic seal chamber pressure for single seal shall exceed the
3.4.11 maximum liquid vapor pressure at maximum seal chamber liquid Complied Comply [20-Apr_21] Noted N CLOSED i
d
temperature by at least 3.5 bar or 10% whichever is greater e
d
3.5 Material of Construction

3.5.1 Casing Carbon Steel (SUPPLIER to confirm) Carbon Steel 1025 [20-Apr_21] Noted N CLOSED

3.5.2 Diffuser NI-RESIST Type 1 (SUPPLIER to confirm) Comply, Ni-Resist Type1 [20-Apr_21] Noted N CLOSED

3.5.3 Impeller NI-RESIST Type 1 (SUPPLIER to confirm) Comply, Ni-Resist Type1 [20-Apr_21] Noted N CLOSED

3.5.4 Shaft / Coupling ULTA HIGH STRENGTH INCONEL (SUPPLIER to confirm) Comply, Ultra High Strength Inconel 718 [20-Apr_21] Noted N CLOSED

3.5.5 Pump Head SS316L (SUPPLIER to confirm) Comply, SS316L [20-Apr_21] Noted N CLOSED

3.5.6 Baseplate Carbon Steel (SUPPLIER to confirm) Carbon Steel, SS400 [20-Apr_21] Noted N CLOSED

3.5.7 Pump Suction housing including inlet nozzle SS316L (SUPPLIER to confirm) Comply, SS316L [20-Apr_21] Noted N CLOSED
3.5.8 Pump Discharge nozzle SS316L (SUPPLIER to confirm) Comply, SS316L [20-Apr_21] Noted N CLOSED

3.6 Coupling and Guard

3.6.1 Manufacturer SUPPLIER to advise (Complied as per PTTEP AML) Thomas Rexnord / XTSR71-1088 [20-Apr_21] Noted N CLOSED

3.6.2 Code and standard design for Couplings and Guards API 671 Comply [20-Apr_21] Noted N CLOSED

3.6.3 Service factor ≥ 1.75 (SUPPLIER to confirm) Comply, 6 [20-Apr_21] Noted N CLOSED

3.6.4 Coupling type Dry (non-lubricated), metallic, flexible type Comply [20-Apr_21] Noted N CLOSED

3.6.5 Metal Coupling guard Non-sparking material , Brass Preferred (SUPPLIER to confirm) Comply [20-Apr_21] Noted N CLOSED

Spacer-type coupling shall be provided. Additionally, couplings shall


comply with following.
• Flexible elements shall be of corrosion-resistant material.
3.6.6 Complied Comply [20-Apr_21] Noted N CLOSED
• Couplings shall be designed to retain the spacer if a flexible element
ruptures.
• Couplings hub shall be steel

3.6.7 Coupling shall be balanced to ISO 21940-11 grade G6.3 Complied Comply [20-Apr_21] Noted N CLOSED

3.7 Power Transmission (Gear)

3.7.1 Manufacturer SUPPLIER to advise (Complied as per PTTEP AML) NA for this project [20-Apr_21] Noted N CLOSED

3.7.2 Service factor SUPPLIER to advise NA for this project [20-Apr_21] Noted N CLOSED

3.7.3 Gear type SUPPLIER to advise NA for this project [20-Apr_21] Noted N CLOSED

3.8 Electrical Motor (Pump Driver)

3.8.1 Area classification Non-hazdous area Comply, Non-Ex, process performance motor [20-Apr-21] Noted N CLOSED

10008-STD-6-ELE-020-R00 and TH-GS1-PRO-19030-00-EOR03-


3.8.2 Motor specification Comply, follow filled in technical datasheet for LV Motor [20-Apr-21] Noted N CLOSED
MEC-DTS-1001
Comply, IEC60034
3.8.3 Standard and Code IEC60034 and IEC60079 (IEC60079 is not applicable because the motor is in non-hazardous [20-Apr-21] Noted N CLOSED
area

3.8.4 Manufacturer name and model As per AML (SUPPLIER to confirm) Comply, ABB [20-Apr-21] Noted N CLOSED

3.8.5 Direction of rotation (facing driven end) Bi-direction Comply, Bi-directional [20-Apr-21] Noted N CLOSED

[20-Apr-21] Please provide response for the following requests;

