TH GS1 Pro 19030 00 Eor03 Mec TCS 1002 - MMSVS - 20210420
TH GS1 Pro 19030 00 Eor03 Mec TCS 1002 - MMSVS - 20210420
A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
1.0 SCOPE OF WORK AND SUPPLY n
v
GOODS i
d
e
Completed Dilution Water Booster Pumps (P-E3101) per reference [blank] [20-Apr-21] Please provide the response. See below See below d
1.1 datasheet “TH-GS1-PRO-19030-00-EOR03-MEC-DTS-1001” and Included, Qty 1 unit
specification, including but not limited to the following: OPEN
Comply for Electric motor and VSD, Gear is not applicable for this
1.1.2 Driver unit including electric motor, Variable Speed Drive and Gear Included [20-Apr-21] Noted N CLOSED
proposal
Bearing temperature transmitter and Vibration transmitter at Thrust Comply, Bearing Temperature Transmitter and Vibration Transmitter
1.1.3 Included [20-Apr-21] Noted N CLOSED
chamber at Thrust Chamber will be provide by UAL
Comply, Bearing and Winding temperature transmitter for Surface
1.1.4 Bearing and winding temperature transmitters for motor Included [20-Apr-21] Noted N CLOSED
motor will be provide by UAL
Mechanical seals, seal flush plans, and all accessories (API seal plan
1.1.5 11/65A) including level switch at seal drain collection tank (seal leak Included Comply [20-Apr-21] Noted N CLOSED
detector)
1.1.6 Flexible Coupling complete with brass non-sparking guards Included Comply [20-Apr-21] Noted N CLOSED
1.1.7 Common base plate for mounting of pump, driver unit and seal system Included Comply [20-Apr-21] Noted N CLOSED
1.1.11 Jack Screws – lateral & axial for motor Included Comply [20-Apr-21] Noted N CLOSED
1.1.12 SS316 Shim plates for alignment Included Comply [20-Apr-21] Noted N CLOSED
1.1.13 Holding bolt detailed drawing Included Comply [20-Apr-21] Noted N CLOSED
Inspection and Testing with reports complying with the requirements in this
1.2 Included Comply [20-Apr-21] Noted N CLOSED
document and reference documents
1.4 Surface preparation, Cleaning and Painting Included Comply [20-Apr-21] Noted N CLOSED
Functional skid lifting test (self-empty weight) with 100% visual inspection
1.6 Included Comply [20-Apr-21] Noted N CLOSED
after test
OPEN
Transportation of all supplied items per agreed delivery term and location
1.12 (DAP at COMPANY’s worksite, Lankrabue, Kamphaengphet, Thailand, Included Comply [20-Apr-21] Noted N CLOSED
INCOTERMS 2010)
The spare parts list shall be provided and composed of the following items
[20-Apr-21] Noted. Refer to discussion at 1.8.
as a minimum:
1.16 - Pump consumable parts (e.g. gaskets, o-rings, etc.) Included as option, Unit rate provided for 1 - 3 Unit(s) Comply N CLOSED
[ Note : No concern on cost impact due to optional items and no
- Pump lubricant (separated from first fill)
additional proposed price ]
- Completed set of mechanical seal cartridge
The SUPPLIER shall indicate in the offer, if any other items are required.
(Item refer to item no. 1.8) (Unit price shall be provided)
Spare parts for normal operation (priced list, separately quoted). The spare
parts list shall be composed of the following items as a minimum:
- Complete pump bundle
- Complete set of mechanical seal
Comply, Completed Pump, Mechanical Seals, Coupling, Pump
- Coupling
Consumables, 100% pump lubricant
1.18 - Pump bearings Included as option, price list provided [20-Apr-21] Noted. N CLOSED
- Throat bushing
N/A Throat Bushings and Pump Bearing
- Key
- Pump consumable parts (e.g. gaskets, o-rings, etc.)
