Renovation 2
Renovation 2
PACKAGE
Item Description Qty. Unit Unit Cost Labor Total Unit Cost Amount
Materials 30.00%
Sub-total 173,808.10
TOTAL 260,712.15
PREPARED BY:
JUN REY P. MAWE
LISCENCED CIVIL ENGINEER