0% found this document useful (0 votes)
64 views

Design Report Final

This document appears to be a section from a design project report for the design of a four-story commercial building using reinforced concrete. It outlines the design criteria including design references, material specifications, design loads from dead and live loads to wind and seismic loads, and load combinations for ultimate and allowable stress design. The loads and load combinations are defined to properly size the structural elements of the building for the various design conditions.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

Design Report Final

This document appears to be a section from a design project report for the design of a four-story commercial building using reinforced concrete. It outlines the design criteria including design references, material specifications, design loads from dead and live loads to wind and seismic loads, and load combinations for ultimate and allowable stress design. The loads and load combinations are defined to properly size the structural elements of the building for the various design conditions.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 72

National University

Fairview Campus

CEPRCD1D
PRINCIPLES OF REINFORCED CONCRETE

Design of Four-Story Commercial Building

Rate

Submitted by:

Group 4

Beltran, Christian Kyle

Buendia, Jose Antonio

Calmada, Richard

Maningas, Rennielle

Signature over printed name


Student Number
Date

Submitted to:

Engr. Arnulfo P. Delima


Table of Contents
Page

Section 1 Design Criteria

Design Criteria 1.1

Section 2 Design Inputs

Architectural Drawings 2.1

Structural Drawings 2.2

Section 3 Loads

Dead and Live Loads 3.1

Panel Loads 3.2

Section 4 STAAD Inputs

Structural Node and Member Number 4.1

Structural Design Input File 4.2

Section 5 Design Result

Reinforced Concrete

Beams 5.1

Columns 5.2

Section 6 Summary of Design Results

Beams 6.1

Columns 6.2
SECTION 1
DESIGN CRITERIA

1.0 DESIGN REFERENCE


Association of Structural Engineers of the Philippines, “National Structural Code of
the Philippines C101-15, Vol. 1, 7th Ed,” Association of Structural Engineers of the
Philippines, Inc., 2015
ACI Committee 318, “American Concrete Institute (ACI 318-02) Building Code
Requirement for Reinforced Concrete, 2002,”
Association of Structural Engineers of the Philippines, “ASEP Earthquake Design
Manual M301- 03, Vol. 1 Code Provisions for Lateral Forces, 1st Ed.,” Association of
Structural Engineers of the Philippines, Inc. 2001
Association of Structural Engineers of the Philippines, “Handbook on Computer-
Aided Analysis and Design of RC Buildings HD202-01, 1st Ed.,” Association of
Structural Engineers of the Philippines, Inc. 2001
Ferguson, P.M., Breen, J.E., and J.O. Jirsa, “Reinforced Concrete Fundamentals, 5th
Ed.,” John Wiley and Sons, 1988 • Blodgett, W. O., Funderbark, R. S., Miller, D.K.,
M. Quintana, “Fabricators’ and Erectors’ Guide to Welded Steel Construction”, The
James F. Lincoln Arc Welding Foundation, 1999
2. 0 MATERIAL SPECIFICATIONS
2.1 Concrete (f’c) = 41.4 MPa (@ 28 days) for columns, beams and elevated slabs
20.7 MPa (@ 28 days) for bedded slabs, footing

2.2 Reinforcing Bars = Grade 33 (33,000psi) for 12mmø & smaller


Grade 60 (60,000psi) (414Mpa) for 16mmø and larger

3.0 DESIGN LOAD CRITERIA


3.1 DEAD LOAD
Concrete 24 KN/cu.m.
Topping 25thk 0.60 KPa
Floor Finish 0.288 KPa
Ceiling 0.15 KPa
Utilities 0.15 KPa
Partition 1.0 KPa
12mm thk Cellular glass insulation 0.016 KPa
Waterproofing: Bituminous smooth surface 0.07 KPa

