Professional Practice

500PHP/100KM

Uploaded by

kelvin real
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 115

ARCHITECTURAL PRACTICE

1. Which is an ethical action with respect to the Architect’s


responsibility to his manufacturer’s, dealers, and agents?

a. Receives gifts or favors from agents

b. Accept market discounts credited to client

c. Receives commissions placing him in a


reciprocal frame of mind
ARCHITECTURAL PRACTICE

2. In Code of Ethics, does serving as professional adviser, accepts


employment as Design Architect for a competition project an
unethical action with respect to the Architect’s responsibility to
__________?

a. Subordinates and Colleagues

b. The People / Public

c. Client
ARCHITECTURAL PRACTICE

3. In what phase in architect’s regular design services does


periodic visits to the site to familiarize himself with the general
progress and quality of work?

a. Schematic design

b. Construction

c. Contract Document
ARCHITECTURAL PRACTICE

4. If the estimated cost for a residential project is P10,000,000.00,


how much should the Architect bill the Client upon the
completion of the Schematic Design Phase if a down payment of
P50,000.00 has been made upon signing of the agreement?

a. P350,000.00

b. P500,000.00

c. P150,00.00
ARCHITECTURAL PRACTICE

5. The portions of the building are erected at different periods of


time, thus increasing the Architect’s construction period and burden
of services, the charges pertaining to services rendered shall be
doubled. A suspension of construction for a period not exceeding
___ months shall not be covered by this provision.

a. 9 months

b. 6 months

c. 3 months
ARCHITECTURAL PRACTICE

6. This shall be issued by the Owner to the Contractor following the


execution of the Contract Agreement.

a. Notice to initiate

b. Notice to Proceed

c. Notice to Start
ARCHITECTURAL PRACTICE

7. What method of compensation is most suitable for compensating


the Architect’s services for the pre-design phase?

a. Professional Fee + Reimbursable Expenses

b. MDPE

c. Lump Sum / Fixed Fee


ARCHITECTURAL PRACTICE

8. What pre-design services involves investigating, identifying, and


documenting the needs of the client for use in the design of the
project?

a. Architectural Programming

b. Project Financing

c. Economic Feasibility Studies


ARCHITECTURAL PRACTICE

9. Approved form of security furnished by the Contractor and his


Surety as a guarantee to the quality of the materials and
equipment installed and the workmanship performed by the
Contractor.

a. Performance Bond

b. Proposal Bond

c. Payment Bond
ARCHITECTURAL PRACTICE

10. The third phase of an architect’s regular services.

a. Schematic Design

b. Construction

c. Contract Document
ARCHITECTURAL PRACTICE

11. A method of selection for an Architect most often used by an


individual person undertaking a relatively small project.

a. Design Competition

b. Direct

c. Indirect
ARCHITECTURAL PRACTICE

12. A method of compensation that is flexible, easy to apply and is


related to the size and the type of the project.

a. MDPE

b. Professional Fee + Reimbursable Expenses

c. PCC
ARCHITECTURAL PRACTICE

13. The Project Construction Cost referred to in the compensation


of the Architect for his Regular Design Fee means the cost of the
completed structure which include one of the following:

a. Communications and electronic system

b. Swimming pool

c. Movable pieces of furniture


ARCHITECTURAL PRACTICE

14. Within how many days from the date the change is ordered
shall any claim for adjustment involving questions of fact be
asserted?

a. 60 Days

b. 30 Days

c. 15 Days
ARCHITECTURAL PRACTICE

15. A type of specification stipulating the use of specific product/s


or processes without provision for substitution.

a. Open

b. Performance

c. Closed
ARCHITECTURAL PRACTICE

16. Most expensive and time-consuming method of selecting the


Architect.

a. Design Competition

b. Direct

c. Indirect
ARCHITECTURAL PRACTICE

17. A method of compensation that represents a risk situation to


the Architect since his costs may exceed the agreed amount.

a. Professional Fee + Reimbursable Expenses

b. Lump Sum or Fixed Fee

c. MDPE
ARCHITECTURAL PRACTICE

18. In BP 220 Economic and Socialized Housing Law, what is the


minimum Door Width Construction for Toilets?