- 100% of pump lubricant
The SUPPLIER shall indicate in the offer, if any other items are required
[20-Apr-21] Please recheck for any deviation(s) has not been listed
Compliance with specifications and requirements of TH-GS1-PRO-19030- and complete the deviation list for discussion prior the completion of
00-EOR03-MEC-RFQ-1002, Requistion for Dilution Water Booster Pumps Comply this document. After that, please provide confirmation that all See below See below
(Horizontal Surface Pump) and related documents. deviations have been listed in topic of "OTHERS / DEVIATION" in
this Technical Compliance/Clarification Sheet (TCS).
All deviations shall be listed in this TCS in topic of "OTHERS /
Complied
2.1 DEVIATION". If any deviations are not mentioned specifically in the this
TCS format, then it will be considered that the SUPPLIER agrees to
comply with all requirements of tender packages.
This TCS will be the part of CONTRACT after awards which SUPPLIER Page 1 of 7
shall follow.
A
A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. Compliance with specifications
CHARACTERISTICS
and requirements of TH-GS1-PRO-19030- REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
00-EOR03-MEC-RFQ-1002, Requistion for Dilution Water Booster Pumps
a
c
(Horizontal Surface Pump) and related documents. tP
e
SUMMARY & CONCLUSION ri
All deviations shall be listed in this TCS in topic of "OTHERS / o
o
Complied
2.1 DEVIATION". If any deviations are not mentioned specifically in the this n
v
TCS format, then it will be considered that the SUPPLIER agrees to i
comply with all requirements of tender packages. d
e
OPEN
This TCS will be the part of CONTRACT after awards which SUPPLIER d
shall follow.
3.1.1 Code and standard design for Horizontal Surface Pump Complied as per 10008-STD-6-ROT-037-R00 Comply [20-Apr-21] Noted N CLOSED
The Net Positive Suction Head Available (NPSHa) shall exceed the Net
3.1.2 Positive Suction Head Require (NPSHr) by at least 1m throughout the Complied Comply [20-Apr-21] Noted N CLOSED
entire operating range.
3.1.4 Head rise from rate point to shutoff shall be at least 10% Complied Comply [20-Apr-21] Noted N CLOSED
3.1.5 Thrust chamber bearing operating temperature shall be less than 80oC. Complied Comply [20-Apr-21] Noted N CLOSED
Guard protection shall be provided for the part which surface temperature
3.1.6 Complied Comply [20-Apr-21] Noted N CLOSED
exceeds 70oC.
Material selection for all wetted parts shall be suitable for the pumped fluid.
3.1.10 Complied Comply [20-Apr-21] Noted N CLOSED
SUPPLIER shall confirm this in the tender
All piping onskid shall be complied in accordance with 10008-STD-6-PIP-
3.1.11 Complied Comply [20-Apr-21] Noted N CLOSED
001-R00 for piping design
Piping stress analysis shall be performed including small bore connections
3.1.12 Complied Comply [20-Apr-21] Noted N CLOSED
in accordance with pump design code
A fabricated steel base plate skid with drain rim shall be furnished and shall
3.1.13 Complied Comply [20-Apr-21] Noted N CLOSED
extend completely under both pump and driver
SUPPLIER shall take full responsibility to complete the Pump package for
design, engineering and manufacture so as to ensure that it can provide
3.1.14 the guaranteed capabilities in process service. The responsibility shall Complied Comply [20-Apr-21] Noted N CLOSED
cover to the specification of the parts and accessories sub-contracted by
the SUPPLIER
3.1.18 Dissimilar material welding is not permitted Complied Comply [20-Apr-21] Noted N CLOSED
OPEN
3.2.3 Capacity (Min / Nor / Max (Rated)) 1,500 (SUPPLIER to confirm) / 5,000 / 9,500 (bpd) 1530@50Hz/5000/9500 [20-Apr-21] Noted N CLOSED
OPEN
OPEN
OPEN
Page 2 of 7
A
A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
3.2.7 Tempurature (Min / Nor / Max) 30 / 60 / 80 (oC) o
o
n
v
OPEN i
d
e
d
[20-Apr-21] Please comfirm that the proposed pump is suitable for
Acknowledge to Min/Max Suction Pressure provided See below See below
the process requirement or not.
