Tutorial Example On Bund Design
Tutorial Example On Bund Design
❖ Given data
✓ Qmax=6000m3/s
✓ H.F. L=104m
✓ River bed level=100m
✓ Average diametric of bed material=0.10m
❖ Required
✓ Design and sketch a guide bund including the launching apron to
train the river
❖ Solution
✓ The Waterway to be provided between two guide banks planes,
as Lacey’s Regime waterway=Clear waterway
P=4.75*Q^1/2
Cont.
Where
✓ P = Lacey’s Regime perimeter (m),
✓ Q = maximum discharge (m³/s)
P =368m
Generally, L≈ 1.1 to 1.25 P.
Assuming 20% extra for piers etc.
✓ The net spacing between the two guide
bunds at the bridge site
L=1.2*368=440m
Cont.
✓ Hence L=440m= (1+20%)
L=1.2P=440m
✓ The length of guide bund upstream of the bridge
LU/s=1.25L=1.25*440m=550m
✓ Because of Lu/s=1.25L for Q max up to
20,000m3/s.
✓ Length of the guide bunds downstream of the
bridge
Ld/s=0.25L=0.25*440=110m
✓ The radius of the curved head U/s portion may be
kept R=0.45L=0.45*440=194m
✓ The U/s end of guide bund may therefore be curved
in such away as to make an angle of 60 degree as
shown between 45 to 60 take an angle of 60 degree
at D/s R1=1/2*R=1/2*194=97m
Cont.
✓ Vel.head=v2/2g
Where
V=Q/PRs
Cont.
=6000/(368*10.36)
=1.57m/s
Where Rs=0.47(Q/f)1/3
f=1.76*dmm^1/2
dmm=given=0.1mm
f=1.76*0.1^1/2=0.556
• The end