Mini Project - Guidelines Sem1
Mini Project - Guidelines Sem1
Project Guidelines
1. Project report should be neatly typed only on one side of the paper with 1.5 line spacing
on an A4 size bond paper.
2. The margins should be: Left 1.5’’, right 1.25, top & bottom 1.5”.
3. Before taking the final printout, the approval of the concerned internal guide is
mandatory & suggestions, if any, must be incorporated.
4. Every page must contain page number at the left side on bottom of page along with
header (Title of the Project) & footer (Name Of the college) on right side of top of
page.
5. Text :font size-12 ,Times new roman,1.5 line spacing ,justified,
6. Sub heading--- 12 Times new roman, Bold
7. Paragraph Headings -font size-12, Times new roman, Bold, underline ,left aligned,12
points above & below spacing
8. Chapter heading: font size 12 Uppercase , Times new roman, Bold, centre aligned,30
points above & below spacing
9. Coding :font size 10,courier new
10. No page Border required.
11. Every copy of the report should be in spiral binding and must contain
12. All the diagrams and tables should be numbered and referred in the documents. The
numbering of the diagrams should be Figure:<chapter no>.<diagram no>
Title Of Project
Certificate of approval
Completion of project” certificate from Company ( for Live Project)
Acknowledgment
Table of Contents
Project Introduction: It includes description of your topic for the identified problem or
opportunity
Problem Definition
Problem statements typically defining the domain of the problem.
A description of the various entities and actors and how they interact with one another.
Define the overall reason why you need this project in the first place.
Describe the problem.
The problem statement must include:
o A description of the decisions that must be made or the elements of the system
that is to be adjusted.
o The criteria that measure how good your solutions are i. e., performance
measurements to evaluate the system, the current level of performance, and the
target levels to be achieved. To the extent possible these measures should be
quantitative.
o Constraints that limit the decisions or control actions that can be taken.
Objective and scope: This should give a clear picture of the project. Objective should be
clearly specified
User Manual
Explanation of Key functions
Method of Implementation
o Forms
o Output Screens
Conclusion
Project Conclusion & Future enhancement