(1) Please correct a load's characteristic curve, it shall be quadratic


torque.
To be indicated by Supplier, The motor power rating including Comply, DOL Rating power 200kW with service factor 1.0, temp rise
See below See below
service factor shall be a minimum of: class B.
(2) Refer to Doc.402 page 2 of 3, torque vs speed curve indicates
3.8.6 Motor rating (kW) - 125% for Motor < 22 kW that the margin of motor & load is only 2 % at the end of curve. It
- 115% for Motor 22 to 55 kW doesn't meet the requirement (110% shall be provided to the end of
- 110% for Motor > 55 kW curve). Please provide the clarification.

OPEN

[20-Apr-21] Please provide response for the following requests;


Base 3570rpm,
When operating at maximum speed See below See below
min 1800rpm, max 3600rpm
(1) What is the value of motor power ?
(2) What is the value of shaft required power ?
3.8.7 Speed (Min - Max @motor) (rpm) SUPPLIER to advise

OPEN

For driver 400 V / 50 Hz / 3 phases Comply, For driver 400 V / 50 Hz / 3 phases


3.8.8 Electrical power supply [20-Apr-21] Noted N CLOSED
For heating 230 V / 50 Hz / 1 phase For heating 230 V / 50 Hz / 1 phase

3.8.9 Ingress Protection-Motor IP55 or higher Comply, IP55 [20-Apr-21] Noted N CLOSED

3.8.10 Overall Explosion proof protection Not required - [20-Apr-21] Noted N CLOSED

3.8.11 Starting method VSD Comply, VSD [20-Apr-21] Noted N CLOSED

- Comply, Pt100 3-wire in stator winding, 2 per phase [20-Apr-21] Please confirm that the temperature protection relay is
See below See below
- Comply, Double Pt100 3-wire in bearings provided inside VSD cabinet to receive signal from all RTDs.
Motor Winding Temperature detector 3-wire RTD (PT100) x 2 sets per phase ( 1 used & 1 spare)
3.8.12
Motor Bearing Temperature detection (both DE & NDE) 3-wire RTD (PT100) x 2 sets per position ( 1 used & 1 spare)

OPEN

3.8.13 Motor Efficiency IE2 Comply, IE2 at 200kW DOL Rating [20-Apr-21] Noted N CLOSED

3.8.14 Motor explosion proof certification Not required N/A [20-Apr-21] Noted N CLOSED

Comply, S1 & S9 [20-Apr-21] Please submit motor datasheet S1 duty to review. See below See below
3.8.15 Motor Duty S9 (provided both name plate S1 & S9)
OPEN

[20-Apr-21] Please confirm that the cooling capacity of IC411 is


enough at low speed operation.
Comply, IC411 See below See below
IC411 self-cooling or IC4A1A6 external constant speed cooling
3.8.16 Cooling method Note: For example, ABB motor, IC411, might be generally applicable
(To be incated by Supplier)
when running around 45-50% of motor rated speed.

OPEN

3.8.17 Bearing Type Regreasable type Comply, Yes [20-Apr-21] Noted N CLOSED

Main TB Position Top (adjustable 4 directions) or Right (view from


Comply, MTB at Top of motor,
DE)
ATB at Right (view from DE) [20-Apr-21] Please confirm that TB for space heater and RTD
3.8.18 Motor Junction Box Aux. TB Position Top / Right (view from DE) See below See below
Specific entry size shall be confirmed before order unless standard (PT100) shall be installed separately.
Connection: Thread metric
size, drilled by ABB factory shall be provided
Cable: Three core cables (CU/XLPE/SWA/PVC)

OPEN

3.9 Electrical Requirements


3.9.1 Electrical specification
3.9.1.1 Electrical requirements for packaged units Complied with PEGS-12059-ELE-046 Comply [20-Apr-21] Noted N CLOSED
3.9.1.2 Design of earthing and bounding systems Complied with TYP-4-57-0004 / TYP-4-59-0006 Comply [20-Apr-21] Noted N CLOSED
3.9.1.3 Electrical equipment shall be selected according PTTEP
Complied Comply [20-Apr-21] Noted N CLOSED
recommended manufacturer list
3.9.1.4 The electrical earthing system TN-S Comply [20-Apr-21] Noted N CLOSED

