Concrete Pouring Log

The document is a concrete pouring log and cube register for the King Abdullah International Gardens project. It lists 16 concrete pours that took place between March 2nd and March 7th, 2020 for various structures like retaining walls, pile caps, and slabs. It provides details on the location, date, design mix, truck delivery numbers, and quantities for each pour. It also tracks the 7 and 28 day compressive strengths for cubes from the pours, with all results shown as having passed.

Uploaded by

akram hussein
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
172 views537 pages

Concrete Pouring Log

The document is a concrete pouring log and cube register for the King Abdullah International Gardens project. It lists 16 concrete pours that took place between March 2nd and March 7th, 2020 for various structures like retaining walls, pile caps, and slabs. It provides details on the location, date, design mix, truck delivery numbers, and quantities for each pour. It also tracks the 7 and 28 day compressive strengths for cubes from the pours, with all results shown as having passed.

Uploaded by

akram hussein
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 537

RUN DATE: February 12, 2023

KING ABDULLAH INTERNATIONAL GARDENS PROJECT


TOTAL QUANTITY TRUCK LOAD (M³): 1272

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS
Boundary Wall -
Concrete Pouring for Retaining Wall - Corebel Extension (for span76-90) as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 -
1 KAIG3-RFI-BO-S-0364-00 Retaining Wall Span 76 03.03.2020 C32/40 62% OPC+30%FA P 28-19858 9
- 90 Very Severe. Boundary Wall done by 2nd Stage Contractor.
PASSED
Concrete Pouring for Retaining Wall - Corebel Extension (for span76-90) as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 -
2 C32/40 62% OPC+30%FA P 28-19866 9
Very Severe. Boundary Wall done by 2nd Stage Contractor.

Boundary Wall Nick Concrete Pouring for Retaining Wall - Corebel Extension (for span76-90) as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 -
3 KAIG3-RFI-BO-S-0364-00 07.03.2020 C32/40 62% OPC+30%FA P 29-11660 9
Wall for Cladding 76-90 Very Severe. Boundary Wall done by 2nd Stage Contractor.
PASSED
Concrete Pouring for Retaining Wall - Corebel Extension (for span76-90) as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 -
4 C32/40 62% OPC+30%FA P 28-19885 8
Very Severe. Boundary Wall done by 2nd Stage Contractor.

Crescent - PC
5 KAIG3-RFI-CO-S-0368-00 (91,92,93)
02.03.2020 Concreting of Blinding / Mass concrete for PC 91-93. C16/20 SRC P 29-11493 9
PASSED
6 C16/20 SRC P 28-19801 9

7 KAIG3-RFI-TT-S-0370-00 Tower 1 - S.O.G 02.03.2020 Blinding Concrete for Slab on Grade of Tower-1; "Done by 2nd Stage Contractor". Mix Design - C 16/20 (SRC). C16/20 SRC P 28-19804 12 PASSED

Crescent - PC
8 KAIG3-RFI-CO-S-0374-00 (81,79,77) 03.03.2020 Inspection Blinding Concrete (C16/20) under pile cap at PC 81, 79 & 77. C16/20 SRC P 28-19828 9

9 P 28-19830 12

10 P 28-19831 9

11 P 28-19836 9 PASSED

12 P 28-19837 9

13 P 28-19840 9

14 P 28-19848 10

Crescent - PC
15 KAIG3-RFI-CO-S-0380-00 (94,95,96,97 & 98)
05.03.2020 Inspection of Blinding Concrete casting C(16-20) at PC (94,95,96,97 & 98). C16/20 SRC P 29-11586 9

16 P 2911590 9

17 P 29-11592 9 PASSED

18 P 29-11594 9

19 P 29-11596 9

C32/40
20 KAIG3-RFI-BO-S-0381-00 67%OPC+25%FA 05.03.2020 Concrete Pouring for Columns of Boundary, Column # 76-80. Conc Mix Design C32/40 - Very Severe C32/40 67% OPC+25%FA P 29-11608 5 PASSED

Crescent 1 - PC
21 KAIG3-RFI-CO-S-0388-00 (78,80,82)
07.03.2020 Inspection of concrete casting SRC, C(16-20) under PC (82,80 & 78). C16/20 SRC P 28-19892 9

22 P 28-19896 9

23 P 28-19899 9

24 P 28-19901 9 PASSED

25 P 28-19907 9

26 P 28-19909 9

27 P 28-19910 8

28 KAIG3-RFI-MB-S-0394-00 Management Buiding 08.03.2020 Concrete Pouring for Post beside existing Column of Management Building (as per SCR-MB-G-0031-00); done by 2nd Stage Contractor. C32/40 62% OPC+30%FA P 29-11674 8 PASSED

29 09.03.2020 P 29-11725 5

Crescent - 2 PC
30 KAIG3-RFI-CO-S-0396-00 (188,189,190,191,192)
08.03.2020 Inspection of concrete casting SRC, C(16-20) under PC (188-192) C16/20 SRC P 29-11678 9.5

31 P 29-11679 11.5 PASSED

32 P 29-11681 10

Crescent 2 - PC (71,73
33 KAIG3-RFI-CO-S-0401-00 & 71) 09.03.2020 Inspection of concrete casting SRC, C(16-20) under PC (181, 183, 185 & 187) C16/20 SRC P 29-11727 9

kaig-qcals 1
PASSED
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1272

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
34 LOCATION CASTING No.
P 29-11728 10 ) PASSED
(m³

35 P 29-11729 10

Crescent 1 - PC
KAIG3-RFI-CO-S-0406-00 (71,73,75)
10.03.2020 Inspection of concrete casting SRC, C(16-20) under PC (71, 73 & 75). C16/20 SRC P 29-11785 9

P 29-11786 9

P 29-11788 9 PASSED

P 29-11791 9

P 29-11793 9

36 KAIG3-RFI-TT-S-0407-00 Management Buiding 10.03.2020 Concrete Pouring for Slab on Grade of Tower 1, Mix Design C32/40 - (Severe Exposed). C32/40 62% OPC+30%FA P 29-11781 9
PASSED
P 29-11891 6

Crescent 1 & 2 - PC (78


37 KAIG3-RFI-CO-S-0417-00 & 186)
12.03.2020 Inspection of concrete casting C(16-20) under Pile Cap PC (78 & 186). C16/20 SRC P 29-11905 9

38 P 29-11907 9

39 P 29-11908 10 PASSED

40 P 29-11912 10

41 P 29-11919 4

42 KAIG3-RFI-PB-S-0420-00 Ticket Booth 1 14.03.2020 Concrete pouring for Kicker of Ticketing booth 1, (H=100mm). C32/40 62% OPC+30%FA P 29-11980 2 PASSED

Crescent 1 - PC (65,67
43 KAIG3-RFI-CO-S-0422-00 & 69)
14.03.2020 Inspection of concrete casting SRC, C (16-20) under Pile Cap PC (65, 67 & 69). C16/20 SRC P 29-11977 9

44 P 29-11986 9

45 P 29-11987 9
PASSED
46 P 29-11988 9

47 P 29-11989 9

48 P 29-11990 6

49 KAIG3-RFI-CO-S-0426-00 Crescent 1 15.03.2020 Inspection of concrete SRC, C (16-20) casting under strip footing between axis 01/AP-01/AQ outer line of crescent 1. C16/20 SRC P 29-12031 10

P 29-12026 10 PASSED

50 P 29-12033 6

Crescent 1 - PC
51 KAIG3-RFI-CO-S-0429-00 (55,57,59,61 & 63) 16.03.2020 Inspection of concrete casting SRC, C (16-20) under Pile Cap PC (55, 57, 59, 61 & 63). C16/20 SRC P 29-12086 9

53 P 29-12089 9 PASSED

54 P 29-12091 8

Crescent 1 - PC (72,74
55 KAIG3-RFI-CO-S-0433-00 & 76) 17.03.2020 Inspection of concrete casting SRC, C (16-20) under Pile Cap PC (72, 74 & 76). C16/20 SRC P 29-12147 9

56 P 29-12149 9

57 P 29-12150 9

58 P 29-12151 9 PASSED

59 P 29-12152 9

60 P 29-12154 9

61 P 29-12155 9

Crescent 1 - PC (66,68
62 KAIG3-RFI-CO-S-0439-00 & 70) 18.03.2020 Inspection of concrete casting SRC, C (16-20) under Pile Cap PC (66, 68 & 70). C16/20 SRC P 29-12204 12

kaig-qcals 2
PASSED
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1272

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
63 LOCATION CASTING No.
P 29-12205 11 )
(m³

64 P 29-12207 10 PASSED

65 P 29-12208 9

66 P 29-12209 9

Concrete pouring for post beam beside existing column/grade beam of management building (as per KAIG3-SD-MB-A-BW-1014-00) as per
67 KAIG3-RFI-MB-S-0452-00 Management Buiding 21.03.2020 C32/40 62% OPC+30%FA P 29-12313 6 PASSED
attached highlighted drawing; Mix Design C32/40 - (Moderate Exposed). Done by 2nd stage Contractor.

Crescent 1 - PC
68 KAIG3-RFI-CO-S-0454-00 (54,56,58,60,62 & 69) 19.03.2020 Inspection of Concrete Casting SRC, C (16-20) at PC (62 & 64). C16/20 SRC P 29-12255 10

69 P 29-12257 10

70 P 29-12266 9

71 P 29-12267 9

72 P 29-12268 11 PASSED

73 P 29-12269 9

74 P 29-12269 9

75 P 29-12270 9

76 P 29-12271 9

77 KAIG3-RFI-TT-S-0456-00 Tower 1 21.03.2020 Concrete pouringof blinding concrete for Slab on Grade - Entrance Area; Tower-1 Mix-1 Mi Design-C 16/20 (SRC). C16/20 SRC P 29-12323 3 PASSED

Crescent 1 - PC
78 KAIG3-RFI-CO-S-0458-00 (54,56,58 & 60)
21.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps PC (54,56,58 & 60). C16/20 SRC P 29-12325 9

79 P 29-12326 9

80 P 29-12327 9

81 P 29-12328 9

82 P 29-12331 9 PASSED

83 P 29-12332 9

kaig-qcals 3
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1272
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
84 LOCATION CASTING No.
P 28-20138 9)
(m³

85 P 28-20139 9

86 P 29-12343 6

87 KAIG3-RFI-PT-S-0460-00 Toilet 1 22.03.2020 Concrete pouringof blinding concrete for Slab on Grade - Toilet-1 Mix Design-C 16/20 (SRC). C16/20 SRC P 29-12402 9 PASSED

88 KAIG3-RFI-TB-S-0464-00 Ticketing Booth 1 22.03.2020 Concrete pouring for Wall - Ticketing Booth -1 Mix Design 32/40 Screed Concrete (Severe Exposed to Climate). C32/40 62% OPC+30%FA P 29-12378 9
PASSED
89 P 29-12395 5

90 KAIG3-RFI-CO-S-0466-00 Crescent 1 & 2 22.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps PC (53,51,49,47,45,43,41) PC (186 second layer) & (182,184 first layer). C16/20 SRC P 29-12404 9

91 P 29-12405 9 PASSED

92 P 29-12406 9

93 KAIG3-RFI-TT-S-0470-00 Tower 1 23.03.2020 Concrete Pouring for Slab on Grade of Entrance Area of Tower 1, Mix Design C32/40 - (Severe Exposed). done by 2nd stage Contractor. C32/40 67% OPC+25%FA P 29-12450 5 PASSED

Crescent 1 - PC
94 KAIG3-RFI-CO-S-0486-00 (44,42,40,38,36,34 & 32) 23.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (44,42,40,38,36,34 & 32). C16/20 SRC P 29-12464 11

95 P 29-12467 11

96 P 29-12472 11

97 P 29-12474 11 PASSED

98 P 29-12477 11

99 P 29-12480 11

100 P 29-12481 4

Concrete pouring for post beam beside existing column/grade beam of management building (as per KAIG3-SD-MB-A-BW-1014-00) as per
101 KAIG3-RFI-MB-S-0463-00 Management Buiding 24.03.2020 C32/40 62% OPC+30%FA P 29-12499 6 PASSED
attached highlighted drawing; Mix Design C32/40 - (Moderate Exposed). Done by 2nd stage Contractor.

102 KAIG3-RFI-PT-S-0481-00 Toilet 1 24.03.2020 Concrete pouring of blinding concrete for Slab on Grade - Toilet-1 Mix Design-C 32/40 Severe Exposed, done by 2nd stage Contractor. C32/40 67% OPC+25%FA P 29-12508 8 PASSED

103 KAIG3-RFI-CO-S-0475-00 Crescent 1 & 2 24.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (46,48,50 & 52). C16/20 SRC P 29-12519 10
PASSED
104 P 29-12521 8

105 KAIG3-RFI-PT-S-0481-00 Toilet 1 25.03.2020 Concrete pouring of blinding concrete for Slab on Grade - Toilet-1 Mix Design-C 32/40 Severe Exposed, done by 2nd stage Contractor. C32/40 67% OPC+25%FA P 29-12530 9 PASSED

106 KAIG3-RFI-CO-S-0489-00 Crescent 1 25.03.2020 Inspection of Anti termite prior to concrete casting under pile cap PC (33,35,37,39,42 & 44). C16/20 SRC P 29-12541 7

107 P 29-12551 9

108 P 29-12555 9
PASSED
109 P 28-20184 9

110 P 28-20185 9

111 P 28-20189 5

112 KAIG3-RFI-TB-S-0491-00 Ticketing Booth 3 26.03.2020 Concrete pouring for Existing Foundation - Ticketing Booth 3; Mix Design - 32/40 Screed Concrete (Severe Exposed to Climate). C32/40 62% OPC+30%FA P 29-12574 3 PASSED

113 KAIG3-RFI-CO-S-0500-00 Crescent 1 26.03.2020 Inspection of Anti termite prior to concrete casting under pile cap PC (40,38,36 & 34). C16/20 SRC P 29-12561 9

114 P 29-12564 9

115 P 29-12566 9
PASSED
116 P 29-12568 9

117 P 29-12569 10

118 P 29-12576 9

kaig-qcals 4
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1272

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
119 KAIG3-RFI-CO-S-0490-00 LOCATION
Crescent 1 CASTING
28.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (33,35,37,39,42 & 44). C16/20 SRC No.
P 29-12579 10 )
(m³

120 P 28-20217 9
PASSED
121 P 28-20218 8

122 P 28-20215 9

Concrete Pouring for Post and Beam beside existing column Grade beam of Management building (as per KAIG3-SD-MB-A-BW-1014-00); and
123 KAIG3-RFI-MB-S-0495-00 Management Buiding 28.03.2020 C32/40 62% OPC+30%FA P 29-12590 6 PASSED
highlighted in attached drawing; Mix Design C32/40 - (Very Severe Expose).

124 KAIG3-RFI-TB-S-0502-00 Ticketing Booth 3 28.03.2020 Concrete Pouring for Kicker at Ticketing Booth 3. C32/40 62% OPC+30%FA P 29-12592 3 PASSED

125 KAIG3-RFI-PT-S-0493-00 Toilet 2 29.03.2020 Concrete pouring for Slab on Grade - Toilet-2 Mix Design-C 32/40 (Very Severe Exposed). C32/40 67% OPC+25%FA P 29-12600 10 PASSED

126 KAIG3-RFI-CO-S-0499-00 Crescent 2 29.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (180,178,176,174,172,170,168 & 186). C16/20 SRC P 29-12609 10

127 P 29-12613 9
PASSED
128 P 29-12615 9

129 P 29-12616 7

130 KAIG3-RFI-CO-S-0511-00 Crescent 2 30.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (174,172 & 170). C16/20 SRC P 29-12628 12

131 P 29-12628 12

132 P 29-12631 9 PASSED

133 P 29-12631 9

134 P 29-12640 6

135 KAIG3-RFI-PT-S-0493-00 Toilet 2 31.03.2020 Concrete pouring for Slab on Grade - Toilet-2 Mix Design-C 32/40 (Very Severe Exposed). C32/40 67% OPC+25%FA P 29-12659 9
PASSED
136 P 29-12670 2

Concrete Pouring for Post and Beam beside existing column Grade beam of Management building (as per KAIG3-SD-MB-A-BW-1014-00); and
137 KAIG3-RFI-MB-S-0509-00 Management Buiding 31.03.2020 C32/40 62% OPC+30%FA P 29-12664 5 PASSED
highlighted in attached drawing; Mix Design C32/40 - (Very Severe Expose).

138 KAIG3-RFI-CO-S-0490-00 Crescent 1 28.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (33,35,37,39,42 & 44). C16/20 SRC P 29-12579 10

139 P 28-20217 9
PASSED
140 P 28-20218 8

141 P 28-20215 9

kaig-qcals 5
RUN DATE: February 12, 2023

KING ABDULLAH INTERNATIONAL GARDENS PROJECT


TOTAL QUANTITY TRUCK LOAD (M³): 264

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS

1 KAIG3-RFI-CO-S-0516-00 Crescent 2 01.04.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (163,161,159,157,155,153,151,149,147 & 145). C16/20 SRC P 28-20263 9

2 P 28-20264 9

3 P 28-20270 9
PASSED
4 P 28-20272 9

5 P 28-20273 9

6 P 28-20274 9

7 KAIG3-RFI-TB-S-0503-00 Ticketing Booth 1 04.04.2020 Concrete pouring for Roof Slab of Ticketing Booth # 1; Mix Design - C32/40 Sceed Concrete (Severe Exposed to Climate). C32/40 62% OPC+30%FA P 29-12737 4 PASSED

8 KAIG3-RFI-CO-S-0519-00 Crescent 2 04.04.2020 Inspection of Concrete Casting SRC, C (16-20) at PC (143,141,139,137,135,133,131 & 129). C16/20 SRC P 28-20312 9

9 P 28-20313 9

PASSED

kaig-qcals 6
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 264

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
10 LOCATION CASTING No.
P 28-20314 10 ) PASSED
(m³

11 P 28-20315 10

12 P 28-20316 7

Concrete Pouring for Column - Corebel extension outer face for (column 75 to 89, except col. 81)as per attached SCR-BO-S-0010-00 Concrete
13 KAIG3-RFI-BO-S-0514-00 Boundary Wall 05.04.2020 C32/40 62% OPC+30%FA P 29-12754 2 PASSED
Mix Design C32/40 - (Very Severe).

14 KAIG3-RFI-CO-S-0529-00 Crescent 2 06.04.2020 Inspection of Concrete Casting SRC, C (16-20) at PC (153,161,165,166,168 & 177). C16/20 SRC P 28-20338 9

15 P 28-20339 9

16 P 28-20346 9
PASSED
17 P 28-20347 9

18 P 28-20349 9

19 P 29-12784 9

20 KAIG3-RFI-TB-S-0544-00 Ticket Booth 3 & 4 27.04.2020 Concrete pouring Existing wall - Ticketing Booth - 4 Mix Design 32/40 Screed Concrete (Severe Exposure 3 cu m.). P 29-12812 7
PASSED
21 P 29-12813 10

22 KAIG3-RFI-CO-S-0530-01 Crescent 2 28.04.2020 Inspection of Concrete Casting SRC, C (16-20) at PC (127,125,123,121,119,117,115 & 113). P 29-12817 9

23 P 29-12818 9

24 P 29-12819 9
PASSED
25 P 29-12820 9

26 P 29-12821 9

27 P 29-12823 9

28 KAIG3-RFI-PT-S-0556-00 Toilet 5 30.04.2020 Concrete Pouring of Blinding Concrete for Slab on Grade, Toilet 5 as per attached drawing, Mix Design - C 16/20 (SRC). P 29-12838 4 PASSED

29 KAIG3-RFI-CO-S-0548-00 Crescent 2 30.04.2020 Concreting SRC C16/20 under pile caps PC (151,149,145 & 143). P 29-12840 10

30 P 29-12842 10 PASSED

31 P 29-12847 10

kaig-qcals 7
RUN DATE: February 12, 2023

KING ABDULLAH INTERNATIONAL GARDENS PROJECT


TOTAL QUANTITY TRUCK LOAD (M³): 856

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
LOCATION DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS

1 KAIG3-RFI-TB-S-0557-00 Ticket Booth 3 02.05.2020 Concrete Pouring for Kicker at Ticketing Booth 4. C32/40 62% OPC+30%FA P 29-12857 4 PASSED

2 KAIG3-RFI-PT-S-0556-00 Public Toilet 5 04.05.2020 Concrete Pouring of Blinding Concrete for Slab on Grade, Toilet 5 as per attached drawing, Mix Design - C 16/20 (SRC). C16/20 SRC P 29-12897 4 PASSED

3 KAIG3-RFI-CO-S-0559-00 Crescent 2 04.05.2020 Inspection of Concrete casting SRC, C (16-20) under Pile Caps (141,139 & 135). C16/20 SRC P 29-12899 9

4 C16/20 SRC P 29-12906 9 PASSED

5 C16/20 SRC P 29-12911 9

6 KAIG3-RFI-CO-S-0568-00 Crescent 2 05.05.2020 Inspection of casting concrete SRC C (15-20) under pile caps (125,123,119,115 & 113). C16/20 SRC P 29-12932 10
PASSED
7 C16/20 SRC P 29-12936 10

8 KAIG3-RFI-PT-S-0564-00 Public Toilet 5 06.05.2020 Concrete Pouring and checking of level for Slab on Grade of Toilet 5; Mix Design C 32/40 OPC - (Very Severe Expose). C32/40 62% OPC+30%FA P 29-12949 10 PASSED

9 KAIG3-RFI-CO-S-0568-00 Crescent 2 06.05.2020 Inspection of casting concrete SRC C (15-20) under pile caps (125,123,119,115 & 113). C16/20 SRC P 29-12954 9
PASSED
10 C16/20 SRC P 29-12955 6

11 KAIG3-RFI-TT-S-0592-00 Site Tower 2 07.05.2020 Concreting of SOG for Tower 2. C16/20 SRC P 29-12962 5 PASSED

12 KAIG3-RFI-CO-S-0566-00 Crescent 2 07.05.2020 Inspection of casting concrete SRC C (15-20) under pile caps (179,175,173,171,169 & 167). C16/20 SRC P 29-12971 9

13 C16/20 SRC P 29-12974 9

14 C16/20 SRC P 29-12976 9

15 C16/20 SRC P 29-12991 9

16 C16/20 SRC P 29-12992 9 PASSED

17 C16/20 SRC P 29-12996 9

18 C16/20 SRC P 29-12997 9

19 C16/20 SRC P 29-12998 10

20 C16/20 SRC P 29-12999 9

21 KAIG3-RFI-CO-S-0582-00 Crescent 2 10.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (163,159,157 & 155). C16/20 SRC P 29-13011 9

22 C16/20 SRC P 29-13012 9

23 C16/20 SRC P 28-20467 9 PASSED

24 C16/20 SRC P 28-20468 10

25 C16/20 SRC P 28-20469 10

26 KAIG3-RFI-CO-S-0585-00 Crescent 1 11.05.2020 Inspection to check concreting SRC C(16-20) under shear Key PC (11,12,13,14,15,16 & 18). C16/20 SRC P 29-13033 9

27 C16/20 SRC P 29-13034 9 PASSED

28 C16/20 SRC P 29-13035 9

29 KAIG3-RFI-CO-S-0596-00 Crescent 12.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (126,130,134,137 & 147). C16/20 SRC P 28-20495 9

30 C16/20 SRC P 28-20498 9

31 C16/20 SRC P 28-20499 9 PASSED

32 C16/20 SRC P 28-20500 9

33 C16/20 SRC P 28-20503 6

kaig-qcals 8
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 856

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
34 KAIG3-RFI-PT-S-0570-00 LOCATION
Public Toilet 5 CASTING
13.05.2020 Concrete Pouring of Concrete and checking of level for Slab on Grade; Toilet 5 as per attached drawing; Mix Design - Severe C 32/40 (OPC). C32/40 62% OPC+30%FA No.
P 29-13046 10 ) PASSED
(m³

35 KAIG3-RFI-CO-S-0601-00 Crescent 13.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (13,14,16 & 18). C16/20 SRC P 29-13047 9

36 C16/20 SRC P 29-13048 9


PASSED
37 C16/20 SRC P 29-13049 9

38 C16/20 SRC P 29-13050 6

39 KAIG3-RFI-TB-S-0579-00 Ticket Booth 14.05.2020 Concrete Pouring for Slab of Ticketing Booth 3; Mix Design - 32/40 (Very Severe Exposed) C32/40 62% OPC+30%FA P 29-13061 3
PASSED
40 C32/40 62% OPC+30%FA P 29-13065 2

41 KAIG3-RFI-TT-S-0592-00 Site Tower 2 14.05.2020 Concreting of SOG for Tower 2. C32/40 62% OPC+30%FA P 28-20533 10 PASSED

42 KAIG3-RFI-CO-S-0604-00 Crescent 16.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (19,20,21,22,27,28,29 & 30). C16/20 SRC P 28-20537 9

43 C16/20 SRC P 28-20539 9

44 C16/20 SRC P 28-20540 9

45 C16/20 SRC P 28-20542 9

46 C16/20 SRC P 28-20543 9


PASSED
47 C16/20 SRC P 28-20544 9

48 C16/20 SRC P 28-20545 9

49 C16/20 SRC P 28-20546 9

50 C16/20 SRC P 28-20547 9

51 C16/20 SRC P 28-20548 9

52 KAIG3-RFI-CO-S-0611-00 Crescent 17.05.2020 Inspection to check concreting SRC C(16-20) for Shear Key PC (100,102,104,106,108,110,112,114,116,118 & 120). C16/20 SRC P 28-20556 10

53 C16/20 SRC P 28-20558 9

54 C16/20 SRC P 28-20559 9


PASSED
55 C16/20 SRC P 28-20560 9

56 C16/20 SRC P 28-20562 9

57 C16/20 SRC P 28-20563 9

58 KAIG3-RFI-PT-S-0607-00 Crescent 18.05.2020 Pouring of Blinding concrete (16/20) for ramp area at Toilet 1. C16/20 SRC P 28-20567 3 PASSED

59 KAIG3-RFI-CO-S-0624-00 Crescent 2 18.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (122,124,128,132,136,138,140 & 142). C16/20 SRC P 28-20572 9

60 C16/20 SRC P 28-20573 9

61 C16/20 SRC P 28-20574 9

62 C16/20 SRC P 28-20576 9

63 C16/20 SRC P 28-20577 9

64 C16/20 SRC P 28-20579 5

65 KAIG3-RFI-CO-S-0626-00 Crescent 2 19.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (108 & 110). C16/20 SRC P 28-20585 9

66 C16/20 SRC P 28-20586 9 PASSED

67 C16/20 SRC P 28-20587 9

68 C16/20 SRC P 28-20588 9

kaig-qcals 9
KING ABDULLAH INTERNATIONAL GARDENS PROJECT PASSED
TOTAL QUANTITY TRUCK LOAD (M³): 856

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
69 LOCATION CASTING C16/20 SRC No.
P 28-20590 9)
(m³

70 C16/20 SRC P 28-20591 9

71 C16/20 SRC P 28-20592 9

72 C16/20 SRC P 28-20593 9

73 C16/20 SRC P 28-20594 3

74 KAIG3-RFI-CO-S-0631-00 Crescent 1 20.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (19,20,21 & 22). C16/20 SRC P 28-20603 10

75 KAIG3-RFI-CO-S-0633-00 Crescent 2 20.05.2020 Inspection to check concreting SRC C(16-20) for Shear Key PC (148,150,162 & 164). C16/20 SRC P 28-20604 10
PASSED
76 C16/20 SRC P 28-20606 10

77 C16/20 SRC P 28-20607 10

78 KAIG3-RFI-TB-S-0634-00 Crescent 2 21.05.2020 Concreting of Wall for Ticket Booth 4. C16/20 SRC P 28-20618 8
PASSED
79 C16/20 SRC P 28-20622 10

80 KAIG3-RFI-CO-S-0644-00 Crescent 2 28.05.2020 Inspection to check Concreting SRC, C (16-20) under Pile Caps PC (108,110) Second Layer and (122,124,128 & 132). C16/20 SRC P 28-20630 9

81 C16/20 SRC P 28-20632 9

82 C16/20 SRC P 28-20633 9

83 C16/20 SRC P 28-20634 9


PASSED
84 C16/20 SRC P 28-20635 9

85 C16/20 SRC P 28-20636 9

86 C16/20 SRC P 28-20637 9

87 C16/20 SRC P 28-20638 5

88 KAIG3-RFI-TB-S-0640-00 Ticket Booth 1 28.05.2020 Concrete pouring for DOME - Ticketing booth 1 (C32/40) - Very Severe Exposed. C32/40 62% OPC+30%FA P 28-20631 7 PASSED

89 KAIG3-RFI-CO-S-0649-00 Crescent 30.05.2020 Inspection to check concreting SRC C(16/20) for Shear Key of Retaining Wall from Axis AO to AV. C16/20 SRC P 28-20642 9

90 KAIG3-RFI-CO-S-0644-00 Inspection to check Concreting SRC, C (16-20) under Pile Caps PC (108,110) Second Layer and (122,124,128 & 132). C16/20 SRC P 28-20643 9

91 C16/20 SRC P 28-20644 9 PASSED

92 C16/20 SRC P 28-20648 9

93 C16/20 SRC P 28-20649 9

94 KAIG3-RFI-CO-S-0644-00 31.05.2020 C16/20 SRC P 29-13113 9 PASSED

95 KAIG3-RFI-CO-S-0658-00 Crescent 31.05.2020 Inspection to check Concreting SRC, C (16-20) under Pile Caps PC (129,131,133,136 & 138). C16/20 SRC P 29-13117 9

96 C16/20 SRC P 29-13118 9

97 C16/20 SRC P 29-13120 9


PASSED
98 C16/20 SRC P 29-13121 9

99 C16/20 SRC P 29-13122 9

100 C16/20 SRC P 29-13123 7

101 KAIG3-RFI-TB-S-0653-00 Ticketing Booth 5 31.05.2020 Concrete Pouring for Kicker at Ticketing Booth 5. C32/40 62% OPC+30%FA P 28-20651 3 PASSED

kaig-qcals 10
RUN DATE: February 12, 2023
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS

1 KAIG3-RFI-CO-S-0664-00 Crescent 6/1/20 Inspection to check Concreting SRC,C(16-20) under PC (140,142,148,150)(152,154) First layer. C16/20 SRC P 28-20654 9

2 P 28-20655 9

3 P 28-20656 9

4 P 28-20657 9

5 P 28-20658 9

6 P 28-20659 9 PASSED

7 P 28-20660 9

8 P 28-20661 9

9 P 28-20662 9

10 P 28-20666 8

11 P 28-20668 10

Inspection to check Concreting SRC,C(16-20)under strip footings between PC(77-79)to PC(79-81)from axis (01/AM-01/AN) and
12 KAIG3-RFI-CO-S-0672-00 Crescent 1 6/2/20 C16/20 SRC P 28-20670 9
(01/AN-01/AO) outer line.

13 P 28-20672 9

14 P 28-20673 9

15 P 28-20674 9

16 P 28-20675 9

17 P 28-20679 9

18 P 28-20680 9

19 P 28-20682 9

20 P 28-20683 9

21 P 28-20684 9

22 P 28-20685 9

23 P 28-20686 9

24 P 28-20687 9 PASSED

25 P 28-20689 9

26 P 28-20690 9

27 P 28-20693 9

28 P 28-20695 9

29 P 28-20696 9

30 P 28-20697 9

31 P 28-20698 9

32 P 28-20700 9

33 P 28-20701 9

kaig-qcals 11
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
34 LOCATION CASTING No.
P 28-20702 9)
(m³

35 P 28-20703 9

36 P 28-20704 9

37 KAIG3-RFI-TT-SU-0560-00 Site Tower 3 6/3/20 Level of concrete fro Slab on Grade at Site Tower 3. C32/40 62% OPC+30%FA P 28-20719 10
PASSED
38 P 28-20745 10

39 KAIG3-RFI-CO-S-0670-00 Crescent 1 & 2 6/4/20 Inspection to check Concreting SRC,C(16-20) under PC (156,158) & (24,25) First layer and PC(27). C16/20 SRC P 28-20739 9

40 P 28-20740 9

41 P 28-20741 9

42 P 28-20742 9

43 P 28-20743 9

44 P 28-20744 9

45 P 28-20746 9

46 P 28-20747 9

47 P 28-20748 9

48 P 28-20749 9

49 P 28-20750 9 PASSED

50 P 28-20751 9

51 P 28-20752 9

52 P 28-20753 9

53 P 28-20756 9

54 P 28-20757 9

55 P 28-20758 9

56 P 28-20759 9

57 P 28-20760 9

58 P 28-20761 9

59 P 28-20764 6

60 KAIG3-RFI-CO-S-0691-00 Crescent 1 & 2 6/7/20 Inspection to check Concreting SRC,C(16-20) under pile caps (162,164)Crescent -2 & PC(25) Crecent-1. Third layer. C16/20 SRC P 28-20801 9

61 P 28-20802 9

62 P 28-20803 9
PASSED
63 P 28-20810 9

64 P 28-20814 9

65 P 28-20815 9

66 KAIG3-RFI-CO-S-0708-00 Crescent 1 6/8/20 Inspection to check Concreting SRC,C(16-20) under retaining wall footings from axis AV to axis AO. C16/20 SRC P 28-20847 9

67 P 28-20851 9

68 P 28-20853 9
PASSED

kaig-qcals 12
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
69 LOCATION CASTING No.
P 28-20856 9)
(m³

70 P 28-20859 9

71 P 28-20861 5

72 KAIG3-RFI-CO-S-0708-00 Ticket Booth 4 6/8/20 Inspection to check Concreting SRC,C(16-20) under retaining wall footings from axis AV to axis AO. C32/40 62% OPC+30%FA P 28-20862 3 PASSED

73 KAIG3-RFI-PT-S-0721-00 Public Toilet 4 6/9/20 Blinding Concrete for Toilet 4. C16/20 SRC P 28-20869 10
PASSED
74 P 2820887 9

KAIG3-+C361:K370RFI-TB-S-
75 Ticket Booth 6 6/10/20 Concrete Pouring for Footing at Ticket Booth 6. C32/40 62% OPC+30%FA P 28-20899 7
0730-00

76 P 28-20906 8

77 KAIG3-RFI-CO-S-0720-00 Crescent 2 6/10/20 Inspection to check Concreting SRC,C(16-20) under pile caps (152 third layer)&(158 second layer). C16/20 SRC P 28-20896 9

78 P 28-20897 9

79 P 28-20898 9

80 P 28-20900 9

81 P 28-20901 9

82 P 28-20902 9

83 P 28-20903 9
PASSED
84 P 28-20904 9

85 P 28-20905 9

86 P 28-20907 9

87 P 28-20908 9

88 P 28-20909 9

89 P 28-20910 9

90 P 28-20911 9

91 P 28-20912 11

92 P 28-20913 9

93 KAIG3-RFI-TT-S-0713-00 Site Tower 2 6/11/20 Concrete Pouring C (32/40) Severe Exposed for Ramp SOG at Tower 2. C32/40 62% OPC+30%FA P 28-20928 10 PASSED

KAIG3-RFI-CO-S-0713-00, KAIG3-
Concrete Pouring C (32/40) Severe Exposed for Ramp SOG at Tower 2., Inspection to check Concreting SRC,C(16-20) under pile cap PC(24)
94 RFI-CO-S-0726-00, KAIG3-RFI- Cresce+D380:I406nt 6/14/20 C16/20 SRC P 28-20976 9
second layer., Inspection to check Concreting SRC,C(16-20) under pile cap PC(23) First layer.
CO-S-0729-00

95 P 28-20977 9

96 P 28-20979 9

97 P 28-20980 9

98 P 28-20982 9

99 P 28-20983 9

100 P 28-20984 9

101 P 28-20985 9
PASSED

102 P 28-20986 9

103 P 28-20987 9

kaig-qcals 13
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): PASSED
1534

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
104 LOCATION CASTING No.
P 28-20988 9)
(m³

105 P 28-20989 9

106 P 28-20992 9

107 P 28-20993 9

108 P 28-20994 9

109 P 28-21000 9

110 KAIG3-RFI-TB-S-0734-00 Ticket Booth 6 6/14/20 Concrete Pouring of Kicker for Ticket Booth 6. C32/40 62% OPC+30%FA P 28-21001 3 PASSED

111 KAIG3-RFI-TT-S-0736-00 Site Tower 5 6/15/20 Concrete Pouring of SOG at Tower 5. C32/40 62% OPC+30%FA P 28-21013 10 PASSED

112 KAIG3-RFI-BO-S-0725-00 Boundary Wall 6/16/20 Closing of Shutter and Casting of Concrete for Kicker of Boundary Wall at Span 37. C32/40 62% OPC+30%FA P 28-21052 10 PASSED

113 KAIG3-RFI-CO-S-0746-00 Crescent 1 & 2 6/16/20 Inspection to check Concreting SRC,C(16-20) under pile cap PC(24-3rd layer,26 -2nd layer & 160-2nd layer). C16/20 SRC P 28-21078 9

114 P 28-21082 9

115 P 28-21083 9 PASSED

116 P 28-21084 9

117 P 28-21085 5

118 KAIG3-RFI-CO-S-0746-00 Crescent 1 & 2 6/17/20 Inspection to check Concreting SRC,C(16-20) under pile cap PC(24-3rd layer,26 -2nd layer & 160-2nd layer). C16/20 SRC P 28-21086 9

119 P 28-21087 9

120 P 28-21091 9
PASSED
121 P 28-21094 9

122 P 28-21096 8

123 P 28-21097 6

124 KAIG3-RFI-TB-S-0743-00 Ticket Booth 3 6/18/20 Concrete Pouring for Dome at Ticket booth No. 3. C16/20 SRC P 28-21137 9

125 P 28-21147 9
PASSED
126 P 28-21149 4

127 P 28-21149 9

128 KAIG3-RFI-MB-S-0756-00 Management Buiding 6/18/20 Concrete Pouring of Blinding for SOG (Grid 3-6 / A-E) of Management Building. C16/20 SRC P 28-21157 9
PASSED
129 P 28-21160 9

130 KAIG3-RFI-CO-S-0758-00 Crescent 1 & 2 6/20/20 Inspection to check Concreting SRC,C(16-20) under pile cap PC(23-2nd layer & 160-3rd layer). C16/20 SRC P 28-21178 11

131 P 28-21179 11

132 P 28-21181 10

133 P 28-21182 9
PASSED
134 P 28-21186 11

135 P 28-21187 11

136 P 28-21190 9

137 P 28-21193 6

138 KAIG3-RFI-BO-S-0759-00 Boundary Wall 6/21/20 Concrete Pouring for Kicker at Booundary Wall Span 38. C32/40 62% OPC+30%FA P 28-21221 6 PASSED

kaig-qcals 14
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
139 KAIG3-RFI-MB-S-0764-00 LOCATION
Management Buiding CASTING
6/21/20 Concrete Pouring of Blinding for Grade Beam (Grid 3-6 / A-E) of Management Building. C16/20 SRC No.
P 28-21225 6) PASSED
(m³

140 KAIG3-RFI-BO-S-0762-00 Boundary Wall 6/22/20 Concrete Pouring for wall at Boundary wall Span 37. C32/40 62% OPC+30%FA P 28-21273 9

141 KAIG3-RFI-PT-S-0766-00 Public Toilet 4 6/22/20 Pouring of Concrete for SOG at Toilet 4. C32/40 62% OPC+30%FA P 28-21281 9
PASSED
142 6/23/20 P 28-21297 9

143 KAIG3-RFI-CO-S-0771-00 Cresent 1 6/23/20 Inspection to check concreting SRC C (16-20) under pile cap PC (23) Third Layer. C16/20 SRC P 28-21298 9

144 P 28-21299 9
PASSED
145 P 28-21300 9

146 P 28-21301 9

147 KAIG3-RFI-CO-S-0758-00 Crescent 1 & 2 6/20/20 Inspection to check Concreting SRC,C(16-20) under pile cap PC(23-2nd layer & 160-3rd layer). C16/20 SRC P 28-21302 8

148 P 28-21303 11 PASSED

149 P 28-21304 11

150 KAIG3-RFI-TB-S-0767-00 Ticket Booth 6 6/24/20 Concrete Pouring of Wall for Ticket Booth 6. C32/40 62% OPC+30%FA P 28-21340 7
PASSED
151 P 28-21342 8

152 KAIG3-RFI-CO-S-0769-00 Crescent 2 6/24/20 Inspection to check concreting SRC C (16-20) under Strip Footing between PC (97-99). C16/20 SRC P 28-21346 9

153 P 28-21348 11

154 P 28-21349 9 PASSED

155 P 28-21350 9

156 P 28-21352 5

157 KAIG3-RFI-PT-S-0777-00 Public Toilet 2 6/24/20 Pouring of Concrete for Ramp at Toilet 2. C16/20 SRC P 28-21347 3

158 P 28-21368 9

159 P 28-21369 9
PASSED
160 P 28-21373 8

161 P 28-21375 9

162 P 28-21378 10

163 KAIG3-RFI-BO-S-0776-00 Boundary Wall 6/25/20 Concrete Pouring for Boundary Wall Footing at Span 19,20 & 21. C32/40 62% OPC+30%FA P 28-21386 10

164 P 28-21392 10 PASSED

165 KAIG3-RFI-BO-S-0781-00 Boundary Wall 6/25/20 Concrete Pouring of Wall at Span 38 for Boundary Wall. P 28-21400 12

166 KAIG3-RFI-CO-S-0783-00 Crescent 1 6/27/20 Inspection to Check Concreting SRC, C (16-20) under Pile Cap PC (23) 4th Layer. C16/20 SRC P 28-21410 9

167 KAIG3-RFI-CO-S-0774-00 Inspection to check concreting SRC C (16-20) under pile cap PC (32). P 28-21412 9
PASSED
168 P 28-21415 9

169 P 28-21420 9

170 KAIG3-RFI-TB-S-0791-00 Ticket Booth 5 6/27/20 Concrete Pouring of Slab for Ticket Booth 5. C32/40 62% OPC+30%FA P 28-21418 10
PASSED
171 KAIG3-RFI-TB-S-0790-00 Ticket Booth 7 6/27/20 Concreting for Kicker at Ticket Booth 7. P 28-21422 4

172 KAIG3-RFI-BO-S-0797-00 Boundary Wall 6/28/20 Concrete Pouring for Boundary Wall Footing at Span 21. C32/40 62% OPC+30%FA P 28-21456 6 PASSED

173 KAIG3-RFI-TB-S-0790-00 Ticket Booth 7 6/29/20 Concreting for Kicker at Ticket Booth 7. C32/40 62% OPC+30%FA P 28-21499 3 PASSED

kaig-qcals 15
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
174 KAIG3-RFI-MB-S-0805-00 LOCATION
Management Buiding CASTING
6/30/20 Chipping of loose and damaged concrete at Footing Grid 18/F at Management Building prior to start repairing ( done by 2nd stage contractor). C16/20 SRC No.
P 28-21513 10 )
(m³
PASSED
175 P 28-21518 10

kaig-qcals 16
RUN DATE: February 12, 2023
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS

1 KAIG3-RFI-PT-S-0804-00 Public Toilet 3 7/1/20 Concrete Pouring for blinding at SOG (Toilet 3) except EE room. C16/20 SRC P 28-21549 10 PASSED

2 KAIG3-RFI-BO-S-0808-00 Boundary Wall 7/4/20 Concrete Pouring for Kicker of Wall in Boundary Wall Span 26, 27 & 28. C32/40 62% OPC+30%FA P 28-21648 9 PASSED

3 KAIG3-RFI-BO-S-0840-00 Boundary Wall 7/4/20 Concrete Pouring for Wall Kicker at span 23,24 & 25. C32/40 62% OPC+30%FA P 28-21650 9 PASSED

4 KAIG3-RFI-BO-S-0842-00 Boundary Wall 7/5/20 Concrete Pouring for Wall at span 36 as per attached drawing. C32/40 62% OPC+30%FA P 28-21691 10 PASSED

5 KAIG3-RFI-BO-S-0822-00 Boundary Wall 7/5/20 Concrete Pouring for Kicker and Wall at Span 33 of Boundary Wall. C32/40 62% OPC+30%FA P 28-21694 11

6 KAIG3-RFI-BO-S-0822-00 Boundary Wall 7/6/20 Concrete Pouring for Kicker and Wall at Span 33 of Boundary Wall. C16/20 SRC P 28-21719 10 PASSED

7 C16/20 SRC P 28-21721 10

8 KAIG3-RFI-CO-S-0824-00 Crescent 2 7/6/20 Inspection to check concreting SRC, C (16-20) under Pile Caps PC 15 & 17 1st layer 144 1st layer. C16/20 SRC P 28-21729 9

9 C16/20 SRC P 28-21733 9

10 C16/20 SRC P 28-21734 9


PASSED
11 C16/20 SRC P 28-21735 5

12 C16/20 SRC P 28-21738 10

13 C16/20 SRC P 28-21740 10

14 KAIG3-RFI-CO-S-0826-00 Crescent 2 7/7/20 Inspection to check Concreting SRC, C (16-20) under Strip Footing between PC (99-101). C16/20 SRC P 28-21771 10

15 C16/20 SRC P 28-21774 10


PASSED
16 C16/20 SRC P 28-21781 9

17 C16/20 SRC P 28-21782 6

kaig-qcals 17
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
18 KAIG3-RFI-TB-S-0847-00 LOCATION
Ticketing Booth 7 CASTING
7/9/20 Concrete Pouring of Wall at Ticketing Booth 7. C32/40 62% OPC+30%FA No.
P 28-21825 7)
(m³
PASSED
19 C32/40 62% OPC+30%FA P 28-21830 8

20 KAIG3-RFI-BO-S-0841-00 Boundary Wall 7/9/20 Concrete Pouring for Kicker at span 35 as per attached drawing. C32/40 62% OPC+30%FA P 28-21835 10 PASSED

21 KAIG3-RFI-BO-S-0842-00 Boundary Wall 7/9/20 Concrete Pouring for Wall at span 36 as per attached drawing. C32/40 67%OPC+25%FA P 28-21845 10 PASSED

Management
22 KAIG3-RFI-MB-S-0845-00 7/9/20 Concrete Pouring for Blinding Grade Beam SOG for the highlighted drawing (Grid 6 to 10/A to E). C32/40 62% OPC+30%FA P 28-21847 6 PASSED
Building

23 KAIG3-RFI-CO-S-0848-00 Crescent 1 & 2 7/11/20 Inspection to check Concreting SRC, C (16-20) under pile cap PC (144 & 17) second layer. C16/20 SRC P 28-21865 9

24 C16/20 SRC P 28-21869 11

25 C16/20 SRC P 28-21871 9

26 C16/20 SRC P 28-21876 9

27 C16/20 SRC P 28-21877 12 PASSED

28 C16/20 SRC P 28-21879 9

29 C16/20 SRC P 28-21885 9

30 C16/20 SRC P 28-21891 9

31 C16/20 SRC P 28-2194 4

32 KAIG3-RFI-TB-S-0914-00 Ticket Booth 7/9/20 Concrete Pouring for Blinding of footing of Canopy at old Ticket Booth (7 footing). C16/20 SRC P 28-21833 9.5 PASSED

33 KAIG3-RFI-BO-S-0868-00 Boundary Wall 7/13/20 Concrete pouring for Kicker inside at Span 34 as per attached drawing C (32/40) very severe. C32/40 62% OPC+30%FA P 28-21978 12 PASSED

34 KAIG3-RFI-BO-S-0867-00 Boundary Wall 7/13/20 Concrete Pouring for Wall at Span 35 as per attached drawing C (32/40 severe). C32/40 67%OPC+25%FA P 28-21987 10 PASSED

35 KAIG3-RFI-TB-S-0862-00 Ticket Booth 6 7/13/20 Concrete Pouring of Slab at Ticket Booth 6. C32/40 62% OPC+30%FA P 28-21998 3 PASSED

Management
36 KAIG3-RFI-MB-S-0869-00 7/13/20 Inspection for Formwork for Grade Beam at Management Building. C32/40 62% OPC+30%FA P 28-21999 8 PASSED
Building

37 KAIG3-RFI-CO-S-0854-00 Crescent 1 7/14/20 Inspection to check Concreting SRC, C (16-20) under pile cap PC (31). C16/20 SRC P 28-22040 9

38 C16/20 SRC P 28-22046 8 PASSED

39 C16/20 SRC P 28-22047 5

KAIG3-RFI-TB-S-0899-00 /
40 Ticket Booth 7/15/20 Inspection of Concrete Pouring for Blinding (16-20) of Canopy Footing (5 Footings). C16/20 SRC P 28-22107 6 PASSED
KAIG3-RFI-TB-S-0901-00

41 KAIG3-RFI-BO-S-0864-00 Boundary Wall 7/15/20 Concrete Pouring for Column (69,70,71,72 & 73). C32/40 67%OPC+25%FA P 28-22102 6 PASSED

42 KAIG3-RFI-CO-S-0891-00 Crescent 7/15/20 Inspection to check concreting SRC, C (16-20) under Pile Cap (144-17) Third Layer. C16/20 SRC P 28-22079 9

43 C16/20 SRC P 28-22080 9


PASSED
44 C16/20 SRC P 28-22087 12

45 C16/20 SRC P 28-22091 10

Inspection to check concrete (C-32/40) Very Severe) of Retaining Wall Footing between Axis AV) and Axis (AT) and between (AR) and (AP) as
46 KAIG3-RFI-CO-S-0894-00 Crescent 7/15/20 C32/40 62% OPC+30%FA P 28-22103 9
highlighted.

47 C32/40 62% OPC+30%FA P 28-22104 9

48 C32/40 62% OPC+30%FA P 28-22105 9

49 C32/40 62% OPC+30%FA P 28-22106 9 PASSED

50 C32/40 62% OPC+30%FA P 28-22108 9

51 C32/40 62% OPC+30%FA P 28-22109 9

52 C32/40 62% OPC+30%FA P 28-22110 5

kaig-qcals 18
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
53 KAIG3-RFI-BO-S-0898-00 LOCATION
Boundary Wall CASTING
7/16/20 Concrete Pouring for Wall Span 34, Kicker inside Span 33 & Kicker outside Span 32 as per attached drawing. C32/40 62% OPC+30%FA No.
P 28-22124 10 )
(m³

54 C32/40 62% OPC+30%FA P 28-22129 8 PASSED

55 7/16/20 C32/40 67%OPC+25%FA P 28-22133 9

56 KAIG3-RFI-BO-S-0904-00 Boundary Wall 7/16/20 Concrete Pouring for Kicker at Span 19 & 20 (outside level) as per attached drawing. C32/40 62% OPC+30%FA P 28-22135 7 PASSED

57 KAIG3-RFI-CO-S-0928-00 Crescent 7/18/20 Inspection to check concrete (c-32/40 very severe) of retaining wall footing between axis (AT) and axis (AR) as highlighted. C32/40 62% OPC+30%FA P 28-22166 11

58 C32/40 62% OPC+30%FA P 28-22167 9

59 C32/40 62% OPC+30%FA P 28-22168 9

60 C32/40 62% OPC+30%FA P 28-22171 9


PASSED
61 C32/40 62% OPC+30%FA P 28-22172 9

62 C32/40 62% OPC+30%FA P 28-22175 9

63 C32/40 62% OPC+30%FA P 28-22177 6

64 C32/40 62% OPC+30%FA P 28-22179 2

65 KAIG3-RFI-CO-S-0928-00 Crescent 7/19/20 Inspection to check concrete (c-32/40 very severe) of retaining wall footing between axis (AT) and axis (AR) as highlighted. C32/40 62% OPC+30%FA P 28-22199 9

66 C32/40 62% OPC+30%FA P 28-22200 9

67 C32/40 62% OPC+30%FA P 28-22201 9 PASSED

68 C32/40 62% OPC+30%FA P 28-22206 11

69 C32/40 62% OPC+30%FA P 28-22208 7

70 KAIG3-RFI-BO-S-0930-00 Boundary Wall 7/20/20 Concrete Pouring of Wall at Span 33 and the Kicker inside Span 32 and Kicker outside Span 31. C16/20 SRC P 28-22228 9

71 C16/20 SRC P 28-22231 9 PASSED

72 C16/20 SRC P 28-22234 8

73 KAIG3-RFI-BO-S-0929-00 Boundary Wall 7/20/20 Concrete Pouring of Columns 37 & 38 from Top of Wall up to Top Level of Columns. C32/40 62% OPC+30%FA P 28-22239 7 PASSED

74 KAIG3-RFI-BO-S-0930-00 Boundary Wall 7/20/20 Concrete Pouring of Wall at Span 33 and the Kicker inside Span 32 and Kicker outside Span 31. C32/40 62% OPC+30%FA P 28-22239 7

75 C32/40 62% OPC+30%FA P 28-22246 12 PASSED

76 C32/40 62% OPC+30%FA P 28-22242 9

77 KAIG3-RFI-BO-S-0929-00 Boundary Wall 7/20/20 Concrete Pouring of Columns 37 & 38 from Top of Wall up to Top Level of Columns. C32/40 67%OPC+25%FA P 28-22252 9
PASSED
78 C32/40 67%OPC+25%FA P 28-22253 3

Management
79 KAIG3-RFI-MB-S-0932-00 7/21/20 Concrete Pouring of Blinding Concrete under Grade Beam GL 6-9/A; GL 9-10/B. C16/20 SRC P 28-22256 9
Building

80 C16/20 SRC P 28-22257 9

81 C16/20 SRC P 28-22258 9

82 C16/20 SRC P 28-22259 9

83 C16/20 SRC P 28-22260 9

84 C16/20 SRC P 28-22261 9


PASSED
85 C16/20 SRC P 28-22263 9

86 C16/20 SRC P 28-22264 9

87 C16/20 SRC P 28-22265 9

88 C16/20 SRC P 28-22267 9

89 C16/20 SRC P 28-22270 9

90 C16/20 SRC P 28-22274 9

kaig-qcals 19
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
91 KAIG3-RFI-SW-SU-0912-00 LOCATION
Boundary Wall CASTING
7/21/20 Concreting of Boundary Wall Span 23, 24 & 25. C32/40 67%OPC+25%FA No.
P 28-22262 9)
(m³

92 C32/40 67%OPC+25%FA P 28-22266 9 PASSED

93 C32/40 67%OPC+25%FA P 28-22268 12

94 KAIG3-RFI-TB-S-0914-00 Ticket Booth 7/21/20 Concrete Pouring for Blinding of footing of Canopy at old Ticket Booth (7 footing). C16/20 SRC P 28-22272 9
PASSED
95 C16/20 SRC P 28-22275 10

96 KAIG3-RFI-CO-S-0928-00 Crescent 7/22/20 Inspection to check concrete (c-32/40 very severe) of retaining wall footing between axis (AT) and axis (AR) as highlighted. C32/40 62% OPC+30%FA P 28-22296 9

97 C32/40 62% OPC+30%FA P 28-22297 9

98 C32/40 62% OPC+30%FA P 28-22298 9

99 C32/40 62% OPC+30%FA P 28-22299 9 PASSED

100 C32/40 62% OPC+30%FA P 28-22300 9

101 C32/40 62% OPC+30%FA P 28-22302 9

102 C32/40 62% OPC+30%FA P 28-22305 6

103 KAIG3-RFI-TB-S-0947-00 Ticket Booth 7/22/20 Concrete Pouring of Doom at Ticket Booth 4. C32/40 62% OPC+30%FA P 28-22310 10

104 C32/40 62% OPC+30%FA P 28-22313 10 PASSED

105 C32/40 62% OPC+30%FA P 28-22316 10

106 KAIG3-RFI-BO-S-0925-00 Boundary Wall 7/23/20 Inspection of steel reinforcement for wall and kicker of boundary wall span 31. C32/40 62% OPC+30%FA P 28-22350 10 PASSED

Management
107 KAIG3-RFI-MB-S-0951-00 7/23/20 Concrete Pouring for Slab on Grade at GL 3-6/A-E. C32/40 62% OPC+30%FA P 28-22331 9
Building

108 C32/40 62% OPC+30%FA P 28-22332 9

109 C32/40 62% OPC+30%FA P 28-22333 9


PASSED
110 C32/40 62% OPC+30%FA P 28-22336 9

111 C32/40 62% OPC+30%FA P 28-22339 9

112 C32/40 62% OPC+30%FA P 28-22341 7

113 KAIG3-RFI-BO-S-0898-00 Boundary Wall 7/23/20 Concrete Pouring for Wall Span 34, Kicker inside Span 33 & Kicker outside Span 32 as per attached drawing. C32/40 67%OPC+25%FA P 28-22355 9 PASSED

114 KAIG3-RFI-BO-S-0959-00 Boundary Wall 7/25/20 Concrete Pouring for 5 footings Canopy. C32/40 62% OPC+30%FA P 28-22401 6 PASSED

115 KAIG3-RFI-CO-S-0982-00 Crescent 7/25/20 Inspection to check mass Concreting SRC, C (16-20) 45 cm from the wall footing foundation width (+ or - 60cm). C16/20 SRC P 28-22376 9

116 C16/20 SRC P 28-22377 9

117 C16/20 SRC P 28-22379 9

118 C16/20 SRC P 28-22381 11

119 C16/20 SRC P 28-22384 10


PASSED
120 C16/20 SRC P 28-22385 9

121 C16/20 SRC P 28-22388 10

122 C16/20 SRC P 28-22389 12

123 C16/20 SRC P 28-22391 9

124 C16/20 SRC P 28-22392 10

125 KAIG3-RFI-CO-S-0933-00 Crescent 7/26/20 Installation of Protection for Waterproofing for PC (97,98,99,100,101 & 103). C32/40 62% OPC+30%FA P 28-22440 4 PASSED

126 KAIG3-RFI-CO-S-0977-00 Crescent 7/26/20 Inspection to check concrete (C 32-40 very severe) of retaining wall footing between axis (AT) and axis (AR) as highlighted (part 2). C32/40 62% OPC+30%FA P 28-22420 9

127 C32/40 62% OPC+30%FA P 28-22421 9

128 C32/40 62% OPC+30%FA P 28-22423 9

129 C32/40 62% OPC+30%FA P 28-22427 9


PASSED
kaig-qcals 20
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5

CONCRETE POURING LOG AND CUBE REGISTER


Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
130 LOCATION CASTING C32/40 62% OPC+30%FA No.
P 28-22430 9)
(m³

131 C32/40 62% OPC+30%FA P 28-22431 9

132 C32/40 62% OPC+30%FA P 28-22433 9

133 C32/40 62% OPC+30%FA P 28-22434 9

Management
134 KAIG3-RFI-MB-S-0979-00 7/27/20 Concrete Pouring for Blinding for SOG and Grade Beam at Management Building Grid 1-2 / I-R. C16/20 SRC P 28-22474 8
Building
PASSED
135 C16/20 SRC P 28-22475 7

136 KAIG3-RFI-TB-S-0988-00 Ticket Booth Canopy 7/27/20 Inspection prior to Pour Blinding Concrete for footings 2 no. Grid 2-A, 1-A @Ticket Booth Canopy. C32/40 62% OPC+30%FA P 28-22479 10
PASSED
137 C32/40 62% OPC+30%FA P 28-22480 5

138 KAIG3-RFI-TB-S-0989-00 Ticket Booth Canopy 7/27/20 Inspection prior to Pour Blinding Concrete for footings 2 no. Grid 2-A, 1-A @Ticket Booth Canopy. C16/20 SRC P 28-22481 10
PASSED
139 C16/20 SRC P 28-22482 6

140 KAIG3-RFI-CO-S-1004-00 Crescent 2 7/29/20 Inspection to check concrete OPC (C-32-40 very severe) for PC (99 & 101). C32/40 62% OPC+30%FA P 28-22543 9

141 C32/40 62% OPC+30%FA P 28-22545 9


PASSED
142 C32/40 62% OPC+30%FA P 28-22546 9

143 C32/40 62% OPC+30%FA P 28-22553 6

144 KAIG3-RFI-CO-S-0911-00 Crescent 7/29/20 Installation of protection board for Waterproofing at PC (102 & 104). C32/40 62% OPC+30%FA P 28-22538 3 PASSED

145 KAIG3-RFI-BO-S-1009-00 Boundary Wall 7/29/20 Inspection prior to concrete pouring for Wall at Span 26, 27 & 28 as per attached drawing. C32/40 67%OPC+25%FA P 28-22544 10
PASSED
146 C32/40 67%OPC+25%FA P 28-22549 12

147 KAIG3-RFI-TB-S-1006-00 Ticket Booth Canopy 7/29/20 Inspection prior to concrete pouring for 4 footings at Grids (A/5, 6, 7 & 8) for Ticket Booth Canopy as highlighted in attached drawing. C32/40 62% OPC+30%FA P 25-22551 3 PASSED

148 KAIG3-RFI-BO-S-0990-00 Boundary Wall 7/29/20 Inspection prior to Pour Columns concrete 3 no. (C34, C35 & C36) from T.O.W. to T.O.C. in Boundary Wall. C32/40 67%OPC+25%FA P 28-22557 7.5
PASSED
148 C32/40 67%OPC+25%FA P 28-22559 7.5

kaig-qcals 21
RUN DATE: February 12, 2023
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS

1 KAIG3-RFI-BO-S-1009-00 Boundary Wall 8/3/20 Inspection prior to concrete pouring for Wall at Span 26, 27 & 28 as per attached drawing. C32/40 67%OPC+25%FA P 28-22586 7

2 C32/40 67%OPC+25%FA P 28-22584 12 PASSED

3 C32/40 67%OPC+25%FA P 28-22583 9

4 KAIG3-RFI-TB-S-1006-00 Ticket Booth Canopy 8/3/20 Inspection prior to concrete pouring for 4 footings at Grids (A/5, 6, 7 & 8) for Ticket Booth Canopy as highlighted in attached drawing. C32/40 62% OPC+30%FA P 28-22595 7.5

5 C32/40 62% OPC+30%FA P 28-22594 7.5 PASSED

6 C32/40 62% OPC+30%FA P 28-22592 10

7 KAIG3-RFI-CO-S-0996-00 Crescent 2 8/3/20 Inspection to check concreting SRC, C (16-20) under Pile Cap (146 1st layer). C16/20 SRC P 28-22603 10

8 C16/20 SRC P 28-22600 10 PASSED

9 C16/20 SRC P 28-22598 10

10 KAIG3-RFI-CO-S-0996-01 Crescent 2 8/4/20 Inspection to check concreting SRC, C (16-20) under Pile Cap (146 1st layer). C16/20 SRC P 28-22636 10

11 C16/20 SRC P 28-22635 10


PASSED
P 28-22639 5

12 C16/20 SRC P 28-22633 10

13 KAIG3-RFI-MB-S-1001-00 Management Building 8/5/20 Concrete pouring for the Slab on Grade at Grid 12 to 18 / A to F as highlighted in attached drawing at Management Building. C32/40 62% OPC+30%FA P 28-22667 9

14 C32/40 62% OPC+30%FA P 28-22665 9


PASSED
15 C32/40 62% OPC+30%FA P 28-22662 10

16 C32/40 62% OPC+30%FA P 28-22660 12

kaig-qcals 22
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
17 KAIG3-RFI-BO-S-1027-00 LOCATION
Boundary Wall CASTING
8/5/20 Concrete Pouring for Kicker innerface @ Span 29 & 30 As per Attached Drawings.8/5/2020 C32/40 62% OPC+30%FA No.
P 28-22683 7)
(m³

18 C32/40 62% OPC+30%FA P 28-22670 6 PASSED

19 C32/40 62% OPC+30%FA P 28-22669 4

20 KAIG3-RFI-CO-S-1045-00 Crescent 2 8/5/20 Inspection to check concreting C (32-40)(62% OPC, 32%FA, 8%MC) very severe expose for PC (99 & 102). C32/40 62% OPC+30%FA P 28-22676 9
PASSED
21 C32/40 62% OPC+30%FA P 28-22671 10

22 KAIG3-RFI-TB-S-1041-00 Ticket Booth 6 8/6/20 Concrete Pouring for Dome at Ticket Booth 6 as per attached drawing. C32/40 62% OPC+30%FA P 28-22710 5 PASSED

23 KAIG3-RFI-MB-S-1038-00 Management Building 8/6/20 Concrete Pouring for the Grade Beam at Grid 1 and 2 / I to R as highhlighted in attached drawing at Management Building. C32/40 62% OPC+30%FA P 28-22720 8
PASSED
24 C32/40 62% OPC+30%FA P 28-22718 10

25 KAIG3-RFI-BO-S-1010-00 Boundary Wall 8/6/20 Inspection prior to concrete pouring for Wall at Span 19 & 20 as per attached drawing. C32/40 67%OPC+25%FA P 28-22726 11
PASSED
26 C32/40 67%OPC+25%FA P 28-22722 9

27 KAIG3-RFI-CO-S-1074-00 Crescent 1 8/8/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C32/40 62% OPC+30%FA P 28-22754 10

28 C32/40 62% OPC+30%FA P 28-22760 10 PASSED

29 C32/40 62% OPC+30%FA P 28-22761 10

Concrete Pouring for Column & Corebel Extension Outer face for column @ Span 70, 71, 72 & 73. As per Attached (KAIG3-SCR-BO-S-0010-
30 KAIG3-RFI-BO-S-1024-00 Boundary Wall 8/8/20 C16/20 SRC P 28-22773 11
00) SCR & Drawing.
PASSED
31 C32/40 62% OPC+30%FA P 28-22800 5

32 KAIG3-RFI-MB-S-1067-00 Management Building 8/9/20 Concrete Pouring for Blinding at Grid 18 to 20 / E to P as highlighted in attached drawing at Management Building. C16/20 SRC P 28-22806 9

33 C16/20 SRC P 28-22804 9 PASSED

34 C16/20 SRC P 28-22803 9

35 KAIG3-RFI-BO-S-1054-00 Ticket Booth 3 8/9/20 Surface preparation for external elevation of Ticket Booth 3 as per attahced drawing. C16/20 SRC P 28-22808 7
PASSED
36 C16/20 SRC P 28-22807 9

37 KAIG3-RFI-CO-S-1074-00 Crescent 1 8/10/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C16/20 SRC P 28-22836 10

38 C16/20 SRC P 28-22835 9 PASSED

39 C16/20 SRC P 28-22834 9

40 KAIG3-RFI-CO-S-0996-00 Crescent 2 8/11/20 Inspection to check concreting SRC, C (16-20) under Pile Cap (146 1st layer). C32/40 62% OPC+30%FA P 28-22878 7 PASSED

41 KAIG3-RFI-CO-S-1074-00 Crescent 1 8/11/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C32/40 62% OPC+30%FA P 28-22898 9

42 C32/40 62% OPC+30%FA P 28-22897 10

43 C32/40 62% OPC+30%FA P 28-22892 11 PASSED

44 C32/40 62% OPC+30%FA P 28-22890 10

45 C32/40 62% OPC+30%FA P 28-22888 10

46 KAIG3-RFI-MB-S-1141-00 Management Building 8/11/20 Concrete Pouring for Slab on Grade at Grid 15-18/D-E, 13-18/E-Q, 18-20/F-Q & 12-20/Q-X as highlighted in attached drawing. C32/40 62% OPC+30%FA P 28-22895 9 PASSED

47 KAIG3-RFI-TB-S-1058-00 Ticket Booth 7 8/12/20 Concrete Pouring for Dome at Ticket Booth 7 as per attached drawing. C32/40 62% OPC+30%FA P 28-22919 5 PASSED

48 KAIG3-RFI-BO-S-1149-00 Boundary Wall 8/12/20 Concrete Pouring for coloum from top of wall to top of column C22, C23, C24, C24A, C25, C26, C27, C27A as per attached drawing. C32/40 67%OPC+25%FA P 28-22924 9

49 C32/40 67%OPC+25%FA P 28-22922 11

50 C16/20 SRC P 28-22437 9 PASSED

C16/20 SRC P 28-22436 9

51 C16/20 SRC P 28-22435 9

kaig-qcals 23
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
52 KAIG3-RFI-MB-S-1098-00 LOCATION
Management Building CASTING
8/12/20 Concrete Pouring for Slab on Grade at Grid 1-2/I-R as highlighted in attached drawing. C32/40 62% OPC+30%FA No.
P 28-22931 10 )
(m³

53 C32/40 62% OPC+30%FA P 28-22928 10 PASSED

54 C32/40 62% OPC+30%FA P 28-22926 10

55 KAIG3-RFI-MB-S-1193-00 Management Building 8/13/20 Concrete Pouring for Grade Beam at Grid X/7-9, 9/X-W & W/9-12 as highlighted in attched drawing. C32/40 62% OPC+30%FA P 28-22968 5

56 C32/40 62% OPC+30%FA P 28-22966 9

57 C32/40 62% OPC+30%FA P 28-22965 9

58 C32/40 62% OPC+30%FA P 28-22964 9

59 C32/40 62% OPC+30%FA P 28-22963 9

60 C32/40 62% OPC+30%FA P 28-22961 11

61 C32/40 62% OPC+30%FA P 28-22962 9

62 C32/40 62% OPC+30%FA P 28-22960 9 PASSED

63 C32/40 62% OPC+30%FA P 28-22959 9

64 C32/40 62% OPC+30%FA P 28-22958 9

65 C32/40 62% OPC+30%FA P 28-22957 9

66 C32/40 62% OPC+30%FA P 28-22956 9

67 C32/40 62% OPC+30%FA P 28-22955 9

68 C32/40 62% OPC+30%FA P 28-22954 11

69 C32/40 62% OPC+30%FA P 28-22950 9

70 KAIG3-RFI-CO-S-1083-00 Crescent 1 8/15/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C32/40 62% OPC+30%FA P 28-23005 10

71 C32/40 62% OPC+30%FA P 28-23002 10

72 C32/40 62% OPC+30%FA P 28-23000 10 PASSED

73 C32/40 62% OPC+30%FA P 28-22995 11

74 C32/40 62% OPC+30%FA P 28-22993 9

75 KAIG3-RFI-CO-S-1083-00 Crescent 1 8/15/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C32/40 62% OPC+30%FA P 28-22999 5 PASSED

76 KAIG3-RFI-BO-S-1180-00 Boundary Wall 8/15/20 Concrete Pouring for Foundation of Boundary wall @ span 49A, 49B & 50A. C32/40 67%OPC+25%FA P 28-23023 7

77 C32/40 67%OPC+25%FA P 28-23021 9

78 C32/40 67%OPC+25%FA P 28-23019 9 PASSED

79 C32/40 67%OPC+25%FA P 28-23013 10

80 C32/40 67%OPC+25%FA P 28-23012 10

81 KAIG3-RFI-CO-S-1151-00 Crescent 1 8/16/20 Inspection to check blinding Concrete SRC,C(16-20) under retaining wall footing between Axis (AV) to North watch tower(Outer and Inner). C16/20 SRC P 28-23054 10

82 C16/20 SRC P 28-23052 10 PASSED

83 C16/20 SRC P 28-23050 10

84 KAIG3-RFI-TB-S-1164-00 Ticket Booth Canopy 8/16/20 Concrete Pouring for footing & Pedestal 3 no's Grid A/ 2, 3 & 4 @ Ticket Booth Canopy. C32/40 62% OPC+30%FA P 28-23062 8

85 P 28-23061 8

86 P 28-23057 9
PASSED
87 P 28-23056 9

C16/20 SRC P 28-23070 7

88 P 28-23055 9

kaig-qcals 24
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
89 KAIG3-RFI-BO-S-1166-00 LOCATION
Boundary Wall CASTING
8/17/20 Concrete Pouring for Footing of Boundary wall @ span 56, 57 & 58. C32/40 62% OPC+30%FA No.
P 28-23089 9)
(m³
PASSED
90 P 28-23087 9

91 KAIG3-RFI-MB-S-1199-00 Management Building 8/18/20 Concrete Pouring of Blinding for SOG and Grade Beam at Grid 6-10/H-Q, as Highlighted in attached Drawing, at Management Building. C32/40 62% OPC+30%FA P 28-23127 10 PASSED

92 KAIG3-RFI-BO-S-1208-00 Boundary Wall 8/18/20 Concrete Pouring for blinding 7 no's of Spans @ 63, 66A, 66B, 67B, 67C, 68A, & 68B at Boundary Wall. C16/20 SRC P 28-23142 6
PASSED
93 P 28-23141 10

94 KAIG3-RFI-CO-S-1203-00 Crescent 2 8/19/20 Inspection to check mass Concrete SRC,C(16-20) under pile cap PC(146) Second layer. C16/20 SRC P 28-23173 9

95 P 28-23170 10

96 P 28-23168 10 PASSED

C32/40 62% OPC+30%FA P 28-23186 7

97 P 28-23165 10

98 KAIG3-RFI-CO-S-1172-00 Crescent 1 8/19/20 Inspection to check concreting C (32-40) very severe for pile cap foundation for PC (79,80,81 & 82). C32/40 62% OPC+30%FA P 28-23185 5

99 P 28-23184 7
PASSED
100 P 28-23183 10

101 P 28-23182 10

102 KAIG3-RFI-BO-S-1223-00 Boundary Wall 8/22/20 Concrete Pouring for Kicker at Span 49A, 49B & 50A at Boundary Wall. C32/40 62% OPC+30%FA P 28-23270 9 PASSED

103 KAIG3-RFI-BO-S-1225-00 Boundary Wall 8/22/20 Concrete Pouring for Boundary Wall @ Span 56, 57 & 58 at Boundary Wall. C32/40 62% OPC+30%FA P 28-23268 9

104 P 28-23267 9

105 P 28-23263 10 PASSED

106 P 28-23257 10

107 P 28-23256 10

108 KAIG3-RFI-MB-S-1199-00 Management Building 8/22/20 Concrete Pouring of Blinding for SOG and Grade Beam at Grid 6-10/H-Q as highlighted in attached drawing, at Management Building. C16/20 SRC P 28-23272 12
PASSED
109 P 28-23271 10

110 KAIG3-RFI-CO-S-1172-00 Crescent 1 8/23/20 Inspection to check concreting C (32-40) very severe for pile cap foundation for PC (79,80,81 & 82). C32/40 62% OPC+30%FA P 28-23314 4

111 P 28-23313 7

112 P 28-23310 9 PASSED

113 P 28-23308 10

114 P 28-23305 10

115 KAIG3-RFI-MB-S-1193-00 Management Building 8/23/20 Concrete Pouring for Grade Beam at Grid X/7-9, 9/X-W & W/9-12 as highlighted in attached drawing. C32/40 62% OPC+30%FA P 28-23322 7

116 P 28-23321 7

117 P 28-23320 10

118 P 28-23319 12 PASSED

119 P 28-23318 10

120 P 28-23317 10

121 P 28-23316 9

122 KAIG3-RFI-CO-S-1185-00 Crescent 2 8/24/20 Inspection to check protection layer of Geotextile sheet and protection screed for strip footing between axis (E to D). C32/40 62% OPC+30%FA P 28-23357 9 PASSED

123 KAIG3-RFI-BO-S-1149-00 Boundary Wall 8/24/20 Concrete Pouring for coloum from top of wall to top of column C22, C23, C24, C24A, C25, C26, C27, C27A as per attached drawing. C32/40 67%OPC+25%FA P 28-23361 11 PASSED

124 KAIG3-RFI-CO-S-1221-00 Crescent 2 8/24/20 Inspection to check blinding Concrete SRC,C(16-20) for Deviding wall at Axis T. C16/20 SRC P 28-23363 10 PASSED

125 KAIG3-RFI-BO-S-1223-00 Boundary Wall 8/24/20 Concrete Pouring for Kicker at Span 49A, 49B & 50A at Boundary Wall. C32/40 62% OPC+30%FA P 28-23365 9
PASSED
126 P 28-23364 9

kaig-qcals 25
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
127 KAIG3-RFI-PT-S-1039-01 LOCATION
Public Toilet 3 CASTING
8/25/20 Concrete Pouring for S.O.G at Toilet 3, As per attached Drawings. C32/40 67%OPC+25%FA No.
P 28-23416 9)
(m³
PASSED
128 C32/40 67%OPC+25%FA P 28-23415 9

129 KAIG3-RFI-MB-S-1234-00 Management Building 8/25/20 Concrete pouring for Grade Beam at Grid 6/I-Q as highlighted in attached drawing at Management Building. C32/40 62% OPC+30%FA P 28-23417 4 PASSED

Surface preparation prior to start Rip Rap Geotextile and filter for the bottom and slope area at North Culvert and open Channel (SBC-02 to SBC-
130 KAIG3-RFI-GN-S-1030-01 Site Works 8/26/20 C32/40 67%OPC+25%FA P 28-23469 10
03 as highlighted).

131 C32/40 67%OPC+25%FA P 28-23466 10

132 C32/40 67%OPC+25%FA P 28-23462 10 PASSED

133 C32/40 67%OPC+25%FA P 28-23460 10

134 C32/40 67%OPC+25%FA P 28-23459 10

135 KAIG3-RFI-CO-S-1236-00 Crescent 8/26/20 Inspection to check concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) outer as highlighted. C32/40 62% OPC+30%FA P 28-23473 7

136 P 28-23471 9
PASSED
137 P 28-23467 10

138 P 28-23465 10

139 KAIG3-RFI-BO-S-1225-00 Boundary Wall 8/27/20 Concrete Pouring for Boundary Wall @ Span 56, 57 & 58 at Boundary Wall. C32/40 67%OPC+25%FA P 28-23510 10
PASSED
140 C32/40 67%OPC+25%FA P 28-23509 10

141 KAIG3-RFI-BO-S-1227-00 Boundary Wall 8/27/20 Concrete Pouring for Footing of Boundary Wall at span 59, 60A & 60B at Boundary Wall. C32/40 62% OPC+30%FA P 28-23516 7

142 P 28-23515 10
PASSED
143 P 28-23514 10

144 P 28-23513 10

145 KAIG3-RFI-BO-S-1231-00 Boundary Wall 8/29/20 Concrete Pouring for Blinding 2 nos. of Span 61B & 62B at Boundary Wall. C32/40 62% OPC+30%FA P 28-23545 6 PASSED

146 KAIG3-RFI-MB-S-1234-00 Management Building 8/29/20 Concrete pouring for Grade Beam at Grid 6/I-Q as highlighted in attached drawing at Management Building. C32/40 62% OPC+30%FA P 28-23559 10

147 P 28-23558 10

148 P 28-23557 10

149 P 28-23556 10
PASSED
150 P 28-23555 10

151 P 28-23552 10

152 P 28-23551 10

153 P 28-23537 9

154 KAIG3-RFI-CO-S-1151-01 Crescent 1 8/30/20 Inspection to check blinding Concrete SRC,C(16-20) under retaining wall footing between Axis (AV) to North watch tower(Outer and Inner). C16/20 SRC P 28-23579 5 PASSED

155 KAIG3-RFI-BO-S-1231-00 Boundary Wall 8/29/20 Concrete Pouring for Blinding 2 nos. of Span 61B & 62B at Boundary Wall. C16/20 SRC P 28-23598 7 PASSED

156 KAIG3-RFI-BO-S-1248-00 Boundary Wall 8/31/20 Concrete Pouring for Wall at Span 49A, 49B & 50A at Boundary Wall. C32/40 62% OPC+30%FA P 28-23618 9

157 P 28-23614 9

158 P 28-23609 10

159 P 28-23608 10
PASSED
160 P 28-23607 10

161 P 28-23606 10

162 P 28-23604 10

163 P 28-23603 10

164 KAIG3-RFI-MB-S-1242-00 Management Building 8/31/20 Concrete Pouring for Slab on Grade at Grid 6-10/I-Q as highlighted in attached drawing at Management Building. C16/20 SRC P 28-23619 5
PASSED
165 P 28-23616 10

Security and Fire


166 KAIG3-RFI-FC-S-1240-00 8/31/20 Concrete Pouring for Blinding at Security & Fire Control Building at highlighted in attached drawing. C16/20 SRC P 28-23623 10
Control Building
PASSED
167 P 28-23621 10

kaig-qcals 26
RUN DATE: February 12, 2023
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS

1 KAIG3-RFI-CO-S-1267-00 Crescent 9/1/20 Inspection to check concreting C(32-40)very severe for retaining wall Foundation between axis AV to till end (outer side) as highlighted. C32/40 62% OPC+30%FA P 28-23648 10

2 KAIG3-RFI-CO-S-1269-00 Crescent 9/1/20 Inspection to check concreting C(32-40)very severe for retaining wall Foundation between axis AV to till end (Inner side) as highlighted. C32/40 62% OPC+30%FA P 28-23649 10

3 C32/40 62% OPC+30%FA P 28-23650 10 PASSED

4 C32/40 62% OPC+30%FA P 28-23651 10

5 C32/40 62% OPC+30%FA P 28-23652 2

6 KAIG3-RFI-PA-S-1304-00 Picnic Area 9/1/20 Inspection for casting the Blinding Concrete under foundation of Prayer Area at Zone-I. C16/20 SRC P 28-23658 8 PASSED

Concrete Pouring for Blinding prior to Slab on Grade and Grade Beam at Grid 6-7/Q-R & 5-7/R-X as highlighted in attached drawing at
7 KAIG3-RFI-MB-S-1273-00 Management Building 9/1/20 C32/40 62% OPC+30%FA P 28-23661 7 PASSED
Management Building.

8 KAIG3-RFI-CO-S-1284-00 Crescent 2 9/3/20 Inspection to check 50mm protection screed below PC(193,194,195,196,197,198,199 & 200). C32/40 62% OPC+30%FA P 28-23735 2 PASSED

9 KAIG3-RFI-CO-S-1315-00 Crescent 9/3/20 Inspection to check mass Concrete SRC,C(16-20) First layer under Central bridge foundation as highlighted. C16/20 SRC P 28-23740 9

10 C16/20 SRC P 28-23739 9


PASSED
11 C16/20 SRC P 28-23738 9

12 C16/20 SRC P 28-23737 9

13 KAIG3-RFI-SW-S-1288-00 Boundary Wall 9/3/20 Concrete Pouring for Footing of Boundary Wall @ Span 66A & 66B, (Highlighted in the attached drawing's). C32/40 62% OPC+30%FA P 28-23746 9 PASSED

14 KAIG3-RFI-BO-S-1248-00 Boundary Wall 9/3/20 Concrete Pouring for Wall at Span 49A, 49B & 50A at Boundary Wall. C32/40 67%OPC+25%FA P 28-23753 9

15 C32/40 67%OPC+25%FA P 28-23752 9 PASSED

16 C32/40 67%OPC+25%FA P 28-23751 9

kaig-qcals 27
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
17 KAIG3-RFI-MB-S-1317-00 LOCATION
Management Building CASTING
9/5/20 Concrete Pouring for S.O.G at Grid 6-7/Q-R & 5-7/R-X, as Highlighted in attached Drawing, at Management Building. C32/40 62% OPC+30%FA No.
P 28-23784 8
(m³)

18 C32/40 62% OPC+30%FA P 28-23783 9


PASSED
19 C32/40 62% OPC+30%FA P 28-23782 9

20 C32/40 62% OPC+30%FA P 28-23780 9

Concrete Pouring for Blinding under S.O.G & Grade Beam at Grid 1-2/A-E, 1-2/F-I & 10/F-Q, as Highlighted in attached Drawing, at
21 KAIG3-RFI-MB-S-1318-00 Management Building 9/5/20 C16/20 SRC P 28-23788 6
Management Building.
PASSED
22 C16/20 SRC P 28-23787 9

23 KAIG3-RFI-SW-S-1334-00 Site Works 9/5/20 Concrete Pouring for Kicker at Span 62B & 63 @ Boundary Wall, as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-23794 10
PASSED
24 C32/40 62% OPC+30%FA P 28-23793 10

25 KAIG3-RFI-CO-S-1255-00 Crescent 9/6/20 Inspection to check Protection layer of geotextile sheet and protection screed below Promenade bridge strip footing. C32/40 62% OPC+30%FA P 28-23826 5 PASSED

26 KAIG3-RFI-SW-S-1344-00 Site Works 9/7/20 Concrete Pouring for Footing at Span 67C, 68A & 68B @ Boundary wall, as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-23868 10

27 C32/40 62% OPC+30%FA P 28-23864 11

28 C32/40 62% OPC+30%FA P 28-23859 10 PASSED

29 C32/40 62% OPC+30%FA P 28-23857 10

30 C32/40 62% OPC+30%FA P 28-23858 10

31 KAIG3-RFI-SW-S-1338-00 Site Works 9/7/20 Concrete Pouring for Column's 4 no's, C48A, C49A, C49B & C50A @ Boundary wall, as Highlighted in attached Drawing's(T.O.W to T.O.C). C32/40 67%OPC+25%FA P 28-23872 4 PASSED

32 KAIG3-RFI-PA-S-1371-00 Picnic Area 9/7/20 Inspection for Casting the Blinding Concrete under Footing of Prayer Area at Zone-J. C16/20 SRC P 28-23879 8 PASSED

33 KAIG3-RFI-CO-S-1352-00 Crescent 9/8/20 Inspection to check mass Concrete SRC,C(16-20) Second layer under Central bridge foundation as highlighted. C16/20 SRC P 28-23897 4

34 C32/40 62% OPC+30%FA P 28-23892 9 PASSED

35 C32/40 62% OPC+30%FA P 28-23891 9

36 KAIG3-RFI-CO-S-1287-00 Crescent 9/8/20 Inspection to check concreting C(32-40)very severe for retaining wall axis AT to AR (Inner side) as highlighted. C32/40 62% OPC+30%FA P 28-23910 6

37 C32/40 62% OPC+30%FA P 28-23906 9

38 C32/40 62% OPC+30%FA P 28-23902 9 PASSED

39 C32/40 62% OPC+30%FA P 28-23900 9

40 C32/40 62% OPC+30%FA P 28-23898 9

Concrete pouring for Grade Beam at Grid 1/A-E, 1/F-I, 2/A-E, 2/F-I, 1-2/A, E & F and 10/F-Q as Highlighted in attached Drawing, at
41 KAIG3-RFI-MB-S-1359-00 Management Building 9/9/20 C32/40 62% OPC+30%FA P 28-23934 6
Management Building.