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 1
DESIGN CRITERIA

3.2 LIVE LOAD


Basic Floor Area = 1.90 KPa
Lobby/Hallway = 2.90 KPa
Decks = 1.90 KPa
Exit Facilities = 2.40 KPa
3.3 WIND LOAD

Area (Zone) II with V = 280 kph


Occupancy Category V Standard Occupancy
Structures Total height of the building 16.7 m

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 1
DESIGN CRITERIA

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 1
DESIGN CRITERIA

3.4 SEISMIC LOAD


3.3.1 Seismic Parameters
Zone 2
Importance Factor 1.0
Response Modification Factor, R 6.5
Soil Profile Type Sc
Nearest Source Type A
Distance from nearest seismic source 27.9 km
Near Source Factor
Na 1.0
Nv 1.0

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 1
DESIGN CRITERIA

3.4.2 Design base shear

 The total design base shear in a given direction shall be determined by the
following equation:

 The total design base shear need not exceed the following

 The total design base shear shall not be less than the following

 In addition, for Seismic Zone 4, the total base shear shall also not be less than the following

3.4.3 Member Weight Calculation


Refer to Structural Calculations

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 1
DESIGN CRITERIA

4.0 LOAD COMBINATION

Ultimate Design
 Where Load and Resistance Factor Design (Strength Design) is used,
structures and all portions thereof shall resist the most critical effects
from the following combinations of factored loads:
1.4D
1.2D + 1.6L + 0.5Lr
1.2D + 1.6Lr + (fL or 0.8W)
1.2D + 1.6W + fL + 0.5Lr
1.2D + 1.0E + fL
0.9D ± (1.0E or 1.6W)

Where
f 1.0 for floors in place of public assembly, for live loads in excess
of 4.8 KPa, and for garage live load 0.5 for all other live loads

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 1
DESIGN CRITERIA

Allowable Stress Design


 Where allowable stress design (working stress design) is used,
structures and all portions thereof shall resist the most critical effects
from the following combinations:
D
D + L + Lr
D + (W or E/1.4)
D + 0.75(L + Lr)
D + (W or E/1.4)

No increase in allowable stresses shall be used with these load


combinations except as specified by Section 203.4.2 of NSCP-C101-10
(Alternate Basic Load Combinations)

Alternate Basic Load Combinations


 In lieu of basic load combinations specified in allowable stress design,
structures and all portions thereof shall resist the most critical effects
from the following combinations. When using these alternative basic
load combinations, a one-third increase shall be permitted in
allowable stresses for all combinations, including W or E.

D + 0.75[L + Lr +(W or E/1.4)]


0.6D + W
0.6D + E/1.4
D + L + Lr
D + L+ W
D + L+ E/1.4

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 2
DESIGN INPUTS
ARCHITECTURAL

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 2
DESIGN INPUTS
ARCHITECTURAL

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 2
DESIGN INPUTS
ARCHITECTURAL

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 2
DESIGN INPUTS
ARCHITECTURAL

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 2
DESIGN INPUTS
ARCHITECTURAL

STRUCTURAL FRAME AND TRIBUTARY WIDTHS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 3
LOADS

Load Matrix

W/o
Panel Slab T Slab DL LL
Second & Third
Floor
1 0.1 4.588 1.9
2 0.1 4.588 1.9
3 0.1 4.588
4 0.1 4.588 2.9
5 0.1 4.588 1.9

Third & Fourth


Floor
1 0.1 4.588 1.9
2 0.1 4.588 1.9
3 0.1 4.588
4 0.1 4.588 2.9
5 0.1 4.588 1.9

Roof Deck
1 0.1 4.588 1.9
2 0.1 4.588 1.9
3 0.1 4.588
4 0.1 4.588 2.9
5 0.1 4.588 1.9