3.9.2 Variable Speed Drive (VSD)

[20-Apr-21] VSD specification shall also comply with COMPANY's


Comply, Checked and clarified in TH-GS1-PRO-19030-00-EOR03- specification 10008-STD-6-ELE-032-R00. Therefore, which item is
See below See below
3.9.2.1 VSD specifiction Complied with 10008-STD-6-ELE-032-R00 MEC-DTS-1001 deviated from company standard. Bidder shall clarfy to company to
consider item by item in exception deviation list.

OPEN
3.9.2.2 Transformer's manufacturer SUPPLIER to advise (Complied as per PTTEP AML) N/A [20-Apr-21] Noted N CLOSED
3.9.2.3 VSD scheme/configuration LV VSD to drive LV motor Comply [20-Apr-21] Noted N CLOSED
400 V +/- 10%, 50 Hz +/- 5%
3.9.2.4 Voltage/frequency of input Comply [20-Apr-21] Noted N CLOSED
(3 phases, 3 wires)

Page 4 of 7
A

A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
3.9.2.5 Comply to earthing system of existing utility TN-S Comply [20-Apr-21] Noted N CLOSED n
v
no extra supply, control voltage is connected from VSD input i
3.9.2.6 Control voltage Comply [20-Apr-21] Noted N CLOSED d
voltage itself e
d
THDU (Voltage) <5% with assumption of network and transformer [20-Apr-21] Please provide the clarification on the assumption of
3.9.2.7 Maximum THDU at minimum fault level < 5% See below See below
data network and transformer data

OPEN

3.9.2.8 Minimum efficiency at all operating points > 97% > 97% at nominal power [20-Apr-21] Noted N CLOSED
Comply, 2nd environment, C4, grounded network (TN) as standard
from ACS880-07
3.9.2.9 Radio interference class (IEC 61800-3) Class A, design category C4 [20-Apr-21] Noted N CLOSED

3.9.2.10 Mounting Floor Comply, Floor [20-Apr-21] Noted N CLOSED


3.9.2.11 Degree of Protection indoor enclosure IP41 and IP20 at door openning Comply, indoor enclosure IP42 and IP20 at door openning [20-Apr-21] Noted N CLOSED
3.9.2.12 VSD pulse system 6 pulse or higher to meet harmonic emission requirement Comply, 6-pulse [20-Apr-21] Noted N CLOSED

3.9.2.13 VSD mode of control speed / torque / power Comply, Direct torque control (DTC) / Torque control / Speed control [20-Apr-21] Noted N CLOSED

[20-Apr-21] Please provide response for the following requests;

Comply, design for operation at 3570rpm At motor speed 3570 rpm See below See below
3.9.2.14 Cover operation range match with operation range of pump (1) What is the value of motor power ?
(2) What is the value of shaft required power ?

OPEN

Comply, Earth fault protection: Yes


[20-Apr-21] Please provide more information as the following:
Thermal protection: Yes (+)
Loss of phase: Yes
Earth fault protection / Thermal protection / Loss of phase / (1) Which protection functions are built-in function of VSD ? See below See below
Over and under voltage protection: Yes
3.9.2.15 Protection function Over and under voltage protection / Over current protection / Over current protection: Yes
Motor widing protection (RTD) (2) Which protection functions are required additional module ?
Motor widing protection: Yes (+)

OPEN

Speed control switch (adjustable): Yes at local control panel (keypad [20-Apr-21] Please confirm to use the color of signaling lamp as
at front of cabinet) follows:
Emergency push button: Yes - Ready (Stopped): Green See below See below
Speed control switch (adjustable) / Emergency push button /
3.9.2.16 Auxiliary switch at front panel On/Off switch: Yes - Running: Red
On/Off switch / Indicating lamps/signaling lamp (red, green,amber)
Indicating lamps/signaling lamp (red, green,amber): - Fault: Amber