42 C32/40 62% OPC+30%FA P 28-23932 6 PASSED

43 C32/40 62% OPC+30%FA P 28-23930 9

44 KAIG3-RFI-SW-S-1324-00 Site Works 9/9/20 Concrete pouring for Wall at Span 59, 60A, 60B & 61A @ Boundary wall, as Highlighted in attached Drawing's. C32/40 67%OPC+25%FA P 28-23943 6

45 C32/40 67%OPC+25%FA P 28-23940 10 PASSED

46 C32/40 67%OPC+25%FA P 28-23937 10

47 KAIG3-RFI-SW-S-1335-00 Site Works 9/10/20 Concrete Pouring for Footing at Span 61B @ Boundary wall, as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-23974 10

48 KAIG3-RFI-SW-S-1345-00 Site Works 9/10/20 Concrete Pouring for Kicker at Span 67C, 68A & 68B @ Boundary wall, as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-23975 10 PASSED

50 C32/40 62% OPC+30%FA P 28-23983 5

kaig-qcals 28
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER Concrete Pouring of Blinding under S.O.G & Grade Beam @ Grid
DESCRIPTION
6-7/D-I, 7-9/F-I, 9-10/B-I, 10-13/F at Management Building, at highlighted DESIGN MIX QUANTITY
51 KAIG3-RFI-MB-S-1392-00 LOCATION
Management Building CASTING
9/12/20 C16/20 SRC No.
P 28-23994 9
area in attached Drawing's. (m³)

52 C16/20 SRC P 28-23999 9 PASSED

53 C16/20 SRC P 28-24000 9

54 KAIG3-RFI-CO-S-1323-00 Crescent 2 9/13/20 Inspection to check concreting C(32-40)very severe for strip footing between PC# 99 to 101. C32/40 62% OPC+30%FA P 28-24045 10

55 C32/40 62% OPC+30%FA P 28-24043 9 PASSED

56 C32/40 62% OPC+30%FA P 28-24037 8

57 KAIG3-RFI-SW-S-1324-00 Site Works 9/13/20 Concrete pouring for Wall at Span 59, 60A, 60B & 61A @ Boundary wall, as Highlighted in attached Drawing's. C32/40 67%OPC+25%FA P 28-24053 5

58 KAIG3-RFI-SW-S-1332-00 Site Works 9/13/20 Concrete Pouring for Footing at Span 62B & 63 @ Boundary Wall, as Highlighted in attached Drawing's. C32/40 67%OPC+25%FA P 28-24052 10

59 C32/40 67%OPC+25%FA P 28-24050 10

60 C32/40 67%OPC+25%FA P 28-24048 10


PASSED
61 C32/40 67%OPC+25%FA P 28-24046 10

62 C32/40 67%OPC+25%FA P 28-24040 8

63 C32/40 67%OPC+25%FA P 28-24039 11

64 C32/40 67%OPC+25%FA P 28-24038 10

65 KAIG3-RFI-CO-S-1424-00 Crescent 9/13/20 Inspection to check Blinding Concrete SRC,C(16-20) for retaining wall between axis AQ to AP as highlighted. C16/20 SRC P 28-24051 8 PASSED

66 KAIG3-RFI-PA-S-1437-00 Picnic Area 9/14/20 Inspection of concrete pouring for the foundation of Prayer Area at Zone-I (as highlighted). C32/40 62% OPC+30%FA P 28-24086 3

67 C32/40 62% OPC+30%FA P 28-24083 9

68 C32/40 62% OPC+30%FA P 28-24082 9


PASSED
69 C32/40 62% OPC+30%FA P 28-24081 9

70 C32/40 62% OPC+30%FA P 28-24080 9

71 C32/40 62% OPC+30%FA P 28-24079 9

Security and Fire


72 KAIG3-RFI-FC-S-1413-00 9/15/20 Concrete Pouring of Slab on Grad at Security & Fire Control Building, at Highlighted area in attached Drawing's. C32/40 62% OPC+30%FA P 28-24122 7
Control Building

73 C32/40 62% OPC+30%FA P 28-24121 9 PASSED

74 C32/40 62% OPC+30%FA P 28-24120 9

75 KAIG3-RFI-CO-S-1404-00 Crescent 2 9/15/20 Inspection to check concreting C(32-40)very severe for PC (195,196,197 & 198). C32/40 62% OPC+30%FA P 28-24126 7 PASSED

76 KAIG3-RFI-CO-S-1352-00 Crescent 9/15/20 Inspection to check mass Concrete SRC,C(16-20) Second layer under Central bridge foundation as highlighted. C16/20 SRC P 28-24134 10 PASSED

77 KAIG3-RFI-CO-S-1355-00 Crescent 9/15/20 Inspection to check concreting C(32-40)very severe for retaining wall Kicker between axis AV to till end (Inner side) as highlighted. C32/40 62% OPC+30%FA P 28-24157 4.5

78 C32/40 62% OPC+30%FA P 28-24152 8

79 C32/40 62% OPC+30%FA P 28-24148 10

80 C32/40 62% OPC+30%FA P 28-24144 10 PASSED

81 C32/40 62% OPC+30%FA P 28-24142 10

82 C32/40 62% OPC+30%FA P 28-24137 10

83 C32/40 62% OPC+30%FA P 28-24136 10

84 KAIG3-RFI-MB-S-1400-00 Management Building 9/15/20 Inspection for Concrete Pouring for Slab on Grade at Grid 10-12/Q-X, 12-13/Q and 10/I-Q Management Building. C32/40 62% OPC+30%FA P 28-24154 7 PASSED

85 KAIG3-RFI-CO-S-1430-00 Crescent 2 9/16/20 Inspection to check 50mm protection screed below PC(181,182,183,184,185 & 186). C32/40 62% OPC+30%FA P 28-24185 8 PASSED

86 KAIG3-RFI-CO-S-1417-00 Crescent 9/16/20 Inspection to check mass Concrete SRC,C(16-20) Third layer under Central bridge foundation as highlighted. C16/20 SRC P 28-24188 6 PASSED

87 KAIG3-RFI-SW-S-1420-00 Site Works 9/16/20 Concrete Pouring for Wall @ Span 62B & 63 at Boundary Wall. C32/40 67%OPC+25%FA P 28-24193 10 PASSED

88 KAIG3-RFI-SW-S-1522-00 Site Works 9/16/20 Concrete pouring for Footing @ Span 67B, at Boundary Wall. C32/40 62% OPC+30%FA P 28-24194 10
PASSED
89 C32/40 62% OPC+30%FA P 28-24198 3

kaig-qcals 29
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Concrete pouring for Slab on Grade at Grid 6-7/D-I, 7-9/F-I, 9-10/B-I, 10-12/B-F, 12-13/E-F & 10/I-Q as highlighted in attached drawing at DELIVERY NOTE
Sl90
No. RFI NUMBER
KAIG3-RFI-MB-S-1491-00 Management Building 9/19/20 DESCRIPTION DESIGN
C32/40 MIX
62% OPC+30%FA P 28-24305 QUANTITY
10
LOCATION CASTING Management Building. No.
(m³)

91 C32/40 62% OPC+30%FA P 28-24304 10

92 C32/40 62% OPC+30%FA P 28-24303 10

93 C32/40 62% OPC+30%FA P 28-24298 10

94 C32/40 62% OPC+30%FA P 28-24297 10


PASSED
95 C32/40 62% OPC+30%FA P 28-24296 10

96 C32/40 62% OPC+30%FA P 28-24295 10

97 C32/40 62% OPC+30%FA P 28-24294 10

98 C32/40 62% OPC+30%FA P 28-24292 10

99 C32/40 62% OPC+30%FA P 28-24291 10

100 KAIG3-RFI-SW-S-1465-00 Site Works 9/20/20 Inspection for Concrete Pouring for Foundation and kicker of SBC-02 (Part-3) As Highlighted. C32/40 62% OPC+30%FA P 28-24350 4

101 C32/40 62% OPC+30%FA P 28-24345 10

102 C32/40 62% OPC+30%FA P 28-24344 10


PASSED
103 C32/40 62% OPC+30%FA P 28-24342 10

104 C32/40 62% OPC+30%FA P 28-24341 10

105 C32/40 62% OPC+30%FA P 28-24340 10

106 KAIG3-RFI-SW-S-1535-00 Site Works 9/21/20 Concrete Pouring for Column's @ C66A, C66B & C67A at Boundary Wall. C32/40 67%OPC+25%FA P 28-24375 10 PASSED

107 KAIG3-RFI-SW-S-1536-00 Site Works 9/21/20 Concrete Pouring for Wall @ Span 68B, at Boundary Wall. C32/40 67%OPC+25%FA P 28-24378 10 PASSED

108 KAIG3-RFI-SW-S-1530-00 Site Works 9/21/20 Concrete pouring for Kicker @ Span 67B, at Boundary Wall. C32/40 62% OPC+30%FA P 28-24380 9 PASSED

109 KAIG3-RFI-PA-S-1499-00 Picnic Area 9/22/20 Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-J (as Highlighted). C32/40 62% OPC+30%FA P 28-24420 9

110 C32/40 62% OPC+30%FA P 28-24419 9

111 C32/40 62% OPC+30%FA P 28-24418 9 PASSED

112 C32/40 62% OPC+30%FA P 28-24417 9

113 C32/40 62% OPC+30%FA P 28-24414 9

114 KAIG3-RFI-PA-S-1501-00 Picnic Area 9/22/20 Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-I (as Highlighted). C32/40 62% OPC+30%FA P 28-24433 7

115 C32/40 62% OPC+30%FA P 28-24430 9 PASSED

116 C32/40 62% OPC+30%FA P 28-24428 9

117 KAIG3-RFI-CO-S-1382-00 Crescent 2 9/22/20 Inspection to check 50mm protection screed below PC(187,188,189,190,191 & 192). C32/40 62% OPC+30%FA P 28-24439 5 PASSED

118 KAIG3-RFI-CO-S-1471-00 Crescent 1 9/22/20 Inspection to check 50mm protection screed below PC (1,2,3,4,5,6,7 & 8). C16/20 SRC P 28-24444 5
PASSED
119 C16/20 SRC P 28-24440 10

120 KAIG3-RFI-SW-S-1512-00 Site Works 9/24/20 Inspection of Concrete Pouring for Foundation and Kicker of SBC-02 (Part-1) as highlighted. C32/40 62% OPC+30%FA P 28-24477 10

121 C32/40 62% OPC+30%FA P 28-24479 10

122 C32/40 62% OPC+30%FA P 28-24481 10


PASSED
123 C32/40 62% OPC+30%FA P 28-24483 10

124 C32/40 62% OPC+30%FA P 28-24485 10

125 C32/40 62% OPC+30%FA P 28-24486 5

126 KAIG3-RFI-CO-S-1503-00 Crescent 9/26/20 Inspection to check Mass Concrete SRC,C(16-20 )for strip footing between PC(195 to 197) & (196 to 198). C16/20 SRC P 28-24505 10

127 C16/20 SRC P 28-24510 10


PASSED
128 C16/20 SRC P 28-24519 10

129 C16/20 SRC P 28-24523 10

kaig-qcals 30
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl130
No. RFI NUMBER
KAIG3-RFI-CO-S-1532-00 Crescent 2 9/27/20 Inspection to check Concrete SRC,C(16-20 ) under TIP Footing DESCRIPTION
foundation. DESIGN MIX
C16/20 SRC P 28-24541 QUANTITY
10
LOCATION CASTING No.
(m³)

131 C16/20 SRC P 28-24542 10

132 C16/20 SRC P 28-24545 10

133 C16/20 SRC P 28-24546 10 PASSED

134 C16/20 SRC P 28-24550 10

135 C16/20 SRC P 28-24551 10

136 C16/20 SRC P 28-24556 10

137 KAIG3-RFI-PA-S-1554-00 Picnic Area 9/27/20 Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-B (as highlighted). C16/20 SRC P 28-24555 8 PASSED

138 KAIG3-RFI-SW-S-1522-00 Site Works 9/28/20 Concrete pouring for Footing @ Span 67B at Boundary Wall. C32/40 67%OPC+25%FA P 28-24586 9

139 C32/40 67%OPC+25%FA P 28-24584 9

140 C32/40 67%OPC+25%FA P 28-24583 9 PASSED

141 C32/40 67%OPC+25%FA P 28-24587 7

142 C32/40 67%OPC+25%FA P 28-24592 5

143 KAIG3-RFI-PA-S-1555-00 Picnic Area 9/28/20 Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-K (as highlighted). C16/20 SRC P 28-24589 8 PASSED

144 KAIG3-RFI-SM-S-1559-00 South Small Mosque 9/28/20 Inspection to check blinding Concrete SRC,C(16-20 ) for South Small Mosque. C16/20 SRC P 28-24593 10

145 C16/20 SRC P 28-24594 10


PASSED
146 C16/20 SRC P 28-24595 10

147 C16/20 SRC P 28-24596 10

148 KAIG3-RFI-CO-S-1547-00 Crescent 9/28/20 Inspection to check concreting C(32-40)very severe for PC(199 & 200). C32/40 62% OPC+30%FA P 28-24607 6

149 C32/40 62% OPC+30%FA P 28-24605 9


PASSED
150 C32/40 62% OPC+30%FA P 28-24604 9

151 C32/40 62% OPC+30%FA P 28-24600 10

152 KAIG3-RFI-SW-S-1565-00 Site Works 9/29/20 Inspection of Concrete Pouring for Side Walls and Top Slab of SBC-03. C32/40 62% OPC+30%FA P 28-24625 9

153 C32/40 62% OPC+30%FA P 28-24627 9

154 C32/40 62% OPC+30%FA P 28-24629 9

155 C32/40 62% OPC+30%FA P 28-24630 9 PASSED

156 C32/40 62% OPC+30%FA P 28-24634 9

157 C32/40 62% OPC+30%FA P 28-24635 10

158 C32/40 62% OPC+30%FA P 28-24636 10

Inspection to check 50mm protection screed below PC (65, 66, 67, 68, 69, 70, 71 & 72) Crescent 1, (151, 152, 153, 154, 155, 156, 157 & 158)
159 KAIG3-RFI-CO-S-1572-00 Crescent 1 & 2 9/29/20 C16/20 SRC P 28-24650 10
Crescent 2.

160 C16/20 SRC P 28-24648 10 PASSED

161 C16/20 SRC P 28-24645 10

162 KAIG3-RFI-CO-S-1534-00 Crescent 9/29/20 Inspection to check concreting C(32-40)very severe for Promenade bridge foundation. C32/40 62% OPC+30%FA P 28-24654 12 PASSED

163 KAIG3-RFI-CO-S-1588-00 Crescent 1 & 2 9/30/20 Inspection to check 50mm protection screed above PC (79, 80, 81, 82, 195, 196, 197, 198, 199 & 200). C32/40 62% OPC+30%FA P 28-24681 7

164 C16/20 SRC P 28-24694 10 PASSED

166 C32/40 62% OPC+30%FA P 28-24698 5

167 KAIG3-RFI-CO-S-1545-00 Crescent 9/30/20 Inspection to check concreting C(32-40)very severe for retaining wall foundation between Axis AP to AQ. C32/40 62% OPC+30%FA P 28-24701 9
PASSED
168 C32/40 62% OPC+30%FA P 28-24703 6

kaig-qcals 31
RUN DATE: February 12, 2023

KING ABDULLAH INTERNATIONAL GARDENS PROJECT


TOTAL QUANTITY TRUCK LOAD (M³): 1800

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS

1 KAIG3-RFI-PA-S-1598-00 Picnic Area 10/1/20 Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-I (as highlighted). C32/40 62% OPC+30%FA P 28-24724 9

C32/40 62% OPC+30%FA P 28-24725 9 PASSED

C32/40 62% OPC+30%FA P 28-24728 7

KAIG3-RFI-PA-S-1590-00 Picnic Area 10/1/20 Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-G (As highlighted). C32/40 62% OPC+30%FA P 28-24740 10

C32/40 62% OPC+30%FA P 28-24741 10

C32/40 62% OPC+30%FA P 28-24742 10 PASSED

C32/40 62% OPC+30%FA P 28-24749 4

C16/20 SRC P 28-24745 7

KAIG3-RFI-SW-S-1599-00 Site Works 10/3/20 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-02 (Part-2) as highlighted. C32/40 62% OPC+30%FA P 28-24768 9

C32/40 62% OPC+30%FA P 28-24769 9

C32/40 62% OPC+30%FA P 28-24770 11


PASSED
C32/40 62% OPC+30%FA P 28-24773 9

C32/40 62% OPC+30%FA P 28-24777 9

C32/40 62% OPC+30%FA P 28-24781 8

KAIG3-RFI-CO-S-1605-00 Crescent 10/3/20 Inspection to check blinding Concrete SRC,C(16-20 ) for South bridge foundation. C16/20 SRC P 28-24804 9

C16/20 SRC P 28-24800 10

C16/20 SRC P 28-24791 9


PASSED
C16/20 SRC P 28-24789 10

C16/20 SRC P 28-24788 11

C16/20 SRC P 28-24803 9

Concrete Pouring for Window Bottom Sill Door Lintels and 4 no's of Stiffner column for walls at Grid 3-6/A, 3-6/E, 3/A-E, 4/A-E, 5/A-E, 1-2/A,
KAIG3-RFI-MB-S-1611-00 Management Building 10/4/20 C32/40 67%OPC+25%FA P 28-24819 9
1-2/E, 1/A-E, 2/A-E, 1/I-J, 2/I-J, 1/L-R & 2/L-R as highlighted in attached drawings.
PASSED
C32/40 67%OPC+25%FA P 28-24827 9

KAIG3-RFI-CO-S-1602-00 Crescent 2 10/4/20 Inspection to check concreting C(32-40) very severe for PC(183,184,185 & 186). C32/40 62% OPC+30%FA P 28-24837 9

C32/40 62% OPC+30%FA P 28-24838 9 PASSED

C32/40 62% OPC+30%FA P 28-24840 6

kaig-qcals 32
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
KAIG3-RFI-PA-S-1592-00 LOCATION
Picnic Area CASTING
10/5/20 Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-01 to PA-08) as highlighted. C16/20 SRC No.
P 28-24857 8)
(m³
PASSED
C16/20 SRC P 28-24858 4

KAIG3-RFI-MB-S-1626-00 Management Building 10/6/20 Concrete Pouring for Blindig below SOG and Grade Beam at Grid 3-5/R-X as highlighted in attached drawing. C16/20 SRC P 28-24910 9
PASSED
C16/20 SRC P 28-24917 6

KAIG3-RFI-CO-S-1639-00 Crescent 2 10/6/20 Inspection to check 50mm protection screed below South Bridge foundation. C16/20 SRC P 28-24919 3
PASSED
C16/20 SRC P 28-24915 10

KAIG3-RFI-PA-S-1615-00 Picnic Area 10/7/20 Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-J (as highlighted). C32/40 62% OPC+30%FA P 28-24966 8

C32/40 62% OPC+30%FA P 28-24965 9

C32/40 62% OPC+30%FA P 28-24964 9

C32/40 62% OPC+30%FA P 28-24955 10 PASSED

C32/40 62% OPC+30%FA P 28-24956 10

C32/40 62% OPC+30%FA P 28-24958 10

C32/40 62% OPC+30%FA P 28-24959 10

Water Play / Boat


KAIG3-RFI-WG-S-1661-00 10/7/20 Concrete pouring for blinding of boundary wall @ span 14, 15, 16 & 17 at Water Garden. C16/20 SRC P 28-24974 9
Garden

C16/20 SRC P 28-24970 9


PASSED
C16/20 SRC P 28-24969 9

C16/20 SRC P 28-24968 9

KAIG3-RFI-TB-S-1765-00 Ticket Booth 4, 5 & 6 10/7/20 Concrete pouring for Blinding prior to S.O.G Inside, Ticket booths # 4, 5 & 6. C32/40 62% OPC+30%FA P 28-24975 10

C32/40 62% OPC+30%FA P 28-24977 10


PASSED
C32/40 62% OPC+30%FA P 28-24978 10

C32/40 62% OPC+30%FA P 28-24980 10

KAIG3-RFI-CO-S-1665-00 Crescent 2 10/8/20 Concreting for Strip Footing between PC 197-199 & 198-200 (C-32/40 Very Severe). C32/40 62% OPC+30%FA P 258-24997 9

C32/40 62% OPC+30%FA P 28-25000 9


PASSED
C32/40 62% OPC+30%FA P 28-25002 9

C32/40 62% OPC+30%FA P 28-25004 8

KAIG3-RFI-PA-S-1683-00 Picnic Area 10/8/20 Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-12 to PA-17) as highlighted. C16/20 SRC P 28-25110 10 PASSED

KAIG3-RFI-MB-S-1663-00 Management Building 10/8/20 Concrete Pouring for Grade beam at Grid 3-5/R, 3-5/X & 3/R-X as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-25005 8 PASSED

kaig-qcals 33
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
KAIG3-RFI-PA-S-1653-00 LOCATION
Picnic Area CASTING
10/8/20 Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-1,2,3,9,10,11,12 ) as highlighted. C16/20 SRC No.
P 28-24998 10 ) PASSED
(m³

KAIG3-RFI-CO-S-1644-00 Crescent 2 10/12/20 Inspection to check 50mm protection screed below retaining wall foundation between axis AP to AH. C32/40 62% OPC+30%FA P 28-25126 4
PASSED
KAIG3-RFI-CO-S-1639-00 Crescent 2 10/12/20 Inspection to check 50mm protection screed below South Bridge foundation.

KAIG3-RFI-PA-S-1683-00 Picnic Area 10/12/20 Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-12 to PA-17) as highlighted. C16/20 SRC P 28-25128 5 PASSED

KAIG3-RFI-MB-S-1675-00 Management Building 10/12/20 Concrete Pouring for Slab on Grade at Grid 3-5/R-X as highlighted in attached drawings. C32/40 62% OPC+30%FA P 28-25139 9

C32/40 62% OPC+30%FA P 28-25141 9


PASSED
C32/40 62% OPC+30%FA P 28-25140 9

C32/40 62% OPC+30%FA P 28-25143 9

Concrete Pouring for blinding of boundary wall foundation @ (EXC4-29/30 to EXC4-41/42) ( EXC4-11/12 to EXC4-27/28) at Physic Garden at
KAIG3-RFI-PG-S-1784-00 Physic Garden 10/12/20 C16/20 SRC P 28-25145 9
highlighted area in attached drawings.

C16/20 SRC P 28-25146 9

C16/20 SRC P 28-25148 9 PASSED

C16/20 SRC P 28-25149 9

C16/20 SRC P 28-25151 8

KAIG3-RFI-SW-S-1767-00 Site Works 10/13/20 Inspection of Concrete Pouring for Foundation and Kicker of SBC-01 (Part-A) as highlighted. C32/40 62% OPC+30%FA P 28-25167 9

C32/40 62% OPC+30%FA P 28-25169 9

C32/40 62% OPC+30%FA P 28-25170 9 PASSED

C32/40 62% OPC+30%FA P 28-25171 9

C32/40 62% OPC+30%FA P 28-25174 9

KAIG3-RFI-PA-S-1481-00 Picnic Area 10/13/20 Inspection of concrete pouring for the foundation of Prayer Area at Zone-B (as highlighted). C32/40 62% OPC+30%FA P 28-25180 9

C32/40 62% OPC+30%FA P 28-25181 9

C32/40 62% OPC+30%FA P 28-25182 9

C32/40 62% OPC+30%FA P 28-25184 9 PASSED

C32/40 62% OPC+30%FA P 28-25187 9

C32/40 62% OPC+30%FA P 28-25188 8

C32/40 62% OPC+30%FA P 28-25190 6

Inspection to check 50mm protection screed below PC (65, 66, 67, 68, 69, 70, 71 & 72) Crescent 1, (151, 152, 153, 154, 155, 156, 157 & 158)
KAIG3-RFI-CO-S-1572-00 Crescent 1 & 2 10/14/20 C32/40 62% OPC+30%FA P 29-13152 6 PASSED
Crescent 2.

kaig-qcals 34
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER Crescent 1 / Retaining DESCRIPTION DESIGN MIX QUANTITY
KAIG3-RFI-CO-S-1718-00 LOCATION CASTING
10/14/20 Concrete Pouring for Retaining Wall Foundation as highlighted at Grid 01AN to 01AP. C32/40 62% OPC+30%FA No.
P 29-13159 10 )
Wall (m³

C32/40 62% OPC+30%FA P 29-13161 10

C32/40 62% OPC+30%FA P 29-13162 10

C32/40 62% OPC+30%FA P 29-13163 10

C32/40 62% OPC+30%FA P 29-13166 10


PASSED
C32/40 62% OPC+30%FA P 29-13169 9

C32/40 62% OPC+30%FA P 29-13171 9

C32/40 62% OPC+30%FA P 29-13172 6

C32/40 62% OPC+30%FA P 29-13173 9

C32/40 62% OPC+30%FA P 29-13179 6

KAIG3-RFI-PA-S-1747-00 Picnic Area 10/14/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-J (SA-7 ) as highlighted. C16/20 SRC P 29-13164 10 PASSED

KAIG3-RFI-CO-S-1890-00 Crescent 2 10/15/20 30mm Screed Protection of Waterproofing for Strip Footing between PC 200-198, 199-197, 197-195, 198-196. C16/20 SRC P 29-13207 10
PASSED
C16/20 SRC P 29-13204 10

New Ticket Booth 1A


KAIG3-RFI-TB-S-1764-00 10/17/20 Concrete Pouring for Blinding prior to foundation @ New Ticket Booths # 1A & 2A, as per the attached drawing. C16/20 SRC P 28-25213 10
& 2A.

C16/20 SRC P 28-25212 9 PASSED

C16/20 SRC P28-25210 8


Concrete Pouring for Stiffner, Lintel for Door opening (level = 2.10m), Sill level for windows (90cm) and Lintel for window top (2.89m @ grid 4-
KAIG3-RFI-MB-S-1725-00 Management Building 10/17/20 5/A), Lintel for walls at grid 10-18/B, 18/B-F, 18-20/F, 16/B-D, 15-18/D, 15/B-E, 13/B-E, 12/B-E & 10/B-E and Store Room for Technical, C32/40 62% OPC+30%FA P 28-25217 9
Scientific and Human Resource Office as same as highlighted in attached drawing. PASSED
C32/40 62% OPC+30%FA P 28-25220 9

KAIG3-RFI-CO-S-1658-00 Crescent 2 10/18/20 Concreting for Strip Footing between PC 101 to 103 (C-32/40 Very Severe). C05-20 OPC P 28-25236 10

Crescent 2/ Central
KAIG3-RFI-CO-S-1716-00 10/18/20 Concrete Pouring for Central Bridge Pier Foundation as highlighted. C32/40 62% OPC+30%FA P 28-25241 10
Bridge
Crescent 1 - Retaining
KAIG3-RFI-CO-S-1743-00 10/18/20 Concrete Pouring for Retaining Wall Foundation as highlighted at Grid 01AJ to 01/AL C-32/40 Very Severe SRC. C32/40 62% OPC+30%FA P 28-25243 11
Wall

C32/40 62% OPC+30%FA P 28-25244 11

C32/40 62% OPC+30%FA P 28-25246 10 PASSED

C32/40 62% OPC+30%FA P 28-25251 9

C32/40 62% OPC+30%FA P 28-25257 8

C32/40 62% OPC+30%FA P 28-25261 10

C32/40 62% OPC+30%FA P 28-25266 9

Site Works/Boundary
KAIG3-RFI-SW-S-1775-00 10/19/20 Concrete Pouring for Corebel Extension of Boundary wall @ Span 64, 65, & 67A as per attached drawings (Inner Face). C32/40 62% OPC+30%FA P 28-25298 6
Wall
PASSED
C32/40 62% OPC+30%FA P 28-25286 6

kaig-qcals 35
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
KAIG3-RFI-SW-S-1797-00 LOCATION
Site Works CASTING
10/18/20 Inspection of Thrust block for Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line from (CH- 2 to CH-22) (as highlighted). C16/20 SRC No.
P 28-25239 9) PASSED
(m³

KAIG3-RFI-PA-S-1756-00 Picnic Area 10/19/20 Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-J (as highlighted). C32/40 62% OPC+30%FA P 28-25291 9

C32/40 62% OPC+30%FA P 28-25292 9 PASSED

C32/40 62% OPC+30%FA P 28-25297 5

KAIG3-RFI-PA-S-1755-00 Picnic Area 10/19/20 Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-K (as highlighted). C32/40 62% OPC+30%FA P 28-25303 9

KAIG3-RFI-PA-S-1812-00 Picnic Area Concrete pouring for Footing's of Picnic Area PA1-07, 08, 09, 10 & 11, as highlighted in attached drawings. C32/40 62% OPC+30%FA P 28-25304 9

C32/40 62% OPC+30%FA P 28-25306 9

C32/40 62% OPC+30%FA P 28-25307 9

C32/40 62% OPC+30%FA P 28-25308 9


PASSED
C32/40 62% OPC+30%FA P 28-25314 9

C32/40 62% OPC+30%FA P 28-25316 9

C32/40 62% OPC+30%FA P 28-25318 9

C32/40 62% OPC+30%FA P 28-25319 9

C32/40 62% OPC+30%FA P 28-25320 9

KAIG3-RFI-PA-S-1748-00 Picnic Area 10/20/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA-20,21,22,23,24 ) as highlighted. C16/20 SRC P 28-13232 10
PASSED
KAIG3-RFI-PA-S-1749-00 Picnic Area 10/20/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (SA-16,17 ) as highlighted. C16/20 SRC P 28-25333 10

Crescent 1/Retaining
KAIG3-RFI-CO-S-1796-00 10/20/20 Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AF to 01/AH) C-32/40 VERY SEVERE SRC. C32/40 62% OPC+30%FA P 28-13242 9
Wall

C32/40 62% OPC+30%FA P 29-13245 9

C32/40 62% OPC+30%FA P 29-13247 9 PASSED

C32/40 62% OPC+30%FA P 29-13249 9

C32/40 62% OPC+30%FA P 29-13250 6

Crescent 1/Retaining
KAIG3-RFI-CO-S-1795-00 10/21/20 Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AL to 01/AN) C-32/40 VERY SEVERE SRC. C32/40 62% OPC+30%FA P 29-13294 9
Wall

C32/40 62% OPC+30%FA P 29-13288 10

C32/40 62% OPC+30%FA P 29-13287 10 PASSED

C32/40 62% OPC+30%FA P 29-13283 10

C32/40 62% OPC+30%FA P 29-13282 10

KAIG3-RFI-PA-S-1757-00 Picnic Area 10/22/20 Inspection of Concrete Pouring for Footing of Picnic Area (1) at Zone-I (PA-1,2,3,4,5,6 ) as highlighted. C32/40 62% OPC+30%FA P 29-13307 6

KAIG3-RFI-PA-S-1820-00 Picnic Area 10/22/20 Inspection of Concrete Pouring for Footing of Picnic Area (1) at Zone-I (PA-13 ) as highlighted. C32/40 62% OPC+30%FA P 29-13305 10 PASSED

C32/40 62% OPC+30%FA P 29-13304 10

kaig-qcals 36
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
KAIG3-RFI-PA-S-1748-00 LOCATION
Picnic Area CASTING
10/22/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA-20,21,22,23,24 ) as highlighted. C16/20 SRC No.
P 29-13311 10 ) PASSED
(m³
Crescent 2/South Small
KAIG3-RFI-CO-S-1712-01 10/24/20 Concrete Pouring for Foundation of South Small Mosque as highlighted. C32/40 62% OPC+30%FA P 29-13373 4
Mosque

C32/40 62% OPC+30%FA P 29-13371 10

C32/40 62% OPC+30%FA P 29-13369 10

C32/40 62% OPC+30%FA P 29-13364 10


PASSED
C32/40 62% OPC+30%FA P 29-13363 10

C32/40 62% OPC+30%FA P 29-13361 10

C32/40 62% OPC+30%FA P 29-13360 10

C32/40 62% OPC+30%FA P 29-13359 10

Crescent 1/Retaining
KAIG3-RFI-CO-S-1836-00 10/22/20 Concrete Pouring for Retaining Wall Foundation (as highlighted at Grid 01/AH to 01/AJ) C-32/40 Very Severe SRC. C32/40 62% OPC+30%FA P 29-13315 10
Wall

C32/40 62% OPC+30%FA P 29-13375 9

C32/40 62% OPC+30%FA P 29-13376 9


PASSED
C32/40 62% OPC+30%FA P 29-13377 9

C32/40 62% OPC+30%FA P 29-13378 9

C32/40 62% OPC+30%FA P 29-13379 6

KAIG3-RFI-PA-S-1881-00 Picnic Area 1 10/25/20 Concrete Pouring for Footing's of Picnic Area PA1-12, 14, 15, 16 & 17 as highlighted in attached drawings. C32/40 62% OPC+30%FA P 29-13422 4

KAIG3-RFI-PA-S-1882-00 Picnic Area 1 10/25/20 Concrete pouring for Kicker of Picnic Area PA1-07, 08, 09, 10 & 11 as highlighted in attached drawings. C32/40 62% OPC+30%FA P 29-13421 9

New Ticket Booth 1A


KAIG3-RFI-TB-S-1883-00 10/25/20 Concrete Pouring for Footing @ New Ticket Booths # 1A & 2A as per the attached drawing. C32/40 62% OPC+30%FA P 29-13420 9
& 2A.

C32/40 62% OPC+30%FA P 29-13419 9 PASSED

C32/40 62% OPC+30%FA P 29-13418 9

C32/40 62% OPC+30%FA P 29-13416 9

C32/40 62% OPC+30%FA P 29-13415 9

KAIG3-RFI-PA-S-1825-00 Picnic Area 10/25/20 Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-B (as highlighted). C32/40 62% OPC+30%FA P 29-13413 9

KAIG3-RFI-PA-S-1826-00 Picnic Area 10/25/20 Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-G (as highlighted). C32/40 62% OPC+30%FA P 29-13412 9

C32/40 62% OPC+30%FA P 29-13409 9

C32/40 62% OPC+30%FA P 29-13405 9

C32/40 62% OPC+30%FA P 29-13404 9


PASSED
C32/40 62% OPC+30%FA P 29-13402 9

C32/40 62% OPC+30%FA P 29-13401 9

kaig-qcals 37
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800
PASSED

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING C32/40 62% OPC+30%FA No.
P 29-13399 9)
(m³

C32/40 62% OPC+30%FA P 29-13396 9

C32/40 62% OPC+30%FA P 29-13395 9

Concrete Pouring for Window Sill, window top Lintel, Lintel for walls & Doors at grid 6-9/A, 9-18/B, 3-6/R, 3/R-X, 3-9/X, 9/W-X, 9-17/W, 18/D-
KAIG3-RFI-MB-S-1851-00 Management Building 10/26/20 C32/40 62% OPC+30%FA P 29-13462 10
F, 20/J-M & 3-6/A as same as highlighted in attached drawings.

C32/40 62% OPC+30%FA P 29-13470 10 PASSED

C32/40 62% OPC+30%FA P 29-13477 4

KAIG3-RFI-PA-S-1852-00 Picnic Area 10/28/20 Inspection of Cocrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-09 ) as highlighted. C32/40 62% OPC+30%FA P 28-25426 11

KAIG3-RFI-PA-S-1853-00 Picnic Area 10/28/20 Inspection of Concrete Pouring for 1st part of Wall for Picnic Area (1) at Zone-I (PA-6 & PA-13) as highlighted. C32/40 62% OPC+30%FA P 28-25421 10

KAIG3-RFI-PA-S-1897-00 Picnic Area 10/28/20 Inspection of Concrete Pouring for 1st part of Wall for Picnic Area (1) at Zone-I (PA-1, 2 & 3) as highlighted. C32/40 62% OPC+30%FA P 28-25419 10

KAIG3-RFI-PA-S-1898-00 Picnic Area 10/28/20 Inspection of Cocrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-07 ) as highlighted. C32/40 62% OPC+30%FA P28-25412 10
PASSED
C32/40 62% OPC+30%FA P 28-25404 10

C32/40 62% OPC+30%FA P 28-25400 10

C32/40 62% OPC+30%FA P 28-25399 10

C32/40 62% OPC+30%FA P 28-25398 10

Crescent 1/Retaining
KAIG3-RFI-CO-S-1841-00 10/29/20 Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AD to 01/AF) C-32/40 VERY SEVERE SRC. C32/40 62% OPC+30%FA P 28-25482 9
Wall

C32/40 62% OPC+30%FA P 28-25477 10


PASSED
C32/40 62% OPC+30%FA P 28-25474 10

C32/40 62% OPC+30%FA P 28-25471 10

Concrete Pouring for Footing of boundary walls @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EXC4-41/42) at Physic Garden at highlighted
KAIG3-RFI-PG-S-1933-00 Physic Garden 10/31/20 C32/40 62% OPC+30%FA P 29-13498 8
area in attached drawings.

C32/40 62% OPC+30%FA P 29-13496 9

C32/40 62% OPC+30%FA P 29-13495 10

C32/40 62% OPC+30%FA P 29-25544 10

C32/40 62% OPC+30%FA P 28-25542 10


PASSED
C32/40 62% OPC+30%FA P 28-25541 11

C32/40 62% OPC+30%FA P 28-25537 10

C32/40 62% OPC+30%FA P 28-25536 9

C32/40 62% OPC+30%FA P 28-25535 10

C32/40 62% OPC+30%FA P 28-25533 11

KAIG3-RFI-SW-S-1899-00 Site Works 10/31/20 Inspection of Concrete Pouring for the wall and Top Slab of SBC-02 (Part-2) as highlighted. C32/40 62% OPC+30%FA P 28-25528 9

C32/40 62% OPC+30%FA P 28-25524 9

kaig-qcals 38

PASSED
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING C32/40 62% OPC+30%FA No.
P 28-25520 9)
(m³

C32/40 62% OPC+30%FA P 28-25518 9

C32/40 62% OPC+30%FA P 28-25516 11 PASSED

C32/40 62% OPC+30%FA P 28-25514 9

C32/40 62% OPC+30%FA P 28-25512 9

C32/40 62% OPC+30%FA P 28-25510 10

C32/40 62% OPC+30%FA P 28-25508 11

kaig-qcals 39
RUN DATE: February 12, 2023

KING ABDULLAH INTERNATIONAL GARDENS PROJECT


TOTAL QUANTITY TRUCK LOAD (M³): 1730

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS

1 KAIG3-RFI-PA-S-1915-00 Picnic Area 11/1/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-J (SA-10) as highlighted. C16/20 SRC P 29-13537 10
PASSED
2 C16/20 SRC P 29-13542 10

3 KAIG3-RFI-PA-S-1930-00 Picnic Area 11/2/20 Inspection of Concrete pouring for the 2nd part of Wall for Prayer Area at Zone-B (as highlighted). C32/40 62% OPC+30%FA P 29-13579 10

4 KAIG3-RFI-PA-S-1931-00 Picnic Area Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-K (as highlighted). C32/40 62% OPC+30%FA P 29-13580 10

5 C32/40 62% OPC+30%FA P 29-13585 10

6 C32/40 62% OPC+30%FA P 29-13588 10

7 C32/40 62% OPC+30%FA P 29-13589 10

8 C32/40 62% OPC+30%FA P 29-13596 10 PASSED

9 C32/40 62% OPC+30%FA P 29-13601 10

10 C32/40 62% OPC+30%FA P 29-13602 10

11 C32/40 62% OPC+30%FA P 29-13603 10

C32/40 62% OPC+30%FA P 29-13609 10

12 C32/40 62% OPC+30%FA P 29-13608 5

Crescent 2/Bridge
13 KAIG3-RFI-CO-S-1714-01 11/3/20 Concrete Pouring for Foundation of Bridge to South Tower as highlighted. C32/40 62% OPC+30%FA P 29-13657 4
South Tower

14 C32/40 62% OPC+30%FA P 29-13653 10.25

PASSED
15 C32/40 62% OPC+30%FA P 29-13652 10.25

16 C32/40 62% OPC+30%FA P 29-13650 11.5

17 C32/40 62% OPC+30%FA P 29-13648 10

Water Play & Boat


18 KAIG3-RFI-WG-S-1960-00 11/3/20 Concrete pouring for Blinding Under Column's & wall foundations @ Jetty # 1 at Boat Garden at highlighted area in attached drawings. C16/20 SRC P 29-13660 2
Garden
PASSED
19 C16/20 SRC P 29-13656 10

20 KAIG3-RFI-CO-S-1921-00 Crescent 2 Concrete Pouring for Strip Footing between PC 200 to 198, 199 to 197, 197 to 195 & 198 to 196 (C-32 40 SRC). C32/40 62% OPC+30%FA P 29-13675 7

Concrete Pouring for Kicker of boundary walls @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EXC4-41/42) at Physic Garden at highlighted
21 KAIG3-RFI-PG-S-1934-00 Physic Garden C32/40 62% OPC+30%FA P 29-13673 9
area in attached drawings.

22 C32/40 62% OPC+30%FA P 29-13667 10 PASSED

23 C32/40 62% OPC+30%FA P 29-13664 10

24 C32/40 62% OPC+30%FA P 29-13662 10

25 KAIG3-RFI-PA-S-1932-00 Picnic Area 11/4/20 Inspection for casting the Blinding Concrete under Footing of Seating Area (3) (SA-20, 22, 25) - as highlighted. C16/20 SRC P 29-13676 10
PASSED
26 C16/20 SRC P 29-13671 10

27 KAIG3-RFI-WG-S-1972-00 Picnic Area 11/5/20 Concrete pouring for Blinding Under Column's & wall foundations @ Jetty # 2 at Boat Garden at highlighted area in attached drawings. C16/20 SRC P 29-13732 10

28 C16/20 SRC P 29-13731 10

29 C16/20 SRC P 29-13730 10


PASSED
30 C16/20 SRC P 29-13729 10

31 C16/20 SRC P 29-13724 10

32 C16/20 SRC P 29-13718 10

kaig-qcals 40
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
33 KAIG3-RFI-PA-S-1948-00 Picnic Area 11/5/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-G (SA-12 & SA-13 ) as highlighted. C16/20 SRC P 29-13725 (m³
10 )

34 KAIG3-RFI-PA-S-1965-00 Picnic Area 11/5/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-G (SA-24 ) as highlighted. C16/20 SRC P 29-13721 10 PASSED

35 KAIG3-RFI-PA-S-1966-00 Picnic Area 11/5/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-G (SA-11 ) as highlighted. C16/20 SRC P 29-13719 10

Concrete Pouring for Blinding of boundary walls @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11/20) at Physic Garden at highlighted
36 KAIG3-RFI-PG-S-1935-00 Physic Garden 11/7/20 C16/20 SRC P 28-25640 10
area in attached drawings.

C32/40 62% OPC+30%FA P 28-25635 5

37 C16/20 SRC P 28-25636 10


PASSED
38 C16/20 SRC P 28-25632 10

39 C16/20 SRC P 28-25631 10

40 C16/20 SRC P 28-25629 10

41 KAIG3-RFI-PA-S-1951-00 Picnic Area 11/7/20 Inspection of Concrete Pouring for 2nd part of Wall for Picnic Area (1) at Zone-I (PA-1,2 & 3) as highlighted. C32/40 62% OPC+30%FA P 28-25647 10
PASSED
42 C32/40 62% OPC+30%FA P 28-25650 10

43 KAIG3-RFI-CO-S-1944-00 Crescent 2 11/8/20 Concreting for Strip Footing at Zone 2R (TIP) Crescent 2 Zone 2. C32/40 62% OPC+30%FA P 28-25700 10

44 C32/40 62% OPC+30%FA P 28-25698 10 PASSED

45 C32/40 62% OPC+30%FA P 28-25694 10

46 KAIG3-RFI-MB-S-1995-00 Management Building 11/9/20 Concrete Pouring for Lintels of window's and Stiffner Column's @ Grid 7-8/A, 4-6/R, 3/T-V & 3-6/X, as highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-25705 9
PASSED
Concrete Pouring for Lintels of walls, Doors and Stiffner Column's @ Grid 20/F-G, 20/P-Q, 19-20/Q and Between grid 18-20/J-L (for Toilets) as
47 KAIG3-RFI-MB-S-1993-00 Management Building 11/9/20 C32/40 62% OPC+30%FA P 28-25710 6
same as highlighted in attached Drawing's.

48 KAIG3-RFI-PA-S-1988-00 Picnic Area 11/9/20 Inspection for casting the Blinding Concrete under Footing of Seating Area (3) at Zone-G (SA-23) - As highlighted. C16/20 SRC P 28-25706 10
PASSED
49 KAIG3-RFI-PA-S-1991-00 Picnic Area 11/9/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-K (SA-28 & 32 ) As Highlighted.

50 KAIG3-RFI-PA-S-1975-00 Picnic Area 11/9/20 Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-G (as highlighted). C32/40 62% OPC+30%FA P 28-25744 10

51 KAIG3-RFI-PA-S-1976-00 Picnic Area 11/9/20 Inspection of Concrete pouring for the 2nd part of Wall for Prayer Area at Zone-K (as highlighted). C32/40 62% OPC+30%FA P 28-25742 9

52 C32/40 62% OPC+30%FA P 28-25741 9

53 C32/40 62% OPC+30%FA P 28-25739 9

54 C32/40 62% OPC+30%FA P 28-25737 9

55 C32/40 62% OPC+30%FA P 28-25736 9


PASSED
56 C32/40 62% OPC+30%FA P 28-25735 9

57 C32/40 62% OPC+30%FA P 28-25733 10

58 C32/40 62% OPC+30%FA P 28-25728 10

59 C32/40 62% OPC+30%FA P 28-25720 10

60 C32/40 62% OPC+30%FA P 28-25715 10

61 C32/40 62% OPC+30%FA P 28-25714 10

62 KAIG3-RFI-TG-S-2074-00 Butterfly Garden 11/10/20 Concrete Pouring for Kicker Extension at Boundary wall (Outer Face) @ Butterfly Garden at highlighted areas in attached drawings. C32/40 62% OPC+30%FA P 28-25788 6
PASSED
63 C32/40 62% OPC+30%FA P 28-25775 4

kaig-qcals 41
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
64 KAIG3-RFI-CO-S-1971-00 LOCATION
Crescent CASTING
11/10/20 50mm Screed Protection at Tunnel Zone 5 (as highlighted). C32/40 62% OPC+30%FA No.
P 28-25781 2)
(m³

65 C32/40 62% OPC+30%FA P 28-25778 10


PASSED
66 C32/40 62% OPC+30%FA P 28-25774 10

67 C32/40 62% OPC+30%FA P 28-25772 10

68 KAIG3-RFI-WG-S-2070-00 Water Play Garden 11/14/20 Concrete Pouring for Footing of Boundary Wall @ Span 14 & 15 at Water Garden as per attached drawings. C32/40 62% OPC+30%FA P 29-13830 10

69 C32/40 62% OPC+30%FA P 29-13831 10

70 C32/40 62% OPC+30%FA P 29-13832 10 PASSED

71 C32/40 62% OPC+30%FA P 29-13836 10

72 C32/40 62% OPC+30%FA P 29-13838 10

Concrete Pouring for Lintels of walls, Doors and Stiffner Column's Between grid 8-10/E-H (for Toilets) Disable Toilets & Partion wall between
73 KAIG3-RFI-MB-S-2019-00 Management Building 11/14/20 C32/40 62% OPC+30%FA P 29-13817 10 PASSED
General Dinging & Private Dining as highlighted in attached drawings.

74 KAIG3-RFI-SW-S-2045-00 Site Works 11/15/20 Inspection of Concrete Pouring for the walls and Top slab of SBC-01 (Part-A) as highlighted. C32/40 62% OPC+30%FA P 29-13871 10

75 C32/40 62% OPC+30%FA P 29-13870 9

76 C32/40 62% OPC+30%FA P 29-13869 9


PASSED
77 C32/40 62% OPC+30%FA P 29-13868 9

78 C32/40 62% OPC+30%FA P 29-13867 9

79 C32/40 62% OPC+30%FA P 29-13866 9

Crescent South Small


80 KAIG3-RFI-CO-S-1946-01 11/15/20 Concreting for Kicker (80cm.) for column and wall of South Small Mosque (as highlighted). C32/40 62% OPC+30%FA P 29-13880 8
Mosque

81 C32/40 62% OPC+30%FA P 29-13877 10


PASSED
82 C32/40 62% OPC+30%FA P 29-13874 10

83 C32/40 62% OPC+30%FA P 29-13872 10

Water Play & Boat Concrete pouring for Footing's 11 No's (2/B,C & D) (3/4,C,D & E) (4/B,C,D,E) and Wall Raft footing @ Jetty # 1 at Boat Garden at highlighted
84 KAIG3-RFI-WG-S-2050-00 11/16/20 C32/40 62% OPC+30%FA P 28-25995 9
Garden area in attached drawings.

85 C32/40 62% OPC+30%FA P 28-25993 9

86 C32/40 62% OPC+30%FA P 28-25988 9

87 C32/40 62% OPC+30%FA P 28-25987 9


PASSED
88 C32/40 62% OPC+30%FA P 28-25984 9

89 C32/40 62% OPC+30%FA P 28-25983 9

90 C32/40 62% OPC+30%FA P 28-25981 9

91 C32/40 62% OPC+30%FA P 28-25980 9

kaig-qcals 42
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
92 KAIG3-RFI-SW-S-2026-00 LOCATION
Site Works CASTING
11/17/20 Inspection of Concrete Pouring for the walls and top slab of SBC-2 (Part-3) as highlighted. C32/40 62% OPC+30%FA No.
P 28-26026 5)
(m³

93 C32/40 62% OPC+30%FA P 28-26019 9

94 C32/40 62% OPC+30%FA P 28-26018 9

95 C32/40 62% OPC+30%FA P 28-26015 9

96 C32/40 62% OPC+30%FA P 28-26014 9


PASSED
97 C32/40 62% OPC+30%FA P 28-26013 9

98 C32/40 62% OPC+30%FA P 28-26012 9

99 C32/40 62% OPC+30%FA P 28-26011 9

100 C32/40 62% OPC+30%FA P 28-26010 9

101 C32/40 62% OPC+30%FA P 28-26009 9

Water Play & Boat Concrete pouring for Footing's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4/B,C & D) and Wall Raft footing @ Jetty # 2 at Boat
102 KAIG3-RFI-WG-S-2051-00 11/17/20 C32/40 62% OPC+30%FA P 28-26043 9
Garden Garden at highlighted area in attached drawings.

103 C32/40 62% OPC+30%FA P 28-26035 9

104 C32/40 62% OPC+30%FA P 28-26034 9

105 C32/40 62% OPC+30%FA P 28-26032 11

106 C32/40 62% OPC+30%FA P 28-26031 9

107 C32/40 62% OPC+30%FA P 28-26030 9 PASSED

108 C32/40 62% OPC+30%FA P 28-26029 9

109 C32/40 62% OPC+30%FA P 28-26027 9

110 C32/40 62% OPC+30%FA P 28-26024 9

111 C32/40 62% OPC+30%FA P 28-26023 9

112 C32/40 62% OPC+30%FA P 28-26022 9

Crescent 2 - Bridge to
113 KAIG3-RFI-CO-S-2085-00 11/17/20 Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/A. C32/40 62% OPC+30%FA P 28-26046 5.5 PASSED
South Tower

114 KAIG3-RFI-PA-S-2110-00 Picnic Area 11/18/20 Inspection for casting the Blinding Concrete under Foundation of Seating Area (3) at Zone-K (SA-28) as highlighted. C16/20 SRC P 28-26083 10

115 KAIG3-RFI-PA-S-2111-00 Picnic Area 11/18/20 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-29) as highlighted. PASSED

116 KAIG3-RFI-PA-S-2112-00 Picnic Area 11/18/20 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-30) as highlighted.

117 KAIG3-RFI-WG-S-2104-00 Water Play Garden 11/19/20 Concrete pouring & Shuttering for Kicker of boundary wall @ span 15, 16 & 17 at Water Garden as per attached highlighted drawings. C32/40 62% OPC+30%FA P 28-26134 6

Concrete Pouring for Stiffner Column's 14 no's (From Lintels Top to bottom of roof beam) @ Grid 6-9/A, 9-18/B, 18/A-F & 18-20/F as highlighted
118 KAIG3-RFI-MB-S-2106-00 Management Building 11/19/20 C32/40 62% OPC+30%FA P 28-26131 10
in attached drawings.
PASSED
119 C32/40 62% OPC+30%FA P 28-26129 10

120 C32/40 62% OPC+30%FA P 28-26128 10

121 KAIG3-RFI-SW-S-2109-00 Site Works 11/21/20 Inspection of Thrust block for Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line from (CH- 21 to CH-22) (as highlighted). C16/20 SRC P 28-26155 5 PASSED

Crescent 2 - Bridge to
122 KAIG3-RFI-CO-S-2122-00 11/21/20 Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/A1. C32/40 62% OPC+30%FA P 28-26160 5.5 PASSED
South Tower

kaig-qcals 43
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER Water Play & Boat DESCRIPTION DESIGN MIX QUANTITY
123 KAIG3-RFI-WG-S-2139-00 LOCATION CASTING
11/22/20 Concrete Pouring & Shuttering for Wall @ Span 14 for Boundary Wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA No.
P 29-13931 7)
Garden (m³
Water Play & Boat Concrete Pouring & Shuttering for Neck Column's 11 No's (2/B, C & D) (3/4, C, D & E) (4/B, C, D, E) @ Jetty # 1 at Boat Garden at highlighted
124 KAIG3-RFI-WG-S-2140-00 11/22/20 C32/40 62% OPC+30%FA P 29-13930 9
Garden area in attached drawings.
PASSED
Water Play & Boat
125 KAIG3-RFI-WG-S-2157-00 11/22/20 Concrete pouring & Shuttering for Kicker (2nd Lift) of boundary wall @ span 17 at Water Garden as per attached highlighted drawings. C32/40 62% OPC+30%FA P 29-13926 10
Garden

126 C32/40 62% OPC+30%FA P 29-13921 10

127 KAIG3-RFI-PA-S-2142-00 Picnic Area 11/22/20 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-G (SA-10, 11, 12, 13 ) as highlighted. C32/40 62% OPC+30%FA P 29-13947 6

128 C32/40 62% OPC+30%FA P 29-13946 9

129 C32/40 62% OPC+30%FA P 29-13942 9

130 C32/40 62% OPC+30%FA P 29-13941 9


PASSED
131 C32/40 62% OPC+30%FA P 29-13939 9

132 C32/40 62% OPC+30%FA P 29-13938 9

133 C32/40 62% OPC+30%FA P 29-13937 9

134 C32/40 62% OPC+30%FA P 29-13934 9

135 KAIG3-RFI-PA-S-2095-00 Picnic Area 11/23/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-21) as highlighted. C32/40 62% OPC+30%FA P 29-13960 9

136 KAIG3-RFI-PA-S-2136-00 Picnic Area 11/23/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-23) as highlighted. C32/40 62% OPC+30%FA P 29-13961 9

137 KAIG3-RFI-PA-S-2142-00 Picnic Area 11/23/20 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-G (SA-10, 11, 12, 13 ) as highlighted. C32/40 62% OPC+30%FA P 29-13962 9
PASSED
138 C32/40 62% OPC+30%FA P 29-13967 9.5

139 C32/40 62% OPC+30%FA P 29-13969 9.5

140 C32/40 62% OPC+30%FA P 29-13974 4

Concrete pouring & Shuttering for Footing of boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11/20) at Physic Garden at
141 KAIG3-RFI-PG-S-2153-00 Physic Garden 11/23/20 C32/40 62% OPC+30%FA P 29-13996 10
highlighted area in attached drawings.

C32/40 62% OPC+30%FA P 29-13997 10

142 C32/40 62% OPC+30%FA P 29-13992 9

143 C32/40 62% OPC+30%FA P 29-13989 9


PASSED
144 C32/40 62% OPC+30%FA P 29-13982 9

145 C32/40 62% OPC+30%FA P 29-13981 9

146 C32/40 62% OPC+30%FA P 29-13978 9

147 C32/40 62% OPC+30%FA P 29-13977 9

Crescent 2 - Bridge to
KAIG3-RFI-CO-S-2130-00 11/24/20 Concrete Pouring for Column of Bridge to South Tower (as highlighted) in Axis 02/B1. C32/40 62% OPC+30%FA P 29-14014 5.5 PASSED
South Tower

KAIG3-RFI-SW-S-2145-00 Site Works 11/24/20 Inspection for Casting the Blinding Concrete under foundation of SBC - 04 for the extended area - as per the approved drawing. C16/20 SRC P 29-14013 4 PASSED

KAIG3-RFI-CO-S-2125-00 Crescent - Tunnel 1 11/26/20 Concrete Pouring for Foundation of Tunnel 1 (Crescent) as highlighted. C32/40 62% OPC+30%FA P 29-14103 2

C32/40 62% OPC+30%FA P 28-26175 9

C32/40 62% OPC+30%FA P 28-26174 10

C32/40 62% OPC+30%FA P 28-26173 10

C32/40 62% OPC+30%FA P 28-26172 10

C32/40 62% OPC+30%FA P 28-26167 9

C32/40 62% OPC+30%FA P 28-26166 9


PASSED
C32/40 62% OPC+30%FA P 28-26165 9

C32/40 62% OPC+30%FA P 28-26161 9

C32/40 62% OPC+30%FA P 29-14094 9

C32/40 62% OPC+30%FA P 29-14093 9

C32/40 62% OPC+30%FA P 29-14090 9

C32/40 62% OPC+30%FA P 29-14089 9

C32/40 62% OPC+30%FA P 29-14088 9

kaig-qcals 44
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
KAIG3-RFI-MB-S-2175-00 LOCATION
Management Building CASTING
11/26/20 Concrete Pouring for Stiffner Column's, Lintels of Walls & Doors @ Grid between 9-10/N-Q as per highlighted in attached drawings. C32/40 62% OPC+30%FA No.
P 29-14087 10 )
(m³
PASSED
Concrete pouring for Stiffner Column's (From Lintels Top to bottom of roof beam) @ Grid 20/F-Q, 3-9/X, 9-17/W, 3/R-X, 19/Q-T, 3-6/R, 3/A-E,
KAIG3-RFI-MB-S-2173-00 Management Building 11/26/20
1-2/A, 2/A-E, 1/I-R & 2/I-R and Lintel @ Grid 19/Q-T, as per highlighted in attached drawings.

KAIG3-RFI-CO-S-2150-00 Crescent 11/25/20 Application of Protection Layer of Geotextile sheet 180 gr. Per sq.m and Screed of Tunnel Zone 5 (as highlighted). C32/40 62% OPC+30%FA P 29-14055 4

C32/40 62% OPC+30%FA P 29-14049 10 PASSED

C32/40 62% OPC+30%FA P 29-14044 10

148 KAIG3-RFI-PA-S-2189-00 Picnic Area 11/28/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-20) as highlighted. C32/40 62% OPC+30%FA P 29-14132 4

149 KAIG3-RFI-SW-S-2020-00 Site Works 11/28/20 Inspection of Formwork for the walls and Top slab of SBC-01 (Part-A) as highlighted. C32/40 62% OPC+30%FA P 29-14124 9 PASSED

150 C32/40 62% OPC+30%FA P 29-14123 9

Concrete Pouring & Shuttering of Kicker for boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11/20) at Physic Garden at
151 KAIG3-RFI-PG-S-2162-00 Physic Garden 11/28/20 C32/40 62% OPC+30%FA P 29-14157 9
highlighted area in attached drawings.

152 C32/40 62% OPC+30%FA P 29-14153 9

153 C32/40 62% OPC+30%FA P 29-14148 9


PASSED
154 C32/40 62% OPC+30%FA P 29-14146 9

155 C32/40 62% OPC+30%FA P 29-14138 8

156 C32/40 62% OPC+30%FA P 29-14137 9

Water Play & Boat


KAIG3-RFI-WG-S-2196-00 11/29/20 Concrete Pouring & Shuttering for Wall @ Span 15 & 16 of Boundary Wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA P 29-14185 10
Garden
PASSED
C32/40 67%OPC+25%FA P 29-14188 10

157 KAIG3-RFI-PA-S-2181-00 Picnic Area 11/29/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-L (SA-37) as highlighted. C16/20 SRC P 29-14173 8
PASSED
158 KAIG3-RFI-PA-S-2160-00 Picnic Area 11/29/20 Inspection for casting the Blinding Concrete under Footing of Seating Area (3) at Zone-G (SA-19) as highlighted.

Concrete Pouring for Blinding of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/10) at Physic Garden at highlighted
159 KAIG3-RFI-PG-S-2145-00 Physic Garden 11/29/20 C16/20 SRC P 29-14190 10 PASSED
area in attached drawings.
Crescent 2 - Bridge to
160 KAIG3-RFI-CO-S-2166-00 11/30/20 Concrete Pouring for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1. C32/40 62% OPC+30%FA P 29-14200 5.5 PASSED
South Tower

161 KAIG3-RFI-MB-S-2203-00 Management Building 11/30/20 Concrete Pouring for Lintels of Walls, Doors & Stiffner Column's @ Grid between 4-7/Q-X as per highlighted in attached drawings. C32/40 62% OPC+30%FA P 29-14201 8
PASSED
P 29-14203 8

162 KAIG3-RFI-PA-S-2215-00 Picnic Area 11/30/20 Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-G (as highlighted). C32/40 62% OPC+30%FA P 29-14211 6

163 C32/40 62% OPC+30%FA P 29-14207 9 PASSED

164 C32/40 62% OPC+30%FA P 29-14206 9

165 KAIG3-RFI-SW-S-2201-00 Site Works 11/30/20 Inspection of Concrete Pouring for walls and Top Slab of SBC-02 (Part-1) as highlighted. C32/40 62% OPC+30%FA P 29-14223 8

166 C32/40 62% OPC+30%FA P 29-14225 10

167 C32/40 62% OPC+30%FA P 29-14222 9

168 C32/40 62% OPC+30%FA P 29-14220 9 PASSED

169 C32/40 62% OPC+30%FA P 29-14218 10

170 C32/40 62% OPC+30%FA P 29-14217 10

171 C32/40 62% OPC+30%FA P 29-14216 9

172 KAIG3-RFI-AG-S-2226-00 Aviary Garden 11/30/20 Concrete Pouring for Blinding concrete for Boundary Wall (Part-1) at Aviary Garden as per attached highlighted drawings. C16/20 SRC P 29-14229 4
PASSED
173 C16/20 SRC P 29-14228 9

kaig-qcals 45
RUN DATE: February 12, 2023

KING ABDULLAH INTERNATIONAL GARDENS PROJECT


TOTAL QUANTITY TRUCK LOAD (M³): 1874.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY 28 DAYS
LOCATION CASTING No.
(m³) 7 DAYS AND
MORE THAN 28 DAYS
Concrete Pouring & Shuttering of Kicker for boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11/20) at Physic
1 KAIG3-RFI-PG-S-2162-00 Physic Garden 12/2/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14288 5
Garden at highlighted area in attached drawings.

2 KAIG3-RFI-MB-S-2243-00 Management Building 12/2/20 Concrete Pouring for Lintels of Walls, Doors & Window's @Grid 6/F-J, 6/M-R & 6-7/Q as per highlighted in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14285 11

3 C32/40 62% OPC+30%FA - 160+/-40 P 29-14269 10

4 C32/40 62% OPC+30%FA - 160+/-40 P 29-14277 10


PASSED

5 C32/40 62% OPC+30%FA - 160+/-40 P 29-14268 10

6 C32/40 62% OPC+30%FA - 160+/-40 P 29-14262 10

7 C32/40 62% OPC+30%FA - 160+/-40 P 29-14260 10

8 C32/40 62% OPC+30%FA - 160+/-40 P 29-14257 10

Concrete Pouring for Blinding for Boundary wall (Part-2, Grid 8-23 of Left Side) at Aviary Garden as per highlighted in attached
9 KAIG3-RFI-AG-S-2238-00 Aviary Garden 12/3/20 C16/20 SRC P 29-14347 9
drawings.
PASSED
10 C16/20 SRC P 29-14346 11

Water Play & Boat


11 KAIG3-RFI-WG-S-2269-00 12/5/20 Concrete Pouring & Shuttering for Wall @ span 17 of Boundary Wall at Water Garden, as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-26219 9
Garden
Concrete Pouring for Stiffner Column's, Lintels of Walls, Doors & Window's @ Grid 10-15/F, 13/F-H, 13-15/H, 11-15/Q, 13/N-Q, 13-
12 KAIG3-RFI-MB-S-2271-00 Management Building 12/5/20 C32/40 67%OPC+25%FA - 160+/-40 P 29-14372 6 PASSED
15/N & 15/F-Q, as per highlighted in attached drawings.

13 C32/40 67%OPC+25%FA - 160+/-40 P 29-14368 8

Water Play & Boat


14 KAIG3-RFI-WG-S-2197-00 12/5/20 Concrete Pouring & Shuttering for Retaining Wall @ Jetty # 1 at Boat Garden at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14355 9
Garden
PASSED
15 C32/40 62% OPC+30%FA - 160+/-40 P 29-14356 6

16 KAIG3-RFI-CO-S-2261-00 Crescent 12/7/20 Blinding/Plain Concrete Under foundation for Dividing (zone 2P) as highlighted 9 foundations. C16/20 SRC P 29-14437 10

17 C16/20 SRC P 29-14442 10


PASSED
18 C16/20 SRC P 29-14446 10

19 C16/20 SRC P 29-14451 9

Crescent 2 - Bridge to
20 KAIG3-RFI-CO-S-2263-00 12/7/20 Concrete Pouring for Column of Bridge to South Tower (as highlighted) in Axis 02/C1 - 2nd stage. C32/40 62% OPC+30%FA - 160+/-40 P 29-14452 5 PASSED
South Tower

Water Play & Boat


21 KAIG3-RFI-WG-S-2310-00 12/8/20 Concrete Pouring for blinding of boundary wall @ span 18 & 19 at Water Garden. C16/20 SRC P 29-14511 10 PASSED
Garden
Concrete pouring for Footing of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/10) at Physic Garden at
22 KAIG3-RFI-PG-S-2306-00 Physic Garden 12/8/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14506 9
highlighted area in attached Drawing's.

23 C32/40 62% OPC+30%FA - 160+/-40 P 29-14507 9


PASSED
24 C32/40 62% OPC+30%FA - 160+/-40 P 29-14508 9

25 C32/40 62% OPC+30%FA - 160+/-40 P 29-14509 8

26 KAIG3-RFI-PA-S-2283-00 Picnic Area 12/8/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-22) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14479 9

27 KAIG3-RFI-PA-S-2284-00 Picnic Area 12/8/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-28) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14480 9

28 KAIG3-RFI-PA-S-2285-00 Picnic Area 12/8/20 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-11 ) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14485 9
PASSED
29 KAIG3-RFI-PA-S-2286-00 Picnic Area 12/8/20 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-29 & 30) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14486 10

30 C32/40 62% OPC+30%FA - 160+/-40 P 29-14493 10

31 C32/40 62% OPC+30%FA - 160+/-40 P 29-14503 4

kaig-qcals 46
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION
Concrete Pouring for Blinding of Boundary wall (Part-4, Grid 3-9 of Left Side) at Aviary Garden, As per Highlighted in attached DESIGN MIX QUANTITY
32 KAIG3-RFI-AG-S-2309-00 LOCATION
Aviary Garden CASTING
12/9/20 C16/20 SRC No.
P 29-14526 9)
Drawing's. (m³

33 C16/20 SRC P 29-14527 6


PASSED
34 C16/20 SRC P 29-14528 5

35 C16/20 SRC P 29-14531 3

Crescent 1 - Retaining
36 KAIG3-RFI-CO-S-2265-00 12/10/20 Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AN TO AP). C32/40 62% OPC+30%FA - 160+/-40 P 29-14568 10
Wall

37 C32/40 62% OPC+30%FA - 160+/-40 P 29-14567 10


PASSED
38 C32/40 62% OPC+30%FA - 160+/-40 P 29-14566 10

39 C32/40 62% OPC+30%FA - 160+/-40 P 29-14565 10

Concrete pouring & Shuttering for Kicker (1st lift) of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/10)
40 KAIG3-RFI-PG-S-2315-00 Physic Garden 12/10/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14563 10
at Physic Garden at highlighted area in attached drawings.
PASSED
41 C32/40 62% OPC+30%FA - 160+/-40 P 29-14564 10

42 KAIG3-RFI-CO-S-2207-00 Crescent 1 12/10/20 Protection Layer of Geotextile sheet and 30mm Screed under PC 105 to 110 (as Highlighted). C32/40 62% OPC+30%FA - 240+/-20 P 29-14553 5 PASSED

43 KAIG3-RFI-WG-S-2343-00 Water Garden 12/10/20 Concrete Pouring for Blinding of Boundary Wall @ span 20 & 21 at Water Garden. C16/20 SRC P 29-14569 7 PASSED

44 KAIG3-RFI-PA-S-2323-00 Picnic Area 12/12/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G&K (SA-24,25) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14576 9

45 KAIG3-RFI-PA-S-2332-00 Site Works 12/12/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-23) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14577 9

46 KAIG3-RFI-SW-S-2340-00 Site Works 12/12/20 Inspection of Concrete Pouring for Foundation and Kicker of SBC-04 as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14583 9
PASSED
47 C32/40 62% OPC+30%FA - 160+/-40 P 29-14585 9

48 C32/40 62% OPC+30%FA - 160+/-40 P 29-14587 10

49 C32/40 62% OPC+30%FA - 160+/-40 P 29-14588 10

Concrete Pouring for Stiffner Column's, Lintels of Doors & Walls @ Grid (between 3-4/R-V) (3-4/V) (4/R-T) & (4/V-X) as per
50 KAIG3-RFI-MB-S-2342-00 Management Building 12/12/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14586 8 PASSED
highlighted in attached drawings.
Concrete pouring & Shuttering for Wall of boundary wall @ (EXC1-12/13 to EXC3-11/20) at Physic Garden at highlighted area in
51 KAIG3-RFI-PG-S-2327-00 Physic Garden 12/12/20 C32/40 67%OPC+25%FA - 160+/-40 P 29-14596 9
attached drawings.

52 C32/40 67%OPC+25%FA - 160+/-40 P 29-14597 9

53 C32/40 67%OPC+25%FA - 160+/-40 P 29-14601 9 PASSED

54 C32/40 67%OPC+25%FA - 160+/-40 P 29-14602 9

55 C32/40 67%OPC+25%FA - 160+/-40 P 29-14604 9

56 KAIG3-RFI-CO-S-2325-00 Crescent - Tunnel 1 12/12/20 Concreting for Wall of Tunnel 1 (Crescent) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14603 9

57 C32/40 62% OPC+30%FA - 160+/-40 P 29-14605 9


PASSED
58 C32/40 62% OPC+30%FA - 160+/-40 P 29-14606 9

59 C32/40 62% OPC+30%FA - 160+/-40 P 29-14609 2

Concrete Pouring for Blinding for Boundary wall (Part-3, Grid 21-23 of Left Side) at Aviary Garden as per highlighted in attached
60 KAIG3-RFI-AG-S-2305-00 Aviary Garden 12/12/20 C16/20 SRC P 29-14607 10
drawings.
PASSED
61 C16/20 SRC P 29-14608 10

Concrete pouring & Shuttering for Kicker (2nd lift) of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/10)
62 KAIG3-RFI-PG-S-2344-00 Physic Garden 12/13/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14624 10
at Physic Garden at highlighted area in attached drawings.

63 C32/40 62% OPC+30%FA - 160+/-40 P 29-14625 10


PASSED
64 C32/40 62% OPC+30%FA - 160+/-40 P 29-14634 9

65 C32/40 62% OPC+30%FA - 160+/-40 P 29-14635 6

Crescent Promenade
66 KAIG3-RFI-CO-S-2339-00 12/13/20 Concreting for Column of Promenade Bridge axis 01-O. C32/40 62% OPC+30%FA - 160+/-40 P 29-14638 8 PASSED
Bridge

Concrete Pouring for Stiffner Column's, Lintels of Walls, Doors & Window's @ Grid 1-2/F-I & 3-5/E as per highlighted in attached
67 KAIG3-RFI-MB-S-2329-00 Management Building 12/14/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26230 10
drawings.
Concrete Pouring for Footing & Buttress of Boundary wall (Part-1, Grid 20-23 of Left Side & Upside) at Aviary Garden as per
68 KAIG3-RFI-AG-S-2367-00 Aviary Garden 12/14/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26232 10
highlighted in attached drawings.

69 C32/40 62% OPC+30%FA - 160+/-40 P 28-26233 10 PASSED

70 C32/40 62% OPC+30%FA - 160+/-40 P 28-26235 10

71 C32/40 62% OPC+30%FA - 160+/-40 P 28-26245 5

kaig-qcals 47
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION
Concrete Pouring for Blinding for Boundary wall (Part-6, Grid 2-1/left side & 1-3/Right Side) at Aviary Garden as per highlighted in DESIGN MIX QUANTITY
72 KAIG3-RFI-AG-S-2377-00 LOCATION
Aviary Garden CASTING
12/14/20 C16/20 SRC No.
P 28-26244 10 ) PASSED
attached drawings. (m³

73 KAIG3-RFI-PA-S-2352-00 Picnic Area 12/15/20 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-13) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14659 9

74 C32/40 62% OPC+30%FA - 160+/-40 P 29-14664 9 PASSED

75 C32/40 62% OPC+30%FA - 160+/-40 P 29-14667 8

76 KAIG3-RFI-SW-S-2379-00 Site Works 12/16/20 Inspection of Concrete Pouring for Walls and Top Slab of SBC-02 (Part-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14714 10

77 C32/40 62% OPC+30%FA - 160+/-40 P 29-14715 10

78 C32/40 62% OPC+30%FA - 160+/-40 P 29-14719 10 PASSED

79 C32/40 62% OPC+30%FA - 160+/-40 P 29-14720 9.5

80 C32/40 62% OPC+30%FA - 160+/-40 P 29-14723 9.5

Protection Layer of Geo-textile sheet and Screed Protection 50mm thick below Foundation Colonnadeds (dividing at Zone 2P) (as
81 KAIG3-RFI-CO-S-2336-00 Crescent 2 12/16/20 C32/40 62% OPC+30%FA - 240+/-20 P 29-14728 7 PASSED
highlighted).
Concrete Pouring & Shuttering for Wall of Boundary Wall @ (EXC1-04/05 to EXC3-01/10) at Physic Garden at highlighted area in
82 KAIG3-RFI-PG-S-2371-00 Physic Garden 12/16/20 C32/40 67%OPC+25%FA - 160+/-40 P 29-14731 10
attached drawings.

83 C32/40 67%OPC+25%FA - 160+/-40 P 29-14734 10

84 C32/40 67%OPC+25%FA - 160+/-40 P 29-14736 10 PASSED

85 C32/40 67%OPC+25%FA - 160+/-40 P 29-14739 10

86 C32/40 67%OPC+25%FA - 160+/-40 P 29-14741 4

Crescent Promenade
87 KAIG3-RFI-CO-S-2366-00 12/16/20 Concreting for Column of Promenade Bridge axis 01-N. C32/40 62% OPC+30%FA -160+/-40 P 29-14738 8 PASSED
Bridge
Water Play & Boat
88 KAIG3-RFI-WG-S-2395-00 12/17/20 Concrete Pouring & Shuttering for Footing @ span 18 & 19 for boundary wall at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14757 9
Garden
Concrete Pouring for S.O.G @ Grid 17-18/F-H, 17-19/O-S & Between 10-12/R-S (Excluding Electrical Room) as per highlighted in
89 KAIG3-RFI-MB-S-2397-00 Management Building 12/17/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14759 9
attached Drawing's.

90 C32/40 62% OPC+30%FA - 160+/-40 P 29-14760 9


PASSED
91 C32/40 62% OPC+30%FA - 160+/-40 P 29-14763 8

92 C32/40 62% OPC+30%FA - 160+/-40 P 29-14769 9

93 C32/40 62% OPC+30%FA - 160+/-40 P 29-14772 6

Crescent 1 - Retaining
94 KAIG3-RFI-CO-S-2265-00 12/17/20 Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AN TO AP). C32/40 62% OPC+30%FA - 240+/-20 P 29-14778 10
Wall
PASSED
95 C32/40 62% OPC+30%FA - 240+/-20 P 29-14781 10

96 KAIG3-RFI-PA-S-2390-00 Picnic Area 12/19/20 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-10) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14806 9
PASSED
97 C32/40 62% OPC+30%FA - 160+/-40 P 29-14808 9

Water Play & Boat


98 KAIG3-RFI-WG-S-2403-00 12/19/20 Concrete Pouring & Shuttering for Abutment Wall @ Jetty # 2 at Boat Garden at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14813 9
Garden
Water Play & Boat Concrete Pouring & Shuttering for Neck Column's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4/B,C&D) @ Jetty # 2 at
99 KAIG3-RFI-WG-S-2391-00 12/19/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14816 9 PASSED
Garden Boat Garden at highlighted area in attached Drawing's.

100 C32/40 62% OPC+30%FA - 160+/-40 P 29-14817 7

Crescent 1 - Retaining
101 KAIG3-RFI-CO-S-2293-00 12/19/20 Concreting for Retaining Wall (Wall) (as highlighted at Axis AJ to AL). C32/40 62% OPC+30%FA - 160+/-40 P 29-14834 9
Wall

102 KAIG3-RFI-CO-S-2363-00 Crescent - Tunnel 1 12/19/20 Concreting for Wall of Tunnel 1 (crescent) as highlighted 2 outer walls. C32/40 62% OPC+30%FA - 160+/-40 P 29-14833 9

103 C32/40 62% OPC+30%FA - 160+/-40 P 29-14831 10

104 C32/40 62% OPC+30%FA - 160+/-40 P 29-14830 10

105 C32/40 62% OPC+30%FA - 160+/-40 P 29-14829 10


PASSED
106 C32/40 62% OPC+30%FA - 160+/-40 P 29-14825 10

107 C32/40 62% OPC+30%FA - 160+/-40 P 29-14824 10

108 C32/40 62% OPC+30%FA - 160+/-40 P 29-14823 10

109 C32/40 62% OPC+30%FA - 160+/-40 P 29-14815 10

110 C32/40 62% OPC+30%FA - 160+/-40 P 29-14814 10

kaig-qcals 48
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER Concrete Pouring & Shuttering for Wall of Boundary Wall DESCRIPTION
@ (EXC4-43/44 to EXC4-51/52) at Physic Garden at highlighted area in DESIGN MIX QUANTITY
111 KAIG3-RFI-PG-S-2372-00 LOCATION
Physic Garden CASTING
12/19/20 C32/40 67%OPC+25%FA - 160+/-40 No.
P 29-14828 7)
attached drawings. (m³
Concrete Pouring & Shuttering for Wall of boundary wall @ (EXC4-01/02 to EXC4-09/10) at Physic Garden at highlighted area in
112 KAIG3-RFI-PG-S-2426-00 Physic Garden 12/19/20 C32/40 67%OPC+25%FA - 160+/-40 P 29-14827 9 PASSED
attached drawings.

113 C32/40 67%OPC+25%FA - 160+/-40 P 29-14826 9

Water Play & Boat


114 KAIG3-RFI-WG-S-2412-00 12/20/20 Concrete Pouring for Kicker (1st Lift) @ span 18 & 19 for boundary wall at Water Garden, as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14851 10
Garden

115 KAIG3-RFI-AG-S-2414-00 Aviary Garden 12/20/20 Concrete Pouring for Footing of Boundary wall (Grid 11-20/Left Side) at Aviary Garden as per highlighted in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14850 10

116 C32/40 62% OPC+30%FA - 160+/-40 P 29-14864 10


PASSED
117 C32/40 62% OPC+30%FA - 160+/-40 P 29-14867 10

118 C32/40 62% OPC+30%FA - 160+/-40 P 29-14875 9

119 C32/40 62% OPC+30%FA - 160+/-40 P 29-14876 6

120 KAIG3-RFI-CO-S-2321-00 Crescent - Tunnel 1 12/21/20 Concreting for Foundation of Tunnel 1 near MCPE (Crescent) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14881 11

121 C32/40 62% OPC+30%FA - 160+/-40 P 29-14882 9

122 C32/40 62% OPC+30%FA - 160+/-40 P 29-14883 9

123 C32/40 62% OPC+30%FA - 160+/-40 P 29-14884 9

124 C32/40 62% OPC+30%FA - 160+/-40 P 29-14885 9


PASSED
125 C32/40 62% OPC+30%FA - 160+/-40 P 29-14886 9

126 C32/40 62% OPC+30%FA - 160+/-40 P 29-14887 9

127 C32/40 62% OPC+30%FA - 160+/-40 P 29-14888 11

128 C32/40 62% OPC+30%FA - 160+/-40 P 29-14889 9

129 C32/40 62% OPC+30%FA - 160+/-40 P 29-14890 10

130 KAIG3-RFI-PA-S-2430-00 Picnic Area 12/21/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-21) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26264 9

131 KAIG3-RFI-PA-S-2431-00 Picnic Area 12/21/20 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-12) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26266 9 PASSED

132 C32/40 62% OPC+30%FA - 160+/-40 P 28-26269 8

Water Play & Boat


133 KAIG3-RFI-WG-S-2429-00 12/21/20 Concrete Pouring & Shuttering for Footing @ span 20 & 21 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26290 9
Garden

134 C32/40 62% OPC+30%FA - 160+/-40 P 28-26291 9

135 C32/40 62% OPC+30%FA - 160+/-40 P 28-26292 11 PASSED

136 C32/40 62% OPC+30%FA - 160+/-40 P 28-26294 9

137 C32/40 62% OPC+30%FA - 160+/-40 P 28-26295 7

kaig-qcals 49
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
138 KAIG3-RFI-SW-S-2445-00 LOCATION
Site Works CASTING
12/22/20 Inspection of Concrete Pouring for Walls and Top Slab of SBC-04 as highlighted. C32/40 62% OPC+30%FA - 160+/-40 No.
P 29-14900 9)
(m³

139 C32/40 62% OPC+30%FA - 160+/-40 P 29-14901 9


PASSED
140 C32/40 62% OPC+30%FA - 160+/-40 P 29-14902 9

141 C32/40 62% OPC+30%FA - 160+/-40 P 29-14904 3

Concrete pouring for Lintels of Doors & Walls & Stiffner Column's, @ Grid Between 9-10/R-W, 12-14/R-W, 9-10/A-E & 8-9/G-H as
142 KAIG3-RFI-MB-S-2433-00 Management Building 12/23/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14932 9
same as highlighted in attached drawings.
Water Play & Boat Concrete Pouring & Shuttering for Kicker inside (2nd Lift) @ span 18 & 19 for boundary wall at Water Garden, as per attached
143 KAIG3-RFI-WG-S-2443-00 12/23/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14933 9
Garden drawings.
Concrete pouring for Lintels of Doors & Walls & Stiffner Column's at Shower Area @ Grid Between 7-9/R-X, as highlighted in
144 KAIG3-RFI-MB-S-2468-00 Management Building 12/23/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14937 9
attached drawings.
PASSED
145 C32/40 62% OPC+30%FA - 160+/-40 P 29-14941 9

146 C32/40 62% OPC+30%FA - 160+/-40 P 29-14943 10

147 C32/40 62% OPC+30%FA - 160+/-40 P 29-14944 10

Crescent 2 - Bridge to
148 KAIG3-RFI-CO-S-2318-00 12/22/20 Concrete Pouring for Column of Bridge to South Tower (as highlighted) in Axis 02/B1 2nd. C32/40 62% OPC+30%FA - 160+/-40 P 29-14914 3.5
South Tower
Crescent - Promenade
149 KAIG3-RFI-CO-S-2400-00 12/22/20 Concreting works for Column of CENTRAL Bridge axis 02-AI. PASSED
Bridge
Crescent 2 - Bridge to
150 KAIG3-RFI-CO-S-2425-00 12/22/20 Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/A 2nd.
South Tower

151 KAIG3-RFI-PA-S-2464-00 Picnic Area 12/24/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-19) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26313 10
PASSED
152 KAIG3-RFI-PA-S-2465-00 Picnic Area 12/24/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-25) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26311 10

Water Play & Boat


153 KAIG3-RFI-WG-S-2473-00 12/24/20 Concrete Pouring for Blinding of boundary wall @ span 22 & 23 @ Water Garden. at highlighted area in attached drawings. C16/20 SRC P 28-26317 9
Garden
PASSED
154 C16/20 SRC P 28-26320 9

Concrete pouring for Lintels of Doors & Walls & Stiffner Column's, @ Grid Between 9-10/R-W, 12-14/R-W, 9-10/A-E & 8-9/G-H as
155 KAIG3-RFI-MB-S-2433-00 Management Building 12/24/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26327 8 PASSED
same as highlighted in attached drawings.

156 KAIG3-RFI-CO-S-2460-00 Crescent 12/24/20 Concreting of foundation for Colonnades (zone 2P) as highlighted 9 foundations. C32/40 62% OPC+30%FA - 160+/-40 P 28-26331 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-26332 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-26335 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-26338 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-26341 9


PASSED
C32/40 62% OPC+30%FA - 160+/-40 P 28-26342 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-26344 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-26345 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-26346 8

C32/40 62% OPC+30%FA - 160+/-40 P 28-26352 8

Water Play & Boat Concrete Pouring & Shuttering for Kicker Inside (2nd Lift) @span 20 & 21 of boundary wall at Water Garden as per attached
KAIG3-RFI-WG-S-2482-00 12/26/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26389 10
Garden drawings.

C32/40 62% OPC+30%FA - 160+/-40 P 28-26390 9 PASSED

C32/40 62% OPC+30%FA - 160+/-40 P 28-26391 9

KAIG3-RFI-SW-S-2495-00 Site Works 12/27/20 Inspection for Casting the Blinding Concrete under foundation of Cesspool-2. C16/20 SRC P 29-14953 9
PASSED
KAIG3-RFI-PA-S-2497-00 Picnic Area 12/27/20 Inspection for Casting the Blinding Concrete under the Footing of Play Area (03) at Zone-G as highlighted.

KAIG3-RFI-AG-S-2475-00 Aviary Garden 12/27/20 Concrete pouring for Footing of Boundary wall (1-11/Right side) at Aviary Garden as per highlighted in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14960 9

Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some part of A to B) @ Butterfly
KAIG3-RFI-TG-S-2509-00 Butterfly Garden 12/27/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14961 9
Garden at highlighted areas in attached drawings.

C32/40 62% OPC+30%FA - 160+/-40 P 29-14962 9

C32/40 62% OPC+30%FA - 160+/-40 P 29-14968 9

C32/40 62% OPC+30%FA - 160+/-40 P 29-14971 9

C32/40 62% OPC+30%FA - 160+/-40 P 29-14972 10 PASSED

148 C32/40 62% OPC+30%FA - 160+/-40 P 29-14976 10

149 C32/40 62% OPC+30%FA - 160+/-40 P 29-14979 10

150 C32/40 62% OPC+30%FA - 160+/-40 P 29-14985 9

151 C32/40 62% OPC+30%FA - 160+/-40 P 29-14987 6

152 C32/40 62% OPC+30%FA - 160+/-40 P 29-14988 2

kaig-qcals 50
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
153 KAIG3-RFI-PA-S-2503-00 LOCATION
Picnic Area CASTING
12/28/20 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-28 & 32) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 No.
P 28-26409 9)
(m³
PASSED
154 KAIG3-RFI-PA-S-2504-00 Picnic Area 12/28/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-24) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26412 8

Water Play & Boat


155 KAIG3-RFI-WG-S-2512-00 12/28/20 Concrete Pouring for Blinding of boundary wall @ span 1, 2, 3 & 4 @ Water Garden at highlighted area in attached drawings. C16/20 SRC P 28-26440 10
Garden
PASSED
156 C16/20 SRC P 28-26438 10

Concrete pouring for Footing of Boundary wall @ Grid (1-11/Left side) (16-20/Right side) at Aviary Garden as per highlighted in
157 KAIG3-RFI-AG-S-2519-00 Aviary Garden 12/28/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26421 9
attached drawings.

158 C32/40 62% OPC+30%FA - 160+/-40 P 28-26422 9

159 C32/40 62% OPC+30%FA - 160+/-40 P 28-26423 9

160 C32/40 62% OPC+30%FA - 160+/-40 P 28-26427 9

161 C32/40 62% OPC+30%FA - 160+/-40 P28-26430 9 PASSED

162 C32/40 62% OPC+30%FA - 160+/-40 P 28-26431 9

163 C32/40 62% OPC+30%FA - 160+/-40 P 28-26434 9

164 C32/40 62% OPC+30%FA - 160+/-40 P 28-26436 9

165 C32/40 62% OPC+30%FA - 160+/-40 P 28-26437 4

Crescent - Promenade
166 KAIG3-RFI-CO-S-2400-00 12/29/20 Concreting works for Column of CENTRAL Bridge axis 02-AI. C32/40 62% OPC+30%FA - 160+/-40 P 28-26467 5
Bridge
Crescent - Promenade
167 KAIG3-RFI-CO-S-2422-00 12/29/20 Concreting works for Column of CENTRAL Bridge axis 02-AJ. C32/40 62% OPC+30%FA - 160+/-40 P 28-26462 10
Bridge
Crescent 2 - Bridge to
168 KAIG3-RFI-CO-S-2425-00 12/29/20 Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/A 2nd. C32/40 62% OPC+30%FA - 160+/-40 P 28-26456 10
South Tower
PASSED
169 C32/40 62% OPC+30%FA - 160+/-40 P 28-26453 10

170 C32/40 62% OPC+30%FA - 160+/-40 P 28-26451 10

171 C32/40 62% OPC+30%FA - 160+/-40 P 28-26450 10

Water Play & Boat


172 KAIG3-RFI-WG-S-2512-00 12/29/20 Concrete Pouring for Blinding of boundary wall @ span 1, 2, 3 & 4 @ Water Garden at highlighted area in attached drawings. C16/20 SRC P 28-26459 10 PASSED
Garden
Water Play & Boat Concrete pouring & Shuttering for Wall & Column's @ span 18 & 19 and C18 & C19 for boundary wall at Water Garden, as per
173 KAIG3-RFI-WG-S-2510-00 12/30/20 C32/40 67%OPC+25%FA - 160+/-40 P 29-15010 9
Garden attached drawings.

174 C32/40 67%OPC+25%FA - 160+/-40 P 29-15015 9 PASSED

175 C32/40 67%OPC+25%FA - 160+/-40 P 29-15020 9

Crescent 1 - Retaining
176 KAIG3-RFI-CO-S-2463-00 12/30/20 Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AL TO AN) C32/40 62% OPC+30%FA - 160+/-40 P 29-15017 9
Wall

177 C32/40 62% OPC+30%FA - 160+/-40 P 29-15022 9

178 C32/40 62% OPC+30%FA - 160+/-40 P 29-15028 9 PASSED

179 C32/40 62% OPC+30%FA - 160+/-40 P 29-15032 9

180 C32/40 62% OPC+30%FA - 160+/-40 P 29-15033 9

Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some part of A to B) @ Butterfly
181 KAIG3-RFI-TG-S-2509-00 Butterfly Garden 12/30/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-15029 9 PASSED
Garden at highlighted areas in attached drawings.

182 KAIG3-RFI-CO-S-2224-01 Crescent 1 12/30/20 Geotextile sheet 180 gr. per sq.m and Screed above foundation (Inner and Outer) of Retaining Wall at Axis AP to AV (as highligted). C32/40 62% OPC+30%FA - 240+/-20 P 29-15041 10 PASSED

Water Play & Boat


183 KAIG3-RFI-WG-S-2545-00 12/30/20 Concrete Pouring for Blinding of boundary wall @ span 24 & 25 @ Water Garden. at highlighted area in attached drawings. C16/20 SRC P 29-15007 10 PASSED
Garden
Water Play & Boat Concrete pouring & Shuttering for Walls & Column's @ span 20 & 21 and C20 & C21 for boundary wall at Water Garden as per
184 KAIG3-RFI-WG-S-2518-00 12/31/2020 C32/40 67%OPC+25%FA - 160+/-40 P 29-15066 9
Garden highlighted in attached drawings.

185 C32/40 67%OPC+25%FA - 160+/-40 P 29-15070 9 PASSED

186 C32/40 67%OPC+25%FA - 160+/-40 P 29-15071 9

kaig-qcals 51
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-PA-S-2532-00 Picnic Area 1/2/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-29 & 30) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15091 9 PASSED

Water Play & Boat


2 KAIG3-RFI-WG-S-2545-00 1/2/21 Concrete Pouring for Blinding of boundary wall @ span 24 & 25 @ Water Garden. at highlighted area in attached drawings. C16/20 SRC P 29-15095 6 PASSED
Garden

3 KAIG3-RFI-SW-S-2535-00 Site Works 1/3/21 Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-2 (as highlighted). C32/40 62% OPC+30%FA - 240+/-20 P 29-15131 3 PASSED

Water Play & Boat


4 KAIG3-RFI-WG-S-2568-00 1/4/21 Concrete pouring & Shuttering for Footing @ span 3 & 4 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15173 10
Garden
Water Play & Boat
5 KAIG3-RFI-WG-S-2571-00 1/4/21 Concrete pouring & Shuttering for Footing @ span 22 & 23 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15174 10
Garden

6 C32/40 62% OPC+30%FA - 160+/-40 P 29-15176 10

7 C32/40 62% OPC+30%FA - 160+/-40 P 29-15184 9 PASSED

8 C32/40 62% OPC+30%FA - 160+/-40 P 29-15186 9

9 C32/40 62% OPC+30%FA - 160+/-40 P 29-15187 9

10 C32/40 62% OPC+30%FA - 160+/-40 P 29-15188 6

11 KAIG3-RFI-CO-S-2515-00 Crescent - Tunnel 1 1/3/21 Concreting for Foundation of Tunnel 1 (crescent) as highlighted Going axis 02/1. C32/40 62% OPC+30%FA - 160+/-40 P 29-15109 10

12 C32/40 62% OPC+30%FA - 160+/-40 P 29-15110 10

13 C32/40 62% OPC+30%FA - 160+/-40 P 29-15112 10

14 C32/40 62% OPC+30%FA - 160+/-40 P 29-15115 10

15 C32/40 62% OPC+30%FA - 160+/-40 P 29-15117 10

16 C32/40 62% OPC+30%FA - 160+/-40 P 29-15119 10 PASSED

17 C32/40 62% OPC+30%FA - 160+/-40 P 29-15124 10

18 C32/40 62% OPC+30%FA - 160+/-40 P 29-15125 10

19 C32/40 62% OPC+30%FA - 160+/-40 P 29-15129 4

20 C32/40 62% OPC+30%FA - 160+/-40 P 29-15138 9

21 C32/40 62% OPC+30%FA - 160+/-40 P 29-15139 9

22 KAIG3-RFI-PA-S-2577-00 Picnic Area 1/5/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-19) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15219 11 PASSED

Concrete Pouring for Lintels of Doors & Walls & Stiffner Column's at Grid between 17-18/E-I, 17-19/M-Q, 4-5/T-N, as highlighted in
23 KAIG3-RFI-MB-S-2547-00 Management Building 1/5/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-15229 9 PASSED
attached drawings.
Water Play & Boat
24 KAIG3-RFI-WG-S-2599-00 1/6/21 Concrete Pouring & Shuttering for Footing @ span 1, of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15254 10
Garden
Water Play & Boat
25 KAIG3-RFI-WG-S-2600-00 1/6/21 Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 3 & 4, of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15256 10
Garden
Water Play & Boat
26 KAIG3-RFI-WG-S-2607-00 1/6/21 Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 22 & 23, of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15261 10
Garden
Water Play & Boat
27 KAIG3-RFI-WG-S-2609-00 1/6/21 Concrete Pouring & Shuttering for Footing @ span 24 & 25, of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15264 10
Garden
PASSED
28 C32/40 62% OPC+30%FA - 160+/-40 P 29-15267 10

kaig-qcals 52
Consultant : DAR

Main Contractor: ZHBG

PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl29
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-15271 QUANTITY
10
LOCATION CASTING No.
(m³)

30 C32/40 62% OPC+30%FA - 160+/-40 P 29-15272 10

31 C32/40 62% OPC+30%FA - 160+/-40 P 29-15274 6

32 KAIG3-RFI-CO-S-2576-00 Crescent 1/6/21 Shuttering and Concreting of Blinding for Retaining wall Foundation Between Axis AA to AB (as highlighted). C16/20 SRC P 29-15278 10 PASSED

33 KAIG3-RFI-PA-S-2578-00 Picnic Area 1/6/21 Inspection of Concrete Pouring for the Foundation of Play Area (3) at Zone-G as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15284 9
PASSED
34 C32/40 62% OPC+30%FA - 160+/-40 P 29-15287 8

35 KAIG3-RFI-CO-S-2606-00 Crescent - Tunnel 1 1/6/21 Concreting for Mid Wall of Tunnel 1 going Axis 02/1 (crescent) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15288 9
PASSED
36 C32/40 62% OPC+30%FA - 160+/-40 P 29-15290 9

Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation "A to B to C to D & (Some part of D to A) @ Maze
37 KAIG3-RFI-ZG-S-2626-00 Maze Garden 1/7/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-15315 9
Garden at highlighted areas in attached drawings.
PASSED
38 C32/40 62% OPC+30%FA - 160+/-40 P 29-15318 7

39 KAIG3-RFI-CO-S-2576-00 Crescent 1/7/21 Shuttering and Concreting of Blinding for Retaining wall Foundation Between Axis AA to AB (as highlighted). C16/20 SRC P 29-15323 10

40 C16/20 SRC P 29-15326 10

C16/20 SRC P 29-15329 10

41 C16/20 SRC P 29-15332 10 PASSED

42 C16/20 SRC P 29-15333 10

43 C16/20 SRC P 29-15338 10

44 C16/20 SRC P 29-15347 5

45 KAIG3-RFI-PA-S-2651-00 Site Works 1/10/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (1) at Zone-J (SA-8) as highlighted. C16/20 SRC P 29-15394 8 PASSED

46 KAIG3-RFI-WG-S-2642-00 Water Play Garden 1/10/21 Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 24 & 25 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15379 10

47 KAIG3-RFI-WG-S-2643-00 Water Play Garden 1/10/21 Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 22 & 23 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15380 10

48 KAIG3-RFI-WG-S-2644-00 Water Play Garden 1/10/21 Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 1 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15390 10

49 KAIG3-RFI-WG-S-2645-00 Water Play Garden 1/10/21 Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 3 & 4 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15392 10 PASSED

50 C32/40 62% OPC+30%FA - 160+/-40 P 29-15395 10

51 C32/40 62% OPC+30%FA - 160+/-40 P 29-15398 10

52 C32/40 62% OPC+30%FA - 160+/-40 P 29-15399 10

Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation "A to B to C to D & (Some part of D to A) @ Maze
53 KAIG3-RFI-ZG-S-2626-00 Maze Garden 1/10/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-15363 10.5
Garden at highlighted areas in attached drawings.
PASSED
54 C32/40 62% OPC+30%FA - 160+/-40 P 29-15368 10.5

55 KAIG3-RFI-SW-S-2650-00 Site Works 1/11/21 Inspection of Concrete Pouring for Foundation and Kicker of Cesspool-02 (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-15411 9

56 C32/40 62% OPC+30%FA - 160+/-40 P 29-15413 4

57 KAIG3-RFI-CO-S-2657-00 Crescent 1/11/21 Concreting of Blinding for Foundation of Tunnel 2 (as highlighted). C16/20 SRC P 29-15437 10

kaig-qcals 53

PASSED
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/
Crescent - Retaining DATE OF DELIVERY NOTE
Sl58
No. KAIG3-RFI-CO-S-2708-00
RFI NUMBER 1/11/21 DESCRIPTION
Concreting of Blinding of Retaining wall Foundation shearkey at Axis 01-W to 01-S. DESIGN MIX
C16/20 SRC P 29-15439 QUANTITY
10
LOCATION
Wall CASTING No.
(m³)

59 C16/20 SRC P 29-15441 10 PASSED

60 C16/20 SRC P 29-15442 10

61 C16/20 SRC P 29-15443 10

62 KAIG3-RFI-PA-S-2694-00 Picnic Area 1/13/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-N (SA-5) as highlighted. C16/20 SRC P 29-15496 8 PASSED

Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation "A to B to C to D & (Some part of D to A) @ Maze
63 KAIG3-RFI-ZG-S-2626-00 Maze Garden 1/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-15497 10
Garden at highlighted areas in attached drawings.