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 3
LOADS

Course
Code

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 3
LOADS

Section
Group
Name
Project Title

Member Forces typical floor


plan
    Moment Shear
Memb No. Load Condition Left End Midspan Right End Left End Right End
DEAD LOAD 21.288 -20.527 6.295 23.939 -17.941
13
LIVE LOAD 13.093 -10.515 13.076 14.403 -14.397
DEAD LOAD 11.103 -10.524 3.722 15.805 -12.115
26
LIVE LOAD 6.6 -4.153 8.115 9.221 -9.979
DEAD LOAD 39.611 -34.228 32.235 43.86 -48.974
38
LIVE LOAD 26.329 -19.958 30.239 28.365 -35.475
DEAD LOAD 11.899 -11.24 2.098 16.41 -11.51
27 LIVE LOAD 7.114 -4.563 7.15 9.591 -9.609
DEAD LOAD 21.028 5.259 -8.115 25.377 18.537
60 LIVE LOAD 11.687 3.961 -2.12 12.998 8.294
DEAD LOAD -6.931 5.212 19.75 -16.778 -23.618
76 LIVE LOAD -2.108 3.927 11.609 -8.23 -12.934
DEAD LOAD 10.369 -10.129 1.289 14.988 -10.209
43 LIVE LOAD 6.149 -4.869 6.062 8.687 -8.641
DEAD LOAD 7.845 -10.01 7.845 5.58 5.58
106 LIVE LOAD 2.451 -1.144 -4.739 1.123 1.123
DEAD LOAD 20.793 -20.095 5.945 23.526 -17.587
15 LIVE LOAD 12.8 -10.219 12.787 14.139 -14.133
DEAD LOAD 9.577 -9.705 2.93 14.348 -10.85
44
LIVE LOAD 5.636 -4.638 7.036 8.296 -9.032
DEAD LOAD 10.254 -7.238 2.408 13.487 -9.128
117 LIVE LOAD 6.127 -3.247 6.042 7.8 -7.752
DEAD LOAD 86.894 -54.285 43.959 66.318 -52.901
110 LIVE LOAD 56.719 -31.626 44.676 42.874 -39.11
DEAD LOAD 12.67 -14.21 13.186 22.472 -22.758
93 LIVE LOAD 8.353 -7.997 12.977 14.267 -16.837
DEAD LOAD 68.351 -54.287 62.498 60.524 -58.695
83 LIVE LOAD 44.669 -31.627 56.723 39.109 -42.875

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 3
LOADS

DEAD LOAD 13.469 -11.306 1.146 17.041 -10.879


66 LIVE LOAD 8.066 -5.523 6.488 9.994 -9.206
DEAD LOAD 36.358 -32.458 23.063 32.789 -28.635
87 LIVE LOAD 22.644 -16.62 29.621 20.03 -22.21
DEAD LOAD 25.515 -19.092 10.755 31.61 -24.23
96 LIVE LOAD 16.216 -10.878 13.228 19.947 -18.453
DEAD LOAD 47.45 -32.457 11.973 36.255 -25.169
114 LIVE LOAD 29.611 -16.619 22.655 22.207 -20.033
120 DEAD LOAD 13.534 -11.297 1.098 17.069 -10.851
LIVE LOAD 8.105 -5.518 6.459 10.012 -9.188