a. 0.71

b. 0.55

c. 0.60
ARCHITECTURAL PRACTICE

19. Included under Part I-General Requirements of a three-part


section specification format.

a. Requirements of regulatory agencies

b. Fabrication

c. Installation
ARCHITECTURAL PRACTICE

20. Not a function of the Construction Supervision Group.

a. Review extra work orders claimed by contractor

b. Prepares PERT-CPM

c. Conducts regular coordination meetings


ARCHITECTURAL PRACTICE

21. The release of 10% retention by the owner shall be done after
how many months from the date of final payment.

a. 12 Months

b. 6 Months

c. 3 Months
ARCHITECTURAL PRACTICE

22. The fee of the architect for design-build services on a


guaranteed maximum cost aside from his fee for regular design
services.

a. 12%

b. 7%

c. 10%
ARCHITECTURAL PRACTICE

23. Project financing falls under what kind of service of the


architect.

a. Comprehensive Services

b. Pre-Design Services

c. Specialized Allied Services


ARCHITECTURAL PRACTICE

24. Duly notarized written contract or equivalent public instrument


stipulating the scope of services and guaranteeing compensation of
such services.

a. Written Notice

b. Service Agreement

c. Notice to Proceed
ARCHITECTURAL PRACTICE

25. A Master's Degree in Architecture shall be credited how many


months in the practical experience required of any person applying
for examination?

a. 24 Months

b. 6 Months

c. 12 Months
ARCHITECTURAL PRACTICE

26. In design-build services, the single-point-responsibility of project


delivery puts the legal liability for both the design and construction on
the ________.

a. Architect

b. Engineer

c. Contractor
ARCHITECTURAL PRACTICE

27. Comprehensive planning falls under what service of the


architect.

a. Specialized Allied Services

b. Comprehensive Services

c. Regular Design Services


ARCHITECTURAL PRACTICE

28. The selection of a member of the Board of Architecture will


commence with the submission of a list of five nominees submitted
by whom?

a. PRBOA

b. UAP

c. IAPOA
ARCHITECTURAL PRACTICE

29. Who shall accredit Continuing Professional Development


providers?

a. UAP

b. PRC

c. Board of Architecture
ARCHITECTURAL PRACTICE

30. Not a criterion for computing the Architect's compensation.

a. Personal Relations

b. Talent and skill

c. Experience
ARCHITECTURAL PRACTICE

31. In BP 220 Economic and Socialized Housing Law, what is the


minimum Door Width Construction for Bedrooms and Services
Areas?
a. 0.80

b. 0.60

c. 0.70
ARCHITECTURAL PRACTICE

32. What part of the Architect services is space/management


studies?

a. Specialized Allied Services

b. Regular Design Services

c. None
ARCHITECTURAL PRACTICE

33. A provision in the Architecture Act of 2004 pertaining to


application of a foreign citizen taking the licensure examinations.

a. Reflexibility

b. Reciprocity

c. Reciprocally
ARCHITECTURAL PRACTICE

34. Invitations issued to prospective bidders, giving information as to


the nature of the proposed project, conditions for the issuance of
contract documents, date of bidding, and estimated cost or
information that would give the Contractor a general idea of the
magnitude and extent of the project.

a. Invitation to Bid

b. Instruction to Bidders

c. Bid Bulletin
ARCHITECTURAL PRACTICE

35. An outline specification enumerating the type and trade names


of materials to be used.

a. Breakdown of Work and Cost

b. Schedule of materials and Finishes

c. Estimate Cost
ARCHITECTURAL PRACTICE

36. What is the general basis of the Architects minimum basic fee?

a. Contractors Funds

b. PCC

c. Owners Financial Support


ARCHITECTURAL PRACTICE

37. Which of the following services are expected from the architect
serving as building/ground administrator?

a. Building Maintenance

b. Ownership

c. Bidding of tenants for rentals/utilities


ARCHITECTURAL PRACTICE

38. The act of conceiving, choosing, and developing the type,


disposition, arrangement and proportioning of the structural
elements of an architectural work giving due consideration to safety,
cost-effectiveness, functionality and aesthetics.