64 KAIG3-RFI-WG-S-2690-00 Water Play Garden 1/13/21 Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 1, of boundary wall at Water Garden, as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15499 9

65 KAIG3-RFI-WG-S-2704-00 Water Play Garden 1/13/21 Concrete Pouring Kicker Inside (2nd lift) @ span 24 & 25, of boundary wall at Water Garden, as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15502 9

66 C32/40 62% OPC+30%FA - 160+/-40 P 29-15510 9 PASSED

67 C32/40 62% OPC+30%FA - 160+/-40 P 29-15513 9

68 C32/40 62% OPC+30%FA - 160+/-40 P 29-15520 9

69 C32/40 62% OPC+30%FA - 160+/-40 P 29-15522 9

Crescent - Retaining
70 KAIG3-RFI-CO-S-2618-00 1/13/21 Concreting of Plain Concrete of foundation at South Administration Building (as Highlighted) Zone 2C. C16/20 SRC P 29-15500 9
Wall

71 KAIG3-RFI-CO-S-2630-00 Crescent 1/13/21 Concreting of 2nd Layer Plain Concrete Below Foundation of Strip Footing at TIP zone 1A. C16/20 SRC P 29-15501 9

72 C16/20 SRC P 29-15504 10

73 C16/20 SRC P 29-15505 10


PASSED
74 C16/20 SRC P 29-15512 10

75 C16/20 SRC P 29-15514 10

76 C16/20 SRC P 29-15521 10

77 C16/20 SRC P 29-15524 10

78 KAIG3-RFI-PA-S-2705-00 Picnic Area 1/13/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-L (SA-37) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15529 10
PASSED
79 KAIG3-RFI-PA-S-2709-00 Picnic Area 1/13/21 Inspection of Concrete Pouring for the Wall of Play Area (3) at Zone-G as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15532 10

80 KAIG3-RFI-WG-S-2692-00 Water Play Garden 1/14/21 Concrete Pouring & Shuttering for Wall @ span 3 & 4, of boundary wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-15554 10

81 KAIG3-RFI-WG-S-2703-00 Water Play Garden 1/14/21 Concrete Pouring & Shuttering for Wall @ span 22 & 23, of boundary wall at Water Garden, as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-15555 10

82 C32/40 67%OPC+25%FA - 160+/-40 P 29-15557 10 PASSED

83 C32/40 67%OPC+25%FA - 160+/-40 P 29-15565 10

84 C32/40 67%OPC+25%FA - 160+/-40 P 29-15566 10

85 KAIG3-RFI-CO-S-2701-00 Crescent 1 - Tunnel 1 11/14/21 Concreting for Slab of Tunnel 1 (mid section) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15571 9

86 C32/40 62% OPC+30%FA - 160+/-40 P 29-15572 9

87 C32/40 62% OPC+30%FA - 160+/-40 P 29-15573 9

88 C32/40 62% OPC+30%FA - 160+/-40 P 29-15574 9

kaig-qcals 54

PASSED
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl89
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-15576 QUANTITY
9
LOCATION CASTING No.
(m³)
90 C32/40 62% OPC+30%FA - 160+/-40 P 29-15577 9

91 C32/40 62% OPC+30%FA - 160+/-40 P 29-15581 9 PASSED

92 C32/40 62% OPC+30%FA - 160+/-40 P 29-15582 9

93 C32/40 62% OPC+30%FA - 160+/-40 P 29-15583 9

94 C32/40 62% OPC+30%FA - 160+/-40 P 29-15584 9

95 C32/40 62% OPC+30%FA - 160+/-40 P 29-15585 10

96 C32/40 62% OPC+30%FA - 160+/-40 P 29-15586 10

97 C32/40 62% OPC+30%FA - 160+/-40 P 29-15587 10

98 KAIG3-RFI-PA-S-2693-00 Picnic Area 1/14/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-N (SA-1) as highlighted. C16/20 SRC P 29-15575 10
PASSED
99 KAIG3-RFI-PA-S-2735-00 Picnic Area 1/14/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone- M (SA- 6) as highlighted. C16/20 SRC P 29-15579 10

100 KAIG3-RFI-PA-S-2730-00 Site Works 1/16/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA- 8,9,10) as highlighted. C16/20 SRC P 29-15593 10

101 KAIG3-RFI-PA-S-2734-00 Picnic Area 1/16/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone- I (SA-18) as highlighted. C16/20 SRC P 29-15594 10
PASSED
102 C32/40 62% OPC+30%FA - 160+/-40 P 29-15595 9

103 C32/40 62% OPC+30%FA - 160+/-40 P 29-15596 9

104 KAIG3-RFI-PA-S-2736-00 Picnic Area 1/16/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-8) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15619 9

105 C32/40 62% OPC+30%FA - 160+/-40 P 29-15620 9 PASSED

106 C32/40 62% OPC+30%FA - 160+/-40 P 29-15623 6

Crescent - Retaining
107 KAIG3-RFI-CO-S-2654-00 1/17/21 Concreting of Blinding of Retaining wall Foundation at Axis 01-W to 01-S. C16/20 SRC P 29-15650 10
Wall

108 C16/20 SRC P 29-15655 10


PASSED
109 C16/20 SRC P 29-15660 10

110 C16/20 SRC P 29-15642 6

111 KAIG3-RFI-PA-S-2731-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (15) as highlighted. C16/20 SRC P 29-15680 9

112 KAIG3-RFI-PA-S-2745-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-M (SA- 4) as highlighted. C16/20 SRC P 29-15689 10

113 KAIG3-RFI-PA-S-2758-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N (SA-1) as highlighted. C16/20 SRC P 29-15699 10 PASSED

114 KAIG3-RFI-PA-S-2767-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA-11) as highlighted. C16/20 SRC P 29-15710 9

115 KAIG3-RFI-PA-S-2768-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA-2) as highlighted.

116 KAIG3-RFI-WG-S-2757-00 Water Play Garden 1/18/21 Shuttering & Concrete Pouring for Wall @ span 24 & 25, of boundary wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-15686 10

117 C32/40 67%OPC+25%FA - 160+/-40 P 29-15690 10


PASSED
118 C32/40 67%OPC+25%FA - 160+/-40 P 29-15695 10

119 C32/40 67%OPC+25%FA - 160+/-40 P 29-15709 4

120 KAIG3-RFI-CO-S-2613-00 Crescent 1/19/21 Concreting of Column/Buttress for Colonnades (zone 2P) as highlighted 3 foundations axis 02 AT. C32/40 62% OPC+30%FA - 160+/-40 P 29-15736 10

121 KAIG3-RFI-CO-S-2640-00 Crescent - Tunnel 1 1/19/21 Concreting for 2 outer Wall of Tunnel 1 going Axis 02/1 (Crescent) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15737 10

kaig-qcals 55

PASSED
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl122
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-15741 QUANTITY
10
LOCATION CASTING No.
(m³)
123 C32/40 62% OPC+30%FA - 160+/-40 P 29-15742 10
PASSED
124 C32/40 62% OPC+30%FA - 160+/-40 P 29-15748 10

125 C32/40 62% OPC+30%FA - 160+/-40 P 29-15755 10

126 C32/40 62% OPC+30%FA - 160+/-40 P 29-15759 9

127 C32/40 62% OPC+30%FA - 160+/-40 P 29-15760 8

128 KAIG3-RFI-PA-S-2801-00 Picnic Area 1/19/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-1) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15729 9

129 KAIG3-RFI-PA-S-2802-00 Picnic Area 1/19/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-20) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15727 9
PASSED
130 KAIG3-RFI-PA-S-2803-00 Picnic Area 1/19/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-21) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15726 9

131 C32/40 62% OPC+30%FA - 160+/-40 P 29-15724 9

132 KAIG3-RFI-PA-S-2812-00 Picnic Area 1/19/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 4) as highlighted. C16/20 SRC P 29-15750 10

133 KAIG3-RFI-PA-S-2818-00 Picnic Area 1/19/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 3) as highlighted. C16/20 SRC P 29-15767 8
PASSED
134 KAIG3-RFI-PA-S-2819-00 Picnic Area 1/19/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 12) as highlighted.

135 KAIG3-RFI-PA-S-2820-00 Picnic Area 1/19/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA-13) as highlighted.

136 KAIG3-RFI-WG-S-2755-00 Water Play Garden 1/20/21 Shuttering & Concrete Pouring for Wall @ span 1, of boundary wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-15778 10

137 C32/40 67%OPC+25%FA - 160+/-40 P 29-15783 10


PASSED
138 C32/40 67%OPC+25%FA - 160+/-40 P 29-15786 10

139 C32/40 67%OPC+25%FA - 160+/-40 P 29-15791 10

140 KAIG3-RFI-WG-S-2853-00 Water Play Garden 1/21/21 Concrete Pouring for Blinding of boundary wall @ span 5, 6 & 7 @ Water Garden at highlighted area in attached drawings. C16/20 SRC P 29-15820 10

141 C16/20 SRC P 29-15830 10 PASSED

142 C16/20 SRC P 29-15838 10

143 KAIG3-RFI-PA-S-2832-00 Picnic Area 1/21/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-5) As Highlighted C32/40 67%OPC+25%FA - 160+/-40 P 29-15827 9

144 C32/40 67%OPC+25%FA - 160+/-40 P 29-15829 9 PASSED

145 C32/40 67%OPC+25%FA - 160+/-40 P 29-15834 6

146 KAIG3-RFI-PA-S-2846-00 Picnic Area 1/21/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 5) as highlighted. C16/20 SRC P 29-15839 9
PASSED
147 KAIG3-RFI-PA-S-2847-00 Picnic Area 1/21/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 6) as highlighted. C16/20 SRC P 29-15836 9

148 KAIG3-RFI-PA-S-2851-00 Picnic Area 1/23/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-J (SA-8) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26574 10

149 KAIG3-RFI-PA-S-2904-00 Picnic Area 1/23/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-M (SA-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26576 10

150 C32/40 62% OPC+30%FA - 160+/-40 P 28-26582 10 PASSED

151 C32/40 62% OPC+30%FA - 160+/-40 P 28-26583 10

152 C32/40 62% OPC+30%FA - 160+/-40 P 28-26590 2

Crescent 1 - Retaining
153 KAIG3-RFI-CO-S-2680-00 1/23/21 Concrete Pouring for Retaining Wall (Wall) (as highlighted at AXIS AJ to AH). C32/40 67%OPC+25%FA - 160+/-40 P 28-26594 10
Wall

154 C32/40 67%OPC+25%FA - 160+/-40 P 28-26598 10 PASSED

kaig-qcals 56
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


PASSED
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl155
No. RFI NUMBER DESCRIPTION DESIGN MIX - 160+/-40
C32/40 67%OPC+25%FA P 28-26600 QUANTITY
8
LOCATION CASTING No.
(m³)
156 KAIG3-RFI-PA-S-2897-00 Picnic Area 1/24/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-8) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15860 10

157 KAIG3-RFI-PA-S-2898-00 Picnic Area 1/24/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15862 10
PASSED
158 KAIG3-RFI-PA-S-2901-00 Picnic Area 1/24/21 Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-22) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15868 10

159 KAIG3-RFI-PA-S-2902-00 Picnic Area 1/24/21 Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-23) as highlighted.

Crescent - South Admin


160 KAIG3-RFI-CO-S-2824-00 1/24/21 Concreting of 9 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15864 10
Bldg.

161 KAIG3-RFI-CO-S-2845-00 Crescent 1/25/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02 AT & 02 AW. C32/40 62% OPC+30%FA - 160+/-40 P 29-15873 9

162 C32/40 62% OPC+30%FA - 160+/-40 P 29-15880 4

163 C32/40 62% OPC+30%FA - 160+/-40 P 29-15886 10 PASSED

164 C32/40 62% OPC+30%FA - 160+/-40 P 29-15893 10

165 C32/40 62% OPC+30%FA - 160+/-40 P 29-15895 10

166 C32/40 62% OPC+30%FA - 160+/-40 P 29-15896 3

167 KAIG3-RFI-PA-S-2848-00 Picnic Area 1/24/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 7) as highlighted. C16/20 SRC P 29-15888 10
PASSED
168 KAIG3-RFI-PA-S-2888-00 Picnic Area 1/24/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (SA-14) as highlighted.

169 KAIG3-RFI-CO-S-2615-00 Crescent 1/25/21 Concreting of Column/Buttress for PC 184 Axis 02 AU. C32/40 62% OPC+30%FA - 240+/-20 P 29-15908 7
PASSED
170 C32/40 62% OPC+30%FA - 240+/-20 P 29-15917 3

Concrete Pouring & Shuttering for Stiffner Column's at Grid Between 3-4/S-V, 6/Q, 7/Q, 8-10/N-Q, 8-10/E-H, 10/C, 11/B-E, 13/B-E,
171 KAIG3-RFI-MB-S-2923-00 Management Building 1/25/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-15914 6 PASSED
15/B-C, 15/F-Q, 14/Q & 14/N as highlighted in attached drawings. (From Lintel Top to Roof Bottom).

Concrete Pouring & Shuttering for Lintels of Doors & Walls and Stiffner Column's at Grid between 10-12/R-S, as highlighted in
172 KAIG3-RFI-MB-S-2925-00 Management Building 1/25/21
attached drawings.

173 KAIG3-RFI-CO-S-2880-00 Crescent 2 1/25/21 Concreting of Blinding for MCPE 3 @ zone 6. C16/20 SRC P 29-15921 10

174 C16/20 SRC P 29-15927 10

175 C16/20 SRC P 29-15931 10 PASSED

176 C16/20 SRC P 29-15935 10

177 C16/20 SRC P 29-15938 10

178 KAIG3-RFI-PA-S-2938-00 Picnic Area 1/25/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-M (SA-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15924 10

179 KAIG3-RFI-PA-S-2934-00 Picnic Area 1/25/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-2) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15925 10

180 KAIG3-RFI-PA-S-2935-00 Picnic Area 1/25/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-2) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15934 9
PASSED
181 C32/40 62% OPC+30%FA - 160+/-40 P 29-15936 9

182 C32/40 62% OPC+30%FA - 160+/-40 P 29-15939 9

183 C32/40 62% OPC+30%FA - 160+/-40 P 29-15940 9

184 KAIG3-RFI-PA-S-2912-00 Picnic Area 1/25/21 Inspection for Casting the Blinding Concrete under the Footing of Play Area (01) at Zone-N as highlighted. C16/20 SRC P 29-15941 10 PASSED

Inspection for application of Damp Proofing (1rt Coat) on top of Primer for External Wall and Top Slab of SBC-02 (Part-4) as
185 KAIG3-RFI-SW-S-2981-00 Site Works 1/26/21 C16/20 SRC P 29-15947 10
highlighted.
PASSED
186 C16/20 SRC P 29-15955 10

kaig-qcals 57
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl187
No. KAIG3-RFI-PA-S-2936-00
RFI NUMBER Picnic Area 1/26/21 Inspection of Concrete Pouring for the Foundation of SeatingDESCRIPTION
Area (3) at Zone-N (SA-12) as highlighted. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-15960 QUANTITY
10
LOCATION CASTING No.
(m³)
188 KAIG3-RFI-PA-S-2937-00 Picnic Area 1/26/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-13) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15962 10 PASSED

189 KAIG3-RFI-PA-S-2944-00 Picnic Area 1/26/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-L (SA-37) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15963 8

190 KAIG3-RFI-WG-S-2949-00 Water Play Garden 1/27/21 Concrete Pouring & Shuttering for Footing of boundary wall Span 5 & 6 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26645 10

191 C32/40 62% OPC+30%FA - 160+/-40 P 28-26647 9

192 C32/40 62% OPC+30%FA - 160+/-40 P 28-26649 9


PASSED
193 C32/40 62% OPC+30%FA - 160+/-40 P 28-26653 9

194 C32/40 62% OPC+30%FA - 160+/-40 P 28-26655 9

195 C32/40 62% OPC+30%FA - 160+/-40 P 28-26657 6

Inspection for application of Damp Proofing (1rt Coat) on top of Primer for External Wall and Top Slab of SBC-02 (Part-4) - As
196 KAIG3-RFI-SW-S-2981-00 Site Works 1/27/21 C16/20 SRC P 28-26663 10
Highlighted

197 C16/20 SRC P 28-26673 5 PASSED

198 C16/20 SRC P 28-26679 3

199 KAIG3-RFI-PA-S-2942-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-5) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26664 10

200 KAIG3-RFI-PA-S-2945-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-5) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26665 10

201 KAIG3-RFI-PA-S-2946-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-6) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26668 10

202 KAIG3-RFI-PA-S-2968-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-1) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26671 10 PASSED

203 KAIG3-RFI-PA-S-2969-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-7) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26677 10

204 P 28-26678 10

205 P 28-26680 7

Installation of thrust block for the pipe (315 mmØ upvc pipes) foul water drinage lifting line )pt. 49 to pt 56 (FORCE LINE) as per
206 KAIG3-RFI-SW-S-2960-00 Site Works 1/28/21 C16/20 SRC P 28-26698 5 PASSED
highlighted.

207 KAIG3-RFI-CO-S-2955-00 Crescent 1/28/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02 AW. C32/40 67%OPC+25%FA - 160+/-40 P 28-26709 10

208 C32/40 67%OPC+25%FA - 160+/-40 P 28-26712 10


PASSED
209 C32/40 67%OPC+25%FA - 160+/-40 P 28-26717 10

210 C32/40 67%OPC+25%FA - 160+/-40 P 28-26720 4

kaig-qcals 58
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 167 to 174 (zone 1M) as DELIVERY NOTE
Sl211
No. KAIG3-RFI-CO-S-2676-00
RFI NUMBER Crescent 1 1/28/21 DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-26699 QUANTITY
10
LOCATION CASTING highlighted. No.
(m³)
PASSED
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 175 to 180 (zone 2N) as
212 KAIG3-RFI-CO-S-2842-00 Crescent 2 1/28/21
highlighted.

213 KAIG3-RFI-PA-S-2943-00 Picnic Area 1/30/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-6) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15972 10

214 KAIG3-RFI-PA-S-3007-00 Picnic Area 1/30/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-3) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15973 10
PASSED
215 KAIG3-RFI-PA-S-3021-00 Picnic Area 1/30/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-4) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-15978 10

216 C32/40 62% OPC+30%FA - 160+/-40 P 29-15982 10

Crescent - South Admin


217 KAIG3-RFI-CO-S-2965-00 1/30/21 Concreting of 9 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted (2nd) C32/40 62% OPC+30%FA - 160+/-40 P 29-15987 10
Bldg.

218 C32/40 62% OPC+30%FA - 160+/-40 P 29-15988 10

219 C32/40 62% OPC+30%FA - 160+/-40 P 29-15989 10

220 C32/40 62% OPC+30%FA - 160+/-40 P 29-15990 10

221 C32/40 62% OPC+30%FA - 160+/-40 P 29-15991 10 PASSED

222 C32/40 62% OPC+30%FA - 160+/-40 P 29-15992 10

223 C32/40 62% OPC+30%FA - 160+/-40 P 29-15993 10

224 C32/40 62% OPC+30%FA - 160+/-40 P 29-15996 10

225 C32/40 62% OPC+30%FA - 160+/-40 P 29-15997 5

226 KAIG3-RFI-WG-S-2983-00 Water Play Garden 1/30/21 Concrete Pouring & Shuttering for Kicker (Outside) for boundary wall @ Span 5 & 6 at Water Garden, as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15998 10

227 KAIG3-RFI-WG-S-2985-00 Water Play Garden 1/30/21 Concrete Pouring & Shuttering for Footing of boundary wall Span 7 at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15999 10

228 C32/40 62% OPC+30%FA - 160+/-40 P 29-16001 10


PASSED
229 C32/40 62% OPC+30%FA - 160+/-40 P 29-16002 10

230 C32/40 62% OPC+30%FA - 160+/-40 P 29-16003 10

231 C32/40 62% OPC+30%FA - 160+/-40 P 29-16006 5

Crescent 1 - North
232 KAIG3-RFI-CO-S-3014-00 1/31/21 Shuttering and Cconcreting of Blinding for Internal Building (Zone 2Q North Admin BLDG) as Highlighted C16/20 SRC P 28-26754 10
Admin Bldg.

233 C16/20 SRC P 28-26755 10 PASSED

234 C16/20 SRC P 28-26761 10

kaig-qcals 59
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl235
No. KAIG3-RFI-CO-S-2929-00
RFI NUMBER Crescent 1 - Tunnel 1 1/31/21 DESCRIPTION
Concreting for Slab of Tunnel 1 (Near MCPE) as highlighted. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-16040 QUANTITY
10
LOCATION CASTING No.
(m³)
236 C32/40 62% OPC+30%FA - 160+/-40 P 29-16041 10

237 C32/40 62% OPC+30%FA - 160+/-40 P 29-16042 10

238 C32/40 62% OPC+30%FA - 160+/-40 P 29-16045 10

239 C32/40 62% OPC+30%FA - 160+/-40 P 29-16046 10


PASSED
240 C32/40 62% OPC+30%FA - 160+/-40 P 29-16047 10

241 C32/40 62% OPC+30%FA - 160+/-40 P 29-16048 10

242 C32/40 62% OPC+30%FA - 160+/-40 P 29-16049 10

243 C32/40 62% OPC+30%FA - 160+/-40 P 29-16050 10

244 C32/40 62% OPC+30%FA - 160+/-40 P 29-16051 5

245 C05/20 OPC P 29-15891 10

246 C05/20 OPC P 29-15892 10

247 C05/20 OPC P 29-15943 10

248 C05/20 OPC P 29-15942 10


PASSED
249 C05/20 OPC P 29-26621 10

250 C05/20 OPC P 28-26626 10

251 C05/20 OPC P 28-26686 10

252 C05/20 OPC P 28-26694 10

TOTAL QUANTITY TRUCK LOAD (M³): 2257

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 60
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-PA-S-3023-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-M (SA-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26766 10

2 KAIG3-RFI-PA-S-3092-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-2) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26767 10

3 KAIG3-RFI-PA-S-3082-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26768 10

4 KAIG3-RFI-PA-S-3081-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-6) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26769 10
PASSED
5 KAIG3-RFI-PA-S-3079-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-14) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26770 10

6 KAIG3-RFI-PA-S-3080-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-9) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26771 10

7 C32/40 62% OPC+30%FA - 160+/-40 P 28-26772 10

8 C32/40 62% OPC+30%FA - 160+/-40 P 28-26776 10

9 KAIG3-RFI-CO-S-3030-00 Crescent 2 2/1/21 Concreting of Blinding for MCPE 3 @ zone 6 (2nd). C32/40 62% OPC+30%FA - 160+/-40 P 28-26777 10 PASSED

10 KAIG3-RFI-CO-S-3027-00 Crescent 1 2/2/21 Shuttering and Cconcreting of Blinding for Internal Building (Zone 1A & 1B) as highlighted. C16/20 SRC P 29-16091 10

11 C16/20 SRC P 29-16092 10

12 C16/20 SRC P 29-16095 10

13 C16/20 SRC P 29-16097 10

14 C16/20 SRC P 29-16099 10

15 C16/20 SRC P 29-16100 10

16 C16/20 SRC P 29-16101 10

17 C16/20 SRC P 29-16103 10

18 C16/20 SRC P 29-16104 10 PASSED

19 C16/20 SRC P 29-16106 10

20 C16/20 SRC P 29-16107 10

21 C16/20 SRC P 29-16108 10

22 C16/20 SRC P 29-16110 10

23 C16/20 SRC P 29-16111 10

24 C16/20 SRC P 29-16113 10

25 C16/20 SRC P 29-16114 10

26 C16/20 SRC P 29-16118 8

kaig-qcals 61
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Concrete Pouring & Shuttering for Wall upto 3.8m Height ofDESCRIPTION
Boundary wall (Grid 12-18/Left Side) at Aviary Garden, as per highlighted DELIVERY NOTE
Sl27
No. KAIG3-RFI-AG-S-2986-00
RFI NUMBER Aviary Garden 2/2/21 C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-16119 QUANTITY
10
LOCATION CASTING in attached drawings. No.
(m³)

28 C32/40 62% OPC+30%FA - 220+/-20 P 29-16120 10

29 C32/40 62% OPC+30%FA - 220+/-20 P 29-16121 10

30 C32/40 62% OPC+30%FA - 220+/-20 P 29-16123 10 PASSED

31 C32/40 62% OPC+30%FA - 220+/-20 P 29-16122 10

32 C32/40 62% OPC+30%FA - 220+/-20 P 29-16124 10

33 C32/40 62% OPC+30%FA - 220+/-20 P 29-16125 10

34 KAIG3-RFI-PA-S-3062-00 Picnic Area 2/3/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 25) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26811 10

35 KAIG3-RFI-PA-S-3063-00 Picnic Area 2/3/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 26) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26812 9

36 KAIG3-RFI-PA-S-3065-00 Picnic Area 2/3/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 3) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26813 10 PASSED

37 KAIG3-RFI-PA-S-3066-00 Picnic Area 2/3/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26815 10

38 C32/40 62% OPC+30%FA - 160+/-40 P 28-26823 6

39 KAIG3-RFI-WG-S-3039-00 Water Play Garden 2/3/21 Concrete Pouring & Shuttering for Kicker (Inside) for boundary wall @ Span 5 & 6 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26814 10

40 KAIG3-RFI-WG-S-3040-00 Water Play Garden 2/3/21 Concrete Pouring & Shuttering for Kicker (Outside) for boundary wall @ Span 7 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26816 10

41 KAIG3-RFI-WG-S-3054-00 Water Play Garden 2/3/21 Concrete Pouring & Shuttering of Footing of boundary wall Span 8, 9 & 10 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26817 10

42 C32/40 62% OPC+30%FA - 160+/-40 P 28-26818 10

43 C32/40 62% OPC+30%FA - 160+/-40 P 28-26819 10

44 C32/40 62% OPC+30%FA - 160+/-40 P 28-26820 10

45 C32/40 62% OPC+30%FA - 160+/-40 P 28-26821 10

46 C32/40 62% OPC+30%FA - 160+/-40 P 28-26822 10


PASSED
47 C32/40 62% OPC+30%FA - 160+/-40 P 28-26826 10

48 C32/40 62% OPC+30%FA - 160+/-40 P 28-26827 10

49 C32/40 62% OPC+30%FA - 160+/-40 P 28-26829 10

50 C32/40 62% OPC+30%FA - 160+/-40 P 28-26831 10

51 C32/40 62% OPC+30%FA - 160+/-40 P 28-26833 10

52 C32/40 62% OPC+30%FA - 160+/-40 P 28-26834 10

53 C32/40 62% OPC+30%FA - 160+/-40 P 28-26835 10

54 C32/40 62% OPC+30%FA - 160+/-40 P 28-26836 6

kaig-qcals 62
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl55
No. KAIG3-RFI-CO-S-3017-00
RFI NUMBER Crescent 2/4/21 Concreting of Column/Buttress for PC 186 Axis 02 AV. DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-26841 QUANTITY
8 PASSED
LOCATION CASTING No.
(m³)

56 KAIG3-RFI-PA-S-3009-00 Picnic Area 2/4/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-10) as highlighted. C16/20 SRC P 29-161559 10

57 KAIG3-RFI-PA-S-3010-00 Picnic Area 2/4/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-11) as highlighted. C16/20 SRC P 29-16168 5 PASSED

58 KAIG3-RFI-PA-S-3022-00 Picnic Area 2/4/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-2) As Highlighted.

Crescent 1 - Retaining
59 KAIG3-RFI-CO-S-3003-00 2/4/21 Concrete Pourng for Retaining Wall (WALL) (as Highlighted at AXIS AF TO AH). C32/40 62% OPC+30%FA - 160+/-40 P 29-16180 10
Wall

60 C32/40 62% OPC+30%FA - 160+/-40 P 29-16185 9 PASSED

61 C32/40 62% OPC+30%FA - 160+/-40 P 29-16188 2

62 KAIG3-RFI-CO-S-2929-00 Crescent 1 - Tunnel 1 2/6/21 Concreting for Slab of Tunnel 1 (Near MCPE) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16207 10

63 C32/40 62% OPC+30%FA - 160+/-40 P 29-16209 10

64 C32/40 62% OPC+30%FA - 160+/-40 P 29-16214 10

65 C32/40 62% OPC+30%FA - 160+/-40 P 29-16217 10


PASSED
66 C32/40 62% OPC+30%FA - 160+/-40 P 29-16218 10

67 C32/40 62% OPC+30%FA - 160+/-40 P 29-16221 10

68 C32/40 62% OPC+30%FA - 160+/-40 P 29-16222 10

69 C32/40 62% OPC+30%FA - 160+/-40 P 29-16227 5

70 KAIG3-RFI-WG-S-3087-00 Water Play Garden 2/4/21 Concrete Pouring & Shuttering for Kicker (Outside) of boundary wall Span 8, 9 & 10 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16219 10

71 C32/40 62% OPC+30%FA - 160+/-40 P 29-16223 10

72 C32/40 62% OPC+30%FA - 160+/-40 P 29-16224 10 PASSED

73 C32/40 62% OPC+30%FA - 160+/-40 P 29-16225 10

74 C32/40 62% OPC+30%FA - 160+/-40 P 29-16226 10

75 KAIG3-RFI-PA-S-3118-00 Picnic Area 2/6/21 Inspection of Concrete Pouring for the Foundation of Play Area(2) at Zone-I As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26848 10
PASSED
76 C32/40 62% OPC+30%FA - 160+/-40 P 28-26850 10

83 KAIG3-RFI-PA-S-3115-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-24) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26866 10

84 KAIG3-RFI-PA-S-3117-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-20) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26869 9

85 KAIG3-RFI-PA-S-3116-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-21) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26873 9
PASSED
86 KAIG3-RFI-PA-S-3114-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-15) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26887 10

87 KAIG3-RFI-PA-S-3140-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26895 10

88 KAIG3-RFI-PA-S-3141-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Play Area(1) at Zone-N as highlighted. C32/40 62% OPC+30%FA - 160+/-40

kaig-qcals 63
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl89
No. KAIG3-RFI-PA-S-3093-00
RFI NUMBER Picnic Area 2/9/21 DESCRIPTION
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J(SA- 1) as highlighted. DESIGN MIX
C16/20 SRC P 29-16261 QUANTITY
10
LOCATION CASTING No.
(m³)
90 KAIG3-RFI-PA-S-3127-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-12) As Highlighted

91 KAIG3-RFI-PA-S-3138-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-11) as highlighted. PASSED

92 KAIG3-RFI-PA-S-3126-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-15) As Highlighted

93 KAIG3-RFI-PA-S-3139-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-N (SA-4) as highlighted.

94 KAIG3-RFI-PA-S-3126-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-15) as highlighted. C32/40 67%OPC+25%FA - 160+/-40 P 29-16264 9

95 C32/40 67%OPC+25%FA - 160+/-40 P 29-16268 9 PASSED

96 C32/40 67%OPC+25%FA - 160+/-40 P 29-16270 5

97 KAIG3-RFI-CO-S-3016-00 Crescent 2/9/21 Shuttering of Column/Buttress for PC 186 Axis 02 AV. C16/20 SRC P 29-16269 10

98 C16/20 SRC P 29-16274 10

99 C16/20 SRC P 29-16279 10 PASSED

100 C16/20 SRC P 29-16287 10

101 C16/20 SRC P 29-16289 10

102 KAIG3-RFI-WG-S-3122-00 Water Play Garden 2/9/21 Concrete Pouring & Shuttering of Kicker for boundary wall @ Span 11 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16277 8 PASSED

103 KAIG3-RFI-PA-S-3143-00 Picnic Area 2/9/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-7) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16283 10

104 KAIG3-RFI-PA-S-3144-00 Picnic Area 2/9/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-17) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16288 10

105 KAIG3-RFI-PA-S-3142-00 Picnic Area 2/9/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-3) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16292 10 PASSED

106 KAIG3-RFI-PA-S-3159-00 Picnic Area 2/9/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-14) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16296 10

107 C32/40 62% OPC+30%FA - 160+/-40 P 29-16300 5

108 KAIG3-RFI-WG-S-3152-00 Water Play Garden 2/10/21 Concrete Pouring & Shuttering for Kicker (Inside) for boundary wall @ Span 7 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26922 10

109 C32/40 62% OPC+30%FA - 160+/-40 P 28-26926 10


PASSED
110 C32/40 62% OPC+30%FA - 160+/-40 P 28-26928 10

C32/40 62% OPC + 30% FA + 8% MS


P 28-26933 5
(SCREED)

111 KAIG3-RFI-CO-S-3074-00 Crescent 1 2/10/21 Concreting for Internal Building (Zone 1A & 1B) Foundation as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26942 10

112 C32/40 62% OPC+30%FA - 160+/-40 P 28-26943 10 PASSED

113 C32/40 62% OPC+30%FA - 160+/-40 P 28-26945 5

kaig-qcals 64
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl114
No. KAIG3-RFI-SW-S-3158-00
RFI NUMBER Site Works 2/11/21 DESCRIPTION
Inspection for Casting the Blinding Concrete under foundation of Cesspool -5. DESIGN MIX
C16/20 SRC P 28-26953 QUANTITY
10
LOCATION CASTING No.
(m³)
115 KAIG3-RFI-SW-S-3055-01 Site Works 2/11/21 Inspection for Casting the Blinding Concrete under foundation of Cesspool -4. C16/20 SRC P 28-26954 10

116 KAIG3-RFI-SW-S-3150-00 Site Works 2/11/21 Inspection for Casting the Blinding Concrete under the Manhole of Storm Water at Zone-1 as highlighted. C16/20 SRC P 28-26961 10 PASSED

117 KAIG3-RFI-PA-S-3128-00 Picnic Area 2/11/21 Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-11) As Highlighted. C16/20 SRC P 28-26962 9

118 KAIG3-RFI-PA-S-3184-00 Picnic Area 2/11/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-K (SA-17) As Highlighted

Crescent - Retaining
119 KAIG3-RFI-CO-S-3071-00 2/11/21 Concreting for Retaining wall Kicker At Axis AD to AF (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-16327 7 PASSED
Wall
Application of Protection Layer of Geotextile Sheet 180 gr. Per sq.m. and 30mm Screed for TIP Under Strip Footing Zone 2A as
120 KAIG3-RFI-CO-S-3307-00 Crescent 2/11/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-16330 3 PASSED
highlighted.

121 KAIG3-RFI-CO-S-3129-00 Crescent 2/13/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW as highlighted (2nd). C32/40 62% OPC+30%FA - 160+/-40 P 28-26986 10

122 C32/40 62% OPC+30%FA - 160+/-40 P 28-26990 10 PASSED

123 C32/40 62% OPC+30%FA - 160+/-40 P 28-26993 8

124 KAIG3-RFI-PA-S-3218-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-5) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26975 10

125 KAIG3-RFI-PA-S-3219-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-13) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26977 10

126 KAIG3-RFI-PA-S-3220-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-9) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26981 10

127 KAIG3-RFI-PA-S-3221-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-10) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26983 10
PASSED
128 KAIG3-RFI-PA-S-3222-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-11) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26984 10

129 KAIG3-RFI-PA-S-3223-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-25) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26988 10

130 KAIG3-RFI-PA-S-3224-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-26) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26989 10

131 KAIG3-RFI-PA-S-3225-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-3) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26991 10

Concrete Pouring & Shuttering of Wall up to 3.8m height of Boundary Wall, Grid 6-12/left side or (Grid 39 to 45) at Aviary Garden as
132 KAIG3-RFI-AG-S-3190-00 Aviary Garden 2/15/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-16391 10
per attached highlighted drawings.

133 C32/40 62% OPC+30%FA - 220+/-20 P 29-16394 10

134 C32/40 62% OPC+30%FA - 220+/-20 P 29-16397 10

135 C32/40 62% OPC+30%FA - 220+/-20 P 29-16399 10


PASSED
136 C32/40 62% OPC+30%FA - 220+/-20 P 29-16400 10

137 C32/40 62% OPC+30%FA - 220+/-20 P 29-16403 10

138 C32/40 62% OPC+30%FA - 220+/-20 P 29-16406 10

139 C32/40 62% OPC+30%FA - 220+/-20 P 29-16410 10

140 KAIG3-RFI-CO-S-3204-00 Crescent 1 2/15/21 Concreting for Internal Building (Zone 1A & 1B) Foundation as Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-27033 10

141 C32/40 62% OPC+30%FA - 160+/-40 P 29-16402 10

142 C32/40 62% OPC+30%FA - 160+/-40 P 29-16404 10


PASSED
143 C32/40 62% OPC+30%FA - 160+/-40 P 29-16407 10

144 C32/40 62% OPC+30%FA - 160+/-40 P 29-16411 10

145 C32/40 62% OPC+30%FA - 160+/-40 P 29-16412 10

kaig-qcals 65
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl146
No. KAIG3-RFI-WG-S-3189-00
RFI NUMBER Water Play Garden 2/16/21 DESCRIPTION
Concrete Pouring & Shuttering for Kicker inside of Bouondary Wall Span 8, 9 & 10 at Water Garden as per attached drawings. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-16430 QUANTITY
10
LOCATION CASTING No.
(m³)
147 C32/40 62% OPC+30%FA - 160+/-40 P 29-16431 10

148 C32/40 62% OPC+30%FA - 160+/-40 P 29-16433 10

149 C32/40 62% OPC+30%FA - 160+/-40 P 29-16436 10

150 C32/40 62% OPC+30%FA - 160+/-40 P 29-16437 10

151 C32/40 62% OPC+30%FA - 160+/-40 P 29-16439 10

152 C32/40 62% OPC+30%FA - 160+/-40 P 29-16440 10 PASSED

153 C32/40 62% OPC+30%FA - 160+/-40 P 29-16443 10

154 C32/40 62% OPC+30%FA - 160+/-40 P 29-16444 10

155 C32/40 62% OPC+30%FA - 160+/-40 P 29-16451 10

156 C32/40 62% OPC+30%FA - 160+/-40 P 29-16453 10

157 C32/40 62% OPC+30%FA - 160+/-40 P 29-16455 10

158 C32/40 62% OPC+30%FA - 160+/-40 P 29-16458 5

Crescent - Retaining
159 KAIG3-RFI-CO-S-3198-00 2/16/21 Concrete Pourng for Retaining Wall (Foundation) (as highlighted at Axis AD to AB). C32/40 62% OPC+30%FA - 160+/-40 P 29-16442 10
Wall

160 C32/40 62% OPC+30%FA - 160+/-40 P 29-16445 10


PASSED
161 C32/40 62% OPC+30%FA - 160+/-40 P 29-16450 10

162 C32/40 62% OPC+30%FA - 160+/-40 P 29-16452 8

Crescent 1 - North
163 KAIG3-RFI-CO-S-3180-00 2/17/21 Shuttering and Concreting of Foundation for Internal Building (Zone 2Q North Admin BLDG) as Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16478 10
Admin Bldg.

164 KAIG3-RFI-CO-S-3255-00 Crescent - Tunnel 1 2/17/21 Concreting for Slab of Tunnel 1 (near Axis 02-1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16480 10

165 C32/40 62% OPC+30%FA - 160+/-40 P 29-16482 10

166 C32/40 62% OPC+30%FA - 160+/-40 P 29-16483 10

167 C32/40 62% OPC+30%FA - 160+/-40 P 29-16485 10

168 C32/40 62% OPC+30%FA - 160+/-40 P 29-16490 10

169 C32/40 62% OPC+30%FA - 160+/-40 P 29-16493 10 PASSED

170 C32/40 62% OPC+30%FA - 160+/-40 P 29-16494 10

171 C32/40 62% OPC+30%FA - 160+/-40 P 29-16499 10

172 C32/40 62% OPC+30%FA - 160+/-40 P 29-16501 10

173 C32/40 62% OPC+30%FA - 160+/-40 P 29-16503 10

174 C32/40 62% OPC+30%FA - 160+/-40 P 29-16506 10

175 C32/40 62% OPC+30%FA - 160+/-40 P 29-16507 4

kaig-qcals 66
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl176
No. KAIG3-RFI-PA-S-3182-00
RFI NUMBER Picnic Area 2/17/21 DESCRIPTION
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-N (SA-13) As Highlighted. DESIGN MIX
C16/20 SRC P 29-16479 QUANTITY
10
LOCATION CASTING No.
(m³)
177 KAIG3-RFI-PA-S-3183-00 Picnic Area 2/17/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-N (SA-14) As Highlighted. C16/20 SRC
PASSED
178 KAIG3-RFI-PA-S-3242-00 Picnic Area 2/17/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-5) As Highlighted. C16/20 SRC

179 KAIG3-RFI-PA-S-3285-00 Picnic Area 2/17/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-6) As Highlighted. C16/20 SRC

180 KAIG3-RFI-PA-S-3303-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16491 10

181 KAIG3-RFI-PA-S-3309-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-19) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16496 10

182 KAIG3-RFI-PA-S-3310-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-11) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16500 10
PASSED
183 KAIG3-RFI-PA-S-3311-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-12) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16505 10

184 KAIG3-RFI-PA-S-3312-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-15) As Highlighted

185 KAIG3-RFI-PA-S-3313-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N(SA-4) As Highlighted

186 KAIG3-RFI-WG-S-3248-00 Water Play Garden 2/18/21 Concrete pouring & Shuttering for Wall of Span 7 for boundary wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-16515 9
PASSED
187 C32/40 67%OPC+25%FA - 160+/-40 P 29-16516 5

188 KAIG3-RFI-CO-S-3195-00 Crescent 2/18/21 Concreting of Column/Buttress for PC 184 Axis 02 AV / 02 1 (2nd) C32/40 62% OPC+30%FA - 220+/-20 P 29-16518 10 PASSED

189 KAIG3-RFI-WG-S-3291-00 Water Play Garden 2/18/21 Concrete Pouring & Shuttering of Kicker (Inside) for boundary wall @ Span 11 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16525 10

190 C32/40 62% OPC+30%FA - 160+/-40 P 29-16526 9 PASSED

191 C32/40 62% OPC+30%FA - 160+/-40 P 29-16528 4

192 KAIG3-RFI-CO-S-3208-00 Crescent 2/18/21 Formworks & Concreting of Plain Concrete of foundation at South Administration Building (as Highlighted) Zone 2C. C16/20 SRC P 29-16532 10

193 KAIG3-RFI-CO-S-3235-00 Crescent 2/18/21 Formworks & Concreting of Plain Concrete of foundation at North Administration Building (as Highlighted) Zone 2Q. C16/20 SRC P 29-16533 10

194 KAIG3-RFI-CO-S-3271-00 Crescent 2/18/21 Formworks & Concreting of Plain Concrete of foundation at North Administration Building (as Highlighted) Zone 2Q. C16/20 SRC P 29-16536 10

195 C16/20 SRC P 29-16540 10

196 C16/20 SRC P 29-16541 10

197 C16/20 SRC P 29-16543 10

198 C16/20 SRC P 29-16545 10 PASSED

199 C16/20 SRC P 29-16547 10

200 C16/20 SRC P 29-16550 10

201 C16/20 SRC P 29-16552 10

202 C16/20 SRC P 29-16553 10

203 C16/20 SRC P 29-16554 10

204 C16/20 SRC P 29-16555 5

Application of Protection Layer of Geotextile Sheet 180 gr. Per sq.m. and 30mm Screed for TIP Under Strip Footing Zone 2A as
205 KAIG3-RFI-CO-S-3307-00 Crescent 2/18/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-16546 3 PASSED
highlighted.

kaig-qcals 67
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl206
No. KAIG3-RFI-PA-S-3331-00
RFI NUMBER Picnic Area 2/20/21 Inspection of Concrete Pouring for the Wall of Seating AreaDESCRIPTION
(3) at Zone-M(SA-8) As Highlighted. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-27060 QUANTITY
10
LOCATION CASTING No.
(m³)
207 KAIG3-RFI-PA-S-3332-00 Picnic Area 2/20/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-I(SA-18) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27062 10 PASSED

208 KAIG3-RFI-PA-S-3333-00 Picnic Area 2/20/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N(SA-12) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27063 6

209 KAIG3-RFI-PA-S-3286-00 Picnic Area 2/20/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-7) As Highlighted. C16/20 SRC P 28-27067 10

210 KAIG3-RFI-PA-S-3295-00 Picnic Area 2/20/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-17) as highlighted. C16/20 SRC P 28-27084 6 PASSED

211 KAIG3-RFI-PA-S-3314-00 Picnic Area 2/20/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (1) at Zone-N (SA-14) As Highlighted

212 KAIG3-RFI-SW-S-3329-00 Site Works 2/20/21 Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-4 (As Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-27078 6
PASSED
213 KAIG3-RFI-SW-S-3330-00 Site Works 2/20/21 Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-5 (As Highlighted).

214 KAIG3-RFI-CO-S-3178-00 Crescent 2/21/21 Concreting of Column/Buttress for PC 185 Axis 02 AV C32/40 62% OPC+30%FA - 220+/-20 P 28-27106 10 PASSED

215 KAIG3-RFI-CO-S-3210-00 Crescent 2/21/21 Formworks & Concreting of Plain Concrete of foundation at Internal Building (as Highlighted) Zone 2R. C16/20 SRC P 28-27119 9
PASSED
216 C16/20 SRC P 29-16556 5

Crescent - Retaining
217 KAIG3-RFI-CO-S-3201-00 2/23/21 Concreting for Retaining wall (wall) at Axis AD to AF (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-16600 10
Wall
PASSED
218 P 29-16602 10

219 KAIG3-RFI-WG-S-3364-00 Water Play Garden 2/23/21 Concrete Pouring & Shuttering for Wall of Span 10 for boundary wall at Water Garden, as per Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-16607 9

220 KAIG3-RFI-WG-S-3365-00 Water Play Garden 2/23/21 Concrete Pouring & Shuttering for Wall of Span 11 for boundary wall at Water Garden, as per Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-16611 9 PASSED

221 P 29-16612 7

222 KAIG3-RFI-CO-S-3346-00 Crescent 2/23/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW AT as highlighted (2nd). C32/40 62% OPC+30%FA - 160+/-40 P 29-16619 10

223 C32/40 62% OPC+30%FA - 160+/-40 P 28-27120 10 PASSED

224 C32/40 62% OPC+30%FA - 160+/-40 P 28-27121 7

225 KAIG3-RFI-PA-S-3403-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for theWall of Seating Area (2) at Zone-M (SA-11) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16627 10

226 KAIG3-RFI-PA-S-3404-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-M (SA-12) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16631 10

227 KAIG3-RFI-PA-S-3405-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-M (SA-15) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16636 10

228 KAIG3-RFI-PA-S-3406-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-03) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16638 10
PASSED
229 KAIG3-RFI-PA-S-3407-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-25) as highlighted.

230 KAIG3-RFI-PA-S-3408-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-26) as highlighted.

231 KAIG3-RFI-PA-S-3409-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-15) as highlighted.

232 KAIG3-RFI-PA-S-3415-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-05) As Highlighted.

233 KAIG3-RFI-PA-S-3288-01 Picnic Area 2/24/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-8) As Highlighted. C16/20 SRC P 29-16650 10

234 KAIG3-RFI-PA-S-3289-01 Picnic Area 2/24/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-10) As Highlighted. C16/20 SRC P 29-16658 5 PASSED

235 KAIG3-RFI-PA-S-3287-01 Picnic Area 2/24/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-9) As Highlighted.

kaig-qcals 68
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Concrete Pouring & Shuttering for Wall @ Grid 45 to 51 or DESCRIPTION
(1-5/Left Side), of Boundary wall at Aviary Garden as per highlighted in DELIVERY NOTE
Sl236
No. KAIG3-RFI-AG-S-3378-00
RFI NUMBER viary Garden 2/25/21 C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-16674 QUANTITY
10
LOCATION CASTING attached drawings. No.
(m³)
237 C32/40 62% OPC+30%FA - 220+/-20 P 29-16677 10

238 C32/40 62% OPC+30%FA - 220+/-20 P 29-16680 10

239 C32/40 62% OPC+30%FA - 220+/-20 P 29-16679 10


PASSED
240 C32/40 62% OPC+30%FA - 220+/-20 P 29-16685 10

241 C32/40 62% OPC+30%FA - 220+/-20 P 29-16686 10

242 C32/40 62% OPC+30%FA - 220+/-20 P 29-16692 10

243 C32/40 62% OPC+30%FA - 220+/-20 P 29-16693 10

244 KAIG3-RFI-CO-S-3411-00 Crescent 2/25/21 Formworks & Concreting of Plain Concrete of foundation at South Administration Building (as Highlighted) Zone 2C. C16/20 SRC P 29-16703 6 PASSED

Crescent - South Admin


245 KAIG3-RFI-CO-S-3414-00 2/25/21 Concreting of 12 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16688 9
Bldg.

246 C32/40 62% OPC+30%FA - 160+/-40 P 29-16695 10


PASSED
247 C32/40 62% OPC+30%FA - 160+/-40 P 29-16696 10

248 C32/40 62% OPC+30%FA - 160+/-40 P 29-16698 8

Concrete pouring & Shuttering for Footings @ Grid (19-23/Left Side), of Boundary wall at Aviary Garden as per highlighted in attached
249 KAIG3-RFI-AG-S-3381-00 Aviary Garden 2/25/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-16700 10
drawings.

250 C32/40 62% OPC+30%FA - 160+/-40 P 29-16701 10 PASSED

251 C32/40 62% OPC+30%FA - 160+/-40 P 29-16702 10

252 KAIG3-RFI-WG-S-3377-00 Water Play Garden 2/27/21 Concrete Pouring & Shuttering for Wall of Span 8 & 9 for boundary wall at Water Garden, as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-16709 9

253 C32/40 67%OPC+25%FA - 160+/-40 P 29-16715 9 PASSED

254 C32/40 67%OPC+25%FA - 160+/-40 P 29-16716 5

255 KAIG3-RFI-CO-S-2794-01 Crescent 1 2/27/21 Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 13 to 20 (zone 1C) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27129 10
PASSED
256 KAIG3-RFI-CO-S-2789-01 Crescent 1 2/27/21 Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 7 to 12 (zone 1B) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27141 10

Crescent - Retaining
257 KAIG3-RFI-CO-S-3420-00 2/27/21 Shuttering and Concrete Pouring of Blinding for Retaining wall Shear Key and foundation Between Axis 01-AA to 01-Z (as highlighted). C16/20 SRC P 28-27159 3 PASSED
Wall

258 KAIG3-RFI-WG-S-3434-00 Water Play Garden 2/28/21 Concrete Pouring for Blinding of boundary wall @ span 37, 38 & 39 @ Water Garden at highlighted area in attached Drawing's. C16/20 SRC P 29-16725 10
PASSED
259 C16/20 SRC P 29-16729 6

260 KAIG3-RFI-PA-S-3390-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-6) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16726 10

261 KAIG3-RFI-PA-S-3391-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-7) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16728 10

262 KAIG3-RFI-PA-S-3440-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-14) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16733 10 PASSED

263 KAIG3-RFI-PA-S-3441-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-01) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16739 8

264 KAIG3-RFI-PA-S-3442-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-19) As Highlighted

kaig-qcals 69
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/
Crescent - South Admin DATE OF DELIVERY NOTE
Sl265
No. KAIG3-RFI-CO-S-3414-00
RFI NUMBER 2/28/21 DESCRIPTION
Concreting of 12 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-16752 QUANTITY
9
LOCATION
Bldg. CASTING No.
(m³)
266 C32/40 62% OPC+30%FA - 160+/-40 P 29-16754 9 PASSED

267 C32/40 62% OPC+30%FA - 160+/-40 P 29-16755 8

TOTAL QUANTITY TRUCK LOAD (M³): 2249

C05 OPC 167

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2416

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 70
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-TB-S-3462-00 Ticket Booth Canopy 3/1/21 Concrete pouring & Shuttering for Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) of Ticket Booths Canopy. C32/40 62% OPC+30%FA - 160+/-40 P 29-16789 7 PASSED

2 KAIG3-RFI-SW-S-3494-00 Site Works 3/2/21 Inspection of Concrete Pouring for Wall and Slab of Cesspool-02 as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27170 10

3 C32/40 62% OPC+30%FA - 160+/-40 P 28-27172 10 PASSED

4 C32/40 62% OPC+30%FA - 160+/-40 P 28-27176 10

5 KAIG3-RFI-CO-S-3213-01 Crescent - Tunnel 1 3/2/21 Concreting for Tunnel 1 Service Access (near MCPE) as Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27179 7 PASSED

Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 109 to 116 (zone 2D) as
6 KAIG3-RFI-CO-S-2872-00 Crescent 2 3/2/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-27183 7
highlighted.
PASSED
7 KAIG3-RFI-CO-S-3452-00 Crescent 2 3/2/21 Application of Protection layer of Geotextile Sheet & Screed for Below Foundation of MCPE 3 Zone 2E as Highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27189 6

8 KAIG3-RFI-CO-S-3447-00 Crescent 3/2/21 Concreting of Pile Cap (Foundation) 187, 188, 193 & 194 (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 28-27194 10

9 KAIG3-RFI-CO-S-3470-00 Crescent - North Admin 3/2/21 Concreting of 6 Internal Foundation in Zone 2Q (North Admin) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27195 10

10 C32/40 62% OPC+30%FA - 160+/-40 P 28-27196 10

11 C32/40 62% OPC+30%FA - 160+/-40 P 28-27197 10

12 C32/40 62% OPC+30%FA - 160+/-40 P 28-27198 10


PASSED
13 C32/40 62% OPC+30%FA - 160+/-40 P 28-27199 10

14 C32/40 62% OPC+30%FA - 160+/-40 P 28-27200 10

15 C32/40 62% OPC+30%FA - 160+/-40 P 28-27201 10

16 C32/40 62% OPC+30%FA - 160+/-40 P 28-27202 8

17 C32/40 62% OPC+30%FA - 160+/-40 P 28-27203 5

Site Works/Near Aviary


18 KAIG3-RFI-SW-S-3549-00 3/3/21 Cast of blinding concrete for Foul water line manhole (FW9, FW10, FW11, FW12, FW12-1, & FW12-2); as per attached dwg. C16/20 SRC P 28-27207 10
Garden

19 C16/20 SRC P 29-16790 10

20 C16/20 SRC P 29-16791 10 PASSED

21 C16/20 SRC P 29-16792 10

22 C16/20 SRC P 28-27219 3

23 KAIG3-RFI-CO-S-3452-00 Crescent 2 3/3/21 Application of Protection layer of Geotextile Sheet & Screed for Below Foundation of MCPE 3 Zone 2E as Highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27220 10 PASSED

24 KAIG3-RFI-CO-S-3483-00 Crescent 3/3/21 Concreting for 8 foundation at South Administration Building (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-27237 9

25 C32/40 62% OPC+30%FA - 160+/-40 P 28-27239 9


PASSED
26 C32/40 62% OPC+30%FA - 160+/-40 P 28-27242 9

27 C32/40 62% OPC+30%FA - 160+/-40 P 28-27243 12

28 KAIG3-RFI-CO-S-3452-00 Crescent 2 3/3/21 Application of Protection layer of Geotextile Sheet & Screed for Below Foundation of MCPE 3 Zone 2E as Highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27252 3
PASSED
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 109 to 116 (zone 2D) as
29 KAIG3-RFI-CO-S-2872-00 Crescent 2 3/3/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-27250 9
highlighted.

30 KAIG3-RFI-WG-S-3460-00 Water Play Garden 3/4/21 Concrete pouring for Blinding of boundary wall @ span 34, 35 & 36 at Water Garden at highlighted area in attached Drawing's. C16/20 SRC P 28-27256 10
PASSED
31 KAIG3-RFI-WG-S-3461-00 Water Play Garden 3/4/21 Concrete pouring for Blinding of boundary wall @ span 30, 32 & 33 at Water Garden at highlighted area in attached Drawing's. C16/20 SRC P 28-27257 10

kaig-qcals 71
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl32
No. RFI NUMBER
KAIG3-RFI-CO-S-3507-00 Crescent 3/4/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P)DESCRIPTION
as highlighted axis 02-AW as highlighted (2nd) C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-27259 QUANTITY
10
LOCATION CASTING No.
(m³)

33 C32/40 62% OPC+30%FA - 160+/-40 P 28-27260 10

34 C32/40 62% OPC+30%FA - 160+/-40 P 28-27262 10

35 C32/40 62% OPC+30%FA - 160+/-40 P 28-27263 10 PASSED

36 C32/40 62% OPC+30%FA - 160+/-40 P 28-27275 9

37 C32/40 62% OPC+30%FA - 160+/-40 P 28-27278 9

38 C32/40 62% OPC+30%FA - 160+/-40 P 28-27286 8

39 KAIG3-RFI-PA-S-3350-00 Picnic Area 3/6/21 Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-25) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16801 10

40 C32/40 62% OPC+30%FA - 160+/-40 P 29-16802 10 PASSED

41 C32/40 62% OPC+30%FA - 160+/-40 P 29-16805 10

42 KAIG3-RFI-CO-S-3514-00 Crescent 3/6/21 Concreting of Pile Cap (Foundation) 189 to 192 (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-16810 10

43 C32/40 62% OPC+30%FA - 160+/-40 P 29-16812 10

44 C32/40 62% OPC+30%FA - 160+/-40 P 29-16813 10

45 C32/40 62% OPC+30%FA - 160+/-40 P 29-16814 10 PASSED

46 C32/40 62% OPC+30%FA - 160+/-40 P 29-16815 10

47 C32/40 62% OPC+30%FA - 160+/-40 P 29-16816 10

48 C32/40 62% OPC+30%FA - 160+/-40 P 29-16818 5

49 KAIG3-RFI-CO-S-3510-00 Crescent 3/6/21 Concreting of Pile Cap (Foundation) 175 to 182 (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-16820 9

50 C32/40 62% OPC+30%FA - 160+/-40 P 29-16821 9

51 C32/40 62% OPC+30%FA - 160+/-40 P 29-16822 9

52 C32/40 62% OPC+30%FA - 160+/-40 P 29-16823 9

53 C32/40 62% OPC+30%FA - 160+/-40 P 29-16824 9

54 C32/40 62% OPC+30%FA - 160+/-40 P 29-16825 9

55 C32/40 62% OPC+30%FA - 160+/-40 P 29-16826 9 PASSED

56 C32/40 62% OPC+30%FA - 160+/-40 P 29-16827 9

57 C32/40 62% OPC+30%FA - 160+/-40 P 29-16828 9

58 C32/40 62% OPC+30%FA - 160+/-40 P 29-16829 10

59 C32/40 62% OPC+30%FA - 160+/-40 P 29-16830 10

60 C32/40 62% OPC+30%FA - 160+/-40 P 29-16831 6

C32/40 62% OPC+30%FA - 160+/-40 P 27308 8

Site Works near Nursery


61 KAIG3-RFI-SW-S-3597-00 3/9/21 Cast of concrete encastment ( L=17M) for Foul water line between (FW1-2.2 to FW1-2.3); as per attached dwg. C16/20 SRC P 28-27331 9
Garden

62 C16/20 SRC P 28-27333 6


PASSED
63 C16/20 SRC P 28-27341 10

64 C16/20 SRC P 28-27343 6

65 KAIG3-RFI-WG-S-3563-00 Water Play Garden 3/9/21 Concrete pouring & Shuttering of Footing for boundary wall Span 38 & 39 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27336 10

66 C32/40 62% OPC+30%FA - 160+/-40 P 28-27337 10


PASSED
67 C32/40 62% OPC+30%FA - 160+/-40 P 28-27338 10

68 C32/40 62% OPC+30%FA - 160+/-40 P 28-27339 5

kaig-qcals 72
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/
Crescent - Retaining DATE OF DELIVERY NOTE
Sl69
No. RFI NUMBER
KAIG3-RFI-CO-S-3576-00 3/9/21 Concreting for Retaining Wall (Foundation) (as highlightedDESCRIPTION
at AXIS AB to Z). C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-27349 QUANTITY
10
LOCATION
Wall CASTING No.
(m³)

70 C32/40 62% OPC+30%FA - 160+/-40 P 28-27350 10


PASSED
71 C32/40 62% OPC+30%FA - 160+/-40 P 28-27351 10

72 C32/40 62% OPC+30%FA - 160+/-40 P 28-27356 2

73 KAIG3-RFI-CO-S-3545-00 Crescent 1 3/9/21 Concreting of Column/Butress for PC 185 Axis 02 AV / 02 2 (2nd). C32/40 62% OPC+30%FA - 220+/-20 P 28-27359 7
PASSED
74 C32/40 62% OPC+30%FA - 220+/-20 P 28-27362 4

Concrete pouring & Shuttering for Wall @ Grid 1 to 7 or (1-7/Right Side), of Boundary wall at Aviary Garden, As per Highlighted in
75 KAIG3-RFI-AG-S-3533-00 Aviary Garden 3/10/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-27372 10
attached Drawing's.

76 C32/40 62% OPC+30%FA - 220+/-20 P 28-27374 10

77 C32/40 62% OPC+30%FA - 220+/-20 P 28-27377 10

78 C32/40 62% OPC+30%FA - 220+/-20 P 28-27380 10

79 C32/40 62% OPC+30%FA - 220+/-20 P 28-27381 10 PASSED

80 C32/40 62% OPC+30%FA - 220+/-20 P 28-27384 10

81 C32/40 62% OPC+30%FA - 220+/-20 P 28-27395 10

82 C32/40 62% OPC+30%FA - 220+/-20 P 28-27396 10

83 C32/40 62% OPC+30%FA - 220+/-20 P 28-27402 10

84 KAIG3-RFI-CO-S-3591-00 Crescent 3/10/21 Concreting of Strip Footing Mass Concrete at Zone 2N (Between Axis 02-AT to 02 AS, 02-AS to 02-AR) as highlighted. C16/20 SRC P 28-27399 10

85 C16/20 SRC P 28-27404 10


PASSED
86 C16/20 SRC P 28-27406 7

87 C16/20 SRC P 28-27409 6

88 KAIG3-RFI-CO-S-3582-00 Crescent 3/11 Concreting for 12 foundation at North Administration Building (as Highlighted) Zone 2R C32/40 62% OPC+30%FA - 160+/-40 P 29-16845 10

89 C32/40 62% OPC+30%FA - 160+/-40 P 29-16846 9


PASSED
90 C32/40 62% OPC+30%FA - 160+/-40 P 29-16848 9

91 C32/40 62% OPC+30%FA - 160+/-40 P 29-16853 5

92 KAIG3-RFI-CO-S-3448-01 Crescent 3/11/21 Concreting of Mass Concrete for TIP Foundation at Zone 1P (as highlighted) C16/20 SRC P 29-16858 10

93 C16/20 SRC P 29-16859 10

94 C16/20 SRC P 29-16860 10

95 C16/20 SRC P 29-16861 10

96 C16/20 SRC P 29-16863 10


PASSED
97 C16/20 SRC p 29-16866 10

98 C16/20 SRC P 29-16869 10

99 C16/20 SRC P 29-16872 10

100 C16/20 SRC P 29-16875 10

101 C16/20 SRC P 29-16876 10

102 KAIG3-RFI-CO-S-3612-00 Crescent 3/11/21 Concreting of Pile Cap (Foundation) 167, 169, 171, 173 (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-16862 10

103 C32/40 62% OPC+30%FA - 160+/-40 P 29-16868 10

104 C32/40 62% OPC+30%FA - 160+/-40 P 29-16870 10


PASSED
105 C32/40 62% OPC+30%FA - 160+/-40 P 29-16873 10

106 C32/40 62% OPC+30%FA - 160+/-40 P 29-16874 10

107 C32/40 62% OPC+30%FA - 160+/-40 P 29-16880 10

108 KAIG3-RFI-CO-S-3621-00 Crescent 3/13/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G (as Highlighted). C16/20 SRC P 28-27420 10

109 C16/20 SRC P 28-27421 10

110 C16/20 SRC P 28-27425 10

111 C16/20 SRC P 28-27428 10

112 C16/20 SRC P 28-27432 10 PASSED

113 C16/20 SRC P 29-16884 10

114 C16/20 SRC P 29-16886 10

115 C16/20 SRC P 29-16887 10

116 C16/20 SRC P 29-16893 2

kaig-qcals 73
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl117
No. RFI NUMBER
KAIG3-RFI-WG-S-3602-00 Water Play Garden 3/13/21 DESCRIPTION
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 38 of Water Garden, as per highlighted Attached Drawings. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-27444 QUANTITY
10
LOCATION CASTING No.
(m³)
118 KAIG3-RFI-WG-S-3603-00 Water Play Garden 3/13/21 Concrete pouring & Shuttering for Kicker (Outside) for boundary wall Span 39 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27445 10
PASSED
119 KAIG3-RFI-WG-S-3605-00 Water Play Garden 3/13/21 Concrete pouring & Shuttering Footing of boundary wall Span 37 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27446 10

120 C32/40 62% OPC+30%FA - 160+/-40 P 29-16892 10

121 KAIG3-RFI-WG-S-3607-00 Water Play Garden 3/14/21 Concrete pouring & Shuttering Footing of boundary wall Span 30 & 33 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16912 10

122 KAIG3-RFI-WG-S-3625-00 Water Play Garden 3/14/21 ete pouring & Shuttering for Footing of boundary wall Span 36 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16915 10

123 C32/40 62% OPC+30%FA - 160+/-40 P 29-16918 10


PASSED
124 C32/40 62% OPC+30%FA - 160+/-40 P 29-16920 10

125 C32/40 62% OPC+30%FA - 160+/-40 P 29-16922 10

126 C32/40 62% OPC+30%FA - 160+/-40 P 29-16931 6

Inspection for Casting the Blinding Concrete under the Manhole of Foul Water (FW1 ,& FW 1-1 FW 1-2, FW 1-3, FW 1-4, FW 1-2.1,
127 KAIG3-RFI-SW-S-3614-00 Site Works 3/14/21 C16/20 SRC P 29-16932 10
FW 1-2.3) at Zone-4C as highlighted.
PASSED
128 C16/20 SRC P 29-16917 10

129 KAIG3-RFI-SG-S-3636-00 Sound & Light Garden 3/14/21 Concrete pouring for Blinding of Boundary wall (A, B, G & H) at Sound & Light Garden, At highlighted area in attached Drawing's. C16/20 SRC P 29-16939 10
PASSED
130 P 29-16936 10

131 KAIG3-RFI-CO-S-3629-00 Crescent 2 3/15/21 Protection Layer of Geotextile Sheet and 30mm Screed for Below Foundation PC 157 to 164 (zone 2L) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 29-16961 5
PASSED
132 C32/40 62% OPC+30%FA - 220+/-20 P 29-16950 10

133 KAIG3-RFI-SW-S-3584-00 Site Works 3/15/21 Inspection for Casting the Blinding Concrete under the Manhole of Foul Water(FW 9-1,FW 13 &FW 14) at Zone-4C As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16949 10

Inspection for Casting the Blinding Concrete under the Manhole of Foul Water (FW1 ,& FW 1-1 FW 1-2, FW 1-3, FW 1-4, FW 1-2.1,
134 KAIG3-RFI-SW-S-3614-00 Site Works 3/15/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-16951 10
FW 1-2.3) at Zone-4C as highlighted.

135 KAIG3-RFI-PA-S-3641-00 Picnic Area 3/15/21 Inspection of concrete pouring for the Foundation of Seating Area (1) at Zone-K (SA-14) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16952 10

136 KAIG3-RFI-PA-S-3696-00 Picnic Area 3/15/21 Inspection of concrete pouring for the Foundation of Seating Area (1) at Zone-K (SA-17) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16966 10 PASSED

137 C32/40 62% OPC+30%FA - 160+/-40 P 29-16971 10

138 C32/40 62% OPC+30%FA - 160+/-40 P 29-16976 10

139 C32/40 62% OPC+30%FA - 160+/-40 P 29-16982 5

140 KAIG3-RFI-CO-S-3662-00 Crescent 3/15/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2H (as Highlighted) C16/20 SRC P 29-16964 10

141 C16/20 SRC P 29-16967 10

142 C16/20 SRC P 29-16969 10


PASSED
143 C16/20 SRC P 29-16977 10

144 C16/20 SRC P 29-16978 10

145 C16/20 SRC P 29-16980 10

146 KAIG3-RFI-WG-S-3635-00 Water Play Garden 3/15/21 Concrete pouring & Shuttering for Footing of boundary wall Span 34 & 35 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16965 10

147 C32/40 62% OPC+30%FA - 160+/-40 P 29-16968 10


PASSED
148 C32/40 62% OPC+30%FA - 160+/-40 P 29-16970 10

149 C32/40 62% OPC+30%FA - 160+/-40 P 29-16972 6

Crescent - Retaining
150 KAIG3-RFI-CO-S-3620-00 3/15/21 Concreting for Retaining Wall (Wall) (as Highlighted at AXIS AD TO AB). C32/40 62% OPC+30%FA - 160+/-40 P 29-16975 9
Wall

151 C32/40 62% OPC+30%FA - 160+/-40 P 29-16979 9 PASSED

152 C32/40 62% OPC+30%FA - 160+/-40 P 29-16983 9

153 KAIG3-RFI-CO-S-2725-00 Crescent 1 3/15/21 Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 71 to 78 (zone 1M) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 29-16986 10

154 KAIG3-RFI-CO-S-3629-00 Crescent 2 3/15/21 Protection Layer of Geotextile Sheet and 30mm Screed for Below Foundation PC 157 to 164 (zone 2L) as highlighted. C32/40 62% OPC+30%FA - 220+/-20

155 KAIG3-RFI-CO-S-3638-00 Crescent 3/16/21 Inspection to check Shuttering & Concreting of R.C. for MCPE-3 foundation. C32/40 62% OPC+30%FA - 160+/-40 P 29-16999 10

Shuttering and Concreting of Mass Concrete Under Strip Footing at Zone 2Q (Between Axis PC 193-191-189-187, 194-192-190) as
156 KAIG3-RFI-CO-S-3664-00 Crescent 3/16/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17001 10
highlighted

157 C32/40 62% OPC+30%FA - 160+/-40 P 29-17002 10

158 C32/40 62% OPC+30%FA - 160+/-40 P 29-17003 10

159 C32/40 62% OPC+30%FA - 160+/-40 P 29-17004 10


PASSED
160 C32/40 62% OPC+30%FA - 160+/-40 P 29-17005 10

161 C32/40 62% OPC+30%FA - 160+/-40 P 29-17007 10

162 C32/40 62% OPC+30%FA - 160+/-40 P 29-17011 10

163 C32/40 62% OPC+30%FA - 160+/-40 P 29-17018 9

164 C32/40 62% OPC+30%FA - 160+/-40 P 29-17019 5

kaig-qcals 74
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
Sl165
No. RFI NUMBER Site BUILDING/
Works near Mgt. DATE OF DELIVERY NOTE
KAIG3-RFI-SW-C-0208-00 LOCATION 3/17/21
CASTING Excavation, soil preparation of the bottom of manhole priorDESCRIPTION
to concrete blinding (FW5 TO FW8) as per highlighted. DESIGN MIX
C16/20 SRC P 28-27458
No.
QUANTITY
9
Building (m³)
Site Works near Mgt.
166 KAIG3-RFI-SW-C-0219-00 3/17/21 Excavation & Blinding Concrete for Foul Water Manholes (FW6-2 & FW6-3). C16/20 SRC P 28-27459 8 PASSED
Building

167 C16/20 SRC P 2917049 3

Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 37 & 39 of Water Garden, as per highlighted Attached
168 KAIG3-RFI-WG-S-3643-01 Water Play Garden 3/17/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27462 10
Drawings.

169 KAIG3-RFI-WG-S-3642-01 Water Play Garden 3/17/21 Concrete pouring & Shuttering for Kicker (Outside) for boundary wall Span 38 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27467 10

Concrete pouring & Shuttering of Kicker (Inside) for boundary wall Span 34 & 35 of Water Garden, as per highlighted Attached
170 KAIG3-RFI-WG-S-3701-00 Water Play Garden 3/17/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17021 10
Drawings.
PASSED
171 KAIG3-RFI-WG-S-3669-00 Water Play Garden 3/17/21 Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 36 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-17022 10

Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 30 & 33 of Water Garden, as per highlighted Attached
172 KAIG3-RFI-WG-S-3668-00 Water Play Garden 3/17/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17028 9
Drawings.
Concrete Pouring & Shuttering for Stiffner columns & Lintel of window at Grid (6/I-M) in Management Building, as highlighted in
173 KAIG3-RFI-MB-S-3667-00 Water Play Garden 3/17/21
attached Drawing's.

174 KAIG3-RFI-CO-S-3665-00 Crescent 3/17/21 Shuttering and Concreting of Column/Buttress for PC 183 Axis 02-AU / 02-2 (2nd) C32/40 62% OPC+30%FA - 220+/-20 P 29-17025 7
PASSED
175 C32/40 62% OPC+30%FA - 220+/-20 P 29-17036 4

176 KAIG3-RFI-CO-S-3627-00 Crescent 3/18/21 Concreting of Pile Cap (Foundation) 168 & 170 (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-17053 10

177 KAIG3-RFI-CO-S-3684-00 Crescent 3/18/21 Shuttering and Concreting of Pile Cap (Foundation) 172 & 174 (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-17054 10

178 C32/40 62% OPC+30%FA - 160+/-40 P 29-17055 10


PASSED
179 C32/40 62% OPC+30%FA - 160+/-40 P 29-17061 10

180 C32/40 62% OPC+30%FA - 160+/-40 P 29-17062 9

181 C32/40 62% OPC+30%FA - 160+/-40 P 29-17065 3

Shuttering and Concreting of Mass Concrete Under Strip Footing at Zone 2Q (Between Axis PC 193-191-189-187, 194-192-190) as
182 KAIG3-RFI-CO-S-3664-00 Crescent 3/18/21 C16/20 SRC P 29-17072 10
highlighted

183 KAIG3-RFI-CO-S-3674-00 Crescent 3/18/21 Application of Anti Termite Under 10 internal Foundation Plain Concrete at Zone 2Q (as Highlighted). C16/20 SRC P 29-17074 10

184 C16/20 SRC P 29-17075 10

185 C16/20 SRC P 29-17080 10

186 C16/20 SRC P 29-17081 10


PASSED
187 C16/20 SRC P 29-17085 10

188 C16/20 SRC P 29-17089 10

189 C16/20 SRC P 29-17090 10

190 C16/20 SRC P 29-17091 5

191 C16/20 SRC P 29-17092 6

192 KAIG3-RFI-SG-S-3719-00 Sound & Light Garden 3/20/21 Concrete pouring for Blinding of Boundary wall (C, D, E, F & I) at Sound & Light Garden, At highlighted area in attached Drawing's. C16/20 SRC P 29-17111 10

193 C16/20 SRC P 29-17116 10 PASSED

194 C16/20 SRC P 29-17120 10

195 KAIG3-RFI-CO-S-3621-00 Crescent 3/20/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G (as Highlighted). C16/20 SRC P 29-17121 10

196 C16/20 SRC P 29-17122 10 PASSED

197 C16/20 SRC P 29-17125 10

198 KAIG3-RFI-CO-S-3678-00 Crescent 3/20/21 Protection Layer of Geo-Textile and Screed Under Strip Footing for TIP (Zone 1P). C32/40 62% OPC+30%FA - 220+/-20 P 29-17127 5 PASSED

199 KAIG3-RFI-CO-S-3662-00 Crescent 3/21/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2H (as Highlighted) C16/20 SRC P 29-17157 10

200 KAIG3-RFI-CO-S-3745-00 Crescent 3/21/21 Shuttering and Concreting of Plain Concrete Under 5 internal Foundation Plain Concrete at Zone 2C (as Highlighted) C16/20 SRC P 29-17159 10
PASSED
201 C16/20 SRC P 29-17162 10

202 C16/20 SRC P 29-17168 4

Concrete Pouring & Shuttering for Wall @ Grid 7 to 12 or (6-11/Right Side), of Boundary wall at Aviary Garden, As per Highlighted in
203 KAIG3-RFI-AG-S-3731-00 Aviary Garden 3/21/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-17165 10
attached Drawing's.

204 C32/40 62% OPC+30%FA - 220+/-20 P 29-17166 10

205 C32/40 62% OPC+30%FA - 220+/-20 P 29-17167 10


PASSED
206 C32/40 62% OPC+30%FA - 220+/-20 P 29-17172 10

207 C32/40 62% OPC+30%FA - 220+/-20 P 29-17173 10

208 C32/40 62% OPC+30%FA - 220+/-20 P 29-17174 10

209 KAIG3-RFI-PA-S-3803-00 Picnic Area 3/22/21 Inspection of concrete pouring for the Wall of Seating Area (1) at Zone-K (SA-17) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27482 10
PASSED
210 C32/40 62% OPC+30%FA - 160+/-40 P 28-27483 10

kaig-qcals 75
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Concrete pouring & Shuttering of Kicker (Outside) for boundary wall Span 30 & 33 of Water Garden, as per highlighted Attached DELIVERY NOTE
Sl211
No. RFI NUMBER
KAIG3-RFI-WG-S-3734-00 Water Play Garden 3/22/21 DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-27494 QUANTITY
10
LOCATION CASTING Drawings. No.
(m³)
Concrete pouring & Shuttering of Kicker (Outside) for boundary wall Span 34, 35 & 36 of Water Garden, as per highlighted Attached
212 KAIG3-RFI-WG-S-3735-00 Water Play Garden 3/22/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27495 10
Drawings.

213 KAIG3-RFI-WG-S-3736-00 Water Play Garden 3/22/21 Concrete pouring & Shuttering of Kicker (Outside) for boundary wall Span 37 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27500 10

214 C32/40 62% OPC+30%FA - 160+/-40 P 28-27502 10


PASSED
215 C32/40 62% OPC+30%FA - 160+/-40 P 28-27503 10

216 C32/40 62% OPC+30%FA - 160+/-40 P 28-27506 10

217 C32/40 62% OPC+30%FA - 160+/-40 P 28-27507 10

218 C32/40 62% OPC+30%FA - 160+/-40 P 28-27512 10

219 KAIG3-RFI-CO-S-3741-00 Crescent 3/23/21 Concreting of Strip Footing in Zone 2N Between axis 02-2, 02-AT to 02-AR (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-17202 10

220 C32/40 62% OPC+30%FA - 160+/-40 P 29-17203 10

221 C32/40 62% OPC+30%FA - 160+/-40 P 28-27525 10

222 C32/40 62% OPC+30%FA - 160+/-40 P 28-27526 10

223 C32/40 62% OPC+30%FA - 160+/-40 P 28-27528 10

224 C32/40 62% OPC+30%FA - 160+/-40 P 28-27530 10


PASSED
225 C32/40 62% OPC+30%FA - 160+/-40 P 28-27531 10

226 C32/40 62% OPC+30%FA - 160+/-40 P 28-27532 10

227 C32/40 62% OPC+30%FA - 160+/-40 P 28-27534 10

228 C32/40 62% OPC+30%FA - 160+/-40 P 28-27535 10

229 C32/40 62% OPC+30%FA - 160+/-40 P 28-27536 10

230 C32/40 62% OPC+30%FA - 160+/-40 P 28-27537 10

231 KAIG3-RFI-CO-S-3780-00 Crescent 3/24/21 Protection layer of Geo-textile sheet and Screed of Slab (Mid) for Tunnel 1 (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-27545 10

232 KAIG3-RFI-CO-S-3781-00 Crescent 3/24/21 Protection layer of Geo-textile sheet and Screed of Slab (Near MCPE) for Tunnel 1 (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-27548 10
PASSED
233 C32/40 62% OPC+30%FA - 220+/-20 P 28-27550 10

234 C32/40 62% OPC+30%FA - 220+/-20 P 28-27554 10

235 KAIG3-RFI-CO-S-3765-00 Crescent 3/24/21 Shuttering and Concreting for 2 Foundation of Internal Bldg. in Zone 2Q ( as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 28-27558 10

236 KAIG3-RFI-CO-S-3794-00 Crescent 3/24/21 Shuttering and Concreting for 5 internal Foundation at Zone 2C (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 28-27559 10 PASSED

237 C32/40 62% OPC+30%FA - 160+/-40 P 28-27565 7

238 KAIG3-RFI-WG-S-3796-00 Water Play Garden 3/25/21 Concrete Pouring & Shuttering for wall of Span 38 & 39 for boundary wall of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27585 10

239 KAIG3-RFI-WG-S-3798-00 Water Play Garden 3/25/21 Concrete pouring for Blinding of boundary wall Span 26, 27, 28 & 29 of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27586 10

240 C32/40 67%OPC+25%FA - 160+/-40 P 28-27587 10


PASSED
241 C32/40 67%OPC+25%FA - 160+/-40 P 28-27599 10

242 C32/40 67%OPC+25%FA - 160+/-40 P 28-27600 10

243 C32/40 67%OPC+25%FA - 160+/-40 P 28-27605 5

244 KAIG3-RFI-CO-S-3799-00 Crescent 3/25/21 Shuttering For 1st Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as Highlighted) Between Axis 02-1, 02-G to 02-J. C16/20 SRC P 28-27602 10

245 C16/20 SRC P 28-27603 10

246 C16/20 SRC P 28-27608 10 PASSED

247 C16/20 SRC P 28-27609 10

248 C16/20 SRC P 28-27613 10

249 KAIG3-RFI-MB-S-3759-00 Management Building 4/25/21 Concrete Pouring for Thickening of Slab at Grid (6/A-E) in Management Building, as highlighted in attached Drawing's. C16/20 SRC P 28-27607 10
PASSED
250 C16/20 SRC P 28-27612 10

251 KAIG3-RFI-TB-S-3733-00 Ticket Booth Canopy 4/25/21 Concrete Pouring & Shuttering for Pedestal (Column's 03 no's @ Grids A / 3, 4 & 5) for foundation of Ticket Booths Canopy. C32/40 62% OPC+30%FA - 160+/-40 P 28-27614 3 PASSED

252 KAIG3-RFI-CO-S-3842-00 Crescent 4/28/21 Protection layer of Geo-textile sheet and 50mm Screed above blinding of Tunnel 2 (as Highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 28-27622 10
PASSED
253 C32/40 62% OPC+30%FA - 220+/-20 P 28-27632 8

254 KAIG3-RFI-PA-S-3856-00 Picnic Area 4/28/21 Inspection of concrete pouring for the Wall of Seating Area (1) at Zone-K (SA-14) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27630 10

255 C32/40 62% OPC+30%FA - 160+/-40 P 28-27633 10 PASSED

C32/40 62% OPC+30%FA - 160+/-40 P 28-27619 10

kaig-qcals 76
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl256
No. RFI NUMBER
KAIG3-RFI-CO-S-3810-00 Crescent 3/28/21 DESCRIPTION
Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted) DESIGN MIX
C16/20 SRC P 28-27639 QUANTITY
10
LOCATION CASTING No.
(m³)
257 C16/20 SRC P 28-27640 10

258 C16/20 SRC P 28-27646 10

259 C16/20 SRC P 28-27647 10

260 C16/20 SRC P 28-27648 10


PASSED
261 C16/20 SRC P 28-27649 10

262 C16/20 SRC P 28-27650 10

263 C16/20 SRC P 28-27651 10

264 C16/20 SRC P 28-27652 10

265 C16/20 SRC P 28-27655 10

266 KAIG3-RFI-CO-S-3810-00 Crescent 3/28/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted) C16/20 SRC P 28-27664 10

267 C16/20 SRC P 28-27665 10

268 C16/20 SRC P 28-27666 10

269 C16/20 SRC P 28-27667 10

270 C16/20 SRC P 28-27671 10

271 C16/20 SRC P 28-27672 10

272 C16/20 SRC P 28-27673 10


PASSED
273 C16/20 SRC P 28-27674 10

274 C16/20 SRC P 28-27678 10

275 C16/20 SRC P 28-27686 10

276 C16/20 SRC P 28-27692 10

277 C16/20 SRC P 28-27700 10

278 C16/20 SRC P 28-27704 10

279 C16/20 SRC P 28-27705 10

Concrete pouring for Blinding of Seat wall (B, D, E & F) & Light wall (A to H) at Sound & Light Garden at highlighted area in attached
280 KAIG3-RFI-SG-S-3839-00 Sound & Light Garden 3/29/21 C16/20 SRC P 28-27680 10
drawings.

281 C16/20 SRC P 28-27683 10 PASSED

282 C16/20 SRC P 28-27685 10

Concrete pouring & Shuttering for Wall @ Grid 24 to 30 or (21-23/Left Side & 23/Right Side), of Boundary wall at Aviary Garden, As
283 KAIG3-RFI-AG-S-3832-00 Aviary Garden 3/29/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-27693 10
per Highlighted in attached Drawing's.

284 C32/40 62% OPC+30%FA - 220+/-20 P 28-27395 10

285 C32/40 62% OPC+30%FA - 220+/-20 P 28-27697 10

286 C32/40 62% OPC+30%FA - 220+/-20 P 28-27701 10 PASSED

287 C32/40 62% OPC+30%FA - 220+/-20 P 28-27703 10

288 C32/40 62% OPC+30%FA - 220+/-20 P 28-27706 10

289 C32/40 62% OPC+30%FA - 220+/-20 P 28-27707 4

290 KAIG3-RFI-CO-S-3808-00 Crescent 3/30/21 Shuttering and Concreting for Strip Footing at TIP Zone 1P (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-27715 10

291 C32/40 62% OPC+30%FA - 160+/-40 P 28-27716 10


PASSED
292 C32/40 62% OPC+30%FA - 160+/-40 P 28-27727 10

293 C32/40 62% OPC+30%FA - 160+/-40 P 28-27731 3

294 KAIG3-RFI-SW-S-3880-00 Picnic Area 3/30/21 Inspection for Concrete Benching Manhole for Storm Water No # (MH-B-03 & MH-B 02)at Zone-1 as highted in drawing. C16/20 SRC P 28-27719 8 PASSED

295 KAIG3-RFI-WG-S-3820-00 Water Play Garden 3/30/21 Concrete Pouring & Shuttering for wall of Span 33 & 34 for boundary wall of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27741 10

296 C32/40 67%OPC+25%FA - 160+/-40 P 28-27745 9


PASSED
297 C32/40 67%OPC+25%FA - 160+/-40 P 28-27746 10

298 C32/40 67%OPC+25%FA - 160+/-40 P 28-27747 5

299 KAIG3-RFI-CO-S-3876-00 Crescent Retaining Wall 3/31/21 Steel Reinforcement for Retaining wall (wall) At Axis AB to Z (as Highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 28-27772 8
PASSED
300 C32/40 62% OPC+30%FA - 220+/-20 P 28-27784 5

301 KAIG3-RFI-WG-S-3852-00 Water Play Garden 3/31/21 Concrete Pouring & Shuttering for wall of Span 35, 36 & 37 for boundary wall of Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27785 10

302 C32/40 67%OPC+25%FA - 160+/-40 P 28-27788 10

303 C32/40 67%OPC+25%FA - 160+/-40 P 28-27789 10 PASSED

304 C32/40 67%OPC+25%FA - 160+/-40 P 28-27792 10

305 C32/40 67%OPC+25%FA - 160+/-40 P 28-27794 10

kaig-qcals 77
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
TOTAL QUANTITY TRUCK LOAD (M³): (m³)
2817

C05 OPC 77

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2894

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 78
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS
(m³)

1 KAIG3-RFI-CO-S-3810-00 Crescent 4/1/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted) C16/20 SRC P 28-27813 9
PASSED
2 C16/20 SRC P 28-27814 6

3 KAIG3-RFI-CO-S-3855-00 Crescent 4/1/21 Shuttering and Concreting for Blinding of Internal Buildings at Zone 2Q & 2R (as Highlighted) C16/20 SRC P 28-27827 8
PASSED
4 C16/20 SRC P 28-27832 5

Shuttering and Concreting For 2nd Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as highlighted) between PC 104 to 110
5 KAIG3-RFI-CO-S-3858-00 Crescent 4/3/21 C16/20 SRC P 28-27848 10
Axis 02-1, 02-G to 02-J.
PASSED
6 C16/20 SRC P 28-27853 10

7 KAIG3-RFI-WG-S-3867-00 Water Play Garden 4/3/21 Concrete pouring & Shuttering of Footing of Span 28 & 29 for boundary wall of Water Garden, as per highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27849 10

8 C32/40 62% OPC+30%FA - 160+/-40 P 28-27851 10

9 C32/40 62% OPC+30%FA - 160+/-40 P 28-27856 10 PASSED

10 C32/40 62% OPC+30%FA - 160+/-40 P 28-27857 10

11 C32/40 62% OPC+30%FA - 160+/-40 P 28-27858 10

Shuttering and Concreting For 2nd Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as highlighted) between PC 104 to 110
12 KAIG3-RFI-CO-S-3858-00 Crescent 4/3/21 C16/20 SRC P 28-27860 10
Axis 02-1, 02-G to 02-J.

13 C16/20 SRC P 28-27861 10 PASSED

14 C16/20 SRC P 28-27865 9

Concrete pouring of Blinding of Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along the Retaining wall @ Jetty 1 at Boat Garden at
15 KAIG3-RFI-WG-S-3868-00 Water Play Garden 4/3/21 C16/20 SRC P 28-27866 10
highlighted area in attached drawing's.
PASSED
Concrete pouring of Blinding of Columns at Grid (5/3 & 3') (5/4 & 4') & (5/A, B, C, D & E) along the Retaining wall @ Jetty 2 at Boat
16 KAIG3-RFI-WG-S-3869-00 Water Play Garden 4/3/21
Garden at highlighted area in attached drawings.

17 KAIG3-RFI-CO-S-3870-00 Crescent 4/4/21 Protection layer of Geotextile and Screed for Under foundation of MCPE 2E & 2F (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-27877 10

18 C32/40 62% OPC+30%FA - 220+/-20 P 28-27878 10


PASSED
19 C32/40 62% OPC+30%FA - 220+/-20 P 28-27885 10

20 C32/40 62% OPC+30%FA - 220+/-20 P 28-27886 10

21 KAIG3-RFI-WG-S-3878-00 Water Play Garden 4/4/21 Concrete Pouring & Shuttering for Wall of Span 30 for boundary wall of Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27891 10

22 C32/40 67%OPC+25%FA - 160+/-40 P 28-27893 8


PASSED
23 C32/40 67%OPC+25%FA - 160+/-40 P 28-27895 7

24 C32/40 67%OPC+25%FA - 160+/-40 P 28-27900 3

KAIG3-RFI-MC-S-3901-00 Crescent MCPE 4/5/21 Shuttering and Concreting of embossed Blinding for MCPE Foundation at Zone 2J, 2K (as highlighted). C16/20 SRC P 28-27906 10

C16/20 SRC P 28-27907 10

kaig-qcals 79
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC P 28-27908 QUANTITY
10
LOCATION CASTING No.
(m³)

C16/20 SRC P 28-27910 10

C16/20 SRC P 28-27911 10

C16/20 SRC P 28-27912 10


PASSED
C16/20 SRC P 28-27913 10

C16/20 SRC P 28-27915 10

C16/20 SRC P 29-17249 10

C16/20 SRC P 29-17251 10

C16/20 SRC P 29-17255 10

C16/20 SRC P 29-17260 10

25 KAIG3-RFI-WG-S-3819-00 Water Play Garden 4/6/21 Concrete pouring for Blinding of boundary wall Span 40, 41 & 42 of Water Garden, as per highlighted Attached Drawings. C16/20 SRC P 29-17287 10

26 KAIG3-RFI-SG-S-3883-00 Sound & Light Garden 4/6/21 Concrete pouring for Blinding of Light wall (G & F) at Sound & Light Garden, At highlighted area in attached Drawing's. C16/20 SRC P 29-17289 10 PASSED

27 C16/20 SRC P 29-17295 10

KAIG3-RFI-CO-S-3810-00 Crescent 4/6/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted) C16/20 SRC P 29-17282 8 PASSED

Concrete Pouring & Shuttering for Footing of Boundary wall (C, D, E, F & I) at Sound & Light Garden, At highlighted area in attached
28 KAIG3-RFI-SG-S-3898-00 Sound & Light Garden 4/7/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27934 10
drawing's.