3.2.8 Suction Pressure (Min / Nor / Max) 1,000 / 1,500 / 1,600 (Psig)
OPEN
OPEN
[20-Apr-21] Noted.
317 PSI @30Hz to 900 PSI @50Hz See below See below
Please also update pump performance curve to show the curve at
3.2.10 Differential pressure at Minimum flow 200 (SUPPLIER to confirm) - 900 (Psi) 30Hz
OPEN
3.2.11 Differential pressure at Normal flow 200 (SUPPLIER to confirm) - 900 (Psi) 235 PSI @30Hz to 900 PSI @52.5Hz [20-Apr-21] Noted N CLOSED
3.2.12 Differential pressure at Rated flow 200 (SUPPLIER to confirm) - 900 (Psi) 370 PSI @43Hz to 900 PSI @58.5Hz [20-Apr-21] Noted N CLOSED
Acknowledge, Minimum Require at rated flow is 4.383 Meters (6.226 [20-Apr-21] From Pump performance curve, this information should
See below See below
PSI) not correct. So, please recheck and reconfirm the value.
3.2.14 NPSHR @ Rated Capacity SUPPLIER to advise
OPEN
3.2.17 Suction Specific Speed (Nss) Shall not exceed 11000 (USC units) 3487 [20-Apr_21] Noted N CLOSED
3.2.18 Mechanical design pressure, barg SUPPLIER to advise 172.3 Barg (2500 PSI) [20-Apr_21] Noted N CLOSED
[20-Apr-21] Please specify Pump min and max continous flow for
stable operation (BPD) at the following conditions.
10.14@50Hz / 87.84@60Hz - Max speed See below See below
3.2.20 Pump min and max continous flow for stable operation (BPD) SUPPLIER to advise (Min / Max) - Same speed with rated capacity
- Min speed
OPEN
3.2.21 Efficiency (at Min / Nor / Rated / Max Flow), % SUPPLIER to advise 27 / 61 / 78 / 71 [20-Apr_21] Noted N CLOSED
3.2.22 Best efficiency point (BEP), % (SUPPLIER to advise) % at (SUPPLIER to advise) m3/h 78% at 9751BPD [20-Apr_21] Noted N CLOSED
3.2.23 Power absorbed (Min / Nor / Rated / Max), kW SUPPLIER to advise 64 / 125 / 150 / 173 [20-Apr_21] Noted N CLOSED
3.3.1 Suction Nozzle SUPPLIER to advise / 1500# (SUPPLIER to confirm) / RF / Side Comply, Suction 6" WNRF 1500CL [20-Apr_21] Noted N CLOSED
3.3.2 Discharge Nozzle SUPPLIER to advise / 1500# (SUPPLIER to confirm) / RF / End Comply, Discharge 4" LJRF 1500CL [20-Apr_21] Noted N CLOSED
Comply (1) Please advise size and type of vent connection. See below See below
3.3.4 Vent-Gland Nozzle SUPPLIER to advise / NPT / Valved with Plug
(2) Please confirm to supply valve with plug.
