0% found this document useful (0 votes)
134 views16 pages

3-NCR Procedure

Specific procedures

Uploaded by

Sudhakar Jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
134 views16 pages

3-NCR Procedure

Specific procedures

Uploaded by

Sudhakar Jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 16
Transmittal Note Transmittal No. Subject ) Sent Date Submission No. (as of 16-Mar-2019) Project Title Project No From To ‘DNO99-PO1-HYD-QTC-TML-00266 MNP - Work Management Procedure (WMP) 16-Mar-2019 cNs102319 atar ee) Roads and Infrastructure in Al Ebb and Leabaib ~ Package 01 DINog9-POt Ashraf El Sayed Senior Resident Engineer Hyder Consulting Middle East P.O. Box 1884 Doha, Qatar Raed Ammori Project Construction Director Qatar Trading & Contracting Group P.O. Box 9887 Doha, Qatar ‘Company Issued For Date Task QTCG - Qatar Trading & ‘Action and 23-Mar-2019 This is for your action Conactots Group Response Attachments: Document Number ev. Tie Medium —Altachment Remark Type DNO99.PO1-0TC-CON-APR: —00-A MNP-- Work Management Procedure Hard Copy ‘A10547 (WMP) Form: J-OTC-CONINE: 00-A MINP-Werk Management Prosedire Hard Copy GEC.-7- Approved Boe (wn) wa Comments 1 ‘ares DN999 - POT) SLE, poet A Incoming — 7” ReceIvED \e\pispatet] Action | Info ‘tain Th M16 MaR 2019 fi heal © QTCG %y \ ‘Sent by Ryan Cantillana (ryanrchie [email protected]) on 16-Mar-2019 at 08:27 Document Submittal Form Document No. | PWA-RPD-CON-FN-1504 Rewsion No. | 6 Issue Date | 18,Jan 2019 arated Document No Project Title Project No Contractor -QTC-CON-APR-A10547 Roads & Infrastructure in Al Ebb & Le: 12017 ¢ 1376 Qatar Trading & Contracting Group To the Supervision Consultant: This submittal has been reviewed, checked and approved by an authorised pers} has been coordinated with the requirements of the works and the project documentation, contents has been verified prior to the submittal LUM Kee ue amen ea) Project Quality Plan: Quality Organization Plan: Quality Checklist: Commissioning Plan: 0 List of laboratories to be used for Testing: 0. Rev. No: 00 SXARCADIS Doha, Gatar INCOMING DOCUMENT rem Tpnlo 94 regio, (00032 a a Dept [Raton] sabaib-Package-1 Date: 11-03-2019 GEC: Hyder Consulting Ce Inspection & Test Plan: Method Statement / Method Statement Schedule: Key Performance Indicators: Handover & Close Out Plan: a ooo Non-Conformance / Audit Reports: SU RR ee CR neat ao) Programme of Works / Programming Data Inspection & Test Plan Schedule: Schedule of Submittals: Quality Organization Chart Health & Safety Plan’ Monthly Progress Report Bo Os) b: eo. ol Materials List: one @ Drawings & Date: Construction Staff Organisation Chart Health & Safety Organisation Chart Quality Assurance Plan: Procurement Status Report Photographic Records: ‘As Built Record Drawings: Boo. ooo. oe oo eben ‘As Built Survey Drawings: Dae Cen cour Renee ue Construction Environmental Plan: 0 Project Specific Logistics Plan: Traffic Management Plan / Traffic Diversion Plan: Methodology for Managing Subcontractors: Document No. : | PWA-RPD-CON-FN-1604 Document Submittal Form Revision No. : | 5 Issue Date | 16 Jan 2079 DN099-P01-QTC-CON-MNP-A10548: Work Management Procedure (Control Of Incidents & Non- Conformances, Corrective & Preventive Actions) : Rev 00 Cosa seta) ‘We certify that the document(s) submitted are complete and have been reviewed in detail and meet Name: Raed Ammori Position: Project Construction Director 11-03-2019 Date: Sune! We have reviewed the document(s) submitted and have provided our assessment of the document(s) in meeting the requirements of the General Conditions of Contract and QCS 2014 Document(s) status: Approved Not Approved: 1 Revise and Resubmit: 0 AS uO cs Reason for Rejeation: aXe dom Plea

You might also like