a. Structural Conceptualization

b. Structural Design

c. Structural Analyzation
ARCHITECTURAL PRACTICE

39. A per diem of not less than _____ plus traveling and living
expenses shall be chargeable to the Owner on any occasion where
the Architect or his duly authorized representative shall be required
to perform services at a locality beyond the radius of ____ kilometers
from his established office.

a. 500PHP/100KM

b. 500PHP/50KM

c. 1000PHP/50KM
ARCHITECTURAL PRACTICE

40. Printed documents stipulating the procedural and administrative


aspect of the contract.

a. Specifications

b. Written Notice

c. General Conditions
ARCHITECTURAL PRACTICE

41. What is LOI 1000?

a. Letter of Insertion Mandating Government


Support only to the APO

b. Letter of Inscription mandating government


support only to the APO

c. Letter of Inspection Mandating Government


Support only to the APO
ARCHITECTURAL PRACTICE

42. Not included in the scope of practice of Architecture.

a. Structural Design

b. Architectural designing

c. Quality Surveys
ARCHITECTURAL PRACTICE

43. One of the methods of compensation for architectural service is based


on technical hours and expenses & made by adding all costs of technical
services (man-hours time rate). A multiplier is used to take care of
overhead & profit. This method, however, is applicable only to non-
creative work & aspects of pre-design services & supervision work. What is
this method called?

a. Lump Sum

b. PCC

c. MDPE
ARCHITECTURAL PRACTICE

44. In BP 220 Economic and Socialized Housing Law, what is the


minimum Door Width Construction for Main Doors?

a. 0.80

b. 0.55

c. 0.60
ARCHITECTURAL PRACTICE

45. What part of the Architects services is site selection and


analysis?

a. Design Build

b. Regular Design Services

c. None
ARCHITECTURAL PRACTICE

46. What pre-design service involves investigating, identifying, and


documenting the needs of the client for use in the design of the
project?

a. Site Selection and Analysis

b. Economic Feasibility Studies

c. Architectural Programming
ARCHITECTURAL PRACTICE

47. Which is not true for Consulting Architect?

a. Licensed Architect

b. Assumes civil liability

c. With exceptional expertise


ARCHITECTURAL PRACTICE

48. Which of the following does NOT constitute the post-


construction services of the architect?

a. Building/ground administration

b. Post-construction evaluation

c. Real property evaluation


ARCHITECTURAL PRACTICE

49. Which work item is chargeable to the Owner and not included in
the regular scope of services?

a. electrical load calculation

b. extra drafting of changes made by Owner

c. structural analysis
ARCHITECTURAL PRACTICE

50. What is RA 8293?

a. Intellectual Property Code of the Philippines

b. Socialized Housing Law

c. The Architectural law


ARCHITECTURAL PRACTICE

51. What is U.A.P Doc 203?

a. Pre-Design Services

b. Post Construction Services

c. Specialized Allied Services


ARCHITECTURAL PRACTICE

52. What is U.A.P Doc 201?

a. Pre-Design Services

b. Specialized Allied Services

c. Post Construction Services


ARCHITECTURAL PRACTICE

53. What is U.A.P Doc 206?

a. Comprehensive Architectural Services

b. Regular Design Services

c. Post Construction Services


ARCHITECTURAL PRACTICE

54. What is BP 344?

a. Socialized Housing Project

b. Accessibility Law

c. National Building Code


ARCHITECTURAL PRACTICE

55. What is PD 957?

a. Condominium and Subdivision Law

b. National Building Code

c. Socialized Housing
ARCHITECTURAL PRACTICE

56. What is U.A.P Doc 202?

a. Specialized Allied Services

b. Post Construction Services

c. Regular Design Services


ARCHITECTURAL PRACTICE

57. What is U.A.P Doc 207?

a. Specialized Allied Services

b. Design Build Services

c. Comprehensive Architectural Services


ARCHITECTURAL PRACTICE

58. What is U.A.P Doc 205?

a. Post Construction Services

b. Regular Design Services

c. Specialized Allied Services


ARCHITECTURAL PRACTICE

59. What is BP 220?

a. National Building Code

b. Accessibility Law

c. Socialized Housing Project


ARCHITECTURAL PRACTICE

60. What is PD 1096?

a. National Building Code

b. Fire Code

c. Socialized Housing
ARCHITECTURAL PRACTICE

61. A list of instructions stipulating the manner on which bids are


to be prepared.