OPEN
3.3.5 Drain Nozzle at drain pan 2" / 150# / RF / End Comply [20-Apr_21] Noted N CLOSED
3.3.7 Hydrostatic Test Pressure 1.5 x MAWP Comply [20-Apr_21] Noted N CLOSED
OPEN
Comply, Basic dynamic load rating 132KN / Basic static load rating
3.3.11 Bearing max. allowable load (Radial / Thrust) (N) SUPPLIER to specify / SUPPLIER to specify [20-Apr_21] Noted N CLOSED
104KN
3.3.12 Pump thrust load (Radial / Thrust) (N) SUPPLIER to specify / SUPPLIER to specify Comply, 500N /13.3 KN [20-Apr_21] Noted N CLOSED
3.3.13 Pump MFG and country of origin SUPPLIER to specify UAL, Thailand [20-Apr_21] Noted N CLOSED
3.3.14 Pump Model SUPPLIER to advise Pump Model 675-9600 [20-Apr_21] Noted N CLOSED
3.4.1 Manufacturer/ Model SUPPLIER to advise (Complied as per PTTEP AML) John Crane Type T8610 [20-Apr_21] Noted N CLOSED
3.4.2 Code and standard design Complied as per API 682 latest edition Comply [20-Apr_21] Noted N CLOSED
3.4.3 Seal Plan API plan 11/65A API Seal Plan 11/65A with Level Switch [20-Apr_21] Noted N CLOSED
3.4.4 Pressureized accessories Complied per ASME VIII Div.1. Comply per ASME VIII Div.1 [20-Apr_21] Noted N CLOSED
3.4.6 Flush pipe size shall be ¾” to 1” Complied Comply [20-Apr_21] Noted N CLOSED
The isolation valve between seal and seal plan system shall be provided
3.4.7 Complied Comply [20-Apr_21] Noted N CLOSED
and normally opened.
3.4.8 Pressure Indicator shall be provided at pipe end (after orifice) Complied Comply [20-Apr_21] Noted N CLOSED
Page 3 of 7
A
A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
n
v
The dynamic seal chamber pressure for single seal shall exceed the
3.4.11 maximum liquid vapor pressure at maximum seal chamber liquid Complied Comply [20-Apr_21] Noted N CLOSED i
d
temperature by at least 3.5 bar or 10% whichever is greater e
d
3.5 Material of Construction
3.5.1 Casing Carbon Steel (SUPPLIER to confirm) Carbon Steel 1025 [20-Apr_21] Noted N CLOSED
3.5.2 Diffuser NI-RESIST Type 1 (SUPPLIER to confirm) Comply, Ni-Resist Type1 [20-Apr_21] Noted N CLOSED
3.5.3 Impeller NI-RESIST Type 1 (SUPPLIER to confirm) Comply, Ni-Resist Type1 [20-Apr_21] Noted N CLOSED
3.5.4 Shaft / Coupling ULTA HIGH STRENGTH INCONEL (SUPPLIER to confirm) Comply, Ultra High Strength Inconel 718 [20-Apr_21] Noted N CLOSED
3.5.5 Pump Head SS316L (SUPPLIER to confirm) Comply, SS316L [20-Apr_21] Noted N CLOSED
3.5.6 Baseplate Carbon Steel (SUPPLIER to confirm) Carbon Steel, SS400 [20-Apr_21] Noted N CLOSED
3.5.7 Pump Suction housing including inlet nozzle SS316L (SUPPLIER to confirm) Comply, SS316L [20-Apr_21] Noted N CLOSED
3.5.8 Pump Discharge nozzle SS316L (SUPPLIER to confirm) Comply, SS316L [20-Apr_21] Noted N CLOSED
3.6.1 Manufacturer SUPPLIER to advise (Complied as per PTTEP AML) Thomas Rexnord / XTSR71-1088 [20-Apr_21] Noted N CLOSED
3.6.2 Code and standard design for Couplings and Guards API 671 Comply [20-Apr_21] Noted N CLOSED
3.6.3 Service factor ≥ 1.75 (SUPPLIER to confirm) Comply, 6 [20-Apr_21] Noted N CLOSED
3.6.4 Coupling type Dry (non-lubricated), metallic, flexible type Comply [20-Apr_21] Noted N CLOSED
3.6.5 Metal Coupling guard Non-sparking material , Brass Preferred (SUPPLIER to confirm) Comply [20-Apr_21] Noted N CLOSED
3.6.7 Coupling shall be balanced to ISO 21940-11 grade G6.3 Complied Comply [20-Apr_21] Noted N CLOSED