OPEN
3.9.3 Others
3.9.3.1 Please provide the confirmation to provide incoming MCCB or Fuse
Complied OPEN
which will be suitable with breaking capacity 25 kA as minimum.
3.9.3.2 If the electric motor rating is 200 kW, company plans to lay 3Cx240
sq.mm. cable for supplying power from transformer to VSD and from VSD
Complied OPEN
to motor. Please provide the confirmation to provide the suitable cable's
terminal at VSD and suitable cable entry at motor.
3.9.3.3 the cable length from VSD to the motor is less than 100 M. Please
To be considered. OPEN
specify the selected additional output filter, if required.
3.9.3.4
(1) Available area in company cabin is 1000 mm x 2200 mm x 1200 mm
Complied OPEN
(WxHxD), please provide the confirmation to propose VSD cabinet which
can be installed at this area.

3.9.3.5 Please provide the confirmation to add one signalling lamp for VSD
cabinet's anti-condensation heaters and this lamp shall be luminated when Complied OPEN
heaters is "ON"
3.9.3.6 Please provide the confirmation to provide Interlocking to prevent
Complied OPEN
the door opening while circuits are live.

3.9.3.7 Please provide the confirmation that the following interfacing


concepts can be provided as minimum:
Interfacing with local control unit:
- Local/Remote selector
- Start/Stop
- Field Emergency Stop Switch
Front Panel of Cabinet
- Emergency Stop Button
- Standard Keypad of VSD
Interfacing with PLC
- Normal stop command from PLC
- Normal start command from PLC Complied OPEN
- Speed control from PLC
- ESD Stop Command from PLC
- VSD Ready to RUN Status to PLC
- Running Status to PLC
- Fault Status to PLC
- Common Alarm to PLC
- Speed status to PLC
- Local/Remote Status to PLC
- Current Status to PLC
- Suction Pressure Status to PLC
- Discharge Pressure Status to PLC

3.9.3.8 For the interfacing between VSD and equipment at pump skid
please refer to document "Attachment#1" and provide the confirmation to Complied OPEN
comply the scheme shown in this document.

3.9.3.9 Schematic diagram between VSD & Field shall be in the scope of
suppiler. Please provide the confirmation to provide this drawing as a part
Complied OPEN
of VSD schematic diagram. (See the example from another project in an
attached file "Attachment#2")

3.9.3.10 Please provide the confirmation to provide both CAD file and PDF
Complied OPEN
file for VSD schematic diagram.

3.10 INSTRUMENTATION REQUIREMENTS


Control sequence and Interface signal

The signal between Varies Speed Drive (VSD) and Plant DCS/ESD shall
be provided by following list.
3.10.1 • Shutdown signal from ESD to VSD Complied Comply [20-Apr-21] Noted N CLOSED
• Start signal from DCS or ESD or RCU to VSD
• Control signal from DCS to VSD

Start and stop process shall be received command from remote control unit
(RCU) located at field. Speed control set point shall be received from DCS
3.10.2 Complied Comply [20-Apr-21] Noted N CLOSED
and emergency shutdown equipment or permissive signal shall be received
from SIS system.

The control sequence to operating accessory equipment such motor lube


3.10.3 Complied Comply [20-Apr-21] Noted N CLOSED
oil shall be controlled and operated from VSD system.
Signal from level transmitter/switch (at seal drain collection tank), Vibration
transmitter (at Thrust chamber), Temperature transmitter (for thrust
3.10.4 chamber bearing, motor bearing and winding) and other Complied Comply [20-Apr-21] Noted N CLOSED
transmitter(s)/switch(es), if provided, shall be directed to VSD local panel,
and function alarm/trip to be performed by VSD local panel.
Signal from suction and discharge pressure shall be directed to VSD and
3.10.5 Complied Comply [20-Apr-21] Noted N CLOSED
VSD shall send data to DCS or SIS system.
Contractor shall include protection of allowance minimum and maximum
3.10.6 flow inside VSD system or provide equation minimum and maximum Complied Comply [20-Apr-21] Noted N CLOSED
allowance flow to PTTEP.
The protective sunshade shall be provided of each instrument to protect
3.10.7 Complied Comply [20-Apr-21] Noted N CLOSED
them from the adverse tropical weather conditions
3.10.8 The cable gland at field instrument shall be Hawke 501/453 UNIV Complied Comply [20-Apr-21] Noted N CLOSED