a. Bid bulletin

b. Written Notice

c. Instruction to Bidders
ARCHITECTURAL PRACTICE

62. A bond furnished by the contractor and his surety as a guarantee


to execute the work in accordance with the terms of the contract.

a. Surety Bond

b. Guarantee Bond

c. Performance Bond
ARCHITECTURAL PRACTICE

63. A price given by a contractor, sub-contractor, material supplier


or vendor to furnish materials, labor, or both.

a. Bill of materials

b. Quotations

c. Bill of Quantities
ARCHITECTURAL PRACTICE

64. What is Republic Act 7277?

a. Architecture Law

b. Intellectual Property Law

c. Magna Carta for Disabled Persons


ARCHITECTURAL PRACTICE

65. What is U.A.P Doc 204?

a. Construction Services

b. Regular Design Services

c. Specialized Allied Services


ARCHITECTURAL PRACTICE

66. An offer to perform the work prescribed in a contract at a


specified cost.

a. Cost

b. Bid

c. Estimate
ARCHITECTURAL PRACTICE

67. A statement from the architect confirming the amount of money


due the contractor for work accomplished.

a. Certificate of Completion

b. Certificate of Performance

c. Certificate of Payment
ARCHITECTURAL PRACTICE

68. How many groups are there in the "classification and general
requirements of all buildings by use or occupancy"?

a. 10

b. 11

c. 9
ARCHITECTURAL PRACTICE

69. What is Division 7 of the 16-division uniform construction index?

a. Doors and Windows

b. Specialties

c. Thermal and Moisture Protection


ARCHITECTURAL PRACTICE

70. How many days shall the Building Official issue a certificate of
occupancy after final inspection of the project.

a. 45 days

b. 60 days

c. 30 days
ARCHITECTURAL PRACTICE

71. What PD created the PRC which regulates the practice of various
professionals?

a. PD 223

b. PD 1096

c. PD 957
ARCHITECTURAL PRACTICE

72. Arrange sequentially the following work according to the 16-


division uniform construction index: I. Thermal and Moisture
Protection II. Specialties III. Finishes IV. Doors and Windows

a. IV, I, III, II

b. I, IV, III, II

c. III, I, IV, II
ARCHITECTURAL PRACTICE

73. What presidential decree institutionalized the profession of


environmental planning?

a. PD 1308

b. PD 1096

c. PD 1185
ARCHITECTURAL PRACTICE

74. In RA 9514, what is the minimum distance of any exit from any
opening or door if the building is not Fire Sprinklered?

a. 44 meters

b. 45 meters

c. 46 meters
ARCHITECTURAL PRACTICE

75. If portions of the buildings are erected at different periods of


time, thus increasing the Architect's construction period and burden
of services, the charges pertaining to services rendered shall be
doubled. A suspension of construction for a period not exceeding
____ months shall not be covered by this provision.

a. 2 Months

b. 6 Months

c. 3 Months
ARCHITECTURAL PRACTICE

76. A contract provision setting forth the damages a party must pay
in the event of his breach.

a. Arbitration

b. Penalty Clause

c. Breach of Contract
ARCHITECTURAL PRACTICE

77. In RA 9514, what is the required height of a building before it is


required to be installed with Fire Sprinkler System?

a. 12 mts

b. 15 mts

c. 18 mts
ARCHITECTURAL PRACTICE

78. Situation A: Adam, a 5th year architecture student was asked by his aunt and
uncle to prepare architectural plans for their dream house. Both parents mutually
agreed on their contract stipulations as well as the contract price. However, since
Adam is still not licensed, he asked his professor, Arch. Lee to sign and seal his
work. Arch. Lee obliges asks and receives a signing fee. Is there something illegal
in this situation? If yes, what is it?