3.7.1 Manufacturer SUPPLIER to advise (Complied as per PTTEP AML) NA for this project [20-Apr_21] Noted N CLOSED
3.7.2 Service factor SUPPLIER to advise NA for this project [20-Apr_21] Noted N CLOSED
3.7.3 Gear type SUPPLIER to advise NA for this project [20-Apr_21] Noted N CLOSED
3.8.1 Area classification Non-hazdous area Comply, Non-Ex, process performance motor [20-Apr-21] Noted N CLOSED
3.8.4 Manufacturer name and model As per AML (SUPPLIER to confirm) Comply, ABB [20-Apr-21] Noted N CLOSED
3.8.5 Direction of rotation (facing driven end) Bi-direction Comply, Bi-directional [20-Apr-21] Noted N CLOSED
OPEN
OPEN
3.8.9 Ingress Protection-Motor IP55 or higher Comply, IP55 [20-Apr-21] Noted N CLOSED
3.8.10 Overall Explosion proof protection Not required - [20-Apr-21] Noted N CLOSED
- Comply, Pt100 3-wire in stator winding, 2 per phase [20-Apr-21] Please confirm that the temperature protection relay is
See below See below
- Comply, Double Pt100 3-wire in bearings provided inside VSD cabinet to receive signal from all RTDs.
Motor Winding Temperature detector 3-wire RTD (PT100) x 2 sets per phase ( 1 used & 1 spare)
3.8.12
Motor Bearing Temperature detection (both DE & NDE) 3-wire RTD (PT100) x 2 sets per position ( 1 used & 1 spare)
OPEN
3.8.13 Motor Efficiency IE2 Comply, IE2 at 200kW DOL Rating [20-Apr-21] Noted N CLOSED
3.8.14 Motor explosion proof certification Not required N/A [20-Apr-21] Noted N CLOSED
Comply, S1 & S9 [20-Apr-21] Please submit motor datasheet S1 duty to review. See below See below
3.8.15 Motor Duty S9 (provided both name plate S1 & S9)
OPEN
OPEN
3.8.17 Bearing Type Regreasable type Comply, Yes [20-Apr-21] Noted N CLOSED
OPEN
OPEN
3.9.2.2 Transformer's manufacturer SUPPLIER to advise (Complied as per PTTEP AML) N/A [20-Apr-21] Noted N CLOSED
3.9.2.3 VSD scheme/configuration LV VSD to drive LV motor Comply [20-Apr-21] Noted N CLOSED
400 V +/- 10%, 50 Hz +/- 5%
3.9.2.4 Voltage/frequency of input Comply [20-Apr-21] Noted N CLOSED
(3 phases, 3 wires)
Page 4 of 7
A
A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
3.9.2.5 Comply to earthing system of existing utility TN-S Comply [20-Apr-21] Noted N CLOSED n
v
no extra supply, control voltage is connected from VSD input i
3.9.2.6 Control voltage Comply [20-Apr-21] Noted N CLOSED d
voltage itself e
d
THDU (Voltage) <5% with assumption of network and transformer [20-Apr-21] Please provide the clarification on the assumption of
3.9.2.7 Maximum THDU at minimum fault level < 5% See below See below
data network and transformer data
OPEN
3.9.2.8 Minimum efficiency at all operating points > 97% > 97% at nominal power [20-Apr-21] Noted N CLOSED
Comply, 2nd environment, C4, grounded network (TN) as standard
from ACS880-07
3.9.2.9 Radio interference class (IEC 61800-3) Class A, design category C4 [20-Apr-21] Noted N CLOSED
3.9.2.13 VSD mode of control speed / torque / power Comply, Direct torque control (DTC) / Torque control / Speed control [20-Apr-21] Noted N CLOSED
Comply, design for operation at 3570rpm At motor speed 3570 rpm See below See below
3.9.2.14 Cover operation range match with operation range of pump (1) What is the value of motor power ?
(2) What is the value of shaft required power ?
