Professional Practice
Professional Practice
c. Client
ARCHITECTURAL PRACTICE
a. Schematic design
b. Construction
c. Contract Document
ARCHITECTURAL PRACTICE
a. P350,000.00
b. P500,000.00
c. P150,00.00
ARCHITECTURAL PRACTICE
a. 9 months
b. 6 months
c. 3 months
ARCHITECTURAL PRACTICE
a. Notice to initiate
b. Notice to Proceed
c. Notice to Start
ARCHITECTURAL PRACTICE
b. MDPE
a. Architectural Programming
b. Project Financing
a. Performance Bond
b. Proposal Bond
c. Payment Bond
ARCHITECTURAL PRACTICE
a. Schematic Design
b. Construction
c. Contract Document
ARCHITECTURAL PRACTICE
a. Design Competition
b. Direct
c. Indirect
ARCHITECTURAL PRACTICE
a. MDPE
c. PCC
ARCHITECTURAL PRACTICE
b. Swimming pool
14. Within how many days from the date the change is ordered
shall any claim for adjustment involving questions of fact be
asserted?
a. 60 Days
b. 30 Days
c. 15 Days
ARCHITECTURAL PRACTICE
a. Open
b. Performance
c. Closed
ARCHITECTURAL PRACTICE
a. Design Competition
b. Direct
c. Indirect
ARCHITECTURAL PRACTICE
c. MDPE
ARCHITECTURAL PRACTICE
a. 0.71
b. 0.55
c. 0.60
ARCHITECTURAL PRACTICE
b. Fabrication
c. Installation
ARCHITECTURAL PRACTICE
b. Prepares PERT-CPM
21. The release of 10% retention by the owner shall be done after
how many months from the date of final payment.
a. 12 Months
b. 6 Months
c. 3 Months
ARCHITECTURAL PRACTICE
a. 12%
b. 7%
c. 10%
ARCHITECTURAL PRACTICE
a. Comprehensive Services
b. Pre-Design Services
a. Written Notice
b. Service Agreement
c. Notice to Proceed
ARCHITECTURAL PRACTICE
a. 24 Months
b. 6 Months
c. 12 Months
ARCHITECTURAL PRACTICE
a. Architect
b. Engineer
c. Contractor
ARCHITECTURAL PRACTICE
b. Comprehensive Services
a. PRBOA
b. UAP
c. IAPOA
ARCHITECTURAL PRACTICE
a. UAP
b. PRC
c. Board of Architecture
ARCHITECTURAL PRACTICE
a. Personal Relations
c. Experience
ARCHITECTURAL PRACTICE
b. 0.60
c. 0.70
ARCHITECTURAL PRACTICE
c. None
ARCHITECTURAL PRACTICE
a. Reflexibility
b. Reciprocity
c. Reciprocally
ARCHITECTURAL PRACTICE
a. Invitation to Bid
b. Instruction to Bidders
c. Bid Bulletin
ARCHITECTURAL PRACTICE
c. Estimate Cost
ARCHITECTURAL PRACTICE
36. What is the general basis of the Architects minimum basic fee?
a. Contractors Funds
b. PCC
37. Which of the following services are expected from the architect
serving as building/ground administrator?
a. Building Maintenance
b. Ownership
a. Structural Conceptualization
b. Structural Design
c. Structural Analyzation
ARCHITECTURAL PRACTICE
39. A per diem of not less than _____ plus traveling and living
expenses shall be chargeable to the Owner on any occasion where
the Architect or his duly authorized representative shall be required
to perform services at a locality beyond the radius of ____ kilometers
from his established office.
a. 500PHP/100KM
b. 500PHP/50KM
c. 1000PHP/50KM
ARCHITECTURAL PRACTICE
a. Specifications
b. Written Notice
c. General Conditions
ARCHITECTURAL PRACTICE
a. Structural Design
b. Architectural designing
c. Quality Surveys
ARCHITECTURAL PRACTICE
a. Lump Sum
b. PCC
c. MDPE
ARCHITECTURAL PRACTICE
a. 0.80
b. 0.55
c. 0.60
ARCHITECTURAL PRACTICE
a. Design Build
c. None
ARCHITECTURAL PRACTICE
c. Architectural Programming
ARCHITECTURAL PRACTICE
a. Licensed Architect
a. Building/ground administration
b. Post-construction evaluation
49. Which work item is chargeable to the Owner and not included in
the regular scope of services?