29 C32/40 62% OPC+30%FA - 160+/-40 P 28-27935 10

30 C32/40 62% OPC+30%FA - 160+/-40 P 28-27938 10

31 C32/40 62% OPC+30%FA - 160+/-40 P 28-27942 10

32 C32/40 62% OPC+30%FA - 160+/-40 P 28-27945 10 PASSED

33 C32/40 62% OPC+30%FA - 160+/-40 P 28-27947 10

34 C32/40 62% OPC+30%FA - 160+/-40 P 28-27951 10

35 C32/40 62% OPC+30%FA - 160+/-40 P 28-27952 10

36 C32/40 62% OPC+30%FA - 160+/-40 P 28-27955 10

37 KAIG3-RFI-CO-S-3890-00 Crescent 4/8/21 Concreting for Buttress BIV 115 top of PC to Bottom of Ring beam. C32/40 62% OPC+30%FA - 220+/-20 P 28-27963 10

38 C32/40 62% OPC+30%FA - 220+/-20 P 28-27964 10

39 C32/40 62% OPC+30%FA - 220+/-20 P 28-27972 10


PASSED
40 C32/40 62% OPC+30%FA - 220+/-20 P 28-27976 10

kaig-qcals 80
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl41
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-27987 QUANTITY
8.5
LOCATION CASTING No.
(m³)

42 C32/40 62% OPC+30%FA - 220+/-20 P 28-27999 5

43 KAIG3-RFI-WG-S-3893-00 Water Play Garden 4/8/21 Concrete Pouring & Shuttering for Footings of Span 26 & 27 for boundary wall of Water Garden as per highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27969 10

Concrete pouring & Shuttering of Kicker (Inside) of Span 28 & 29 for boundary wall of Water Garden, as per highlighted attached
44 KAIG3-RFI-WG-S-3891-00 Water Play Garden 4/8/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27970 10
drawings.
Solvent Base Primer prior to waterproofing membrane for Foundation of Boundary wall (Inner Face) @ Grid (1-11/Right Side) at Aviary
45 KAIG3-RFI-AG-S-3896-00 Aviary Garden 4/8/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27971 10
Garden as per highlighted in attached drawing's.

46 C32/40 62% OPC+30%FA - 160+/-40 P 28-27973 10

47 C32/40 62% OPC+30%FA - 160+/-40 P 28-27977 10

48 C32/40 62% OPC+30%FA - 160+/-40 P 28-27978 10

49 C32/40 62% OPC+30%FA - 160+/-40 P 28-28002 10

50 C32/40 62% OPC+30%FA - 160+/-40 P 28-28003 10


PASSED
51 C32/40 62% OPC+30%FA - 160+/-40 P 28-28006 10

52 C32/40 62% OPC+30%FA - 160+/-40 P 28-28008 10

53 C32/40 62% OPC+30%FA - 160+/-40 P 28-28009 9

54 C32/40 62% OPC+30%FA - 160+/-40 P 28-28010 10

55 C32/40 62% OPC+30%FA - 160+/-40 P 28-28011 10

56 C32/40 62% OPC+30%FA - 160+/-40 P 28-28012 10

57 C32/40 62% OPC+30%FA - 160+/-40 P 28-28013 10

58 C32/40 62% OPC+30%FA - 160+/-40 P 28-28014 10

59 KAIG3-RFI-MC-S-3922-00 Crescent MCPE 4/8/21 Protection Layer of Geotextile sheet and Screed Protection 50mm thk for MCPE 2 Zone 2G (as highlighted) Axis 02-X to 02-Z. C16/20 SRC P 28-27980 10

60 KAIG3-RFI-MC-S-3901-00 Crescent MCPE 4/8/21 Shuttering and Concreting of embossed Blinding for MCPE Foundation at Zone 2J, 2K (as highlighted). C16/20 SRC P 28-27981 10

61 C16/20 SRC P 28-27989 10

62 C16/20 SRC P 28-27991 10


PASSED
63 C16/20 SRC P 28-27996 10

64 C16/20 SRC P 28-28000 10

65 C16/20 SRC P 28-28004 10

66 C16/20 SRC P 28-28007 3

kaig-qcals 81
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF Concrete Pouring & Shuttering for Wall & Buttress @ Grid DESCRIPTION
29 to 33 or (18-22/Left Side) of Boundary wall at Aviary Garden as per DELIVERY NOTE
Sl67
No. RFI NUMBER
KAIG3-RFI-AG-S-3892-00 Aviary Garden 4/8/21 C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-27983 QUANTITY
10
LOCATION CASTING highlighted in attached drawings. No.
(m³)

68 C32/40 62% OPC+30%FA - 220+/-20 P 28-27990 10


PASSED
69 C32/40 62% OPC+30%FA - 220+/-20 P 28-27994 10

70 C32/40 62% OPC+30%FA - 220+/-20 P 28-27998 10

KAIG3-RFI-MC-S-3922-00 Crescent MCPE 4/11/21 Protection Layer of Geotextile sheet and Screed Protection 50mm thk for MCPE 2 Zone 2G (as highlighted) Axis 02-X to 02-Z. C32/40 62% OPC+30%FA - 220+/-20 P 28-28091 7 PASSED

Concrete Pouring & Shuttering for Kicker (Outside) of Span 26 & 28 and Kicker (Inside) of Span 27 for boundary wall of Water Garden
71 KAIG3-RFI-WG-S-3933-00 Water Play Garden 4/12/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17344 10
as per highlighted attached Drawings.
Concrete Pouring & Shuttering for Kicker (Outside) of Boundary wall (A, B & G) and Kicker (Inside & Outside) of Boundary wall (C,
72 KAIG3-RFI-SG-S-3930-00 Sound & Light Garden 4/12/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17345 10
D, H & I) at Sound & Light Garden at highlighted area in attached drawings.

73 C32/40 62% OPC+30%FA - 160+/-40 P 29-17346 10

74 C32/40 62% OPC+30%FA - 160+/-40 P 29-17350 10


PASSED
75 C32/40 62% OPC+30%FA - 160+/-40 P 29-17353 10

76 C32/40 62% OPC+30%FA - 160+/-40 P 29-17358 10

77 C32/40 62% OPC+30%FA - 160+/-40 P 29-17361 10

78 C32/40 62% OPC+30%FA - 160+/-40 P 29-17362 10

79 KAIG3-RFI-CO-S-3770-01 Crescent 4/12/21 Protection Layer of Geo-textile Sheet and Screed under PC 17, 23 to 32 Zone 1E 1D & 1C (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 29-17359 6
PASSED
80 C32/40 62% OPC+30%FA - 220+/-20 P 29-17372 3

81 KAIG3-RFI-WG-S-3941-00 Water Play Garden 4/12/21 Concrete pouring for Blinding of boundary wall at Span 43, 44, 45 & 46 of Water Garden, as per highlighted attached drawings. C16/20 SRC P 29-17368 10
PASSED
82 C16/20 SRC P 29-17375 10

83 KAIG3-RFI-CO-S-3906-00 Crescent 4/12/21 Concreting for Buttress BOV 113 top of PC to Bottom of Ring beam. C32/40 62% OPC+30%FA - 160+/-40 P 29-17378 10

84 C32/40 62% OPC+30%FA - 160+/-40 P 29-17379 10 PASSED

85 C32/40 62% OPC+30%FA - 160+/-40 P 29-17380 10

86 KAIG3-RFI-CO-S-3770-01 Crescent 4/12/21 Protection Layer of Geo-textile Sheet and Screed under PC 17, 23 to 32 Zone 1E 1D & 1C (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-28108 10 PASSED

KAIG3-RFI-CO-S-3924-00 Crescent Retaining Wall 4/13/21 Shuttering and Concreting for Retaining wall (wall) At Axis AB to Z (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 28-28113 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-28114 9


PASSED
C32/40 62% OPC+30%FA - 160+/-40 P 28-28119 3

C32/40 62% OPC+30%FA - 160+/-40 P 28-28122 3

87 KAIG3-RFI-TB-S-3971-00 New Ticket Booth 1 & 2 4/14/21 Concrete pouring & shuttering of Pedestal Beam (Kicker) for New Ticket booths # 1A & 2A as per highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28129 10

88 KAIG3-RFI-TB-S-3973-00 Ticket Booth Canopy 4/14/21 Concrete pouring and Shuttering for Pedestal Column's (03 no's @ Grids A / 6, 7 & 8) & with Anchor Bolts at Ticket Booths Canopy. C32/40 62% OPC+30%FA - 160+/-40 P 28-28130 10 PASSED

Concrete Pouring & Shuttering for Kicker (Inside & Outside) of Boundary wall (E) and Kicker (Inside-2) & (Outside) of Boundary wall
89 KAIG3-RFI-SG-S-3943-00 Sound & Light Garden 4/14/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28143 10
(F) at Sound & Light Garden at highlighted area in attached drawing's.

kaig-qcals 82
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER
KAIG3-RFI-MC-S-3937-00 Crescent MCPE 4/14/21 DESCRIPTION
Concreting of Blinding for MCPE Zone 2E and 2F (small area) as highlighted. DESIGN MIX
C16/20 SRC P 28-28150 QUANTITY
3 PASSED
LOCATION CASTING No.
(m³)

kaig-qcals 83
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF Concrete Pouring & Shuttering for Wall & Buttress @ Grid DESCRIPTION
17 to 24 or (16-22/Right Side) of Boundary wall at Aviary Garden as per DELIVERY NOTE
Sl90
No. RFI NUMBER
KAIG3-RFI-AG-S-3966-00 Aviary Garden 4/15/21 C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-28173 QUANTITY
10
LOCATION CASTING highlighted in attached drawings. No.
(m³)
91 C32/40 62% OPC+30%FA - 220+/-20 P 28-28174 10

92 C32/40 62% OPC+30%FA - 220+/-20 P 28-28178 10

93 C32/40 62% OPC+30%FA - 220+/-20 P 28-28182 10

94 C32/40 62% OPC+30%FA - 220+/-20 P 28-28183 10


PASSED
95 C32/40 62% OPC+30%FA - 220+/-20 P 28-28186 10

96 C32/40 62% OPC+30%FA - 220+/-20 P 28-28187 10

97 C32/40 62% OPC+30%FA - 220+/-20 P 28-28188 10

98 C32/40 62% OPC+30%FA - 220+/-20 P 28-28189 10

99 C32/40 62% OPC+30%FA - 220+/-20 P 28-28191 10

100 KAIG3-RFI-PA-S-3982-00 Picnic Area 4/15/21 Concrete Surface Preperation prior to start the Waterproofing at Seating Area (1) at Zone-K (SA-14) as highlighted. C16/20 SRC P 28-28192 10 PASSED

101 KAIG3-RFI-CO-S-3957-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-28210 10
PASSED
102 KAIG3-RFI-CO-S-3960-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as highlighted.

103 KAIG3-RFI-CO-S-3957-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-28214 10

104 KAIG3-RFI-CO-S-3960-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-28215 10

105 C32/40 62% OPC+30%FA - 160+/-40 P 28-28216 10


PASSED
106 C32/40 62% OPC+30%FA - 160+/-40 P 28-28217 9

107 C32/40 62% OPC+30%FA - 160+/-40 P 28-28218 9

108 C32/40 62% OPC+30%FA - 160+/-40 P 28-28219 8

109 KAIG3-RFI-CO-S-3957-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as highlighted. C16/20 SRC P 28-28220 3
PASSED
110 KAIG3-RFI-CO-S-3960-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as highlighted.

KAIG3-RFI-CO-S-3957-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-28199 8
PASSED
KAIG3-RFI-CO-S-3960-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-28200 8

111 KAIG3-RFI-CO-S-3993-00 Crescent 2 4/18/21 Shuttering and Concreting of Strip Footing Foundation at Zone 2Q. C32/40 62% OPC+30%FA - 160+/-40 P 28-28222 10
PASSED
112 P 28-28223 10

113 KAIG3-RFI-MC-S-3945-01 Crescent MCPE 4/19/21 Protection layer of geo-textile sheet and 50mm thk screed for MCPE 2 Zone 2H (as highlighted) Axis 02-Z to 02-AB. C32/40 62% OPC+30%FA - 220+/-20 P 28-28226 10

114 C32/40 62% OPC+30%FA - 220+/-20 P 28-28227 10

115 C32/40 62% OPC+30%FA - 220+/-20 P 28-28230 10 PASSED

116 C32/40 62% OPC+30%FA - 220+/-20 P 28-28234 10

kaig-qcals 84
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

PASSED

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl117
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-28236 QUANTITY
10
LOCATION CASTING No.
(m³)
118 KAIG3-RFI-MC-S-3945-01 Crescent MCPE 4/19/21 Protection layer of geo-textile sheet and 50mm thk screed for MCPE 2 Zone 2H (as highlighted) Axis 02-Z to 02-AB. C32/40 62% OPC+30%FA - 160+/-40 P 28-28235 6 PASSED

119 KAIG3-RFI-CO-S-3977-01 Crescent 4/20/21 Shuttering and Concreting of Pile Cap (Foundation) 109 (as highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28241 10

120 KAIG3-RFI-CO-S-4009-00 Crescent 4/20/21 Shuttering and Concreting of Pile Cap (Foundation) 160, 162, 164 (as Highlighted) Zone 2L C32/40 62% OPC+30%FA - 160+/-40 P 28-28242 10

121 KAIG3-RFI-CO-S-4024-01 Crescent 4/20/21 Shuttering and Concreting of Pile Cap (Foundation) 112 (as highlighted) Zone 2D. C32/40 62% OPC+30%FA - 160+/-40 P 28-28243 10

122 KAIG3-RFI-CO-S-4053-00 Crescent 4/20/21 Shuttering and Concreting of Pile Cap (Foundation) 114 (as Highlighted) Zone 2D C32/40 62% OPC+30%FA - 160+/-40 P 28-28244 10

123 C32/40 62% OPC+30%FA - 160+/-40 P 28-28245 10

124 C32/40 62% OPC+30%FA - 160+/-40 P 28-28250 10

125 C32/40 62% OPC+30%FA - 160+/-40 P 28-28251 10 PASSED

126 C32/40 62% OPC+30%FA - 160+/-40 P 28-28253 10

127 C32/40 62% OPC+30%FA - 160+/-40 P 28-28256 10

128 C32/40 62% OPC+30%FA - 160+/-40 P 28-28259 10

129 C32/40 62% OPC+30%FA - 160+/-40 P 28-28261 10

130 C32/40 62% OPC+30%FA - 160+/-40 P 28-28262 10

131 C32/40 62% OPC+30%FA - 160+/-40 P 28-28271 8

132 KAIG3-RFI-WG-S-4014-00 Water Play Garden 4/20/21 Concrete pouring & Shuttering for Footing of boundary wall at Span 40, 41 & 42 of Water Garden, as per highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28247 10

Concrete pouring & Shuttering of Kicker (Inside) of Span 26 and Kicker (Outside) of Span 27 for boundary wall of Water Garden, as per
133 KAIG3-RFI-WG-S-4021-00 Water Play Garden 4/20/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28248 10
highlighted attached drawings.

134 C32/40 62% OPC+30%FA - 160+/-40 P 28-28249 6 PASSED

135 C32/40 62% OPC+30%FA - 160+/-40 P 28-28257 10

136 C32/40 62% OPC+30%FA - 160+/-40 P 28-28258 6

137 KAIG3-RFI-CO-S-3994-01 Crescent 2 4/20/21 Steel Reinforcement of BII-BIV 122 (as Highlighted) Zone 2Q. C32/40 62% OPC+30%FA - 220+/-20 P 28-28269 8 PASSED

138 KAIG3-RFI-SG-S-4022-00 Sound & Light Garden 4/21/21 Concrete pouring & Shuttering of Wall (H) of Boundary wall at Sound & Light Garden at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28293 10

Concrete Pouring & Shuttering for footings of Light Wall (A, B, G & F) at Sound & Light Garden at highlighted area in attached
139 KAIG3-RFI-SG-S-4041-00 Sound & Light Garden 4/21/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28297 10
drawings.
PASSED
140 C32/40 62% OPC+30%FA - 160+/-40 P 28-28298 10

141 C32/40 62% OPC+30%FA - 160+/-40 P 28-28302 4

142 KAIG3-RFI-CO-S-4026-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 110 (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28309 10

143 KAIG3-RFI-CO-S-4029-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 106 (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28310 10

144 KAIG3-RFI-CO-S-4031-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 108 (as highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28313 10

145 KAIG3-RFI-CO-S-4033-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 159 (as highlighted) Zone 2L. C32/40 62% OPC+30%FA - 160+/-40 P 28-28317 10

kaig-qcals 85

PASSED
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl146
No. RFI NUMBER
KAIG3-RFI-CO-S-4035-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 161 (asDESCRIPTION
highlighted) Zone 2L. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-28319 QUANTITY
10
LOCATION CASTING No.
(m³)
147 KAIG3-RFI-CO-S-4037-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 163 (as highlighted) Zone 2L. C32/40 62% OPC+30%FA - 160+/-40 P 28-28322 10
PASSED
Concrete pouring & Shuttering for Kicker (Inside) of Boundary wall (A & G) at Sound & Light Garden, at D4184highlighted area in
148 KAIG3-RFI-SG-S-4050-00 Crescent 4/22/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28326 10
attached drawing's.

149 C32/40 62% OPC+30%FA - 160+/-40 P 28-28330 10

150 C32/40 62% OPC+30%FA - 160+/-40 P 28-28333 10

151 C32/40 62% OPC+30%FA - 160+/-40 P 28-28335 10

152 C32/40 62% OPC+30%FA - 160+/-40 P 28-28337 10

153 C32/40 62% OPC+30%FA - 160+/-40 P 28-28339 10

154 KAIG3-RFI-SG-S-4040-00 Sound & Light Garden 4/22/21 Concrete Pouring & Shuttering for Kicker (Inside) of Boundary wall (F) at Sound & Light Garden at highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28315 10

Concrete pouring & Shuttering for Footings of boundary wall at Span 43, 44, 45 & 46 of Water Garden, as per highlighted Attached
155 KAIG3-RFI-WG-S-4048-00 Water Play Garden 4/22/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28316 10
Drawings.
Concrete pouring & Shuttering for Kicker (Inside) of Boundary wall (A & G) at Sound & Light Garden, at D4184highlighted area in
156 KAIG3-RFI-SG-S-4050-00 Sound & Light Garden 4/22/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28318 10
attached drawing's.

157 C32/40 62% OPC+30%FA - 160+/-40 P 28-28321 10

158 C32/40 62% OPC+30%FA - 160+/-40 P 28-28329 10


PASSED
159 C32/40 62% OPC+30%FA - 160+/-40 P 28-28332 10

160 C32/40 62% OPC+30%FA - 160+/-40 P 28-28334 10

161 C32/40 62% OPC+30%FA - 160+/-40 P 28-28336 10

162 C32/40 62% OPC+30%FA - 160+/-40 P 28-28338 10

163 C32/40 62% OPC+30%FA - 160+/-40 P 28-28341 7

164 KAIG3-RFI-WG-S-4049-00 Water Play Garden 4/24/21 Concrete pouring & Shuttering of Wall at Span 28 & 29 of boundary wall of Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-28359 10

165 C32/40 67%OPC+25%FA - 160+/-40 P 28-28363 10

166 C32/40 67%OPC+25%FA - 160+/-40 P 28-28364 10 PASSED

167 C32/40 67%OPC+25%FA - 160+/-40 P 28-28365 10

168 C32/40 67%OPC+25%FA - 160+/-40 P 28-28366 7

KAIG3-RFI-MC-S-4065-00 Crescent 4/25/21 Concreting of Blinding for MCPE (small area) as highlighted in Zone 2J C16/20 SRC P 28-28388 10 PASSED

169 KAIG3-RFI-WG-S-4047-00 Water Play Garden 4/25/21 Concrete pouring & Shuttering of Footings for boundary wall at Span 48 & 49 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28373 10

170 C32/40 62% OPC+30%FA - 160+/-40 P 28-28374 10


PASSED
171 C32/40 62% OPC+30%FA - 160+/-40 P 28-28376 10

172 C32/40 62% OPC+30%FA - 160+/-40 P 28-28378 6

173 KAIG3-RFI-SG-S-4058-00 Sound & Light Garden 4/25/21 Concrete pouring & Shuttering for Wall of Boundary wall (B) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-28382 7
PASSED

kaig-qcals 86
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
Sl174
No. RFI NUMBER DESCRIPTION DESIGN MIX - 160+/-40
C32/40 67%OPC+25%FA P 28-28383 QUANTITY
7
LOCATION CASTING No.
(m³)
175 KAIG3-RFI-MC-S-3945-01 Crescent MCPE 4/25/21 Protection layer of geo-textile sheet and 50mm thk screed for MCPE 2 Zone 2H (as highlighted) Axis 02-Z to 02-AB. C32/40 62% OPC+30%FA - 220+/-20 P 28-28384 5 PASSED

kaig-qcals 87
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
Site Works near Water TRUCK LOAD /
BUILDING/ DATE OF Casting of Blinding Concrete for Storm Water Manholes (MH-A-07, MH-A-08, MH-A-09, MH-A-13, MH-A-14, MH-A-15 & MH-X- DELIVERY NOTE
Sl176
No. RFI NUMBER
KAIG3-RFI-SW-C-0358-00 TankLOCATION
& Management 4/25/21 DESCRIPTION DESIGN MIX
C16/20 SRC P 28-28385 QUANTITY
10
CASTING 01, MH-X-02, MH-X-01-1) at highlighted in the attached Dwg. No.
Building (m³)
177 C16/20 SRC P 28-28387 10 PASSED

178 C16/20 SRC P 28-28389 6

INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
179 KAIG3-RFI-SW-C-0360-00 Site Works 4/26/21 C16/20 SRC P 28-28407 10 PASSED
PIECE - MH-B-04 (As Highlighted)

180 KAIG3-RFI-CO-S-4082-01 Crescent 4/26/21 Shuttering and Concreting of Pile Cap (Foundation) 165 & 166 (as Highlighted) Zone 2L. C32/40 62% OPC+30%FA - 160+/-40 P 28-28412 10

181 C32/40 62% OPC+30%FA - 160+/-40 P 28-28413 10


PASSED
182 C32/40 62% OPC+30%FA - 160+/-40 P 28-28414 10

183 C32/40 62% OPC+30%FA - 160+/-40 P 28-28415 8

Concrete pouring & Shuttering for Kicker (Inside) for boundary wall at Span 43, 44, 45 & 46 of Water Garden as per highlighted
184 KAIG3-RFI-WG-S-4073-00 Water Play Garden 4/27/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28416 10
attached drawings.

185 KAIG3-RFI-SG-S-4074-00 Sound & Light Garden 4/27/21 Concrete pouring & Shuttering for Wall of Boundary wall (C) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 28-28417 10

186 C32/40 62% OPC+30%FA - 160+/-40 P 28-28425 10 PASSED

187 C32/40 62% OPC+30%FA - 160+/-40 P 28-28428 10

188 C32/40 62% OPC+30%FA - 160+/-40 P 28-28431 10

189 KAIG3-RFI-WG-S-4085-00 Water Play Garden 4/27/21 Concrete pouring & Shuttering for Footing of boundary wall at Span 41 & 42 @ Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-28437 10

190 C32/40 67%OPC+25%FA - 160+/-40 P 28-28441 8 PASSED

191 C32/40 67%OPC+25%FA - 160+/-40 P 28-28442 7

192 KAIG3-RFI-CO-S-4063-00 Crescent 4/28/21 Shuttering and Concreting for Buttress BIV 113 top of PC to Bottom of Ring beam C32/40 62% OPC+30%FA - 220+/-20 P 28-28456 8 PASSED

193 KAIG3-RFI-CO-S-4024-01 Crescent 4/28/21 Shuttering and Concreting of Pile Cap (Foundation) 112 (as highlighted) Zone 2D. C32/40 62% OPC+30%FA - 160+/-40 P 28-28457 10

194 KAIG3-RFI-CO-S-4055-00 Crescent 4/28/21 Shuttering and Concreting of Strip Footing (as Highlighted) Zone 2Q. C32/40 62% OPC+30%FA - 160+/-40 P 28-28460 10

195 KAIG3-RFI-CO-S-4080-00 Crescent 4/28/21 Shuttering and Concreting of Pile Cap (Foundation) 116 (as Highlighted) Zone 2D. C32/40 62% OPC+30%FA - 160+/-40 P 28-28465 10
PASSED
196 C32/40 62% OPC+30%FA - 160+/-40 P 28-28466 10

197 C32/40 62% OPC+30%FA - 160+/-40 P 28-28468 10

198 C32/40 62% OPC+30%FA - 160+/-40 P 28-28469 5

Concrete pouring & Shuttering for Kicker (Inside) at Span 48 and Kicker (Outside) at Span 49 of boundary wall of Water Garden, as per
199 KAIG3-RFI-WG-S-4081-01 Water Play Garden 4/29/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28475 8
highlighted Attached Drawings.
PASSED
200 C32/40 62% OPC+30%FA - 160+/-40 P 28-28476 7

201 KAIG3-RFI-WG-S-4089-00 Water Play Garden 4/29/21 Concrete pouring & Shuttering for Wall at Span 26 & 27 of boundary wall @ Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-28480 10

202 C32/40 67%OPC+25%FA - 160+/-40 P 28-28481 10


PASSED
203 C32/40 67%OPC+25%FA - 160+/-40 P 28-28482 10

204 C32/40 67%OPC+25%FA - 160+/-40 P 28-28485 10

kaig-qcals 88
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
TOTAL QUANTITY TRUCK LOAD (M³): (m³)
2070.5

C05 OPC 63

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2133.5

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush


QC DC QC Manager

kaig-qcals 89
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
28 DAYS
AND
MORE THAN 28 DAYS

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 90
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 91
February 12, 2023

PASSED
TE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT

PASSED

PASSED

kaig-qcals 92
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 93
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

kaig-qcals 94
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 95
February 12, 2023

PASSED

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 96

PASSED
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 97
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
PASSED

PASSED

kaig-qcals 98
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 99
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS
(m³)

1 KAIG3-RFI-CO-S-4094-00 Crescent 5/2/21 Shuttering and Concreting of Pile Cap (Foundation) 103 (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28559 8

2 C32/40 62% OPC+30%FA - 160+/-40 P 28-28560 10 PASSED

3 C32/40 62% OPC+30%FA - 160+/-40 P 28-28561 6

Concrete pouring & Shuttering for Kickers of Light wall (A, B, C, D, E, F, G & H) at Sound & Light Garden at highlighted area in
4 KAIG3-RFI-SG-S-4059-01 Sound & Light Garden 5/2/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28544 10
attached drawings.

5 C32/40 62% OPC+30%FA - 160+/-40 P 28-28548 10 PASSED

6 C32/40 62% OPC+30%FA - 160+/-40 P 28-28554 10

Concrete pouring & Shuttering for Kicker (Outside) of boundary wall at Span 43, 44, 45 & 46 of Water Garden, as per highlighted
7 KAIG3-RFI-WG-S-4106-00 Water Play Garden 5/2/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28531 10
attached drawings.
Concrete pouring & Shuttering for Kicker (Outside) at Span 48 and Kicker (Inside) at Span 49 of boundary wall of Water Garden, as per
8 KAIG3-RFI-WG-S-4112-00 Water Play Garden 5/2/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28532 10 PASSED
highlighted Attached Drawings.

9 C32/40 62% OPC+30%FA - 160+/-40 P 28-28533 10

10 KAIG3-RFI-SG-S-4114-00 Sound & Light Garden 5/3/21 Concrete pouring & Shuttering of Walls for Boundary wall (D & E) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-28571 10

11 C32/40 67%OPC+25%FA - 160+/-40 P 28-28572 10

12 C32/40 67%OPC+25%FA - 160+/-40 P 28-28574 10

13 C32/40 67%OPC+25%FA - 160+/-40 P 28-28577 10 PASSED

14 C32/40 67%OPC+25%FA - 160+/-40 P 28-28579 10

15 C32/40 67%OPC+25%FA - 160+/-40 P 28-28580 10

16 C32/40 67%OPC+25%FA - 160+/-40 P 28-28584 5

17 KAIG3-RFI-CO-S-4111-00 Crescent 5/3/21 Shuttering and Concreting of Pile Cap (Foundation) 16 & 18 (as Highlighted) Zone 1C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28573 10

18 C32/40 62% OPC+30%FA - 160+/-40 P 28-28578 10

19 C32/40 62% OPC+30%FA - 160+/-40 P 28-28576 10 PASSED

20 C32/40 62% OPC+30%FA - 160+/-40 P 28-28585 4

21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28586 2

22 KAIG3-RFI-CO-S-4062-00 Crescent 5/4/21 Shuttering and Concreting for Buttress BII 115 top of PC to Bottom of Ring beam C32/40 62% OPC+30%FA - 220+/-20 P 28-28593 10 PASSED

23 KAIG3-RFI-CO-S-4123-00 Crescent 5/4/21 Shuttering and Concreting of Pile Cap (Foundation) 153, 154, 155, 157 (as Highlighted) Zone 2K C32/40 62% OPC+30%FA - 160+/-40 P 28-28594 10

24 C32/40 62% OPC+30%FA - 160+/-40 P 28-28595 10


PASSED
25 C32/40 62% OPC+30%FA - 160+/-40 P 28-28598 10

26 C32/40 62% OPC+30%FA - 160+/-40 P 28-28601 7

kaig-qcals 100
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF Protection layer of geotextile sheet and screed protection 50mm thk above blinding for MCPE 2 Zone 2J & 2K (as Highlighted) Axis 02- DELIVERY NOTE
SI27
No. RFI NUMBER
KAIG3-RFI-MC-S-4008-01 Crescent MCPE 5/4/21 DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-28608 QUANTITY
8
LOCATION CASTING AH to 02-AC No.
(m³)
PASSED
28 C32/40 62% OPC+30%FA - 220+/-20 P 28-28609 7

29 KAIG3-RFI-CO-S-4126-00 Crescent 5/4/21 Shuttering and Concreting of Pile Cap 104 at Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28611 10
PASSED
30 C32/40 62% OPC+30%FA - 160+/-40 P 28-28612 10

31 KAIG3-RFI-SG-S-4115-00 Sound & Light Garden 5/5/21 Concrete pouring & Shuttering of Wall for Boundary wall (G) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-28623 10
PASSED
32 C32/40 67%OPC+25%FA - 160+/-40 P 28-28624 9

33 KAIG3-RFI-TB-S-4130-00 Ticket Booth Canopy 5/5/21 Primer coat Prior to Damp Proofing for Pedestal (Column's Surround) (06 no's @ Grids A / 3, 4, 5, 6, 7 & 8) at Ticket Booths Canopy. C32/40 62% OPC+30%FA - 160+/-40 P 28-28628 10

34 C32/40 62% OPC+30%FA - 160+/-40 P 28-28629 10


PASSED
35 C32/40 62% OPC+30%FA - 160+/-40 P 28-28630 10

36 C32/40 62% OPC+30%FA - 160+/-40 P 28-28634 6

37 KAIG3-RFI-CO-S-4119-00 Crescent 5/8/21 Shuttering and concreting of 3rd layer mass concrete for Strip Footing Between PC 110-108, 108-106 (as Highlighted) Zone 2C. C16/20 SRC P 29-17393 9

38 C16/20 SRC P 29-17396 10

39 C16/20 SRC P 29-17399 10


PASSED
40 C16/20 SRC P 29-17400 10

41 C16/20 SRC P 29-17401 10

42 C16/20 SRC P 29-17403 9

43 KAIG3-RFI-SW-C-0369 -00 Site Works 5/8/21 Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW6-2, FW6-3) (as highlighted). C16/20 SRC P 29-17398 9

44 KAIG3-RFI-SW-C-0375-00 Site Works 5/8/21 Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW1, FW1-3.1) (As Highlighted).
PASSED
45 KAIG3-RFI-SW-C-0378-00 Site Works 5/8/21 Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW1-3.2, FW7) (as highlighted).

Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW5, FW6, FW8, FW9-1) (as
46 KAIG3-RFI-SW-C-0389-00 Site Works 5/8/21
highlighted).

47 KAIG3-RFI-CO-S-4181-00 Crescent 5/8/21 Geotextile Sheet and 30mm thk Screed for PC-91, 92, 93, 94, 95, 96 (as highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17404 4 PASSED

48 KAIG3-RFI-CO-S-4147-00 Crescent 5/9/21 Shuttering and Concreting for PC 13 & 14 As Highlighted) Zone 1C. C32/40 62% OPC+30%FA - 160+/-40 P 29-17415 10

49 C32/40 62% OPC+30%FA - 160+/-40 P 29-17418 10


PASSED
50 C32/40 62% OPC+30%FA - 160+/-40 P 29-17419 10

51 C32/40 62% OPC+30%FA - 160+/-40 P 29-17424 8

52 KAIG3-RFI-WG-S-4165-00 Water Play Garden 5/9/21 Concrete pouring & Shuttering of Wall at Span 43, 44 & 45 for boundary wall of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-17421 10

53 C32/40 67%OPC+25%FA - 160+/-40 P 29-17422 10

kaig-qcals PASSED
101
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI54
No. RFI NUMBER DESCRIPTION DESIGN MIX - 160+/-40
C32/40 67%OPC+25%FA P 29-17423 QUANTITY
10 PASSED
LOCATION CASTING No.
(m³)

55 C32/40 67%OPC+25%FA - 160+/-40 P 29-17428 10

56 C32/40 67%OPC+25%FA - 160+/-40 P 29-17431 10

Protection Screed 50mm on Blinding Under Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along the Retaining wall @ Jetty # 1 at
57 KAIG3-RFI-WG-S-4173-00 Water Play Garden 5/9/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-17436 3
Boat Garden at highlighted area in attached drawings.
PASSED
Protection Screed 50mm on Blinding Under Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) along the Retaining
58 KAIG3-RFI-WG-S-4174-00 Water Play Garden 5/9/21
wall @ Jetty 2 atat Boat Garden at highlighted area in attached drawings.

Concrete pouring & Shuttering of Kicker (Outside) of Span 41 and Kicker (Inside) of span 42 for boundary wall of Water Garden, as per
59 KAIG3-RFI-WG-S-4176-00 Water Play Garden 5/10/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17444 10
highlighted attached drawings.
PASSED
Concrete pouring & Shuttering of Kicker (Outside) of Span 40 for boundary wall of Water Garden, as per highlighted Attached
60 KAIG3-RFI-WG-S-4188-00 Water Play Garden 5/10/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17447 10
Drawings.

61 KAIG3-RFI-SG-S-4178-00 Sound & Light Garden 5/10/21 Concrete Pouring & Shuttering for Wall of Boundary wall (A) at Sound & Light Garden at highlighted area in attached drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 29-17456 10

62 C32/40 67%OPC+25%FA - 160+/-40 P 29-17458 10 PASSED

63 C32/40 67%OPC+25%FA - 160+/-40 P 29-17459 7

64 KAIG3-RFI-CO-S-4180-00 Crescent 5/11/21 Protection layer of 4mm thk bituminous protection board for PC-91, 92, 93, 94, 95, 96 (as highlighted) Zone 2A C32/40 62% OPC+30%FA - 220+/-20 P 29-17465 5

65 KAIG3-RFI-CO-S-4202-00 Crescent 5/11/21 Protection layer of geotextile sheet and 30mm screed for Strip Footing between PC 104-106-108-110 at Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 29-17466 5
PASSED
66 C32/40 62% OPC+30%FA - 220+/-20 P 29-17469 5

67 C32/40 62% OPC+30%FA - 220+/-20 P 29-17473 5

Protection layer of geotextile sheet and screed protection 50mm thk above blinding for MCPE 2 Zone 2J & 2K (as Highlighted) Axis 02-
68 KAIG3-RFI-MC-S-4008-02 Crescent MCPE 5/18/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-17526 7
AH to 02-AC

69 C32/40 67%OPC+25%FA - 160+/-40 P 29-17527 7 PASSED

70 C32/40 67%OPC+25%FA - 160+/-40 P 29-17529 8

Protection layer of geotextile sheet and screed protection 50mm thk above blinding for MCPE 2 Zone 2J & 2K (as Highlighted) Axis 02-
71 KAIG3-RFI-MC-S-4008-02 Crescent MCPE 5/18/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-17521 3 PASSED
AH to 02-AC
Notification to Start Removal of Disposal Materials between the 2 Retaining walls as per the Highlighted Area & Attached Survey
72 KAIG3-RFI-SW-C-0401-00 Site Works 5/19/21 C16/20 SRC P 29-17540 6
Report.
PASSED
73 C16/20 SRC P 29-17553 6

Concrete Pouring & Shuttering for Walls of Light wall (A, B, C, E, F, G & H) at Sound & Light Garden, At highlighted area in attached
74 KAIG3-RFI-SG-S-4177-00 Sound & Light Garden 5/19/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-17542 10
Drawing's.

75 C32/40 67%OPC+25%FA - 160+/-40 P 29-17543 10

76 C32/40 67%OPC+25%FA - 160+/-40 P 29-17544 10 PASSED

77 C32/40 67%OPC+25%FA - 160+/-40 P 29-17547 10

78 C32/40 67%OPC+25%FA - 160+/-40 P 29-17548 5

79 KAIG3-RFI-CO-S-4198-00 Crescent 5/19/21 Shuttering and Concreting of Pile Cap (Foundation) 4 (as highlighted) Zone 1A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17549 10

80 KAIG3-RFI-CO-S-4199-00 Crescent 5/19/21 Shuttering and Concreting of Pile Cap (Foundation) 8, 10, 12 (as Highlighted) Zone 1B. C32/40 62% OPC+30%FA - 160+/-40 P 29-17550 10

kaig-qcals 102
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI81
No. RFI NUMBER
KAIG3-RFI-CO-S-4194-01 Crescent 5/19/21 DESCRIPTION
Shuttering and Concreting of Pile Cap (Foundation) 15, 17 (as Highlighted) Zone 1C C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-17555 QUANTITY
10
LOCATION CASTING No.
(m³)

82 KAIG3-RFI-CO-S-4200-00 Crescent 5/19/21 Shuttering and Concreting of Duct Bank under Strip Footing at TIP zone 1A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17557 10

83 KAIG3-RFI-CO-S-4206-00 Crescent 5/19/21 Shuttering and Concreting of Pile Cap (Foundation) 6 (as Highlighted) Zone 1A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17558 10

84 C32/40 62% OPC+30%FA - 160+/-40 P 29-17559 10


PASSED
85 C32/40 62% OPC+30%FA - 160+/-40 P 29-17562 10

86 C32/40 62% OPC+30%FA - 160+/-40 P 29-17564 10

87 C32/40 62% OPC+30%FA - 160+/-40 P 29-17566 10

88 C32/40 62% OPC+30%FA - 160+/-40 P 29-17567 10

89 C32/40 62% OPC+30%FA - 160+/-40 P 29-17568 10

90 C32/40 62% OPC+30%FA - 160+/-40 P 29-17572 10

Concrete pouring & Shuttering for Kicker (Inside) of Span 40 & 41 and Kicker (Outside) of span 42 for boundary wall of Water Garden,
91 KAIG3-RFI-WG-S-4229-00 Water Play Garden 5/19/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17560 10 PASSED
as per highlighted Attached Drawings.

92 KAIG3-RFI-CO-S-4210-00 Crescent 5/19/21 Shuttering and Concreting of Strip Footing Between PC 103-105, 107-109 (as Highlighted) Zone 2C. C16/20 SRC P 29-17573 10

93 C16/20 SRC P 29-17574 10

94 C16/20 SRC P 29-17576 10 PASSED

95 C16/20 SRC P 29-17582 10

96 C16/20 SRC P 29-17583 3

97 KAIG3-RFI-CO-S-4212-01 Crescent 5/20/21 Shuttering and Concreting of Mass concrete for Strip Footing Between PC 168 to 170 (as Highlighted) Zone 2M. C16/20 SRC P 29-17590 10
PASSED
98 C16/20 SRC P 29-17593 10

Inspection for Casting the Blinding Concrete under the Manhole of Foul Water (FW1 ,& FW 1-1 FW 1-2, FW 1-3, FW 1-4, FW 1-2.1,
99 KAIG3-RFI-SW-S-3614-00 Site Works 5/20/21 C16/20 SRC P 29-17594 4 PASSED
FW 1-2.3) at Zone-4C as highlighted.

100 KAIG3-RFI-CO-S-4200-00 Crescent 5/19/21 Shuttering and Concreting of Duct Bank under Strip Footing at TIP zone 1A. C32/40 62% OPC+30%FA - 220+/-20 P 29-17600 5

101 C32/40 62% OPC+30%FA - 220+/-20 P 29-17602 7 PASSED

102 C32/40 62% OPC+30%FA - 220+/-20 P 29-17607 9

103 KAIG3-RFI-CO-S-4208-00 Crescent 5/20/21 Shuttering and Concreting of Pile Cap (Foundation) 97 & 98 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17614 10

104 KAIG3-RFI-CO-S-4232-00 Crescent 5/20/21 Shuttering and Concreting of Buttress BOV-114 at Zone 2N. C32/40 62% OPC+30%FA - 160+/-40 P 29-17615 10

105 KAIG3-RFI-SA-S-4236-00 Crescent 5/20/21 Shuttering and Concreting of 1 foundation Internal Building (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 29-17616 10

106 C32/40 62% OPC+30%FA - 160+/-40 P 29-17617 10 PASSED

107 C32/40 62% OPC+30%FA - 160+/-40 P 29-17619 10

108 C32/40 62% OPC+30%FA - 160+/-40 P 29-17621 10

kaig-qcals 103
Consultant : DAR
PASSED
Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI109
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-17626 QUANTITY
5
LOCATION CASTING No.
(m³)
Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-01, G-A-03, G-A-06, G-A-07, G-A-08, G-A-09, G-A-10, G-A-
110 KAIG3-RFI-SW-C-0421-00 Site Works 5/22/21 C16/20 SRC P 29-17629 3 PASSED
11, G-X-07 (as highlighted)

111 KAIG3-RFI-WG-S-4258-00 Water Play Garden 5/22/21 Concrete pouring & Shuttering for Wall at Span 48 & 49 of boundary wall of Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-17632 10

Concrete pouring & Shuttering for Footing's at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) under Columns along the Retaining wall @
112 KAIG3-RFI-WG-S-4259-00 Water Play Garden 5/22/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-17633 10
Jetty # 1 at Boat Garden at highlighted area in attached drawing's.
Concrete pouring & Shuttering for Footing's at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) under Columns along the
113 KAIG3-RFI-WG-S-4260-00 Water Play Garden 5/22/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-17634 10
Retaining wall @ Jetty 2 atat Boat Garden at highlighted area in attached drawing's.
PASSED
114 C32/40 67%OPC+25%FA - 160+/-40 P 29-17635 10

115 C32/40 67%OPC+25%FA - 160+/-40 P 29-17638 9

116 C32/40 67%OPC+25%FA - 160+/-40 P 29-17639 9

117 KAIG3-RFI-CO-S-4256-01 Crescent 5/22/21 Shuttering And Concreting of Plain Concrete Strip Footing between PC 109, 111, 113 for zone 2D. C16/20 SRC P 29-17660 10

118 C16/20 SRC P 29-17661 10 PASSED

119 C16/20 SRC P 29-17662 4

120 KAIG3-RFI-CO-S-4231 Crescent 5/22/21 Shuttering and Concreting of Pile Cap (Foundation) 91 & 92 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17636 10

121 C32/40 62% OPC+30%FA - 160+/-40 P 29-17637 10

122 C32/40 62% OPC+30%FA - 160+/-40 P 29-17641 10

123 C32/40 62% OPC+30%FA - 160+/-40 P 29-17642 10

124 C32/40 62% OPC+30%FA - 160+/-40 P 29-17645 10


PASSED
125 C32/40 62% OPC+30%FA - 160+/-40 P 29-17647 10

126 C32/40 62% OPC+30%FA - 160+/-40 P 29-17648 10

127 C32/40 62% OPC+30%FA - 160+/-40 P 29-17653 10

128 C32/40 62% OPC+30%FA - 160+/-40 P 29-17655 10

129 C32/40 62% OPC+30%FA - 160+/-40 P 29-17659 4

130 KAIG3-RFI-CO-S-4244-01 Crescent 5/22/21 Two layer of 4mm thick modified bituminous WP membrane of Slab at Tunnel 1 Zone 5 (as Highlighted) (Near 02/2). C32/40 62% OPC+30%FA - 160+/-40 P 29-17646 9
PASSED
Concrete pouring of Blinding for Manhole (MH-C-3-2) prior to blinding @ East Side in Aviary garden, At Highlighted in the attached
131 KAIG3-RFI-AG-S-4245-01 Crescent 5/22/21
drawing's.

132 KAIG3-RFI-CO-S-4251-00 Crescent 5/23/21 Shuttering and Concreting of Buttress BII-113 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17703 10

133 KAIG3-RFI-CO-S-4233-00 Crescent 5/23/21 Shuttering and Concreting of Buttress BII-114 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17693 10 PASSED

134 KAIG3-RFI-CO-S-4148-01 Crescent 5/23/21 Shuttering and Concreting of Buttress BII- 116 & 117 at Zone 2N and 2P. C32/40 62% OPC+30%FA - 220+/-20 P 29-17690 10

135 KAIG3-RFI-CO-S-4253-00 Crescent 5/24/21 Shuttering And Concreting of Strip Footing between PC 104, 106, 108, 110 for zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 29-17713 7
PASSED
136 C32/40 62% OPC+30%FA - 160+/-40 P 29-17712 10

137 KAIG3-RFI-CO-S-4267-00 Crescent 5/24/21 Shuttering and Concreting of Buttress BOV-116 & 117 at Zone 2N & 2P. C32/40 62% OPC+30%FA - 220+/-20 P 29-17717 10

kaig-qcals PASSED
104
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI138
No. RFI NUMBER
KAIG3-RFI-CO-S-4282-00 Crescent 5/24/21 Shuttering and Concreting of Buttress BII-BIV 120 and 121 DESCRIPTION
(1st) at Zone 2Q & 2P C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-17722 QUANTITY
10
LOCATION CASTING No.
(m³)
PASSED
139 KAIG3-RFI-CO-S-4295-00 Crescent 5/24/21 Protection layer of geotextile sheet and 30mm screed for Strip Footing between PC 103-105-107-109 at Zone 2C. C32/40 62% OPC+30%FA - 220+/-20 P 29-17723 10

140 KAIG3-RFI-CO-S-4303-00 Crescent 5/24/21 Protection layer of geotextile sheet and 30mm screed for below Strip footing zone 2D between PC 109-111-113.

141 KAIG3-RFI-PA-C-0438-00 Picnic Area 5/25/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-30) as highlighted C16/20 SRC P 29-17731 10
PASSED
142 KAIG3-RFI-PA-C-0448-00 Picnic Area 5/25/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-35) as highlighted. C16/20 SRC P 29-17730 10

143 KAIG3-RFI-CO-S-4281-00 Crescent 5/25/21 Shuttering and Concreting of Pile Cap (Foundation) 94 & 96 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 220+/-20 P 29-17734 10

144 C32/40 62% OPC+30%FA - 220+/-20 P 29-17733 10 PASSED

145 C32/40 62% OPC+30%FA - 220+/-20 P 29-17732 10

146 KAIG3-RFI-CO-S-4281-00 Crescent 5/25/21 Shuttering and Concreting of Pile Cap (Foundation) 94 & 96 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17736 10

147 C32/40 62% OPC+30%FA - 160+/-40 P 29-17737 10

148 C32/40 62% OPC+30%FA - 160+/-40 P 29-17738 10 PASSED

149 C32/40 62% OPC+30%FA - 160+/-40 P 29-17741 10

150 C32/40 62% OPC+30%FA - 160+/-40 P 29-17750 8

151 KAIG3-RFI-CO-S-4303-00 Crescent 5/25/21 Protection layer of geotextile sheet and 30mm screed for below Strip footing zone 2D between PC 109-111-113. C16/20 SRC P 29-17744 9 PASSED

152 KAIG3-RFI-PA-C-0437-00 Picnic Area 5/26/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-40) as highlighted. C16/20 SRC P 29-17760 6
PASSED
153 KAIG3-RFI-SW-C-0456-00 Site Works 5/26/21 INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE - MH-B-04, G-B-01, G-B-02 (As highlighted). C16/20 SRC P 29-17778 3

154 KAIG3-RFI-CO-S-4298-00 Crescent 5/26/21 Shuttering and Concreting for Buttress BOV-115 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17769 8 PASSED

155 KAIG3-RFI-CO-S-4249-01 Crescent 5/26/21 Shuttering and Concreting of Pile Cap (Foundation) 9 & 11 (as Highlighted) Zone 1B C32/40 62% OPC+30%FA - 160+/-40 P 29-17785 10

156 KAIG3-RFI-CO-S-4286-00 Crescent 5/26/21 Shuttering and Concrerting of Pile Cap (Foundation) 3 & 5 (as Highlighted) Zone 1A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17780 10

157 C32/40 62% OPC+30%FA - 160+/-40 P 29-17782 10


PASSED
158 C32/40 62% OPC+30%FA - 160+/-40 P 29-17779 10

159 C32/40 62% OPC+30%FA - 160+/-40 P 29-17784 10

160 C32/40 62% OPC+30%FA - 160+/-40 P 29-17786 8

161 KAIG3-RFI-CO-S-4284-01 Crescent 5/29/21 Shuttering and Concreting of Foundation for Tunnel 2 (Zone 2F) C32/40 62% OPC+30%FA - 160+/-40 P 29-17805 10

162 KAIG3-RFI-CO-S-4312-00 Crescent 5/29/21 Shuttering and concreting of Pile Cap (Foundation) 93 (as Highlighted) Zone 2A C32/40 62% OPC+30%FA - 160+/-40 P 29-17807 10

163 KAIG3-RFI-CO-S-4328-00 Crescent 5/29/21 Concreting of Pile Cap (Foundation) 95 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17808 10

164 C32/40 62% OPC+30%FA - 160+/-40 P 29-17809 10

165 C32/40 62% OPC+30%FA - 160+/-40 P 29-17811 10

166 C32/40 62% OPC+30%FA - 160+/-40 P 29-17812 10

kaig-qcals 105

PASSED
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI167
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-17813 QUANTITY
10
LOCATION CASTING No.
(m³)
168 C32/40 62% OPC+30%FA - 160+/-40 P 29-17814 10

169 C32/40 62% OPC+30%FA - 160+/-40 P 29-17815 10 PASSED

170 C32/40 62% OPC+30%FA - 160+/-40 P 29-17816 10

171 C32/40 62% OPC+30%FA - 160+/-40 P 29-17821 10

172 C32/40 62% OPC+30%FA - 160+/-40 P 29-17828 10

173 C32/40 62% OPC+30%FA - 160+/-40 P 29-17831 10

174 C32/40 62% OPC+30%FA - 160+/-40 P 29-17837 10

175 C32/40 62% OPC+30%FA - 160+/-40 P 29-17838 10

176 C32/40 62% OPC+30%FA - 160+/-40 P 29-17839 10

177 C32/40 62% OPC+30%FA - 160+/-40 P 29-17840 5

178 KAIG3-RFI-SW-C-0456-00 Civil 5/29/21 INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE - MH-B-04, G-B-01, G-B-02 (As Highlighted). C16/20 SRC P 29-17822 6
PASSED
Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G-A-26, G-X-8, G-X-9 (as
179 KAIG3-RFI-SW-C-0463-00 Site Works 5/29/21 C16/20 SRC P 29-17830 6
Highlighted).

180 KAIG3-RFI-AG-S-4354-00 Aviary Garden 5/29/21 Concrete Encasement for Backdrop & Short piece of Manhole (MH-C-3-2) @ Aviary garden at highlighted in the attached drawing's. C16/20 SRC P 29-17823 3 PASSED

181 KAIG3-RFI-SW-C-0473-00 Site Works 5/30/21 Inspection for casting the Concrete Encasement for the Storm Water Line From G-B-07 to G-B-09 As Highlighted. C16/20 SRC P 29-17846 7 PASSED

182 KAIG3-RFI-SW-C-0473-00 Site Works 5/31/21 Inspection for casting the Concrete Encasement for the Storm Water Line From G-B-07 to G-B-09 As Highlighted. C16/20 SRC P 29-17868 7 PASSED

Concrete pouring & Shuttering for Column's at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) along the Retaining wall @ Jetty # 1 at Boat
183 KAIG3-RFI-WG-S-4339-00 Water Play Garden 5/31/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17865 5
Garden at highlighted area in attached Drawing's.
PASSED
Concrete pouring & Shuttering for Column's at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) along the Retaining wall @
184 KAIG3-RFI-WG-S-4340-00 Water Play Garden 5/31/21
Jetty 2 atat Boat Garden at highlighted area in attached Drawing's.

185 KAIG3-RFI-WG-S-4341-00 Water Play Garden 5/31/21 Concrete pouring & Shuttering of Wall of Span 40, 41 & 42 for boundary wall of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-17870 10

186 C32/40 67%OPC+25%FA - 160+/-40 P 29-17871 10

187 C32/40 67%OPC+25%FA - 160+/-40 P 29-17872 10 PASSED

188 C32/40 67%OPC+25%FA - 160+/-40 P 29-17877 10

189 C32/40 67%OPC+25%FA - 160+/-40 P 29-17878 10

190 KAIG3-RFI-MC-S-4346-00 Crescent MCPE 5/31/21 Protection layer of geotextile sheet and 50mm thick screed rpotection for MCPE 2 Zone 2K (as Highlighted) Axis 02-AG to 02-AH. C32/40 62% OPC+30%FA - 220+/-20 P 29-17873 10

191 KAIG3-RFI-CO-S-2785-01 Crescent 1 5/31/21 Application of Protection Layer of Geotextile Sheet and 30mm Screed Protection Under Strip Footing TIP Zone 1A. C32/40 62% OPC+30%FA - 220+/-20 P 29-17874 10
PASSED
192 C32/40 62% OPC+30%FA - 220+/-20 P 29-17876 10

193 C32/40 62% OPC+30%FA - 220+/-20 P 29-17889 3

194 KAIG3-RFI-CO-S-4288-01 Crescent 5/31/21 Shuttering and Concreting of Pile Cap (Foundation) 7 (as Highlighted) Zone 1B. C32/40 62% OPC+30%FA - 160+/-40 P 29-17883 10
PASSED
195 C32/40 62% OPC+30%FA - 160+/-40 P 29-17886 10

kaig-qcals 106
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI196
No. RFI NUMBER
KAIG3-RFI-SG-S-4366-00 Sound & Light Garden 5/31/21 Concrete pouring for Blinding of Whispering Cave 1 & 2, @DESCRIPTION
Sound & Light Garden, At highlighted area in attached Drawing's DESIGN MIX
C16/20 SRC P 29-17885 QUANTITY
10
LOCATION CASTING No.
(m³)
PASSED
197 C16/20 SRC P 29-17887 10

kaig-qcals 107
Consultant : DAR

Main Contractor: ZHBG RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
(m³)
TOTAL QUANTITY TRUCK LOAD (M³): 1685

C05 OPC 28

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 1713

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 108
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
28 DAYS
AND
MORE THAN 28 DAYS

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 109
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals PASSED 110


February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 111
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 112
PASSED
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals PASSED 113


February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 114

PASSED
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 115
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

kaig-qcals 116
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS
(m³)

1 KAIG3-RFI-MC-S-4360-00 Crescent 06/01/21 Shuttering for foundation of MCPE 2 Movement joint @ axis 03-G and 02-Y (as highlighted) Zone 2G. C32/40 62% OPC+30%FA - 160+/-40 P 29-17911 10

2 C32/40 62% OPC+30%FA - 160+/-40 P 29-17910 10

3 C32/40 62% OPC+30%FA - 160+/-40 P 29-17907 10

4 C32/40 62% OPC+30%FA - 160+/-40 P 29-17906 10

5 C32/40 62% OPC+30%FA - 160+/-40 P 29-17905 10

6 C32/40 62% OPC+30%FA - 160+/-40 P 29-17904 10

7 C32/40 62% OPC+30%FA - 160+/-40 P 29-17903 10

8 C32/40 62% OPC+30%FA - 160+/-40 P 29-17902 10

9 C32/40 62% OPC+30%FA - 160+/-40 P 29-17901 10

10 C32/40 62% OPC+30%FA - 160+/-40 P 29-17900 10 PASSED

11 C32/40 62% OPC+30%FA - 160+/-40 P 29-17899 10

12 C32/40 62% OPC+30%FA - 160+/-40 P 29-17898 10

13 C32/40 62% OPC+30%FA - 160+/-40 P 29-17897 10

14 C32/40 62% OPC+30%FA - 160+/-40 P 29-17896 10

15 C32/40 62% OPC+30%FA - 160+/-40 P 29-17895 10

16 C32/40 62% OPC+30%FA - 160+/-40 P 29-17894 10

17 C32/40 62% OPC+30%FA - 160+/-40 P 29-17893 10

18 C32/40 62% OPC+30%FA - 160+/-40 P 29-17892 10

19 C32/40 62% OPC+30%FA - 160+/-40 P 29-17891 10

20 KAIG3-RFI-CO-S-4333-00 Crescent 06/01/21 Concreting for Strip Footing between PC 103-105-107-109 at Zone 2C. C16/20 SRC P 29-17926 4

21 KAIG3-RFI-CO-S-4337-00 Crescent 06/01/21 Protection Layer of 4mm THK Bituminous Protection Board of Pile cap foundation 167, 168, 169, 170, 171, 172, 173, 174 at zone 2M C16/20 SRC P 29-17925 5

22 C16/20 SRC P 29-17924 10


PASSED
23 C16/20 SRC P 29-17923 10

24 C16/20 SRC P 29-17922 10

25 C16/20 SRC P 29-17921 10

26 KAIG3-RFI-PA-C-0514-00 Picnic Area 06/01/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-30) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-17919 6
PASSED

kaig-qcals 117
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
SI27
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-17920 QUANTITY
5
LOCATION CASTING No.
(m³)

28 KAIG3-RFI-PA-C-0477-00 Picnic Area 06/01/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-K (SA-16) as highlighted. C16/20 SRC P 29-17913 10 PASSED

29 KAIG3-RFI-SW-C-0522-00 Site Works 06/01/21 Inspection for casting the Concrete Encasement for the Storm Water Line From G-A-06 to Main Line (As Highlighted). C16/20 SRC P 29-17935 5

30 KAIG3-RFI-SW-C-0523-00 Site Works 06/01/21 Inspection for Casting the Blinding Concrete under the Manhole (MH-A-06) (as Highlighted). C16/20 SRC P 29-17933 10
PASSED
31 KAIG3-RFI-PA-C-0525-00 Site Works 06/01/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-L (SA-38) As Highlighted C16/20 SRC P 29-17932 10

32 C16/20 SRC P 29-17931 10

33 KAIG3-RFI-CO-S-4315-00 Crescent 06/02/21 Concreting for Buttress BOI-113 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17934 10
PASSED
34 KAIG3-RFI-CO-S-4318-00 Crescent 06/02/21 Concreting for Buttress BOI-114 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17941 10

35 KAIG3-RFI-CO-S-4364-00 Crescent 06/02/21 Concreting of RC Strip Footing between PC 109, 111, 113 for zone 2D. C32/40 62% OPC+30%FA - 160+/-40 P 29-17961 10

36 C32/40 62% OPC+30%FA - 160+/-40 P 29-17960 10

37 C32/40 62% OPC+30%FA - 160+/-40 P 29-17959 10

38 C32/40 62% OPC+30%FA - 160+/-40 P 29-17957 10

39 C32/40 62% OPC+30%FA - 160+/-40 P 29-17956 10

40 C32/40 62% OPC+30%FA - 160+/-40 P 29-17955 10

41 C32/40 62% OPC+30%FA - 160+/-40 P 29-17954 10

42 C32/40 62% OPC+30%FA - 160+/-40 P 29-17953 10 PASSED

43 C32/40 62% OPC+30%FA - 160+/-40 P 29-17952 10

44 C32/40 62% OPC+30%FA - 160+/-40 P 29-17951 10

45 C32/40 62% OPC+30%FA - 160+/-40 P 29-17950 10

46 C32/40 62% OPC+30%FA - 160+/-40 P 29-17949 10

47 C32/40 62% OPC+30%FA - 160+/-40 P 29-17948 10

48 C32/40 62% OPC+30%FA - 160+/-40 P 29-17947 10

49 C32/40 62% OPC+30%FA - 160+/-40 P 29-17946 10

50 KAIG3-RFI-PA-C-0521-00 Picnic Area 06/03/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-35) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-17968 9

51 KAIG3-RFI-PA-C-0532-00 Picnic Area 06/03/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-40) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-17969 9
PASSED
52 C32/40 62% OPC+30%FA - 160+/-40 P 29-17971 3

C16/20 SRC P 29-17974 10

kaig-qcals 118
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI53
No. RFI NUMBER
KAIG3-RFI-CO-S-4250-01 Crescent 06/03/21 DESCRIPTION
Concreting of Buttress BII-BIV 122 (2nd) at Zone 2Q.Structural C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-17975 QUANTITY
4
LOCATION CASTING No.
(m³)

KAIG3-RFI-CO-S-4353-00 Crescent 06/03/21 Concreting of Buttress BOV 123 (1st) at Zone 2Q. C16/20 SRC P 29-17978 7

54 C32/40 62% OPC+30%FA - 220+/-20 P 29-17979 5 PASSED

55 C32/40 62% OPC+30%FA - 220+/-20 P 29-17980 5

56 C32/40 62% OPC+30%FA - 220+/-20 P 29-17981 5

57 KAIG3-RFI-CO-S-4432-00 Crescent 06/05/21 Concretingg for 2nd layer mass concrete of strip footing at zone 2D between PC 110-112 (as highlighted) C16/20 SRC P 29-18024 5

58 C16/20 SRC P 29-18021 10

59 C16/20 SRC P 29-18018 10

60 C16/20 SRC P 29-18017 10

61 C16/20 SRC P 29-18016 10 PASSED

62 C16/20 SRC P 29-18014 10

63 C16/20 SRC P 29-18010 10

64 C16/20 SRC P 29-18009 10

65 C16/20 SRC P 29-18007 10

Excavation for Foul Water Line from FW-A-3-6.9 to FW-A-3-6.12 including the Manhole FW-A-3-6.9, FW-A-3-6.10, FW-A-3-6.11,
66 KAIG3-RFI-SW-C-0565-00 Site Works 06/06/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18025 7
FW-A-3-6.12 prior to start Gravel Bedding (as Highlighted).
PASSED
67 C32/40 62% OPC+30%FA - 160+/-40 P 29-18026 5

68 KAIG3-RFI-CO-S-4550-00 Crescent 06/06/21 Shuttering for BUTRESS BIV 109 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18028 6

69 C32/40 62% OPC+30%FA - 220+/-20 P 29-18033 4 PASSED

70 C32/40 62% OPC+30%FA - 220+/-20 P 29-18038 6

71 KAIG3-RFI-PA-C-0524-00 Picnic Area 06/06/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-26) As Highlighted. C16/20 SRC P 29-18030 6 PASSED

72 KAIG3-RFI-CO-S-4544-01 Crescent 06/07/21 Protection layer of geotextile sheet and 50mm screed protection under strip footing between PC 8-10-12-14 at Zone 1B C32/40 62% OPC+30%FA - 160+/-40 P 29-18078 8
PASSED
73 C32/40 62% OPC+30%FA - 160+/-40 P 29-18083 4

Inspection for casting the Concrete Encasement for the Storm Water Line from G-B-07 to MH-B-02 as per the Highlighted area in the
74 KAIG3-RFI-SW-C-0548-00 Site Works 06/07/21 C16/20 SRC P 29-18082 8
attached Drawing

C16/20 SRC P 29-18075 8 PASSED

75 KAIG3-RFI-PA-C-0519-01 Picnic Area 06/07/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted C16/20 SRC P 29-18084 4

76 KAIG3-RFI-PA-C-0519-01 Picnic Area 06/07/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted C16/20 SRC P 29-18087 4 PASSED

77 KAIG3-RFI-CO-S-4348-00 Crescent 06/07/21 Concreting of Buttress BII-BIV 120 and 121 (2nd) at Zone 2Q & 2P. C32/40 62% OPC+30%FA - 220+/-20 P 29-18089 5 PASSED

kaig-qcals 119
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI78
No. RFI NUMBER
KAIG3-RFI-CO-S-4438-00 Crescent 06/08/21 Concreting for BOV 109 for Zone 2M (as Highlighted) DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18111 QUANTITY
9
LOCATION CASTING No.
(m³)

PASSED

kaig-qcals 120
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI79
No. RFI NUMBER
KAIG3-RFI-CO-S-4440-00 Crescent 06/08/21 Concreting for BOV 110 for Zone 2M (as Highlighted) DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18112 QUANTITY
9
LOCATION CASTING No.
(m³)

80 C32/40 62% OPC+30%FA - 220+/-20 P 29-18124 8


PASSED
C32/40 62% OPC+30%FA - 160+/-40 P 29-18127 3

81 C32/40 62% OPC+30%FA - 220+/-20 P 29-18131 10

82 C32/40 62% OPC+30%FA - 220+/-20 P 29-18133 8

83 KAIG3-RFI-CO-S-4452-00 Crescent 06/08/21 Concreting of Mass concrete for Strip footing at zone 1B Between PC 8-10-12-14. C16/20 SRC P 29-18121 4

84 C16/20 SRC P 29-18119 10

85 C16/20 SRC P 29-18118 10 PASSED

86 C16/20 SRC P 29-18117 10

87 C16/20 SRC P 29-18116 10

88 KAIG3-RFI-CO-S-4479-00 Crescent 06/09/21 Concreting of blinding for ETFE Foundation (Mock Up) C32/40 62% OPC+30%FA - 220+/-20 P 29-18152 10

C16/20 SRC P 29-18156 8

89 C32/40 62% OPC+30%FA - 220+/-20 P 29-18147 5

90 C32/40 62% OPC+30%FA - 220+/-20 P 29-18144 5 PASSED

C16/20 SRC P 29-18182 10

91 C32/40 62% OPC+30%FA - 220+/-20 P 29-18142 0

92 C32/40 62% OPC+30%FA - 220+/-20 P 29-18141 5

93 KAIG3-RFI-PA-C-0569-00 Picnic Area 06/09/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-K (SA-16) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18149 6

94 KAIG3-RFI-PA-C-0570-00 Picnic Area 06/09/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-L (SA-38) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18146 10
PASSED
95 C32/40 62% OPC+30%FA - 160+/-40 P 29-18145 10

96 C32/40 62% OPC+30%FA - 160+/-40 P 29-18143 10

97 KAIG3-RFI-PA-C-0519-01 Picnic Area 06/09/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted C16/20 SRC P 29-18169 8

KAIG3-RFI-PA-C-0578-00 Picnic Area 06/09/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted C16/20 SRC P 29-18201 10
PASSED
C16/20 SRC P 29-18158 7

98

99 KAIG3-RFI-PA-C-0579-00 Picnic Area 06/12/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-26) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18194 8

100 KAIG3-RFI-PA-C-0588-00 Picnic Area 06/12/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-34) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-18190 6 PASSED

101 C32/40 62% OPC+30%FA - 160+/-40 P 29-18188 6

kaig-qcals 121
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI102
No. RFI NUMBER
KAIG3-RFI-CO-S-4450-00 Crescent 06/12/21 DESCRIPTION
Concreting for BOV 111 & 112 for Zone 2M & 2N (as Highlighted) C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18202 QUANTITY
10
LOCATION CASTING No.
(m³)
103 C32/40 62% OPC+30%FA - 220+/-20 P 29-18196 5

C16/20 SRC P 29-18203 8 PASSED

104 C32/40 62% OPC+30%FA - 220+/-20 P 29-18192 5

105 C32/40 62% OPC+30%FA - 220+/-20 P 29-18189 5

106 KAIG3-RFI-CO-S-4455-00 Crescent 06/12/21 Concreting for 3rd layer mass concrete of strip footing at zone 2D between PC 110-112 (as highlighted). C16/20 SRC P 29-18193 9 PASSED

107 KAIG3-RFI-CO-S-4470-00 Crescent 06/13/21 Concreting for Pile cap 20 Zone 1C C32/40 62% OPC+30%FA - 160+/-40 P 29-18212 10

108 KAIG3-RFI-CO-S-4483-00 Crescent 06/13/21 Concreting for BUTTRESS BII-BIV 64 (1st) Zone 2B C32/40 62% OPC+30%FA - 160+/-40 P 29-18213 10

109 KAIG3-RFI-CO-S-4493-00 Crescent 06/13/21 Concreting for Pile cap 24 Zone 1D C32/40 62% OPC+30%FA - 160+/-40 P 29-18214 10

C32/40 62% OPC+30%FA - 220+/-20 P 29-18222 5

C32/40 62% OPC+30%FA - 220+/-20 P 29-18225 5 PASSED

C32/40 62% OPC+30%FA - 220+/-20 P 29-18226 5

110 C32/40 62% OPC+30%FA - 160+/-40 P 29-18215 10

111 C32/40 62% OPC+30%FA - 160+/-40 P 29-18216 10

112 C32/40 62% OPC+30%FA - 160+/-40 P 29-18220 6

Inspection for Casting the Concrete Encasement for the Storm Water Line from G-X-08 to G-X-09 as per the Highlighted area in the
113 KAIG3-RFI-SW-C-0589-00 Site Works 06/14/21 C16/20 SRC P 29-18233 6
attached Drawing.
PASSED
Inspection for Casting the Concrete Encasement for the Storm Water Line from Management Building to Main Line as per the
114 KAIG3-RFI-SW-C-0590-00 Site Works 06/14/21 C16/20 SRC P 29-18237 10
Highlighted area in the attached Drawing

115 KAIG3-RFI-PA-C-0578-00 Picnic Area 06/15/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted C16/20 SRC P 29-18258 4 PASSED

116 KAIG3-RFI-PA-C-0626-00 Picnic Area 06/15/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-27) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-18260 8 PASSED

KAIG3-RFI-CO-S-4544-00 Crescent 06/15/21 Protection layer of geotextile sheet and 50mm screed protection under strip footing between PC 8-10-12-14 at Zone 1B C32/40 62% OPC+30%FA - 220+/-20 P 29-18261 10

C32/40 62% OPC+30%FA - 220+/-20 P 29-18264 10 PASSED

C32/40 62% OPC+30%FA - 220+/-20 P 29-18266 10

117 KAIG3-RFI-MC-S-4520-00 Crescent MCPE 06/16/21 Concreting for MCPE foundation at AXIS 02-Z to 03-I as highlighted at zone 2G and 2H C32/40 62% OPC+30%FA - 160+/-40 P 29-18283 10

118 C32/40 62% OPC+30%FA - 160+/-40 P 29-18282 10

119 C32/40 62% OPC+30%FA - 160+/-40 P 29-18281 10

120 C32/40 62% OPC+30%FA - 160+/-40 P 29-18280 10

121 C32/40 62% OPC+30%FA - 160+/-40 P 29-18279 10

122 C32/40 62% OPC+30%FA - 160+/-40 P 29-18278 10

123 C32/40 62% OPC+30%FA - 160+/-40 P 29-18277 10


PASSED

kaig-qcals 122
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
SI124
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18276 QUANTITY
10
LOCATION CASTING No.
(m³)

kaig-qcals 123
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI125
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18275 QUANTITY
10
LOCATION CASTING No.
(m³)
126 C32/40 62% OPC+30%FA - 160+/-40 P 29-18274 10

127 C32/40 62% OPC+30%FA - 160+/-40 P 29-18273 10

128 C32/40 62% OPC+30%FA - 160+/-40 P 29-18272 10

129 C32/40 62% OPC+30%FA - 160+/-40 P 29-18271 10

130 C32/40 62% OPC+30%FA - 160+/-40 P 29-18270 10

131 KAIG3-RFI-CO-S-4393-00 Crescent 06/16/21 Protection layer of geotextile sheet and 50mm screed for tunnel 1 slab (near 02/1) zone 2H. C32/40 62% OPC+30%FA - 220+/-20 P 29-18293 10

132 C32/40 62% OPC+30%FA - 220+/-20 P 29-18296 3 PASSED

133 C32/40 62% OPC+30%FA - 220+/-20 P 29-18298 3

134 KAIG3-RFI-CO-S-4526-00 Crescent 06/19/21 Concreting for Strip footing at zone 2D Between PC 112-114-116-118 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-18321 10

135 C32/40 62% OPC+30%FA - 160+/-40 P 29-18320 10


PASSED
136 C32/40 62% OPC+30%FA - 160+/-40 P 29-18317 10

137 C32/40 62% OPC+30%FA - 160+/-40 P 29-18316 10

138 KAIG3-RFI-PA-C-0641-00 Picnic Area 06/19/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-K (SA-16) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18327 10

139 KAIG3-RFI-PA-C-0635-00 Picnic Area 06/19/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18328 8 PASSED

140 C32/40 62% OPC+30%FA - 160+/-40 P 29-18329 8

141 KAIG3-RFI-CO-S-4563-00 Crescent 06/19/21 Concreting for BUTRESS BII-BIV 65 (1st) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18332 10
PASSED
142 C32/40 62% OPC+30%FA - 220+/-20 P 29-18330 10

143 KAIG3-RFI-CO-S-4558-00 Crescent 06/20/21 Concreting for BUTRESS BIV 124 & 125 (2ND) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18347 9
PASSED
144 C32/40 62% OPC+30%FA - 220+/-20 P 29-18343 5

145 KAIG3-RFI-PA-C-0635-00 Picnic Area 06/21/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted C16/20 SRC P 29-18355 7
PASSED
146 C16/20 SRC P 29-18354 8

Concrete pouring & Shuttering for Footings of Seat wall (B, D, E & F) at Sound & Light Garden, At highlighted area in attached
147 KAIG3-RFI-SG-S-4541-00 Sound & Light Garden 06/21/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18362 10
Drawing's.

148 KAIG3-RFI-SG-S-4572-00 Sound & Light Garden 06/21/21 Concrete pouring & Shuttering for Kickers of Light wall (D) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 29-18361 10

Concrete pouring & Shuttering for Footing and Kicker 1st Lift @ (874.50) of Whispering Cave 2, @ Sound & Light Garden, At
149 KAIG3-RFI-SG-S-4573-00 Sound & Light Garden 06/21/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18360 10
highlighted area in attached Drawing's.

150 C32/40 62% OPC+30%FA - 160+/-40 P 29-18359 10 PASSED

151 C32/40 62% OPC+30%FA - 160+/-40 P 29-18358 10

152 C32/40 62% OPC+30%FA - 160+/-40 P 29-18357 10

153 C32/40 62% OPC+30%FA - 160+/-40 P 29-18356 10

kaig-qcals 124
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI154
No. RFI NUMBER
KAIG3-RFI-CO-S-4551-00 Crescent 06/21/21 Concreting for BUTRESS BIV 109 Zone 2M DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18374 QUANTITY
10
LOCATION CASTING No.
(m³)
PASSED

kaig-qcals 125
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI155
No. RFI NUMBER
KAIG3-RFI-CO-S-4564-00 Crescent 06/21/21 Concreting for BUTRESS BIV 108 Zone 2M DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18371 QUANTITY
10 PASSED
LOCATION CASTING No.
(m³)
156 KAIG3-RFI-CO-S-4565-00 Crescent 06/21/21 Concreting for BUTRESS BIV 110 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18368 10

157 KAIG3-RFI-PA-C-0675-00 Picnic Area 06/22/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-35) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18375 8 PASSED

Inspection for Casting the Concrete Encasement for the Storm Water Line from G-A-23 to Main Line and from G-A-24 to Main Line (as
158 KAIG3-RFI-SW-C-0634-00 Site Works 06/22/21 C16/20 SRC P 29-18378 10 PASSED
Highlighted)

159 KAIG3-RFI-PA-C-0674-00 Picnic Area 06/22/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-40) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18379 8 PASSED

160 KAIG3-RFI-CO-S-4606-00 Crescent 06/22/21 Concreting for Pile cap 117, 119, 121, 123 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 29-18402 10

161 C32/40 62% OPC+30%FA - 160+/-40 P 29-18401 10

162 C32/40 62% OPC+30%FA - 160+/-40 P 29-18400 10

163 C32/40 62% OPC+30%FA - 160+/-40 P 29-18399 10 PASSED

164 C32/40 62% OPC+30%FA - 160+/-40 P 29-18396 10

165 C32/40 62% OPC+30%FA - 160+/-40 P 29-18395 10

166 C32/40 62% OPC+30%FA - 160+/-40 P 29-18394 10

Concrete pouring & Shuttering for Footing and Kicker (1st lift @ 874.10) of Whispering Cave 1, @ Sound & Light Garden, At
167 KAIG3-RFI-SG-S-4595-00 Sound & Light Garden 06/23/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18405 10
highlighted area in attached Drawing's.

168 C32/40 62% OPC+30%FA - 160+/-40 P 29-18406 10

169 C32/40 62% OPC+30%FA - 160+/-40 P 29-18407 10 PASSED

170 C32/40 62% OPC+30%FA - 160+/-40 P 29-18409 10

171 C32/40 62% OPC+30%FA - 160+/-40 P 29-18411 10

Concrete Pouring for Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At Highlighted in the attached
172 KAIG3-RFI-AG-S-4540-00 Aviary Garden 06/26/21 C16/20 SRC P 29-18460 10
drawing's.

173 C16/20 SRC P 29-18462 5


PASSED
174 C16/20 SRC P 29-18463 10

175 C16/20 SRC P 29-18464 10

Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-M (SA-10) As Highlighted (Note: This work
176 KAIG3-RFI-PA-C-0488-00 Picnic Area 06/27/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-18475 10
has been completed on March 01, 2021)

177 KAIG3-RFI-CO-S-4553-00 Crescent 06/27/21 Shuttering for BUTRESS BIV 111 & 112 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18470 10

178 KAIG3-RFI-CO-S-4591-00 Crescent 06/27/21 Concreting for Buttress BIV 106 & 107 Zone 2L & 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18465 10 PASSED

179 KAIG3-RFI-CO-S-4601-00 Crescent 06/27/21 Concreting of Buttress BII 64 (2nd) zone 2B

180 KAIG3-RFI-CO-S-4619-00 Crescent 06/27/21 Concreting for PILECAP 19 at Zone 1C

181 KAIG3-RFI-CO-S-4603-00 Crescent 06/27/21 Concreting for Pile cap 120 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 29-18479 8

182 KAIG3-RFI-CO-S-4604-00 Crescent 06/27/21 Concreting for Pile cap 118, 122 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 29-18478 10

183 KAIG3-RFI-CO-S-4605-01 Crescent 06/27/21 Concreting for Pile cap 124 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 29-18477 10

kaig-qcals 126

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI184
No. RFI NUMBER
KAIG3-RFI-CO-S-4619-00 Crescent 06/27/21 Concreting for PILECAP 19 at Zone 1C DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18476 QUANTITY
10
LOCATION CASTING No.
(m³)

PASSED

kaig-qcals 127
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI185
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18473 QUANTITY
10
LOCATION CASTING No.
(m³)
186 C32/40 62% OPC+30%FA - 160+/-40 P 29-18472 10 PASSED

187 C32/40 62% OPC+30%FA - 160+/-40 P 29-18471 10

188 C32/40 62% OPC+30%FA - 160+/-40 P 29-18469 10

189 C32/40 62% OPC+30%FA - 160+/-40 P 29-18468 10

190 C32/40 62% OPC+30%FA - 160+/-40 P 29-18467 10

191 C32/40 62% OPC+30%FA - 160+/-40 P 29-18466 10

192 KAIG3-RFI-CO-S-4599-00 Crescent 06/27/21 Concreting for ETFE Foundation (Mock Up) C32/40 62% OPC+30%FA - 160+/-40 P 29-18489 3

193 C32/40 62% OPC+30%FA - 160+/-40 P 29-18488 6

194 C32/40 62% OPC+30%FA - 160+/-40 P 29-18487 10

195 C32/40 62% OPC+30%FA - 160+/-40 P 29-18486 7.5


PASSED
196 C32/40 62% OPC+30%FA - 160+/-40 P 29-18485 10

197 C32/40 62% OPC+30%FA - 160+/-40 P 29-18483 10

198 C32/40 62% OPC+30%FA - 160+/-40 P 29-18482 10

199 C32/40 62% OPC+30%FA - 160+/-40 P 29-18480 10

200 KAIG3-RFI-PA-C-0683-00 Picnic Area 06/28/21 Soil Preparation prior to start backfilling for Seating Area (2) (SA-39A) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18491 10

201 KAIG3-RFI-PA-C-0693-00 Picnic Area 06/28/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-26) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18492 10
PASSED
202 KAIG3-RFI-PA-C-0710-00 Picnic Area 06/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18498 10

203 KAIG3-RFI-PA-C-0770-00 Picnic Area 06/28/21 Inspection of formwork for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18500 10

204 KAIG3-RFI-CO-S-4593-00 Crescent 06/28/21 Concreting for Buttress BOV 106 & 107 Zone 2L & 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18511 9

205 KAIG3-RFI-CO-S-4628-00 Crescent 06/28/21 Concreting for BUTTRESS BOI BOV - 122 (1st) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18507 6
PASSED
206 C32/40 62% OPC+30%FA - 220+/-20 P 29-18499 10

207 C32/40 62% OPC+30%FA - 220+/-20 P 29-18496 10

208 KAIG3-RFI-PA-C-0666-00 Picnic Area 06/28/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-33) As Highlighted C16/20 SRC P 29-18501 10

209 KAIG3-RFI-PA-C-0694-00 Picnic Area 06/28/21 Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted C16/20 SRC P 29-18503 10 PASSED

210 KAIG3-RFI-PA-C-0712-00 Picnic Area 06/28/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-L (SA-15) As Highlighted C16/20 SRC P 29-18509 10

211 KAIG3-RFI-CO-S-4656-00 Crescent 06/29/21 Concreting for BUTTRESS BII 108, 109, 110 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18531 3

212 C32/40 62% OPC+30%FA - 220+/-20 P 29-18528 10


PASSED
213 C32/40 62% OPC+30%FA - 220+/-20 P 29-18525 10

kaig-qcals 128
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI214
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18519 QUANTITY
10
LOCATION CASTING No.
(m³)

kaig-qcals 129
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI215
No. RFI NUMBER
KAIG3-RFI-CO-S-4659-00 Crescent 06/29/21 DESCRIPTION
Concreting of Blinding of strip footing between PC 175 - 177 at Zone 2N DESIGN MIX
C16/20 SRC P 29-18541 QUANTITY
10
LOCATION CASTING No.
(m³)
216 C16/20 SRC P 29-18540 10

217 C16/20 SRC P 29-18539 10 PASSED

218 C16/20 SRC P 29-18536 10

219 C16/20 SRC P 29-18534 10

220 KAIG3-RFI-PG-S-4661-00 Physic Garden 06/29/21 Concrete pouring for Blinding under Foundation of Outer Canopy 1 & 3 at Physic Garden, as per highlighted area in attached drawings. C16/20 SRC P 29-18542 5

221 C16/20 SRC P 29-18537 10 PASSED

222 C16/20 SRC P 29-18535 10

223 KAIG3-RFI-SG-S-4660-00 Sound & Light Garden 06/30/21 Concrete pouring & Shuttering of Walls for Seat wall (B, D, E & F) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 29-18560 5

224 KAIG3-RFI-SG-S-4662-00 Sound & Light Garden 06/30/21 Concrete pouring & Shuttering for Wall of Light wall (D) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 29-18558 10
PASSED
Concrete pouring & Shuttering for Kicker (2nd lift) of Whispering Cave 1 & 2, @ Sound & Light Garden, At highlighted area in attached
225 KAIG3-RFI-SG-S-4663-00 Sound & Light Garden 06/30/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18556 10
Drawing's.

226 C32/40 62% OPC+30%FA - 160+/-40 P 29-18555 10

227 KAIG3-RFI-CO-S-4642-00 Crescent 06/30/21 Concreting for Strip footing between PC 110-112 zone 2D C32/40 62% OPC+30%FA - 160+/-40 P 29-18567 3 PASSED

228 KAIG3-RFI-CO-S-4630-00 Crescent 06/30/21 Concreting for BOI 111 & 112 for Zone 2M (as Highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 29-18566 10

229 KAIG3-RFI-CO-S-4649-00 Crescent 06/30/21 Concreting for BUTTRESS BII 124 & 125 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18565 5

230 KAIG3-RFI-CO-S-4651-00 Crescent 06/30/21 Concreting for BUTTRESS BII 123 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18563 5
PASSED
231 C32/40 62% OPC+30%FA - 220+/-20 P 29-18559 8

232 C32/40 62% OPC+30%FA - 220+/-20 P 29-18552 6

233 C32/40 62% OPC+30%FA - 220+/-20 P 29-18564 10

TOTAL QUANTITY TRUCK LOAD (M³): 2119.5

C05 OPC 40

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2159.5

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 130
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
28 DAYS
AND
MORE THAN 28 DAYS

PASSED

PASSED

PASSED

kaig-qcals 131
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 132
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 133
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

kaig-qcals 134
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 135
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 136
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
PASSED

kaig-qcals 137
February 12, 2023

PASSED
TE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 138
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

kaig-qcals 139
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 140

PASSED
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

kaig-qcals 141
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 142
February 12, 2023

PASSED
TE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT

kaig-qcals 143
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 144
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS
(m³)

1 KAIG3-RFI-SW-C-0679-00 Site Works 07/01/21 INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE - FW1-3 (As Highlighted) C16/20 SRC P 29-18576 6

P 29-18573 10 PASSED

P 29-18575 10

Screed Protection 50mm thk on Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At Highlighted in the
2 KAIG3-RFI-AG-S-4686-00 Aviary Garden 07/01/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-18578 4
attached drawing's.

C32/40 62% OPC+30%FA - 220+/-20 P 29-18574 3 PASSED

3 C32/40 62% OPC+30%FA - 220+/-20 P 29-18577 5

4 KAIG3-RFI-CO-S-4705-00 Crescent 07/03/21 Concreting for PILECAP 126, 128, 130, 132 ZONE 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-18587 10

5 C32/40 62% OPC+30%FA - 160+/-40 P 29-18586 10

6 C32/40 62% OPC+30%FA - 160+/-40 P 29-18585 10

7 C32/40 62% OPC+30%FA - 160+/-40 P 29-18584 10

8 C32/40 62% OPC+30%FA - 160+/-40 P 29-18583 10 PASSED

9 C32/40 62% OPC+30%FA - 160+/-40 P 29-18582 10

10 C32/40 62% OPC+30%FA - 160+/-40 P 29-18581 10

11 C32/40 62% OPC+30%FA - 160+/-40 P 29-18580 10

12 C32/40 62% OPC+30%FA - 160+/-40 P 29-18579 10

13 KAIG3-RFI-CO-S-4633-01 Crescent 07/03/21 Concreting for Strip Footing at Zone 1A TIP C32/40 62% OPC+30%FA - 160+/-40 P 29-18595 5

14 C32/40 62% OPC+30%FA - 160+/-40 P 29-18592 10

15 C32/40 62% OPC+30%FA - 160+/-40 P 29-18591 10


PASSED
16 C32/40 62% OPC+30%FA - 160+/-40 P 29-18590 10

17 C32/40 62% OPC+30%FA - 160+/-40 P 29-18589 10

18 C32/40 62% OPC+30%FA - 160+/-40 P 29-18588 10

19 KAIG3-RFI-CO-S-4645-01 Crescent 07/04/21 Concreting for Pilecap 28 & 30 Zone 1E C32/40 62% OPC+30%FA - 160+/-40 P 29-18608 6

20 C32/40 62% OPC+30%FA - 160+/-40 P 29-18604 10

21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18603 10

22 C32/40 62% OPC+30%FA - 160+/-40 P 29-18602 10 PASSED

23 C32/40 62% OPC+30%FA - 160+/-40 P 29-18601 10

kaig-qcals 145
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023
PASSED

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI24
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18600 QUANTITY
10
LOCATION CASTING No.
(m³)

kaig-qcals 146
Consultant : DAR PASSED
Main Contractor: ZHBG
RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI25
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18599 QUANTITY
10
LOCATION CASTING No.
(m³)

26 KAIG3-RFI-CO-S-4700-00 Crescent 07/04/21 Concreting of Buttress BII 65 (2nd) zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18617 7

C32/40 62% OPC+30%FA - 220+/-20 P 29-18613 3 PASSED

27 C32/40 62% OPC+30%FA - 220+/-20 P 29-18610 5

28 KAIG3-RFI-CO-S-4698-00 Crescent 07/04/21 Concreting for PILECAP 125, 127, 129, 131 Zone 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-18627 10

29 C32/40 62% OPC+30%FA - 160+/-40 P 29-18625 10

30 C32/40 62% OPC+30%FA - 160+/-40 P 29-18624 10

31 C32/40 62% OPC+30%FA - 160+/-40 P 29-18623 10 PASSED

32 C32/40 62% OPC+30%FA - 160+/-40 P 29-18621 10

33 C32/40 62% OPC+30%FA - 160+/-40 P 29-18620 10

34 C32/40 62% OPC+30%FA - 160+/-40 P 29-18618 10

35 KAIG3-RFI-SW-C-0738-00 Site Works 07/05/21 Inspection for Casting the Concrete Encasement for the Storm Water Line inside management building (As Highlighted) C16/20 SRC P 29-18628 8
PASSED
36 C16/20 SRC P 29-18631 10

Concrete pouring & Shuttering for Kicker (2nd lift) of Whispering Cave 2, @ Sound & Light Garden, At highlighted area in attached
37 KAIG3-RFI-SG-S-4713-00 Sound & Light Garden 07/05/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18634 10 PASSED
Drawing's.