Member forces roof deck


    Moment Shear
Memb No. Load Condition Left End Midspan Right End Left End Right End
DEAD LOAD 8.514 -10.833 -6.58 10.219 -4.181
218
LIVE LOAD 7.163 -7.079 7.195 8.694 -8.706
DEAD LOAD 8.189 -10.684 -6.544 10.015 -4.121
219
LIVE LOAD 7.041 -6.889 6.988 8.551 -8.53
DEAD LOAD 5.151 -5.931 -4.213 7.141 -2.459
220
LIVE LOAD 3.664 -3.475 4.852 5.503 -6.097
DEAD LOAD 5.889 -6.008 -5.104 7.548 -2.052
221
LIVE LOAD 4.144 -3.625 4.073 5.818 -5.782
DEAD LOAD 5.388 -5.245 -4.903 7.04 -1.624
223
LIVE LOAD 3.662 -3.093 3.412 5.301 -5.168
DEAD LOAD 4.608 -5.176 -3.984 6.593 -2.071
224
LIVE LOAD 3.164 -2.949 4.199 4.962 -5.507
DEAD LOAD 14.421 -15.476 2.87 16.884 -15.036
222
LIVE LOAD 15.239 -12.867 17.319 17.194 -21.376
DEAD LOAD 10.605 1.848 -6.087 13.491 11.139
226
LIVE LOAD 8.872 3.74 -0.397 8.515 5.673
DEAD LOAD -4.973 1.865 9.525 -9.571 -11.923
229
LIVE LOAD -0.418 3.729 8.87 -5.687 -8.529
DEAD LOAD 17.667 -15.316 -0.644 20.877 -10.779
225
LIVE LOAD 17.174 -12.676 15.057 21.224 -17.027
DEAD LOAD 4.411 -4.353 -3.787 6.165 -1.611
227
LIVE LOAD 3.979 -1.901 3.495 4.833 -4.563
223 DEAD LOAD 5.987 -7.165 -1.654 9.898 -5.654
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 3
LOADS

LIVE LOAD 6.261 -4.974 6.341 9.374 -9.418


DEAD LOAD 4.269 -4.418 -3.773 6.122 -1.654
238
LIVE LOAD 3.804 -1.972 3.526 4.775 -4.621
DEAD LOAD 25.707 -24.4 7.815 23.292 -17.7
231
LIVE LOAD 24.91 -19.814 34.935 23.2 -26.332
DEAD LOAD 32.226 -24.399 -4.914 25.328 -15.28
236
LIVE LOAD 34.939 -19.812 24.911 26.333 -23.199
DEAD LOAD 5.257 -6.196 -4.848 7.326 -2.274
228
LIVE LOAD 4.417 -3.644 3.762 5.964 -5.636
DEAD LOAD 8.453 -9.121 -1.095 11.987 -7.213
234
LIVE LOAD 8.518 -7.22 7.975 11.736 -11.464
DEAD LOAD 5.267 -6.196 -4.858 7.331 -2.269
239
LIVE LOAD 4.444 -3.64 3.743 5.975 -5.625
DEAD LOAD 14.408 -16.835 -5.326 13.643 -7.477
232
LIVE LOAD 12.158 -10.519 18.462 11.775 -13.745
DEAD LOAD 19.073 -16.834 -9.99 15.101 -6.019
237
LIVE LOAD 18.458 -10.519 12.163 13.744 -11.776

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

1st Floor

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

2nd Floor

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

3rd Floor

Roof Deck

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

Framing Plan

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 4
STAAD INPUTS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 5
DESIGN RESULTS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 5
DESIGN RESULTS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 5
DESIGN RESULTS

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

TYPICAL FLOOR

B-13

Length, L (mm): 5000 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 315 mm
d' 85 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 628 628 628
As (Bottom) 628 628 628

Left Midspan Right


ρ (Top) 0.00997331 0.00997331 0.00997331
ρ (Bottom) 0.00997331 0.00997331 0.00997331

Checking for Beam Steel Ratio

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 3.89 3.89 3.89
Rn (Bottom) 3.89 3.89 3.89

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 69.41 69.41 69.41 Top
Botto
⌀Mn (-) 69.41 69.41 69.41 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 46.4944 0.00 28.4756 Top
Botto
Mn (-) 0.00 41.4564 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 36.44 -21.42 50.00 1.00
0.5 36.44 -21.42 150.00 3.43
0.9 36.44 -21.42 150.00 6.00
0.9 36.44 -21.42 150.00 6.00
0.7 36.44 -21.42 150.00 4.80

B-13.2 C

Length, L (mm): 2000 Concrete Cover (mm): 65


Width, b (mm): 300 Bar Diameter (mm): 16
Heigth, h (mm): 500 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 415 mm
d' 85 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 4
Bottom 2 4 2

