Lifting and Rigging Procedure
Lifting and Rigging Procedure
Title:
Lifting Plan of use Crane /
.
Document Type: Controlled Document No :
Rev. No. : 0
Issued Date :
Systems affected: None Dept. : Service Department
TABLE OF CONTENT
1. CRANE …………………………………………………………………………………… 2
SPECIFICATION ………………………………………
2. DRAWING …………………………………………………………………………………… 2
………………………………………
3. SUMMARY …………………………………………………………………………………… 3
………………………………………
4. HES PRECAUTION …………………………………………………………………………………… 3
………………………………………
5. PRE-REQUISITES …………………………………………………………………………………… 3
………………………………………
6. RESOURCES …………………………………………………………………………………… 3
………………………………………
7. REFERENCES …………………………………………………………………………………… 3
………………………………………
8. CHECKLIST …………………………………………………………………………………… 4
PROCEDURE ……………………………………... 4
Preparation …………………………………………………………………………………… 4
Pre Lift Inspection ……………………………………… 4
For All Terrain Crane …………………………………………………………………………………… 5
Lifting The Load ………………………………………
……………………………………………………………………………………
………………………………………
……………………………………………………………………………………
………………………………………
9. SIGNAL STANDARD …………………………………………………………………………………… 7
………………………………………
1
NORTH DURI COGEN PLANT
Lifting & Rigging Procedure
Approved by:
Reviewed by:
Prepared by:
Name Department Signature Date
(dd/mm/yy)
.
2
NORTH DURI COGEN PLANT
Lifting & Rigging Procedure
1. CRANE SPECIFICATION
Crane :
Load :
Boom Length :
Load Radius :
Boom Angle : °
Fully Outriggers Extended
Rope Type :
2. DRAWING
3
3. SUMMARY
The scope of this document is to provide guideline to the team performing
Lifting Plan during site preparation for …..
The work will be included:
Crane Pre-Lift Inspection Checklist.
Operation or simulation test refer to available SOP.
4. HES PRECAUTION
All steps in this procedure shall be performed in accordance with and under
the constraints of Torishima Safe Work Practices (SWP) and applicable local
safety rules and regulations.
Warning:
STRICT ADHERENCE TO THE DETAILS INDONESIA LABOR LAWS MUST BE
MAINTAINED AT ALL TIMES DURING THE IMPLEMENTATION OF THIS
PROCEDURE. THE SITE AND LOCAL SAFETY GUIDELINES AND PROCEDURES
SHALL BE ADHERED TO AT ALL TIMES.
IT IS ADVISABLE TO USE THE LOCAL NDC STANDARD OPERATION
PROCEDURE OF OVER HEAD CRANE OF MAINTENANCE, TAGGING AND
PADLOCKING OF EQUIPMENT, WITH ALL PERSONNEL MADE FAMILIAR WITH
THE PROCEDURE.
IT IS OF PARAMOUNT IMPORTANCE THAT ALL PERSONNEL IN THE
VICINITY OF LIFTING & RIGGING AND WORKING AT HIGH.
5. PRE-REQUISITES:
The following prerequisites shall be completed prior to performing Lifting Job
using Crane at HCT Plant :
Ensure to do Crane Pre-Lift Inspection Checklist before operate crane
Lifting Plan should be done prior to lifting operation start and Lifting Plan
The weight of the lifted load and its center of gravity must be known with
reasonable accuracy early in the planning process
Special consideration for ground support capacity for the crane
Before perform lifting ensure that atmospheric test is doing.
Lifting Equipment to be used should have a valid certificate and color code
Use appropriate lifting equipment
All crane crew should be certified personals:
Crane operator should have a valid certificate as a MIGAS Crane
Operator
Lifting Supervisor, Rigger and Signalman should have a valid
certificate as a Lifting Supervisor, Rigger and Signalman
All crane crew should be get safety induction as SWP required
6. RESOURCES
a) Personnel Qualification
o Supervisor : 1 person
o Crane Operator : 1 person
o Rigger : 2 persons
b) Tools and Materials Required
o Lifting gears ( wire rope sling, shackle, etc )
o Plastic rope for tag line.
7. REFERENCES
Document No. Title
N/A SOP Crane
8. CHECKLIST PROCEDURE
The following checklist procedure outlines the steps for Lifting using Mobile
crane at NDC Plant Area :
ST STATUS/Va Tim
PROCEDURE
EP lue e
Preparations:
A
Persiapan :
Prepare SRP, JSA, Permit, Check ATC and conduct tail
gate meeting between Crane crew who will perform
this job
1.
Siapkan SRP, JSA, Permit, Check atmosphere dan
lakukan tail gate meeting bagi crew crane yang akan
bekerja
Make sure that all of PPE are available and used.
2. Pastikan semua PPE yang diperlukan tersedia dan
dipakai
Remarks :
1. Pastikan Crane bersertifikat (SILO)
2. Pastikan Operator bersertifikat (SIO)
3. Pastikan Rigger bersertifikat
4. Pastikan Work Permit disetujui dan berlaku
5. Pastikan Personil tidak berada di Line Of Fire
6. Pastikan melakukan tailgate meeting dan sosialisasi JSA
7. Pastikan komunikasi lengkap antar personil terlibat
8. Pakai bahasa isyarat yang standard dan dimengerti
9. Signal Standard :