38 KAIG3-RFI-PA-C-0711-00 Picnic Area 07/05/21 Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-13) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18638 10

39 KAIG3-RFI-PA-C-0730-00 Picnic Area 07/05/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-32) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18639 7
PASSED
40 KAIG3-RFI-PA-C-0734-00 Picnic Area 07/05/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-31) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18637 10

41 KAIG3-RFI-PA-C-0742-00 Picnic Area 07/05/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-33) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18635 9

42 KAIG3-RFI-CO-S-4704-00 Crescent 07/05/21 Concreting for PILECAP 84, 86, 88 ZONE 1P C32/40 62% OPC+30%FA - 160+/-40 P 29-18650 6

C32/40 62% OPC+30%FA - 160+/-40 P 29-18649 10

43 C32/40 62% OPC+30%FA - 160+/-40 P 29-18648 9

44 C32/40 62% OPC+30%FA - 160+/-40 P 29-18647 10 PASSED

45 C32/40 62% OPC+30%FA - 160+/-40 P 29-18646 10

46 P C32/40 62% OPC+30%FA - 160+/-40 P 29-18645 10

47 C32/40 62% OPC+30%FA - 160+/-40 P 29-18644 10

48 KAIG3-RFI-MC-S-4522-02 Crescent MCPE 07/06/21 COncreting for MCPE 3 WALL at AXIS 03-A as highlighted at zone 2E C32/40 62% OPC+30%FA - 220+/-20 P 29-18660 10

49 C32/40 62% OPC+30%FA - 220+/-20 P 29-18657 5

kaig-qcals PASSED
147
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI50
No. RFI NUMBER DESCRIPTION QUANTITY
LOCATION CASTING C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18656
No. 5 PASSED
(m³)

51 C32/40 62% OPC+30%FA - 220+/-20 P 29-18655 5

52 C32/40 62% OPC+30%FA - 220+/-20 P 29-18653 5

53 KAIG3-RFI-CO-S-4653-01 Crescent 07/06/21 Concreting for BUTTRESS BOI BOV 64 (1st) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18666 7

54 C32/40 62% OPC+30%FA - 220+/-20 P 29-18665 7 PASSED

55 C32/40 62% OPC+30%FA - 220+/-20 P 29-18664 6

56 KAIG3-RFI-CO-S-4715-00 Crescent 07/07/21 Concreting of Buttress BII-BIV 66 & 67 (1st) zone 2B & 2C C32/40 62% OPC+30%FA - 220+/-20 P 29-18676 5

57 C32/40 62% OPC+30%FA - 220+/-20 P 29-18675 5

58 C32/40 62% OPC+30%FA - 220+/-20 P 29-18674 5


PASSED
59 C32/40 62% OPC+30%FA - 220+/-20 P 29-18673 5

60 C32/40 62% OPC+30%FA - 220+/-20 P 29-18672 5

61 C32/40 62% OPC+30%FA - 220+/-20 P 29-18668 5

62 KAIG3-RFI-CO-S-4730-00 Crescent 07/07/21 Concreting for PILECAP 136 Zone 2G C32/40 62% OPC+30%FA - 160+/-40 P 29-18685 10

63 C32/40 62% OPC+30%FA - 160+/-40 P 29-18684 10

64 C32/40 62% OPC+30%FA - 160+/-40 P 29-18682 10 PASSED

65 C32/40 62% OPC+30%FA - 160+/-40 P 29-18678 10

66 C32/40 62% OPC+30%FA - 160+/-40 P 29-18677 10

INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT PIECE -
67 KAIG3-RFI-SW-C-0749-00 Site Works 07/07/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18686 10 PASSED
MH-B-01 (As Highlighted)

68 KAIG3-RFI-PG-S-4735-00 Physic Garden 07/07/21 Concrete Pouring for Blinding under Foundation of Outer Canopy 2 at Physic Garden, as per highlighted area in attached drawings. C16/20 SRC P 29-18687 3

69 C16/20 SRC P 29-18683 4 PASSED

70 C16/20 SRC P 29-18679 8

71 KAIG3-RFI-CO-S-4745-00 Crescent 07/07/21 Concreting for BUTTRESS BOI BOV - 120 & 121 (2nd) Zone 2P & 2Q C16/20 SRC P 29-18688 3 PASSED

72 KAIG3-RFI-CO-S-4707-00 Crescent 07/08/21 Concreting for BUTTRESS BOI & BII 106, 107 Zone 2L & 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18701 3

73 C32/40 62% OPC+30%FA - 220+/-20 P 29-18700 3

74 C32/40 62% OPC+30%FA - 220+/-20 P 29-18698 5


PASSED
75 C32/40 62% OPC+30%FA - 220+/-20 P 29-18696 5

76 C32/40 62% OPC+30%FA - 220+/-20 P 29-18695 5

kaig-qcals 148
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023
PASSED

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI77
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18693 QUANTITY
5
LOCATION CASTING No.
(m³)

78 KAIG3-RFI-CO-S-4705-00 Crescent 07/08/21 Concreting for PILECAP 126, 128, 130, 132 ZONE 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-18705 10
PASSED
79 C32/40 62% OPC+30%FA - 160+/-40 P 29-18704 10

80 KAIG3-RFI-CO-S-4738-00 Crescent 07/08/21 Concreting of Mass Concrete under strip footing at Zone 1B between PC 7-9-11-13 C16/20 SRC P 29-18709 10

81 C16/20 SRC P 29-18708 10 PASSED

82 C16/20 SRC P 29-187807 10

83 KAIG3-RFI-CO-S-4768-00 Crescent 07/10/21 Concreting for Tunnel 2 Wall (1st) as highlighted zone 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-18736 10

84 C32/40 62% OPC+30%FA - 160+/-40 P 29-18734 9

85 C32/40 62% OPC+30%FA - 160+/-40 P 29-18730 10

86 C32/40 62% OPC+30%FA - 160+/-40 P 29-18725 10

87 C32/40 62% OPC+30%FA - 160+/-40 P 29-18720 10 PASSED

88 C32/40 62% OPC+30%FA - 160+/-40 P29-18715 10

89 C32/40 62% OPC+30%FA - 160+/-40 P 29-18710 10

90 C32/40 62% OPC+30%FA - 160+/-40 P 29-18723 10

91 C32/40 62% OPC+30%FA - 160+/-40 P 29-18732 10

92 KAIG3-RFI-AG-S-4756-00 Aviary Garden 07/10/21 Concrete pouring & Shuttering for Footings (21 no's) at Back of House inside Aviary garden, At Highlighted in the attached drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 29-18719 10

93 C32/40 62% OPC+30%FA - 160+/-40 P 29-18716 10

94 C32/40 62% OPC+30%FA - 160+/-40 P 29-18713 10 PASSED

95 C32/40 62% OPC+30%FA - 160+/-40 P 29-18712 10

96 C32/40 62% OPC+30%FA - 160+/-40 P 29-18711 10

97 KAIG3-RFI-CO-S-4743-00 Crescent 07/10/21 Concreting for BUTTRESS BOV - 122 & 123 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18735 3

98 C32/40 62% OPC+30%FA - 220+/-20 P 29-18731 10 PASSED

99 C32/40 62% OPC+30%FA - 220+/-20 P 29-18726 10

100 KAIG3-RFI-MC-S-4635-00 Crescent MCPE 1 07/10/21 Concreting of blinding for MCPE 1 (embossed) zone 2M (as highlighted) C16/20 SRC P 29-18729 7 PASSED

Protection layer of geotextile sheet and 30mm screed protectiond for below PC 141, 142, 143, 144, 145, 146, 147, 148, 149, 150 Zone
101 KAIG3-RFI-CO-S-4301-02 Crescent 07/12/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18749 10 PASSED
2H & 2J.

102 KAIG3-RFI-SW-C-0790-00 Site Works 07/12/21 Inspection for Casting Blinding Concrete under the Catch Basin (G-X-2, G-X-3 and G-X-4) as highlighted C16/20 SRC P 29-18746 10 PASSED

103 KAIG3-RFI-PA-C-0784-00 Picnic Area 07/12/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-31) As highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18754 10

104 C32/40 62% OPC+30%FA - 160+/-40 P 29-18753 5


PASSED
kaig-qcals 149
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
SI105
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18751 QUANTITY
10
LOCATION CASTING No.
(m³)
106 C32/40 62% OPC+30%FA - 160+/-40 P 29-18748 10

107 KAIG3-RFI-PA-C-0763-00 Picnic Area 07/12/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-42) As Highlighted C16/20 SRC P 29-18750 7 PASSED

108 KAIG3-RFI-CO-S-4759-00 Crescent 07/13/21 Concreting for Pilecaps 133, 135, 137 Zone 2G C32/40 62% OPC+30%FA - 160+/-40 P 29-18762 9

109 C32/40 62% OPC+30%FA - 160+/-40 P 29-18761 9


PASSED
110 C32/40 62% OPC+30%FA - 160+/-40 P 29-18760 9

111 C32/40 62% OPC+30%FA - 160+/-40 P 29-18757 9

112 KAIG3-RFI-CO-S-4773-00 Crescent 07/13/21 Concreting for BUTTRESS BIV 66 & 67 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18774 10

113 C32/40 62% OPC+30%FA - 220+/-20 P 29-18766 10

114 C32/40 62% OPC+30%FA - 220+/-20 P 29-18764 5 PASSED

115 C32/40 62% OPC+30%FA - 220+/-20 P 29-18763 5

116 C32/40 62% OPC+30%FA - 220+/-20 P 29-18759 5

Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-6.7, FW-A-3-6.8,FW-A-3-6.9, FW-A-3-6.10, FW-A-3-
117 KAIG3-RFI-SW-C-0806-00 Site Works 07/13/21 C16/20 SRC P 29-18773 7
6.11, FW-A-3-6.12 (as Highlighted)
PASSED
118 C16/20 SRC P 29-18772 8

119 KAIG3-RFI-CO-S-4740-00 Crescent 07/14/21 Shuttering for PILECAP 23, 25 zone 1D C32/40 62% OPC+30%FA - 160+/-40 P 29-18790 6

120 C32/40 62% OPC+30%FA - 160+/-40 P 29-18784 9

121 C32/40 62% OPC+30%FA - 160+/-40 P 29-18786 9

122 C32/40 62% OPC+30%FA - 160+/-40 P 29-18785 9

123 C32/40 62% OPC+30%FA - 160+/-40 P 29-18783 9

124 C32/40 62% OPC+30%FA - 160+/-40 P 29-18782 9


PASSED
125 C32/40 62% OPC+30%FA - 160+/-40 P 29-18781 9

126 C32/40 62% OPC+30%FA - 160+/-40 P 29-18779 9

127 C32/40 62% OPC+30%FA - 160+/-40 P 29-18778 9

128 C32/40 62% OPC+30%FA - 160+/-40 P 29-18777 9

129 C32/40 62% OPC+30%FA - 160+/-40 P 29-18776 9

130 C32/40 62% OPC+30%FA - 160+/-40 P 29-18775 9

131 KAIG3-RFI-CO-S-4799-00 Crescent 07/14/21 Concreting for BUTTRESS BOV 64 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18780 7 PASSED

132 KAIG3-RFI-CO-S-4809-01 Crescent 07/15/21 Concreting for PILECAPS 89 &90 Zone 1P C32/40 62% OPC+30%FA - 160+/-40 P 29-18819 5

133 C32/40 62% OPC+30%FA - 160+/-40 P 29-18817 9

PASSED
kaig-qcals 150
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI134
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18814 QUANTITY
9 PASSED
LOCATION CASTING No.
(m³)

kaig-qcals 151
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


PASSED
COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI135
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18811 QUANTITY
9
LOCATION CASTING No.
(m³)
136 C32/40 62% OPC+30%FA - 160+/-40 P 29-18810 9

137 KAIG3-RFI-CO-S-4821-00 Crescent 07/15/21 Concreting for blinding of strip footing between PC 93-95 & 94-96 zone 2A C16/20 SRC P 29-18821 9

138 C16/20 SRC P 29-18820 9

139 C16/20 SRC P 29-18818 9


PASSED
140 C16/20 SRC P 29-18815 9

141 C16/20 SRC P 29-18813 9

142 C16/20 SRC P 29-18812 9

Concrete pouring & Shuttering of Wall (Upto Bottom of Slab) of Whispering Cave 2, @ Sound & Light Garden, At highlighted area in
143 KAIG3-RFI-SG-S-4794-00 Sound & Light Garden 07/15/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-18830 10
attached Drawing's.

144 C32/40 67%OPC+25%FA - 160+/-40 P 29-18829 10


PASSED
145 C32/40 67%OPC+25%FA - 160+/-40 P 29-18823 10

146 C32/40 67%OPC+25%FA - 160+/-40 P 29-18822 10

147 KAIG3-RFI-CO-S-4818-00 Crescent 07/15/21 Concreting for strip footing blinding at Zone 1A Between PC 2 - 4 - 6 - 8 C16/20 SRC P 29-18835 6

148 C16/20 SRC P 29-18834 4

149 C16/20 SRC P 29-18833 5

150 C16/20 SRC P 29-18832 9


PASSED
151 C16/20 SRC P 29-18831 9

152 C16/20 SRC P 29-18828 9

153 C16/20 SRC P 29-18825 9

154 C16/20 SRC P 29-18824 9

155 KAIG3-RFI-MC-S-4802-00 Crescent 07/17/21 Concreting for MCPE 2 Foundation, Zone 2K, Axis 02-AG to 02-AF (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-18852 9

156 C32/40 62% OPC+30%FA - 160+/-40 P 29-18851 9

157 C32/40 62% OPC+30%FA - 160+/-40 P 29-18850 9

158 C32/40 62% OPC+30%FA - 160+/-40 P 29-18849 9

159 C32/40 62% OPC+30%FA - 160+/-40 P 29-18848 9

160 C32/40 62% OPC+30%FA - 160+/-40 P 29-18847 9

161 C32/40 62% OPC+30%FA - 160+/-40 P 29-18846 9

162 C32/40 62% OPC+30%FA - 160+/-40 P 29-18845 9

163 C32/40 62% OPC+30%FA - 160+/-40 P 29-18844 9 PASSED

kaig-qcals 152
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


PASSED
COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI164
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18843 QUANTITY
9
LOCATION CASTING No.
(m³)

kaig-qcals 153
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023
PASSED

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI165
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18842 QUANTITY
9
LOCATION CASTING No.
(m³)
166 C32/40 62% OPC+30%FA - 160+/-40 P 29-18841 9

167 C32/40 62% OPC+30%FA - 160+/-40 P 29-18840 9

168 C32/40 62% OPC+30%FA - 160+/-40 P 29-18839 9

169 C32/40 62% OPC+30%FA - 160+/-40 P 29-18838 9

170 C32/40 62% OPC+30%FA - 160+/-40 P 29-18837 9

171 C32/40 62% OPC+30%FA - 160+/-40 P 29-18836 9

172 KAIG3-RFI-SW-C-0829-00 Site Works 07/17/21 Inspection for Casting the Concrete Encasement for the Storm Water Line Catch Basin G-B-12 (as Highlighted) C16/20 SRC P 29-18857 10 PASSED

173 KAIG3-RFI-CO-S-4833-00 Crescent 07/24/21 Concreting for BUTTRESS BII 66 & 67 Zone 2B & 2C C32/40 62% OPC+30%FA - 220+/-20 P 29-18863 5

174 C32/40 62% OPC+30%FA - 220+/-20 P 29-18861 6 PASSED

175 C32/40 62% OPC+30%FA - 220+/-20 P 29-18860 10

176 KAIG3-RFI-CO-S-4830-00 Crescent 07/24/21 Concreting for BUTTRESS BOV 72 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 29-188730 5

177 C32/40 62% OPC+30%FA - 220+/-20 P 29-18872 8


PASSED
178 C32/40 62% OPC+30%FA - 220+/-20 P 29-18868 8

179 C32/40 62% OPC+30%FA - 220+/-20 P 29-18865 8

180 KAIG3-RFI-PG-S-4823-00 Physic Garden 07/25/21 Concrete pouring & Shuttering for footing of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-18884 3

181 C32/40 62% OPC+30%FA - 160+/-40 P 29-18883 10

182 C32/40 62% OPC+30%FA - 160+/-40 P 29-18880 10


PASSED
183 C32/40 62% OPC+30%FA - 160+/-40 P 29-18879 10

184 C32/40 62% OPC+30%FA - 160+/-40 P 29-18877 10

185 C32/40 62% OPC+30%FA - 160+/-40 P 29-18876 10

186 KAIG3-RFI-CO-S-4881-00 Crescent 07/25/21 Protection layer of geotextile sheet and 30mm screed under Strip footing Zone 2A between PC 91-93-95-97 & 94-96-98 C32/40 62% OPC+30%FA - 220+/-20 P 29-18887 10 PASSED

187 KAIG3-RFI-PA-C-0843-00 Picnic Area 07/26/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-K (SA-15) as highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18898 10

188 C32/40 62% OPC+30%FA - 160+/-40 P 29-18894 9


PASSED
189 C32/40 62% OPC+30%FA - 160+/-40 P 29-18890 9

190 C32/40 62% OPC+30%FA - 160+/-40 P 29-18889 9

191 KAIG3-RFI-CO-S-4858-00 Crescent 07/26/21 Shuttering for PILECAPS 139, 140, 141, 142, 143 & 144 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 P 29-18902 10

192 C32/40 62% OPC+30%FA - 160+/-40 P 29-18900 10

193 C32/40 62% OPC+30%FA - 160+/-40 P 29-18899 10

kaig-qcals 154
PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI194
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18897 QUANTITY
10
LOCATION CASTING No.
(m³)
PASSED

kaig-qcals 155
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI195
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18896 QUANTITY
10 PASSED
LOCATION CASTING No.
(m³)
196 C32/40 62% OPC+30%FA - 160+/-40 P 29-18895 10

197 C32/40 62% OPC+30%FA - 160+/-40 P 29-18893 10

198 C32/40 62% OPC+30%FA - 160+/-40 P 29-18892 10

199 C32/40 62% OPC+30%FA - 160+/-40 P 29-18891 10

Concrete pouring for Blinding under Foundation of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
200 KAIG3-RFI-ZG-S-4885-00 Maze Garden 07/26/21 C16/20 SRC P 29-18901 5 PASSED
drawing's.

201 KAIG3-RFI-CO-S-4845-00 Crescent 07/26/21 Concreting for BUTTRESS BOI 122 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18909 2

202 C32/40 62% OPC+30%FA - 220+/-20 P 29-18907 8 PASSED

203 C32/40 62% OPC+30%FA - 220+/-20 P 29-18903 6

204 KAIG3-RFI-CO-S-4871-00 Crescent 07/26/21 Concreting for blinding under strip footing between PC 1-3-5 Zone 1A C16/20 SRC P 29-18906 6
PASSED
205 C16/20 SRC P 29-18904 9

206 KAIG3-RFI-CO-S-4852-00 Crescent 07/27/21 Concreting for BUTTRESS BOI BOV 66 & 67 Zone 2B & 2C. C32/40 62% OPC+30%FA - 220+/-20 P 29-18916 7

207 C32/40 62% OPC+30%FA - 220+/-20 P 29-18915 5

208 C32/40 62% OPC+30%FA - 220+/-20 P 29-18914 5 PASSED

209 C32/40 62% OPC+30%FA - 220+/-20 P 29-18913 5

210 C32/40 62% OPC+30%FA - 220+/-20 P 29-18912 5

211 KAIG3-RFI-CO-S-4871-00 Crescent 07/26/21 Concreting for blinding under strip footing between PC 1-3-5 Zone 1A C16/20 SRC P 29-18925 10

212 C16/20 SRC P 29-18924 10

213 C16/20 SRC P 29-18923 10 PASSED

214 C16/20 SRC P 29-18922 10

215 C16/20 SRC P 29-18919 10

216 KAIG3-RFI-MC-S-4800-00 Crescent 07/28/21 Steel Reinforcement for MCPE 2 Foundation with starter bars, Zone 2K, Axis 02-AG to 02-AF (as highlighted) C32/40 67%OPC+25%FA - 160+/-40 P 29-18928 10

217 C32/40 67%OPC+25%FA - 160+/-40 P 29-18930 10


PASSED
218 C32/40 67%OPC+25%FA - 160+/-40 P 29-18931 10

219 C32/40 67%OPC+25%FA - 160+/-40 P 29-18934 10

220 KAIG3-RFI-CO-S-4861-00 Crescent 07/28/21 Concreting for Buttress BII BIV 105 (1st) As highlighted Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 29-18929 10

221 C32/40 62% OPC+30%FA - 220+/-20 P 29-18932 10

222 C32/40 62% OPC+30%FA - 220+/-20 P 29-18935 10

223 C32/40 62% OPC+30%FA - 220+/-20 P 29-18937 10


PASSED

kaig-qcals 156
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
SI224
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18939 QUANTITY
10
LOCATION CASTING No.
(m³)
225 C32/40 62% OPC+30%FA - 220+/-20 P 29-18940 10

226 C32/40 62% OPC+30%FA - 220+/-20 P 29-18941 10

227 C32/40 62% OPC+30%FA - 220+/-20 P 29-18942 10

Concrete pouring for Blinding under Foundation of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
228 KAIG3-RFI-ZG-S-4885-00 Maze Garden 07/28/21 C16/20 SRC P 29-18943 5
drawing's.

229 C16/20 SRC P 29-18938 10 PASSED

230 C16/20 SRC P 29-18936 10

231 KAIG3-RFI-PA-C-0895-00 Picnic Area 07/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-42) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18948 6
PASSED
232 C32/40 62% OPC+30%FA - 160+/-40 P 29-18946 9

233 KAIG3-RFI-PG-S-4909-00 Physic Garden 07/29/21 Concrete pouring & Shuttering for Kicker (1st Lift) of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-18962 3

234 C32/40 62% OPC+30%FA - 160+/-40 P 29-18959 5

235 C32/40 62% OPC+30%FA - 160+/-40 P 29-18958 10

236 C32/40 62% OPC+30%FA - 160+/-40 P 29-18957 10


PASSED
237 C32/40 62% OPC+30%FA - 160+/-40 P 29-18956 10

238 C32/40 62% OPC+30%FA - 160+/-40 P 29-18955 10

239 C32/40 62% OPC+30%FA - 160+/-40 P 29-18954 10

240 C32/40 62% OPC+30%FA - 160+/-40 P 29-18953 10

241 KAIG3-RFI-PG-S-4823-00 Physic Garden 07/31/21 Concrete pouring & Shuttering for footing of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-18973 10

242 C32/40 62% OPC+30%FA - 160+/-40 P 29-18974 10

243 C32/40 62% OPC+30%FA - 160+/-40 P 29-18975 10

244 C32/40 62% OPC+30%FA - 160+/-40 P 29-18976 10 PASSED

245 C32/40 62% OPC+30%FA - 160+/-40 P 29-18977 9

246 C32/40 62% OPC+30%FA - 160+/-40 P 29-18979 4

247 C32/40 62% OPC+30%FA - 160+/-40 P 29-18988 4

INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
248 KAIG3-RFI-SW-C-0882-00 Site Works 07/31/21 C16/20 SRC P 29-18978 6
PIECE FOR - FW-A-3-6.11, FW-A-3-6.12 (As Highlighted)
PASSED
249 C16/20 SRC P 29-18980 4

250 KAIG3-RFI-CO-S-4901-00 Crescent 07/31/21 Concreting for BUTTRESS BII BIV 126 Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 29-18984 6
PASSED
251 C32/40 62% OPC+30%FA - 220+/-20 P 29-18982 6

252 KAIG3-RFI-CO-S-4918-00 Crescent 07/31/21 Concreting for PILECAPS 146 Zone 2J, 2K C32/40 62% OPC+30%FA - 160+/-40 P 29-18986 10

kaig-qcals 157

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI253
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18989 QUANTITY
10
LOCATION CASTING No.
(m³)
254 C32/40 62% OPC+30%FA - 160+/-40 P 29-18990 10

PASSED

kaig-qcals 158
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI255
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18991 QUANTITY
10 PASSED
LOCATION CASTING No.
(m³)
256 C32/40 62% OPC+30%FA - 160+/-40 P 29-18992 10

257 C32/40 62% OPC+30%FA - 160+/-40 P 29-18993 10

258 C32/40 62% OPC+30%FA - 160+/-40 P 29-18994 10

259 KAIG3-RFI-CO-S-4867-00 Crescent 07/31/21 Concreting for Strip footing blinding between PC 174-176-178-180-182 Zone 2N C16/20 SRC P 29-18995 10

260 C16/20 SRC P 29-18996 10 PASSED

261 C16/20 SRC P 29-18997 10

TOTAL QUANTITY TRUCK LOAD (M³): 2244

C05 OPC 25

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2269

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 159
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
28 DAYS
AND
MORE THAN 28 DAYS

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 160
February 12, 2023
PASSED

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

kaig-qcals 161
PASSED
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals PASSED 162


February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 163
February 12, 2023
PASSED

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED
kaig-qcals 164
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED
kaig-qcals 165
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

kaig-qcals 166
February 12, 2023

TE POURING LOG AND CUBE REGISTER


PASSED
COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

kaig-qcals 167
February 12, 2023

TE POURING LOG AND CUBE REGISTER


PASSED
COMPRESSIVE STRENGHT

kaig-qcals 168
February 12, 2023
PASSED

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 169
PASSED
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

kaig-qcals 170
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 171
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

PASSED

kaig-qcals 172

PASSED
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

kaig-qcals 173
February 12, 2023

TE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT

PASSED

PASSED

kaig-qcals 174
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-MC-S-4906-00 MCPE 08/01/21 Concreting for MCPE 2 Foundation Between Axis 02-AE - 02-AF (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-19000 10

2 C32/40 62% OPC+30%FA - 160+/-40 P 29-19001 10

3 C32/40 62% OPC+30%FA - 160+/-40 P 29-19002 10

4 C32/40 62% OPC+30%FA - 160+/-40 P 29-19003 10

5 C32/40 62% OPC+30%FA - 160+/-40 P 29-19004 10

6 C32/40 62% OPC+30%FA - 160+/-40 P 29-19905 10

7 C32/40 62% OPC+30%FA - 160+/-40 P 29-19007 10 PASSED

8 C32/40 62% OPC+30%FA - 160+/-40 P 29-19008 10

9 C32/40 62% OPC+30%FA - 160+/-40 P 29-19009 10

10 C32/40 62% OPC+30%FA - 160+/-40 P 29-19010 10

11 C32/40 62% OPC+30%FA - 160+/-40 P 29-19012 10

12 C32/40 62% OPC+30%FA - 160+/-40 P 29-19014 10

13 C32/40 62% OPC+30%FA - 160+/-40 P 29-19015 10

14 KAIG3-RFI-PA-C-0907-00 Picnic Area 08/01/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-G (SA-39) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-19006 7
PASSED
15 C32/40 62% OPC+30%FA - 160+/-40 P 29-19011 4

16 KAIG3-RFI-CO-S-4920-00 Crescent 08/01/21 Concreting for BUTTRESS BOV 66-67 Zone 2B & 2C C32/40 62% OPC+30%FA - 220+/-20 P 29-19018 5

17 C32/40 62% OPC+30%FA - 220+/-20 P 29-19019 5 PASSED

18 C32/40 62% OPC+30%FA - 220+/-20 P 29-19020 7

Concrete pouring for Blinding under Manholes (Type 'A' 4 no's and Type 'B' 2 no's) Inside Maze garden, as per highlighted area in
19 KAIG3-RFI-ZG-S-4910-00 Maze Garden 08/02/21 C16/20 SRC P 29-19025 3
attached drawing's.

20 C16/20 SRC P 29-19023 3 PASSED

21 C16/20 SRC P 29-19024 7

22 KAIG3-RFI-CO-S-4864-01 Crescent 08/02/21 Concreting for Strip Footing Between PC 8-10-12-14 Zone 1B C32/40 62% OPC+30%FA - 160+/-40 P 29-19027 8 PASSED

23 KAIG3-RFI-CO-S-4899-00 Crescent 08/03/21 Concreting for Steel Structure & ETFE Pedestal (as highlighted) (Mock Up) C32/40 62% OPC+30%FA - 220+/-20 P 29-19030 10

24 C32/40 62% OPC+30%FA - 220+/-20 P 29-19031 10

25 C32/40 62% OPC+30%FA - 220+/-20 P 29-19035 10

26 C32/40 62% OPC+30%FA - 220+/-20 P 29-19037 10

27 C32/40 62% OPC+30%FA - 220+/-20 P 29-19040 10 PASSED

kaig-qcals 175
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER PASSED


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI28
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-19041 QUANTITY
5
LOCATION CASTING No.
(m³)

29 C32/40 62% OPC+30%FA - 220+/-20 P 29-19042 10

30 C32/40 62% OPC+30%FA - 220+/-20 P 29-19045 10

31 C32/40 62% OPC+30%FA - 220+/-20 P 29-19046 10

32 KAIG3-RFI-CO-S-4928-01 Crescent 08/03/21 Concreting for Buttress BII BIV 104 (1st) As highlighted Zone 2L C32/40 62% OPC+30%FA - 160+/-40 P 29-19032 10

33 C32/40 62% OPC+30%FA - 160+/-40 P 29-19036 10 PASSED

34 C32/40 62% OPC+30%FA - 160+/-40 P 29-19039 10

Concretes pouring & Shuttering of Kicker (1st lift) for Outer Canopy 1 & 2 at Physic Garden, as per highlighted area in attached
35 KAIG3-RFI-PG-S-4965-00 Physic Garden 08/03/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19047 10
drawings.

36 C32/40 62% OPC+30%FA - 160+/-40 P 29-19048 10


PASSED
37 C32/40 62% OPC+30%FA - 160+/-40 P 29-19049 10

38 C32/40 62% OPC+30%FA - 160+/-40 P 29-19053 5

INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
39 KAIG3-RFI-SW-C-0882-00 Site Works 08/03/21 C16/20 SRC P 29-19033 4 PASSED
PIECE FOR - FW-A-3-6.11, FW-A-3-6.12 (As Highlighted)

40 KAIG3-RFI-CO-S-4941-00 Crescent 08/03/21 Concreting for PILCAPS 145, 147, 179 Zone 2J & 2H C32/40 62% OPC+30%FA - 160+/-40 P 29-19051 10

41 C32/40 62% OPC+30%FA - 160+/-40 P 29-19052 10

42 C32/40 62% OPC+30%FA - 160+/-40 P 29-19054 10

43 C32/40 62% OPC+30%FA - 160+/-40 P 29-19055 10 PASSED

44 C32/40 62% OPC+30%FA - 160+/-40 P 29-19056 10

45 C32/40 62% OPC+30%FA - 160+/-40 P 29-19057 10

46 C32/40 62% OPC+30%FA - 160+/-40 P 29-19058 6

47 KAIG3-RFI-CO-S-4924-00 Crescent 08/04/21 Concreting for BUTTRESS BOI 120-121 Zone 2Q & 2P C32/40 62% OPC+30%FA - 220+/-20 P 29-19074 10

48 C32/40 62% OPC+30%FA - 220+/-20 P 29-19069 7

49 C32/40 62% OPC+30%FA - 220+/-20 P 29-19068 10


PASSED
50 C32/40 62% OPC+30%FA - 220+/-20 P 29-19066 10

51 C32/40 62% OPC+30%FA - 220+/-20 P 29-19063 10

52 C32/40 62% OPC+30%FA - 220+/-20 P 29-19062 8

53 KAIG3-RFI-PG-S-4991-00 Physic Garden 08/04/21 Concrete pouring & Shuttering for Kicker (2nd Lift) of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-19064 10

54 C32/40 62% OPC+30%FA - 160+/-40 P 29-19065 10 PASSED

kaig-qcals 176
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER PASSED


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI55
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-19067 QUANTITY
10
LOCATION CASTING No.
(m³)

kaig-qcals 177
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Concrete Pouring for Blinding under Foundation of CircularDESCRIPTION
Walls (6, 7, 8, 9 & 10) inside Maze garden, as per highlighted area in DELIVERY NOTE
SI56
No. KAIG3-RFI-ZG-S-4992-00
RFI NUMBER Maze Garden 08/04/21 DESIGN MIX
C16/20 SRC P 29-19070 QUANTITY
10
LOCATION CASTING attached drawing's. No.
(m³)

57 C16/20 SRC P 29-19071 10

58 C16/20 SRC P 29-19072 10 PASSED

59 C16/20 SRC P 29-19073 10

60 C16/20 SRC P 29-19075 10

61 KAIG3-RFI-CO-S-4953-00 Crescent 08/05/21 Concreting for Mass Concrete of strip footing at Zone 2N Between PC 180-182 C16/20 SRC P 29-19079 10

62 C16/20 SRC P 29-19080 10


PASSED
63 C16/20 SRC P 29-19082 10

64 C16/20 SRC P 29-19083 9

65 KAIG3-RFI-CO-S-4944-00 Crescent 08/05/21 Concreting for PILCAPS 151, 156, 158 ZONE 2K C32/40 62% OPC+30%FA - 160+/-40 P 29-19084 10

66 C32/40 62% OPC+30%FA - 160+/-40 P 29-19085 10

67 C32/40 62% OPC+30%FA - 160+/-40 P 29-19086 10


PASSED
68 C32/40 62% OPC+30%FA - 160+/-40 P 29-19087 10

69 C32/40 62% OPC+30%FA - 160+/-40 P 29-19088 10

70 C32/40 62% OPC+30%FA - 220+/-20 P 29-19115 10

Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water Line Manhole - FW-A-22,
71 KAIG3-RFI-SW-C-0924-00 Site Works 08/07/21 C16/20 SRC P 29-19119 8
FW-A-23, FW-A-24 (As Highlighted)
PASSED
C16/20 SRC P 29-19132 3

72 KAIG3-RFI-CO-S-4948-00 Crescent 08/08/21 Concreting for BUTTRESS BOI 72, 73, 74 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 29-19121 10

73 C32/40 62% OPC+30%FA - 220+/-20 P 29-19123 10

74 C32/40 62% OPC+30%FA - 220+/-20 P 29-19125 10 PASSED

75 C32/40 62% OPC+30%FA - 220+/-20 P 29-19127 8

76 C32/40 62% OPC+30%FA - 220+/-20 P 29-19129 7

77 KAIG3-RFI-CO-S-4950 Crescent 08/09/21 Concreting for BUTTRESS BOI 103, 104, 105 Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 29-19139 10

78 C32/40 62% OPC+30%FA - 220+/-20 P 29-19142 9

79 C32/40 62% OPC+30%FA - 220+/-20 P 29-19144 10 PASSED

80 C32/40 62% OPC+30%FA - 220+/-20 P 29-19145 10

81 C32/40 62% OPC+30%FA - 220+/-20 P 29-19147 10

kaig-qcals 178
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Concrete pouring for Blinding of Remaining Boundary wall DESCRIPTION
and Plant Room at Discovery Garden at highlighted area in attached DELIVERY NOTE
SI82
No. KAIG3-RFI-DG-S-5019-00
RFI NUMBER Discovery Garden 08/09/21 DESIGN MIX
C16/20 SRC P 29-19143 QUANTITY
10
LOCATION CASTING Drawing's. No.
(m³)
PASSED
83 C16/20 SRC P 29-19146 3

Concrete pouring & Shuttering for Column's (22 no's) (upto level +883.200) at Back of House inside Aviary garden, At Highlighted in
84 KAIG3-RFI-AG-S-5021-00 Aviary Garden 08/09/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-19149 10
the attached drawing's.
PASSED
85 C32/40 67%OPC+25%FA - 160+/-40 P 29-19150 7

86 KAIG3-RFI-CO-S-5038-00 Crescent 08/10/21 Concreting for Tunnel 2 Wall (2nd) zone 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-19152 10

87 C32/40 62% OPC+30%FA - 160+/-40 P 29-19153 10

88 C32/40 62% OPC+30%FA - 160+/-40 P 29-19155 10

89 C32/40 62% OPC+30%FA - 160+/-40 P 29-19157 10

90 C32/40 62% OPC+30%FA - 160+/-40 P 29-19159 10


PASSED
91 C32/40 62% OPC+30%FA - 160+/-40 P 29-19160 10

92 C32/40 62% OPC+30%FA - 160+/-40 P 29-19162 10

93 C32/40 62% OPC+30%FA - 160+/-40 P 29-19163 10

94 C32/40 62% OPC+30%FA - 160+/-40 P 29-19166 10

95 C32/40 62% OPC+30%FA - 160+/-40 P 29-19172 10

Concrete pouring & Shuttering for Footings of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
96 KAIG3-RFI-ZG-S-5032-00 Maze Garden 08/10/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19164 10
drawing's.

97 C32/40 62% OPC+30%FA - 160+/-40 P 29-19165 10

98 C32/40 62% OPC+30%FA - 160+/-40 P 29-19169 10

99 C32/40 62% OPC+30%FA - 160+/-40 P 29-19170 10 PASSED

100 C32/40 62% OPC+30%FA - 160+/-40 P 29-19171 10

101 C32/40 62% OPC+30%FA - 160+/-40 P 29-19173 10

102 C32/40 62% OPC+30%FA - 160+/-40 P 29-19174 5

Concretes pouring & Shuttering of Kicker (2nd lift) for Outer Canopy 1 & 2 at Physic Garden, as per highlighted area in attached
103 KAIG3-RFI-PG-S-5031-00 Physic Garden 08/11/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19175 10
drawings.

104 C32/40 62% OPC+30%FA - 160+/-40 P 29-19176 10

105 C32/40 62% OPC+30%FA - 160+/-40 P 29-19177 10


PASSED
106 C32/40 62% OPC+30%FA - 160+/-40 P 29-19178 10

107 C32/40 62% OPC+30%FA - 160+/-40 P 29-19179 10

108 C32/40 62% OPC+30%FA - 160+/-40 P 29-19180 10

109 KAIG3-RFI-CO-S-5034-00 Crescent 08/11/21 Concrete for BUTTRESS BIV 104 (2nd) Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 29-19181 10

110 C32/40 62% OPC+30%FA - 220+/-20 P 29-19182 10

kaig-qcals 179

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI111
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-19184 QUANTITY
9
LOCATION CASTING No.
(m³)
112 C32/40 62% OPC+30%FA - 220+/-20 P 29-19187 10

113 C32/40 62% OPC+30%FA - 220+/-20 P 29-19188 10 PASSED

114 C32/40 62% OPC+30%FA - 220+/-20 P 29-19189 10

115 C32/40 62% OPC+30%FA - 220+/-20 P 29-19191 10

116 C32/40 62% OPC+30%FA - 220+/-20 P 29-19193 10

117 C32/40 62% OPC+30%FA - 220+/-20 P 29-19195 10

Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water Line Manhole - FW-A-15,
118 KAIG3-RFI-SW-C-0974-00 Site Works 08/11/21 C16/20 SRC P 29-19186 10 PASSED
FW-A-16, FW-A-17 (As Highlighted

119 KAIG3-RFI-PG-S-5049-00 Physic Garden 08/11/21 Concrete pouring for Blinding's of Manholes (14 no's) Inside Physic garden, as per highlighted area in attached drawing's. C16/20 SRC P 29-19190 10

120 C16/20 SRC P 29-19192 10 PASSED

121 C16/20 SRC P 29-19194 3

122 KAIG3-RFI-CO-S-5007-00 Crescent 08/11/21 Concreting for mass concrete for strip footing between PC 120-122-124-126 zone 2E C16/20 SRC P 29-19204 10

123 C16/20 SRC P 29-19205 10 PASSED

124 C16/20 SRC P 29-19206 10

125 KAIG3-RFI-CO-S-5030-01 Crescent 08/12/21 Concreting for BUTTRESS BII 126 (2nd) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 29-19218 10
PASSED
126 C32/40 62% OPC+30%FA - 220+/-20 P 29-19220 10

127 KAIG3-RFI-CO-S-5003-00 Crescent 08/12/21 Concreting for Pilecaps 83, 85, 87 Zone 1P C32/40 62% OPC+30%FA - 160+/-40 P 29-19223 10

128 C32/40 62% OPC+30%FA - 160+/-40 P 29-19224 10

129 C32/40 62% OPC+30%FA - 160+/-40 P 29-19225 10

130 C32/40 62% OPC+30%FA - 160+/-40 P 29-19226 10

131 C32/40 62% OPC+30%FA - 160+/-40 P 29-19227 10

132 C32/40 62% OPC+30%FA - 160+/-40 P 29-19228 10

133 C32/40 62% OPC+30%FA - 160+/-40 P 29-19229 10

134 C32/40 62% OPC+30%FA - 160+/-40 P 29-19231 10 PASSED

135 C32/40 62% OPC+30%FA - 160+/-40 P 29-19232 10

136 C32/40 62% OPC+30%FA - 160+/-40 P 29-19233 10

137 C32/40 62% OPC+30%FA - 160+/-40 P 29-19234 10

138 C32/40 62% OPC+30%FA - 160+/-40 P 29-19235 10

139 C32/40 62% OPC+30%FA - 160+/-40 P 29-19236 10

140 C32/40 62% OPC+30%FA - 160+/-40 P 29-19237 10

kaig-qcals 180
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI141
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-19238 QUANTITY
10
LOCATION CASTING No.
(m³)

kaig-qcals 181
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI142
No. KAIG3-RFI-MC-S-5028-00
RFI NUMBER MCPE 08/14/21 Concreting for MCPE 2 Foundation (axis 02-AE to 02-AD) DESCRIPTION
(as Highlighted) C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-19243 QUANTITY
10
LOCATION CASTING No.
(m³)
143 C32/40 62% OPC+30%FA - 160+/-40 P 29-19244 10

144 C32/40 62% OPC+30%FA - 160+/-40 P 29-19245 10

145 C32/40 62% OPC+30%FA - 160+/-40 P 29-19246 10

146 C32/40 62% OPC+30%FA - 160+/-40 P 29-19247 10

147 C32/40 62% OPC+30%FA - 160+/-40 P 29-19249 10

148 C32/40 62% OPC+30%FA - 160+/-40 P 29-19252 10

149 C32/40 62% OPC+30%FA - 160+/-40 P 29-19253 10

150 C32/40 62% OPC+30%FA - 160+/-40 P 29-19254 10 PASSED

151 C32/40 62% OPC+30%FA - 160+/-40 P 29-19256 10

152 C32/40 62% OPC+30%FA - 160+/-40 P 29-19257 10

153 C32/40 62% OPC+30%FA - 160+/-40 P 29-19258 10

154 C32/40 62% OPC+30%FA - 160+/-40 P 29-19259 10

155 C32/40 62% OPC+30%FA - 160+/-40 P 29-19260 10

156 C32/40 62% OPC+30%FA - 160+/-40 P 29-19261 10

157 C32/40 62% OPC+30%FA - 160+/-40 P 29-19262 10

158 C32/40 62% OPC+30%FA - 160+/-40 P 29-19263 10

159 KAIG3-RFI-CO-S-5046-00 Crescent 08/14/21 Concreting for PILECAPS 32, 34, 36 Zone 1F C16/20 SRC P 29-19264 10

160 C16/20 SRC P 29-19268 10 PASSED

161 C16/20 SRC P 29-19271 10

162 KAIG3-RFI-PA-C-0973-00 Picnic Area 08/14/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-42) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-19270 5 PASSED

Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water Line Manhole - FW-A-15,
163 KAIG3-RFI-SW-C-0974-00 Site Works 08/14/21 C16/20 SRC P 29-19272 5 PASSED
FW-A-16, FW-A-17 (As Highlighted)
Concrete pouring for Blinding under Manholes (Type 'A' 4 no's and Type 'B' 2 no's) Inside Maze garden, as per highlighted area in
164 KAIG3-RFI-ZG-S-4910-00 Maze Garden 08/15/21 C16/20 SRC P 29-19273 6 PASSED
attached drawing's.

165 KAIG3-RFI-CO-S-5058-00 Crescent 08/15/21 Protection layer of geotextile sheet and 30 mm screed protection under Strip footing Between PC 166-168-170-172-174 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-19278 7 PASSED

166 KAIG3-RFI-MC-S-5054-00 MCPE 08/15/21 Concreting for MCPE 1 Foundation (axis 03-T to 03-S) as highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-19280 10

167 C32/40 62% OPC+30%FA - 160+/-40 P 29-19281 10

168 C32/40 62% OPC+30%FA - 160+/-40 P 29-19282 10

169 C32/40 62% OPC+30%FA - 160+/-40 P 29-19284 10

170 C32/40 62% OPC+30%FA - 160+/-40 P 29-19285 10

171 C32/40 62% OPC+30%FA - 160+/-40 P 29-19286 10

kaig-qcals 182
PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI172
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-19287 QUANTITY
10
LOCATION CASTING No.
(m³)
PASSED
173 C32/40 62% OPC+30%FA - 160+/-40 P 29-19288 10

174 C32/40 62% OPC+30%FA - 160+/-40 P 29-19289 10

175 C32/40 62% OPC+30%FA - 160+/-40 P 29-19292 10

176 C32/40 62% OPC+30%FA - 160+/-40 P 29-19293 10

177 C32/40 62% OPC+30%FA - 160+/-40 P 29-19294 10

178 C32/40 62% OPC+30%FA - 160+/-40 P 29-19295 10

179 C32/40 62% OPC+30%FA - 160+/-40 P 29-19297 10

INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
180 KAIG3-RFI-SW-C-1009-00 Site Works 08/15/21 C16/20 SRC P 29-19291 4
PIECE FOR - FW-A-3-6.5, FW-A-3-6.6, FW-A-3-6.7, FW-A-3-6.8 (As Highlighted)
PASSED
181 C16/20 SRC P 29-19296 3

182 KAIG3-RFI-CO-S-5063-00 Crescent 08/16/21 Concreting for BUTTRESS BIV 72, 73, 74, 75, 76 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 29-19303 10 PASSED

183 KAIG3-RFI-CO-S-5063-00 Crescent 08/16/21 Concreting for BUTTRESS BIV 72, 73, 74, 75, 76 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 29-19309 10

184 C32/40 62% OPC+30%FA - 220+/-20 P 29-19312 10


PASSED
185 C32/40 62% OPC+30%FA - 220+/-20 P 29-19315 10

186 C32/40 62% OPC+30%FA - 220+/-20 P 29-19316 5

187 KAIG3-RFI-DG-S-5094-00 Discovery Garden 08/17/21 Concrete pouring & Shuttering for Footing of Remaining Boundary wall at Discovery Garden at highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 28-28662 10

188 C32/40 62% OPC+30%FA - 160+/-40 P 28-28663 10


PASSED
189 C32/40 62% OPC+30%FA - 160+/-40 P 28-28664 10

190 C32/40 62% OPC+30%FA - 160+/-40 P 28-28665 10

191 KAIG3-RFI-CO-S-5034-00 Crescent 08/17/21 Concrete for BUTTRESS BIV 104 (2nd) Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 28-28667 9

192 C32/40 62% OPC+30%FA - 220+/-20 P 28-28672 7


PASSED
193 C32/40 62% OPC+30%FA - 220+/-20 P 28-28688 5

194 C32/40 62% OPC+30%FA - 220+/-20 P 28-28692 5

Concrete pouring & Shuttering for Footings of Circular Walls (6, 7, 8, 9 & 10) Half Part 1, inside Maze garden, as per highlighted area in
195 KAIG3-RFI-ZG-S-5095-00 Maze Garden 08/17/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28698 10
attached drawing's.

196 C32/40 62% OPC+30%FA - 160+/-40 P 28-28697 10

197 C32/40 62% OPC+30%FA - 160+/-40 P 28-28696 10

198 C32/40 62% OPC+30%FA - 160+/-40 P 28-28693 10


PASSED
199 C32/40 62% OPC+30%FA - 160+/-40 P 28-28691 10

200 C32/40 62% OPC+30%FA - 160+/-40 P 28-28690 10

kaig-qcals 183
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023
PASSED

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI201
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-28689 QUANTITY
10
LOCATION CASTING No.
(m³)
202 C32/40 62% OPC+30%FA - 160+/-40 P 28-28686 10

203 KAIG3-RFI-CO-S-5067-00 Crescent 08/18/21 Concreting for PILECAPS 31, 33, 35 Zone 1F C32/40 62% OPC+30%FA - 160+/-40 P 28-28700 10

204 C32/40 62% OPC+30%FA - 160+/-40 P 28-28702 10

205 C32/40 62% OPC+30%FA - 160+/-40 P 28-28703 10 PASSED

206 C32/40 62% OPC+30%FA - 160+/-40 P 28-28704 10

207 C32/40 62% OPC+30%FA - 160+/-40 P 28-28705 10

208 KAIG3-RFI-CO-S-5069-00 Crescent 08/19/21 Concreting for BUTTRESS BOI 65 (1st) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 28-28740 5

209 C32/40 62% OPC+30%FA - 220+/-20 P 28-28742 5 PASSED

210 C32/40 62% OPC+30%FA - 220+/-20 P 28-28743 10

Concrete pouring & Shuttering of Kicker 1st lift for Remaining Boundary wall at Discovery Garden at highlighted area in attached
211 KAIG3-RFI-DG-S-5114-00 Discovery Garden 08/19/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28754 10
Drawing's.
Concrete poring & Shuttering for Kicker of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
212 KAIG3-RFI-ZG-S-5110-00 Maze Garden 08/19/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28755 10 PASSED
drawing's.

213 C32/40 62% OPC+30%FA - 160+/-40 P 28-28757 10

214 KAIG3-RFI-CO-S-4969-01 Crescent 08/21/21 Concreting for BUTTRESS BII BIV 68, 69 Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-28765 5

215 C32/40 62% OPC+30%FA - 220+/-20 P 28-28767 5

216 C32/40 62% OPC+30%FA - 220+/-20 P 28-28771 5


PASSED
217 C32/40 62% OPC+30%FA - 220+/-20 P 28-28774 5

218 C32/40 62% OPC+30%FA - 220+/-20 P 28-28786 5

219 C32/40 62% OPC+30%FA - 220+/-20 P 28-28790 5

220 KAIG3-RFI-CO-S-5113-00 Crescent 08/21/21 Concreting for PILECAPS 38, 42 Zone 1G C32/40 62% OPC+30%FA - 160+/-40 P 28-28795 12

221 C32/40 62% OPC+30%FA - 160+/-40 P 28-28797 10

222 C32/40 62% OPC+30%FA - 160+/-40 P 28-28798 10


PASSED
223 C32/40 62% OPC+30%FA - 160+/-40 P 28-28802 9

224 C32/40 62% OPC+30%FA - 160+/-40 P 28-28804 10

225 C32/40 62% OPC+30%FA - 160+/-40 P 28-28805 12

Inspection for Casting the Blinding Concrete under the Manhole (MH-D-06, MH-D-07, MH-D-08, MH-D-08-01, MH-D-08-02) (as
226 KAIG3-RFI-SW-C-1169-00 Site Works 08/21/21 C16/20 SRC P 28-28803 10 PASSED
Highlighted)

227 KAIG3-RFI-MC-S-5126-00 MCPE 1 08/22/21 Concreting for MCPE 1 Foundation at Axis 03-S to 03-R (as Highlighted) ZONE 2M 2N C32/40 62% OPC+30%FA - 160+/-40 P 28-28809 10

228 C32/40 62% OPC+30%FA - 160+/-40 P 28-28810 10

229 C32/40 62% OPC+30%FA - 160+/-40 P 28-28812 10

230 C32/40 62% OPC+30%FA - 160+/-40 P 28-28813 10

kaig-qcals 184
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI231
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-28814 QUANTITY
10
LOCATION CASTING No.
(m³)
232 C32/40 62% OPC+30%FA - 160+/-40 P 28-28815 10

233 C32/40 62% OPC+30%FA - 160+/-40 P 28-28816 10

234 C32/40 62% OPC+30%FA - 160+/-40 P 28-28817 10

235 C32/40 62% OPC+30%FA - 160+/-40 P 28-28818 10

236 C32/40 62% OPC+30%FA - 160+/-40 P 28-28820 10

237 C32/40 62% OPC+30%FA - 160+/-40 P 28-28821 10

238 C32/40 62% OPC+30%FA - 160+/-40 P 28-28822 10

239 C32/40 62% OPC+30%FA - 160+/-40 P 28-28823 10 PASSED

240 C32/40 62% OPC+30%FA - 160+/-40 P 28-28824 10

241 C32/40 62% OPC+30%FA - 160+/-40 P 28-28825 10

242 C32/40 62% OPC+30%FA - 160+/-40 P 28-28826 10

243 C32/40 62% OPC+30%FA - 160+/-40 P 28-28827 10

244 C32/40 62% OPC+30%FA - 160+/-40 P 28-28828 10

245 C32/40 62% OPC+30%FA - 160+/-40 P 28-28829 10

246 C32/40 62% OPC+30%FA - 160+/-40 P 28-28830 10

247 C32/40 62% OPC+30%FA - 160+/-40 P 28-28831 10

248 C32/40 62% OPC+30%FA - 160+/-40 P 28-28836 10

249 C32/40 62% OPC+30%FA - 160+/-40 P 28-28837 10

250 C32/40 62% OPC+30%FA - 160+/-40 P 28-28838 10

251 C32/40 62% OPC+30%FA - 160+/-40 P 28-28839 10

252 KAIG3-RFI-CO-S-5100-00 Crescent 08/22/21 Concreting for Strip footing RC at Zone 2A Between PC 91-93-95-97 C32/40 62% OPC+30%FA - 220+/-20 P 28-28834 10

253 C32/40 62% OPC+30%FA - 220+/-20 P 28-28840 10 PASSED

254 C32/40 62% OPC+30%FA - 220+/-20 P 28-28843 3

Concrete Pouring & Shuttering for Kicker (Inside) 2nd Lift for remaining Boundary Wall at Discovery Garden at hihglighted area in
255 KAIG3-RFI-DG-S-5130-00 Discovery Garden 08/22/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28835 10 PASSED
attached drawing.

256 KAIG3-RFI-MC-S-5089-00 Crescent 08/23/21 Concreting for MCPE 2 Foundation Axis 02-AH to 02 AG as highlighted Zone 2J 2K C32/40 62% OPC+30%FA - 160+/-40 P 28-28847 10

257 C32/40 62% OPC+30%FA - 160+/-40 P 28-28848 10

258 C32/40 62% OPC+30%FA - 160+/-40 P 28-28849 10

259 C32/40 62% OPC+30%FA - 160+/-40 P 28-28850 10

260 C32/40 62% OPC+30%FA - 160+/-40 P 28-28851 10

kaig-qcals 185
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI261
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-28852 QUANTITY
10
LOCATION CASTING No.
(m³)
262 C32/40 62% OPC+30%FA - 160+/-40 P 28-28853 10

263 C32/40 62% OPC+30%FA - 160+/-40 P 28-28854 10

264 C32/40 62% OPC+30%FA - 160+/-40 P 28-28856 10 PASSED

265 C32/40 62% OPC+30%FA - 160+/-40 P 28-28857 10

266 C32/40 62% OPC+30%FA - 160+/-40 P 28-28861 10

267 C32/40 62% OPC+30%FA - 160+/-40 P 28-28862 12

268 C32/40 62% OPC+30%FA - 160+/-40 P 28-28863 12

269 C32/40 62% OPC+30%FA - 160+/-40 P 28-28864 12

270 C32/40 62% OPC+30%FA - 160+/-40 P 28-28866 10

271 C32/40 62% OPC+30%FA - 160+/-40 P 28-28868 10

272 C32/40 62% OPC+30%FA - 160+/-40 P 28-28869 10

273 KAIG3-RFI-CO-S-5121-00 Crescent 08/23/21 Concreting for BUTTRESS BII 103, 104, 105 (2nd) Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 28-28873 9

274 C32/40 62% OPC+30%FA - 220+/-20 P 28-28877 10 PASSED

275 C32/40 62% OPC+30%FA - 220+/-20 P 28-28878 10

276 KAIG3-RFI-CO-S-5103-00 Crescent 08/24/21 Concretingfor BUTTRESS BOI 66-67 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 28-28884 10 PASSED

277 KAIG3-RFI-MC-S-5126-00 MCPE 1 08/24/21 Concreting for MCPE 1 Foundation at Axis 03-S to 03-R (as Highlighted) ZONE 2M 2N C32/40 62% OPC+30%FA - 160+/-40 P 28-28887 10

278 C32/40 62% OPC+30%FA - 160+/-40 P 28-28889 10

279 C32/40 62% OPC+30%FA - 160+/-40 P 28-28890 10

280 C32/40 62% OPC+30%FA - 160+/-40 P 28-28891 9

281 C32/40 62% OPC+30%FA - 160+/-40 P 28-28892 10

282 C32/40 62% OPC+30%FA - 160+/-40 P 28-28893 10

283 C32/40 62% OPC+30%FA - 160+/-40 P 28-28895 10


PASSED
284 C32/40 62% OPC+30%FA - 160+/-40 P 28-28896 10

285 C32/40 62% OPC+30%FA - 160+/-40 P 28-28901 10

286 C32/40 62% OPC+30%FA - 160+/-40 P 28-28903 10

287 C32/40 62% OPC+30%FA - 160+/-40 P 28-28905 10

288 C32/40 62% OPC+30%FA - 160+/-40 P 28-28906 9

289 C32/40 62% OPC+30%FA - 160+/-40 P 28-28907 10

290 C32/40 62% OPC+30%FA - 160+/-40 P 28-28909 10

kaig-qcals 186
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI291
No. KAIG3-RFI-DG-S-5150-00
RFI NUMBER Discovery Garden 08/25/21 DESCRIPTION
Concrete pouring & Shuttering for Footings of Plant Room at Dicovery Garden as per highlighted area in attached drawing's. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-28912 QUANTITY
8
LOCATION CASTING No.
(m³)
PASSED
292 C32/40 62% OPC+30%FA - 160+/-40 P 28-28913 8

293 KAIG3-RFI-CO-S-5135-00 Crescent 08/25/21 Concreting for the PILECAP 37, 39, 41, 43 Zone 1G C32/40 62% OPC+30%FA - 160+/-40 P 28-28914 10

294 C32/40 62% OPC+30%FA - 160+/-40 P 28-28916 10

295 C32/40 62% OPC+30%FA - 160+/-40 P 28-28917 10

296 C32/40 62% OPC+30%FA - 160+/-40 P 28-28919 10


PASSED
297 C32/40 62% OPC+30%FA - 160+/-40 P 28-28920 9

298 C32/40 62% OPC+30%FA - 160+/-40 P 28-28922 10

299 C32/40 62% OPC+30%FA - 160+/-40 P 28-28923 10

300 C32/40 62% OPC+30%FA - 160+/-40 P 28-28925 5

301 KAIG3-RFI-CO-S-4766-00 Crescent 08/25/21 Concreting for BUTTRESS BOI BOV 124 & 125 (1st) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 28-28946 10
PASSED
302 C32/40 62% OPC+30%FA - 220+/-20 P 28-28934 10

Inspection for Casting the Blinding Concrete under the Manhole (MH-D-01, MH-D-02, MH-D-03, MH-D-04, MH-D-05) (as
303 KAIG3-RFI-SW-C-1175-00 Site Works 08/25/21 C16/20 SRC P 28-28937 10 PASSED
Highlighted)
Concrete pouring & Shuttering of Footings of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as per highlighted area in
304 KAIG3-RFI-ZG-S-5132-00 Maze Garden 08/26/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28950 10
attached drawing's.

305 C32/40 62% OPC+30%FA - 160+/-40 P 28-28951 10

306 C32/40 62% OPC+30%FA - 160+/-40 P 28-28952 10 PASSED

307 C32/40 62% OPC+30%FA - 160+/-40 P 28-28953 9

308 C32/40 62% OPC+30%FA - 160+/-40 P 28-28957 10

309 KAIG3-RFI-CO-S-5128-00 Crescent 08/26/21 Concreting for BUTTRESS BII 72, 73, 74, 75, 76 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 28-28956 9

310 C32/40 62% OPC+30%FA - 220+/-20 P 28-28960 10


PASSED
311 C32/40 62% OPC+30%FA - 220+/-20 P 28-28961 10

312 C32/40 62% OPC+30%FA - 220+/-20 P 28-28962 9

Coordinate Pouring & Shuttering for Kicker of Circular Walls (6,7,8,9 & 10) Half Part 1 inside Maze Garden as per highlighted area in
313 KAIG3-RFI-ZG-S-5146-00 Maze Garden 08/26/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28968 9
attached drawing.

314 C32/40 62% OPC+30%FA - 160+/-40 P 28-28969 10

315 C32/40 62% OPC+30%FA - 160+/-40 P 28-28975 9 PASSED

316 C32/40 62% OPC+30%FA - 160+/-40 P 28-28978 9

317 C32/40 62% OPC+30%FA - 160+/-40 P 28-28979 10

318 KAIG3-RFI-MC-S-5149-01 Crescent 08/28/21 Concreting for MCPE 2 Foundation Axis 02AD to 03K Zone 2J 2K C32/40 62% OPC+30%FA - 160+/-40 P 28-28981 10

319 C32/40 62% OPC+30%FA - 160+/-40 P 28-28982 9

320 C32/40 62% OPC+30%FA - 160+/-40 P 28-28983 9

kaig-qcals 187

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI321
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-28984 QUANTITY
9
LOCATION CASTING No.
(m³)
322 C32/40 62% OPC+30%FA - 160+/-40 P 28-28985 9
PASSED

kaig-qcals 188
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
SI323
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-28986 QUANTITY
9
LOCATION CASTING No.
(m³)
324 C32/40 62% OPC+30%FA - 160+/-40 P 28-28987 9

325 C32/40 62% OPC+30%FA - 160+/-40 P 28-28988 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-28990 9

C32/40 62% OPC+30%FA - 160+/-40 P 28-28993 9

KAIG3-RFI-PA-C-1196-00 Picnic Area 08/28/21 Inspection of Concrete Pouring for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-28989 4 PASSED

KAIG3-RFI-CO-S-5165-00 Crescent 08/28/21 Shuttering for BUTTRESS BOI 65 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 28-29002 7 PASSED

KAIG3-RFI-CO-S-5161-00 Crescent 08/28/21 Concreting for BUTTRESS BII 128 (1st) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 28-29018 9
PASSED
C32/40 62% OPC+30%FA - 220+/-20 P 28-29023 10

KAIG3-RFI-CO-S-5144-01 Crescent 08/28/21 Concreting for Mass Concrete of Strip Footing Between PC 134-136-138-140 Zone 2G C16/20 SRC P 28-29019 10

C16/20 SRC P 28-29020 9


PASSED
C16/20 SRC P 28-29021 9

C16/20 SRC P 28-29024 6

KAIG3-RFI-CO-S-5177-00 Crescent 08/29/21 Surface Preparation and Solvent base primer under Strip footing Between PC 134-136-138-140 Zone 2G C16/20 SRC P 28-29036 8 PASSED

KAIG3-RFI-CO-S-5166-00 Crescent 08/29/21 Concreting for BUTTRESS BOI 65 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 28-29054 10
PASSED
C32/40 62% OPC+30%FA - 220+/-20 P 28-29056 10

KAIG3-RFI-CO-S-5173-01 Crescent 08/30/21 Concreting for BUTTRESS BIV 68 & 69 (2nd) Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-29063 5
PASSED
P 28-29066 5

KAIG3-RFI-CO-S-5195-00 Crescent 08/31/21 Concreting for PILECAPS 71 & 75 Zone 1M C32/40 62% OPC+30%FA - 160+/-40 P 28-29099 10

C32/40 62% OPC+30%FA - 160+/-40 P 28-29101 10


PASSED
C32/40 62% OPC+30%FA - 160+/-40 P 28-29106 10

C32/40 62% OPC+30%FA - 160+/-40 P 28-29107 9

Concrete Pouring for Blinding under foundation at Grid (2-20/B & 14/B-B') Inside Butterfly Garden, as highlighted area in attached
KAIG3-RFI-TG-S-5202-00 Butterfly Garden 08/31/21 C16/20 SRC P 28-29102 9
drawings.

C16/20 SRC P 28-29103 9

TOTAL QUANTITY TRUCK LOAD (M³): 3219

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 3219

kaig-qcals 189
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
(m³)

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 190
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
Inspection for Casting the Blinding Concrete under the Manhole (MH-D-01-A1, MH-D-01-A1-01, MH-D-01-A2, MH-D-01-B1, MH-D-
1 KAIG3-RFI-SW-C-1304-00 Site Works 09/01/21 C16/20 SRC P 29-19320 8 PASSED
01-B2) (as Highlighted)

2 KAIG3-RFI-CO-S-5153-01 Crescent 09/01/21 Concreting for BUTTRESS BOI 75 & 76 Zone 2D & 2E C32/40 62% OPC+30%FA - 220+/-20 P 29-19332 10
PASSED
3 C32/40 62% OPC+30%FA - 220+/-20 P 29-19341 5

Concrete Pouring & Shuttering for Kicker of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as per highlighted area in
4 KAIG3-RFI-ZG-S-5212-00 Maze Garden 09/01/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19345 10
attached drawing's.

5 C32/40 62% OPC+30%FA - 160+/-40 P 29-19346 10 PASSED

6 C32/40 62% OPC+30%FA - 160+/-40 P 29-19347 10

7 KAIG3-RFI-CO-S-5207-00 Crescent 09/02/21 Concreting for pilecaps 45, 47, 49, 51 Zone 1H 1G C32/40 62% OPC+30%FA - 160+/-40 P 29-19350 10

8 C32/40 62% OPC+30%FA - 160+/-40 P 29-19351 10

9 C32/40 62% OPC+30%FA - 160+/-40 P 29-19352 10


PASSED
10 C32/40 62% OPC+30%FA - 160+/-40 P 29-19354 10

11 C32/40 62% OPC+30%FA - 160+/-40 P 29-19355 10

12 C32/40 62% OPC+30%FA - 160+/-40 P 29-19359 10

13 KAIG3-RFI-CO-S-5209-00 Crescent 09/02/21 Concreting for BUTTRESS BOI BOV 127 (1st) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 29-19360 6

14 C32/40 62% OPC+30%FA - 220+/-20 P 29-19361 10 PASSED

15 C32/40 62% OPC+30%FA - 220+/-20 P 29-19365 5

Concrete pouring for Blindings Under Foundations of 4 Walls at the Entrance Boundary wall inside Maze garden, as per highlighted area
16 KAIG3-RFI-ZG-S-5216-00 Maze Garden 09/02/21 C16/20 SRC P 29-19369 10
in attached drawing's.
PASSED
17 C16/20 SRC P 29-19370 10

18 KAIG3-RFI-CO-S-5226-00 Crescent 09/04/21 Concreting for PILECAP 77 Zone 1N C32/40 62% OPC+30%FA - 160+/-40 P 29-19373 9

19 KAIG3-RFI-CO-S-5219-00 Crescent 09/04/21 Concreting for PILECAP 73 Zone 1M C32/40 62% OPC+30%FA - 160+/-40 P 29-19374 9

20 C32/40 62% OPC+30%FA - 160+/-40 P 29-19375 9


PASSED
21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19376 9

22 C32/40 62% OPC+30%FA - 160+/-40 P 29-19382 4

23 C32/40 62% OPC+30%FA - 160+/-40 P 29-29115 6

24 KAIG3-RFI-PA-C-1323-00 Picnic Area 09/04/21 Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-10) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-29114 10
PASSED
25 C32/40 62% OPC+30%FA - 160+/-40 P 28-29116 3

Concrete Pouring & Shuttering for Walls of Circular Walls (2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
26 KAIG3-RFI-ZG-S-5244-00 Maze Garden 09/05/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-29132 9
drawing's.

27 C32/40 62% OPC+30%FA - 160+/-40 P 28-29133 9

kaig-qcals
PASSED 191
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI28
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-29134 QUANTITY
9 PASSED
LOCATION CASTING No.
(m³)

29 C32/40 62% OPC+30%FA - 160+/-40 P 28-29135 9

30 C32/40 62% OPC+30%FA - 160+/-40 P 28-29136 10

31 KAIG3-RFI-CO-S-5232-00 Crescent 09/05/21 Concreting for PILECAP 48, 52 Zone 1H C32/40 62% OPC+30%FA - 160+/-40 P 28-29139 9

32 C32/40 62% OPC+30%FA - 160+/-40 P 28-29140 9

33 C32/40 62% OPC+30%FA - 160+/-40 P 28-29141 9

34 C32/40 62% OPC+30%FA - 160+/-40 P 28-29142 9 PASSED

35 C32/40 62% OPC+30%FA - 160+/-40 P 28-29143 9

36 C32/40 62% OPC+30%FA - 160+/-40 P 28-29145 9

37 C32/40 62% OPC+30%FA - 160+/-40 P 28-29147 10

38 KAIG3-RFI-PG-S-5231-00 Physic Garden 09/05/21 Concrete Pouring & Shuttering for Wall & Columns of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 220+/-20 P 28-29146 10

39 C32/40 62% OPC+30%FA - 220+/-20 P 28-29149 9

40 C32/40 62% OPC+30%FA - 220+/-20 P 28-29150 9

41 C32/40 62% OPC+30%FA - 220+/-20 P 28-29151 9 PASSED

42 C32/40 62% OPC+30%FA - 220+/-20 P 28-29152 9

43 C32/40 62% OPC+30%FA - 220+/-20 P 28-29153 9

44 C32/40 62% OPC+30%FA - 220+/-20 P 28-29154 9

45 KAIG3-RFI-CO-S-5236-00 Crescent 09/06/21 Concreting for BUTRESS BOI 99, 100, 101, 102 Zone 2K 2L C32/40 62% OPC+30%FA - 220+/-20 P 28-29155 5

46 C32/40 62% OPC+30%FA - 220+/-20 P 28-29156 5

47 C32/40 62% OPC+30%FA - 220+/-20 P 28-29157 5


PASSED
48 C32/40 62% OPC+30%FA - 220+/-20 P 28-29158 5

49 C32/40 62% OPC+30%FA - 220+/-20 P 28-29161 5

50 C32/40 62% OPC+30%FA - 220+/-20 P 28-29162 2

51 KAIG3-RFI-PG-S-5248-00 Physic Garden 09/06/21 Concrete pouring for Blinding of Footings (6 no's) Inside Physic Garden, at highlighted area in attached drawings. C16/20 SRC P 28-29159 10

52 C16/20 SRC P 28-29160 10 PASSED

53 C16/20 SRC P 28-29163 7

54 KAIG3-RFI-CO-S-5239-00 Crescent 09/06/21 Concreting for PILECAPS 74, 78 Zone 1N 1M C32/40 62% OPC+30%FA - 160+/-40 P 28-29167 10

kaig-qcals 192

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI55
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-29168 QUANTITY
10
LOCATION CASTING No.
(m³)

PASSED

kaig-qcals 193
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI56
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-29169 QUANTITY
10
LOCATION CASTING No.
(m³)
PASSED
57 C32/40 62% OPC+30%FA - 160+/-40 P 28-29174 9

58 C32/40 62% OPC+30%FA - 160+/-40 P 28-29178 9

59 C32/40 62% OPC+30%FA - 160+/-40 P 28-29180 3

60 KAIG3-RFI-CO-S-5242-00 Crescent 09/07/21 Concretring for SRTIP FOOTING RC Between PC 174-172, 170-68 Zone 2M, PC 176-174 Zone 2N C32/40 62% OPC+30%FA - 160+/-40 P 28-29187 10
PASSED
61 C32/40 62% OPC+30%FA - 160+/-40 P 28-29189 10

Screed Protection 50mm thk. on Blinding under foundation at Grid (2-20/B) Inside Butterfly Garden, as highlighted area in attached
62 KAIG3-RFI-TG-S-5271-00 Butterfly Garden 09/07/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-29194 9 PASSED
drawings.

63 KAIG3-RFI-DG-S-5215-01 Discovery Garden 09/08/21 Concrete pouring & Shuttering for Kicker (1st Lift) of Plant room at Discovery Garden at highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 28-29212 5 PASSED

64 KAIG3-RFI-CO-S-5257-01 Crescent 09/08/21 Concreting for BUTTRESS BII 128 (2nd) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 28-29213 10 PASSED

65 KAIG3-RFI-DG-S-5270-00 Discovery Garden 09/08/21 Concrete Pouring & Shuttering for Wall of Remaining Boundary wall at Discovery Garden at highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-29219 9

66 C32/40 67%OPC+25%FA - 160+/-40 P 28-29220 9

67 C32/40 67%OPC+25%FA - 160+/-40 P 28-29221 10


PASSED
68 C32/40 67%OPC+25%FA - 160+/-40 P 28-29222 10

69 C32/40 67%OPC+25%FA - 160+/-40 P 28-29223 5

70 C32/40 67%OPC+25%FA - 160+/-40 P 28-29224 1

KAIG3-RFI-CO-S-5226-00 Crescent 09/09/21 Concreting for PILECAP 77 Zone 1N C16/20 SRC P 28-29226 9
PASSED
C16/20 SRC p 28-29230 10

Concrete pouring & Shuttering for Footing of 2 Walls (Curved) along the Boundary wall at Entrance, inside Maze garden, as per
71 KAIG3-RFI-ZG-S-5284-00 Maze Garden 09/11/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-29248 9
highlighted area in attached drawing's.

C32/40 62% OPC+30%FA - 160+/-40 P 28-29250 9

72 C32/40 62% OPC+30%FA - 160+/-40 P 28-29251 9

73 C32/40 62% OPC+30%FA - 160+/-40 P 28-29252 9 PASSED

74 C32/40 62% OPC+30%FA - 160+/-40 P 28-29253 9

75 C32/40 62% OPC+30%FA - 160+/-40 P 28-29254 9

76 C32/40 62% OPC+30%FA - 160+/-40 P 28-29255 4

77 KAIG3-RFI-SW-C-1376-00 Site Works 09/11/21 Inspection for Casting the Blinding Concrete under the SBC-06 (as Highlighted) C16/20 SRC P 28-29257 10 PASSED

78 KAIG3-RFI-PG-S-5286-00 Physic Garden 09/11/21 Concrete Pouring & Shuttering for Wall & Columns of Outer Canopy 2 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 220+/-20 P 28-29274 9

79 C32/40 62% OPC+30%FA - 220+/-20 P 28-29275 9

80 C32/40 62% OPC+30%FA - 220+/-20 P 28-29276 9

kaig-qcals
PASSED 194
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI81
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-29278 QUANTITY
9 PASSED
LOCATION CASTING No.
(m³)

82 C32/40 62% OPC+30%FA - 220+/-20 P 28-29281 9

83 C32/40 62% OPC+30%FA - 220+/-20 P 28-29282 9

84 C32/40 62% OPC+30%FA - 220+/-20 P 28-29283 8

85 KAIG3-RFI-SW-C-1338-00 Site Works 09/12/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-6, FW-A-3-7 (as Highlighted C16/20 SRC P 28-29293 4 PASSED

Concrete Pouring & Shuttering for Walls of Circular Wall (1) and Straight walls (3 no's), inside Maze garden, as per highlighted area in
86 KAIG3-RFI-ZG-S-5292-00 Maze Garden 09/12/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-29314 9
attached drawing's.

87 C32/40 67%OPC+25%FA - 160+/-40 P 28-29315 9

88 C32/40 67%OPC+25%FA - 160+/-40 P 28-29316 9

89 C32/40 67%OPC+25%FA - 160+/-40 P 28-29317 8 PASSED

90 C32/40 67%OPC+25%FA - 160+/-40 P 28-29318 9

91 C32/40 67%OPC+25%FA - 160+/-40 P 28-29319 9

92 C32/40 67%OPC+25%FA - 160+/-40 P 28-29320 9

93 KAIG3-RFI-CO-S-5291-00 Crescent 09/13/21 Concreting for PILECAPS 53, 55, 57 Zone 1H 1J C32/40 62% OPC+30%FA - 160+/-40 P 28-29327 9

94 C32/40 62% OPC+30%FA - 160+/-40 P 28-29328 9

95 C32/40 62% OPC+30%FA - 160+/-40 P 28-29330 9


PASSED
96 C32/40 62% OPC+30%FA - 160+/-40 P 28-29331 9

97 C32/40 62% OPC+30%FA - 160+/-40 P 28-29333 9

98 C32/40 62% OPC+30%FA - 160+/-40 P 28-29334 6

99 KAIG3-RFI-CO-S-5296-00 Crescent 09/13/21 Concreting for BUTTRESS BOI 124 & 125 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 28-29335 10
PASSED
100 C32/40 62% OPC+30%FA - 220+/-20 P 28-29338 8

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
101 KAIG3-RFI-SW-C-1358-00 Site Works 09/13/21 C16/20 SRC P 28-29339 10
Coat and 3rd Coat) for MH-D-07, MH-D-08-01 (As Highlighted)
PASSED
102 C16/20 SRC P 28-29343 5

103 KAIG3-RFI-CO-S-5291-00 Crescent 09/13/21 Concreting for PILECAPS 53, 55, 57 Zone 1H 1J C32/40 62% OPC+30%FA - 160+/-40 P 28-29344 9 PASSED

104 KAIG3-RFI-CO-S-5283-01 Crescent 09/14/21 Concreting of Slab of TUNNEL 2 Zone 6 C32/40 62% OPC+30%FA - 160+/-40 P 28-29349 9

105 C32/40 62% OPC+30%FA - 160+/-40 P 28-29350 9

106 C32/40 62% OPC+30%FA - 160+/-40 P 28-29351 9

107 C32/40 62% OPC+30%FA - 160+/-40 P 28-29352 9

108 C32/40 62% OPC+30%FA - 160+/-40 P 28-29353 9


PASSED
109 C32/40 62% OPC+30%FA - 160+/-40 P 28-29357 9

kaig-qcals 195
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI110
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-29360 QUANTITY
9
LOCATION CASTING No.
(m³)
111 C32/40 62% OPC+30%FA - 160+/-40 P 28-29362 9

112 C32/40 62% OPC+30%FA - 160+/-40 P 28-29363 9

113 C32/40 62% OPC+30%FA - 160+/-40 P 28-29364 9

114 KAIG3-RFI-CO-S-5308-00 Crescent 09/15/21 Concreting for PILECAPS 67 & 69 Zone 1L. C32/40 62% OPC+30%FA - 160+/-40 P 28-29399 9

115 C32/40 62% OPC+30%FA - 160+/-40 P 28-29400 9

116 C32/40 62% OPC+30%FA - 160+/-40 P 28-29401 9

117 C32/40 62% OPC+30%FA - 160+/-40 P 28-29402 9

118 C32/40 62% OPC+30%FA - 160+/-40 P 28-29405 9 PASSED

119 C32/40 62% OPC+30%FA - 160+/-40 P 28-29406 9

120 C32/40 62% OPC+30%FA - 160+/-40 P 28-29409 9

121 C32/40 62% OPC+30%FA - 160+/-40 P 28-29410 9

122 C32/40 62% OPC+30%FA - 160+/-40 P 28-29411 8

Inspection for Casting the Blinding Concrete under the Manhole (MH-A-01, MH-A-02, MH-A-03, MH-A-10, MH-A-11, MH-A-12) as
123 KAIG3-RFI-SW-C-1413-00 Site Works 09/15/21 C16/20 SRC P 28-29413 6 PASSED
Highlighted

124 KAIG3-RFI-CO-S-5308-00 Crescent 09/15/21 Concreting for PILECAPS 67 & 69 Zone 1L. C16/20 SRC P 28-29424 10 PASSED

125 KAIG3-RFI-CO-S-5331-00 Crescent 09/15/21 Concreting for BUTTRESS BIV 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 160+/-40 P 28-29430 9
PASSED
126 C32/40 62% OPC+30%FA - 160+/-40 P 28-29431 9

Concrete Pouring & Shuttering for Walls of Circular Wall (6 & 7) Half part 1 inside Maze garden, as per highlighted area in attached
127 KAIG3-RFI-ZG-S-5325-00 Maze Garden 09/15/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-29434 10
drawing's.

128 C32/40 67%OPC+25%FA - 160+/-40 P 28-29435 10 PASSED

129 C32/40 67%OPC+25%FA - 160+/-40 P 28-29436 7

130 KAIG3-RFI-CO-S-5331-00 Crescent 09/16/21 Concreting for BUTTRESS BIV 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-29450 9

131 C32/40 62% OPC+30%FA - 220+/-20 P 28-29453 9


PASSED
132 C32/40 62% OPC+30%FA - 220+/-20 P 28-29455 9

133 C32/40 62% OPC+30%FA - 220+/-20 P 28-29459 8

134 KAIG3-RFI-TG-S-5342-00 Butterfly Garden 09/16/21 Concrete Pouring and Blinding under Foundation at Grid (A/1-21) at Butterfly Garden at highlighted area in attached drawing. C16/20 SRC P 28-29460 9

135 C16/20 SRC P 28-29461 9


PASSED
136 C16/20 SRC P 28-29466 9

137 C16/20 SRC P 28-29468 9

138 KAIG3-RFI-CO-S-5331-00 Crescent 09/16/21 Concreting for BUTTRESS BIV 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-29473 10

139 C32/40 62% OPC+30%FA - 220+/-20 P 28-29474 10


PASSED

kaig-qcals 196
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
SI140
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-29476 QUANTITY
10
LOCATION CASTING No.
(m³)

kaig-qcals 197
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI141
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-29480 QUANTITY
5
LOCATION CASTING No.
(m³)
142 KAIG3-RFI-DG-S-5335-00 Discovery Garden 09/18/21 Concrete Pouring & Shuttering for Kicker (2nd Lift) of Plant Room at Dicovery Garden at highlighted area in attached drawing. C32/40 62% OPC+30%FA - 160+/-40 P 28-29475 5 PASSED

Concrete pouring for Encasement of Shot piece's of Manholes (Type 'B' 6 no's) Inside Physic garden, as per highlighted area in attached
143 KAIG3-RFI-PG-S-5348-00 Physic Garden 09/18/21 C16/20 SRC P 28-29477 10 PASSED
drawing's.

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
144 KAIG3-RFI-SW-C-1424-00 Site Works 09/18/21 C16/20 SRC P 28-29478 8 PASSED
Coat and 3rd Coat) for MH-D-02, MH-D-03, MH-D-03-01, MH-D-04, MH-D-05, MH-D-06 (As Highlighted)

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
145 KAIG3-RFI-SW-C-1424-00 Site Works 09/18/21 C16/20 SRC P 28-29487 5 PASSED
Coat and 3rd Coat) for MH-D-02, MH-D-03, MH-D-03-01, MH-D-04, MH-D-05, MH-D-06 (As Highlighted)

146 KAIG3-RFI-CO-S-5322-00 Crescent 09/19/21 Concreting for PILECAPS 65 & 70 Zone 1K 1L C32/40 67%OPC+25%FA - 160+/-40 P 28-29488 11

147 C32/40 67%OPC+25%FA - 160+/-40 P 28-29490 9

148 C32/40 67%OPC+25%FA - 160+/-40 P 28-29491 10

149 C32/40 67%OPC+25%FA - 160+/-40 P 28-29494 12 PASSED

150 C32/40 67%OPC+25%FA - 160+/-40 P 28-29495 11

151 C32/40 67%OPC+25%FA - 160+/-40 P 28-29497 10

152 C32/40 67%OPC+25%FA - 160+/-40 P 28-29504 5

153 KAIG3-RFI-CO-S-5358-00 Crescent 09/20/21 Concreting for PILECAPS 59, 61, 63 Zone 1K 1J C32/40 62% OPC+30%FA - 160+/-40 P 28-29520 12

154 C32/40 62% OPC+30%FA - 160+/-40 P 28-29521 10

155 C32/40 62% OPC+30%FA - 160+/-40 P 28-29522 12 PASSED

156 C32/40 62% OPC+30%FA - 160+/-40 P 28-29523 12

157 C32/40 62% OPC+30%FA - 160+/-40 P 28-29524 5

158 KAIG3-RFI-CO-S-5370-00 Crescent 09/20/21 Concreting for BUTTRESS BOV BOI 4, 5, 7 (1st) zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29529 9

159 C32/40 62% OPC+30%FA - 220+/-20 P 28-29532 11 PASSED

160 C32/40 62% OPC+30%FA - 220+/-20 P 28-29539 11

Concrete Pouring & Shuttering for Kicker (1st Lift) of Straight Wall 'A' (Right Side) and 2 Walls (Curved) along the Boundary wall at
161 KAIG3-RFI-ZG-S-5376-00 Maze Garden 09/21/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-29554 12
Entrance, inside Maze garden, as per highlighted area in attached drawing's.

162 C32/40 62% OPC+30%FA - 160+/-40 P 28-29556 9

163 C32/40 62% OPC+30%FA - 160+/-40 P 28-29557 9 PASSED

164 C32/40 62% OPC+30%FA - 160+/-40 P 28-29561 9

165 C32/40 62% OPC+30%FA - 160+/-40 P 28-29562 9

166 C32/40 62% OPC+30%FA - 160+/-40 P 28-29568 5

167 KAIG3-RFI-CO-S-5386-00 Crescent 09/21/21 Concreting for BUTTRESS BII 68 & 69 (2nd) zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-29569 5

168 C32/40 62% OPC+30%FA - 220+/-20 P 28-29571 5


PASSED
169 C32/40 62% OPC+30%FA - 220+/-20 P 28-29576 5

kaig-qcals 198
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI170
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-29582 QUANTITY
5
LOCATION CASTING No.
(m³)
Screed Protection 50mm thk. on Blinding under foundation at Grid (A-B/1-2), (A/2-7), (A/16-21) & (20-21/A-B) Inside Butterfly
171 KAIG3-RFI-TG-S-5382-00 Butterfly Garden 09/21/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-29581 10
Garden, as highlighted area in attached drawings.
PASSED
172 C32/40 62% OPC+30%FA - 220+/-20 P 28-29584 5

173 KAIG3-RFI-CO-S-5396-00 Crescent 09/22/21 Concreting for BUTTRESS BOI BOV 6 (1st) Zone 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29590 5
PASSED
174 C32/40 62% OPC+30%FA - 220+/-20 P 28-29597 10

175 KAIG3-RFI-CO-S-5367-00 Crescent 09/22/21 Concreting for BUTTRESS BIV 70-71 (FULL) & BII 70-71 (1st) Zone 2C 2D (AS HIGHLIGHTED) C32/40 62% OPC+30%FA - 220+/-20 P 28-29609 10
PASSED
176 C32/40 62% OPC+30%FA - 220+/-20 P 28-29617 6

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
177 KAIG3-RFI-SW-C-1458-00 Site Works 09/25/21 C16/20 SRC P 28-29625 8
Coat and 3rd Coat) for MH-D-01-A1, MH-D-01-A2, MH-D-01-A1-01, MH-D-01-B1, MH-D-01-B2 (As Highlighted
PASSED

178 C16/20 SRC P 28-29637 5

179 KAIG3-RFI-MC-S-5402-00 Crescent 09/25/21 Concreting for MCPE 3 Foundatiion Axis 02Q to 02R Zone 2E 2F C32/40 62% OPC+30%FA - 160+/-40 P 28-29666 12

180 C32/40 62% OPC+30%FA - 160+/-40 P 28-29665 12

181 C32/40 62% OPC+30%FA - 160+/-40 P 28-29662 9

182 C32/40 62% OPC+30%FA - 160+/-40 P 28-29661 10

183 C32/40 62% OPC+30%FA - 160+/-40 P 28-29660 12

184 C32/40 62% OPC+30%FA - 160+/-40 P 28-29659 12

185 C32/40 62% OPC+30%FA - 160+/-40 P 28-29656 12

186 C32/40 62% OPC+30%FA - 160+/-40 P 28-29655 12

187 C32/40 62% OPC+30%FA - 160+/-40 P 28-29654 9

188 C32/40 62% OPC+30%FA - 160+/-40 P 28-29652 12

189 C32/40 62% OPC+30%FA - 160+/-40 P 28-29651 12


PASSED
190 C32/40 62% OPC+30%FA - 160+/-40 P 28-29649 12

191 C32/40 62% OPC+30%FA - 160+/-40 P 28-29646 10

192 C32/40 62% OPC+30%FA - 160+/-40 P 28-29645 12

193 C32/40 62% OPC+30%FA - 160+/-40 P 28-29644 12

194 C32/40 62% OPC+30%FA - 160+/-40 P 28-29643 12

195 C32/40 62% OPC+30%FA - 160+/-40 P 28-29642 12

196 C32/40 62% OPC+30%FA - 160+/-40 P 28-29636 12

197 C32/40 62% OPC+30%FA - 160+/-40 P 28-29634 12

198 C32/40 62% OPC+30%FA - 160+/-40 P 28-29633 12

kaig-qcals 199
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI199
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-29632 QUANTITY
12
LOCATION CASTING No.
(m³)
200 C32/40 62% OPC+30%FA - 160+/-40 P 28-29631 12

201 KAIG3-RFI-DG-S-5390-00 Discovery Garden 09/25/21 Concrete Pouring & Shuttering of Wall for Plant room at Discovery Garden at highlighted area in attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-29664 10

202 C32/40 67%OPC+25%FA - 160+/-40 P 28-29663 9

203 C32/40 67%OPC+25%FA - 160+/-40 P 28-29658 12


PASSED
204 C32/40 67%OPC+25%FA - 160+/-40 P 28-29657 10

205 C32/40 67%OPC+25%FA - 160+/-40 P 28-29653 10

206 C32/40 67%OPC+25%FA - 160+/-40 P 28-29650 10

207 KAIG3-RFI-CO-S-5370-00 Crescent 09/26/21 Concreting for BUTTRESS BOV BOI 4, 5, 7 (1st) zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29669 12
PASSED
208 C32/40 62% OPC+30%FA - 220+/-20 P 28-29684 9

209 KAIG3-RFI-CO-S-5412-00 Crescent 09/26/21 Shuttering for Strip footing Between PC 118-120-122-124-126 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 28-29690 9

210 C32/40 62% OPC+30%FA - 160+/-40 P 28-29689 10


PASSED
211 C32/40 62% OPC+30%FA - 160+/-40 P 28-29688 11

212 C32/40 62% OPC+30%FA - 160+/-40 P 28-29678 12

213 KAIG3-RFI-SW-C-1510-00 Site Works 09/26/21 Inspection for Casting the Blinding Concrete under the SBC-05 (as Highlighted) C16/20 SRC P 28-29692 4 PASSED

214 KAIG3-RFI-CO-S-5422-00 Crescent 09/27/21 Concreting for mass concrete of strip footing between PC 134-136-138-140-142-144 Zone 1F 1G (as highlighted) C16/20 SRC P 28-29729 9

215 C16/20 SRC P 28-29728 9

216 C16/20 SRC P 28-29727 9

217 C16/20 SRC P 28-29725 12

218 C16/20 SRC P 28-29724 9

219 C16/20 SRC P 28-29723 12

220 C16/20 SRC P 28-29720 12

221 C16/20 SRC P 28-29719 9

222 C16/20 SRC P 28-29717 9

223 C16/20 SRC P 28-29716 12

224 C16/20 SRC P 28-29715 12 PASSED

225 C16/20 SRC P 28-29711 9

226 C16/20 SRC P 28-29710 12

227 C16/20 SRC P 28-29709 9

228 C16/20 SRC P 28-29708 12

kaig-qcals 200
PASSED

Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI229
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC P 28-29704 QUANTITY
12
LOCATION CASTING No.
(m³)

kaig-qcals 201
PASSED

Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI230
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC P 28-29703 QUANTITY
12
LOCATION CASTING No.
(m³)
231 C16/20 SRC P 28-29702 10

232 C16/20 SRC P 28-29701 10

233 C16/20 SRC P 28-29700 12

234 C16/20 SRC P 28-29699 12

Concrete Pouring & Shuttering for Footing of Straight Wall (left side) at entrance inside Maze Garden as per highlighted area in attached
235 KAIG3-RFI-ZG-S-5434-00 Maze Garden 09/28/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-299734 10
drawing.
PASSED
236 C32/40 62% OPC+30%FA - 160+/-40 P 28-29733 10

237 KAIG3-RFI-CO-S-5419-00 Crescent 09/28/21 Concreting for BUTTRESS BII 99 Zone 2K C32/40 62% OPC+30%FA - 220+/-20 P 28-29736 4
PASSED
238 C32/40 62% OPC+30%FA - 220+/-20 P 28-29735 7

239 KAIG3-RFI-DG-S-5431-00 Discovery Garden 09/28/21 Concrete pouring for Blinding under Manholes (6 no's) Inside Discovery Garden at highlighted area in attached Drawing's. C16/20 SRC P 28-29737 10 PASSED

240 KAIG3-RFI-CO-S-5427-00 Crescent 09/28/21 Concreting for Strip Footing between PC 170-172 Zone 2M C32/40 62% OPC+30%FA - 160+/-40 P 28-29741 12
PASSED
241 C32/40 62% OPC+30%FA - 160+/-40 P 28-29740 10

242 KAIG3-RFI-CO-S-5389-01 Crescent 09/29/21 Concreting for RINGBEAM for Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02AW (as Highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 28-29772 5

243 C32/40 62% OPC+30%FA - 220+/-20 P 28-29765 10

244 C32/40 62% OPC+30%FA - 220+/-20 P 28-29764 10

245 C32/40 62% OPC+30%FA - 220+/-20 P 28-29761 11

246 C32/40 62% OPC+30%FA - 220+/-20 P 28-29760 9


PASSED
247 C32/40 62% OPC+30%FA - 220+/-20 P 28-29757 11

248 C32/40 62% OPC+30%FA - 220+/-20 P 28-29755 11

249 C32/40 62% OPC+30%FA - 220+/-20 P 28-29754 11

250 C32/40 62% OPC+30%FA - 220+/-20 P 28-29751 11

251 C32/40 62% OPC+30%FA - 220+/-20 P 28-29749 9

252 KAIG3-RFI-CO-S-5464-00 Crescent 09/30/21 Concreting for BUTTRESS BIV 4, 5, 6, 7 Zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29800 9

253 C32/40 62% OPC+30%FA - 220+/-20 P 28-29799 11

254 C32/40 62% OPC+30%FA - 220+/-20 P 28-29798 12

255 C32/40 62% OPC+30%FA - 220+/-20 P 28-29797 12

256 C32/40 62% OPC+30%FA - 220+/-20 P 28-29795 10

257 C32/40 62% OPC+30%FA - 220+/-20 P 28-29793 10


PASSED
258 C32/40 62% OPC+30%FA - 220+/-20 P 28-29792 10

259 C32/40 62% OPC+30%FA - 220+/-20 P 28-29791 10

kaig-qcals 202
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023
PASSED

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI260
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-29790 QUANTITY
12
LOCATION CASTING No.
(m³)
261 C32/40 62% OPC+30%FA - 220+/-20 P 28-29788 12

262 C32/40 62% OPC+30%FA - 220+/-20 P 28-29787 12

263 C32/40 62% OPC+30%FA - 220+/-20 P 28-29786 10


Inspection for Casting the Blinding Concrete under the Gullies (G-H-01, G-H-02, G-H-03, G-H-04, G-H-05, G-H-06, G-H-07, G-H-08,
264 KAIG3-RFI-SW-C-1560-00 Site Works 09/30/21 G-H-09, G-H-10, G-H-11, G-H-12, G-H-13, G-H-14, G-H-15, G-H-16, G-H-17, G-H-18, G-H-19, G-H-20, G-H-21) AND Manhole C16/20 SRC P 28-29794 9
MH-H-01, PASSED
265 C16/20 SRC P 28-29789 8

Concrete Pouring for Encasement of Shot pieces of Manholes (type A 1 no. & B 3 nos.) (MH-D-03-02-01, MH-D-05-01-02, MH-D-05-
266 KAIG3-RFI-PG-S-5440-00 Physic Garden 09/30/21 C16/20 SRC P 28-29796 10 PASSED
02 & MH-D-05-04) inside Physic Garden as per highlighted area in attached drawing.