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Left Midspan Right


As (Top) 628 628 1257
As (Bottom) 628 1257 628

Left Midspan Right


ρ (Top) 0.005046735 0.005046735 0.01009347
ρ (Bottom) 0.005046735 0.01009347 0.005046735

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.03 2.03 3.93
Rn (Bottom) 2.03 3.93 2.03

Moment Capacity, ⌀Mn


(Kn.m)
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 94.26 94.26 182.74 Top
Botto
⌀Mn (-) 94.26 182.74 94.26 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 46.4944 0.00 7.47 Top
Botto
Mn (-) 0.00 41.4564 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 33.72 -25.05 50.00 1.00
0.3 33.72 -25.05 200.00 3.43
0.5 33.72 -25.05 200.00 6.00
0.5 33.72 -25.05 200.00 6.00
0.4 33.72 -25.05 200.00 4.80

B-26

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Length, L (mm): 4000 Concrete Cover (mm): 65

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Width, b (mm): 200 Bar Diameter (mm): 16


Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 23.8836 0.00 17.4504 Top
Botto
Mn (-) 0.00 19.2736 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 30.50 -29.33 50.00 1.00
0.9 30.50 -29.33 75.00 3.00
1.6 30.50 -29.33 75.00 3.00
1.6 30.50 -29.33 150.00 6.00
1.3 30.50 -29.33 150.00 4.80

B- 26.2 C

Length, L (mm): 2000 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

As (Top) 402 402 402


As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 23.8836 0.00 17.4504 Top
Botto
Mn (-) 0.00 19.2736 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 30.50 -29.33 50.00 1.00
0.3 30.50 -29.33 200.00 1.00
0.5 30.50 -29.33 200.00 2.00
0.5 30.50 -29.33 200.00 2.00
0.4 30.50 -29.33 200.00 1.00

B-38

Length, L (mm): 6500 Concrete Cover (mm): 65


Width, b (mm): 300 Bar Diameter (mm): 20
Heigth, h (mm): 500 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Effective Depth
d 415 mm
d' 85 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 4
Bottom 2 4 2

Left Midspan Right


As (Top) 628 628 1257
As (Bottom) 628 1257 628

Left Midspan Right


ρ (Top) 0.005046735 0.005046735 0.01009347
ρ (Bottom) 0.005046735 0.01009347 0.005046735

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Adequacy at Midspan: Adequate Adequate


Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.03 2.03 3.93
Rn (Bottom) 2.03 3.93 2.03

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 94.26 94.26 182.74 Top
Botto
⌀Mn (-) 94.26 182.74 94.26 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 89.6596 0.00 87.0644 Top
Botto
Mn (-) 0.00 17.0064 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 115.53 84.03 50.00 1.00
0.6 115.53 84.03 150.00 3.00
1.0 115.53 84.03 150.00 3.00
1.0 115.53 84.03 150.00 4.00
0.8 115.53 84.03 200.00 1.00

B- 38.2 C

Length, L (mm): 2000 Concrete Cover (mm): 65


Width, b (mm): 300 Bar Diameter (mm): 20
Heigth, h (mm): 500 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 415 mm
d' 85 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 4
Bottom 2 4 2

Left Midspan Right


As (Top) 628 628 1257
As (Bottom) 628 1257 628

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Left Midspan Right


ρ (Top) 0.005046735 0.005046735 0.01009347
ρ (Bottom) 0.005046735 0.01009347 0.005046735

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.03 2.03 3.93
Rn (Bottom) 2.03 3.93 2.03

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 94.26 94.26 182.74 Top
Botto
⌀Mn (-) 94.26 182.74 94.26 m