a. Yes, violation of Intellectual property rights

b. None, because everybody involves mutually agreed as


evidenced by their contract

c. Yes, Procurement act was broken


ARCHITECTURAL PRACTICE

79. Who is liable for this unprofessional and scandalous act?

a. Adam

b. Arch. Lee

c. Parents

d. All of them
ARCHITECTURAL PRACTICE

80. A group newly licensed architects and their friends wanted to


put up an architectural firm. How many % of the population should
be owned by the architects?

a. 75%

b. 25%

c. 50%
ARCHITECTURAL PRACTICE

81. What is now allowed by RA 9266 which was not allowed in


RA 545?

a. Sole Proprietorship

b. Corporate Practice

c. Experience before graduation


ARCHITECTURAL PRACTICE

82. As per BP 220, which among the following is the highest in the
hierarchy of basic needs of human settlements, the provision of
which shall be based on the actual setting which the project is
located?

a. Water

b. Power

c. Movement and Circulation


ARCHITECTURAL PRACTICE

83. As per BP 220, what is the maximum length for rowhouse units?

a. 250 meters

b. 150 meters

c. 100 meters
ARCHITECTURAL PRACTICE

84. As per PD 957, what is the prescribed ratio for saleable and non-
saleable lots?

a. 80% / 20%

b. 70% / 30%

c. 60% / 40%
ARCHITECTURAL PRACTICE

85. An architect, an engineer, and an interior designer, who are all


siblings are planning to set up a company. How many % will be the
architect's share?

a. 90%

b. 75%

c. 60%
ARCHITECTURAL PRACTICE

86. It is a submission of a dispute to an impartial board made up of a


person acquainted with the project.

a. Resolution

b. Adjudication

c. Arbitration
ARCHITECTURAL PRACTICE

87. As per PD 957, what is the minimum floor area of family


condominium units for open market?

a. 36

b. 18

c. 32
ARCHITECTURAL PRACTICE

88. What is the minimum lot area for single-detached socialized


housing units as provided for in BP 220?

a. 72 sqm

b. 64 sqm

c. 54 sqm
ARCHITECTURAL PRACTICE

89. Situation B: Trina wants to build a rest house in her lot at Tagaytay. She
talked with her friend, Arch. A, about the project. Trina's daughter also
recommended Interior designer B to the mom. However, while browsing a
magazine, she learned about Architect C, who happens to be an interior
designer at the same time. What is the best method for her to select the
designers?

a. Design competition

b. Select Architect A, since a friend

c. Comparative selection
ARCHITECTURAL PRACTICE

90. Why is it best to select architect C?

a. It is not best to choose architect C since you do


not know her

b. She can get a discount in ID services

c. She can best interpret the architectural drawings


for the interior design
ARCHITECTURAL PRACTICE

91. Under the accessibility code, what is the maximum height of


handrails?

a. 0.90

b. 0.80

c. 0.85
ARCHITECTURAL PRACTICE

92. Situation C: A newspaper editor approaches an architect for an


interview: is it okay to ask to be paid for the interview?

a. It matters, take it if the newspaper editor give


hand you the money

b. No

c. Yes
ARCHITECTURAL PRACTICE

93. Is it ethical to endorse a product?

a. It really matters, if they will give money, then why


not?

b. No

c. Yes
ARCHITECTURAL PRACTICE

94. After a change of use (renovation) of the building, what should be


secured?