267 C16/20 SRC P 28-29479 10 PASSED

268 C16/20 SRC P 28-29462 10 PASSED

269 C32/40 62% OPC+30%FA - 220+/-20 P 28-29414 5 PASSED

270 C32/40 62% OPC+30%FA - 220+/-20 P 28-29417 5 PASSED

TOTAL QUANTITY TRUCK LOAD (M³): 2489

C05 OPC 0

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2489

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 203
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-CO-S-5447-01 Crescent 10/02/21 Concreting for Buttress BOI 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-29823 11

2 KAIG3-RFI-CO-S-5449-01 Crescent 10/02/21 Concreting for Buttress BOI 126 (2nd) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 28-29818 5

3 C32/40 62% OPC+30%FA - 220+/-20 P 28-29817 10 PASSED

4 C32/40 62% OPC+30%FA - 220+/-20 P 28-29808 11

5 C32/40 62% OPC+30%FA - 220+/-20 P 28-29805 11

Concrete Pouring & Shuttering for Walls of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as per highlighted area in
6 KAIG3-RFI-ZG-S-5460-00 Maze Garden 10/02/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-29816 5
attached drawing's.

7 C32/40 67%OPC+25%FA - 160+/-40 P 28-29814 8

8 C32/40 67%OPC+25%FA - 160+/-40 P 28-29813 9

9 C32/40 67%OPC+25%FA - 160+/-40 P 28-29812 10 PASSED

10 C32/40 67%OPC+25%FA - 160+/-40 P 28-29811 9

11 C32/40 67%OPC+25%FA - 160+/-40 P 28-29810 12

12 C32/40 67%OPC+25%FA - 160+/-40 P 28-29809 12

Concrete pouring & Shuttering for Ring Beam @ Grid (3-14/Left. Side) on Boundary wall at Aviary Garden, As per Highlighted in
13 KAIG3-RFI-AG-S-5473-00 Aviary Garden 10/02/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-29824 9
attached Drawing's.

14 C32/40 62% OPC+30%FA - 220+/-20 P 28-29822 12

15 C32/40 62% OPC+30%FA - 220+/-20 P 28-29821 9 PASSED

16 C32/40 62% OPC+30%FA - 220+/-20 P 28-29820 9

17 C32/40 62% OPC+30%FA - 220+/-20 P 28-29819 9

18 KAIG3-RFI-CO-S-5445-00 Crescent 10/02/21 Concreting for Strip Footing at Zone 2G Inner Between PC 134-136-138-140 C32/40 62% OPC+30%FA - 160+/-40 P 28-29826 12
PASSED
19 C32/40 62% OPC+30%FA - 160+/-40 P 28-29825 12

20 KAIG3-RFI-MC-S-5407-01 MCPE 10/03/21 Concreting for MCPE 2 Foundation at axis 02-AC to 03-K as highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-29847 11

21 C32/40 62% OPC+30%FA - 160+/-40 P 28-29845 9

22 C32/40 62% OPC+30%FA - 160+/-40 P 28-29843 9

23 C32/40 62% OPC+30%FA - 160+/-40 P 28-29839 12

24 C32/40 62% OPC+30%FA - 160+/-40 P 28-29838 12

25 C32/40 62% OPC+30%FA - 160+/-40 P 28-29837 12


PASSED
26 C32/40 62% OPC+30%FA - 160+/-40 P 28-29835 9

27 C32/40 62% OPC+30%FA - 160+/-40 P 28-29833 10

kaig-qcals 204
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023
PASSED

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI28
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-29832 QUANTITY
12
LOCATION CASTING No.
(m³)

29 C32/40 62% OPC+30%FA - 160+/-40 P 28-29830 12

30 C32/40 62% OPC+30%FA - 160+/-40 P 28-29829 12

31 C32/40 62% OPC+30%FA - 160+/-40 P 28-29828 12

Concrete pouring for Blinding under foundation at Grid (A/12-16) & (A-B/14) @ Butterfly Garden, at highlighted area in attached
32 KAIG3-RFI-TG-S-5468-00 Butterfly Garden 10/03/21 C16/20 SRC P 28-29859 10
drawings.

33 C16/20 SRC P 28-29858 9 PASSED

34 C16/20 SRC P 28-29857 11

35 KAIG3-RFI-CO-S-5462-00 Crescent 10/04/21 Concreting for BUTTRESS BOI 4, 5, 7 Zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29860 10 PASSED

36 KAIG3-RFI-CO-S-5478-00 Crescent 10/04/21 Concreting of strip footing (Plain Concrete) Between PC 83-85-87, 84-86-88 Zone 1P C16/20 SRC P 28-29875 12

37 C16/20 SRC P 28-29874 12


PASSED
38 C16/20 SRC P 28-29873 9

39 C16/20 SRC P 28-29872 12

40 KAIG3-RFI-PG-S-5486-00 Physic Garden 10/04/21 Concrete Pouring & Shuttering of Wall & Columns for Outer Canopy 1 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 220+/-20 P 28-29887 4

41 C32/40 62% OPC+30%FA - 220+/-20 P 28-29885 12

42 C32/40 62% OPC+30%FA - 220+/-20 P 28-29879 9


PASSED
43 C32/40 62% OPC+30%FA - 220+/-20 P 28-29878 12

44 C32/40 62% OPC+30%FA - 220+/-20 P 28-29877 12

45 C32/40 62% OPC+30%FA - 220+/-20 P 28-29876 12

46 KAIG3-RFI-CO-S-5481-00 Crescent 10/05/21 Concreting of strip footing (Plain Concrete) Between PC 37-39-41-43 Zone 1G C16/20 SRC P 28-29897 11

47 C16/20 SRC P 28-29896 11


PASSED
48 C16/20 SRC P 28-29895 11

49 C16/20 SRC P 28-29894 11

50 KAIG3-RFI-SW-C-1590-00 Site Works 10/05/21 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-05 C32/40 62% OPC+30%FA - 160+/-40 P 28-29901 11 PASSED

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
51 KAIG3-RFI-SW-C-1677-00 Site Works 10/05/21 C16/20 SRC P 28-29906 7 PASSED
Coat and 3rd Coat) for MH-A-01, MH-A-02, MH-A-03, MH-A-10, MH-A-11, MH-A-12 (As Highlighted)

52 KAIG3-RFI-CO-S-5475-00 Crescent 10/06/21 Concreting for BUTTRESS BII 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-29932 12

53 KAIG3-RFI-CO-S-5449-01 Crescent 10/06/21 Concreting for Buttress BOI 126 (2nd) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 28-29923 12
PASSED
54 C32/40 62% OPC+30%FA - 220+/-20 P 28-29913 11

55 C32/40 62% OPC+30%FA - 220+/-20 P 28-29909 11

kaig-qcals 205
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Concrete Pouring & Shuttering for Kicker (2nd Lift) of 2 Walls (Curved) along the Boundary wall at Entrance, inside Maze garden, as DELIVERY NOTE
SI56
No. RFI NUMBER
KAIG3-RFI-ZG-S-5492-01 Maze Garden 10/07/21 DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-29938 QUANTITY
9
LOCATION CASTING per highlighted area in attached drawing's. No.
(m³)
PASSED
57 C32/40 62% OPC+30%FA - 160+/-40 P 28-29937 11

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
58 KAIG3-RFI-SW-C-1677-00 Site Works 10/07/21 C16/20 SRC P 28-29952 10 PASSED
Coat and 3rd Coat) for MH-A-01, MH-A-02, MH-A-03, MH-A-10, MH-A-11, MH-A-12 (As Highlighted)

Casting Blinding Concret under Manhole MH-F-01, MH-F-02, MH-F-03, MH-F-04 and Gullies G-F-01, G-F-02, G-F-03, G-F-04, G-F-
59 KAIG3-RFI-SW-C-1661-00 Site Works 10/09/21
05, G-F-06, G-F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14 as highlighted

Casting Blinding Concret under Manhole MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4 and Gullies G-F-01, G-F-02, G- C16/20 SRC P 28-29960 7 PASSED
60 KAIG3-RFI-SW-C-1634-00 Site Works 10/09/21 F-03, G-F-04, G-F-05, G-F-06, G-F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14, G-F-15, G-F-16, G-F-17, G-F-18,
G-F-19 to G-H-41 as highlighted.

61 KAIG3-RFI-CO-S-5503-01 Crescent 10/09/21 Concreting for INFILL WALL Between Buttress outer 114-115 Axis 02-2, 02AR to 02AS Zone 2N C32/40 62% OPC+30%FA - 220+/-20 P 28-29996 4

62 C32/40 62% OPC+30%FA - 220+/-20 P 28-29991 12

63 C32/40 62% OPC+30%FA - 220+/-20 P 28-29990 12

64 C32/40 62% OPC+30%FA - 220+/-20 P 28-29985 12

65 C32/40 62% OPC+30%FA - 220+/-20 P 28-29984 11

66 C32/40 62% OPC+30%FA - 220+/-20 P 28-29981 12

67 C32/40 62% OPC+30%FA - 220+/-20 P 28-29980 12

68 C32/40 62% OPC+30%FA - 220+/-20 P 28-29977 12


PASSED
69 C32/40 62% OPC+30%FA - 220+/-20 P 28-29975 12

70 C32/40 62% OPC+30%FA - 220+/-20 P 28-29974 12

C32/40 62% OPC+30%FA - 220+/-20 P 28-29970 11

C32/40 62% OPC+30%FA - 220+/-20 P 28-29969 11

71 C32/40 62% OPC+30%FA - 220+/-20 P 28-29964 11

C32/40 62% OPC+30%FA - 220+/-20 P 28-29963 11

72 C32/40 62% OPC+30%FA - 220+/-20 P 28-29962 11

73 C32/40 62% OPC+30%FA - 220+/-20 P 28-29961 11

Concrete pouring for Encasement of Pipes for Manholes (4 no's) (MH-D-09-01, MH-D-09-02, MH-D-09-03 & MH-D-10) (Type A-1
74 KAIG3-RFI-DG-S-5511-00 Discovery Garden 10/09/21 C16/20 SRC P 28-29976 12 PASSED
no's, B-3 no's) Inside Discovery Garden at highlighted area in attached Drawing's.

75 KAIG3-RFI-CO-S-5520-00 Crescent 10/10/21 Concreting for Ring Beam @ Zone 2P (outer) Between Axis 02-2, 02AT to 02AW C32/40 62% OPC+30%FA - 220+/-20 P 28-30026 8

76 C32/40 62% OPC+30%FA - 220+/-20 P 28-30024 12

77 C32/40 62% OPC+30%FA - 220+/-20 P 28-30023 12

78 C32/40 62% OPC+30%FA - 220+/-20 P 28-30022 9

79 C32/40 62% OPC+30%FA - 220+/-20 P 28-30019 12

kaig-qcals
PASSED 206
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI80
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-30018 QUANTITY
12
LOCATION CASTING No.
(m³)
PASSED
81 C32/40 62% OPC+30%FA - 220+/-20 P 28-30017 10

82 C32/40 62% OPC+30%FA - 220+/-20 P 28-30016 12

83 C32/40 62% OPC+30%FA - 220+/-20 P 28-30010 9

84 C32/40 62% OPC+30%FA - 220+/-20 P 28-30008 12

85 C32/40 62% OPC+30%FA - 220+/-20 P 28-30007 10

86 C32/40 62% OPC+30%FA - 220+/-20 P 28-29997 10

Surface Preparation prior to Waterproofing for Foundation of remaining Boundary Wall (Outer Side & Both End Sides) at Discovery
87 KAIG3-RFI-DG-S-5323-00 Discovery Garden 10/10/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-30015 12 PASSED
Garden at highlighted area in attached drawings.

KAIG3-RFI-SW-C-1654-01 Site Works 10/11/21 Inspection of Concrete Pouring for Walls and Top Slab of SBC-09 As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-30035 5

C32/40 62% OPC+30%FA - 160+/-40 P 28-30032 10

C32/40 62% OPC+30%FA - 160+/-40 P 28-30030 10 PASSED

C32/40 62% OPC+30%FA - 160+/-40 P 28-30029 10

C32/40 62% OPC+30%FA - 160+/-40 P 28-30028 10

88 KAIG3-RFI-CO-S-5518-00 Crescent 10/11/21 Concreting of Plain Concrete for Strip footing in Zone 1P Between PC 83-85, 87-89 (as highlighted) C16/20 SRC P 28-30036 7

89 C16/20 SRC P 28-30034 12 PASSED

90 C16/20 SRC P 28-30033 12

Concrete Pouring & shuttering for Slab & Beam of Whispering Cave 1, @ Sound & Light Garden, At highlighted area in attached
91 KAIG3-RFI-SG-S-5537-00 Sound & Light Garden 10/11/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-30046 5
Drawing's

92 C32/40 67%OPC+25%FA - 160+/-40 P 28-30045 9 PASSED

93 C32/40 67%OPC+25%FA - 160+/-40 P 28-30043 7

94 KAIG3-RFI-CO-S-5536-00 Crescent 10/11/21 Concrerting for BUTTRESS BII 4 & 5 Zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-30047 6
PASSED
95 KAIG3-RFI-CO-S-5528-00 Crescent 10/11/21 Concreting for BUTTRESS BII 6 Zone 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-20044 12

96 KAIG3-RFI-CO-S-5543-00 Crescent 10/12/21 Concreting for BUTTRESS BOV 97, 98 & BIV 100 Zone 2J 2K C32/40 62% OPC+30%FA - 220+/-20 P 28-30057 8
PASSED
97 C32/40 62% OPC+30%FA - 220+/-20 P 28-30051 10

Casting Blinding Concret under Manhole MH-F-01, MH-F-02, MH-F-03, MH-F-04 and Gullies G-F-01, G-F-02, G-F-03, G-F-04, G-F-
98 KAIG3-RFI-SW-C-1661-00 Site Works 10/12/21 C16/20 SRC P 28-30052 4 PASSED
05, G-F-06, G-F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14 as highlighted

Concrete pouring & Shuttering for Ring Beam @ Grid (17-23/Right Side upto B.O.H) on Boundary wall at Aviary Garden, As per
99 KAIG3-RFI-AG-S-5539-00 Aviary Garden 10/12/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-30065 9
Highlighted in attached Drawing's.

100 C32/40 62% OPC+30%FA - 220+/-20 P 28-30062 12


PASSED
101 C32/40 62% OPC+30%FA - 220+/-20 P 28-30058 12

102 C32/40 62% OPC+30%FA - 220+/-20 P 28-30056 12

103 KAIG3-RFI-CO-S-5534-01 Crescent 10/13/21 Concreting for BUTTRESS BOI BOV 18 (1ST) Zone 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-30095 5

104 C32/40 62% OPC+30%FA - 220+/-20 P 28-30092 12

kaig-qcals 207

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI105
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-30086 QUANTITY
10
LOCATION CASTING No.
(m³)
106 C32/40 62% OPC+30%FA - 220+/-20 P 28-30081 9 PASSED

107 C32/40 62% OPC+30%FA - 220+/-20 P 28-30080 12

108 C32/40 62% OPC+30%FA - 220+/-20 P 28-30079 12

109 C32/40 62% OPC+30%FA - 220+/-20 P 28-30078 12

110 KAIG3-RFI-CO-S-5550-00 13-Oct Crescent Geotextile and 30mm screed under Strip footing between PC 34-36-38-40-42-44 Zone 1F 1G C16/20 SRC P 28-30097 5

111 C16/20 SRC P 28-30096 12

112 C16/20 SRC P 28-30091 12

113 C16/20 SRC P 28-30090 12 PASSED

114 C16/20 SRC P 28-30089 12

115 C16/20 SRC P 28-30088 12

116 C16/20 SRC P 28-30087 12

Sleeve Installation & Concrete Pouring for Encasement of Sleeve Pipes (2 no's of 200mm Dia.) for Water Feature, beside Plant Room,
117 KAIG3-RFI-AG-S-5584-00 Aviary Garden 10/14/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-30132 9
Passing under the Boundary wall of Aviary garden, At Highlighted area in the attached drawing's.

118 KAIG3-RFI-DG-S-5554-00 Sound & Light Garden 10/14/21 Concrete pouring & Shuttering for Slab & Beams of Plant Room at Discovery Garden at highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-30115 12
PASSED
Concrete Pouring & Shuttering for Walls of 2 (Curved) walls along the Boundary wall at Entrance, inside Maze garden, as per
119 KAIG3-RFI-ZG-S-5560-00 Maze Garden 10/14/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-30114 12
highlighted area in attached drawing's.

120 C32/40 67%OPC+25%FA - 160+/-40 P 28-30107 10

Concrete Pouring & Shuttering for Kicker (2nd Lift) of Straight Wall (Right Side) at Entrance, inside Maze garden, as per highlighted
121 KAIG3-RFI-ZG-S-5561-00 Water Play Garden 10/14/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-30118 7
area in attached drawing's.
PASSED
122 C32/40 62% OPC+30%FA - 160+/-40 P 28-30117 8

123 KAIG3-RFI-SW-C-1587-01 Site Works 10/16/21 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06 C32/40 62% OPC+30%FA - 160+/-40 P 28-30149 3

124 C32/40 62% OPC+30%FA - 160+/-40 P 28-30148 5

125 C32/40 62% OPC+30%FA - 160+/-40 P 28-30144 11 PASSED

126 C32/40 62% OPC+30%FA - 160+/-40 P 28-30143 11

127 C32/40 62% OPC+30%FA - 160+/-40 P 28-30142 11

Water Play/Geyser Concrete pouring for Blinding of Manholes (10 no's: MH-C-1, MH-C-4, MH-C-5, MH-C-6, MH-C-7, MH-C-1-1, MH-C-1-2, MH-C-1-
128 KAIG3-RFI-WG-S-5571-00 10/16/21 C16/20 SRC P 28-30156 10
Garden 3, MH-C-1-4 & MH-C-3-1), at Geyser Garden, Inside Water Garden, at highlighted area in attached drawings.

PASSED
129 C16/20 SRC P 28-30153 10

130 C16/20 SRC P 28-30147 10

131 KAIG3-RFI-CO-S-5570-00 Crescent 10/16/21 Concreting for BUTTRESS BOI 69 (1st) Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-30155 5
PASSED
132 C32/40 62% OPC+30%FA - 220+/-20 P 28-30150 5

133 KAIG3-RFI-CO-S-5577-00 Crescent 10/18/21 Concreting for BUTTRESS BOV 11, BIV 11 & 10 Zone 1C C32/40 62% OPC+30%FA - 220+/-20 P 28-30193 11

134 C32/40 62% OPC+30%FA - 220+/-20 P 28-30191 10

135 C32/40 62% OPC+30%FA - 220+/-20 P 28-30188 11 PASSED

kaig-qcals 208
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


PASSED
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI136
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-30185 QUANTITY
11
LOCATION CASTING No.
(m³)
137 C32/40 62% OPC+30%FA - 220+/-20 P 28-30184 9

138 KAIG3-RFI-CO-S-5532-01 Crescent 10/19/21 Concreting for BUTTRESS BIV 18 (2ND) Zone 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-30226 4

139 C32/40 62% OPC+30%FA - 220+/-20 P 28-30218 7 PASSED

140 C32/40 62% OPC+30%FA - 220+/-20 P 28-30205 12

141 KAIG3-RFI-CO-S-5573-00 Crescent 10/20/21 Concreting for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 28-30262 12

142 C32/40 62% OPC+30%FA - 220+/-20 P 28-30253 12

143 C32/40 62% OPC+30%FA - 220+/-20 P 28-30246 11 PASSED

144 C32/40 62% OPC+30%FA - 220+/-20 P 28-30245 11

145 C32/40 62% OPC+30%FA - 220+/-20 P 28-30244 11

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
146 KAIG3-RFI-SW-C-1788-00 Site Works 10/20/21 C16/20 SRC P 28-30249 9
Coat and 3rd Coat) for MH-H-01, MH-H-02, MH-H-03 (As Highlighted)
PASSED

147 C16/20 SRC P 28-30248 9

148 KAIG3-RFI-TG-S-5592-00 Butterfly Garden 10/20/21 Concrete pouring & Shuttering for Footing at Grid (2-20/B) Inside Butterfly Garden, as highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-30270 10

149 C32/40 62% OPC+30%FA - 160+/-40 P 28-30269 12

150 C32/40 62% OPC+30%FA - 160+/-40 P 28-30266 12

151 C32/40 62% OPC+30%FA - 160+/-40 P 28-30265 12

152 C32/40 62% OPC+30%FA - 160+/-40 P 28-30264 9 PASSED

153 C32/40 62% OPC+30%FA - 160+/-40 P 28-30263 12

154 C32/40 62% OPC+30%FA - 160+/-40 P 28-30261 12

155 C32/40 62% OPC+30%FA - 160+/-40 P 28-30260 9

156 C32/40 62% OPC+30%FA - 160+/-40 P 28-30258 12

157 KAIG3-RFI-CO-S-5594-00 Crescent 10/21/21 Concreting for BUTTRESS BOV BIV 01 Zone 1A C32/40 62% OPC+30%FA - 220+/-20 P 28-30310 4

158 KAIG3-RFI-CO-S-5581-00 Crescent 10/21/21 Concreting for BUTTRESS BII 4, 5, 6 (2ND) Zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-30307 11

159 C32/40 62% OPC+30%FA - 220+/-20 P 28-30299 12


PASSED
160 C32/40 62% OPC+30%FA - 220+/-20 P 28-30289 9

161 C32/40 62% OPC+30%FA - 220+/-20 P 28-30288 12

Concrete pouring for Blinding of Manholes (6 no's: MH-C-2, MH-C-3, MH-C-8, MH-C-4-1, MH-C-4-2 & MH-C-4-3), Inside Water
162 KAIG3-RFI-WG-S-5626-00 Water Play Garden 10/21/21 C16/20 SRC P 28-30301 10 PASSED
Garden, at highlighted area in attached drawings.

163 KAIG3-RFI-MC-S-5613-01 MCPE 2 10/23/21 Concreting of MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H C32/40 62% OPC+30%FA - 160+/-40 P 28-30347 8

164 C32/40 62% OPC+30%FA - 160+/-40 P 28-30341 10

165 C32/40 62% OPC+30%FA - 160+/-40 P 28-30339 12

kaig-qcals 209

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI166
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-30338 QUANTITY
12
LOCATION CASTING No.
(m³)

PASSED

kaig-qcals 210
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI167
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-30337 QUANTITY
12
LOCATION CASTING No.
(m³)
168 C32/40 62% OPC+30%FA - 160+/-40 P 28-30335 12
PASSED
169 C32/40 62% OPC+30%FA - 160+/-40 P 28-30332 12

170 C32/40 62% OPC+30%FA - 160+/-40 P 28-30331 10

171 C32/40 62% OPC+30%FA - 160+/-40 P 28-30329 12

172 C32/40 62% OPC+30%FA - 160+/-40 P 28-30326 12

173 C32/40 62% OPC+30%FA - 160+/-40 P 28-30325 9

174 C32/40 62% OPC+30%FA - 160+/-40 P 28-30323 12

175 KAIG3-RFI-CO-S-5590-00 Crescent 10/24/21 Concreting for BUTTRESS BOI 97, 98 Zone 2J 2K C32/40 62% OPC+30%FA - 220+/-20 P 28-30375 12

176 C32/40 62% OPC+30%FA - 220+/-20 P 28-30374 10


PASSED
177 C32/40 62% OPC+30%FA - 220+/-20 P 28-30366 5

178 C32/40 62% OPC+30%FA - 220+/-20 P 28-30364 7

179 KAIG3-RFI-CO-S-5605-01 Crescent 10/24/21 Concreting for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30373 9

180 C32/40 62% OPC+30%FA - 160+/-40 P 28-30372 12 PASSED

181 C32/40 62% OPC+30%FA - 160+/-40 P 28-30371 12

182 KAIG3-RFI-SW-C-1715-01 Site Works 10/24/21 Inspection of Concrete Pouring for Walls and Top Slab of SBC-05 As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-30382 10

183 C32/40 62% OPC+30%FA - 160+/-40 P 28-30381 10


PASSED
184 C32/40 62% OPC+30%FA - 160+/-40 P 28-30378 10

185 C32/40 62% OPC+30%FA - 160+/-40 P 28-30377 10

186 KAIG3-RFI-CO-S-5621-00 Crescent 10/24/21 Concreting for 1st layer mass concrete of Strip footing between PC 146-148-150 Zone 2J (as highlighted) C16/20 SRC P 28-30383 8
PASSED
187 C16/20 SRC P 28-30379 12

188 KAIG3-RFI-MC-S-5627-00 MCPE 2 10/25/21 Steel Reinforcement of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G C32/40 62% OPC+30%FA - 220+/-20 P 28-30423 12

189 C32/40 62% OPC+30%FA - 220+/-20 P 28-30415 12

190 C32/40 62% OPC+30%FA - 220+/-20 P 28-30405 12 PASSED

191 C32/40 62% OPC+30%FA - 220+/-20 P 28-30397 12

192 C32/40 62% OPC+30%FA - 220+/-20 P 28-30394 12

193 KAIG3-RFI-MC-S-5629-00 MCPE 2 10/25/21 Concreting of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G C32/40 62% OPC+30%FA - 160+/-40 P 28-30414 12

194 C32/40 62% OPC+30%FA - 160+/-40 P 28-30410 10

195 C32/40 62% OPC+30%FA - 160+/-40 P 28-30408 12

196 C32/40 62% OPC+30%FA - 160+/-40 P 28-30407 12

197 C32/40 62% OPC+30%FA - 160+/-40 P 28-30406 12

198 C32/40 62% OPC+30%FA - 160+/-40 P 28-30404 12


PASSED
kaig-qcals 211
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD / PASSED
BUILDING/ DATE OF DELIVERY NOTE
SI199
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-30402 QUANTITY
12
LOCATION CASTING No.
(m³)
200 C32/40 62% OPC+30%FA - 160+/-40 P 28-30400 12

201 C32/40 62% OPC+30%FA - 160+/-40 P 28-30399 12

202 C32/40 62% OPC+30%FA - 160+/-40 P 28-30395 12

203 C32/40 62% OPC+30%FA - 160+/-40 P 28-30393 12

204 C32/40 62% OPC+30%FA - 160+/-40 P 28-30392 12

205 KAIG3-RFI-MC-S-5629-00 MCPE 2 10/25/21 Concreting of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G C32/40 62% OPC+30%FA - 160+/-40 P 28-30424 12 PASSED

206 KAIG3-RFI-CO-S-5647-00 Crescent 10/27/21 Concreting for BUTTRESS BOI 70 & 71 (1st) Zone 2C 2D C32/40 62% OPC+30%FA - 220+/-20 P 28-30507 8

207 C32/40 62% OPC+30%FA - 220+/-20 P 28-30503 8


PASSED
208 C32/40 62% OPC+30%FA - 220+/-20 P 28-30487 5

209 C32/40 62% OPC+30%FA - 220+/-20 P 28-30482 5

Concrete pouring for Encasement of Pipes for Manholes (14 no's: MH-C-1, MH-C-2, MH-C-3, MH-C-4, MH-C-5, MH-C-6, MH-C-8,
210 KAIG3-RFI-WG-S-5658-00 Water Play Garden 10/27/21 MH-C-1-1, MH-C-1-2, MH-C-1-3, MH-C-1-4, MH-C-4-1, MH-C-4-2 & MH-C-4-3), Inside Water Garden, at highlighted area in C16/20 SRC P 28-30508 10
attached drawings. PASSED

211 C16/20 SRC P 28-30504 10

212 KAIG3-RFI-SW-C-1812-00 Site Works 10/28/21 Inspection for Casting the Blinding Concrete under the SBC-06 (as Highlighted) C16/20 SRC P 28-30522 9
PASSED
213 C16/20 SRC P 28-30519 10

Concrete pouring for Encasement of Pipes for Manholes (14 no's: MH-C-1, MH-C-2, MH-C-3, MH-C-4, MH-C-5, MH-C-6, MH-C-8,
214 KAIG3-RFI-WG-S-5658-00 Water Play Garden 10/28/21 MH-C-1-1, MH-C-1-2, MH-C-1-3, MH-C-1-4, MH-C-4-1, MH-C-4-2 & MH-C-4-3), Inside Water Garden, at highlighted area in C16/20 SRC P 28-30533 3
attached drawings. PASSED

215 C16/20 SRC P 28-30527 10

216 KAIG3-RFI-CO-S-5656-00 Crescent 10/28/21 Concreting for BUTTRESS BOI 69 (2nd) Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-30535 10
PASSED
217 C32/40 62% OPC+30%FA - 220+/-20 P 28-30531 5

218 KAIG3-RFI-CO-S-5651-00 Crescent 10/30/21 Concreting for BUTTRESS BII 18, 19 (2ND) Zone 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-30555 5

219 C32/40 62% OPC+30%FA - 220+/-20 P 28-30552 10 PASSED

220 C32/40 62% OPC+30%FA - 220+/-20 P 28-30550 10

221 KAIG3-RFI-CO-S-5694-00 Crescent 10/31/21 Concreting for Plain Concrete of Strip footing between PC 193-195 Zone 2R C16/20 SRC P 28-30562 9 PASSED

Concrete Pouring & Shuttering for Footing at Grid (1-2 & 20-21/A-B), (2-6/A) & (12-20/A) Inside Butterfly Garden, as highlighted area
222 KAIG3-RFI-TG-S-5685-00 Butterfly Garden 10/31/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-30595 4
in attached drawings.

223 C32/40 62% OPC+30%FA - 160+/-40 P 28-30594 9

224 C32/40 62% OPC+30%FA - 160+/-40 P 28-30593 12

225 C32/40 62% OPC+30%FA - 160+/-40 P 28-30591 12

226 C32/40 62% OPC+30%FA - 160+/-40 P 28-30590 12

227 C32/40 62% OPC+30%FA - 160+/-40 P 28-300589 12

228 C32/40 62% OPC+30%FA - 160+/-40 P 28-30587 12

kaig-qcals 212

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI229
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-30586 QUANTITY
12
LOCATION CASTING No.
(m³)

PASSED

kaig-qcals 213
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI230
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-30585 QUANTITY
9
LOCATION CASTING No.
(m³)
PASSED
231 C32/40 62% OPC+30%FA - 160+/-40 P 28-30584 12

232 C32/40 62% OPC+30%FA - 160+/-40 P 28-30582 12

233 C32/40 62% OPC+30%FA - 160+/-40 P 28-30580 12

234 C32/40 62% OPC+30%FA - 160+/-40 P 28-30578 12

235 C32/40 62% OPC+30%FA - 160+/-40 P 28-30576 12

236 C32/40 62% OPC+30%FA - 160+/-40 P 28-30573 12

237 C32/40 62% OPC+30%FA - 160+/-40 P 28-30572 12

238 C32/40 62% OPC+30%FA - 160+/-40 P 29-19398 12

239 C32/40 62% OPC+30%FA - 160+/-40 P 29-19397 12

240 KAIG3-RFI-CO-S-5665-01 Crescent 10/31/21 Concreting for BUTTRESS BII 07 (1st) Zone 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-30588 8
PASSED
241 C32/40 62% OPC+30%FA - 220+/-20 P 28-30577 12

242 KAIG3-RFI-SW-C-1866-00 Site Works 10/31/21 Inspection for Blinding Concrete under Transition Area (As Highlighted) C16/20 SRC P 28-30581 6 PASSED

243 NO RFI C32/40 67%OPC+25%FA - 160+/-40 P 28-30524 5 PASSED

TOTAL QUANTITY TRUCK LOAD (M³): 2549

C05 OPC 44

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2593

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 214
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-SW-C-1920-00 Site Works 11/01/21 Inspection for Casting Blinding Concret under Manhole MH-K-01, MH-K-02 - as highlighted C16/20 SRC P 28-30605 7
PASSED
2 KAIG3-RFI-SW-C-1906-00 Site Works 11/01/21 Inspection for Casting Blinding Concret under Manhole MH-K-03, MH-K-04, MH-K-05, MH-K-06, MH-K-07 - as highlighted C16/20 SRC P 28-30598 10

3 KAIG3-RFI-CO-S-5698-00 Crescent 11/01/21 Concreting for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30616 12

4 C32/40 62% OPC+30%FA - 160+/-40 P 28-30614 12


PASSED
5 C32/40 62% OPC+30%FA - 160+/-40 P 28-30609 12

6 C32/40 62% OPC+30%FA - 160+/-40 P 28-30607 12

Concrete pouring for Blinding of Manholes (6 no's: MH-C-2, MH-C-3, MH-C-8, MH-C-4-1, MH-C-4-2 & MH-C-4-3), Inside Water
7 KAIG3-RFI-WG-S-5626-00 Water Play Garden 11/01/21 C16/20 SRC P 28-30613 9 PASSED
Garden, at highlighted area in attached drawings.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
8 KAIG3-RFI-CO-S-5698-00 Crescent 11/01/21 Concreting for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N (as Highlighted) P 28-30620 12 PASSED
SCREED

9 KAIG3-RFI-MC-S-5610-01 MCPE 3 11/02/21 Concreting of MCPE 3 Wall at Axis 02R to 02Q (as highlighted) Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 28-30658 12

10 C32/40 62% OPC+30%FA - 160+/-40 P 28-30655 12

11 C32/40 62% OPC+30%FA - 160+/-40 P 28-30648 10

12 C32/40 62% OPC+30%FA - 160+/-40 P 28-30645 10 PASSED

13 C32/40 62% OPC+30%FA - 160+/-40 P 28-30639 10

14 C32/40 62% OPC+30%FA - 160+/-40 P 28-30634 12

15 C32/40 62% OPC+30%FA - 160+/-40 P 28-30626 12

Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-12, FW-A-3-13, FW-A-3-14, FW-A-3-15, FW-A-3-16, FW-A-
16 KAIG3-RFI-SW-C-1924-00 Site Works 11/03/21 C16/20 SRC P 28-30680 6
3-17 (as Highlighted)
PASSED
17 KAIG3-RFI-SW-C-1905-00 Site Works 11/03/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-3-11 (as Highlighted C16/20 SRC P 28-30671 10

18 KAIG3-RFI-SW-C-1972-00 Site Works 11/03/21 Inspection of Concrete Pouring for Walls and Top Slab of SBC-08 As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-30694 12

19 C32/40 62% OPC+30%FA - 160+/-40 P 28-30693 12 PASSED

20 C32/40 62% OPC+30%FA - 160+/-40 P 28-30692 12

Concrete pouring & Shuttering for Kicker of Circular Walls (10) (Remaining part at Entrance wall) Half Part 2, inside Maze garden, as
21 KAIG3-RFI-ZG-S-5726-00 Crescent 11/04/21
per highlighted area in attached drawing's.
C32/40 62% OPC+30%FA - 160+/-40 P 28-30715 7 PASSED
Concrete pouring & Shuttering for Kicker (1st Lift) of Straight Wall (Left Side) at Entrance, inside Maze garden, as per highlighted area
22 KAIG3-RFI-ZG-S-5684-00 Maze Garden 11/04/21
in attached drawing's.
Concrete Pouring & Shuttering for Wall of Straight Wall (Right Side) at Entrance, inside Maze garden, as per highlighted area in attached
23 KAIG3-RFI-ZG-S-5678-00 Maze Garden 11/04/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-30722 5
drawing's.
PASSED
24 C32/40 67%OPC+25%FA - 160+/-40 P 28-30719 12

Concrete pouring for Pipe Encasement of Manholes (Type 'A' 3 No's, 'B' 1 no's & 'C' 1 no's)(MH-D-03-02-02, MH-D-03-02-03, MH-D-
25 KAIG3-RFI-PG-S-5750-00 Physic Garden 11/04/21 C16/20 SRC P 29-19399 5 PASSED
05-01, MH-D-05-01-01 & MH-D-05-05) Inside Physic garden, as per highlighted area in attached drawing's.

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


26 KAIG3-RFI-CO-S-5733-00 Crescent 11/06/21 Concreting for BUTTRESS BOV 93, 94, 95, 96 Zone 2J P 29-19411 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
27 KAIG3-RFI-CO-S-5696-00 Crescent 11/06/21 Concreting for BUTTRESS BOI 70, 71 (2nd) Zone 2C 2D P 28-30758 6
SCREED

PASSED

kaig-qcals 215
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI28
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - P 28-30756 QUANTITY
5 PASSED
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
29 P 28-30749 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
30 P 28-30742 10
SCREED

31 KAIG3-RFI-CO-S-5674-00 Crescent 11/06/21 Concreting for Strip footing Between PC 32-34-36-38 Zone 1F C32/40 62% OPC+30%FA - 160+/-40 P 28-30744 12

32 C32/40 62% OPC+30%FA - 160+/-40 P 28-30745 12


PASSED
33 C32/40 62% OPC+30%FA - 160+/-40 P 28-30746 12

34 C32/40 62% OPC+30%FA - 160+/-40 P 28-30752 4

35 KAIG3-RFI-SW-C-1927-00 Site Works 11/07/21 Inspection of Concrete Pouring for Walls and Top Slab of SBC-06 As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-30788 7

36 C32/40 62% OPC+30%FA - 160+/-40 P 28-30787 12

37 C32/40 62% OPC+30%FA - 160+/-40 P 28-30785 12 PASSED

38 C32/40 62% OPC+30%FA - 160+/-40 P 28-30780 12

39 C32/40 62% OPC+30%FA - 160+/-40 P 28-30778 12

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


40 KAIG3-RFI-CO-S-5670-00 Crescent 11/07/21 Concreting for BUTTRESS BII 100, 101, 102 Zone 2K 2L P 29-19424 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
41 P 29-19420 8 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
42 P 29-19415 8
SCREED

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
43 KAIG3-RFI-SW-C-1907-00 Site Works 11/07/21 Coat and 3rd Coat) for MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4, MH-F-02, MH-F-03, MH-F-04 (as highlighted C16/20 SRC P 28-30792 10 PASSED
area).

44 KAIG3-RFI-CO-S-5718-00 Crescent 11/07/21 Concreting for Mass Concrete at Zone 2J between PC 146-148, 150-152 (2nd Layer) C16/20 SRC P 28-30800 5
PASSED
45 C16/20 SRC P 28-30799 12

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


46 KAIG3-RFI-CO-S-5602-00 Crescent 11/08/21 Concreting for Zone 2M Outer Ring Beam axis 02-2, 02AL to 02AP (as highlighted) P 29-19437 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
47 P 28-30809 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
48 P 29-19436 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
49 P 28-30808 12
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


50 P 29-19435 12
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


51 P 29-19434 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - PASSED
52 P 28-30806 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
53 P 29-19433 9
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
54 P 29-19432 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
55 P 29-19431 12
SCREED

kaig-qcals 216
PASSED

Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI56
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - P 29-19430 QUANTITY
12
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
57 P 29-19429 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
58 P 28-30804 12
SCREED

59 KAIG3-RFI-MC-S-5753-00 MCPE 1 11/08/21 Concreting for MCPE 1 Outer Wall at Axis 03T to 03S (as Highlighted) Zone 2N 2M C32/40 62% OPC+30%FA - 160+/-40 P 28-30818 9

60 C32/40 62% OPC+30%FA - 160+/-40 P 28-30817 9 PASSED

61 C32/40 62% OPC+30%FA - 160+/-40 P 28-30816 9

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


62 KAIG3-RFI-CO-S-5743-00 Crescent 11/09/21 Concreting for BUTTRESS BOI BII 01 Zone 1A P 28-30849 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
63 KAIG3-RFI-CO-S-5623-01 Crescent 11/09/21 Concreting for BUTTRESS BOI 68 (1st) Zone 2C P 28-30839 8
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
64 P 28-30831 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65 P 28-30826 8
SCREED

66 KAIG3-RFI-SW-C-2028-00 Site Works 11/09/21 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30840 8

67 C32/40 62% OPC+30%FA - 160+/-40 P 28-30835 10

68 C32/40 62% OPC+30%FA - 160+/-40 P 28-30834 10 PASSED

69 C32/40 62% OPC+30%FA - 160+/-40 P 28-30833 10

70 C32/40 62% OPC+30%FA - 160+/-40 P 28-30832 10

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
71 KAIG3-RFI-SW-C-1907-00 Site Works 11/09/21 Coat and 3rd Coat) for MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4, MH-F-02, MH-F-03, MH-F-04 (as highlighted C16/20 SRC P 28-30846 5 PASSED
area).

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


72 KAIG3-RFI-CO-S-5710-01 Crescent 11/10/21 Concreting for BUTTRESS BOI 8, 9 Zone 1B 1C P 28-30873 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
73 P 28-30867 10
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
74 P 28-30866 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
75 P 28-30875 2
SCREED

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
76 KAIG3-RFI-SW-C-2148-00 Site Works 11/13/21 C16/20 SRC P 28-30946 10 PASSED
Coat and 3rd Coat) for MH-K-04, MH-K-05, MH-K-06 (As Highlighted)

Concrete pouring & Shuttering for Kicker (2nd Lift) of Straight Wall (Left Side) at Entrance, inside Maze garden, as per highlighted area
77 KAIG3-RFI-ZG-S-5793-00 Maze Garden 11/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19530 12
in attached drawing's.
Concrete Pouring & Shuttering of Footings of Boundary wall @ Grid (11-16/Right Side), Behind Plant room, of Aviary garden, At
78 KAIG3-RFI-AG-S-5794-00 Aviary Garden 11/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19529 12
Highlighted area in the attached drawing's.
PASSED
Concrete pouring for Blinding of Manhole (01 no's) (MH-D-04-01) at Entrance of Physic garden, as per highlighted area in attached
79 KAIG3-RFI-PG-S-5792-00 Physic Garden 11/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19525 12
drawing's.
Concrete pouring for Encasement of Shot piece's of Manholes (Type 'B' 1 No's)(MH-D-01-B5) Inside Sound & Light garden, as per
80 KAIG3-RFI-SG-S-5704-00 Sound & Light Garden 11/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19524 12
highlighted area in attached drawing's.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
81 KAIG3-RFI-CO-S-5771-01 Crescent 11/13/21 Concreting for BUTTRESS BII 10, 11, 12, 13 (w/ beam) Zone 1C 1D P 29-19534 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
82 P 29-19532 10
SCREED

kaig-qcals 217
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd No.
83 KAIG3-RFI-SW-C-2148-00 Site Works 11/13/21 C16/20 SRC P 29-19533 (m³
7) PASSED
Coat and 3rd Coat) for MH-K-04, MH-K-05, MH-K-06 (As Highlighted)

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


84 KAIG3-RFI-CO-S-5762-00 Crescent 11/14/21 Concreting for BUTTRESS BIV 52 & 53 (1st) Zone 1N P 28-30970 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
85 KAIG3-RFI-CO-S-5757-00 Crescent 11/14/21 Concreting for BUTTRESS BOV 52 & 53 (1st) Zone 1N P 28-30968 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
86 P 28-30962 10
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
87 P 28-30961 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
88 P 28-30958 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
89 P 28-30957 7
SCREED

90 KAIG3-RFI-CO-S-5791-00 Crescent 11/14/21 Concreting for Strip footing Between PC 31, 33, 35, 37 Zone 1F C32/40 62% OPC+30%FA - 160+/-40 P 28-30973 8

91 KAIG3-RFI-MC-S-5810-00 MCPE 1 11/14/21 Concreting for MCPE 1 WALL (OUTER) at axis 03S to 03R Zone 2N 2M (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30972 10

92 C32/40 62% OPC+30%FA - 160+/-40 P 28-30969 10


PASSED
93 C32/40 62% OPC+30%FA - 160+/-40 P 28-30967 10

94 C32/40 62% OPC+30%FA - 160+/-40 P 28-30966 10

95 C32/40 62% OPC+30%FA - 160+/-40 P 28-30965 10

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
96 KAIG3-RFI-SW-C-2148-00 Site Works 11/14/21 C16/20 SRC P 28-30971 3 PASSED
Coat and 3rd Coat) for MH-K-04, MH-K-05, MH-K-06 (As Highlighted)

97 KAIG3-RFI-CO-S-5785-01 Crescent 11/14/21 Concreting for Mass Concrete at Zone 2J between PC 146-148 (3rd Layer) C16/20 SRC P 28-30974 10 PASSED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


98 KAIG3-RFI-CO-S-5783-00 Crescent 11/15/21 Concreting for BUTTRESS BOI 93, 94, 95, 96 (with beam) Zone 2H 2J P 28-30990 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
99 P 28-30982 10
SCREED

100 KAIG3-RFI-MC-S-5802-00 MCPE 2 11/15/21 Concreting for Foundation of MCPE 2 Axis 02X TO 03E (As highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30997 12

101 C32/40 62% OPC+30%FA - 160+/-40 P 28-30994 12

102 C32/40 62% OPC+30%FA - 160+/-40 P 28-30993 12

103 C32/40 62% OPC+30%FA - 160+/-40 P 28-30992 12


PASSED
104 C32/40 62% OPC+30%FA - 160+/-40 P 28-30989 12

105 C32/40 62% OPC+30%FA - 160+/-40 P 28-30988 12

106 C32/40 62% OPC+30%FA - 160+/-40 P 28-30987 12

107 C32/40 62% OPC+30%FA - 160+/-40 P 28-30986 12

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


108 KAIG3-RFI-CO-S-5783-00 Crescent 11/15/21 Concreting for BUTTRESS BOI 93, 94, 95, 96 (with beam) Zone 2H 2J P 29-19556 4 PASSED
SCREED

109 KAIG3-RFI-CO-S-5816-00 Crescent 11/15/21 Concreting of 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H C16/20 SRC P 29-19565 12

110 C16/20 SRC P 29-19564 12

kaig-qcals 218

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI111
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC P 29-19563 QUANTITY
12
LOCATION CASTING No.
(m³)

PASSED

kaig-qcals 219
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI112
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC P 29-19561 QUANTITY
12
LOCATION CASTING No.
(m³)
PASSED
113 C16/20 SRC P 29-19560 12

114 C16/20 SRC P 29-19559 12

115 C16/20 SRC P 29-19558 12

116 C16/20 SRC P 29-19557 12

117 KAIG3-RFI-CO-S-5798-00 Crescent 11/16/21 Concreting for Ground beam between PC 37-39-41-43 Zone 1G C32/40 62% OPC+30%FA - 160+/-40 P 29-19577 10

118 C32/40 62% OPC+30%FA - 160+/-40 P 29-19573 12 PASSED

119 C32/40 62% OPC+30%FA - 160+/-40 P 29-19570 12

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


120 KAIG3-RFI-CO-S-5787-00 Crescent 11/16/21 Concreting for BUTTRESS BII 97, 98 Zone 2J, 2K P 29-19600 2
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
121 P 29-19595 5 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
122 P 28-30998 8
SCREED
Concrete pouring for Encasement of Manhole (MH-D-01-A1-02-01,Type 'B' 1 no's) Inside Maze garden, as per highlighted area in
123 KAIG3-RFI-ZG-S-5882-00 Maze Garden 11/17/21 C16/20 SRC P 29-19625 3 PASSED
attached drawing's.

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
124 KAIG3-RFI-SW-C-2147-00 Site Works 11/18/21 C16/20 SRC P 29-19635 9 PASSED
Coat and 3rd Coat) for FW-A-3-8, FW-A-3-9, FW-A-3-10 (As Highlighted)

125 KAIG3-RFI-SW-C-2225-00 Site Works 11/18/21 Inspection for Casting Blinding Concrete under Manhole MH-L-01, MH-L-02, MH-L-03, MH-L-04 - as highlighted C16/20 SRC P 28-31006 7 PASSED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


126 KAIG3-RFI-CO-S-5838-00 Crescent 11/18/21 Shuttering and Shear Connector for BUTTRESS BIV 77, 78, 79, 80, 81 Zone 2E P 29-19660 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
127 P 29-19654 10 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
128 P 29-19645 10
SCREED

129 KAIG3-RFI-SW-C-2260-00 Site Works 11/20/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-13-1, FW-A-13-2, FW-A-13-3, FW-A-13-4 (as Highlighted) C16/20 SRC P 28-31036 4
PASSED
130 KAIG3-RFI-SW-C-2226-00 Site Works 11/20/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-13-5, FW-A-13-6, FW-A-13-7, FW-A-13-8 (as Highlighted) C16/20 SRC P 28-31029 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


131 KAIG3-RFI-CO-S-5818-00 Crescent 11/20/21 Concreting for BUTTRESS BOV 62, 63 BIV 62, 63 Zone 2A P 28-31026 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
132 P 28-31019 7 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
133 P 28-31011 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
134 KAIG3-RFI-CO-S-5820-00 Crescent 11/21/21 Concreting for BUTTRESS BIV 02 Zone 1A P 28-31051 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
135 P 28-31048 6 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
136 P 28-31043 7
SCREED

137 KAIG3-RFI-CO-S-5851-00 Crescent 11/21/21 Concreting for Mass Concrete for Stip footing between PC 127-129 Zone 2F C16/20 SRC P 28-31066 10

138 C16/20 SRC P 28-31065 12

139 C16/20 SRC P 28-31064 12

140 C16/20 SRC P 28-31063 12

141 C16/20 SRC P 28-31062 12

kaig-qcals 220
PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI142
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC P 28-31061 QUANTITY
12
LOCATION CASTING No.
(m³)
143 C16/20 SRC P 28-31060 12
PASSED
144 C16/20 SRC P 28-31059 12

145 C16/20 SRC P 28-31058 12

146 C16/20 SRC P 28-31056 12

147 C16/20 SRC P 28-31052 12

148 C16/20 SRC P 28-31047 10

149 C16/20 SRC P 28-31046 10

150 C16/20 SRC P 28-31045 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


151 KAIG3-RFI-CO-S-5854-00 Crescent 11/22/21 Concreting for BUTTRESS BOV 77, 78, 79, 80, 81 Zone 2E P 28-31096 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
152 P 28-31087 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
153 P 28-31083 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
154 P 28-31073 9
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
155 KAIG3-RFI-MC-S-5866-00 MCPE 2 11/23/21 Concreting for MCPE 2 WALL (OUTER ) at axis 02AH to 02AG Zone 2K (as highlighted) P 28-31122 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
156 P 28-31108 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
157 P 28-31103 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
158 P 28-31099 10
SCREED

159 KAIG3-RFI-SW-C-2315-00 Site Works 11/23/21 Inspection of Concrete Pouring for the Foundation and Kicker of Transition Area (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-31109 5

160 C32/40 62% OPC+30%FA - 160+/-40 P 28-31105 12

161 C32/40 62% OPC+30%FA - 160+/-40 P 28-31104 12


PASSED
162 C32/40 62% OPC+30%FA - 160+/-40 P 28-31102 12

163 C32/40 62% OPC+30%FA - 160+/-40 P 28-31101 12

164 C32/40 62% OPC+30%FA - 160+/-40 P 28-31100 12

Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
165 KAIG3-RFI-SW-C-1889-00 Site Works 11/23/21 C16/20 SRC P 28-31112 8 PASSED
Coat and 3rd Coat) for MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-02 (As Highlighted)

Geo-Textile (Both sides 500mm wide) on Blinding under boundary wall @ Grid (11-16/Right Side), of Aviary garden, At Highlighted
166 KAIG3-RFI-AG-S-5780-00 Aviary Garden 11/24/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-31150 10
area in the attached drawing's.

167 C32/40 62% OPC+30%FA - 160+/-40 P 28-31144 12

168 C32/40 62% OPC+30%FA - 160+/-40 P 28-31143 12

169 C32/40 62% OPC+30%FA - 160+/-40 P 28-31142 12

170 C32/40 62% OPC+30%FA - 160+/-40 P 29-19695 12

171 C32/40 62% OPC+30%FA - 160+/-40 P 29-19694 12

kaig-qcals 221

PASSED
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI172
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-19693 QUANTITY
12
LOCATION CASTING No.
(m³)

PASSED

kaig-qcals 222
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI173
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-19692 QUANTITY
12
LOCATION CASTING No.
(m³)
174 C32/40 62% OPC+30%FA - 160+/-40 P 28-31136 12 PASSED

175 C32/40 62% OPC+30%FA - 160+/-40 P 28-31135 12

176 C32/40 62% OPC+30%FA - 160+/-40 P 28-31134 12

177 C32/40 62% OPC+30%FA - 160+/-40 P 28-31133 10

178 C32/40 62% OPC+30%FA - 160+/-40 P 28-31131 12

179 C32/40 62% OPC+30%FA - 160+/-40 P 28-31130 12

180 C32/40 62% OPC+30%FA - 160+/-40 P 28-31129 12

181 C32/40 62% OPC+30%FA - 160+/-40 P 28-31128 12

182 C32/40 62% OPC+30%FA - 160+/-40 P 28-31127 12

Concrete pouring for Encasement of Manhole (MH-D-01-A1-02-01,Type 'B' 1 no's) Inside Maze garden, as per highlighted area in
183 KAIG3-RFI-ZG-S-5882-00 Maze Garden 11/24/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-31139 6
attached drawing's.
Concrete pouring & Shuttering for Wall of Straight Wall (Left Side) at Entrance, inside Maze garden, as per highlighted area in attached
184 KAIG3-RFI-ZG-S-5883-00 Maze Garden 11/24/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-31138 12 PASSED
drawing's.

Concrete pouring & Shuttering for Wall of Circular Walls (10) (Remaining part at Entrance wall) Half Part 2, inside Maze garden, as per
185 KAIG3-RFI-ZG-S-5886-00 Maze Garden 11/24/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-31137 12
highlighted area in attached drawing's.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
186 KAIG3-RFI-PG-S-5286-00 Physic Garden 11/25/21 Concrete Pouring & Shuttering for Wall & Columns of Outer Canopy 2 at Physic Garden, as per highlighted area in attached drawings. P 28-31175 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
187 P 28-31169 10
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
188 P 28-31166 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
189 P 28-31159 10
SCREED
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
190 KAIG3-RFI-SW-C-2057-00 Site Works 11/27/21 C16/20 SRC P 28-31189 10 PASSED
Coat and 3rd Coat) for MH-E-03 (As Highlighted)

191 KAIG3-RFI-CO-S-5896-00 Crescent 11/27/21 Concreting of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D C16/20 SRC P 29-19713 12

192 KAIG3-RFI-CO-S-5898-00 Crescent 11/27/21 Concreting of 3rd layer Mass Concrete for Stip footing between PC 24-26 Zone 1D C16/20 SRC P 29-19712 12

193 C16/20 SRC P 29-19711 12

194 C16/20 SRC P 29-19710 12 PASSED

195 C16/20 SRC P 29-19709 12

196 C16/20 SRC P 29-19708 12

197 C16/20 SRC P 29-19707 12

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


198 KAIG3-RFI-CO-S-5874-01 Crescent 11/28/21 Concreting for BUTTRESS BOI 52 (1st) (w/ beam) Zone 1N P 28-31217 7
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
199 P 28-31204 10
SCREED

200 KAIG3-RFI-CO-S-5892-00 Crescent 11/28/21 Concreting of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H C16/20 SRC P 28-31225 8 PASSED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


201 KAIG3-RFI-CO-S-5852-00 Crescent 11/29/21 Concreting for BUTTRESS BIV 61 (1st) Zone 2A P 28-31258 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
202 P 28-31256 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
203 P 28-31245 10 PASSED
SCREED

kaig-qcals 223
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


PASSED
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI204
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - P 28-31241 QUANTITY
12
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
205 P 28-31237 12
SCREED

206 KAIG3-RFI-SW-C-1905-00 Site Works 11/30/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-3-11 (as Highlighted) C16/20 SRC P 28-31277 5

207 C16/20 SRC P 28-31276 10

208 C16/20 SRC P 28-31273 10 PASSED

209 C16/20 SRC P 28-31263 10

210 C16/20 SRC P 28-31261 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


211 KAIG3-RFI-CO-S-5934-00 Crescent 11/30/21 Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at Zone-G (As Highlighted) P 28-31297 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
212 P 28-31295 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
213 P 28-31294 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
214 P 28-31293 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
215 P 28-31292 12 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
216 P 28-31288 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
217 P 28-31287 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
218 P 28-31286 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
219 P 28-31285 12
SCREED

220 KAIG3-RFI-SW-C-2542-00 Site Works 11/30/21 Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at Zone-G (As Highlighted) C32/40 92%SRC+8%MS - 160+/-40 P 28-31275 12 PASSED

221 KAIG3-RFI-SW-C-2360-00 Site Works 11/27/21 Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Zone-B (As Highlighted) C32/40 92%SRC+8%MS - 160+/-40 P 28-31188 12

222 C32/40 92%SRC+8%MS - 160+/-40 P 28-31187 12

223 C32/40 92%SRC+8%MS - 160+/-40 P 28-31186 12


PASSED
224 C32/40 92%SRC+8%MS - 160+/-40 P 28-31181 12

225 C32/40 92%SRC+8%MS - 160+/-40 P 28-31180 12

226 C32/40 92%SRC+8%MS - 160+/-40 P 28-31179 12

227 NO RFI 11/16/21 C20/25 OPC P 29-19599 12

228 C20/25 OPC P 29-19598 12

229 C20/25 OPC P 29-19594 10

230 C20/25 OPC P 29-19591 12

231 C20/25 OPC P 29-19588 10

232 C20/25 OPC P 29-19601 6

C32/40 62% OPC + 30% FA + 8% MS


233 28-31155 5 PASSED
(SCREED)

234 C16/20 SRC 28-31296 5

235 C16/20 SRC 28-31289 12

kaig-qcals 224
Consultant : DAR
PASSED
Main Contractor: ZHBG
RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI236
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC 28-31291 QUANTITY
12
LOCATION CASTING No.
(m³)
237 C16/20 SRC 28-31229 11

238 C16/20 SRC 29-19456 5

239 C16/20 SRC 28-31228 11

TOTAL QUANTITY TRUCK LOAD (M³): 2387

C05 OPC 41

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2428

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 225
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

kaig-qcals 226
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
83 KAIG3-RFI-SW-C-2835-00 LOCATION
Site Works CASTING
12/09/21 Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/36 to G/MV/35 at Zone-G (As Highlighted) C32/40 67%OPC+25%FA - 160+/-40 No.
P 28-31563 3)
(m³

84 C32/40 67%OPC+25%FA - 160+/-40 P 28-31550 12

85 C32/40 67%OPC+25%FA - 160+/-40 P 28-31549 12 PASSED

86 C32/40 67%OPC+25%FA - 160+/-40 P 28-31548 12

87 C32/40 67%OPC+25%FA - 160+/-40 P 28-31545 12

kaig-qcals 227
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI150
No. RFI NUMBER
KAIG3-RFI-SW-C-2962-00 Site Works 12/16/21 DESCRIPTION
Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/34 to G/MV/09 at Zone-G (As Highlighted) DESIGN MIX - 160+/-40
C32/40 67%OPC+25%FA P 28-31749 QUANTITY
2
LOCATION CASTING No.
(m³)
PASSED
151 C32/40 67%OPC+25%FA - 160+/-40 P 29-19853 12

kaig-qcals 228
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
(m³)

TOTAL QUANTITY TRUCK LOAD (M³): 3243

TOTAL QUANTITY TRUCK LOAD (M³) + C20/25 OPC 3243

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 229
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

20 KAIG3-RFI-CO-S-6143-00 Crescent 12/25/21 Concreting for BUTTRESS BOI BII 52 (2nd) Zone 1N C16/20 SRC 0010 10

21 C16/20 SRC 0009 10

22 C16/20 SRC 0008 10 0005

23 KAIG3-RFI-CO-S-5896-01 Crescent 12/25/21 Concreting of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D C32/40 62% OPC+30%FA - 160+/-40 0020 10 14

24 C32/40 62% OPC+30%FA - 160+/-40 0011 10 0008

25 C32/40 62% OPC+30%FA - 160+/-40 0012 10 9

26 C32/40 62% OPC+30%FA - 160+/-40 0016 10 10

27 C32/40 62% OPC+30%FA - 160+/-40 0017 10 11

28 C32/40 62% OPC+30%FA - 160+/-40 0018 10 12

kaig-qcals 230
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI29
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 0024 QUANTITY
10 16
LOCATION CASTING No.
(m³)

30 C32/40 62% OPC+30%FA - 160+/-40 0023 10 15

31 C32/40 62% OPC+30%FA - 160+/-40 0025 3 17

32 C32/40 62% OPC+30%FA - 160+/-40 0019 10 13

33 KAIG3-RFI-CO-S-5891-00 Crescent 12/26/21 Shuttering of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 0034 10 24

34 C32/40 62% OPC+30%FA - 160+/-40 0026 10 18

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


35 KAIG3-RFI-CO-S-6135-00 Crescent 12/26/21 Concreting for BUTTRESS BIV BOV 53 (2nd) Zone 1N 0042 10 25
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
36 KAIG3-RFI-CO-S-6163-00 Crescent 12/26/21 Concreting for RING BEAM (outer) Axis 02-2, 02AP to 02AT Zone 2N 0043 5 26
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
37 0030 10 20
SCREED

38 KAIG3-RFI-CO-S-5816-00 Crescent 12/26/21 Concreting of 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 0031 5 21

39 KAIG3-RFI-LM-S-6158-00 Large Mosque 12/27/21 Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd) C32/40 62% OPC+30%FA - 160+/-40 0052 10 33

40 C32/40 62% OPC+30%FA - 160+/-40 0050 10

41 C32/40 62% OPC+30%FA - 160+/-40 0045 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


42 KAIG3-RFI-CO-S-5858-00 Crescent 12/27/21 Concreting of 2nd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H 0058 8 38
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
43 0057 11 37
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
44 0056 11 36
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
45 0055 11 35
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
46 0051 11 32
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
47 0049 11 30
SCREED

48 KAIG3-RFI-LM-S-6158-00 Large Mosque 12/27/21 Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd) C32/40 62% OPC+30%FA - 160+/-40 0059 10 39

49 KAIG3-RFI-WG-S-6124-01 Water Play Garden 12/27/21 Concrete Pouring & Shuttering for Wall & Column of Boundary wall @ span 2 at Water Garden, as highlighted in Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 0062 10 41

50 C32/40 62% OPC+30%FA - 160+/-40 0060 8 40

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


51 KAIG3-RFI-CO-S-6109-01 Crescent 12/28/21 Concreting for BUTTRESS(with Beam) BII 20, 21 Zone 1E 1F 0070 4 48
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


52 0068 10 46
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
53 0063 10 42
SCREED
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from G/TL/32 to G/TL/30 at Zone-G (As
54 KAIG3-RFI-SW-C-3088-00 Site Works 12/28/21 C32/40 62% OPC+30%FA - 160+/-40 0069 7
Highlighted)

55 C32/40 62% OPC+30%FA - 160+/-40 0067 10

56 C32/40 62% OPC+30%FA - 160+/-40 0064 10

kaig-qcals 231
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Inspection of Reinforced Concrete Pouring for Duct Bank ofDESCRIPTION
Telecommunications Line from G/TL/32 to G/TL/30 at Zone-G (As DELIVERY NOTE
SI57
No. RFI NUMBER
KAIG3-RFI-SW-C-3092-00 Site Works 12/28/21 C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 0066 QUANTITY
10
LOCATION CASTING Highlighted) No.
(m³)

58 KAIG3-RFI-CO-S-6184-00 Crescent 12/28/21 Protectiol layer of geotextile and 50mm screed under TUNNEL 1 Foundation Zone 1C (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 0071 10 49

59 C32/40 62% OPC+30%FA - 160+/-40 0072 10 50

60 KAIG3-RFI-SW-C-3164-00 Site Works 12/30/21 Inspection for Blinding Concrete under Fire Water Line Pit B/F/06, B/F/07, B/F/08, B/F/09, B/F/12, B/F/15 at Zone-B - as highlighted C32/40 62% OPC+30%FA - 160+/-40 0108 5 82

61 C32/40 62% OPC+30%FA - 160+/-40 0101 10 76

Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and Application of Primer (1st Coat,
62 KAIG3-RFI-SW-C-3157-00 Site Works 12/30/21 C32/40 62% OPC+30%FA - 160+/-40 0110 7 84
2nd Coat and 3rd Coat) As attached

63 KAIG3-RFI-SW-C-3182-00 Site Works 12/30/21 Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 0114 2 88

64 C32/40 62% OPC+30%FA - 160+/-40 0112 7

TOTAL QUANTITY TRUCK LOAD (M³): 406

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 406

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 232
Consultant : DAR

Main Contractor: ZHBG


Dec-21

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-CO-S-6143-00 Crescent 12/25/21 Concreting for BUTTRESS BOI BII 52 (2nd) Zone 1N C16/20 SRC 0006 10

2 C16/20 SRC 0007 10

3 C16/20 SRC 0005 10

4 KAIG3-RFI-CO-S-5896-01 Crescent 12/25/21 Concreting of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D C32/40 62% OPC+30%FA - 160+/-40 0014 10

5 C32/40 62% OPC+30%FA - 160+/-40 0008 10

6 C32/40 62% OPC+30%FA - 160+/-40 0009 10

7 C32/40 62% OPC+30%FA - 160+/-40 0010 10

8 C32/40 62% OPC+30%FA - 160+/-40 0011 10

9 C32/40 62% OPC+30%FA - 160+/-40 0012 10

10 C32/40 62% OPC+30%FA - 160+/-40 0016 10

11 C32/40 62% OPC+30%FA - 160+/-40 0015 10

12 C32/40 62% OPC+30%FA - 160+/-40 0017 3

13 C32/40 62% OPC+30%FA - 160+/-40 0013 10

14 KAIG3-RFI-CO-S-5891-00 Crescent 12/26/21 Shuttering of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 0024 10

15 C32/40 62% OPC+30%FA - 160+/-40 0018 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


16 KAIG3-RFI-CO-S-6135-00 Crescent 12/26/21 Concreting for BUTTRESS BIV BOV 53 (2nd) Zone 1N 0025 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
17 KAIG3-RFI-CO-S-6163-00 Crescent 12/26/21 Concreting for RING BEAM (outer) Axis 02-2, 02AP to 02AT Zone 2N 0026 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
18 0020 10
SCREED

19 KAIG3-RFI-CO-S-5816-00 Crescent 12/26/21 Concreting of 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 0021 5

20 KAIG3-RFI-LM-S-6158-00 Large Mosque 12/27/21 Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd) C32/40 62% OPC+30%FA - 160+/-40 0052 10

21 C32/40 62% OPC+30%FA - 160+/-40 0028 10

22 C32/40 62% OPC+30%FA - 160+/-40 0029 11

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


23 KAIG3-RFI-CO-S-5858-00 Crescent 12/27/21 Concreting of 2nd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H 0058 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
24 0057 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
25 0056 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
26 0055 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
27 0051 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
28 0030 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
29 00031 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
30 00034 11
SCREED

kaig-qcals 233
Consultant : DAR

Main Contractor: ZHBG


Dec-21

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI31
No. RFI NUMBER
KAIG3-RFI-LM-S-6158-00 Large Mosque 12/27/21 DESCRIPTION
Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd) C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 0059 QUANTITY
10
LOCATION CASTING No.
(m³)

32 KAIG3-RFI-WG-S-6124-01 Water Play Garden 12/27/21 Concrete Pouring & Shuttering for Wall & Column of Boundary wall @ span 2 at Water Garden, as highlighted in Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 0062 10

33 C32/40 62% OPC+30%FA - 160+/-40 0060 8

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


34 KAIG3-RFI-CO-S-6109-01 Crescent 12/28/21 Concreting for BUTTRESS(with Beam) BII 20, 21 Zone 1E 1F 0070 4
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


35 00046 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
36 0063 10
SCREED
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from G/TL/32 to G/TL/30 at Zone-G (As
37 KAIG3-RFI-SW-C-3088-00 Site Works 12/28/21 C32/40 62% OPC+30%FA - 160+/-40 00047 7
Highlighted)

38 C32/40 62% OPC+30%FA - 160+/-40 00043 10

39 C32/40 62% OPC+30%FA - 160+/-40 00044 10

Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications Line from G/TL/32 to G/TL/30 at Zone-G (As
40 KAIG3-RFI-SW-C-3092-00 Site Works 12/28/21 C32/40 62% OPC+30%FA - 160+/-40 00045 10
Highlighted)

41 KAIG3-RFI-CO-S-6184-00 Crescent 12/28/21 Protectiol layer of geotextile and 50mm screed under TUNNEL 1 Foundation Zone 1C (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 00049 10

42 C32/40 62% OPC+30%FA - 160+/-40 00050 10

43 KAIG3-RFI-SW-C-3164-00 Site Works 12/30/21 Inspection for Blinding Concrete under Fire Water Line Pit B/F/06, B/F/07, B/F/08, B/F/09, B/F/12, B/F/15 at Zone-B - as highlighted C32/40 62% OPC+30%FA - 160+/-40 0108 5

44 C32/40 62% OPC+30%FA - 160+/-40 0101 10

Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and Application of Primer (1st Coat,
45 KAIG3-RFI-SW-C-3157-00 Site Works 12/30/21 C32/40 62% OPC+30%FA - 160+/-40 0110 7
2nd Coat and 3rd Coat) As attached

46 KAIG3-RFI-SW-C-3182-00 Site Works 12/30/21 Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 0114 2

47 C32/40 62% OPC+30%FA - 160+/-40 00085 7

TOTAL QUANTITY TRUCK LOAD (M³): 428

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 428

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 234
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
1 KAIG3-RFI-MC-S-6148-01 MCPE 1/2/2022 Concreting for MCPE 3 WALL (OUTER ) at axis 02S to 02R Zone 2E 2F (as highlighted) P 28-32189 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
2 P 28-32178 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
3 P 28-32172 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
4 P 28-32165 8
SCREED
Concrete Pouring & Shuttering for Ring Beam & Remaining part of Wall @ Grid (10-16/Right Side) or Grid 11 to 17, on Boundary wall C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5 KAIG3-RFI-AG-S-6229-00 Aviary Garden 1/2/2022 P 28-32169 6
at Aviary Garden, As per Highlighted in attached Drawing's. SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6 P 28-32167 12 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
7 P 28-32166 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
8 KAIG3-RFI-CO-S-6179-01 Crescent 1/3/2022 Concreting for BUTTRESS BII 60 (1st with Beam) Zone 2A P 28-32225 9
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
9 KAIG3-RFI-CO-S-6189-01 Crescent 1/3/2022 Concreting for BUTTRESS BII 61 (2nd) Zone 2A P 28-32215 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
10 KAIG3-RFI-MC-S-6204-00 MCPE 2 1/4/2022 Concreting for MCPE 2 WALL (OUTER ) at axis 03G to 02Y Zone 2G (as highlighted) P 28-32256 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
11 KAIG3-RFI-CO-S-6233-00 Crescent 1/4/2022 Concreting for Ring Beam (outer) Zone 2D as highlighted P 29-19900 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
12 P 28-32255 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
13 P 28-32254 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
14 P 29-19899 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
15 P 29-19898 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
16 P 28-32251 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
17 P 29-19897 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
18 P 29-19896 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
19 P 28-32247 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
20 P 28-32246 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
21 P 28-32245 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
22 P 28-32243 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
23 P 28-32239 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
24 P 28-32236 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
25 P 28-32231 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
26 KAIG3-RFI-CO-S-6261-00 Crescent 1/9/2022 Concreting for RING BEAM Zone 2M (inner) Axis 02-1, 02AL to 02AP P 29-19906 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
27 P 28-32329 13
SCREED

kaig-qcals 235
PASSED
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI28
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - P 28-32328 QUANTITY
13
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
29 P 29-19905 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
30 P 28-32326 13
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
31 P 29-19903 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
32 P 28-32325 11
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


33 P 29-19902 12
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


34 P 28-32324 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
35 P 28-32322 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
36 KAIG3-RFI-CO-S-6277-00 Crescent 1/10/2022 Concreting for RING BEAM Zone 2C (OUTER) Axis 02-2, 02G to 02J (as highlighted) P 28-32366 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
37 P 28-32364 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
38 P 28-32362 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
39 P 28-32358 13
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
40 P 28-32356 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
41 P 28-32355 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
42 P 28-32353 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
43 P 28-32352 13
SCREED

44 KAIG3-RFI-CO-S-6318-00 Crescent 1/13/2022 Concreting for Blinding of Retaining Wall (shearkey) of Zone 4 axis 01M to 01K C16/20 SRC P 28-32429 3

45 C16/20 SRC P 28-32424 10

46 C16/20 SRC P 28-32419 13 PASSED

47 C16/20 SRC P 28-32415 12

48 C16/20 SRC P 28-32414 12

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


49 KAIG3-RFI-CO-S-6340-00 Crescent 1/17/2022 Concreting for RING BEAM Zone 2B (INNER) Axis 02-1, 02D to 02G (as highlighted) P 29-19992 9
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


50 P 29-19991 13
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


51 P 29-19990 13
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 - PASSED


52 P 29-19989 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
53 P 29-19988 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
54 P 29-19985 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
55 P 29-19984 13
SCREED

kaig-qcals 236
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI56
No. RFI NUMBER
KAIG3-RFI-CO-S-6361-00 Crescent 1/19/2022 DESCRIPTION
Concreting for Mass Concrete of Strip Footing Between PC 131 - 133 Zone 2F DESIGN MIX
C16/20 SRC P 29-20037 QUANTITY
7
LOCATION CASTING No.
(m³)

57 C16/20 SRC P 29-20030 9 PASSED

C16/20 SRC P 29-20029 11

58 KAIG3-RFI-CO-S-6353-00 Crescent 1/19/2022 Concreting for Strip Footing between PC 146-148-150 Zone 2J C32/40 62% OPC+30%FA - 160+/-40 P 29-20049 12 PASSED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


59 KAIG3-RFI-CO-S-6358-00 Crescent 1/24/2022 Concreting for BUTTRESS BOI 59, 60 (1st with beam) Zone 2A P 29-20111 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
60 KAIG3-RFI-CO-S-6386-00 Crescent 1/24/2022 Concreting for BUTTRESS BOI 61 (2ND) Zone 2A P 29-20107 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
61 KAIG3-RFI-CO-S-6397-00 Crescent 1/24/2022 Concreting for RING BEAM Zone 2J (Outer) Axis 02-2, 02AB to 02AE (as highlighted) P 29-20103 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
62 P 29-20102 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
63 P 29-20097 13
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
64 P 29-20095 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65 P 29-20091 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
66 P 29-20088 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
67 P 29-20087 13
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


68 P 29-20086 13
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


69 KAIG3-RFI-CO-S-6390-00 Crescent 1/26/2022 Concreting for RING BEAM Zone 2B (Outer) Axis 02-2, 02D to 02G (as highlighted) P 28-32568 4
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


70 KAIG3-RFI-CO-S-6438-00 Crescent 1/26/2022 Concreting for RING BEAM Zone 1B (Inner) Axis 01-1, 01D to 01G (as highlighted) P 29-20180 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


71 P 29-20179 13
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


72 P 29-20177 12
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


73 P 29-20174 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
74 P 28-32556 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
75 P 28-32554 13
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


76 P 28-32553 13
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
77 P 29-20171 11
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


78 P 29-20170 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
79 P 29-20169 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
80 P 29-20167 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
81 P 29-20166 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
82 P 29-20163 13
SCREED

kaig-qcals 237
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 -
C32/40 62% OPC+30%FA+8% QUANTITY
83 LOCATION CASTING No.
P 29-20162 10 )
SCREED (m³

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


84 P 29-20161 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
85 KAIG3-RFI-CO-S-6490-00 Crescent 1/31/2022 Concreting for RING BEAM Zone 1E (OUTER) Axis 01-2, 01M to 01P (as highlighted) P 28-32697 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
86 P 28-32694 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
87 P 28-32693 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
88 P 28-32690 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
89 P 28-32689 13 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
90 P 28-32687 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
91 P 28-32685 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
92 P 28-32684 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
93 P 28-32682 10
SCREED

TOTAL QUANTITY TRUCK LOAD (M³): 1080

C05 OPC 30

TOTAL QUANTITY TRUCK LOAD (M³) + C20/25 OPC 1110

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 238
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-CO-S-6277-00 Crescent 3/1/2022 Concreting for RING BEAM Zone 2C (OUTER) Axis 02-2, 02G to 02J (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 0163 5

2 C32/40 62% OPC+30%FA - 160+/-40 0161 10

3 C32/40 62% OPC+30%FA - 160+/-40 0160 10

4 C32/40 62% OPC+30%FA - 160+/-40 0159 10

5 C32/40 62% OPC+30%FA - 160+/-40 14 10

6 C32/40 62% OPC+30%FA - 160+/-40 12 10

7 C32/40 62% OPC+30%FA - 160+/-40 11 10

8 C32/40 62% OPC+30%FA - 160+/-40 9 10

9 C32/40 62% OPC+30%FA - 160+/-40 8 10

10 C32/40 62% OPC+30%FA - 160+/-40 7 10

11 C32/40 62% OPC+30%FA - 160+/-40 6 10

12 C32/40 62% OPC+30%FA - 160+/-40 5 10

13 KAIG3-RFI-SW-C-3181-00 Site Works 3/1/2022 Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/09 to G/MV/10 at Zone-G (As Highlighted) C16/20 SRC 0165 5

14 C16/20 SRC 0164 10

15 KAIG3-RFI-TG-S-6245-00 Butterfly Garden 4/1/2022 Concrete Pouring for Blinding under foundation at Grid (A/6-16) @ Butterfly Garden, at highlighted area in attached drawings. C16/20 SRC 19 10

16 C16/20 SRC 18 10

17 KAIG3-RFI-SW-C-3198-00 Site Works 5/1/2022 Inspection of Concrete Pouring for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06 at Zone-G - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 37 4

18 C32/40 62% OPC+30%FA - 160+/-40 35 10

19 C32/40 62% OPC+30%FA - 160+/-40 34 10

20 C32/40 62% OPC+30%FA - 160+/-40 33 10

21 C32/40 62% OPC+30%FA - 160+/-40 31 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


22 KAIG3-RFI-CO-S-6241-00 Crescent 5/1/2022 Concreting for BUTTRESS BOV BIV 82, 83 Zone 2F 42 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
23 41 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
24 39 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
25 36 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
26 32 10
SCREED

27 KAIG3-RFI-SW-C-3197-00 Site Works 5/1/2022 Inspection of Concrete Pouring for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at Zone-G - As Highlighted C16/20 SRC 40 10

28 C16/20 SRC 38 10

kaig-qcals 239
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI29
No. RFI NUMBER
KAIG3-RFI-CO-S-6243-00 Crescent 6/1/2022 Concreting for BUTTRESS BOI BII 53 (2ND) Zone 1N DESCRIPTION DESIGN MIX MS - 220+/-20 - 81 QUANTITY
8
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
30 77 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
31 66 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
32 64 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
33 59 9
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
34 61 8
SCREED

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short piece and Application of
35 KAIG3-RFI-SW-C-3209-00 Site Works 6/1/2022 Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-G-01-3, MH-G-01-2, MH-G-01-1, MH-G-01, MH-G-02, MH-G-03, MH-G-03-1, C16/20 SRC 80 2
MH-G-03-02, MH-G-04, MH-G-05, MH-G-06 AS HIGHLIGHTED.

36 C16/20 SRC 76 2

37 C16/20 SRC 63 10

38 KAIG3-RFI-TG-S-6267-00 Butterfly Garden 6/1/2022 Concrete Pouring for Blinding under foundation at Grid (A/8) @ Butterfly Garden, at highlighted area in attached drawings. C16/20 SRC 84 5

39 C16/20 SRC 83 10

40 C16/20 SRC 82 10

41 KAIG3-RFI-CO-S-6250-00 Crescent 8/1/2022 Concreting for Mass Concrete of Strip Footing Between PC 17 - 19 Zone 1C C16/20 SRC 145 9

42 C16/20 SRC 144 9

43 C16/20 SRC 142 10

44 C16/20 SRC 141 10

45 C16/20 SRC 140 10

46 C16/20 SRC 139 10

47 C16/20 SRC 138 10

48 C16/20 SRC 137 10

49 C16/20 SRC 120 6

50 C16/20 SRC 119 11

51 C16/20 SRC 118 11

52 C16/20 SRC 116 11

53 C16/20 SRC 114 11

54 C16/20 SRC 113 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


55 KAIG3-RFI-CO-S-6170-01 Crescent 8/1/2022 Concreting for BUTTRESS BOI 03 Zone 1A 147 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
56 143 6
SCREED

kaig-qcals 240
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI57
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 135 QUANTITY
6
LOCATION CASTING SCREED No.
(m³)
Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line from F/FS/17 to F/FS/04 at Zone- F (As
58 KAIG3-RFI-SW-C-3265-00 Site Works 9/1/2022 C16/20 SRC 157 10
Highlighted)

59 C16/20 SRC 153 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


60 KAIG3-RFI-CO-S-6264-01 Crescent 9/1/2022 Concreting for BUTTRESS BII 84, 85, 86 (with beam) Zone 2F 2G 161 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
61 155 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
62 154 8
SCREED
Screed Protection 50mm thick on Blinding under foundation at Grid (A/6-16) @ Butterfly Garden, at highlighted area in attached C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
63 KAIG3-RFI-TG-S-6281-00 Butterfly Garden 9/1/2022 160 9
drawings. SCREED

64 KAIG3-RFI-TG-S-6299-00 Butterfly Garden 9/1/2022 Concrete Pouring for Blinding of Internal foundations, Inside Butterfly Garden, at highlighted area in attached drawings. C16/20 SRC 165 5

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


65 KAIG3-RFI-MC-S-6204-00 MCPE 2 10/1/2022 Concreting for MCPE 2 WALL (OUTER ) at axis 03G to 02Y Zone 2G (as highlighted) 186 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
66 180 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
67 179 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
68 177 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
69 176 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
70 172 10
SCREED
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from F/TL/12 to F/TL/04 at Zone-F (As
71 KAIG3-RFI-SW-C-3264-00 Site Works 10/1/2022 C20/25-(OPC) 178 3
Highlighted)

72 C20/25-(OPC) 175 8

73 C20/25-(OPC) 174 11

74 C20/25-(OPC) 173 11

Concrete Pouring & Shuttering for Footings & Upstands (6 no's) of Canopy Inside Physic Garden, at highlighted area in attached
75 KAIG3-RFI-PG-S-6289-00 Physic Garden 10/1/2022 C32/40 62% OPC+30%FA - 160+/-40 190 5
drawings.

76 C32/40 62% OPC+30%FA - 160+/-40 189 8

77 C32/40 62% OPC+30%FA - 160+/-40 188 11

78 C32/40 62% OPC+30%FA - 160+/-40 187 11

79 C32/40 62% OPC+30%FA - 160+/-40 185 11

80 C32/40 62% OPC+30%FA - 160+/-40 184 11

81 C32/40 62% OPC+30%FA - 160+/-40 183 11

82 C32/40 62% OPC+30%FA - 160+/-40 182 11

83 C32/40 62% OPC+30%FA - 160+/-40 181 11

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


84 KAIG3-RFI-CO-S-6279-00 Crescent 11/1/2022 Concreting for BUTTRESS BOI & BII 82, 83 (with beam) Zone 2F 199 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
85 197 8
SCREED

kaig-qcals 241
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI86
No. RFI NUMBER
KAIG3-RFI-SW-C-3283-00 Site Works 11/1/2022 DESCRIPTION
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-10, FW-A-11, FW-A-12 (as Highlighted) DESIGN MIX
C16/20 SRC 207 QUANTITY
2
LOCATION CASTING No.
(m³)

87 C16/20 SRC 198 10

Concreting for Isolated Foundation for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2, D-3, D-4, D-5, D-5.1, E-5.1) ZONE 1G
88 KAIG3-RFI-LM-S-6305-00 Large Mosque 11/1/2022 C32/40 62% OPC+30%FA - 160+/-40 216 8
(as highlighetd)

89 C32/40 62% OPC+30%FA - 160+/-40 214 10

90 C32/40 62% OPC+30%FA - 160+/-40 212 10

91 C32/40 62% OPC+30%FA - 160+/-40 211 10

92 C32/40 62% OPC+30%FA - 160+/-40 210 10

93 C32/40 62% OPC+30%FA - 160+/-40 150 10

94 C32/40 62% OPC+30%FA - 160+/-40 16 10

95 C32/40 62% OPC+30%FA - 160+/-40 149 10

96 C32/40 62% OPC+30%FA - 160+/-40 209 10

97 C32/40 62% OPC+30%FA - 160+/-40 208 10

98 C32/40 62% OPC+30%FA - 160+/-40 206 10

99 C32/40 62% OPC+30%FA - 160+/-40 205 10

100 C32/40 62% OPC+30%FA - 160+/-40 204 10

101 C32/40 62% OPC+30%FA - 160+/-40 203 10

102 C32/40 62% OPC+30%FA - 160+/-40 202 10

103 C32/40 62% OPC+30%FA - 160+/-40 201 10

104 C32/40 62% OPC+30%FA - 160+/-40 200 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


105 KAIG3-RFI-CO-S-6294-01 Crescent 12/1/2022 Concreting for Infill Wall Between BI 127-128 (Inner) as highlighted Zone 2R 233 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
106 234 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
107 236 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
108 238 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
109 239 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
110 KAIG3-RFI-CO-S-6307-00 Crescent 13/01/22 Concreting for BUTTRESS BOI 61 (with beam) Zone 2A 282 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
111 281 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
112 269 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
113 256 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
114 251 8
SCREED

kaig-qcals 242
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI115
No. RFI NUMBER
KAIG3-RFI-TG-S-6315-00 Butterfly Garden 13/01/22 DESCRIPTION
Screed Protection 50mm thick on Blinding of Internal foundations, Inside Butterfly Garden, at highlighted area in attached drawings. DESIGN MIX MS - 220+/-20 - 253 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
116 280 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
117 279 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
118 278 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
119 277 10
SCREED
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and Application of Primer (1st Coat,
120 KAIG3-RFI-SW-C-3270-00 Site Works 15/01/22 C32/40 62% OPC+30%FA - 160+/-40 283 10
2nd Coat and 3rd Coat) As attached

121 KAIG3-RFI-CO-S-6349-00 Crescent 15/01/22 Concreting for Promenade Abutment Blinding at Zone 4 Grid P (as highlighted) C16/20 SRC 284 10

122 KAIG3-RFI-SW-C-3283-00 Site Works 15/01/22 Inspection for Casting the Blinding Concrete under the Manhole for FW-A-10, FW-A-11, FW-A-12 (as Highlighted) C16/20 SRC 291 5

123 C16/20 SRC 288 10

124 C16/20 SRC 285 10

125 KAIG3-RFI-SW-C-3353-00 Site Works 16/01/22 Inspection of Concrete Pouring for Canopy Foundation of Seating Area (1) Zone-K (SA-14) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 302 10

126 C32/40 62% OPC+30%FA - 160+/-40 301 10

127 C32/40 62% OPC+30%FA - 160+/-40 300 10

128 KAIG3-RFI-CO-S-6355-00 Crescent 16/01/22 Shuttering for Mass Concrete of Strip Footing Between PC 17 - 19 (3rd Layer)Zone 1C C32/40 62% OPC+30%FA - 160+/-40 331 10

129 C32/40 62% OPC+30%FA - 160+/-40 330 10

130 C32/40 62% OPC+30%FA - 160+/-40 329 10

131 C32/40 62% OPC+30%FA - 160+/-40 328 10

132 C32/40 62% OPC+30%FA - 160+/-40 327 10

133 C32/40 62% OPC+30%FA - 160+/-40 326 10

134 C32/40 62% OPC+30%FA - 160+/-40 325 10

135 C32/40 62% OPC+30%FA - 160+/-40 324 10

136 C32/40 62% OPC+30%FA - 160+/-40 323 10

137 C32/40 62% OPC+30%FA - 160+/-40 322 10

138 C32/40 62% OPC+30%FA - 160+/-40 321 10

139 C32/40 62% OPC+30%FA - 160+/-40 320 10

140 C32/40 62% OPC+30%FA - 160+/-40 319 10

141 C32/40 62% OPC+30%FA - 160+/-40 318 10

142 C32/40 62% OPC+30%FA - 160+/-40 317 10

143 C32/40 62% OPC+30%FA - 160+/-40 316 10

kaig-qcals 243
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI144
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 315 QUANTITY
10
LOCATION CASTING No.
(m³)

145 C32/40 62% OPC+30%FA - 160+/-40 314 10

146 C32/40 62% OPC+30%FA - 160+/-40 313 10

147 C32/40 62% OPC+30%FA - 160+/-40 312 10

148 C32/40 62% OPC+30%FA - 160+/-40 311 10

149 C32/40 62% OPC+30%FA - 160+/-40 310 10

150 C32/40 62% OPC+30%FA - 160+/-40 309 10

151 C32/40 62% OPC+30%FA - 160+/-40 308 10

152 C32/40 62% OPC+30%FA - 160+/-40 307 10

153 C32/40 62% OPC+30%FA - 160+/-40 305 10

154 C32/40 62% OPC+30%FA - 160+/-40 306 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


155 KAIG3-RFI-CO-S-6330-00 Crescent 17/01/22 Concreting for BUTTRESS BII 59 (1st with beam) Zone 2A 361 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
156 349 7
SCREED

157 KAIG3-RFI-SW-C-3404-00 Site Works 18/01/22 Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-B - As Highlighted in the attached drawing C16/20 SRC 372 10

158 C16/20 SRC 371 10

159 C16/20 SRC 370 10

160 C16/20 SRC 369 10

161 KAIG3-RFI-ZG-S-6341-01 Maze Garden 19/01/22 Concrete pouring for Blinding of Circular Walls (Remaining part), inside Maze garden, as highlighted area in attached drawing's. C16/20 SRC 383 5

162 C16/20 SRC 382 10

163 KAIG3-RFI-CO-S-6366-00 Crescent 20/01/22 Anti Termite application under Mass Concrete of Strip Footing Between PC 150 - 152 Zone 2J C16/20 SRC 410 10

164 C16/20 SRC 404 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


165 KAIG3-RFI-CO-S-6371-00 Crescent 20/01/22 Concreting for BUTTRESS BIV 22, 23, 24, 25 Zone 1F 1G 412 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
166 409 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
167 402 10
SCREED

168 KAIG3-RFI-SW-C-3405-00 Site Works 20/01/22 Inspection of Thrust Block for UPVC Pipe (200 mm Dia) for Fire Water Line at Zone- B - As Highlighted in the attached drawing C16/20 SRC 411 10

169 KAIG3-RFI-SW-C-3457-00 Site Works 20/01/22 Inspection for Casting the Blinding Concrete under the Foundation of SBC-05 -Wing Wall (as Highlighted) C16/20 SRC 413 10

Concrete Pouring for Blinding under Foundations (16 nos.) at Grid (A & B/1-8) of Canopy at New Ticketing Booths at highlighted area
170 KAIG3-RFI-TB-S-6377-00 New Ticketing Booths 20/01/22 C16/20 SRC 416 11
in attached drawings.