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 89.6596 0.00 87.0644 Top
Botto
Mn (-) 0.00 17.0064 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 115.53 84.03 50.00 1.00
0.3 115.53 84.03 100.00 1.00
0.5 115.53 84.03 100.00 1.00
0.5 115.53 84.03 100.00 2.00
0.4 115.53 84.03 200.00 1.00

B-27

Length, L (mm): 4000 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 25.6612 0.00 35.0376 Top
Botto
Mn (-) 0.00 20.7888 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
x(m) Vu = Vs = (Vu/Φ)-Vc s=Avfyd/Vs n=(X1-X1-i)/
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

R*Wu(x) S1-i)
0.320 35.04 -23.29 50.00 1.00
0.6 35.04 -23.29 75.00 3.00
1.0 35.04 -23.29 75.00 3.00
1.0 35.04 -23.29 150.00 1.00
0.8 35.04 -23.29 150.00 1.00

B- 27.2 C

Length, L (mm): 2000 Concrete Cover (mm): 65


Width, b (mm): 250 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 3
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 603
As (Bottom) 402 402 402

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Left Midspan Right


ρ (Top) 0.005074118 0.005074118 0.007611177
ρ (Bottom) 0.005074118 0.005074118 0.005074118

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.04 2.04 3.01
Rn (Bottom) 2.04 2.04 2.04

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 46.07 46.07 68.05 Top
Botto
⌀Mn (-) 46.07 46.07 46.07 m

Moment Actual, (Kn.m)


Left Midspan Right
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Mn (+) 25.66 0.00 7.47 Top


Botto
Mn (-) 0.00 20.79 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 35.04 -23.29 50.00 1.00
0.3 35.04 -23.29 75.00 1.00
0.5 35.04 -23.29 75.00 1.00
0.5 35.04 -23.29 75.00 1.00
0.4 35.04 -23.29 150.00 1.00

B-60

Length, L (mm): 1500 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.005074118 0.005074118 0.005074118
ρ (Bottom) 0.005074118 0.005074118 0.005074118

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Left Midspan Right


Rn (Top) 2.04 2.04 2.04
Rn (Bottom) 2.04 2.04 2.04

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 46.07 46.07 46.07 Top
Botto
⌀Mn (-) 46.07 46.07 46.07 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 43.93 12.65 0.00 Top
Botto
Mn (-) 0.00 0.00 13.13 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 35.04 -23.29 50.00 1.00
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

0.2 35.04 -23.29 150.00 1.00


0.4 35.04 -23.29 150.00 1.00
0.4 35.04 -23.29 150.00 1.00
0.3 35.04 -23.29 150.00 1.00

B-76

Length, L (mm): 1500 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

ρ (Top) 0.006342648 0.006342648 0.006342648


ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 0.00 12.54 42.27 Top
Botto
Mn (-) 11.69 0.00 0.00 m
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 49.04 -4.62 50.00 1.00
0.2 49.04 -4.62 150.00 1.00
0.4 49.04 -4.62 150.00 1.00
0.4 49.04 -4.62 150.00 1.00
0.3 49.04 -4.62 150.00 1.00

B- 43

Length, L (mm): 3800 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 22.28 0.00 11.25 Top
Botto
Mn (-) 0.00 19.95 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 31.88 -27.49 50.00 1.00
0.5 31.88 -27.49 100.00 2.00
1.0 31.88 -27.49 150.00 1.00
1.0 31.88 -27.49 150.00 1.00
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

0.8 31.88 -27.49 150.00 1.00

B- 43.2 C

Length, L (mm): 2000 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 0.00 19.95 11.25 Top
Botto
Mn (-) 22.22 0.00 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

⌀Mn (+) Adequate Adequate Adequate Top


Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 31.88 -27.49 50.00 1.00
0.3 31.88 -27.49 150.00 1.00
0.5 31.88 -27.49 150.00 1.00
0.5 31.88 -27.49 150.00 1.00
0.4 31.88 -27.49 150.00 1.00