OPEN
OPEN
Speed control switch (adjustable): Yes at local control panel (keypad [20-Apr-21] Please confirm to use the color of signaling lamp as
at front of cabinet) follows:
Emergency push button: Yes - Ready (Stopped): Green See below See below
Speed control switch (adjustable) / Emergency push button /
3.9.2.16 Auxiliary switch at front panel On/Off switch: Yes - Running: Red
On/Off switch / Indicating lamps/signaling lamp (red, green,amber)
Indicating lamps/signaling lamp (red, green,amber): - Fault: Amber
OPEN
3.9.3 Others
3.9.3.1 Please provide the confirmation to provide incoming MCCB or Fuse
Complied OPEN
which will be suitable with breaking capacity 25 kA as minimum.
3.9.3.2 If the electric motor rating is 200 kW, company plans to lay 3Cx240
sq.mm. cable for supplying power from transformer to VSD and from VSD
Complied OPEN
to motor. Please provide the confirmation to provide the suitable cable's
terminal at VSD and suitable cable entry at motor.
3.9.3.3 the cable length from VSD to the motor is less than 100 M. Please
To be considered. OPEN
specify the selected additional output filter, if required.
3.9.3.4
(1) Available area in company cabin is 1000 mm x 2200 mm x 1200 mm
Complied OPEN
(WxHxD), please provide the confirmation to propose VSD cabinet which
can be installed at this area.
3.9.3.5 Please provide the confirmation to add one signalling lamp for VSD
cabinet's anti-condensation heaters and this lamp shall be luminated when Complied OPEN
heaters is "ON"
3.9.3.6 Please provide the confirmation to provide Interlocking to prevent
Complied OPEN
the door opening while circuits are live.
3.9.3.8 For the interfacing between VSD and equipment at pump skid
please refer to document "Attachment#1" and provide the confirmation to Complied OPEN
comply the scheme shown in this document.
3.9.3.9 Schematic diagram between VSD & Field shall be in the scope of
suppiler. Please provide the confirmation to provide this drawing as a part
Complied OPEN
of VSD schematic diagram. (See the example from another project in an
attached file "Attachment#2")
3.9.3.10 Please provide the confirmation to provide both CAD file and PDF
Complied OPEN
file for VSD schematic diagram.
The signal between Varies Speed Drive (VSD) and Plant DCS/ESD shall
be provided by following list.
3.10.1 • Shutdown signal from ESD to VSD Complied Comply [20-Apr-21] Noted N CLOSED
• Start signal from DCS or ESD or RCU to VSD
• Control signal from DCS to VSD
Start and stop process shall be received command from remote control unit
(RCU) located at field. Speed control set point shall be received from DCS
3.10.2 Complied Comply [20-Apr-21] Noted N CLOSED
and emergency shutdown equipment or permissive signal shall be received
from SIS system.
Cabling and wiring on the skid shall be installed as per IEC standard
3.10.9 Complied Comply [20-Apr-21] Noted N CLOSED
criteria, mix-up of NEC with IEC not allow
3.10.10 Connecting cables in each skid/cabin are require junction boxes Complied Comply [20-Apr-21] Noted N CLOSED
All field instruments shall be provided with isolating, drain and vent valves
3.10.12 Complied Comply [20-Apr-21] Noted N CLOSED
for maintenance purpose
Page 5 of 7
A
A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
n
v
The construction work shall be used cable gland and use close
3.10.14 Complied Comply [20-Apr-21] Noted N CLOSED i
conduit/cable tray for typical installation d
e
The instrument cable shall be SWA type with fire retardant cable outer d
3.10.15 sheath color black (N-IS) and blue (IS), conductor size shall be minimum 1 Complied Comply [20-Apr-21] Noted N CLOSED