171 C16/20 SRC 415 5

172 C16/20 SRC 414 10

kaig-qcals 244
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI173
No. RFI NUMBER
KAIG3-RFI-CO-S-6368-00 Crescent 22/01/22 Concreting for Mass Concrete of Strip Footing Between PCDESCRIPTION
150 - 152 Zone 2J DESIGN MIX
C16/20 SRC 463 QUANTITY
2
LOCATION CASTING No.
(m³)

174 C16/20 SRC 457 10

175 C16/20 SRC 455 10

176 C16/20 SRC 454 10

177 KAIG3-RFI-TG-S-6374-00 Butterfly Garden 22/01/22 Concrete Pouring & Shuttering for Footing at Grid (A/5-14 & A-B/14) @ Butterfly Garden, at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 474 10

178 C32/40 62% OPC+30%FA - 160+/-40 473 10

179 C32/40 62% OPC+30%FA - 160+/-40 472 10

180 C32/40 62% OPC+30%FA - 160+/-40 471 10

181 C32/40 62% OPC+30%FA - 160+/-40 469 10

182 C32/40 62% OPC+30%FA - 160+/-40 468 10

183 C32/40 62% OPC+30%FA - 160+/-40 467 10

184 C32/40 62% OPC+30%FA - 160+/-40 462 10

185 C32/40 62% OPC+30%FA - 160+/-40 465 10

186 C32/40 62% OPC+30%FA - 160+/-40 464 10

187 C32/40 62% OPC+30%FA - 160+/-40 461 10

188 C32/40 62% OPC+30%FA - 160+/-40 456 10

189 C32/40 62% OPC+30%FA - 160+/-40 460 10

190 C32/40 62% OPC+30%FA - 160+/-40 458 10

191 KAIG3-RFI-SW-C-3495-00 Site Works 22/01/22 Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/19, B/FS/21, B/FS/22, B/FS/37 at Zone-B - as highlighted C16/20 SRC 470 6

192 C16/20 SRC 466 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


193 KAIG3-RFI-CO-S-6358-00 Crescent 24/01/22 Concreting for BUTTRESS BOI 59, 60 (1st with beam) Zone 2A 538 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
194 533 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
195 523 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
196 517 10
SCREED

197 KAIG3-RFI-SW-C-3511-00 Site Works 24/01/22 Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/36, B/TL/35, G/TL/32 at Zone-B&G - as highlighted C16/20 SRC 536 10

198 C16/20 SRC 524 10

199 C16/20 SRC 518 10

200 KAIG3-RFI-CO-S-6358-00 Crescent 24/01/22 Concreting for BUTTRESS BOI 59, 60 (1st with beam) Zone 2A C32/40 62% OPC+30%FA - 160+/-40 540 10

201 C32/40 62% OPC+30%FA - 160+/-40 539 10

kaig-qcals 245
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI202
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 535 QUANTITY
10
LOCATION CASTING No.
(m³)

203 C32/40 62% OPC+30%FA - 160+/-40 534 10

204 C32/40 62% OPC+30%FA - 160+/-40 531 10

205 C32/40 62% OPC+30%FA - 160+/-40 532 10

206 C32/40 62% OPC+30%FA - 160+/-40 530 10

207 C32/40 62% OPC+30%FA - 160+/-40 529 10

208 C32/40 62% OPC+30%FA - 160+/-40 528 10

209 C32/40 62% OPC+30%FA - 160+/-40 527 10

210 C32/40 62% OPC+30%FA - 160+/-40 526 10

211 C32/40 62% OPC+30%FA - 160+/-40 525 10

212 C32/40 62% OPC+30%FA - 160+/-40 521 10

213 C32/40 62% OPC+30%FA - 160+/-40 522 10

214 C32/40 62% OPC+30%FA - 160+/-40 520 10

215 C32/40 62% OPC+30%FA - 160+/-40 519 10

216 KAIG3-RFI-PG-S-6392-00 Physic Garden 24/01/22 Concrete Pouring & Shuttering for Footing of Plant Room at Physic Garden, at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 541 10

217 C32/40 62% OPC+30%FA - 160+/-40 537 11

Concrete Pouring & Shuttering for Stair Core Wall (upto Bottom of Slab), at Grid (G-F/8) at Management Building, As Highlighted in
218 KAIG3-RFI-MB-S-6376-00 Management Building 24/01/22 C32/40 62% OPC+30%FA - 160+/-40 542 10
Attached Drawing's

Inspection for Casting Concrete for Short Piece and Surface Preperation prior to start waterproofing for short piece and Application of
219 KAIG3-RFI-SW-C-3616-00 Site Works 25/01/22 C16/20 SRC 806 10
Primer (1st Coat, 2nd Coat and 3rd Coat) for Gullies G-H-1, G-H-2, G-H-3, G-H-4, G-H-5, G-H-6, G-H-7, G-H-8, G-H-9,

220 C16/20 SRC 578 10

221 C16/20 SRC 799 10

222 C16/20 SRC 805 10

223 C16/20 SRC 802 10

Concreting for Isolated Columns (upto SOG only) for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2, D-3, D-4, D-5, D-5.1, E-
224 KAIG3-RFI-LM-S-6381-00 Large Mosque 25/01/22 C32/40 62% OPC+30%FA - 160+/-40 469 8
5.1) ZONE 1G (as highlighted)

225 C32/40 62% OPC+30%FA - 160+/-40 559 8

226 KAIG3-RFI-TB-S-6420-00 New Ticketing Booths 25/01/22 Concrete Pouring & Shuttering for Footings of Canopy Foundations (8 nos) at New Ticketing Booth at highlighted in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 811 10

227 C32/40 62% OPC+30%FA - 160+/-40 810 10

228 C32/40 62% OPC+30%FA - 160+/-40 809 10

229 C32/40 62% OPC+30%FA - 160+/-40 808 10

230 C32/40 62% OPC+30%FA - 160+/-40 807 10

kaig-qcals 246
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI231
No. RFI NUMBER
KAIG3-RFI-CO-S-6390-00 Crescent 26/01/22 DESCRIPTION
Concreting for RING BEAM Zone 2B (Outer) Axis 02-2, 02D to 02G (as highlighted) DESIGN MIX MS - 220+/-20 - 824 QUANTITY
5
LOCATION CASTING SCREED No.
(m³)

232 KAIG3-RFI-CO-S-6361-00 Crescent 26/01/22 Concreting for Mass Concrete of Strip Footing Between PC 131 - 133 Zone 2F C16/20 SRC 832 4

233 C16/20 SRC 831 7

234 C16/20 SRC 830 10

235 C16/20 SRC 829 10

236 C16/20 SRC 826 10

237 C16/20 SRC 825 10

238 KAIG3-RFI-SW-C-3512-00 Site Works 27/01/22 Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/36, B/FS/27, G/FS/17 at Zone-B&G - as highlighted C16/20 SRC 583 10

239 C16/20 SRC 580 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


240 KAIG3-RFI-MC-S-6454-00 MCPE 2 27/01/22 Concreting for MCPE 2 WALL (OUTER ) at axis 03E-02X Zone 2G (as highlighted) 861 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
241 584 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
242 581 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
243 KAIG3-RFI-CO-S-6463-00 Crescent 27/01/22 Concreting for BUTTRESS BII 59 (2nd) Zone 2A 864 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
244 863 6
SCREED

Concrete Pouring for Blinding Under Electrical Handholes of Low voltage (MH/DG/LV/01-08), Telecom (MH/DG/TC/01-16),
245 KAIG3-RFI-DG-C-3605-00 Discovery Garden 27/01/22 Emergency (MH/DG/EM/01-17) and Fire Alarm & Security (MH/DG/FA/01-17), Inside Discovery Garden at highlighted area in C16/20 SRC 865 10
attached Drawing's.

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


246 KAIG3-RFI-CO-S-6471-00 Crescent 29/01/22 Concreting for BUTTRESS BOV 24, 25 Zone 1F 1G 625 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
247 624 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
248 623 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
249 621 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
250 620 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
251 609 10
SCREED

Concrete pouring for Blinding under Electrical Handholes of Emergency (MH/ZG/EM/01-06 & 09-10), Fire Alarm & Security
252 KAIG3-RFI-ZG-C-3612-00 Maze Garden 29/01/22 C16/20 SRC 622 7
(MH/ZG/FA/01-09) and Telecom (MH/ZG/TC/01-05 & 08-12), inside Maze garden, as highlighted area in attached drawing's.

Concrete Pouring & Shuttering for Footings of Canopy Foundations (8 no's) at Grid (A & B/5-8), at New Ticketing Booths, at
253 KAIG3-RFI-TB-S-6480-00 New Ticketing Booths 30/01/22 C32/40 62% OPC+30%FA - 160+/-40 649 11
highlighted area in attached drawings.

254 C32/40 62% OPC+30%FA - 160+/-40 641 10

255 C32/40 62% OPC+30%FA - 160+/-40 635 10

256 C32/40 62% OPC+30%FA - 160+/-40 633 10

257 C32/40 62% OPC+30%FA - 160+/-40 631 10

258 KAIG3-RFI-CO-S-6443-00 Crescent 30/01/22 Concreting for BUTTRESS BOV 22, 23 Zone 1F C32/40 62% OPC+30%FA - 160+/-40 659 8

kaig-qcals 247
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI259
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 658 QUANTITY
10
LOCATION CASTING No.
(m³)

260 C32/40 62% OPC+30%FA - 160+/-40 619 10

261 C32/40 62% OPC+30%FA - 160+/-40 651 10

262 C32/40 62% OPC+30%FA - 160+/-40 642 10

263 C32/40 62% OPC+30%FA - 160+/-40 637 10

264 C32/40 62% OPC+30%FA - 160+/-40 634 10

265 C32/40 62% OPC+30%FA - 160+/-40 632 10

266 KAIG3-RFI-CO-S-6476-00 Crescent 31/01/22 Concreting for Mass Concrete (3rd) of Strip Footing Between PC 150 - 152 Zone 2J C16/20 SRC 674 4

267 C16/20 SRC 669 10

268 C16/20 SRC 668 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


269 KAIG3-RFI-CO-S-6473-00 Crescent 31/01/22 Concreting for BUTTRESS BIV 26, 27, 28 Zone 1G 680 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
270 994 10
SCREED

271 NO RFI C16/20 SRC 671 10

272 C16/20 SRC 630 10

273 C16/20 SRC 629 10

274 C16/20 SRC 628 10

275 NO RFI C20/25-(OPC) 867 3

276 C20/25-(OPC) 493 4

277 C20/25-(OPC) 237 4

Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and Application of Primer (1st Coat,
KAIG3-RFI-SW-C-3157-00 Site Works 22/01/22 C16/20 SRC 65755 10
2nd Coat and 3rd Coat) As attached

KAIG3-RFI-CO-S-6128-00 Crescent 22/01/22 Concreting for RING BEAM (Inner) Axis 02-2, 02J to 02N Zone 2D C32/40 62% OPC+30%FA - 160+/-40 65749 10

C32/40 62% OPC+30%FA - 160+/-40 65748 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


KAIG3-RFI-CO-S-6128-00 Crescent 22/01/22 Concreting for RING BEAM (Inner) Axis 02-2, 02J to 02N Zone 2D 65770 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65769 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65768 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65767 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65764 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65763 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65762 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65761 10
SCREED

kaig-qcals 248
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 65760 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65757 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65754 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65753 10
SCREED

TOTAL QUANTITY TRUCK LOAD (M³): 2672

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2672

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 249
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
Protection layer of 4mm thick bituminous protection board for Isolated Column of Large Mosque (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-
1 KAIG3-RFI-LM-S-6510-00 Large Mosque 2/3/2022 P 29-20273 5
Zone 1G 20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
2 P 29-20271 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
3 P 29-20270 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
4 P 29-20267 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
5 P 29-20266 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
6 P 29-20264 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
7 P 29-20263 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
8 P 29-20262 13
20 - SCREED

9 KAIG3-RFI-CO-S-6496-00 Crescent 2/3/2022 Concreting for Mass Concrete of Strip Footing Between (2nd layer) PC 81-83, 80-82-84 Zone 1N (as highlighted) C16/20 SRC P 29-20277 7

10 C16/20 SRC P 29-20276 13

11 C16/20 SRC P 29-20275 10

C32/40 62% OPC+30%FA+8% MS - 220+/-


12 KAIG3-RFI-CO-S-6539-00 Crescent 2/7/2022 Concreting for RING BEAM Zone 1B (Outer) Axis 01-2, 01D to 01G (as highlighted) P 29-20351 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
13 P 29-20350 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
14 P 29-20349 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
15 P 29-20346 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
16 P 29-20345 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
17 P 29-20344 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
18 P 29-20343 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
19 P 29-20342 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
20 KAIG3-RFI-CO-S-6552-00 Crescent 2/8/2022 Concreting for RING BEAM Zone 1D (Outer) Axis 01-2, 01J to 01M (as highlighted) P 29-20410 5
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
21 P 29-20409 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
22 P 29-20404 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
23 P 29-20400 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
24 P 29-20399 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
25 P 29-20395 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
26 P 29-20394 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
27 P 29-20393 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
28 P 29-20392 13
20 - SCREED

kaig-qcals 250
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
29 RFI NUMBER
KAIG3-RFI-CO-S-6587-00 Crescent 2/10/2022 DESCRIPTION
Concreting for RING BEAM Zone 1D (INNER) Axis 01-1, 01J to 01M (as highlighted) DESIGN MIX MS - 220+/- P 29-20442 QUANTITY
13
No. LOCATION CASTING 20 - SCREED NOTE No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-
30 P 29-20439 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
31 P 29-20434 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
32 P 29-20431 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
33 P 29-20428 10
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
34 P 29-20426 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
35 P 29-20424 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
36 KAIG3-RFI-CO-S-6620-00 Crescent 2/13/2022 Concreting for RING BEAM Zone 1C (INNER) Axis 01-1, 01G to 01J (as highlighted) P 29-20469 11
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
37 P 29-20468 12
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
38 P 29-20467 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
39 P 29-20465 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
40 P 29-20464 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
41 P 29-20463 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
42 P 29-20462 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
43 KAIG3-RFI-CO-S-6637-00 Crescent 2/16/2022 Concreting for BUTTRESS BOI BOV 33, 34, 35, 36 Zone 1H 1J (as highlighted) P 29-20543 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
44 P 29-20542 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
45 P 29-20540 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
46 P 29-20539 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
47 P 29-20537 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
48 P 29-20536 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
49 P 29-20535 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
50 P 29-20534 13
20 - SCREED
Concrete Pouring & Shuttering for Walls & Columns (for Complete Height) at Grid (A&B/1-21 and A-B/1, 2, 20 & C32/40 62% OPC+30%FA+8% MS - 220+/-
51 KAIG3-RFI-TG-S-6702-00 Butterfly Garden 2/24/2022 P 29-20663 9
21) @ Butterfly Garden, at highlighted area in attached drawings. 20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
52 P 29-20662 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
53 P 29-20660 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
54 P 29-20657 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
55 P 29-20656 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
56 P 29-20655 13
20 - SCREED

kaig-qcals 251
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
57 RFI NUMBER
KAIG3-RFI-CO-S-6707-00 Crescent 2/23/2022 DESCRIPTION
Concreting for RING BEAM Zone 2L (INNER) Axis 02-1, 02AL to 02AH (as highlighted) DESIGN MIX MS - 220+/- P 29-20647 QUANTITY
13
No. LOCATION CASTING 20 - SCREED NOTE No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-
58 P 29-20646 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
59 P 29-20645 10
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
60 P 29-20644 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
61 P 29-20643 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
62 P 29-20642 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
63 P 29-20641 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
64 P 29-20640 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
65 P 29-20639 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
66 P 29-20637 10
20 - SCREED

TOTAL QUANTITY TRUCK LOAD (M³): 817

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C20/25 OPC 817

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 252
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-CO-S-6486-00 Crescent 2/1/2022 Concreting for BUTTRESS BOI 59, 60 (2nd) Zone 2A C32/40 62% OPC+30%FA - 160+/-40 666 6

2 C32/40 62% OPC+30%FA - 160+/-40 719 10

3 C32/40 62% OPC+30%FA - 160+/-40 66585 6

4 C32/40 62% OPC+30%FA - 160+/-40 66579 7

5 C32/40 62% OPC+30%FA - 160+/-40 706 10

6 C32/40 62% OPC+30%FA - 160+/-40 704 8

7 KAIG3-RFI-CO-S-6527-00 Crescent 2/1/2022 Concreting for Infill Wall Between BI 87-88 (Inner) as highlighted Zone 2G between Gridline 02-1W - 02-1X C32/40 62% OPC+30%FA - 160+/-40 66613 8

8 C32/40 62% OPC+30%FA - 160+/-40 66608 10

9 C32/40 62% OPC+30%FA - 160+/-40 66602 10

10 C32/40 62% OPC+30%FA - 160+/-40 66601 10

11 C32/40 62% OPC+30%FA - 160+/-40 66599 10

12 C32/40 62% OPC+30%FA - 160+/-40 724 10

13 C32/40 62% OPC+30%FA - 160+/-40 723 10

14 C32/40 62% OPC+30%FA - 160+/-40 714 10

15 C32/40 62% OPC+30%FA - 160+/-40 711 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


16 KAIG3-RFI-CO-S-6527-00 Crescent 2/1/2022 Concreting for Infill Wall Between BI 87-88 (Inner) as highlighted Zone 2G between Gridline 02-1W - 02-1X 722 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
17 KAIG3-RFI-CO-S-6494-00 Crescent 2/1/2022 Concreting for BUTTRESS BOV 26, 27, 28 Zone 1G 66645 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
18 66635 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
19 66627 10
SCREED
Shuttering for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) between axis (2,B-C), (1,C-F), (F,1-2),
20 KAIG3-RFI-LM-S-6414-00 Large Mosque 2/2/2022 C32/40 62% OPC+30%FA - 160+/-40 66654 10
(2,E-F), (E,2-3)

21 C32/40 62% OPC+30%FA - 160+/-40 66653 10

22 C32/40 62% OPC+30%FA - 160+/-40 66650 10

23 C32/40 62% OPC+30%FA - 160+/-40 66649 10

24 C32/40 62% OPC+30%FA - 160+/-40 66647 10

25 C32/40 62% OPC+30%FA - 160+/-40 66646 10

26 C32/40 62% OPC+30%FA - 160+/-40 66644 10

27 C32/40 62% OPC+30%FA - 160+/-40 66643 10

28 C32/40 62% OPC+30%FA - 160+/-40 66642 10

kaig-qcals 253
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI29
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 66641 QUANTITY
10
LOCATION CASTING No.
(m³)

30 C32/40 62% OPC+30%FA - 160+/-40 66640 10

31 C32/40 62% OPC+30%FA - 160+/-40 66639 10

32 C32/40 62% OPC+30%FA - 160+/-40 66638 10

33 C32/40 62% OPC+30%FA - 160+/-40 66636 10

34 C32/40 62% OPC+30%FA - 160+/-40 66633 10

35 C32/40 62% OPC+30%FA - 160+/-40 66632 10

36 C32/40 62% OPC+30%FA - 160+/-40 66630 10

37 C32/40 62% OPC+30%FA - 160+/-40 66629 10

38 C32/40 62% OPC+30%FA - 160+/-40 66628 10

39 KAIG3-RFI-SW-C-3732-00 Site Works 2/2/2022 Inspection for Casting Blinding Concrete under Manhole - MH-M-07, MH-M-08, MH-M-09, MH-M-10 - as highlighted C16/20 SRC 66631 7

Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line between G/TL/31 to G/TL/29 at Zone-G - As
40 KAIG3-RFI-SW-C-3752-00 Site Works 2/2/2022 C32/40 62% OPC+30%FA - 160+/-40 66637 10
Highlighted

41 C32/40 62% OPC+30%FA - 160+/-40 66634 10

Shuttering for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) between axis (2,B-C), (1,C-F), (F,1-2),
42 KAIG3-RFI-LM-S-6414-00 Large Mosque 2/3/2022 C32/40 62% OPC+30%FA - 160+/-40 66689 10
(2,E-F), (E,2-3)

43 C32/40 62% OPC+30%FA - 160+/-40 66687 10

44 C32/40 62% OPC+30%FA - 160+/-40 66686 10

45 C32/40 62% OPC+30%FA - 160+/-40 66685 10

46 C32/40 62% OPC+30%FA - 160+/-40 66680 10

47 C32/40 62% OPC+30%FA - 160+/-40 66679 10

48 C32/40 62% OPC+30%FA - 160+/-40 66678 10

49 C32/40 62% OPC+30%FA - 160+/-40 66677 10

Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at Zone-G - As
50 KAIG3-RFI-SW-C-3761-00 Site Works 2/3/2022 C32/40 62% OPC+30%FA - 160+/-40 66681 10
Highlighted

51 KAIG3-RFI-SW-C-3762-00 Site Works 2/3/2022 Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at Zone-G - As Highlighted C16/20 SRC 66688 3

52 C16/20 SRC 66683 8

53 C16/20 SRC 66682 10

54 KAIG3-RFI-TG-S-6492-01 Butterfly Garden 2/5/2022 Concrete Pouring & Shuttering for Footings of Internal foundations, Inside Butterfly Garden, at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 66715 10

55 C32/40 62% OPC+30%FA - 160+/-40 66714 10

56 KAIG3-RFI-SW-C-3780-00 Site Works 2/5/2022 Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line near G/FS/18 at Zone-G - As Highlighted C16/20 SRC 66718 10

57 C16/20 SRC 66716 10

kaig-qcals 254
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Concrete Pouring & Shuttering for Columns (Upto height +876.51) & Walls (Upto height +876.66) at Grid (A/5-14), at Butterfly Garden, C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI58
No. RFI NUMBER
KAIG3-RFI-TG-S-6534-00 Butterfly Garden 2/5/2022 DESCRIPTION DESIGN MIX MS - 220+/-20 - 66729 QUANTITY
4
LOCATION CASTING at highlighted area in attached drawings. SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
59 66717 4
SCREED
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between G/RC-TL/3 and G/RC-TL/2 at Zone-G - As
60 KAIG3-RFI-SW-C-3821-00 Site Works 2/6/2022 C16/20 SRC 66822 7
Highlighted
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
61 KAIG3-RFI-CO-S-6525-00 Crescent 2/6/2022 Concreting for BUTTRESS BII 26, 27, 28 (with beam) Zone 1G 66841 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
62 66829 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
63 66830 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
64 66827 8
SCREED
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for G/RC-TL/3 and G/RC-TL/2 at Zone-G - As C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65 KAIG3-RFI-SW-C-3820-00 Site Works 2/6/2022 66833 2
Highlighted SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
66 66825 3
SCREED
Shuttering for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) between axis (2,B-C), (1,C-F), (F,1-2),
67 KAIG3-RFI-LM-S-6414-00 Large Mosque 2/6/2022 C32/40 62% OPC+30%FA - 160+/-40 66840 7
(2,E-F), (E,2-3)

68 C32/40 62% OPC+30%FA - 160+/-40 66835 10

69 C32/40 62% OPC+30%FA - 160+/-40 66831 10

70 C32/40 62% OPC+30%FA - 160+/-40 66828 10

71 C32/40 62% OPC+30%FA - 160+/-40 66826 10

Concrete Pouring & Shutteirng for Wall (200mm thk. Outer Wall) at Grid (A/1-21) @ Butterfly Garden, as highlighted area in attached
72 KAIG3-RFI-TG-S-6540-00 Butterfly Garden 2/6/2022 C32/40 62% OPC+30%FA - 160+/-40 66843 7
drawings.

73 C32/40 62% OPC+30%FA - 160+/-40 66839 10

74 C32/40 62% OPC+30%FA - 160+/-40 66838 10

75 C32/40 62% OPC+30%FA - 160+/-40 66837 10

76 C32/40 62% OPC+30%FA - 160+/-40 66836 10

77 C32/40 62% OPC+30%FA - 160+/-40 66834 10

78 KAIG3-RFI-CO-S-6556-00 Crescent 2/7/2022 Geotextile sheet & Screed Protection under Strip footing between PC 80-82-84, 81-83 Zone 1N (as Highlighted) C16/20 SRC 66853 7

79 C16/20 SRC 66849 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


80 KAIG3-RFI-CO-S-6523-00 Crescent 2/7/2022 Concreting for BUTTRESS BOI 22, 23, 24, 25 (with beam) Zone 1F 1G 66866 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
81 66865 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
82 66857 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
83 66854 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
84 66850 8
SCREED

85 KAIG3-RFI-SW-C-3804-01 Site Works 2/7/2022 Inspection of Concrete Pouring for the Footing of SBC-09 - Wing Wall (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 66851 10

Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for G/RC-FS/27 and G/RC-FS/11 at Zone-G - As
86 KAIG3-RFI-SW-C-3824-00 Site Works 2/7/2022 C16/20 SRC 66855 6
Highlighted

kaig-qcals 255
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI87
No. RFI NUMBER
KAIG3-RFI-CO-S-6545-00 Crescent 2/8/2022 DESCRIPTION
Concreting for BUTTRESS BOV 29, 30, 31, 32 Zone 1G 1H DESIGN MIX MS - 220+/-20 - 66889 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
88 66888 2
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
89 66884 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
90 66881 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
91 66875 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
92 66870 10
SCREED

93 KAIG3-RFI-SW-C-3804-01 Site Works 2/8/2022 Inspection of Concrete Pouring for the Footing of SBC-09 - Wing Wall (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 66876 10

Site Works/ Boundary


94 KAIG3-RFI-SW-S-6588-00 2/8/2022 Concrete Pouring for Blinding under Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached Highlighted Drawing's. C16/20 SRC 66891 7
Wall

95 C16/20 SRC 66886 10

96 C16/20 SRC 66885 3

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between G/RC-TL/3 and G/RC-TL/2 at Zone-G - As
97 KAIG3-RFI-SW-C-3821-00 Site Works 2/8/2022 C16/20 SRC 66887 4
Highlighted

98 KAIG3-RFI-CC-S-6572-00 Child Care 2/8/2022 Concreting of Mass Concrete, Blinding of CHILDCARE foundation Zone 2N (as highlighted) C16/20 SRC 66894 10

99 C16/20 SRC 66893 10

100 C16/20 SRC 66892 10

101 C16/20 SRC 66890 10

102 KAIG3-RFI-CO-S-6559-00 Crescent 2/9/2022 Concreting for Mass Concrete of Strip Footing Between (2nd layer) PC 79-81 Zone 1N (as highlighted) C16/20 SRC 66909 10

103 C16/20 SRC 66908 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


104 KAIG3-RFI-CO-S-6564-00 Crescent 2/9/2022 Concreting for BUTTRESS BOI 26, 27, 28 (with beam) Zone 1G 66925 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
105 66918 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
106 66910 10
SCREED

107 KAIG3-RFI-CO-S-6482-00 Crescent 2/9/2022 Concreting of 2 side Wall for Tunnel 1 as highlighted Zone 2H. C32/40 62% OPC+30%FA - 160+/-40 66928 2

108 C32/40 62% OPC+30%FA - 160+/-40 66926 9

109 C32/40 62% OPC+30%FA - 160+/-40 66921 7

110 NO RFI C32/40 62% OPC+30%FA - 160+/-40 66927 2

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


111 KAIG3-RFI-MC-S-6547-00 MCPE 3 2/10/2022 Concreting for MCPE 3 WALL at axis 02S to 02R, 03-1 to 03-2 Zone 2E 2F (as highlighted) 966 2
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
112 955 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
113 951 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
114 943 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
115 942 10
SCREED

kaig-qcals 256
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI116
No. RFI NUMBER
KAIG3-RFI-MC-S-6594-00 MCPE 4 2/10/2022 Concreting for MCPE 4 Foundation at axis 01AP Zone DESCRIPTION
1N (as highlighted) C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 963 QUANTITY
10
LOCATION CASTING No.
(m³)

117 C32/40 62% OPC+30%FA - 160+/-40 962 10

118 C32/40 62% OPC+30%FA - 160+/-40 961 10

119 C32/40 62% OPC+30%FA - 160+/-40 960 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


120 KAIG3-RFI-CO-S-6617-00 Crescent 2/12/2022 Concreting for Infill Wall Between BII BIV 25-26 (only 2 INNER) as highlighted Zone 1G between Gridline 01-1, 01T to 01S 66973 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
121 1028 10
SCREED

122 KAIG3-RFI-SW-C-4033-00 Site Works 2/12/2022 Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-F&G - As Highlighted in the attached drawing C16/20 SRC 1029 3

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


123 KAIG3-RFI-CO-S-6597-00 Crescent 2/12/2022 Concreting for Infill Wall Between BOI 126-127 (OUTER) as highlighted Zone 2R between Gridline 02-2/BA - 02-2/BB 1037 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
124 1036 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
125 1033 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
126 66977 8
SCREED

127 KAIG3-RFI-CC-S-6635-00 Child Care 2/13/2022 Concreting of CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 1054 10

128 C32/40 62% OPC+30%FA - 160+/-40 1053 10

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/49 and B/TL/40 at Zone-B - As
129 KAIG3-RFI-SW-C-3938-00 Site Works 2/13/2022 C16/20 SRC 1076 10
Highlighted

130 C16/20 SRC 1078 10

131 C16/20 SRC 1068 10

132 C16/20 SRC 1062 10

133 C16/20 SRC 1055 10

Concrete Pouring & Shuttering for Wall (200mm thk. Inner Wall) at Grid (A/2-20) @ Butterfly Garden, as highlighted area in attached
134 KAIG3-RFI-TG-S-6607-00 Butterfly Garden 2/13/2022 C32/40 62% OPC+30%FA - 160+/-40 1061 5
drawings.

135 C32/40 62% OPC+30%FA - 160+/-40 1057 10

136 C32/40 62% OPC+30%FA - 160+/-40 1056 10

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/TL/39 and B/RC-TL/02 at Zone-B - As
137 KAIG3-RFI-SW-C-3915-00 Site Works 2/13/2022 C32/40 62% OPC+30%FA - 160+/-40 1079 10
Highlighted

138 C32/40 62% OPC+30%FA - 160+/-40 1077 10

139 C32/40 62% OPC+30%FA - 160+/-40 1075 10

140 C32/40 62% OPC+30%FA - 160+/-40 1074 10

141 C32/40 62% OPC+30%FA - 160+/-40 1073 10

142 C32/40 62% OPC+30%FA - 160+/-40 1058 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


143 KAIG3-RFI-CC-S-6635-00 Child Care 2/13/2022 Concreting of CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted) 1070 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
144 1060 9
SCREED

kaig-qcals 257
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Inspection of Concrete (Plain) Pouring for Duct Bank of FireDESCRIPTION
& Security line between B/RC-FS/8 and B/RC-FS/11 at Zone-B - As DELIVERY NOTE
SI145
No. RFI NUMBER
KAIG3-RFI-SW-C-3939-00 Site Works 2/13/2022 DESIGN MIX
C16/20 SRC 1080 QUANTITY
8
LOCATION CASTING Highlighted No.
(m³)
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/FS/38 and B/RC-FS/18 at Zone-B - As
146 KAIG3-RFI-SW-C-3933-00 Site Works 2/14/2022 C16/20 SRC 1126 5
Highlighted

147 C16/20 SRC 1124 10

148 C16/20 SRC 1120 10

149 KAIG3-RFI-CC-S-6635-00 Child Care 2/14/2022 Concreting of CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 1129 8

150 C32/40 62% OPC+30%FA - 160+/-40 1123 10

151 C32/40 62% OPC+30%FA - 160+/-40 1122 10

Site Works/ Boundary


152 KAIG3-RFI-SW-S-6654 2/14/2022 Concrete Pouring & Shuttering for Footings of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached Highlighted Drawing's. C32/40 62% OPC+30%FA - 160+/-40 1166 6
Wall

153 C32/40 62% OPC+30%FA - 160+/-40 1137 10

154 C32/40 62% OPC+30%FA - 160+/-40 1136 10

155 C32/40 62% OPC+30%FA - 160+/-40 1135 10

156 KAIG3-RFI-SW-C-3976-00 Site Works 2/15/2022 Inspection of Concrete Pouring for the Wall and Slab of Extension Area of SBC-05 - (As Highlighted). C32/40 62% OPC+30%FA - 160+/-40 1216 5

157 KAIG3-RFI-CO-S-6639-00 Crescent 2/15/2022 Shuttering for Strip Footing between PC 2-4-8 Zone 1A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 67125 10

158 C32/40 62% OPC+30%FA - 160+/-40 67121 10

159 C32/40 62% OPC+30%FA - 160+/-40 67114 10

160 C32/40 62% OPC+30%FA - 160+/-40 67107 10

161 C32/40 62% OPC+30%FA - 160+/-40 1223 10

162 C32/40 62% OPC+30%FA - 160+/-40 1222 10

163 C32/40 62% OPC+30%FA - 160+/-40 1217 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


164 KAIG3-RFI-CO-S-6642-00 Crescent 2/15/2022 Concreting for TUNNEL 2 Shaft wall (part A) at Zone 2F (as highlighted) 67127 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
165 67120 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
166 67113 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
167 67106 10
SCREED

168 KAIG3-RFI-SW-C-4062-00 Site Works 2/15/2022 Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-02 - Wing Wall (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 67117 10

169 C32/40 62% OPC+30%FA - 160+/-40 67116 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


170 KAIG3-RFI-MC-S-6667-00 MCPE 2/16/2022 Concreting for MCPE 1 Inner Wall at axis 03-1, 03S - 03T Zone 2N 2M (as highlighted) upto (871.25) 67163 2
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
171 67161 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
172 67157 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
173 67153 10
SCREED

kaig-qcals 258
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI174
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 67152 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
175 67146 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
176 67144 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
177 67136 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
178 67137 10
SCREED
Site Works/ Boundary
179 KAIG3-RFI-SW-S-6588-00 2/16/2022 Concrete Pouring for Blinding under Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached Highlighted Drawing's. C16/20 SRC 67164 4
Wall
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
180 KAIG3-RFI-CO-S-6671-00 Crescent 2/17/2022 Concreting for Infill Wall between Gridline 01-1T - 01-1U - 01-S Zone 1G as highlighted. 67206 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
181 1269 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
182 1266 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
183 67181 10
SCREED
Concrete Pouring & Shuttering for Footing of Circular Walls (Remaining parts), inside Maze garden, as highlighted area in attached C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
184 KAIG3-RFI-ZG-S-6661-00 Maze Garden 2/17/2022 67198 8
drawing's. SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
185 1267 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
186 1265 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
187 KAIG3-RFI-CO-S-6631-00 Crescent 2/19/2022 Concreting for Ground Beam between PC 80-82 Zone 1N (as highlighted) 1410 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
188 1407 10
SCREED

189 KAIG3-RFI-SW-C-4105-00 Site Works 2/19/2022 Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/11 at Zone-B - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 1413 10

190 KAIG3-RFI-MC-S-6701-00 MCPE 4 2/19/2022 Concreting for (2nd) Blinding of MCPE 4 Foundation Zone 1N (as highlighted) C16/20 SRC 1409 4

191 KAIG3-RFI-CO-S-6680-00 Crescent 2/19/2022 Concreting for BUTTRESS BIV 33, 34, 35 Zone 1H 1J C32/40 62% OPC+30%FA - 160+/-40 1414 10

192 KAIG3-RFI-SW-C-4062-00 Site Works 2/20/2022 Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-02 - Wing Wall (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 1519 10

193 C32/40 62% OPC+30%FA - 160+/-40 1491 8

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


194 KAIG3-RFI-CO-S-6682-00 Crescent 2/20/2022 Concreting for BUTTRESS BII 29, 30, 31, 32 (with beam) Zone 1G 1H 1518 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
195 1505 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
196 1493 10
SCREED

197 KAIG3-RFI-SW-C-4113-00 Site Works 2/20/2022 Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/8 at Zone-B - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 1504 10

198 C32/40 62% OPC+30%FA - 160+/-40 1492 10

199 KAIG3-RFI-CO-S-6652-00 Crescent 2/20/2022 Concreting for BUTTRESS BOI 29, 30, 31, 32 (with beam) Zone 1G 1H C32/40 62% OPC+30%FA - 160+/-40 1471 10

200 KAIG3-RFI-SW-C-4146-00 Site Works 2/20/2022 Inspection of Concrete Pouring for the Footing and Kicker of Corner Connection between SBC-01 & SBC-02 - (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 1517 5

201 C32/40 62% OPC+30%FA - 160+/-40 1510 10

202 KAIG3-RFI-CO-S-6680-00 Crescent 2/20/2022 Concreting for BUTTRESS BIV 33, 34, 35 Zone 1H 1J C16/20 SRC 1511 3

kaig-qcals 259
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI203
No. RFI NUMBER
KAIG3-RFI-SW-C-4120-00 Site Works 2/21/2022 DESCRIPTION
Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-K - As Highlighted in the attached drawing DESIGN MIX
C16/20 SRC 1557 QUANTITY
5
LOCATION CASTING No.
(m³)

204 KAIG3-RFI-PG-S-6715-00 Physic Garden 2/21/2022 Concrete Pouring for Blinding under Seat Walls (Outer), Inside Physic garden, as highlighted area in attached drawing's. C16/20 SRC 67459 8

205 C16/20 SRC 1586 10

206 C16/20 SRC 67427 2

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


207 KAIG3-RFI-CO-S-6671-00 Crescent 2/21/2022 Concreting for Infill Wall between Gridline 01-1T - 01-1U - 01-S Zone 1G as highlighted. 67458 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
208 1575 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
209 1562 10
SCREED
Site Works/ Boundary Concrete Pouring & Shuttering for Kicker (1st Lift) of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached Highlighted
210 KAIG3-RFI-SW-S-6690-00 2/21/2022 C32/40 62% OPC+30%FA - 160+/-40 1585 2
Wall Drawing's.

211 C32/40 62% OPC+30%FA - 160+/-40 1584 6

212 C32/40 62% OPC+30%FA - 160+/-40 1578 10

213 C32/40 62% OPC+30%FA - 160+/-40 1577 10

214 C32/40 62% OPC+30%FA - 160+/-40 1574 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


215 KAIG3-RFI-CO-S-6707-00 Crescent 2/23/2022 Concreting for RING BEAM Zone 2L (INNER) Axis 02-1, 02AL to 02AH (as highlighted) 1612 3
SCREED

216 KAIG3-RFI-TB-S-6696-00 New Ticket Booth 2/23/2022 Concrete Pouring & Shuttering for Starter (Kicker) for Wall of New Ticketing Booth # 5A, at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 67483 3

217 KAIG3-RFI-SW-C-4120-00 Site Works 2/23/2022 Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-K - As Highlighted in the attached drawing C16/20 SRC 67492 6

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


218 KAIG3-RFI-TB-S-6741-00 New Ticketing Booth 2/24/2022 Concrete Pouring & Shuttering for Starter (Kicker) for Wall of New Ticketing Booth # 4A, at highlighted area in attached drawings. 1708 3
SCREED

219 KAIG3-RFI-SW-C-4188-00 Site Works 2/24/2022 Inspection of Concrete Pouring for the Wing Wall of SBC-05 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 67534 10

220 C32/40 62% OPC+30%FA - 160+/-40 1709 10

Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/15, F/TL/12, F/TL/14, F/TL/03, F/TL/04, F/TL/16, G/TL/43,
221 KAIG3-RFI-SW-C-4240-00 Site Works 2/24/2022 C16/20 SRC 67556 4
G/TL/21, G/TL/13, G/TL/44, G/TL/50, G/TL/54, G/TL/16 at Zone-F&G - as highlighted

222 C16/20 SRC 67548 10

223 C16/20 SRC 2180 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


224 KAIG3-RFI-CO-S-6717-00 Crescent 2/24/2022 Concreting for BUTTRESS BIV 36, 37 Zone 1J 1715 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
225 1720 3
SCREED

226 KAIG3-RFI-SW-C-4185-00 Site Works 2/26/2022 Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-04 - Wing Wall (As Highlighted) C16/20 SRC 1763 3

227 C16/20 SRC 1758 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


228 KAIG3-RFI-CO-S-6719-00 Crescent 2/26/2022 Concreting for BUTTRESS BOI 33, 34, 35 (with beam) Zone 1J 1H 1794 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
229 1776 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
230 1760 10
SCREED

kaig-qcals 260
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI231
No. RFI NUMBER
KAIG3-RFI-CC-S-6725-00 Child Care 2/26/2022 DESCRIPTION
Concreting of CHILDCARE foundation P2 & P3 Zone 2N (as highlighted) C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 1801 QUANTITY
10
LOCATION CASTING No.
(m³)

232 C32/40 62% OPC+30%FA - 160+/-40 1799 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


233 KAIG3-RFI-CO-S-6711-00 Crescent 2/27/2022 Concreting for Infill Wall between Gridline 01-1T - 01-1U - 01-S Zone 1G as highlighted. 67675 2
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
234 1846 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
235 1637 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
236 1619 10
SCREED

Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/15, F/TL/12, F/TL/14, F/TL/03, F/TL/04, F/TL/16, G/TL/43,
237 KAIG3-RFI-SW-C-4240-00 Site Works 2/27/2022 C16/20 SRC 1820 5
G/TL/21, G/TL/13, G/TL/44, G/TL/50, G/TL/54, G/TL/16 at Zone-F&G - as highlighted

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


238 KAIG3-RFI-CO-S-6736-00 Crescent 2/28/2022 Concreting for BUTTRESS BOI 36, 37 (with beam) Zone 1J 1890 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
239 1884 10
SCREED

Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short piece and Application of
240 KAIG3-RFI-SW-C-4252-00 Site Works 2/28/2022 C32/40 62% OPC+30%FA - 160+/-40 1886 10
Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-M-07, MH-M-08, MH-M-09, MH-M-10 (As Highlighted)

241 C32/40 62% OPC+30%FA - 160+/-40 1885 10

Inspection for Blinding Concrete under Fire & Security Line Pit F/FS/17, F/FS/11, F/FS/03, F/FS/04, F/FS/14, G/FS/07, G/FS/21,
242 KAIG3-RFI-SW-C-4241-00 Site Works 2/28/2022 C16/20 SRC 1896 10
G/FS/08, G/FS/30, G/FS/52, G/FS/19 at Zone-F&G - as highlighted

243 C16/20 SRC 67692 10

244 KAIG3-RFI-CO-S-6739-00 Crescent 2/28/2022 Concreting for RETAINING WALL FOUNDATION Axis 01J to 01K (as highlighted) Zone 1D C32/40 62% OPC+30%FA - 160+/-40 1908 10

245 C32/40 62% OPC+30%FA - 160+/-40 1905 10

246 C32/40 62% OPC+30%FA - 160+/-40 1893 10

247 KAIG3-RFI-CO-S-6758-00 Crescent 2/28/2022 Concreting for Promenade Bridge Abutment Blinding under foundation at Grid M (as highlighted) C16/20 SRC 1909 10

248 C16/20 SRC 1906 10

TOTAL QUANTITY TRUCK LOAD (M³): 2131

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2131

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 261
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

kaig-qcals 262
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI216
No. RFI NUMBER
KAIG3-RFI-TB-S-6696-00 New Ticket Booth 2/23/2022 Concrete Pouring & Shuttering for Starter (Kicker) for WallDESCRIPTION
of New Ticketing Booth # 5A, at highlighted area in attached drawings. DESIGN MIX - 160+/-40
C32/40 67%OPC+25%FA 67483 QUANTITY
3
LOCATION CASTING No.
(m³)

kaig-qcals 263
Consultant : DAR

Main Contractor: ZHBG


RUN DATE: February 12, 2023

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
(m³)
TOTAL QUANTITY TRUCK LOAD (M³): 2132

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2132

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 264
Consultant : DAR

Main Contractor: ZHBG

GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-CO-S-6800-00 Crescent 3/5/2022 Concreting for RING BEAM Zone 2L (OUTER) Axis 02-1, 02AL to 02AH (as highlighted) P 28-32795 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
2 P 28-32794 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
3 P 28-32793 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
4 P 29-20806 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
5 P 29-20803 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
6 P 29-20802 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
7 P 29-20800 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
8 P 29-20799 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
9 P 29-20796 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
10 P 29-20794 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
11 P 29-20793 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
12 P 29-20790 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
13 KAIG3-RFI-CO-S-6805-01 Crescent 3/8/2022 Concreting for Strip Footing between PC 1-3-5 Zone 1A (as highlighted) P 28-32846 9
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
14 P 28-32842 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
15 P 28-32841 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
16 P 28-32839 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
17 P 28-32838 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
18 P 28-32837 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
19 P 28-32836 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
20 KAIG3-RFI-CO-S-6859-00 Crescent 3/10/2022 Concreting for RING BEAM Zone 2E (OUTER) Axis 02-2, 02N to 02R (as highlighted) P 29-20849 3
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
21 P 29-20847 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
22 P 29-20846 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
23 P 29-20844 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
24 P 29-20842 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
25 P 29-20841 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
26 P 29-20838 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
27 P 29-20837 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
28 P 29-20834 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
29 P 29-20833 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
30 P 29-20832 13
- SCREED

kaig-qcals 265
Consultant : DAR

Main Contractor: ZHBG

GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
31 RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 P 29-20831 QUANTITY
13
No. LOCATION CASTING - SCREED NOTE No.
(m³)

kaig-qcals 266
Consultant : DAR

Main Contractor: ZHBG

GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
33 RFI NUMBER
KAIG3-RFI-CO-S-6895-00 Crescent 3/15/2022 DESCRIPTION
Concreting for RING BEAM Zone 2E (INNER) Axis 02-1, 02N to 02R (as highlighted) DESIGN MIX MS - 220+/-20 P 29-20919 QUANTITY
9
No. LOCATION CASTING - SCREED NOTE No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
34 P 29-20918 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
35 P 29-20917 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
36 P 29-20916 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
37 P 29-20915 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
38 P 29-20911 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
39 P 29-20912 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
40 P 29-20910 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
41 P 29-20908 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
42 KAIG3-RFI-CO-S-6947-00 Crescent 3/17/2022 Shuttering and Shear Connector for BUTTRESS BOV 42 & 43 Zone 1K 1L (as highlighted) P 29-20955 12
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
43 P 29-20952 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
44 P 29-20950 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
45 P 29-20947 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
46 P 29-20946 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
47 P 29-20945 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
48 P 29-20944 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
49 P 29-20943 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
50 P 29-20942 13
- SCREED
Concrete Pouring Screed protection of water proofing for wet well( E ) ,at Water Garden as highlighted area in C32/40 62% OPC+30%FA+8% MS - 220+/-20
51 KAIG3-RFI-WG-S-6986-00 Water Play Garden 3/21/2022 P 29-20991 6
attached drawing's. - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
52 P 29-21014 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
53 P 29-21013 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
54 P 29-21012 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
55 P 29-21011 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
56 P 29-21010 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
57 P 29-21008 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
58 P 29-21005 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
59 P 29-21004 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
60 P 29-21001 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
61 P 29-20995 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
62 P 29-20994 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
63 P 29-20992 13
- SCREED

kaig-qcals 267
Consultant : DAR

Main Contractor: ZHBG

GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
Concrete Pouring for Blinding under Electrical Handholes of 10 Nos (MH/WG/EM/7 to15 & 29), (MH/WG/LV/1 to TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY
64 RFI NUMBER
KAIG3-RFI-WG-C-4717-00 Crescent 3/21/2022 56) and 14 Nos (MH/WG/FA/1 7to 29&53 ), insideDESCRIPTION
water play Garden, at water Gardenas highlighted area in DESIGN MIX
C16/20 SRC P 29-20993 QUANTITY
7
No. LOCATION CASTING NOTE No.
attached drawing's. (m³)

Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) around Potable Water Line Pit for C32/40 62% OPC+30%FA+8% MS - 220+/-20
75 KAIG3-RFI-SW-C-4772-00 Site Works 3/23/2022 P 29-21085 3
C/PW/01 at Zone-C - as highlighted (SP# 133 A-1-B) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


76 KAIG3-RFI-CF-S-6984-00 Cafeteria 3/24/2022 Concreting for Cafeteria Foundation RAFT 1 (as highlighted) Zone 2A P 29-21167 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
77 P 29-21166 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
78 P 29-21165 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
79 P 29-32867 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
80 P 29-21164 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
81 P 28-32866 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
82 P 28-32865 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
83 P 28-32864 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
85 P 28-32862 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
86 P 28-32861 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
87 P 29-21158 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
88 P 29-21157 13
- SCREED

89 KAIG3-RFI-PG-S-6989-00 Physic Garden 3/24/2022 Concrete Pouring for blinding under Fountain of (5 nos) at Physic Garden as highlighted area in attached drawing's. C16/20 SRC P 29-21160 7

Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) around Potable Water Line Pit for C32/40 62% OPC+30%FA+8% MS - 220+/-20
90 KAIG3-RFI-SW-C-4771-00 Site Works 3/26/2022 P 29-21212 3
C/PW/01 at Zone-C - as highlighted (SP# 133 A-1-B) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
91 P 28-32916 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
92 P 28-32915 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
93 P 28-32914 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
94 P 28-32913 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
95 P 28-32912 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
96 P 28-32911 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
97 P 28-32910 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
98 P 28-32908 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
99 P 28-32907 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
102 KAIG3-RFI-CO-S-6939-00 Crescent 3/30/2022 Concreting for Tunnel 1 to MCPE Suspended Slab (as highlighted) P 28-33007 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
103 P 28-33006 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
104 P 28-33005 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
105 P 28-33004 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
106 P 28-33003 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
107 P 28-33001 13
- SCREED
kaig-qcals 268
Consultant : DAR

Main Contractor: ZHBG

GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
108 RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 P 28-33000 QUANTITY
13
No. LOCATION CASTING - SCREED NOTE No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
109 P 28-32999 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
110 P 28-32998 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
111 3/29/2022 P 29-21327 4
- SCREED
Management Concrete Pouring & Shuttering for Slab and Parapet of Stair Core Room, at Grid (G-F/8), on Management Building
112 KAIG3-RFI-MB-S-7063-00 3/30/2022 C32/40 67%OPC+25%FA - 160+/-40 P 28-32991 7
Building as highlighted area in attached drawing's.
C32/40 62% OPC+30%FA+8% MS - 220+/-20
68 P 29-21052 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
69 P 29-21050 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
70 P 29-21051 3
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
71 P 29-21046 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
72 P 29-21038 10
- SCREED
Concrete Pouring for Electrical Handholes of Emergency (MH/WG/LV/44 to 47) and (MH/WG/FA/27 to 31) inside
32 KAIG3-RFI-WG-C-4515-00 Water Play Garden 3/12/2022 C32/40 62% OPC+30%FA - 160+/-40 P 29-20851 13
Boat Garden as highlighted area in attached draiwings.

65 C32/40 62% OPC+30%FA - 160+/-40 P 29-21040 6

66 C32/40 62% OPC+30%FA - 160+/-40 P 29-21036 13

67 C32/40 62% OPC+30%FA - 160+/-40 P 29-21035 13


Sound & Light Concrete pouring for walls of Seat Walls (A & C) and along Whispering Cave-1 & 2 Inside Sound & Light garden, as
73 KAIG3-RFI-SG-S-6988-00 3/23/2022 C32/40 62% OPC+30%FA - 160+/-40 P 29-21099 2
Garden per highlighted area in attached drawing's.
74 C32/40 62% OPC+30%FA - 160+/-40 P 29-21075 13
Concrete Pouring and Shuttering for Walls of Seat Walls (Left Side) (Outer), Inside Physic garden, as highlighted
100 KAIG3-RFI-PG-S-7054-00 Physic Garden 3/28/2022 C32/40 62% OPC+30%FA - 160+/-40 P 28-32947 12
area in attached drawings.
101 C32/40 62% OPC+30%FA - 160+/-40 P 28-32945 12

113 C32/40 62% OPC+30%FA - 160+/-40 P 28-32988 3

114 C32/40 62% OPC+30%FA - 160+/-40 P 28-32985 13

115 C32/40 62% OPC+30%FA - 160+/-40 P 28-32984 13

84 C32/40 62% OPC+30%FA - 160+/-40 P 28-32863 13

116 C32/40 62% OPC+30%FA - 160+/-40 P 28-32983 13

117 C32/40 62% OPC+30%FA - 160+/-40 P 28-32982 13

TOTAL QUANTITY TRUCK LOAD (M³): 1397

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C20/25 OPC 1397

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 269
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/14, K/TL/25, K/TL/11, K/TL/22, K/TL/23, K/TL/07,
1 KAIG3-RFI-SW-C-4340-00 Site Works 3/1/2022 C16/20 SRC 1918 5
K/TL/18, K/TL/20 at Zone-K - as highlighted
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/08, B/RC-TL/31, B/RC-TL/32,
2 KAIG3-RFI-SW-C-4278-00 Site Works 3/1/2022 C32/40 62% OPC+30%FA - 160+/-40 1939 10
B/RC-TL/33, B/RC-TL/34 at Zone-B - As Highlighted

3 C32/40 62% OPC+30%FA - 160+/-40 1927 10

4 KAIG3-RFI-CO-S-6767-00 Crescent 3/1/2022 Concreting for Strip Footing between PC 79-81, 82-84 Zone 1N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 1960 5

5 C32/40 62% OPC+30%FA - 160+/-40 1944 10

6 C32/40 62% OPC+30%FA - 160+/-40 1942 10

7 C32/40 62% OPC+30%FA - 160+/-40 2024 10

8 C32/40 62% OPC+30%FA - 160+/-40 1940 10

Concrete pouring for blinding under Electrical Handholes of Emergency (MH/ZG/EM/07 & 08), (MH/ZG/LV/07 & 08) & Telecom
9 KAIG3-RFI-ZG-C-4307-00 Maze Garden 3/1/2022 C16/20 SRC 1948 6
(MH/ZG/TC/09 ), inside Maze garden, as highlighted area in attached drawing's.

Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/20, K/FS/19, K/FS/08, K/FS/07, K/FS/10, K/FS/11, K/FS/16,
10 KAIG3-RFI-SW-C-4341-00 Site Works 3/2/2022 C16/20 SRC 1987 4
K/FS/18 at Zone-K - as highlighted
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
11 KAIG3-RFI-PC-S-6747-00 Crescent 3/2/2022 Concreting for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M - 01P) (as highlighted) 2031 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
12 2010 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
13 1988 10
SCREED

14 KAIG3-RFI-CO-S-6769-00 Crescent 3/2/2022 Concreting for BUTTRESS BIV BOV 50-51 Zone 1N 1M C32/40 62% OPC+30%FA - 160+/-40 1991 10

15 C32/40 62% OPC+30%FA - 160+/-40 1990 10

16 C32/40 62% OPC+30%FA - 160+/-40 1989 10

17 KAIG3-RFI-CF-S-6754-00 Cafeteria 3/2/2022 Concreting for Blinding of Cafeteria Foundation at Zone 2A (as highlighted). C16/20 SRC 2036 8

18 C16/20 SRC 2026 10

19 C16/20 SRC 2012 10

20 C16/20 SRC 2011 10

21 C16/20 SRC 2005 10

22 C16/20 SRC 2004 10

23 C16/20 SRC 1993 10

24 C16/20 SRC 1992 10

25 KAIG3-RFI-SW-C-4281-00 Site Works 3/2/2022 Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/6, B/RC-FS/7 at Zone-B - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 2020 10

26 C32/40 62% OPC+30%FA - 160+/-40 2006 8

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


2028 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
27 KAIG3-RFI-SW-C-4303-00 Site Works 3/2/2022 Inspection of Concrete Pouring for the Wing Wall of SBC-09 (As Highlighted) 2037 10
SCREED

kaig-qcals 270
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI28
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 2035 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
29 2032 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
30 2022 10
SCREED

31 KAIG3-RFI-SW-C-4316-00 Site Works 3/3/2022 Inspection of Concrete Pouring for the Footing of SBC-03 - Wing Wall - (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 2070 10

32 C32/40 62% OPC+30%FA - 160+/-40 2065 10

33 C32/40 62% OPC+30%FA - 160+/-40 2062 10

34 C32/40 62% OPC+30%FA - 160+/-40 2047 6

Concrete pouring and Shuttering for Kicker of Plant Room at Physic Garden, at highlighted area in attached drawings. Attached KAIG3-
35 KAIG3-RFI-PG-S-6781-00 Physic Garden 3/3/2022 C32/40 62% OPC+30%FA - 160+/-40 2063 10
SCR-PG-S-0142-00-Reply.

36 C32/40 62% OPC+30%FA - 160+/-40 2060 10

37 C32/40 62% OPC+30%FA - 160+/-40 2049 8

38 C32/40 62% OPC+30%FA - 160+/-40 2048 10

Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/02, K/FS/24, K/FS/17, K/FS/13, K/FS/14, K/FS/12 at Zone-K - as
39 KAIG3-RFI-SW-C-4356-00 Site Works 3/3/2022 C16/20 SRC 2077 10
highlighted

40 C16/20 SRC 2054 4

41 KAIG3-RFI-CO-S-6797-00 Crescent 3/3/2022 Concreting for Blinding of Retaining Wall of Zone 1D axis 01J to 01G (as highlighted) C16/20 SRC 2061 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


42 KAIG3-RFI-CO-S-6761-00 Crescent 3/5/2022 Concreting for BUTTRESS BII 33 (with Beam) Zone 1H 2157 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
43 2146 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
44 2145 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
45 2139 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
46 2133 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
47 2132 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
48 2131 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
49 2118 10
SCREED

50 KAIG3-RFI-CO-S-6797-00 Crescent 3/5/2022 Concreting for Blinding of Retaining Wall of Zone 1D axis 01J to 01G (as highlighted) C16/20 SRC 2120 10

51 C16/20 SRC 2119 10

52 KAIG3-RFI-CO-S-6856-00 Crescent 3/6/2022 Geotextile and Screedd under Strip Footing Between PC 143-145 Zone 2H (as Highlighted) C16/20 SRC 2180 3

Inspection for Blinding Concrete under Fire & Security Line Pit G/FS/22, G/FS/06, G/FS/05, G/FS/01, G/FS/11, G/FS/34 at Zone-G - as
53 KAIG3-RFI-SW-C-4466-00 Site Works 3/6/2022 C16/20 SRC 2181 4
highlighted
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
54 KAIG3-RFI-CO-S-6806-00 Crescent 3/6/2022 Steel Reinforcements for Tunnel 1 (mid) wall part-C (as Highlighted) Zone 2H 2188 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
55 2182 10
SCREED

56 KAIG3-RFI-SW-C-4420-00 Site Works 3/6/2022 "Inspection of Formwork for the Concrete Pouring of SBC-04 - Wing Wall - (As Highlighted)" C32/40 62% OPC+30%FA - 160+/-40 2191 10

kaig-qcals 271
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI57
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 2189 QUANTITY
10
LOCATION CASTING No.
(m³)

58 C32/40 62% OPC+30%FA - 160+/-40 2184 10

59 C32/40 62% OPC+30%FA - 160+/-40 2185 10

60 C32/40 62% OPC+30%FA - 160+/-40 2183 10

Concrete pouring for Blinding under Seat Walls (A & C) and along Whispering Cave-1, Inside Sound & Light garden, as per highlighted
61 KAIG3-RFI-SG-S-6814-00 Sound & Light Garden 3/6/2022 C16/20 SRC 2190 7
area in attached drawing's.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
62 KAIG3-RFI-CO-S-6867-00 Crescent 3/7/2022 Surface Preparation and Solvent Base Primer under Retaining Wall foundation (as Highlighted) ZONE 1D Axis 01J to 01K 2255 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
63 2238 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
64 2227 10
SCREED
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for C/RC-FS/5 at Zone-C - As Highlighted
65 KAIG3-RFI-SW-C-4398-00 Site Works 3/7/2022 C32/40 62% OPC+30%FA - 160+/-40 2229 10
(SCR:KAIG3-SCR-CO-S-0129-00)

66 C32/40 62% OPC+30%FA - 160+/-40 2228 10

Site Works/ Boundary


67 KAIG3-RFI-SW-S-6836-00 3/7/2022 Cocrete puring and shuttring for Walls of Boundary wall Span 50B, 51, 52,53,54 and 55 As per Attached Highlighted Drawing's. C32/40 62% OPC+30%FA - 160+/-40 2253 10
Wall

68 C32/40 62% OPC+30%FA - 160+/-40 2244 10

69 C32/40 62% OPC+30%FA - 160+/-40 2240 10

70 C32/40 62% OPC+30%FA - 160+/-40 2239 10

71 C32/40 62% OPC+30%FA - 160+/-40 2237 10

72 C32/40 62% OPC+30%FA - 160+/-40 2236 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


79 KAIG3-RFI-CC-S-6883-00 Child Care 3/8/2022 Steel Reinforcement Child Care Foundation P5 Zone 2N as highlighted. 1691 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
80 2287 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
81 2276 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
82 2274 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
83 2261 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
84 2260 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
85 KAIG3-RFI-TB-S-6837-00 New Ticket Booth 3/8/2022 Concrete pouring and shuttring for Wall of new ticketing booth #7A As per Attached Highlighted Drawing's. 2271 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
86 2262 10
SCREED
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for C/RC-TL/1 at Zone-C - As Highlighted
87 KAIG3-RFI-SW-C-4395-00 Site Works 3/8/2022 C32/40 62% OPC+30%FA - 160+/-40 2280 5
(SCR:KAIG3-SCR-CO-S-0129-00)

88 C32/40 62% OPC+30%FA - 160+/-40 2277 10

89 C32/40 62% OPC+30%FA - 160+/-40 2265 10

90 C32/40 62% OPC+30%FA - 160+/-40 2264 10

91 C32/40 62% OPC+30%FA - 160+/-40 2263 10

kaig-qcals 272
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI92
No. RFI NUMBER
KAIG3-RFI-PG-S-6848-00 Physic Garden 3/8/2022 DESCRIPTION
Concerte pouring for Footings of Seat Walls (Right Side) (Outer), Inside Physic garden, as highlighted area in attached drawings. C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 2279 QUANTITY
10
LOCATION CASTING No.
(m³)

93 C32/40 62% OPC+30%FA - 160+/-40 2278 10

Grouting of Installed Anchor bolt and under Baseplate at Zone 1B OUTER ring beam (as highlighted) using MASTERFLOW 980 (main)
94 KAIG3-RFI-CO-S-6851-00 Crescent 3/8/2022 C32/40 62% OPC+30%FA - 160+/-40 2289 10

95 C32/40 62% OPC+30%FA - 160+/-40 2288 10

Inspection for Blinding Concrete under Fire & Security Line Pit G/FS/22, G/FS/06, G/FS/05, G/FS/01, G/FS/11, G/FS/34 at Zone-G - as
96 KAIG3-RFI-SW-C-4466-00 Site Works 3/9/2022 C16/20 SRC 2304 4
highlighted
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
97 KAIG3-RFI-CO-S-6844-00 Crescent 3/9/2022 Concreting for BUTTRESS BIV BOV 48 Zone 1M 2309 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
98 2305 10
SCREED

99 KAIG3-RFI-SW-C-4438-00 Site Works 3/9/2022 Inspection of Concrete Pouring for the Wing Wall of SBC-02 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 2308 6

100 KAIG3-RFI-LM-S-6865-00 Large Mosque 3/9/2022 Concrerting for Isolated Columns (C3, C4, D1.1, D2, D3, D4, E1.1) as highlighted at Large Mosque C32/40 62% OPC+30%FA - 160+/-40 2313 2

101 C32/40 62% OPC+30%FA - 160+/-40 2312 10

102 C32/40 62% OPC+30%FA - 160+/-40 2311 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


103 KAIG3-RFI-CO-S-6817-00 Crescent 3/10/2022 Concreting for BUTTRESS BOV 37 Zone 1J 2315 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
104 2314 7
SCREED

105 KAIG3-RFI-PC-S-6879-00 Promenade Bridge 3/12/2022 Steel Reinforcements for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M) (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 2383 10

106 C32/40 62% OPC+30%FA - 160+/-40 2382 10

107 C32/40 62% OPC+30%FA - 160+/-40 2377 10

108 C32/40 62% OPC+30%FA - 160+/-40 2376 10

Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for C/RC-FS/34, C/RC-FS/35, C/RC-FS/33,
109 KAIG3-RFI-SW-C-4544-00 Site Works 3/12/2022 C32/40 62% OPC+30%FA - 160+/-40 2385 10
C/RC-FS/32, C/RC-FS/31, C/RC-FS/28 at Zone-C - As Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)

110 C32/40 62% OPC+30%FA - 160+/-40 2379 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


111 KAIG3-RFI-PC-S-6881-00 Promenade Bridge 3/12/2022 Concreting for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M) (as highlighted) 2388 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
112 2387 10
SCREED
Concrete Pouring for MCPE 1 of Column C9-10-11-12-13-14-15-16-17-18-19-20-21 at Axis 03R to 03U zone 2M 2N as highlighted
113 KAIG3-RFI-MC-S-6875-00 MCPE 1 3/13/2022 C32/40 62% OPC+30%FA - 160+/-40 2427 6
attached SCR-C-S-0138-01.

114 C32/40 62% OPC+30%FA - 160+/-40 2426 10

115 C32/40 62% OPC+30%FA - 160+/-40 2425 10

116 C32/40 62% OPC+30%FA - 160+/-40 2419 10

117 C32/40 62% OPC+30%FA - 160+/-40 2418 10

118 C32/40 62% OPC+30%FA - 160+/-40 2407 10

119 C32/40 62% OPC+30%FA - 160+/-40 2406 6

kaig-qcals 273
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI120
No. RFI NUMBER
KAIG3-RFI-SW-C-4525-00 Site Works 3/14/2022 DESCRIPTION
Inspection of Concrete Pouring for the Wing Wall of SBC-04 (As Highlighted) C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 2439 QUANTITY
10
LOCATION CASTING No.
(m³)

121 C32/40 62% OPC+30%FA - 160+/-40 2438 10

122 C32/40 62% OPC+30%FA - 160+/-40 2435 10

123 C32/40 62% OPC+30%FA - 160+/-40 2434 10

Site Works/ Boundary Concrete Pouring for Columns of Boundary wall (C- 50A, C-50B,C- 51,C- 52,C-53,C-54 and C- 55 ) As per Attached Highlighted
124 KAIG3-RFI-SW-S-6896-00 3/14/2022 C32/40 62% OPC+30%FA - 160+/-40 2452 8
Wall Drawing's.

125 C32/40 62% OPC+30%FA - 160+/-40 2436 11

126 KAIG3-RFI-CO-S-6903-00 Crescent 3/14/2022 Concreting for Blinding of Diaphragm wall at Zone 2N Axis 02R & 02Q (as highlighted) C16/20 SRC 2450 10

127 C16/20 SRC 2449 10

Inspection for Blinding Concrete under Fire Water Line Pit for H/F/06, H/F/07, H/F/09, H/F/12, L/F/01, L/F/02, L/F/03, L/F/06 at Zone-
128 KAIG3-RFI-SW-C-4582-00 Site Works 3/14/2022 C16/20 SRC 2453 5
H&L - as highlighted

129 KAIG3-RFI-CO-S-6888-00 Crescent 3/14/2022 Concreting for RETAINING WALL FOUNDATION Axis 01G to 01J (as highlighted) Zone 1D C32/40 62% OPC+30%FA - 160+/-40 2482 10

130 C32/40 62% OPC+30%FA - 160+/-40 2476 10

131 C32/40 62% OPC+30%FA - 160+/-40 2475 10

132 C32/40 62% OPC+30%FA - 160+/-40 2474 10

133 C32/40 62% OPC+30%FA - 160+/-40 2471 10

134 C32/40 62% OPC+30%FA - 160+/-40 2459 10

135 C32/40 62% OPC+30%FA - 160+/-40 2456 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


136 KAIG3-RFI-LM-S-6907-00 Large Mosque 3/15/2022 Concreting for Isolated Columns (D-2, D-5, B1-2, B1-5 ) as highlighted at Large Mosque 2530 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
137 2524 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
138 2522 10
SCREED

139 KAIG3-RFI-CO-S-6891-00 Crescent 3/15/2022 Concreting for Infill wall BO 123-124 (as highlighted) Zone 2Q outer between Gridline 02-2AY - 02-2AZ C32/40 62% OPC+30%FA - 160+/-40 2525 4

140 C32/40 62% OPC+30%FA - 160+/-40 2523 7

141 KAIG3-RFI-WG-S-6900-00 Water Play Garden 3/15/2022 Concrete Pouring of blinding for wet well( E ) ,at Water Garden as highlighted area in attached drawing's. C16/20 SRC 2528 10

142 C16/20 SRC 2527 10

143 KAIG3-RFI-SW-C-4589-00 Site Works 3/15/2022 Inspection of Concrete Pouring for the Wing Wall ( F1 & F2) of SBC-03 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 2526 6

144 C32/40 62% OPC+30%FA - 160+/-40 2529 10

145 KAIG3-RFI-CF-S-6913-00 Cafeteria 3/15/2022 Concreting for Cafeteria Foundation P1, 2, 3 & 4, RAFT 3 & 4(as highlighted) Zone 2A C32/40 62% OPC+30%FA - 160+/-40 2545 5

146 C32/40 62% OPC+30%FA - 160+/-40 2544 10

147 C32/40 62% OPC+30%FA - 160+/-40 2543 10

148 C32/40 62% OPC+30%FA - 160+/-40 2542 10

kaig-qcals 274
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI149
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 2541 QUANTITY
10
LOCATION CASTING No.
(m³)

150 C32/40 62% OPC+30%FA - 160+/-40 2540 10

151 C32/40 62% OPC+30%FA - 160+/-40 2539 10

152 C32/40 62% OPC+30%FA - 160+/-40 2538 10

153 C32/40 62% OPC+30%FA - 160+/-40 2533 10

154 C32/40 62% OPC+30%FA - 160+/-40 2536 10

155 C32/40 62% OPC+30%FA - 160+/-40 2535 10

156 C32/40 62% OPC+30%FA - 160+/-40 2534 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


157 KAIG3-RFI-CF-S-6913-00 Cafeteria 3/15/2022 Concreting for Cafeteria Foundation P1, 2, 3 & 4, RAFT 3 & 4(as highlighted) Zone 2A 2537 6
SCREED (650+-150)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
158 KAIG3-RFI-CO-S-6905-00 Crescent 3/16/2022 Concreting for Infill Wall at Zone 2N between Gridline 02-1AP - 02-1AQ (as highlighted) (BII 112-113) 2570 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
159 2558 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
160 2567 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
161 2550 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
162 2548 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
163 KAIG3-RFI-CO-S-6767-00 Crescent 3/16/2022 Concreting for Strip Footing between PC 79-81, 82-84 Zone 1N (as highlighted) 2549 3
SCREED
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zone-F (As Highlighted)
164 KAIG3-RFI-SW-C-4594-00 Site Works 3/16/2022 C32/40 62% OPC+30%FA - 160+/-40 2560 10
SCR:KAIG3-SCR-CO-S-0129-00

165 C32/40 62% OPC+30%FA - 160+/-40 2559 10

166 C32/40 62% OPC+30%FA - 160+/-40 2555 10

167 C32/40 62% OPC+30%FA - 160+/-40 2551 10

Concrete Pouring for blinding under Seat wall (outer),(small part) and blinding of plant room (Remaining part ),at Physic Garden, at
168 KAIG3-RFI-PG-S-6932-00 Physic Garden 3/16/2022 C16/20 SRC 2566 2
highlighted area in attached drawings.

169 KAIG3-RFI-CO-S-6903-00 Crescent 3/16/2022 Concreting for Blinding of Diaphragm wall at Zone 2N Axis 02R & 02Q (as highlighted) C16/20 SRC 2571 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


170 KAIG3-RFI-CO-S-6905-00 Crescent 3/16/2022 Concreting for Infill Wall at Zone 2N between Gridline 02-1AP - 02-1AQ (as highlighted) (BII 112-113) 2573 8
SCREED (650+-150)

171 KAIG3-RFI-SW-C-4635-00 Site Works 3/17/2022 Inspection for Blinding Concrete under Potable Water Line Pit for C/PW/05, C/PW/08, H/PW/02 at Zone-C&H - as highlighted C16/20 SRC 2624 2

172 C16/20 SRC 2610 10

173 KAIG3-RFI-CO-S-6939-00 Crescent 3/17/2022 Concreting for Tunnel 1 to MCPE Suspended Slab (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 2635 11

174 C32/40 62% OPC+30%FA - 160+/-40 2630 11

175 C32/40 62% OPC+30%FA - 160+/-40 2626 11

176 C32/40 62% OPC+30%FA - 160+/-40 2623 11

177 C32/40 62% OPC+30%FA - 160+/-40 2622 11

kaig-qcals 275
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI178
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 2619 QUANTITY
11
LOCATION CASTING No.
(m³)

179 C32/40 62% OPC+30%FA - 160+/-40 2616 11

180 C32/40 62% OPC+30%FA - 160+/-40 2615 11

181 C32/40 62% OPC+30%FA - 160+/-40 2614 11

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


182 KAIG3-RFI-CF-S-6913-00 Cafeteria 3/17/2022 Concreting for Cafeteria Foundation P1, 2, 3 & 4, RAFT 3 & 4(as highlighted) Zone 2A 2646 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
183 2645 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
184 2641 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
185 2636 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
186 2625 11
SCREED

187 KAIG3-RFI-MC-S-6949-00 MCPE 4 3/19/2022 Concreting for MCPE 4 Ground wall and roof Slab at axis 01AP Zone 1N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 2703 4

188 C32/40 62% OPC+30%FA - 160+/-40 2702 5

189 C32/40 62% OPC+30%FA - 160+/-40 2692 10

190 C32/40 62% OPC+30%FA - 160+/-40 2688 10

191 KAIG3-RFI-TB-S-6909-00 New Ticketing Booth 3/19/2022 Concrete pouring and shutting of starter ( Kicker ) for wall of new ticketing booth #2A As per Attached Highlighted Drawing's. C32/40 62% OPC+30%FA - 160+/-40 2693 4

192 KAIG3-RFI-SW-C-4722-00 Site Works 3/20/2022 Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/35 to B/TL/36 at Zone-B - As Highlighted C16/20 SRC 2717 6

Concreting for MCPE 3 Columns (c9 - c10 - c11 - c12 - c13 - c14 - c15 - c16) at Ground Floor axis 02S to 02P, 03-2 Zone 2E 2F (as
193 KAIG3-RFI-MC-S-6952-00 MCPE 3 3/20/2022 C32/40 62% OPC+30%FA - 160+/-40 2718 10
highlighted)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
194 KAIG3-RFI-CO-S-6929-00 Crescent 3/20/2022 Concreting for RETAINING WALL (WALL KICKER) Axis 01G to 01J (as highlighted) Zone 1D 2726 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
195 2734 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
196 2735 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
197 KAIG3-RFI-CO-S-6959-00 Crescent 3/21/2022 Concreting for Buttress BOV BIV 38, 39 & 40 Zone 1K & 1J. 2791 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
198 2773 10
SCREED

199 KAIG3-RFI-SW-C-4726-00 Site Works 3/21/2022 Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from B/FS/27 to B/FS/36 at Zone-B - As Highlighted C16/20 SRC 2793 5

200 C16/20 SRC 2774 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


201 KAIG3-RFI-CO-S-6959-00 Crescent 3/21/2022 Concreting for Buttress BOV BIV 38, 39 & 40 Zone 1K & 1J. 2854 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
202 2851 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
203 2850 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
204 2847 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
205 2846 10
SCREED

206 KAIG3-RFI-SW-C-4738-00 Site Works 3/22/2022 Inspection for Blinding Concrete under Fire Water Line Pit for C/F/16, C/F/17 at Zone-C - as highlighted C16/20 SRC 2853 10

kaig-qcals 276
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI207
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC 2852 QUANTITY
10
LOCATION CASTING No.
(m³)

208 C16/20 SRC 2849 10

209 C16/20 SRC 2848 10

210 KAIG3-RFI-PC-S-6981-00 Bridge to South Tower 3/22/2022 Concreting for Blinding of Bridge to south tower abutments wall at grid 02C Zone 7 (as highlighted) C16/20 SRC 2856 10

211 C16/20 SRC 2855 10

Promenade Bridge
212 KAIG3-RFI-PC-S-7033-00 3/23/2022 Concreting for Promenage Bridge Abutment Wall (2nd) at Grid P Zone 4 C32/40 62% OPC+30%FA - 160+/-40 2884 10
Abutment

213 C32/40 62% OPC+30%FA - 160+/-40 2871 10

214 C32/40 62% OPC+30%FA - 160+/-40 2864 10

215 KAIG3-RFI-SW-C-4736-00 Site Works 3/23/2022 Inspection of Concrete Pouring for wall and Top Slab of Corner Connection between SBC-01 & SBC-02 - (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 2880 10

216 C32/40 62% OPC+30%FA - 160+/-40 2869 10

217 C32/40 62% OPC+30%FA - 160+/-40 2867 10

218 KAIG3-RFI-SW-C-4710-00 Site Works 3/23/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from G/MV/24 to G/MV/14 at Zone-G (As Highlighted) C16/20 SRC 2893 2

Promenade Bridge C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


219 KAIG3-RFI-PC-S-7033-00 3/23/2022 Concreting for Promenage Bridge Abutment Wall (2nd) at Grid P Zone 4 2895 10
Abutment SCREED

220 KAIG3-RFI-CO-S-7023-00 Crescent 3/24/2022 Concreting for RING BEAM Zone 2K (INNER) Axis 02-1E, 02AH to 02AE (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 2937 10

221 C32/40 62% OPC+30%FA - 160+/-40 2933 10

222 C32/40 62% OPC+30%FA - 160+/-40 2932 10

223 C32/40 62% OPC+30%FA - 160+/-40 2931 10

224 C32/40 62% OPC+30%FA - 160+/-40 2930 10

225 C32/40 62% OPC+30%FA - 160+/-40 2929 10

226 C32/40 62% OPC+30%FA - 160+/-40 2926 10

227 C32/40 62% OPC+30%FA - 160+/-40 2925 10

228 C32/40 62% OPC+30%FA - 160+/-40 2924 10

229 C32/40 62% OPC+30%FA - 160+/-40 2923 10

230 C32/40 62% OPC+30%FA - 160+/-40 2922 10

kaig-qcals 277
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI231
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 2921 QUANTITY
10
LOCATION CASTING No.
(m³)

232 C32/40 62% OPC+30%FA - 160+/-40 2920 10

233 C32/40 62% OPC+30%FA - 160+/-40 2919 11

234 C32/40 62% OPC+30%FA - 160+/-40 2917 11

235 C32/40 62% OPC+30%FA - 160+/-40 2916 11

236 C32/40 62% OPC+30%FA - 160+/-40 2915 11

237 C32/40 62% OPC+30%FA - 160+/-40 2914 11

238 C32/40 62% OPC+30%FA - 160+/-40 2913 11

239 C32/40 62% OPC+30%FA - 160+/-40 2895 11

240 C32/40 62% OPC+30%FA - 160+/-40 2894 11

241 C32/40 62% OPC+30%FA - 160+/-40 2906 11

242 C32/40 62% OPC+30%FA - 160+/-40 2912 11

243 C32/40 62% OPC+30%FA - 160+/-40 2911 11

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


244 KAIG3-RFI-CF-S-6984-00 Cafeteria 3/24/2022 Concreting for Cafeteria Foundation RAFT 1 (as highlighted) Zone 2A 2936 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
245 2935 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
246 2934 10
SCREED

247 C32/40 62% OPC+30%FA - 160+/-40 2928 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


248 2927 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
249 2918 10
SCREED

250 KAIG3-RFI-SW-C-4797-00 Site Works 3/24/2022 "Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from K/FS/07 to K/FS/10 at Zone-K - As Highlighted" C16/20 SRC 2938 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


251 KAIG3-RFI-CF-S-6984-00 Cafeteria 3/24/2022 Concreting for Cafeteria Foundation RAFT 1 (as highlighted) Zone 2A 2940 10
SCREED (650+-150)
Inspection of Blinding Concrete under Fire & Security Line Pit for B/FS/06, B/FS/15, B/FS/14, B/FS/31, G/FS/02, G/FS/47, G/FS/51,
252 KAIG3-RFI-SW-C-4860-00 Site Works 3/26/2022 C16/20 SRC 3067 7
G/FS/37, G/FS/04 at Zone B & G as highlighted.

253 C16/20 SRC 3059 10

254 C16/20 SRC 3050 10

255 KAIG3-RFI-CO-S-7041-00 Crescent 3/27/2022 Concreting for BUTTRESS BII 50 51 Zone 1N 1M (as highlighted) C16/20 SRC 3028 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


256 KAIG3-RFI-CO-S-7025-00 Crescent 3/28/2022 Concreting for Tunnel 1 (1 outer right) wall part-C (as Highlighted) Zone 2H 3182 2
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
257 3176 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
258 3177 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
259 3171 10
SCREED

kaig-qcals 278
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI260
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 3170 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
261 3159 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
262 3157 10
SCREED

263 KAIG3-RFI-SW-C-4827-00 Site Works 3/28/2022 Inspection for Blinding Concrete under Fire Water Line Pit for C/F/04, B/F/17, B/F/10 at Zone-B&C - as highlighted C16/20 SRC 3158 4

Inspection of Reinforcement Concrete Pouring for the Duct Bank of MV Line from B/MV/08 to B/MV/21 at Zone B C as highlighted
264 KAIG3-RFI-SW-C-4855-00 Site Works 3/28/2022 C32/40 62% OPC+30%FA - 160+/-40 3174 7
SCR: KAIG3-SCR-CO-S-0129-00.

265 C32/40 62% OPC+30%FA - 160+/-40 3168 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


266 KAIG3-RFI-MC-S-7046-00 MCPE 3/29/2022 Concreting for MCPE 3 Wall at Axis 02R to 02Q (as highlighted) (871.00) 2908 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
267 3224 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
268 3218 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
269 3212 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
270 3205 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
271 3197 10
SCREED

272 KAIG3-RFI-CO-S-7017-00 Crescent 3/29/2022 Concreting for Infill Wall between Gridline 02-2AW - 02-2AW BO 121-122 as hilighlighted at Zone 2Q. C32/40 62% OPC+30%FA - 160+/-40 3240 3

273 C32/40 62% OPC+30%FA - 160+/-40 3239 10

274 C32/40 62% OPC+30%FA - 160+/-40 3237 10

275 C32/40 62% OPC+30%FA - 160+/-40 3236 10

276 C32/40 62% OPC+30%FA - 160+/-40 3235 10

277 C32/40 62% OPC+30%FA - 160+/-40 3234 10

278 C32/40 62% OPC+30%FA - 160+/-40 3233 10

279 C32/40 62% OPC+30%FA - 160+/-40 3232 10

280 C32/40 62% OPC+30%FA - 160+/-40 3231 10

281 C32/40 62% OPC+30%FA - 160+/-40 3230 10

282 C32/40 62% OPC+30%FA - 160+/-40 3229 10

283 C32/40 62% OPC+30%FA - 160+/-40 2907 10

284 C32/40 62% OPC+30%FA - 160+/-40 2728 10

285 C32/40 62% OPC+30%FA - 160+/-40 2727 10

286 C32/40 62% OPC+30%FA - 160+/-40 3198 7

287 KAIG3-RFI-SW-C-4863-00 Site Works 3/29/2022 Inspection of Concrete Pouring for the Footing of SBC 06 Wing Wall as highlighted. C32/40 62% OPC+30%FA - 160+/-40 3211 10

288 C32/40 62% OPC+30%FA - 160+/-40 3199 10

kaig-qcals 279
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI289
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 3114 QUANTITY
10
LOCATION CASTING No.
(m³)

290 KAIG3-RFI-ZG-S-7066-00 Maze Garden 3/29/2022 Concrete Pouring for Blinding under foundation of plant room at Maze Garden, at highlighted area in attached drawing's. C16/20 SRC 3220 10

291 C16/20 SRC 3206 10

292 C16/20 SRC 3203 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


293 KAIG3-RFI-CO-S-7060-00 Crescent 3/30/2022 Concreting for RING BEAM Zone 2G (OUTER) Axis 02-2, 02V to 02Y (as highlighted) 3392 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
294 3391 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
295 3390 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
296 3389 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
297 3388 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
298 3387 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
299 3386 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
300 3385 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
301 3384 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
302 3383 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
303 3382 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
304 3381 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
305 3380 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
306 3279 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
307 3278 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
308 3277 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
309 KAIG3-RFI-CO-S-6955-00 Crescent 3/31/2022 Concreting for BUTTRESS BOV 42 & 43 Zone 1K 1L (as highlighted) 3317 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
310 3302 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
311 NO RFI 3323 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
312 3320 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
313 3128 2
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
314 3113 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
315 3104 7
SCREED

316 NO RFI C32/40 62% OPC+30%FA - 160+/-40 2187 5

317 C32/40 62% OPC+30%FA - 160+/-40 2186 10

kaig-qcals 280
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI318
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 3073 QUANTITY
2
LOCATION CASTING No.
(m³)

319 C32/40 62% OPC+30%FA - 160+/-40 3072 6

320 NO RFI C20/25-(OPC) 2019 2

321 C20/25-(OPC) 1996 4

TOTAL QUANTITY TRUCK LOAD (M³): 2847

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2847

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 281
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
Sound & Light
1 KAIG3-RFI-ZG-S-7135-00 4/6/2022 Concrete Pouring & Shuttering for Footing of plant room at Maze Garden, at highlighted area in attached drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 28-33055 10
Garden

2 C32/40 62% OPC+30%FA - 160+/-40 P 28-33054 10

3 C32/40 62% OPC+30%FA - 160+/-40 P 28-33053 10

4 C32/40 62% OPC+30%FA - 160+/-40 P 28-33052 10

5 C32/40 62% OPC+30%FA - 160+/-40 P 28-33051 10

TOTAL QUANTITY TRUCK LOAD (M³): 50

TOTAL QUANTITY TRUCK LOAD (M³): 50

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 282
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-SW-C-4954-00 Site Works 4/2/2022 Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-08 - Wing Wall (Right Side) - As Highlighted C16/20 SRC 3367 5

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


2 KAIG3-RFI-CO-S-7096-00 Crescent 4/2/2022 Concreting for RING BEAM Zone 2F (OUTER) Axis 02-2, 02V to 02U (as highlighted) 3371 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
3 3374 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
4 3373 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5 3372 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6 3369 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
7 3368 10
SCREED

8 KAIG3-RFI-SW-C-4923-00 Site Works 4/2/2022 Inspection of Concrete Pouring for the Wing Walls of SBC-06 - (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 3370 10

Concrete Pouring for Screed protection on Water proofing for wet area Inside Shower Area's (GF-5057 & 5058), Inside Management C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
9 KAIG3-RFI-MB-A-0789-00 Management Building 4/2/2022 3173 3
Building as highlighted area in attached Drawing's and KAIG3-SCR-PT-A-0084-00 & KAIG3-SCR-GN-A-0011-01. SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


10 KAIG3-RFI-PC-S-7090-00 Promenade Bridge 4/3/2022 Concreting for Promenade Bridge Abutment wall at Grid 1M (as highlighted) 3428 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
11 3423 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
12 3421 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
13 3420 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
14 3419 10
SCREED
Inspection of Thrust Block for UPVC Pipe (200 & 250 mm Dia) for Fire Water Line at Zone- C,H,L - As Highlighted (SCR-KAIG3-
15 KAIG3-RFI-SW-C-4948-00 Site Works 4/3/2022 C16/20 SRC 3427 5
SCR-SW-C-0021-00)

16 C16/20 SRC 3422 11

17 KAIG3-RFI-PC-S-7090-00 Promenade Bridge 4/3/2022 Concreting for Promenade Bridge Abutment wall at Grid 1M (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 3432 10

18 C32/40 62% OPC+30%FA - 160+/-40 3431 10

19 C32/40 62% OPC+30%FA - 160+/-40 3429 10

20 C32/40 62% OPC+30%FA - 160+/-40 3426 5

21 C32/40 62% OPC+30%FA - 160+/-40 3425 8

22 C32/40 62% OPC+30%FA - 160+/-40 3424 10

Concrete Pouring for Blinding under Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Management Building, As Highlighted in
23 KAIG3-RFI-MB-S-7107-00 Management Building 4/3/2022 C16/20 SRC 3430 5
attached Drawings and KAIG3-SCR-MB-S-0159-00-Reply.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
24 KAIG3-RFI-CO-S-7103-00 Crescent 4/4/2022 Concreting for RING BEAM Zone 2H (OUTER) Axis 02-2, 02Y to 02AB (as highlighted) 3465 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
25 3463 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
26 3462 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
3461 10
SCREED

kaig-qcals 283
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI27
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 3460 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)

kaig-qcals 284
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI28
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 3459 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
29 3457 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
30 3456 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
31 3455 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
32 3454 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
33 3453 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
34 3452 10
SCREED
Inspection of Thrust Block for UPVC Pipe (200 & 250 mm Dia) for Fire Water Line at Zone- C,H,L - As Highlighted (SCR-KAIG3-
35 KAIG3-RFI-SW-C-4948-00 Site Works 4/5/2022 C16/20 SRC 3492 6
SCR-SW-C-0021-00)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
36 KAIG3-RFI-CO-S-7120-00 Crescent 4/6/2022 Concreting for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02R (as highlighted) 3521 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
37 3520 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
38 3519 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
39 3518 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
40 3517 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
41 3516 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
42 3515 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
43 3514 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
44 3513 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
45 3512 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
46 3511 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
47 3510 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
48 3509 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
49 3508 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
50 3507 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


51 3506 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


52 3505 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
53 3504 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
54 3503 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
55 3502 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
56 3501 10
SCREED

kaig-qcals 285
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF "Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line between B/RC-FS/38 and C/FS/04 at Zone-B - As DELIVERY NOTE
SI57
No. RFI NUMBER
KAIG3-RFI-SW-C-5063-00 Site Works 4/7/2022 DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 3528 QUANTITY
4
LOCATION CASTING Highlighted SCR:KAIG3-SCR-CO-S-0129-00" No.
(m³)

58 C32/40 62% OPC+30%FA - 160+/-40 3527 10

59 C32/40 62% OPC+30%FA - 160+/-40 3526 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


60 KAIG3-RFI-CO-S-7146-00 Crescent 4/9/2022 Concreting for Buttress with Beam BIV 44 Zone 1L (as highlighted) 3626 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
61 3624 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
62 3623 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
63 3622 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
64 3620 10
SCREED

Concrete Pouring & Shuttering for lintel and Stiffener of Block work & Doors for walls of 350mmthk(200mm wall,500 insulation &
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65 KAIG3-RFI-MB-A-0797-00 Management Building 4/9/2022 100mm wall ) at Grid W/10-12 , 150mm wall thk at Grid R&S/10-11, 350mmthk(200mm wall,500 insulation & 100mm wall ) at Grid 3625 10
SCREED
Q/10-

66 KAIG3-RFI-SW-C-5043-00 Site Works 4/10/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from B/MV/08 to C/MV/04 at Zone-B&C (As Highlighted) C16/20 SRC 3669 10

67 C16/20 SRC 3666 10

68 C16/20 SRC 3665 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


69 KAIG3-RFI-SW-C-4158-00 Site Works 4/10/2022 "Soil Preparation prior to start backfill around SBC-06-Expansion Joint - as highlighted" 3670 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
70 3667 5
SCREED

71 KAIG3-RFI-SW-C-4158-00 Site Works 4/10/2022 "Soil Preparation prior to start backfill around SBC-06-Expansion Joint - as highlighted" C16/20 SRC 3671 10

72 C16/20 SRC 3668 3

79 KAIG3-RFI-CO-S-7133-00 Crescent 4/11/2022 Concreting for RETAINING WALL (WALL) 1st stage, Axis 01M to 01K (as highlighted) Zone 1D C32/40 62% OPC+30%FA - 160+/-40 3717 2

80 C32/40 62% OPC+30%FA - 160+/-40 3716 10

81 C32/40 62% OPC+30%FA - 160+/-40 3715 10

82 C32/40 62% OPC+30%FA - 160+/-40 3713 10

83 C32/40 62% OPC+30%FA - 160+/-40 3711 10

84 C32/40 62% OPC+30%FA - 160+/-40 3710 10

85 C32/40 62% OPC+30%FA - 160+/-40 3709 10

86 C32/40 62% OPC+30%FA - 160+/-40 3708 10

87 C32/40 62% OPC+30%FA - 160+/-40 3707 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


88 KAIG3-RFI-CO-S-7088-00 Crescent 4/11/2022 Concreting for Buttress BOV 44, 45 Zone 1L (as highlighted) 3718 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
89 3714 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
90 3712 10
SCREED

kaig-qcals 286
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI91
No. RFI NUMBER
KAIG3-RFI-SW-C-5085-00 Site Works 4/12/2022 Inspection for Blinding Concrete under MV Line Pulling PitDESCRIPTION
B/MV/26, G/MV/17, G/MV/05 - as highlighted DESIGN MIX
C16/20 SRC 3852 QUANTITY
6
LOCATION CASTING No.
(m³)

Concrete Pouring for Screed protection on Water proofing for wet area Inside Shower Area (GF-5087) and Toilets (GF-5061, 5062, C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
92 KAIG3-RFI-MB-A-0801-00 Management Building 4/12/2022 3753 2
5063, 5064, 5065, 5066, 5070, 5071 & 5088) , Inside Management Building as highlighted area in attached Drawing's and KAIG3-SCR- SCREED

93 KAIG3-RFI-LM-S-7205-00 Large Mosque 4/13/2022 Concreting for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grid (2 to 5 & C1 to F ) C32/40 62% OPC+30%FA - 160+/-40 3805 10

94 C32/40 62% OPC+30%FA - 160+/-40 3804 10

95 C32/40 62% OPC+30%FA - 160+/-40 3803 10

96 C32/40 62% OPC+30%FA - 160+/-40 3802 10

97 C32/40 62% OPC+30%FA - 160+/-40 3800 10

98 C32/40 62% OPC+30%FA - 160+/-40 3799 10

99 C32/40 62% OPC+30%FA - 160+/-40 3798 10

100 C32/40 62% OPC+30%FA - 160+/-40 3781 10

101 C32/40 62% OPC+30%FA - 160+/-40 3781 10

102 C32/40 62% OPC+30%FA - 160+/-40 3795 10

103 KAIG3-RFI-SW-C-5062-00 Site Works 4/13/2022 Inspection for Casting Blinding Concrete under Manhole - MH-Y-01, MH-Y-02 - as highlighted C16/20 SRC 3806 6

104 C16/20 SRC 3801 10

105 C16/20 SRC 3797 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


106 KAIG3-RFI-MC-S-7198-00 MCPE 2 4/14/2022 Concreting for MCPE 2 Wall between Axis 02AB to 02AA (as highlighted) (871.00) 3840 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
107 3837 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
108 3836 10
SCREED

109 KAIG3-RFI-SW-C-5071-00 Site Works 4/14/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/05 to C/MV/30 at Zone-C (As Highlighted) C16/20 SRC 3838 3

Concrete Pouring & Shuttering for Pedestal Column's (08 no's) of Canopy Foundations @ Grids (B/01-08), at New Ticketing Booths
110 KAIG3-RFI-TB-S-7211-00 New Ticketing Booth 4/14/2022 C32/40 62% OPC+30%FA - 160+/-40 3839 6
Canopy, at highlighted area in attached drawings.