Cabling and wiring on the skid shall be installed as per IEC standard
3.10.9 Complied Comply [20-Apr-21] Noted N CLOSED
criteria, mix-up of NEC with IEC not allow

3.10.10 Connecting cables in each skid/cabin are require junction boxes Complied Comply [20-Apr-21] Noted N CLOSED

In the event of an order, SUPPLIER shall include the following


documents/drawings in the operating and maintenance instruction manual
to be submitted to Company:
• Instrument data sheet
• Instrument set point list
• Instrument layout drawing
3.10.11 • Instrument termination diagram Complied Comply [20-Apr-21] Noted N CLOSED
• Instrument signal line hook up details
• Instrument catalogue and manual
• Troubleshooting Flowchart
• Instrument Calibration / Testing Report
• Control narrative/ philosophy
• Cause and Effect diagram

All field instruments shall be provided with isolating, drain and vent valves
3.10.12 Complied Comply [20-Apr-21] Noted N CLOSED
for maintenance purpose

Comply and confirm.


All field instrument shall be 4-20 mA HART protocol and have IP 65 as
3.10.13 Complied - Level switch should be Ex "D" type [20-Apr-21] Noted N CLOSED
minimum
- Vibration transmitter should be Ex"I" type

Page 5 of 7
A

A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
n
v
The construction work shall be used cable gland and use close
3.10.14 Complied Comply [20-Apr-21] Noted N CLOSED i
conduit/cable tray for typical installation d
e
The instrument cable shall be SWA type with fire retardant cable outer d
3.10.15 sheath color black (N-IS) and blue (IS), conductor size shall be minimum 1 Complied Comply [20-Apr-21] Noted N CLOSED
mm2, 300/500V

3.10.16 All the SS316L tubing fittings shall be Swagelok Complied Comply [20-Apr-21] Noted N CLOSED

Instrument devices shall be provided with isolation valve type as followed


conditions:
• Design pressure above 70 barg or design temperature more than 200
degree C shall be DOUBLE BLOCK AND BLEED (DB&B), integral type
3.10.17 Complied Comply [20-Apr-21] Noted N CLOSED
valve
• Design pressure or design temperature below item 1 above shall be
SINGLE BLOCK AND BLEED (SB&B), integral type valve

3.11 BASE PLATE / SKID

Skid base plate shall be designed for non-grouting type installation


on concrete foundation. It shall be suitable for shimming and
3.11.1 Skid baseplate type / installation anchoring to a concrete base. Jacking screw and shim packs shall Comply [20-Apr-21] Noted N CLOSED
be provided by SUPPLIER to facilitate site alignment.
A maximum of three (3) shims shall be used under any single foot

[20-Apr-21] Please confirm that the skid shall be design to take


Comply See below See below
200% of WLL.
SUPPLIER shall provide structural skid calculation note, lifting
calculation note and certified lifting arrangements drawing for
package skid.
3.11.2 Skid baseplate design
SUPPLIER shall be responsible for the integrity of the skid
structures which shall be rigid to avoid any deflections occurrence
during lifting.

OPEN

Package skid shall be suitable for a single lift without deformation,


with all components installed. Lift loads for skid design shall
include the dead weight of all mechanical and structural
components of the package plus the weight of packaging materials
attached to the skid during shipment. It shall clearly been shown in
calculation report and drawing
3.11.3 Skid lifting Comply [20-Apr-21] Noted N CLOSED
Package skid should be designed for lifting without spreader bar
and with no clashing on skid component by using four-leg wire
rope sling with 4 shackles, 2 intermediate links and one master
link. However, if the spreader bar (with slings, links and shackles)
is required for lifting, it shall be included in the scope of supply
without additional cost.