a. Certificate of occupancy

b. Fire inspection certificate

c. Certificate of completion
ARCHITECTURAL PRACTICE

95. What is/are the qualification/s of someone who wishes to take


ALE?
a. Filipino Citizen

b. Architecture graduate

c. Completed the Diversified training experience


logbook

d. All of the above


ARCHITECTURAL PRACTICE

96. What is RA 8981?

a. Public-Private-Partnership Program

b. PRC Modernization Act of 2000

c. National Building Code of the Philippines


ARCHITECTURAL PRACTICE

97. What is RA 386?

a. Civil Code of the Philippines - Article 1378

b. Civil Code of the Philippines - Article 1723

c. Civil Code of the Philippines - Article 1728


ARCHITECTURAL PRACTICE

98. What is RA 8293?

a. Build Operate Transfer Law

b. Local Government Code of 1991

c. Intellectual Property Code of the Philippines


ARCHITECTURAL PRACTICE

99. What is EO 278?

a. Practice of Architecture & Related Consulting


Services for Foreign Assisted Projects

b. Strengthening People’s Nationalism Through


Philippine History Act

c. Unlawful Important of Merchandise


ARCHITECTURAL PRACTICE

100. What is EO 1008?

a. Build Operate Transfer Law

b. Construction Arbitration Law

c. Public-Private-Partnership Program
ARCHITECTURAL PRACTICE

101. What is RA 9285?

a. Alternative Dispute Resolution Law

b. Strengthening People’s Nationalism Through


Philippine History Act

c. Unlawful Important of Merchandise


ARCHITECTURAL PRACTICE

102. What is RA 7718?

a. Civil Code of the Philippines

b. Build Operate Transfer Law

c. National Cultural Heritage Act of 2009


ARCHITECTURAL PRACTICE

103. What is RA 4726?

a. The Condominium Act

b. Practice of Architecture & Related Consulting


Services for Foreign Assisted Projects

c. Condominium and Subdivision Law


ARCHITECTURAL PRACTICE

104. What is RA 10066?

a. Strengthening People’s Nationalism Through


Philippine History Act

b. Cultural Properties and Protection Act

c. National Cultural Heritage Act of 2009


ARCHITECTURAL PRACTICE

105. What is RA 10086?

a. Cultural Properties and Protection Act

b. Strengthening People’s Nationalism Through


Philippine History Act

c. National Cultural Heritage Act of 2009


ARCHITECTURAL PRACTICE

106. What is RA 4846?

a. Strengthening People’s Nationalism Through


Philippine History Act

b. National Cultural Heritage Act of 2009

c. Cultural Properties and Protection Act


ARCHITECTURAL PRACTICE

107. What is RA 1378?

a. Plumbing Code of the Philippines

b. Water Code of the Philippines

c. Code on Sanitation of the Philippines


ARCHITECTURAL PRACTICE

108. What is RA 7160?

a. Alternative Dispute Resolution Law

b. Local Government Code of 1991

c. The Condominium Act


ARCHITECTURAL PRACTICE

109. What is RA 9184?

a. Plumbing Code of the Philippines

b. Continuing Professional Development Act of 2016

c. Government Procurement Reform Act


ARCHITECTURAL PRACTICE

110. What is RA 10219?

a. Continuing Professional Development Act of 2016

b. Strengthening People’s Nationalism Through


Philippine History Act

c. Government Procurement Reform Act


1. B. 11. B. 21. C. 31. C.
2. A. 12. C. 22. C. 32. C.
3. B. 13. A. 23. B. 33. B.
4. C. 14. C. 24. B. 34. A.
5. B. 15. C. 25. C. 35. B.
6. B. 16. A. 26. A. 36. B.
7. B. 17. B. 27. A. 37. C.
8. A. 18. C. 28. B. 38. A.
9. A. 19. A. 29. C. 39. A.
10. C. 20. B. 30. A. 40. C.
41. C. 51. C. 61. C. 71. A.
42. A. 52. A. 62. C. 72. B.
43. C. 53. A. 63. B. 73. A.
44. A. 54. B. 64. C. 74. C.
45. C. 55. A. 65. A. 75. B.
46. C. 56. C. 66. B. 76. B.
47. B. 57. B. 67. C. 77. B.
48. C. 58. A. 68. A. 78. C.
49. B. 59. C. 69. C. 79. D.
50. A. 60. A. 70. C. 80. A.
81. B. 91. A. 101. A.
82. A. 92. B. 102. B.
83. C. 93. B. 103. A.
84. B. 94. A. 104. C.
85. B. 95. D. 105. B.
86. C. 96. B. 106. C.
87. A. 97. B. 107. A.
88. B. 98. C. 108. B.
89. C. 99. A. 109. C.
90. C. 100. B. 110. A.