c. structural analysis
ARCHITECTURAL PRACTICE
a. Pre-Design Services
a. Pre-Design Services
b. Accessibility Law
c. Socialized Housing
ARCHITECTURAL PRACTICE
b. Accessibility Law
b. Fire Code
c. Socialized Housing
ARCHITECTURAL PRACTICE
a. Bid bulletin
b. Written Notice
c. Instruction to Bidders
ARCHITECTURAL PRACTICE
a. Surety Bond
b. Guarantee Bond
c. Performance Bond
ARCHITECTURAL PRACTICE
a. Bill of materials
b. Quotations
c. Bill of Quantities
ARCHITECTURAL PRACTICE
a. Architecture Law
a. Construction Services
a. Cost
b. Bid
c. Estimate
ARCHITECTURAL PRACTICE
a. Certificate of Completion
b. Certificate of Performance
c. Certificate of Payment
ARCHITECTURAL PRACTICE
68. How many groups are there in the "classification and general
requirements of all buildings by use or occupancy"?
a. 10
b. 11
c. 9
ARCHITECTURAL PRACTICE
b. Specialties
70. How many days shall the Building Official issue a certificate of
occupancy after final inspection of the project.
a. 45 days
b. 60 days
c. 30 days
ARCHITECTURAL PRACTICE
71. What PD created the PRC which regulates the practice of various
professionals?
a. PD 223
b. PD 1096
c. PD 957
ARCHITECTURAL PRACTICE
a. IV, I, III, II
b. I, IV, III, II
c. III, I, IV, II
ARCHITECTURAL PRACTICE
a. PD 1308
b. PD 1096
c. PD 1185
ARCHITECTURAL PRACTICE
74. In RA 9514, what is the minimum distance of any exit from any
opening or door if the building is not Fire Sprinklered?
a. 44 meters
b. 45 meters
c. 46 meters
ARCHITECTURAL PRACTICE
a. 2 Months
b. 6 Months
c. 3 Months
ARCHITECTURAL PRACTICE
76. A contract provision setting forth the damages a party must pay
in the event of his breach.
a. Arbitration
b. Penalty Clause
c. Breach of Contract
ARCHITECTURAL PRACTICE
a. 12 mts
b. 15 mts
c. 18 mts
ARCHITECTURAL PRACTICE
78. Situation A: Adam, a 5th year architecture student was asked by his aunt and
uncle to prepare architectural plans for their dream house. Both parents mutually
agreed on their contract stipulations as well as the contract price. However, since
Adam is still not licensed, he asked his professor, Arch. Lee to sign and seal his
work. Arch. Lee obliges asks and receives a signing fee. Is there something illegal
in this situation? If yes, what is it?
a. Adam
b. Arch. Lee
c. Parents
d. All of them
ARCHITECTURAL PRACTICE
a. 75%
b. 25%
c. 50%
ARCHITECTURAL PRACTICE
a. Sole Proprietorship
b. Corporate Practice
82. As per BP 220, which among the following is the highest in the
hierarchy of basic needs of human settlements, the provision of
which shall be based on the actual setting which the project is
located?
a. Water
b. Power
83. As per BP 220, what is the maximum length for rowhouse units?
a. 250 meters
b. 150 meters
c. 100 meters
ARCHITECTURAL PRACTICE
84. As per PD 957, what is the prescribed ratio for saleable and non-
saleable lots?
a. 80% / 20%
b. 70% / 30%
c. 60% / 40%
ARCHITECTURAL PRACTICE
a. 90%
b. 75%
c. 60%
ARCHITECTURAL PRACTICE
a. Resolution
b. Adjudication
c. Arbitration
ARCHITECTURAL PRACTICE
a. 36
b. 18
c. 32
ARCHITECTURAL PRACTICE
a. 72 sqm
b. 64 sqm
c. 54 sqm
ARCHITECTURAL PRACTICE
89. Situation B: Trina wants to build a rest house in her lot at Tagaytay. She
talked with her friend, Arch. A, about the project. Trina's daughter also
recommended Interior designer B to the mom. However, while browsing a
magazine, she learned about Architect C, who happens to be an interior
designer at the same time. What is the best method for her to select the
designers?
a. Design competition
c. Comparative selection
ARCHITECTURAL PRACTICE
a. 0.90
b. 0.80
c. 0.85
ARCHITECTURAL PRACTICE
b. No
c. Yes
ARCHITECTURAL PRACTICE
b. No
c. Yes
ARCHITECTURAL PRACTICE
a. Certificate of occupancy
c. Certificate of completion
ARCHITECTURAL PRACTICE
b. Architecture graduate
a. Public-Private-Partnership Program
c. Public-Private-Partnership Program
ARCHITECTURAL PRACTICE