- Skid drain rim or drain pan shall be provided with 2 inch, class
150 RF as per ASME B16.5.
3.11.4 Drain Pan / Drain rim requirement Comply [20-Apr-21] Noted N CLOSED
- Minimum slope of drain shall be 1 : 50 mm to ensure there is no
any liquid accumulation inside base plate area in case of leakage

3.11.5 Design of earthing and bounding systems Complied with TYP-4-57-0004 / TYP-4-59-0006 Comply [20-Apr-21] Noted N CLOSED

SUPPLIER to supply lifting devices for installation and


maintenance. Lifting devices means slings, shackles, links, master
link and spreader bar. All lifting devices shall be load tested,
withness and certified by PTTEP's approved third party as
3.11.6 Lifting devices Comply [20-Apr-21] Noted N CLOSED
indicated in CMS document. NDE testing shall be performed in
accordance with PTTEP's specification before and after functional
lifting.
SUPPLIER to comply

After completion of pump skid installation. Pump skid shall perform


fuctional lifting test and witness and certified by PTTEP's Approved
3.11.7 Functional lifting test third party. NDE testing shall be performed in accordance with Comply [20-Apr-21] Noted N CLOSED
PTTEP's specification before and after functional lifting.
SUPPLIER to comply

Only wire rope sling is allowed to be used. Minimum breaking load


(MBL) of sling shall be at least 500% of Service working load
3.11.8 Slings Comply [20-Apr-21] Noted N CLOSED
(SWL), MBL > 5 x SWL.
SUPPLIER to comply

Padeye either on pump skid or spreader bar, it shall all be


designed in accordance with API RP-2A. Padeye shall be
designed to take minimum of 200% of SWL in plan force. For out
3.11.9 Padeye Comply [20-Apr-21] Noted N CLOSED
of plan, it shall be applied 200% of actual load or minimum of
0.05x(200% of SWL).
SUPPLIER to comply.

3.12 PERFORMANCE
Process and mechanical performance guarantee of each equipment per
3.12.1 Complied Comply [20-Apr-21] Noted N CLOSED
datasheets.

3.13 IDENTIFICATION NAMEPLATE


Complied as per Section 6 of TH-GS1-PRO-19030-00-EOR03-
3.13.1 Identificaion nameplate Comply [20-Apr-21] Noted N CLOSED
MEC-RFQ-1002

3.14 APPROVED MANUFACTURER LIST (AML)


Complied as per Section 7 of TH-GS1-PRO-19030-00-EOR03- [20-Apr-21] Please follow only COMPANY's AML and consider for
Comply with additional list provided See below See below
MEC-RFQ-1002 and Appendix IV cost impact.
3.14.1 Manufacturers/sub-suppliers
OPEN

3.15 DIMENSION & WEIGHT


3.15.1 Equipment/skid dimension and weight

Comply, P-E3101 Equipment dimension L 6,756.40 mm x W


To be indicated by SUPPLIER (preliminary) unless specified
1,150.62 mm x H 1,276.86 mm
3.15.1.1 Equipment Dimension (L X W x H) [mm] otherwise in the reference datasheet, but it shall not be over the [20-Apr-21] Noted N CLOSED
limitation of transportation

Comply, P-E3101 4.40 Tons. Not over limitation of transportation


To be indicated by SUPPLIER (preliminary), but it shall not be over
3.15.1.2 Equipment Weight [Ton] [20-Apr-21] Noted N CLOSED
the limitation of transportation

3.15.2 Max packaging dimension and weight limitation for transportation

Comply, P-E3101 Equipment dimension L 6,810.54 mm x W


Maximum packaging dimension, including crating shall not be over than 1,150.62 mm x H 1,276.86 mm
3.15.2.1 Complied [20-Apr-21] Noted N CLOSED
12 m (L) x 2.4 m (W) x 3.0 m (H)

Comply, P-E3101 4.40 Tons. Not over limitation of transportation


Packaging including crating weight for transportation shall not be over than
3.15.2.2 Complied [20-Apr-21] Noted N CLOSED
24 Tons / packaging

4.0 QA/QC
Complied as per Section 8 of TH-GS1-PRO-19030-00-EOR03-
4.1 Quality System Comply [20-Apr-21] Noted N CLOSED
MEC-RFQ-1002