mm2, 300/500V
3.10.16 All the SS316L tubing fittings shall be Swagelok Complied Comply [20-Apr-21] Noted N CLOSED
OPEN
- Skid drain rim or drain pan shall be provided with 2 inch, class
150 RF as per ASME B16.5.
3.11.4 Drain Pan / Drain rim requirement Comply [20-Apr-21] Noted N CLOSED
- Minimum slope of drain shall be 1 : 50 mm to ensure there is no
any liquid accumulation inside base plate area in case of leakage
3.11.5 Design of earthing and bounding systems Complied with TYP-4-57-0004 / TYP-4-59-0006 Comply [20-Apr-21] Noted N CLOSED
3.12 PERFORMANCE
Process and mechanical performance guarantee of each equipment per
3.12.1 Complied Comply [20-Apr-21] Noted N CLOSED
datasheets.
4.0 QA/QC
Complied as per Section 8 of TH-GS1-PRO-19030-00-EOR03-
4.1 Quality System Comply [20-Apr-21] Noted N CLOSED
MEC-RFQ-1002
Page 6 of 7
A
A
c
c
e
p
t
a
N
b
N
A
Project No Project Material/Equipment Tag No. lP
e
N
DILUTION WATER BOOSTER PUMP (HORIZONTAL SURFACE -
GS1-PRO-19030 ENHANCED OIL RECOVERY FACILITY NO.3 PROJECT P-E3101 and TBC -C
Technical Compliance/Clarification PUMP) w
N
-io
N
Sheet COMPANY Requisition No.: TH-GS1-PRO-19030-00-EOR03-MEC-RFQ-1002 to
th
N
SUPPLIER Name: MMSVS GROUP HOLDING COMPANY LIMITE SUPPLIER Proposal No.: Io
A
m
n
p
if
p
n
Update Date : 20-Apr-21 C
o
lo
ro
ir
m
c
Note: Technical Compliance/Clarification Sheet filled in by SUPPLIER is considered as a part of SUPPLIER proposal. p
a
a
d
tlb
e
il
COST IMPACT v
ITEM NO. CHARACTERISTICS REQUIREMENTS SUPPLIER RESPONSE PTTEP RESPONSE STATUS a
o
e
(Y/N) in
a
c
tP
e
SUMMARY & CONCLUSION ri
o
o
n
v
i
d
e
d
3.1 for pressure part and primary structures, 2.2 for non-pressure
5.3 Material certificate Comply [20-Apr-21] Noted N CLOSED
part
5.4 Material traceability Complied as per 10008-STD-6-GEN-007-R00 Comply [20-Apr-21] Noted N CLOSED
9.0 GUARANTEES
Mechanical guarantee including mechanical/ structural design, material Complied as per section 17 of TH-GS1-PRO-19030-00-EOR03-
9.1 Comply [20-Apr-21] Noted N CLOSED
and workmanship MEC-RFQ-1002
At least 12 months from the date of completion of commissioning
and start-up of the GOODS or 18 months after the GOODS are
9.2 Warranty period Comply [20-Apr-21] Noted N CLOSED
received by COMPANY at DELIVERY LOCATION, whichever first
occurs
10.0 DOCUMENTATIONS
[20-Apr-21] Refer to technical proposal "201 SUPPLIER / VENDOR
Comply Document Schedule", please reconfirm that all documents in the list See below See below
can be supplied.
Complied as per Section 18 and Appendix III of Document No. TH-
10.1 Drawing and Documents submitted for review
GS1-PRO-19030-00-EOR03-MEC-RFQ-1002
OPEN
11.0 DELIVERY
11.2 Delivery Time (wks) Within 38 weeks after the EFFECTIVE DATE of PO/CONTRACT Comply [20-Apr-21] Noted See below See below
12.1
12.2
12.3
12.4
12.5
13.1 Outstanding
13.2 Conclusion
14.0 ATTACHMENTS
Page 7 of 7