B-106

Length, L (mm): 6500 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 13.34 0.00 1.83 Top
Botto
Mn (-) 0.00 13.84 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 8.49 -58.68 50.00 1.00
0.9 8.49 -58.68 150.00 2.00
1.6 8.49 -58.68 150.00 8.00
1.6 8.49 -58.68 200.00 1.00
1.3 8.49 -58.68 200.00 1.00

B- 106.2 C
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Length, L (mm): 2000 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 13.34 13.84 0.00 Top
Botto
Mn (-) 0.00 0.00 1.83 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 8.49 -58.68 50.00 1.00
0.9 8.49 -58.68 150.00 1.00
1.6 8.49 -58.68 150.00 1.00
1.6 8.49 -58.68 150.00 1.00
1.3 8.49 -58.68 150.00 1.00

B- 15

Length, L (mm): 5000 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Fs (Mpa): 414 F'c (Mpa): 41
Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)
Adequacy at LEFT: Adequate Adequate
Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

⌀Mn (+) 45.72 45.72 45.72 Top


Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 45.43 0.00 27.59 Top
Botto
Mn (-) 0.00 40.46 0.00 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 50.85 -2.20 50.00 1.00
0.7 50.85 -2.20 150.00 1.00
1.3 50.85 -2.20 150.00 1.00
1.3 50.85 -2.20 150.00 1.00
1.0 50.85 -2.20 150.00 1.00

B- 15.2 C

Length, L (mm): 2000 Concrete Cover (mm): 65


Width, b (mm): 200 Bar Diameter (mm): 16
Heigth, h (mm): 400 Stirrup Diameter (mm): 10
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Fs (Mpa): 414 F'c (Mpa): 41


Effective Depth
d 317 mm
d' 83 mm
Beta Code
B 0.7562

No. of Rebars
n left Midspan Right
Top 2 2 2
Bottom 2 2 2

Left Midspan Right


As (Top) 402 402 402
As (Bottom) 402 402 402

Left Midspan Right


ρ (Top) 0.006342648 0.006342648 0.006342648
ρ (Bottom) 0.006342648 0.006342648 0.006342648

Checking for Beam Steel Ratio


0.038033728

0.003381643
Adequate
Inadequate
ρ (Top) ρ (Bottom)

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Adequacy at LEFT: Adequate Adequate


Adequacy at Midspan: Adequate Adequate
Adequacy at RIGHT: Adequate Adequate

Computation for Rn,


(MPa)

Left Midspan Right


Rn (Top) 2.53 2.53 2.53
Rn (Bottom) 2.53 2.53 2.53

Moment Capacity, ⌀Mn


(Kn.m)
⌀Mn = ⌀Rnbd^2 ⌀ 0.9

Left Midspan Right


⌀Mn (+) 45.72 45.72 45.72 Top
Botto
⌀Mn (-) 45.72 45.72 45.72 m

Moment Actual, (Kn.m)


Left Midspan Right
Mn (+) 45.43 40.46 0.00 Top
Botto
Mn (-) 0.00 0.00 27.59 m

Adequacy of Moment Capacity


Left Midspan Right
⌀Mn (+) Adequate Adequate Adequate Top
Botto
⌀Mn (-) Adequate Adequate Adequate m

Increase bars
Adequate
Required
Project Title Job No Page

Client Designed by: Date

Location Checked by: Date


SECTION 6
SUMMARY OF DESIGN RESULTS

Spacing
at other
location
Vu = n=(X1-X1-i)/
x(m) R*Wu(x) Vs = (Vu/Φ)-Vc s=Avfyd/Vs S1-i)
0.320 50.85 -2.20 50.00 1.00
0.7 50.85 -2.20 150.00 1.00
1.3 50.85 -2.20 150.00 1.00
1.3 50.85 -2.20 150.00 1.00
1.0 50.85 -2.20 150.00 1.00

Project Title Job No Page

Client Designed by: Date

Location Checked by: Date

You might also like