5.0 INSPECTION, TESTING, CERTIFICATION


Complied as per Section 10 of TH-GS1-PRO-19030-00-EOR03-
5.1 Inspection and testing Comply [20-Apr-21] Noted N CLOSED
MEC-RFQ-1002

Page 6 of 7
A

A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
n
v
i
d
e
d

Complied as per section 5 of TH-GS1-PRO-19030-00-EOR03-


5.2 Non-destructive Testing Comply [20-Apr-21] Noted N CLOSED
MEC-RFQ-1002

3.1 for pressure part and primary structures, 2.2 for non-pressure
5.3 Material certificate Comply [20-Apr-21] Noted N CLOSED
part

5.4 Material traceability Complied as per 10008-STD-6-GEN-007-R00 Comply [20-Apr-21] Noted N CLOSED

6.0 PROTECTIVE COATING AND PAINTING


Complied as per Section 12 of TH-GS1-PRO-19030-00-EOR03-
6.1 Painting Comply [20-Apr-21] Noted N CLOSED
MEC-RFQ-1002

7.0 SPARES AND SPECIAL TOOLS


For 1st unit, included in base scope.
For others optional unit(s), to be proposed as optional scope.

Minimum required spare part list as followings.


7.1 Start-up and Commissioning spare parts • Pump consumable parts (e.g. gaskets, o-rings, etc.) Acknowledge, will provide in technical and commercial proposal [20-Apr-2021] Noted. Refer to discussion at 1.8 and 1.16. N CLOSED
• Pump lubricant (separated from first fill)
• Completed set of mechanical seal cartridge
The SUPPLIER shall indicate in the offer, if any other items are
required.

For 1st unit, included in base scope (if any).


Special tools for handling, erection, installation, operations and For others optional unit(s), to be proposed as optional scope. Acknowledge, will provide in technical and commercial proposal if
7.2 [20-Apr-2021] Noted. Refer to discussion at 1.9 and 1.17. N CLOSED
maintenance needs
The list shall be provided
To provide in optional scope, the price list and delivery time shall
7.3 Two (2) years operation spare parts Acknowledge, will provide in technical and commercail proposal [20-Apr-21] Noted N CLOSED
be provided

8.0 PREPARATION FOR SHIPMENT


Complied as per Section 15 of TH-GS1-PRO-19030-00-EOR03-
8.1 Preparation for Shipment Comply [20-Apr-21] Noted N CLOSED
MEC-RFQ-1002

9.0 GUARANTEES
Mechanical guarantee including mechanical/ structural design, material Complied as per section 17 of TH-GS1-PRO-19030-00-EOR03-
9.1 Comply [20-Apr-21] Noted N CLOSED
and workmanship MEC-RFQ-1002
At least 12 months from the date of completion of commissioning
and start-up of the GOODS or 18 months after the GOODS are
9.2 Warranty period Comply [20-Apr-21] Noted N CLOSED
received by COMPANY at DELIVERY LOCATION, whichever first
occurs

10.0 DOCUMENTATIONS
[20-Apr-21] Refer to technical proposal "201 SUPPLIER / VENDOR
Comply Document Schedule", please reconfirm that all documents in the list See below See below
can be supplied.
Complied as per Section 18 and Appendix III of Document No. TH-
10.1 Drawing and Documents submitted for review
GS1-PRO-19030-00-EOR03-MEC-RFQ-1002
OPEN

11.0 DELIVERY

Transportation of all supplied items per agreed delivery term (DAP


11.1 Terms & Conditions Comply [20-Apr-21] Noted N CLOSED
at site LKU), INCOTERM 2010)

11.2 Delivery Time (wks) Within 38 weeks after the EFFECTIVE DATE of PO/CONTRACT Comply [20-Apr-21] Noted See below See below

12.0 OTHERS / DEVIATION

12.1

12.2

12.3

12.4

12.5

13.0 SUMMARY AND CONCLUSION

13.1 Outstanding

13.2 Conclusion

14.0 ATTACHMENTS

Page 7 of 7