Arrival Check List - Dareen
Arrival Check List - Dareen
2.Engine Room Informed and tested engine ahead and astern ,steering gear tried out Time
3.Arrival Port Information available / Minimum and maximum Depths for the port approach and berth
6. ETA has been sent with all relevant information required to port authorities
Time
all communication established with the Port Authorities on official channels voyage details
7. All relevant charts and nautical publication up to date and course laid off (including ECDIS)
11. Pilot Embarkation / disembarkation arrangements checked and ready for use
12.Vessel integrity
Fodder Tank Openings Closed and Secured
Mooring Winches Fwd and Aft Ready for Use
Mooring Ropes Checked for use
Rat Guards ready for use
Animal loading and discharge Ramps Secured (Roof
Deck)
Gangway’s Checked and Ready to Use
All Pen Gates Closed and secured (Livestock Cargo Decks)
Ramp and provision crane secured