111 KAIG3-RFI-LM-S-7262-00 Large Mosque 4/14/2022 Shuttering for Staircase, Shaft Opening & ground beam for Large Mosque ZONE 1G (as highlighetd) at grid (A-B, 3-5, D-2, C1-5-6) C16/20 SRC 3845 6

112 C16/20 SRC 3844 10

113 C16/20 SRC 3843 10

114 C16/20 SRC 3842 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


115 KAIG3-RFI-CO-S-7177-00 Crescent 4/16/2022 Concreting for RING BEAM Zone 1H (OUTER) Axis 01-2, 01W to 01AA (as highlighted) 3895 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
116 3894 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
117 3893 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
118 3892 10
SCREED

kaig-qcals 287
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI119
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 3890 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
120 3889 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
121 3888 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
122 3887 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
123 3885 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
124 3884 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
125 3882 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
126 3881 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
127 3880 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
128 3879 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
129 3878 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
130 3877 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
131 3876 10
SCREED

132 KAIG3-RFI-SW-C-5055-00 Site Works 4/16/2022 Inspection of Concrete Pouring for the Wall of SBC-08 - Wing Wall (Right Side) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 3891 2

133 C32/40 62% OPC+30%FA - 160+/-40 3886 10

134 C32/40 62% OPC+30%FA - 160+/-40 3883 10

135 KAIG3-RFI-CO-S-7224-00 Crescent 4/17/2022 Concreting for Buttress with Beam BII 42 43 Zone 1K 1L (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 3915 10

Concrete Pouring & Shuttering for Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Management Building, As Highlighted in
136 KAIG3-RFI-MB-S-7232-00 Management Building 4/17/2022 C32/40 62% OPC+30%FA - 160+/-40 3916 11
attached Drawings and KAIG3-SCR-MB-S-0159-00-Reply.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
137 KAIG3-RFI-CO-S-7236-00 Crescent 4/18/2022 Concreting for RING BEAM Zone 2G (INNER) Axis 02-1, 02V to 02Y (as highlighted) 3958 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
138 3955 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
139 3952 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
140 3951 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
141 3950 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
142 3949 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
143 3948 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
144 3947 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
145 3946 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
146 3945 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
147 3944 10
SCREED

kaig-qcals 288
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF Inspection for Blinding Concrete under Potable Water Line Pit for G/PW/11, G/PW/10, G/PW/04, G/PW/09, G/PW/05, G/PW/06, DELIVERY NOTE
SI148
No. RFI NUMBER
KAIG3-RFI-SW-C-5175-00 Site Works 4/18/2022 DESCRIPTION DESIGN MIX
C16/20 SRC 3954 QUANTITY
10
LOCATION CASTING K/PW/04 at Zone-G&K - as highlighted No.
(m³)
Concrete Pouring & Shuttering for Walls of Seat Walls (Outer) (Both Remaining Parts), Inside Physic garden, as highlighted area in
149 KAIG3-RFI-PG-S-7233-00 Physic Garden 4/18/2022 C32/40 62% OPC+30%FA - 160+/-40 3959 7
attached drawings.

150 C32/40 62% OPC+30%FA - 160+/-40 3957 11

151 C32/40 62% OPC+30%FA - 160+/-40 3956 11

152 KAIG3-RFI-MC-S-7239-00 MCPE 4 4/19/2022 Concreting for Blinding of MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO C16/20 SRC 3981 7

153 C16/20 SRC 3980 10

154 C16/20 SRC 3979 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


155 KAIG3-RFI-TB-S-7257-00 New Ticketing Booth 4/20/2022 Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 7A As per Attached Highlighted Drawing's. 4011 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
156 4010 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
157 KAIG3-RFI-MC-S-7269-00 MCPE 1 4/21/2022 Concreting for Blinding of MCPE 1 8-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2 4023 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
158 4016 6
SCREED
Inspection for Blinding Concrete under MV Line Junction Pit for B/MV/19, B/MV/06, B/MV/16, B/MV/13, G/MV/22, G/MV/29,
159 KAIG3-RFI-SW-C-5136-00 Site Works 4/21/2022 C16/20 SRC 4024 8
G/MV/06 at Zone-B&G - as highlighted

160 C16/20 SRC 4021 10

161 KAIG3-RFI-CO-S-7272-00 Crescent 4/21/2022 Concreting for Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted) C16/20 SRC 4028 5

162 C16/20 SRC 4027 10

163 C16/20 SRC 4026 10

164 C16/20 SRC 4025 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


165 KAIG3-RFI-CO-S-7286-00 Crescent 4/23/2022 Concreting for Buttress with Beam BOI 42, 43, 44 BII 44 Zone 1K 1L (as highlighted) 4093 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
166 4092 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
167 4090 8
SCREED
Inspection for Blinding Concrete under MV Line Pulling Pit G/MV/12, G/MV/16, G/MV/18, K/MV/01, K/MV/02, L/MV/08 - as
168 KAIG3-RFI-SW-C-5190-00 Site Works 4/24/2022 C16/20 SRC 4137 10
highlighted
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
169 KAIG3-RFI-CO-S-7310-00 Crescent 4/25/2022 Concreting for Buttress with Beam BII 46-47 Zone 1M 1L (as highlighted) 4164 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
170 4160 10
SCREED

171 KAIG3-RFI-SW-C-5184-00 Site Works 4/25/2022 Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/48, B/TL/31, B/TL/30, B/TL/51 at Zone-B - as highlighted C16/20 SRC 4167 10

172 C16/20 SRC 4163 5

173 C16/20 SRC 4162 5

174 C16/20 SRC 4161 10

Concrete Pouring & Shuttering for Roof Slabs at Grid (A/8) & (A/14-15), Inside Butterfly Garden, at highlighted area in attached
175 KAIG3-RFI-TG-S-7312-00 Butterfly Garden 4/25/2022 C32/40 62% OPC+30%FA - 160+/-40 4166 8
drawings

176 C32/40 62% OPC+30%FA - 160+/-40 4165 8

kaig-qcals 289
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI177
No. RFI NUMBER
KAIG3-RFI-CO-S-7308-00 Crescent 4/26/2022 DESCRIPTION
Concreting for TUNNEL 2 Shaft wall at Zone 2F (as highlighted) left of axis 02-1 C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 70014 QUANTITY
8
LOCATION CASTING No.
(m³)

178 C32/40 62% OPC+30%FA - 160+/-40 70007 10

179 C32/40 62% OPC+30%FA - 160+/-40 69999 10

180 C32/40 62% OPC+30%FA - 160+/-40 69991 10

181 C32/40 62% OPC+30%FA - 160+/-40 69990 10

182 KAIG3-RFI-SW-C-5194-00 Site Works 4/26/2022 "Inspection of Concrete Pouring for the Upstand of SBC-08 (Right Side) As Highlighted" C32/40 62% OPC+30%FA - 160+/-40 70005 6

183 C32/40 62% OPC+30%FA - 160+/-40 69992 5

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


184 KAIG3-RFI-CO-S-7315-00 Crescent 4/26/2022 Concreting for RING BEAM Zone 1H (INNER) Axis 01-1, 01AA to 01Z, 01Y to 01W (as highlighted) 70013 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
185 70012 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
186 70011 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
187 70008 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
188 70006 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
189 70004 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
190 70003 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
191 70002 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
192 70001 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
193 69998 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
194 69997 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
195 69996 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
196 69995 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
197 69994 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
198 69993 10
SCREED
Inspection of Thrust Block for Non-Potable Water (Irrigation Line) (110mmØ UPVC Class 5) at Water Play Garden as highlighted area
199 KAIG3-RFI-WG-C-5158-00 Water Play Garden 4/26/2022 C32/40 62% OPC+30%FA - 160+/-40 70000 2
in attached drawing.
Concrete Pouring & Shuttering for Walls of Plant Room, at Physic Garden, at highlighted area in attached drawings. Attached KAIG3-
200 KAIG3-RFI-PG-S-7320-00 Physic Garden 4/26/2022 C32/40 62% OPC+30%FA - 160+/-40 70010 11
SCR-PG-S-0142-00-Reply.

201 C32/40 62% OPC+30%FA - 160+/-40 70009 11

202 KAIG3-RFI-MC-S-7350-00 MCPE 2 4/27/2022 Concreting for MCPE 2 Columns (C-25 to C-40) at Ground Floor axis 03E to 03I zone 2G, 2H, 2J, 2K (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 4217 5

203 C32/40 62% OPC+30%FA - 160+/-40 4215 10

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12, NPW-ISC-13, NPW-ISC-20, NPW-ISC-
204 KAIG3-RFI-SW-C-5222-00 Site Works 4/27/2022 C16/20 SRC 4221 2
01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC-04, NPW-ISC-21 at Zone-B,F&G - as highlighted

kaig-qcals 290
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI205
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC 4218 QUANTITY
6
LOCATION CASTING No.
(m³)

206 C16/20 SRC 4216 6

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


207 KAIG3-RFI-MC-S-7350-00 MCPE 2 4/27/2022 Concreting for MCPE 2 Columns (C-25 to C-40) at Ground Floor axis 03E to 03I zone 2G, 2H, 2J, 2K (as highlighted) 4220 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
208 4219 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
209 KAIG3-RFI-CO-S-7358-00 Crescent 4/28/2022 Concreting for RING BEAM Zone 2H (INNER) Axis 02-1, 02AB to 02Y (as highlighted) 4289 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
210 4285 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
211 4284 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
212 4283 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
213 4282 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
214 4280 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
215 4279 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
216 4278 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
217 4277 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
218 4276 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


219 4275 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


220 4274 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
221 4272 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
222 4270 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
223 4269 10
SCREED

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12, NPW-ISC-13, NPW-ISC-20, NPW-ISC-
224 KAIG3-RFI-SW-C-5222-00 Site Works 4/28/2022 C16/20 SRC 4271 3
01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC-04, NPW-ISC-21 at Zone-B,F&G - as highlighted

225 KAIG3-RFI-TG-S-7378-00 Butterfly Garden 4/28/2022 Steel Reinforcement for Wall at Grid (14/A-B), inside Butterfly Garden, as highlighted in attached drawings C16/20 SRC 4273 4

226 KAIG3-RFI-CO-S-7536-00 Crescent 4/28/2022 Concreting for Diaphragm Wall for Zone 2N grid 02/AR from level (870.5 to 874.1 ) (as highlighted) (second part) C32/40 62% OPC+30%FA - 160+/-40 4287 7

227 C32/40 62% OPC+30%FA - 160+/-40 4286 8

228 C32/40 62% OPC+30%FA - 160+/-40 4281 7

Site Works/Boundary
229 KAIG3-RFI-SW-S-7367-00 4/28/2022 Concrete Pouring for Blinding under Foundation of Boundary wall Span 74 & 75, As per Attached Highlighted Drawing's. C16/20 SRC 4288 10
Wall

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


230 KAIG3-RFI-CO-S-7343-00 Crescent 4/30/2022 Concreting for BUTTRESS (with Beam) BII 48 Zone 1M 4326 8
SCREED

kaig-qcals 291
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI231
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 4323 QUANTITY
7
LOCATION CASTING SCREED No.
(m³)

232 KAIG3-RFI-MB-S-7366-00 Management Building 4/30/2022 Concrete pouring & Shuttering for Grade Beam at Grid (R/1-2), at Management Building, as highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 4324 2

233 KAIG3-RFI-CO-S-7339-00 Crescent 4/30/2022 Concreting for 2nd layer Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted) C16/20 SRC 4327 10

234 C16/20 SRC 4326 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


235 NO RFI 4/24/2022 4140 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
236 4139 7
SCREED

237 NO RFI 4/24/2022 C32/40 62% OPC+30%FA - 160+/-40 4138 7

238 C32/40 62% OPC+30%FA - 160+/-40 4136 10

239 NO RFI 4/23/2022 C32/40 62% OPC+30%FA - 160+/-40 4091 9

240 C32/40 62% OPC+30%FA - 160+/-40 4089 9

241 C32/40 62% OPC+30%FA - 160+/-40 4088 10

242 C32/40 62% OPC+30%FA - 160+/-40 4087 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


243 NO RFI 4/17/2022 3914 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
244 NO RFI 4/12/2022 3756 9
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
245 3754 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
246 3751 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
247 3750 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
248 NO RFI 4/5/2022 3493 10
SCREED

249 NO RFI 4/4/2022 C16/20 SRC 3464 10

250 C16/20 SRC 3458 10

TOTAL QUANTITY TRUCK LOAD (M³): 2159

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2159

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

kaig-qcals 292
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF QC DC DELIVERY NOTE
QC Manager
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
(m³)

kaig-qcals 293
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-CF-S-7646-00 Cafeteria 5/30/2022 Concreting for Cafeteria Wall 33, 34, 35 Zone 2A Elev. 869.100 (as highlighted) (undercroft) P 28-33928 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
2 P 28-33926 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
3 P 28-33919 4
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
4 P 28-33925 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
5 P 28-33924 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
6 P 28-33921 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
7 P 28-33920 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
8 P 28-33917 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
9 P 28-33916 13
- SCREED
10 KAIG3-RFI-CO-S-7657-00 Crescent 5/31/2022 Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as highlighted) C16/20 SRC P 28-33981 10

11 C16/20 SRC P 28-33980 10

12 C16/20 SRC P 28-33979 10

13 C16/20 SRC P 28-33977 13

14 C16/20 SRC P 28-33976 13

15 C16/20 SRC P 28-33975 13

16 C16/20 SRC P 28-33974 13

17 C16/20 SRC P 28-33972 13

18 C16/20 SRC P 28-33971 13

19 C16/20 SRC P 28-33968 13

20 C16/20 SRC P 28-33967 13

21 C16/20 SRC P 28-33963 13

22 C16/20 SRC P 28-33962 13

TOTAL QUANTITY TRUCK LOAD (M³): 268

TOTAL QUANTITY TRUCK LOAD (M³): 268

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 294
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS

1 KAIG3-RFI-SW-C-5332-00 Site Works 5/7/2022 Inspection for Blinding Concrete under Potable Water Line Pit F/PW/14, F/PW/15, F/PW/08, F/PW/02 - as highlighted C16/20 SRC 4386 10

2 C16/20 SRC 4377 10

3 C16/20 SRC 4370 10

4 KAIG3-RFI-MC-S-7300-00 MCPE 4 5/7/2022 Concreting for MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO C32/40 62% OPC+30%FA - 160+/-40 4399 10

5 C32/40 62% OPC+30%FA - 160+/-40 4398 10

6 C32/40 62% OPC+30%FA - 160+/-40 4396 10

7 C32/40 62% OPC+30%FA - 160+/-40 4393 10

8 C32/40 62% OPC+30%FA - 160+/-40 4391 10

9 C32/40 62% OPC+30%FA - 160+/-40 4390 10

10 C32/40 62% OPC+30%FA - 160+/-40 4385 10

11 C32/40 62% OPC+30%FA - 160+/-40 4382 10

12 C32/40 62% OPC+30%FA - 160+/-40 4374 10

13 C32/40 62% OPC+30%FA - 160+/-40 4373 10

14 C32/40 62% OPC+30%FA - 160+/-40 4372 10

15 C32/40 62% OPC+30%FA - 160+/-40 4371 10

16 KAIG3-RFI-VA-S-7390-00 VIP Auditorium 5/8/2022 Concreting for Blinding of VIP Auditorium strip footing at Zone 1H axis E-VA, F-VA, D-E-VA, G-VA, 7-VA (as highlighted) C16/20 SRC 4429 10

17 C16/20 SRC 4426 10

18 C16/20 SRC 4419 10

19 C16/20 SRC 4415 10

20 C16/20 SRC 4410 10

21 C16/20 SRC 4409 10

22 C16/20 SRC 4405 10

23 KAIG3-RFI-LM-S-7557-00 Large Mosque 5/8/2022 Shuttering for Large Mosque Shaft for Ground floor Slab (as highlighted) axis 1, 2, C-C-1 C32/40 62% OPC+30%FA - 160+/-40 4421 10

24 C32/40 62% OPC+30%FA - 160+/-40 4411 10

25 C32/40 62% OPC+30%FA - 160+/-40 4408 10

26 C32/40 62% OPC+30%FA - 160+/-40 4406 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


KAIG3-RFI-TB-S-7379-00 New Ticketing Booth 5/8/2022 Concrete pouring & Shuttering for walls of New ticketing booth # 2A, As per Attached Highlighted Drawing's. 4417 2
SCREED
kaig-qcals 295
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI27
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 4412 QUANTITY
8
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
28 4407 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
29 KAIG3-RFI-PC-S-7405-00 Promenade Bridge 5/9/2022 Concreting for Promenade Bridge Abutment Retaining wall foundation at Grid 2C (as highlighted) 4480 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
30 4479 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
31 4475 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
32 4473 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
33 4470 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
34 4467 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
35 4459 10
SCREED

36 KAIG3-RFI-PC-S-7405-00 Promenade Bridge 5/9/2022 Concreting for Promenade Bridge Abutment Retaining wall foundation at Grid 2C (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 4469 10

37 C32/40 62% OPC+30%FA - 160+/-40 4468 10

38 C32/40 62% OPC+30%FA - 160+/-40 4466 10

39 C32/40 62% OPC+30%FA - 160+/-40 4462 10

40 C32/40 62% OPC+30%FA - 160+/-40 4460 10

41 KAIG3-RFI-SW-C-5344-00 Site Works 5/9/2022 Inspection for Blinding Concrete under MV Line Junction Pit B/MV/15, B/MV/22, G/MV/11, G/MV/26 - as highlighted C16/20 SRC 4461 6

42 KAIG3-RFI-CO-S-7417-00 Crescent 5/9/2022 Concreting for BUTTRESS BII 41 (with beam) Zone 1K C16/20 SRC 4477 10

43 C16/20 SRC 4476 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


44 KAIG3-RFI-CO-S-7421-00 Crescent 5/10/2022 Concreting for RING BEAM Zone 1J (OUTER) Axis 01-2, 01AA to 011D (as highlighted) 4510 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
45 4507 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
46 4502 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
47 4501 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
48 4500 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
49 4498 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
50 4497 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


51 4496 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


52 4495 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
53 4494 10
SCREED

kaig-qcals 296
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI54
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 4493 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)

kaig-qcals 297
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI55
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 4492 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
56 4491 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
57 4490 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
58 4489 10
SCREED

59 KAIG3-RFI-SW-C-4856-01 Site Works 5/10/2022 Inspection of Blinding Concrete under Potable Water Line Pit for C/PW/01 at Zone C as highlighted. C16/20 SRC 4505 7

60 KAIG3-RFI-SW-C-5294-00 Site Works 5/11/2022 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted C16/20 SRC 4529 10

61 C16/20 SRC 4520 10

62 C16/20 SRC 4528 10

63 C16/20 SRC 4523 10

64 C16/20 SRC 4522 10

65 C16/20 SRC 4521 10

66 C16/20 SRC 4515 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


67 KAIG3-RFI-CO-S-7411-00 Crescent 5/11/2022 Concreting for INFILL WALL between BIV 108-109 Gridline 02-1AM- 02-1AN (as highlighted) Zone 2M 4555 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
68 4543 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
69 4539 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
70 4530 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
71 4516 7
SCREED
Water Play GardeN/Wet
72 KAIG3-RFI-WG-S-7426-00 5/11/2022 Concrete Pouring & Shuttering for foundation of Wet Well F, Inside Water Garden as highlighted area in attached drawing's. C32/40 62% OPC+30%FA - 160+/-40 4527 10
Fell

79 C32/40 62% OPC+30%FA - 160+/-40 4554 10

80 C32/40 62% OPC+30%FA - 160+/-40 4548 10

81 C32/40 62% OPC+30%FA - 160+/-40 4546 10

82 C32/40 62% OPC+30%FA - 160+/-40 4544 10

83 C32/40 62% OPC+30%FA - 160+/-40 4541 10

84 C32/40 62% OPC+30%FA - 160+/-40 4540 10

85 C32/40 62% OPC+30%FA - 160+/-40 4538 10

86 C32/40 62% OPC+30%FA - 160+/-40 4537 10

87 C32/40 62% OPC+30%FA - 160+/-40 4536 10

88 C32/40 62% OPC+30%FA - 160+/-40 4525 10

kaig-qcals 298
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI89
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 4519 QUANTITY
5
LOCATION CASTING No.
(m³)

90 C32/40 62% OPC+30%FA - 160+/-40 4518 10

91 KAIG3-RFI-MC-S-7431-00 MCPE 1 5/12/2022 Concreting for MCPE 1 6-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2 C32/40 62% OPC+30%FA - 160+/-40 4585 10

92 C32/40 62% OPC+30%FA - 160+/-40 4560 3

93 C32/40 62% OPC+30%FA - 160+/-40 4559 10

Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06, F/MV/05, G/MV/14, G/MV/24, G/MV/25,
94 KAIG3-RFI-SW-C-5268-00 Site Works 5/14/2022 C16/20 SRC 4703 5
G/MV/15, G/MV/01 - as highlighted

95 C16/20 SRC 4702 10

96 C16/20 SRC 4699 10

97 C16/20 SRC 4697 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


98 KAIG3-RFI-CO-S-7447-00 Crescent 5/15/2022 Concreting for Buttress (with beam ) , BII 49, Zone 1M (as highlighted) 4747 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
99 4743 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
100 4741 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
101 4737 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
102 4735 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
103 4733 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
104 4732 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
105 4725 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
106 4723 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
107 4722 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
108 4720 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
109 4719 10
SCREED

110 KAIG3-RFI-SW-C-5294-00 Site Works 5/15/2022 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted C16/20 SRC 4721 10

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12, NPW-ISC-13, NPW-ISC-20, NPW-ISC-
111 KAIG3-RFI-SW-C-5222-00 Site Works 5/16/2022 C16/20 SRC 4791 7
01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC-04, NPW-ISC-21 at Zone-B,F&G - as highlighted

112 C16/20 SRC 4788 10

113 C16/20 SRC 4781 10

114 C16/20 SRC 4780 10

115 C16/20 SRC 4779 10

kaig-qcals 299
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI116
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC 4778 QUANTITY
10
LOCATION CASTING No.
(m³)

117 C16/20 SRC 4777 10

118 C16/20 SRC 4765 10

Site Works/Boundary Concrete Pouring & Shuttering for Kicker's (Inner & Outer both) of Boundary wall Span 74 & 75, As per Attached Highlighted
119 KAIG3-RFI-SW-S-7489-00 5/16/2022 C32/40 62% OPC+30%FA - 160+/-40 4784 11
Wall Drawing's.

120 C32/40 62% OPC+30%FA - 160+/-40 4783 10

121 C32/40 67%OPC+25%FA - 160+/-40 4772 5

122 C32/40 62% OPC+30%FA - 160+/-40 4767 8

123 C32/40 62% OPC+30%FA - 160+/-40 4766 8

Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone-C (As Highlighted) SCR-
124 KAIG3-RFI-SW-C-5417-00 Site Works 5/16/2022 C32/40 62% OPC+30%FA - 160+/-40 4768 7
KAIG3-SCR-CO-S-0129-00

125 KAIG3-RFI-MC-S-7464-00 MCPE 3 5/16/2022 Concreting for MCPE 3 Counter fort & wall (inner) at axis 02-R to 03D As highlighted upto 871.00 C32/40 62% OPC+30%FA - 160+/-40 4769 5

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


126 KAIG3-RFI-MC-S-7464-00 MCPE 3 5/16/2022 Concreting for MCPE 3 Counter fort & wall (inner) at axis 02-R to 03D As highlighted upto 871.00 4792 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
127 4790 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
128 4782 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
129 4773 10
SCREED
Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at Grid (9/B-E, F), Inside Management C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
130 KAIG3-RFI-MB-A-0878-00 Management Building 5/16/2022 4785 2
Building, As per Highlighted Area in Attached Drawing's. SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
131 KAIG3-RFI-CO-S-7481-00 Crescent 5/17/2022 Concreting for RING BEAM Zone 1J (INNER) Axis 01-1, 01AA to 011D (as highlighted) 4855 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
132 4846 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
133 4845 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
134 4839 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
135 4836 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
136 4835 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
137 70614 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
138 70609 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
139 70608 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
140 4828 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
141 4827 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
142 4826 10
SCREED

kaig-qcals 300
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI143
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 4816 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06, F/MV/05, G/MV/14, G/MV/24, G/MV/25,
144 KAIG3-RFI-SW-C-5268-00 Site Works 5/17/2022 C16/20 SRC 4817 3
G/MV/15, G/MV/01 - as highlighted

145 KAIG3-RFI-SW-C-5387-00 Site Works 5/18/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/12 to H/MV/25 at Zone-C&H (As Highlighted) C16/20 SRC 4875 7

146 C16/20 SRC 4871 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


147 KAIG3-RFI-CF-S-7440-00 Cafeteria 5/18/2022 Concreting for Isolated Circular Columns ( C1, C2 ) for CAFETERIA (as highlighted) elev. 869.10 ZONE 2A 4904 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
148 4901 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
149 4898 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
150 4894 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
151 4889 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
152 4881 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
153 4873 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
154 4872 10
SCREED

155 KAIG3-RFI-CO-S-7478-00 Crescent 5/18/2022 Concreting for Blinding of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted) C16/20 SRC 4902 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


156 KAIG3-RFI-CO-S-7534-00 Crescent 5/19/2022 Concreting for Infill wall between BIV 107-108 between Gridline 02-1 AL - 02-1 AM (As highlighted) ZONE 2M 4936 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
157 4931 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
158 4930 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
159 4929 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
160 4928 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
161 4926 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
162 70695 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
163 70694 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
164 KAIG3-RFI-TB-S-7519-00 New Ticketing Booth 5/19/2022 Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 1A As per Attached Highlighted Drawing's. 4914 3
SCREED
Concrete Pouring for Blinding under Boundary Wall @ Grid (M & R/27-29) & (M-R/29-30), at Energy Center 2, as highlighted area in
165 KAIG3-RFI-EC-S-7521-00 Energy Center 2 5/19/2022 C16/20 SRC 4927 10
attached drawing's.

166 C16/20 SRC 4925 10

167 KAIG3-RFI-SW-C-5389-00 Site Works 5/19/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/02 to H/MV/11 at Zone-H (As Highlighted) C16/20 SRC 4935 3

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


168 KAIG3-RFI-CO-S-7523-00 Crescent 5/21/2022 Shuttering for Ground Beam between PC 78-80 Zone 1N (as highlighted) 5032 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
169 5023 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
170 5022 10
SCREED
kaig-qcals 301
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI171
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 5021 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
172 5014 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
173 5012 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
174 5006 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
175 4995 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
176 4985 10
SCREED

177 KAIG3-RFI-CO-S-7523-00 Crescent 5/21/2022 Shuttering for Ground Beam between PC 78-80 Zone 1N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 4998 5

178 C32/40 62% OPC+30%FA - 160+/-40 4986 10

179 KAIG3-RFI-ST-S-7539-00 South Watch Tower 5/21/2022 Anti Termite application under South Watch Tower foundation at Zone 27 (as highlighted) C16/20 SRC 5027 3

180 C16/20 SRC 5026 11

181 C16/20 SRC 5015 10

182 C16/20 SRC 5008 10

183 KAIG3-RFI-CF-S-7549-00 Cefeteria 5/22/2022 Concreting for Cafeteria Circular Column C-03, 06 Zone 2A Elev. 869.100 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 5046 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


184 KAIG3-RFI-CO-S-7553-00 Crescent 5/22/2022 Concreting and Scaffoldings for RING BEAM Zone 1K (2ND OUTER) Axis 01-2, 01AF to 01AG (as highlighted) 5080 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
185 5071 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
186 5066 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
187 5054 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
188 5053 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
189 5052 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
190 5051 10
SCREED

191 KAIG3-RFI-ST-S-7541-00 South Watch Tower 5/22/2022 Concreting for Blinding under South Watch Tower foundation at Zone 27 (as highlighted) C16/20 SRC 5079 8

192 C16/20 SRC 5073 10

193 C16/20 SRC 5068 10

194 C16/20 SRC 5059 10

195 C16/20 SRC 5058 10

196 C16/20 SRC 5057 10

Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone-C (As Highlighted) SCR-
197 KAIG3-RFI-SW-C-5417-00 Site Works 5/23/2022 C32/40 62% OPC+30%FA - 160+/-40 5106 10
KAIG3-SCR-CO-S-0129-00

198 C32/40 62% OPC+30%FA - 160+/-40 5105 10

kaig-qcals 302
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI199
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA 5101 QUANTITY
10
LOCATION CASTING No.
(m³)

200 C32/40 62% OPC+30%FA - 160+/-40 5100 10

201 C32/40 62% OPC+30%FA - 160+/-40 5098 10

202 C32/40 62% OPC+30%FA - 160+/-40 5096 10

203 C32/40 62% OPC+30%FA - 160+/-40 5095 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


204 KAIG3-RFI-PC-S-7543-00 Promenade Bridge 5/23/2022 Concreting for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highlighted 5114 7
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


205 5099 7
SCREED

206 KAIG3-RFI-SW-C-5483-00 Site Works 5/23/2022 Inspection for Casting the Blinding Concrete under the Manhole for FW-A-6 (as Highlighted) C16/20 SRC 5124 10

207 C16/20 SRC 5116 10

208 C16/20 SRC 5115 10

Concrete Pouring & Shuttering for Roof Slab of Plant Room, at Physic Garden, at highlighted area in attached drawings. Attached
209 KAIG3-RFI-PG-S-7562-00 Physic Garden 5/23/2022 C32/40 62% OPC+30%FA - 160+/-40 5123 3
KAIG3-SCR-PG-S-0142-00-Reply.

210 C32/40 62% OPC+30%FA - 160+/-40 5118 11

211 KAIG3-RFI-PC-S-7543-00 Promenade Bridge 5/23/2022 Concreting for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highlighted C32/40 62% OPC+30%FA - 160+/-40 5130 10

212 KAIG3-RFI-PG-S-7538-00 Physic Garden 5/23/2022 Concrete Pouring for Blinding under Foundation of Seat Walls (Inner), Inside Physic Garden as highlighted area in attached drawing's. C16/20 SRC 5133 10

213 C16/20 SRC 5132 10

214 KAIG3-RFI-SW-C-5492-00 Site Works 5/24/2022 Inspection for Blinding Concrete under MV Line Pit H/MV/07, H/MV/08, L/MV/03, L/MV/06 - as highlighted C16/20 SRC 5147 10

215 C16/20 SRC 5140 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


216 KAIG3-RFI-MC-S-7565-00 MCPE 3 5/24/2022 Concreting for MCPE 3 Columns (C17 - C18 - C19 - C20 - C21) at Ground Floor axis 02R to 02S, 03-2 Zone 2E 2F (as highlighted) 5141 9
SCREED

217 KAIG3-RFI-LM-S-7585-00 Large Mosque 5/24/2022 Concreting for Large Mosque Shaft, Electricity Box and Grade Beam for Ground floor Slab (as highlighted) axis 1, 2, C-C-1, E-F, 5-6 C32/40 62% OPC+30%FA - 160+/-40 5172 10

218 C32/40 62% OPC+30%FA - 160+/-40 5158 10

219 C32/40 62% OPC+30%FA - 160+/-40 5157 10

Site Works/Boundary Concrete Pouring & Shuttering for Wall & Columns of Boundary wall (Upto T.O.W) Span 74 & 75, As per Attached Highlighted
220 KAIG3-RFI-SW-S-7577-00 5/24/2022 C32/40 62% OPC+30%FA - 160+/-40 5171 5
Wall Drawing's & KAIG3-SCR-BO-S-0172-00-Reply

221 C32/40 62% OPC+30%FA - 160+/-40 5161 11

222 C32/40 62% OPC+30%FA - 160+/-40 5160 11

223 C32/40 62% OPC+30%FA - 160+/-40 5159 11

Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at Grid (9/B-E, F), Inside Management C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
224 KAIG3-RFI-MB-A-0878-00 Management Building 5/24/2022 5181 2
Building, As per Highlighted Area in Attached Drawing's. SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


225 KAIG3-RFI-CF-S-7583-00 Cefeteria 5/25/2022 Concreting for Isolated Circular Columns (C4, C7 )for CAFETERIA (as highlighted) ZONE 2A 5219 11
SCREED

kaig-qcals 303
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI226
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 5211 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)

kaig-qcals 304
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI227
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - 5196 QUANTITY
8
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
228 KAIG3-RFI-CO-S-7622-00 Crescent 5/26/2022 Protection layer of Geotex and 50mmScreed Under Strip Footing between PC 16-18 (as highlighted) Zone 1C 5289 4
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


229 5287 11
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


230 5281 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
231 5276 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
232 5262 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
233 5252 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
234 5251 10
SCREED

235 KAIG3-RFI-SW-C-5452-00 Site Works 5/26/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/11 to H/MV/10 at Zone-H (As Highlighted) C16/20 SRC 5284 3

236 C16/20 SRC 5268 10

237 C16/20 SRC 5258 10

238 KAIG3-RFI-PC-S-7617-00 South Watch Tower 5/28/2022 Concreting for South Watch Tower Abutment wall kicker at Grid 02/C (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 5354 10

239 C32/40 62% OPC+30%FA - 160+/-40 5348 10

240 C32/40 62% OPC+30%FA - 160+/-40 5329 6

241 C32/40 62% OPC+30%FA - 160+/-40 5317 10

242 C32/40 62% OPC+30%FA - 160+/-40 5310 10

243 C32/40 62% OPC+30%FA - 160+/-40 5309 10

244 KAIG3-RFI-SW-C-5538-00 Site Works 5/28/2022 Inspection for Blinding Concrete under MV Line Pit B/MV/23, F/MV/08, G/MV/21, G/MV/28 - as highlighted C16/20 SRC 5337 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


245 KAIG3-RFI-PC-S-7617-00 South Watch Tower 5/28/2022 Concreting for South watch tower Abutment wall kicker at Grid 02/C (as highlighted) 5342 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
246 KAIG3-RFI-CO-S-7637-00 Crescent 5/29/2022 Concreting for BUTTRESS (with Beam) BOI 49 Zone 1M 6100 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
247 6099 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
248 6096 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
249 6097 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
250 5384 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
251 5382 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
252 5381 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
253 5380 10
SCREED

kaig-qcals 305
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI254
No. RFI NUMBER
KAIG3-RFI-CO-S-7662-00 Crescent 5/31/2022 Concreting for RING BEAM Zone 2R (INNER) Axis 02-1, DESCRIPTION
02AZ to 02BC (as highlighted) DESIGN MIX MS - 220+/-20 - 5545 QUANTITY
10
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
255 5544 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
256 5543 5
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
257 5541 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
258 5535 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
259 5530 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
260 5529 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
261 5528 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
262 5521 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
263 5515 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
264 5514 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
265 5513 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
266 5505 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
267 5504 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
268 5503 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
269 5502 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
270 5501 10
SCREED

271 KAIG3-RFI-CO-S-7657-00 Crescent 5/31/2022 Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as highlighted) C16/20 SRC 5527 10

272 C16/20 SRC 5526 10

273 C16/20 SRC 5525 10

274 C16/20 SRC 5524 10

275 C16/20 SRC 5523 10

276 C16/20 SRC 5522 10

277 C16/20 SRC 5520 10

278 C16/20 SRC 5519 10

279 C16/20 SRC 5512 10

280 C16/20 SRC 5511 10

281 C16/20 SRC 5510 10

282 C16/20 SRC 5509 10

283 C16/20 SRC 5508 10

284 C16/20 SRC 5507 10

kaig-qcals 306
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI285
No. RFI NUMBER DESCRIPTION DESIGN
C16/20 SRC
MIX 5506 QUANTITY
10
LOCATION CASTING No.
(m³)
NO RFI 5/31/2022 C32/40 62% OPC+30%FA - 160+/-40 5516 10

NO RFI 5/31/2022 C16/20 SRC 5517 10

5/31/2022 C16/20 SRC 5537 10

5/31/2022 C16/20 SRC 5518 10

5/25/2022 C16/20 SRC 5222 3

5/22/2022 C16/20 SRC 5070 3

5/22/2022 C16/20 SRC 5056 10

5/22/2022 C16/20 SRC 5055 10

5/22/2022 C16/20 SRC 5050 10

5/22/2022 C16/20 SRC 5047 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


NO RFI 5/12/2022 4593 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5/12/2022 4592 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5/12/2022 4583 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5/12/2022 4566 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5/12/2022 4573 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5/12/2022 4564 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5/12/2022 4558 7
SCREED

NO RFI 5/30/2022 C32/40 62% OPC+30%FA - 160+/-40 5454 10

5/30/2022 C32/40 62% OPC+30%FA - 160+/-40 5453 10

TOTAL QUANTITY TRUCK LOAD (M³): 2760

C05 OPC

TOTAL QUANTITY TRUCK LOAD (M³) + C05 OPC 2760

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush


QC DC QC Manager

kaig-qcals 307
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
28 DAYS
STRENGHT
BUILDING/ DATE OF DELIVERY LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX 7 AND
LOCATION CASTING NOTE No. QUANTITY
DAYS MORE THAN 28
(m³)
DAYS
Inspection for Blinding Concrete under Potable Water Line Pit F/PW/14, F/PW/15, F/PW/08,
1 KAIG3-RFI-SW-C-5332-00 Site Works 5/7/2022 C16/20 SRC 4386 10
F/PW/02 - as highlighted

2 C16/20 SRC 4377 10

3 C16/20 SRC 4370 10

C32/40 62% OPC+30%FA - 160+/-


4 KAIG3-RFI-MC-S-7300-00 MCPE 4 5/7/2022 Concreting for MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO 4399 10
40
C32/40 62% OPC+30%FA - 160+/-
5 4398 10
40
C32/40 62% OPC+30%FA - 160+/-
6 4396 10
40
C32/40 62% OPC+30%FA - 160+/-
7 4393 10
40
C32/40 62% OPC+30%FA - 160+/-
8 4391 10
40
C32/40 62% OPC+30%FA - 160+/-
9 4390 10
40
C32/40 62% OPC+30%FA - 160+/-
10 4385 10
40
C32/40 62% OPC+30%FA - 160+/-
11 4382 10
40
C32/40 62% OPC+30%FA - 160+/-
12 4374 10
40
C32/40 62% OPC+30%FA - 160+/-
13 4373 10
40
C32/40 62% OPC+30%FA - 160+/-
14 4372 10
40
C32/40 62% OPC+30%FA - 160+/-
15 4371 10
40
Concreting for Blinding of VIP Auditorium strip footing at Zone 1H axis E-VA, F-VA, D-E-VA, G-
16 KAIG3-RFI-VA-S-7390-00 VIP Auditorium 5/8/2022 C16/20 SRC 4429 10
VA, 7-VA (as highlighted)

17 C16/20 SRC 4426 10

18 C16/20 SRC 4419 10

19 C16/20 SRC 4415 10

20 C16/20 SRC 4410 10

21 C16/20 SRC 4409 10

22 C16/20 SRC 4405 10

C32/40 62% OPC+30%FA - 160+/-


23 KAIG3-RFI-LM-S-7557-00 Large Mosque 5/8/2022 Shuttering for Large Mosque Shaft for Ground floor Slab (as highlighted) axis 1, 2, C-C-1 4421 10
40
C32/40 62% OPC+30%FA - 160+/-
24 4411 10
40
C32/40 62% OPC+30%FA - 160+/-
25 4408 10
40

kaig-qcals 308
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI26
No. RFI NUMBER DESCRIPTION C32/40 62% OPC+30%FA
DESIGN MIX - 160+/-
LOCATION CASTING 4406No.
NOTE 10
QUANTITY
40
(m³)

kaig-qcals 309
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION DESIGN MIX
New Ticketing
LOCATION CASTING Concrete pouring & Shuttering for walls of New ticketing booth # 2A, As per Attached Highlighted C32/40 62% OPC+30%FA+8% MS NOTE No. QUANTITY
27 KAIG3-RFI-TB-S-7379-00 5/8/2022 4417 2
Booth Drawing's. - 220+/-20 - SCREED (m³)

C32/40 62% OPC+30%FA+8% MS


28 4412 8
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


29 4407 8
- 220+/-20 - SCREED

Promenade C32/40 62% OPC+30%FA+8% MS


30 KAIG3-RFI-PC-S-7405-00 5/9/2022 Concreting for Promenade Bridge Abutment Retaining wall foundation at Grid 2C (as highlighted) 4480 5
Bridge - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


31 4479 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


32 4475 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


33 4473 8
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


34 4470 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


35 4467 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


36 4459 10
- 220+/-20 - SCREED

Promenade C32/40 62% OPC+30%FA - 160+/-


37 KAIG3-RFI-PC-S-7405-00 5/9/2022 Concreting for Promenade Bridge Abutment Retaining wall foundation at Grid 2C (as highlighted) 4469 10
Bridge 40
C32/40 62% OPC+30%FA - 160+/-
38 4468 10
40
C32/40 62% OPC+30%FA - 160+/-
39 4466 10
40
C32/40 62% OPC+30%FA - 160+/-
40 4462 10
40
C32/40 62% OPC+30%FA - 160+/-
41 4460 10
40
Inspection for Blinding Concrete under MV Line Junction Pit B/MV/15, B/MV/22, G/MV/11,
42 KAIG3-RFI-SW-C-5344-00 Site Works 5/9/2022 C16/20 SRC 4461 6
G/MV/26 - as highlighted

43 KAIG3-RFI-CO-S-7417-00 Crescent 5/9/2022 Concreting for BUTTRESS BII 41 (with beam) Zone 1K C16/20 SRC 4477 10

44 C16/20 SRC 4476 10

C32/40 62% OPC+30%FA+8% MS


45 KAIG3-RFI-CO-S-7421-00 Crescent 5/10/2022 Concreting for RING BEAM Zone 1J (OUTER) Axis 01-2, 01AA to 011D (as highlighted) 4510 5
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


46 4507 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


47 4502 10
- 220+/-20 - SCREED

kaig-qcals 310
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
48 LOCATION CASTING NOTE
4501No. QUANTITY
10
- 220+/-20 - SCREED (m³)

C32/40 62% OPC+30%FA+8% MS


49 4500 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


50 4498 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


51 4497 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


52 4496 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


53 4495 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


54 4494 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


55 4493 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


56 4492 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


57 4491 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


58 4490 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


59 4489 10
- 220+/-20 - SCREED

60 KAIG3-RFI-SW-C-4856-01 Site Works 5/10/2022 Inspection of Blinding Concrete under Potable Water Line Pit for C/PW/01 at Zone C as highlighted. C16/20 SRC 4505 7

61 KAIG3-RFI-SW-C-5294-00 Site Works 5/11/2022 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted C16/20 SRC 4529 10

62 C16/20 SRC 4520 10

63 C16/20 SRC 4528 10

64 C16/20 SRC 4523 10

65 C16/20 SRC 4522 10

66 C16/20 SRC 4521 10

67 C16/20 SRC 4515 10

Concreting for INFILL WALL between BIV 108-109 Gridline 02-1AM- 02-1AN (as highlighted) C32/40 62% OPC+30%FA+8% MS
68 KAIG3-RFI-CO-S-7411-00 Crescent 5/11/2022 4555 8
Zone 2M - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


69 4543 6
- 220+/-20 - SCREED

kaig-qcals 311
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
70 LOCATION CASTING NOTE
4539No. QUANTITY
10
- 220+/-20 - SCREED (m³)

C32/40 62% OPC+30%FA+8% MS


71 4530 6
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


72 4516 7
- 220+/-20 - SCREED

Water Play Concrete Pouring & Shuttering for foundation of Wet Well F, Inside Water Garden as highlighted C32/40 62% OPC+30%FA - 160+/-
73 KAIG3-RFI-WG-S-7426-00 5/11/2022 4527 10
GardeN/Wet Fell area in attached drawing's. 40
C32/40 62% OPC+30%FA - 160+/-
74 4554 10
40
C32/40 62% OPC+30%FA - 160+/-
75 4548 10
40
C32/40 62% OPC+30%FA - 160+/-
76 4546 10
40
C32/40 62% OPC+30%FA - 160+/-
77 4544 10
40
C32/40 62% OPC+30%FA - 160+/-
78 4541 10
40
C32/40 62% OPC+30%FA - 160+/-
79 4540 10
40
C32/40 62% OPC+30%FA - 160+/-
80 4538 10
40
C32/40 62% OPC+30%FA - 160+/-
81 4537 10
40
C32/40 62% OPC+30%FA - 160+/-
82 4536 10
40
C32/40 62% OPC+30%FA - 160+/-
83 4525 10
40
C32/40 62% OPC+30%FA - 160+/-
84 4519 5
40
C32/40 62% OPC+30%FA - 160+/-
85 4518 10
40
C32/40 62% OPC+30%FA - 160+/-
86 KAIG3-RFI-MC-S-7431-00 MCPE 1 5/12/2022 Concreting for MCPE 1 6-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2 4585 10
40
C32/40 62% OPC+30%FA - 160+/-
87 4560 3
40
C32/40 62% OPC+30%FA - 160+/-
88 4559 10
40

Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06,
89 KAIG3-RFI-SW-C-5268-00 Site Works 5/14/2022 C16/20 SRC 4703 5
F/MV/05, G/MV/14, G/MV/24, G/MV/25, G/MV/15, G/MV/01 - as highlighted

90 C16/20 SRC 4702 10

91 C16/20 SRC 4699 10

92 C16/20 SRC 4697 10

C32/40 62% OPC+30%FA+8% MS


93 KAIG3-RFI-CO-S-7447-00 Crescent 5/15/2022 Concreting for Buttress (with beam ) , BII 49, Zone 1M (as highlighted) 4747 5
- 220+/-20 - SCREED

kaig-qcals 312
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
94 LOCATION CASTING NOTE
4743No. QUANTITY
10
- 220+/-20 - SCREED (m³)

C32/40 62% OPC+30%FA+8% MS


95 4741 8
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


96 4737 5
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


97 4735 7
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


98 4733 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


99 4732 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


100 4725 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


101 4723 7
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


102 4722 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


103 4720 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


104 4719 10
- 220+/-20 - SCREED

105 KAIG3-RFI-SW-C-5294-00 Site Works 5/15/2022 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted C16/20 SRC 4721 10

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12,
106 KAIG3-RFI-SW-C-5222-00 Site Works 5/16/2022 NPW-ISC-13, NPW-ISC-20, NPW-ISC-01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC- C16/20 SRC 4791 7
04, NPW-ISC-21 at Zone-B,F&G - as highlighted

107 C16/20 SRC 4788 10

108 C16/20 SRC 4781 10

109 C16/20 SRC 4780 10

110 C16/20 SRC 4779 10

111 C16/20 SRC 4778 10

112 C16/20 SRC 4777 10

113 C16/20 SRC 4765 10


Site
Concrete Pouring & Shuttering for Kicker's (Inner & Outer both) of Boundary wall Span 74 & 75, C32/40 62% OPC+30%FA - 160+/-
114 KAIG3-RFI-SW-S-7489-00 Works/Boundary 5/16/2022 4784 11
As per Attached Highlighted Drawing's. 40
Wall
C32/40 62% OPC+30%FA - 160+/-
115 4783 10
40

kaig-qcals 313
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI116
No. RFI NUMBER DESCRIPTION C32/40 67%OPC+25%FA
DESIGN MIX - 160+/-
LOCATION CASTING 4772No.
NOTE 5
QUANTITY
40
(m³)
C32/40 62% OPC+30%FA - 160+/-
117 4767 8
40
C32/40 62% OPC+30%FA - 160+/-
118 4766 8
40

Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C32/40 62% OPC+30%FA - 160+/-
119 KAIG3-RFI-SW-C-5417-00 Site Works 5/16/2022 4768 7
C/MV/23 at Zone-C (As Highlighted) SCR-KAIG3-SCR-CO-S-0129-00 40

C32/40 62% OPC+30%FA - 160+/-


120 KAIG3-RFI-MC-S-7464-00 MCPE 3 5/16/2022 Concreting for MCPE 3 Counter fort & wall (inner) at axis 02-R to 03D As highlighted upto 871.00 4769 5
40
C32/40 62% OPC+30%FA+8% MS
121 KAIG3-RFI-MC-S-7464-00 MCPE 3 5/16/2022 Concreting for MCPE 3 Counter fort & wall (inner) at axis 02-R to 03D As highlighted upto 871.00 4792 8
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


122 4790 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


123 4782 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


124 4773 10
- 220+/-20 - SCREED

Management Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at C32/40 62% OPC+30%FA+8% MS
125 KAIG3-RFI-MB-A-0878-00 5/16/2022 4785 2
Building Grid (9/B-E, F), Inside Management Building, As per Highlighted Area in Attached Drawing's. - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


126 KAIG3-RFI-CO-S-7481-00 Crescent 5/17/2022 Concreting for RING BEAM Zone 1J (INNER) Axis 01-1, 01AA to 011D (as highlighted) 4855 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


127 4846 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


128 4845 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


129 4839 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


130 4836 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


131 4835 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


132 4829 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


133 4856 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


134 4857 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


135 4828 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


136 4827 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


137 4826 10
- 220+/-20 - SCREED

kaig-qcals 314
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
138 LOCATION CASTING NOTE
4816No. QUANTITY
10
- 220+/-20 - SCREED (m³)

Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06,
139 KAIG3-RFI-SW-C-5268-00 Site Works 5/17/2022 C16/20 OPC 4817 3
F/MV/05, G/MV/14, G/MV/24, G/MV/25, G/MV/15, G/MV/01 - as highlighted

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/12 to H/MV/25 at
140 KAIG3-RFI-SW-C-5387-00 Site Works 5/18/2022 C16/20 SRC 4875 7
Zone-C&H (As Highlighted)

141 C16/20 SRC 4871 10

KAIG3-RFI-CO-S-7478-00 Crescent 5/18/2022 Concreting for Blinding of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted) C16/20 SRC 4902 10

Concreting for Isolated Circular Columns ( C1, C2 ) for CAFETERIA (as highlighted) elev. 869.10 C32/40 62% OPC+30%FA+8% MS
142 KAIG3-RFI-CF-S-7440-00 Cafeteria 5/18/2022 4904 10
ZONE 2A - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


143 4901 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


144 4898 4
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


145 4894 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


146 4889 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


147 4881 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


148 4873 7
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


149 KAIG3-RFI-CO-S-7478-00 Crescent 5/18/2022 Concreting for Blinding of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted) 4872 10
- 220+/-20 - SCREED

Concreting for Infill wall between BIV 107-108 between Gridline 02-1 AL - 02-1 AM (As C32/40 62% OPC+30%FA+8% MS
150 KAIG3-RFI-CO-S-7534-00 Crescent 5/19/2022 4936 10
highlighted) ZONE 2M - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


151 4931 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


152 4930 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


153 4929 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


154 4928 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


155 4926 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


156 4912 10
- 220+/-20 - SCREED

kaig-qcals 315
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
157 LOCATION CASTING NOTE
4913No. QUANTITY
10
- 220+/-20 - SCREED (m³)

New Ticketing Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 1A As per Attached Highlighted C32/40 62% OPC+30%FA+8% MS
158 KAIG3-RFI-TB-S-7519-00 5/19/2022 4914 3
Booth Drawing's. - 220+/-20 - SCREED

Concrete Pouring for Blinding under Boundary Wall @ Grid (M & R/27-29) & (M-R/29-30), at
159 KAIG3-RFI-EC-S-7521-00 Energy Center 2 5/19/2022 C16/20 SRC 4927 10
Energy Center 2, as highlighted area in attached drawing's.

kaig-qcals 316
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI160
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC 4925No. 10
LOCATION CASTING NOTE QUANTITY
(m³)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/02 to H/MV/11 at
161 KAIG3-RFI-SW-C-5389-00 Site Works 5/19/2022 C16/20 SRC 4935 3
Zone-H (As Highlighted)

C32/40 62% OPC+30%FA+8% MS


162 KAIG3-RFI-CO-S-7523-00 Crescent 5/21/2022 Shuttering for Ground Beam between PC 78-80 Zone 1N (as highlighted) 5032 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


163 5023 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


164 5022 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


165 5021 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


166 5014 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


167 5012 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


168 5006 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


169 4995 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


170 4985 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA - 160+/-


171 KAIG3-RFI-CO-S-7523-00 Crescent 5/21/2022 Shuttering for Ground Beam between PC 78-80 Zone 1N (as highlighted) 4998 5
40
C32/40 62% OPC+30%FA - 160+/-
172 4986 10
40
South Watch
173 KAIG3-RFI-ST-S-7539-00 5/21/2022 Anti Termite application under South Watch Tower foundation at Zone 27 (as highlighted) C16/20 SRC 5027 3
Tower

174 C16/20 SRC 5026 11

175 C16/20 SRC 5015 10

176 C16/20 SRC 5008 10

C32/40 62% OPC+30%FA - 160+/-


177 KAIG3-RFI-CF-S-7549-00 Cefeteria 5/22/2022 Concreting for Cafeteria Circular Column C-03, 06 Zone 2A Elev. 869.100 (as highlighted) 5046 10
40

Concreting and Scaffoldings for RING BEAM Zone 1K (2ND OUTER) Axis 01-2, 01AF to 01AG C32/40 62% OPC+30%FA+8% MS
178 KAIG3-RFI-CO-S-7553-00 Crescent 5/22/2022 5080 8
(as highlighted) - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


179 5071 10
- 220+/-20 - SCREED

kaig-qcals 317
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION DESIGN MIX
LOCATION CASTING C32/40 62% OPC+30%FA+8% MS NOTE No. QUANTITY
180 5066 8
- 220+/-20 - SCREED (m³)

C32/40 62% OPC+30%FA+8% MS


181 5054 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


182 5053 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


183 5052 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


184 5051 10
- 220+/-20 - SCREED

South Watch
185 KAIG3-RFI-ST-S-7541-00 5/22/2022 Concreting for Blinding under South Watch Tower foundation at Zone 27 (as highlighted) C16/20 SRC 5079 8
Tower

186 C16/20 SRC 5073 10

187 C16/20 SRC 5068 10

188 C16/20 SRC 5059 10

189 C16/20 SRC 5058 10

190 C16/20 SRC 5057 10

Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C32/40 62% OPC+30%FA - 160+/-
191 KAIG3-RFI-SW-C-5417-00 Site Works 5/23/2022 5106 10
C/MV/23 at Zone-C (As Highlighted) SCR-KAIG3-SCR-CO-S-0129-00 40

C32/40 62% OPC+30%FA - 160+/-


192 5105 10
40
C32/40 62% OPC+30%FA - 160+/-
193 5101 10
40
C32/40 62% OPC+30%FA - 160+/-
194 5100 10
40
C32/40 62% OPC+30%FA - 160+/-
195 5098 10
40
C32/40 62% OPC+30%FA - 160+/-
196 5096 10
40
C32/40 62% OPC+30%FA - 160+/-
197 5095 10
40

Promenade C32/40 62% OPC+30%FA+8% MS


198 KAIG3-RFI-PC-S-7543-00 5/23/2022 Concreting for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highlighted 5114 7
Bridge - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


199 5099 7
- 220+/-20 - SCREED

200 KAIG3-RFI-SW-C-5483-00 Site Works 5/23/2022 Inspection for Casting the Blinding Concrete under the Manhole for FW-A-6 (as Highlighted) C16/20 SRC 5124 10

201 C16/20 SRC 5116 10

kaig-qcals 318
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI202
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC 5115No. 10
LOCATION CASTING NOTE QUANTITY
(m³)
Concrete Pouring & Shuttering for Roof Slab of Plant Room, at Physic Garden, at highlighted area C32/40 67%OPC+25%FA - 160+/-
203 KAIG3-RFI-PG-S-7562-00 Physic Garden 5/23/2022 5123 3
in attached drawings. Attached KAIG3-SCR-PG-S-0142-00-Reply. 40
C32/40 67%OPC+25%FA - 160+/-
204 5118 11
40
Promenade C32/40 62% OPC+30%FA - 160+/-
205 KAIG3-RFI-PC-S-7543-00 5/23/2022 Concreting for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highlighted 5130 10
Bridge 40
Concrete Pouring for Blinding under Foundation of Seat Walls (Inner), Inside Physic Garden as
206 KAIG3-RFI-PG-S-7538-00 Physic Garden 5/23/2022 C16/20 OPC 5133 10
highlighted area in attached drawing's.

207 C16/20 OPC 5132 10

Inspection for Blinding Concrete under MV Line Pit H/MV/07, H/MV/08, L/MV/03, L/MV/06 - as
208 KAIG3-RFI-SW-C-5492-00 Site Works 5/24/2022 C16/20 SRC 5147 10
highlighted

209 C16/20 SRC 5140 10

Concreting for MCPE 3 Columns (C17 - C18 - C19 - C20 - C21) at Ground Floor axis 02R to 02S, C32/40 62% OPC+30%FA - 160+/-
210 KAIG3-RFI-MC-S-7565-00 MCPE 3 5/24/2022 5141 9
03-2 Zone 2E 2F (as highlighted) 40
Concreting for Large Mosque Shaft, Electricity Box and Grade Beam for Ground floor Slab (as C32/40 62% OPC+30%FA - 160+/-
211 KAIG3-RFI-LM-S-7585-00 Large Mosque 5/24/2022 5172 10
highlighted) axis 1, 2, C-C-1, E-F, 5-6 40
C32/40 62% OPC+30%FA - 160+/-
212 5158 10
40
C32/40 62% OPC+30%FA - 160+/-
213 5157 10
40
Site
Concrete Pouring & Shuttering for Wall & Columns of Boundary wall (Upto T.O.W) Span 74 & 75, C32/40 67%OPC+25%FA - 160+/-
214 KAIG3-RFI-SW-S-7577-00 Works/Boundary 5/24/2022 5171 5
As per Attached Highlighted Drawing's & KAIG3-SCR-BO-S-0172-00-Reply 40
Wall
C32/40 67%OPC+25%FA - 160+/-
215 5161 11
40
C32/40 67%OPC+25%FA - 160+/-
216 5160 11
40
C32/40 67%OPC+25%FA - 160+/-
217 5159 11
40

Management Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at C32/40 62% OPC+30%FA - 160+/-
218 KAIG3-RFI-MB-A-0878-00 5/24/2022 5181 2
Building Grid (9/B-E, F), Inside Management Building, As per Highlighted Area in Attached Drawing's. 40

219 C16/20 SRC 5182 7

C32/40 62% OPC+30%FA+8% MS


220 KAIG3-RFI-CF-S-7583-00 Cefeteria 5/25/2022 Concreting for Isolated Circular Columns (C4, C7 )for CAFETERIA (as highlighted) ZONE 2A 5219 11
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


221 5211 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


222 5196 8
- 220+/-20 - SCREED

Protection layer of Geotex and 50mmScreed Under Strip Footing between PC 16-18 (as C32/40 62% OPC+30%FA+8% MS
223 KAIG3-RFI-CO-S-7622-00 Crescent 5/26/2022 5289 4
highlighted) Zone 1C - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


224 5287 11
- 220+/-20 - SCREED

kaig-qcals 319
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
225 LOCATION CASTING NOTE
5281No. QUANTITY
10
- 220+/-20 - SCREED (m³)

kaig-qcals 320
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
226 LOCATION CASTING NOTE
5276No. QUANTITY
10
- 220+/-20 - SCREED (m³)

C32/40 62% OPC+30%FA+8% MS


227 5262 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


228 5252 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


229 5251 10
- 220+/-20 - SCREED

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/11 to H/MV/10 at
230 KAIG3-RFI-SW-C-5452-00 Site Works 5/26/2022 C16/20 SRC 5284 3
Zone-H (As Highlighted)

231 C16/20 SRC 5268 10

232 C16/20 SRC 5258 10

South Watch C32/40 62% OPC+30%FA - 160+/-


233 KAIG3-RFI-PC-S-7617-00 5/28/2022 Concreting for South Watch Tower Abutment wall kicker at Grid 02/C (as highlighted) 5354 10
Tower 40
C32/40 62% OPC+30%FA - 160+/-
234 5348 10
40
C32/40 62% OPC+30%FA - 160+/-
235 5329 6
40
C32/40 62% OPC+30%FA - 160+/-
236 5317 10
40

237 C16/20 SRC 5324 5

C32/40 62% OPC+30%FA - 160+/-


238 5310 10
40

239 C16/20 SRC 5311 4

C32/40 62% OPC+30%FA - 160+/-


240 5309 10
40
Inspection for Blinding Concrete under MV Line Pit B/MV/23, F/MV/08, G/MV/21, G/MV/28 - as
241 KAIG3-RFI-SW-C-5538-00 Site Works 5/28/2022 C16/20 SRC 5337 10
highlighted

South Watch C32/40 62% OPC+30%FA+8% MS


242 KAIG3-RFI-PC-S-7617-00 5/28/2022 Concreting for South watch tower Abutment wall kicker at Grid 02/C (as highlighted) 5342 10
Tower - 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


243 KAIG3-RFI-CO-S-7637-00 Crescent 5/29/2022 Concreting for BUTTRESS (with Beam) BOI 49 Zone 1M 6100 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


244 6099 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


245 6096 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


246 6097 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


247 5384 7
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


248 5382 10
- 220+/-20 - SCREED

kaig-qcals 321
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
249 LOCATION CASTING NOTE
5381No. QUANTITY
10
- 220+/-20 - SCREED (m³)

C32/40 62% OPC+30%FA+8% MS


250 5380 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


251 KAIG3-RFI-CO-S-7662-00 Crescent 5/31/2022 Concreting for RING BEAM Zone 2R (INNER) Axis 02-1, 02AZ to 02BC (as highlighted) 5545 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


252 5544 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


253 5543 5
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


254 5541 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


255 5535 11
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


256 5530 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


257 5529 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


258 5528 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


259 5521 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


260 5515 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


261 5514 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


262 5513 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


263 5505 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


264 5504 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


265 5503 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


266 5502 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


267 5501 10
- 220+/-20 - SCREED
Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as
268 KAIG3-RFI-CO-S-7657-00 Crescent 5/31/2022 C16/20 SRC 5527 10
highlighted)
269 C16/20 SRC 5526 10

kaig-qcals 322
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI270
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC 5525No. 10
LOCATION CASTING NOTE QUANTITY
(m³)
271 C16/20 SRC 5524 10

272 C16/20 SRC 5523 10

273 C16/20 SRC 5522 10

274 C16/20 SRC 5520 10

275 C16/20 SRC 5519 10

276 C16/20 SRC 5512 10

277 C16/20 SRC 5511 10

278 C16/20 SRC 5510 10

279 C16/20 SRC 5509 10

280 C16/20 SRC 5508 10

281 C16/20 SRC 5507 10

282 C16/20 SRC 5506 10


C32/40 62% OPC+30%FA - 160+/-
283 NO RFI 5/31/2022 5516 10
40
284 NO RFI 5/31/2022 C16/20 SRC 5517 10

285 5/31/2022 C16/20 SRC 5537 10

286 5/31/2022 C16/20 SRC 5518 10

287 5/25/2022 C16/20 SRC 5222 3

288 5/22/2022 C16/20 SRC 5070 3

289 5/22/2022 C16/20 SRC 5056 10

290 5/22/2022 C16/20 SRC 5055 10

291 5/22/2022 C16/20 SRC 5050 10

292 5/22/2022 C16/20 SRC 5047 10

C32/40 62% OPC+30%FA+8% MS


293 NO RFI 5/12/2022 4593 4
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


294 5/12/2022 4592 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


295 5/12/2022 4583 10
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


296 5/12/2022 4566 8
- 220+/-20 - SCREED

C32/40 62% OPC+30%FA+8% MS


297 5/12/2022 4573 10
- 220+/-20 - SCREED

kaig-qcals 323
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


TRUCK COMPRESSIVE
BUILDING/ DATE OF DELIVERY LOAD / STRENGHT
SI No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX
OPC+30%FA+8% MS
298 LOCATION CASTING
5/12/2022 NOTE
4564No. QUANTITY
10
- 220+/-20 - SCREED (m³)

C32/40 62% OPC+30%FA+8% MS


299 5/12/2022 4558 7
- 220+/-20 - SCREED

C32/40 67%OPC+25%FA - 160+/-


300 NO RFI 5/30/2022 5454 10
40

C32/40 67%OPC+25%FA - 160+/-


301 5/30/2022 5453 10
40

TOTAL QUANTITY TRUCK LOAD (M³): 2776

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush


QC DC QC Manager

kaig-qcals 324
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
1 KAIG3-RFI-CO-S-7753-00 Crescent 6/13/2022 Concreting for RING BEAM Zone 1K (INNER) Axis 01-1, 01AD to 01AG (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-21838 12

2 C32/40 62% OPC+30%FA - 160+/-40 P 29-21837 12

3 C32/40 62% OPC+30%FA - 160+/-40 P 29-21836 12

4 C32/40 62% OPC+30%FA - 160+/-40 P 29-21835 12

5 C32/40 62% OPC+30%FA - 160+/-40 P 29-21834 12

6 C32/40 62% OPC+30%FA - 160+/-40 P 29-21833 12


C32/40 62% OPC+30%FA+8% MS - 220+/-20
7 KAIG3-RFI-CO-S-7753-00 Crescent 6/13/2022 Concreting for RING BEAM Zone 1K (INNER) Axis 01-1, 01AD to 01AG (as highlighted) P 29-21855 12
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
8 P 29-21853 12
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
9 P 29-21852 12
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
10 P 29-21849 12
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
11 P 29-21848 12
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
12 P 29-21847 12
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
13 P 29-21846 12
- SCREED
14 KAIG3-RFI-PC-S-8057-00 Central Bridge 6/28/2022 Concreting for Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AG - 02AH C32/40 62% OPC+30%FA - 160+/-40 P 28-34659 11

15 C32/40 62% OPC+30%FA - 160+/-40 P 29-22117 8

16 C32/40 62% OPC+30%FA - 160+/-40 P 28-34658 12

17 C32/40 62% OPC+30%FA - 160+/-40 P 28-34657 12

18 C32/40 62% OPC+30%FA - 160+/-40 P 29-22112 13

19 NO RFI C32/40 62% OPC+30%FA - 160+/-40 P 28-34727 13

20 C32/40 62% OPC+30%FA - 160+/-40 P 28-34726 13

21 C32/40 62% OPC+30%FA - 160+/-40 P 28-34725 13

22 C32/40 62% OPC+30%FA - 160+/-40 P 28-34724 13

22 C32/40 62% OPC+30%FA - 160+/-40 P 28-34723 13

22 C32/40 62% OPC+30%FA - 160+/-40 P 28-34722 13

22 C32/40 62% OPC+30%FA - 160+/-40 P 28-34721 13

22 C32/40 62% OPC+30%FA - 160+/-40 P 28-34719 13

22 C32/40 62% OPC+30%FA - 160+/-40 P 28-34718 13

22 C32/40 62% OPC+30%FA - 160+/-40 P 28-34717 13

TOTAL QUANTITY TRUCK LOAD (M³): 342

TOTAL QUANTITY TRUCK LOAD (M³): 342

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 325
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
28 DAYS
BUILDING/ DATE OF DELIVERY LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX 7 AND
LOCATION CASTING NOTE No. QUANTITY
DAYS MORE THAN 28
(m³)
DAYS
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at
1 KAIG3-RFI-SW-C-5713-00 Site Works 6/1/2022 C16/20 SRC 5573 10
Zone-B&G (As Highlighted)

2 C16/20 SRC 5558 10

Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as
3 KAIG3-RFI-CO-S-7657-00 Crescent 6/1/2022 C16/20 SRC 5577 10
highlighted)

4 C16/20 SRC 5576 10

5 C16/20 SRC 5557 10

Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (29-30/M-R), at Energy
6 KAIG3-RFI-EC-S-7689-00 Energy Center 2 6/1/2022 C32/40 62% OPC+30%FA - 160+/-40 5575 6
Center 2, as highlighted area in attached drawing's.

7 C32/40 62% OPC+30%FA - 160+/-40 5574 10

8 C32/40 62% OPC+30%FA - 160+/-40 5571 10

9 C32/40 62% OPC+30%FA - 160+/-40 5570 10

10 C32/40 62% OPC+30%FA - 160+/-40 5569 10

11 C32/40 62% OPC+30%FA - 160+/-40 5566 10

12 C32/40 62% OPC+30%FA - 160+/-40 5565 10

13 C32/40 62% OPC+30%FA - 160+/-40 5564 10

14 C32/40 62% OPC+30%FA - 160+/-40 5562 10

15 C32/40 62% OPC+30%FA - 160+/-40 5561 10

16 C32/40 62% OPC+30%FA - 160+/-40 5560 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-14/L and R/16-22), at
17 KAIG3-RFI-EC-S-7687-00 Energy Center 2 6/1/2022 C16/20 SRC 5580 5
Energy Center 2, as highlighted area in attached drawing's.

18 C16/20 SRC 5579 10

19 C16/20 SRC 5578 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


20 KAIG3-RFI-CO-S-7662-00 Crescent 6/1/2022 Concreting for RING BEAM Zone 2R (INNER) Axis 02-1, 02AZ to 02BC (as highlighted) 5582 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


21 5568 5
SCREED
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-G (SA-12) -
22 KAIG3-RFI-PA-C-5636-00 Picnic Area 6/2/2022 C32/40 62% OPC+30%FA - 160+/-40 5608 5
As Highlighted

23 KAIG3-RFI-PC-S-7667-00 Promenade Bridge 6/2/2022 Concreting for Retaining Wall Promenade Bridge Abutment at Grid M Zone 4 as highlighted C32/40 62% OPC+30%FA - 160+/-40 5641 5

kaig-qcals 326
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD
10 /
SI24
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 5635
LOCATION CASTING NOTE No. QUANTITY
(m³)

kaig-qcals 327
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD
10 /
SI25
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 5634
LOCATION CASTING NOTE No. QUANTITY
(m³)
26 C32/40 62% OPC+30%FA - 160+/-40 5630 10

27 C32/40 62% OPC+30%FA - 160+/-40 5629 10

28 C32/40 62% OPC+30%FA - 160+/-40 5619 10

29 C32/40 62% OPC+30%FA - 160+/-40 5618 10

Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- M - As
30 KAIG3-RFI-SW-C-5695-00 Site Works 6/4/2022 C16/20 SRC 5723 5
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)

31 C16/20 SRC 5714 10

32 C16/20 SRC 5708 10

33 KAIG3-RFI-CF-S-7675-00 Cafeteria 6/4/2022 Shuttering for walls(W14 ,W15,W19) at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 5718 5

34 C32/40 62% OPC+30%FA - 160+/-40 5717 10

35 C32/40 62% OPC+30%FA - 160+/-40 5711 10

36 C32/40 62% OPC+30%FA - 160+/-40 5710 10

Concreting for walls (W10) and Isolated Circular Columns (C9 )at CAFETERIA zone 2A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
37 KAIG3-RFI-CO-S-7696-00 Cafeteria 6/4/2022 5740 7
highlighted) SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
38 5738 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
39 5737 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
40 5735 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
41 5733 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
42 5731 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
43 5728 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
44 5727 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
45 5725 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
46 5722 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
47 5712 10
SCREED

Concrete pouring & Shuttering for walls of New ticketing booth # 3A, As per Attached Highlighted C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
48 KAIG3-RFI-TB-S-7726-00 New Ticketing Booth 6/4/2022 5716 7
Drawing's. SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


49 5715 7
SCREED
kaig-qcals 328
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF Concreting for slab on grade inside the large mosque,two electricity box for Large Mosque at grid C32/40 62% OPC+30%FA+8% DELIVERY LOAD /
SI50
No. RFI NUMBER
KAIG3-RFI-LM-S-7724-00 Large Mosque 6/5/2022 DESCRIPTION DESIGN MIX MS - 220+/-20 - 5793No. 10
LOCATION CASTING (C1,1,2-F,1,2) ZONE 1G (as highlighetd) SCREED NOTE QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
51 5777 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


52 5768 10
SCREED

53 KAIG3-RFI-ST-S-7711-00 South Watch Tower 6/5/2022 Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90 C32/40 62% OPC+30%FA - 160+/-40 5796 10

54 C32/40 62% OPC+30%FA - 160+/-40 5795 10

55 C32/40 62% OPC+30%FA - 160+/-40 5791 10

56 C32/40 62% OPC+30%FA - 160+/-40 5790 10

57 C32/40 62% OPC+30%FA - 160+/-40 5788 10

58 C32/40 62% OPC+30%FA - 160+/-40 5787 10

59 C32/40 62% OPC+30%FA - 160+/-40 5786 10

60 C32/40 62% OPC+30%FA - 160+/-40 5784 10

61 C32/40 62% OPC+30%FA - 160+/-40 5783 10

62 C32/40 62% OPC+30%FA - 160+/-40 5782 10

63 C32/40 62% OPC+30%FA - 160+/-40 5774 10

64 C32/40 62% OPC+30%FA - 160+/-40 5773 10

65 C32/40 62% OPC+30%FA - 160+/-40 5772 10

66 C32/40 62% OPC+30%FA - 160+/-40 5771 10

67 C32/40 62% OPC+30%FA - 160+/-40 5770 10

Concreting and Shear Connector for Buttress with Beam BOV, BIV 54, 55 Zone 1N 1P (as
68 KAIG3-RFI-CO-S-7721-00 Crescent 6/5/2022 C32/40 62% OPC+30%FA - 160+/-40 5794 10
highlighted)
Concrete Pouring & shuttering for Walls of Wet Well E, (upto Level +872.10), Inside Water Garden
83 KAIG3-RFI-WG-S-7728-00 Water Play Garden 6/5/2022 C32/40 62% OPC+30%FA - 160+/-40 5792 10
as highlighted area in attached drawing's.

84 C32/40 62% OPC+30%FA - 160+/-40 5789 10

85 C32/40 62% OPC+30%FA - 160+/-40 5785 10

86 C32/40 62% OPC+30%FA - 160+/-40 5781 10

87 C32/40 62% OPC+30%FA - 160+/-40 5776 10

kaig-qcals 329
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD
10 /
SI88
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 5775
LOCATION CASTING NOTE No. QUANTITY
Inspection of Thrust Block for Potable Water Line ( Dia 80 & 50mm) at Zone-M - As Highlighted (m³)
89 KAIG3-RFI-SW-C-5694-00 Site Works 6/5/2022 C16/20 SRC 5780 10
(SCR-KAIG3-SCR-SW-C-0021-00)

90 C16/20 SRC 5779 10

91 C16/20 SRC 5778 10

92 KAIG3-RFI-ST-S-7711-00 South Watch Tower 6/5/2022 Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90 C32/40 62% OPC+30%FA - 160+/-40 5807 10

93 C32/40 62% OPC+30%FA - 160+/-40 5806 10

94 C32/40 62% OPC+30%FA - 160+/-40 5805 10

95 C32/40 62% OPC+30%FA - 160+/-40 5804 10

96 C32/40 62% OPC+30%FA - 160+/-40 5803 10

97 C32/40 62% OPC+30%FA - 160+/-40 5802 10

98 C32/40 62% OPC+30%FA - 160+/-40 5801 10

99 C32/40 62% OPC+30%FA - 160+/-40 5800 10

100 C32/40 62% OPC+30%FA - 160+/-40 5799 10

101 C32/40 62% OPC+30%FA - 160+/-40 5798 10

102 C32/40 62% OPC+30%FA - 160+/-40 5797 10

Concreting for Infill wall between PC 74-75 inner between Gridline 02M- 02N (As highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
103 KAIG3-RFI-CO-S-7682-00 Crescent 6/6/2022 5849 5
ZONE 2D SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
104 5838 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
105 5822 10
SCREED
Inspection for Blinding Concrete under MV Line Pit C/MV/15, G/MV/30, H/MV/25, H/MV/02,
106 KAIG3-RFI-SW-C-5679-00 Site Works 6/6/2022 C16/20 SRC 5839 6
H/MV/11, H/MV/09, H/MV/28 - as highlighted

107 C16/20 SRC 5823 10

108 KAIG3-RFI-CO-S-7735-00 Crescent 6/6/2022 Concreting of Mass Concrete for Strip Footing Between PC 132 - 134 Zone 2F (as highlighted) C16/20 SRC 5860 10

109 C16/20 SRC 5855 10

110 C16/20 SRC 5854 5

111 C16/20 SRC 5846 10

112 C16/20 SRC 5845 10

kaig-qcals 330
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD
10 /
SI113
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX 5837
LOCATION CASTING NOTE No. QUANTITY
(m³)
114 C16/20 SRC 5836 10

115 C16/20 SRC 5835 10

116 C16/20 SRC 5834 10

117 C16/20 SRC 5833 10

118 C16/20 SRC 5832 10

119 C16/20 SRC 5831 10

120 C16/20 SRC 5830 10

121 C16/20 SRC 5829 10

122 C16/20 SRC 5828 10

123 C16/20 SRC 5827 10

124 C16/20 SRC 5826 10

125 C16/20 SRC 5825 10

126 C16/20 SRC 5824 10

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-G (SA-11) - As
127 KAIG3-RFI-PA-C-5576-00 Picnic Area 6/6/2022 C32/40 62% OPC+30%FA - 160+/-40 5853 10
Highlighted

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


128 KAIG3-RFI-CF-S-7741-00 Cafeteria 6/7/2022 Concreting for walls (W20,W21) undercroft at CAFETERIA zone 2A (as highlighted) 869.10 5901 4
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


129 5889 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
130 5888 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
131 5881 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
132 5880 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
133 5879 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
134 5878 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
135 5877 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
136 5876 10
SCREED

kaig-qcals 331
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD
SI137
No. RFI NUMBER DESCRIPTION DESIGN MIX 5875 10 /
LOCATION CASTING SCREED NOTE No. QUANTITY
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - (m³)
138 5874 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
139 5873 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
140 5872 10
SCREED
Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (21-28/R), at Energy Center 2,
141 KAIG3-RFI-EC-S-7762-00 Energy Center 2 6/7/2022 C32/40 62% OPC+30%FA - 160+/-40 5892 5
as highlighted area in attached drawing's.

C32/40 62% OPC+30%FA - 160+/-40 5890 10

142 C32/40 62% OPC+30%FA - 160+/-40 5887 10

143 C32/40 62% OPC+30%FA - 160+/-40 5886 10

144 C32/40 62% OPC+30%FA - 160+/-40 5885 10

145 C32/40 62% OPC+30%FA - 160+/-40 5884 10

146 C32/40 62% OPC+30%FA - 160+/-40 5883 10

147 C32/40 62% OPC+30%FA - 160+/-40 5882 10

148 KAIG3-RFI-CF-S-7741-00 Cafeteria 6/7/2022 Concreting for walls (W20,W21) undercroft at CAFETERIA zone 2A (as highlighted) 869.10 C16/20 SRC 5906 4

149 C16/20 SRC 5905 10

150 C16/20 SRC 5904 10

151 C16/20 SRC 5903 10

152 C16/20 SRC 5902 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


153 KAIG3-RFI-CO-S-7769-00 Crescent 6/8/2022 Concreting for RING BEAM Zone 2R (OUTER) Axis 02-2, 02AZ to 02BC (as highlighted) 5948 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


154 5945 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


155 5938 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


156 5937 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


157 5936 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


158 5935 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


159 5934 10
SCREED

kaig-qcals 332
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD /
SI160
No. RFI NUMBER DESCRIPTION DESIGN MIX 5933 10
LOCATION CASTING SCREED NOTE No. QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
161 5932 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


162 5931 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


163 5930 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


164 5929 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


165 5928 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


166 5927 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


167 5926 10
SCREED

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/30 to
168 KAIG3-RFI-SW-C-5676-00 Site Works 6/8/2022 C16/20 SRC 5947 5
B/TL/31 at Zone-B - As Highlighted

169 C16/20 SRC 5940 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


170 KAIG3-RFI-CO-S-7795-00 Crescent 6/9/2022 Concreting for Infill wall between Gridline 02F- 02E (As highlighted) ZONE 2B 6024 4
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


171 6023 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


172 6022 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


173 6021 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


174 6020 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


175 6019 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


176 6018 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


177 6017 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


178 6016 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


179 6015 10
SCREED

kaig-qcals 333
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD /
SI180
No. RFI NUMBER DESCRIPTION DESIGN MIX
SCREED
6014 10
LOCATION CASTING NOTE No. QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
181 6013 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


182 6008 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


183 6001 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


184 5994 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


185 5992 10
SCREED
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-G (SA-11) - As
186 KAIG3-RFI-PA-C-5576-00 Picnic Area 6/9/2022 C32/40 62% OPC+30%FA - 160+/-40 5996 3
Highlighted
Concreting for plinding under slab on grade at Large Mosque grid C,1-2, C1,1-2 ZONE 1G (as
187 KAIG3-RFI-LM-S-7786-00 Large Mosque 6/9/2022 C16/20 SRC 6012 9
highlighetd)

188 C16/20 SRC 6006 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (M/15-22), at Energy
189 KAIG3-RFI-EC-S-7730-00 Energy Center 2 6/9/2022 C16/20 SRC 6010 10
Center 2, as highlighted area in attached drawing's.

190 C16/20 SRC 6009 10

191 C16/20 SRC 6007 10

192 KAIG3-RFI-CF-S-7775-00 Cafeteria 6/11/2022 Shuttering for walls(W13 ,W9,W8) at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 71845 10

193 C32/40 62% OPC+30%FA - 160+/-40 71825 5

194 C32/40 62% OPC+30%FA - 160+/-40 71824 10

195 C32/40 62% OPC+30%FA - 160+/-40 71823 10

196 C32/40 62% OPC+30%FA - 160+/-40 71822 10

Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid
197 KAIG3-RFI-PC-S-7813-00 Central Bridge 6/11/2022 C16/20 SRC 71832 10
1M, 02AH

198 C16/20 SRC 71831 10

199 C16/20 SRC 71830 10

200 C16/20 SRC 71829 10

Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid
201 KAIG3-RFI-PC-S-7813-00 Central Bridge 6/11/2022 C32/40 62% OPC+30%FA - 160+/-40 71844 5
1M, 02AH

kaig-qcals 334
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD
10 /
SI202
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 71843
LOCATION CASTING NOTE No. QUANTITY
(m³)
203 C32/40 62% OPC+30%FA - 160+/-40 71842 10

204 C32/40 62% OPC+30%FA - 160+/-40 71841 10

205 C32/40 62% OPC+30%FA - 160+/-40 71840 10

206 C32/40 62% OPC+30%FA - 160+/-40 71839 10

207 C32/40 62% OPC+30%FA - 160+/-40 71838 10

208 C32/40 62% OPC+30%FA - 160+/-40 71837 10

209 C32/40 62% OPC+30%FA - 160+/-40 71836 10

210 C32/40 62% OPC+30%FA - 160+/-40 71835 10

211 C32/40 62% OPC+30%FA - 160+/-40 71834 10

212 C32/40 62% OPC+30%FA - 160+/-40 71833 10

Concreting for mass concrete (2nd layer) for Central Bridge foundation Zone 4 grid 1M (as
213 KAIG3-RFI-PC-S-7764-00 Crescent 6/12/2022 C16/20 SRC 6101 10
highlighted)

214 C16/20 SRC 6099 10

215 C16/20 SRC 6096 10

216 C16/20 SRC 6094 10

217 C16/20 SRC 6092 10

218 C16/20 SRC 6091 10

219 C16/20 SRC 6089 10

220 C16/20 SRC 6088 10

221 C16/20 SRC 6087 10

222 C16/20 SRC 6086 10

223 C16/20 SRC 6085 10

224 C16/20 SRC 6084 10

225 C16/20 SRC 6083 10

kaig-qcals 335
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD
10 /
SI226
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX 6082
LOCATION CASTING NOTE No. QUANTITY
(m³)
227 C16/20 SRC 6079 10

228 C16/20 SRC 6078 10

229 C16/20 SRC 6077 10

230 C16/20 SRC 6075 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


231 KAIG3-RFI-CF-S-7797-00 Cafeteria 6/12/2022 Shuttering for walls (W12, W11) at CAFETERIA zone 2A (as highlighted) 6109 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
232 6108 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
233 6107 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
234 6105 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
235 6104 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
236 6098 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
237 6097 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
238 6095 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
239 6080 10
SCREED
Inspection for Blinding Concrete under Potable Water Line Pit F/PW/15, F/PW/08, F/PW/02 - as
240 KAIG3-RFI-SW-C-5667-00 Site Works 6/12/2022 C16/20 SRC 6102 10
highlighted

241 C16/20 SRC 6090 10

Surface Prepation prior to start back filling around Non-Potable water line Pit - NPW-ISC-12, NPW-
242 KAIG3-RFI-SW-C-5660-00 Site Works 6/13/2022 C16/20 SRC 6148 6
ISC-13 , NPW-ISC-20 at Zone B - as highlighted

243 C16/20 SRC 6137 10

Water Play Garden/Wet Concrete Pouring & Shuttering for Walls of Wet Well F, (upto +872.00), Inside Water Garden as
244 KAIG3-RFI-WG-S-7839-00 6/13/2022 C32/40 62% OPC+30%FA - 160+/-40 6150 5
Well highlighted area in attached drawing's

245 C32/40 62% OPC+30%FA - 160+/-40 6149 10

246 C32/40 62% OPC+30%FA - 160+/-40 6147 10

247 C32/40 62% OPC+30%FA - 160+/-40 6146 10

248 C32/40 62% OPC+30%FA - 160+/-40 6145 10

kaig-qcals 336
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD
10 /
SI249
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 6142
LOCATION CASTING NOTE No. QUANTITY
(m³)
250 C32/40 62% OPC+30%FA - 160+/-40 6141 10

251 C32/40 62% OPC+30%FA - 160+/-40 6140 10

252 C32/40 62% OPC+30%FA - 160+/-40 6138 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


253 KAIG3-RFI-PC-S-7807-00 South Watch Tower 6/14/2022 Concreting for abutment wall of Bridge South watch tower grid 02/C Zone 7 (as highlighted) 6172 8
SCREED
Concreting for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as
254 KAIG3-RFI-PC-S-7866-00 Crescent 6/14/2022 C16/20 SRC 6199 4
highlighted)

255 C16/20 SRC 6180 5

256 C16/20 SRC 6193 5

257 KAIG3-RFI-SW-C-5585-01 Site Works 6/14/2022 Inspection of Concrete Pouring for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 6197 6

258 C32/40 62% OPC+30%FA - 160+/-40 6194 6

Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2H
259 KAIG3-RFI-CO-S-7860-00 Crescent 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6234 10
(as highlighted)

260 C32/40 62% OPC+30%FA - 160+/-40 6232 10

261 C32/40 62% OPC+30%FA - 160+/-40 6231 10

262 C32/40 62% OPC+30%FA - 160+/-40 6230 10

263 C32/40 62% OPC+30%FA - 160+/-40 6229 10

264 C32/40 62% OPC+30%FA - 160+/-40 6228 10

265 C32/40 62% OPC+30%FA - 160+/-40 6222 10

266 C32/40 62% OPC+30%FA - 160+/-40 6221 10

267 C32/40 62% OPC+30%FA - 160+/-40 6211 8

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G
268 KAIG3-RFI-SW-C-5828-00 Site Works 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6224 8
(As Highlighted)

269 C32/40 62% OPC+30%FA - 160+/-40 6213 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L & 4-8/L), at
270 KAIG3-RFI-EC-S-7881-00 Energy Center 2 6/15/2022 C16/20 SRC 6241 5
Energy Center 2, as highlighted area in attached drawing's.

271 C16/20 SRC 6240 10

272 C16/20 SRC 6862 2.5

273 C16/20 SRC 6215 5

274 C16/20 SRC 6214 10

kaig-qcals 337
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (L/8-14), at Energy Center 2, DELIVERY LOAD /
SI275
No. KAIG3-RFI-EC-S-7864-00
RFI NUMBER Energy Center 2 6/15/2022 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 6227 10
LOCATION CASTING as highlighted area in attached drawing's. NOTE No. QUANTITY
(m³)
276 C32/40 62% OPC+30%FA - 160+/-40 6223 10

277 C32/40 62% OPC+30%FA - 160+/-40 6220 10

278 C32/40 62% OPC+30%FA - 160+/-40 6218 10

279 C32/40 62% OPC+30%FA - 160+/-40 6217 10

280 C32/40 62% OPC+30%FA - 160+/-40 6216 10

Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2H C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
281 KAIG3-RFI-CO-S-7860-00 Crescent 6/15/2022 6239 10
(as highlighted) SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
282 6233 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
283 6219 10
SCREED
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 2A As per Attached Highlighted C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
284 KAIG3-RFI-TB-S-7822-00 New Ticket Booth 6/15/2022 6235 4
Drawing's. SCREED

285 KAIG3-RFI-SW-C-5822-00 Site Works 6/15/2022 Inspection for Blinding Concrete under Potable Water Line Pit C/PW/02 - as highlighted C16/20 SRC 6236 5

Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis 03-2 to 02-2
286 KAIG3-RFI-MC-S-7877-00 MCPE 1 6/15/2022 C16/20 SRC 6242 10
(as highlighted)
287 C16/20 SRC 6238 10

288 C16/20 SRC 6237 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


289 KAIG3-RFI-CO-S-7874-00 Crescent 6/16/2022 Concreting for Buttress BOV BIV 56, BOV 57 Zone 1P (as highlighted) 6269 2
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
290 6264 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
291 6263 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
292 6259 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
293 6258 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
294 6256 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
295 72037 10
SCREED

Sand Bedding for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer Canopy 3
296 KAIG3-RFI-PG-C-5853-00 Physic Garden 6/16/2022 C32/40 62% OPC+30%FA - 160+/-40 6257 7
(Outer side), at Physic garden, as highlighted area in attached drawing's.

297 C32/40 62% OPC+30%FA - 160+/-40 6255 10

Concrete Pouring & Shuttering for Footings of Seat Walls (Inner), Inside Physic Garden as
298 KAIG3-RFI-PG-S-7821-01 Physic Garden 6/16/2022 C32/40 62% OPC+30%FA - 160+/-40 6262 6
highlighted area in attached drawing's.

299 C32/40 62% OPC+30%FA - 160+/-40 6261 10

300 C32/40 62% OPC+30%FA - 160+/-40 6260 10

kaig-qcals 338
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF Concreting for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as DELIVERY LOAD /
SI301
No. RFI NUMBER
KAIG3-RFI-PC-S-7866-00 Crescent 6/16/2022 DESCRIPTION DESIGN MIX
C16/20 SRC 6279No. 10
LOCATION CASTING highlighted) NOTE QUANTITY
(m³)
302 C16/20 SRC 6278 10

303 C16/20 SRC 6277 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


304 KAIG3-RFI-CO-S-7900-00 Crescent 6/18/2022 Concreting for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st STAGE ) 6321 8
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


305 6317 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


306 6313 8
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


307 6310 5
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


308 6307 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


309 6304 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


310 6299 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


311 6297 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


312 6296 10
SCREED

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-K (SA-14) -
313 KAIG3-RFI-PA-C-5869-00 Picnic Area 6/18/2022 C32/40 62% OPC+30%FA - 160+/-40 6315 4
As Highlighted

314 C32/40 62% OPC+30%FA - 160+/-40 6298 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L & 4-8/L), at
315 KAIG3-RFI-EC-S-7881-00 Energy Center 2 6/18/2022 C16/20 SRC 6308 10
Energy Center 2, as highlighted area in attached drawing's.

316 C16/20 SRC 6303 10

317 C16/20 SRC 6302 10

Inspection for Blinding Concrete under Fire Water Line Pit for C/F/05, K/F/07 at Zone-C&K - as
318 KAIG3-RFI-SW-C-5823-00 Site Works C16/20 SRC 6316 10
highlighted

319 C16/20 SRC 6306 10

320 KAIG3-RFI-CO-S-7900-00 Crescent 6/18/2022 Concreting for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st STAGE ) C32/40 62% OPC+30%FA - 160+/-40 6319 10

Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as
321 KAIG3-RFI-SW-C-5867-00 Site Works 6/19/2022 C16/20 SRC 6345 7
Highlighted)

322 C16/20 SRC 6335 10

kaig-qcals 339
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF Concreting of 3rd layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as DELIVERY LOAD /
SI323
No. RFI NUMBER
KAIG3-RFI-CO-S-7887-00 Crescent 6/18/2022 DESCRIPTION DESIGN MIX
C16/20 SRC 6322No. 10
LOCATION CASTING highlighted) NOTE QUANTITY
(m³)
Concrete Pouring & Shuttering for Footing of Boundary Wall at Span 12, at Water Garden, as
324 KAIG3-RFI-WG-S-7920-00 Water Play Garden 6/19/2022 C32/40 62% OPC+30%FA - 160+/-40 6340 10
Highlighted area in the attached drawing's.

325 C32/40 62% OPC+30%FA - 160+/-40 6339 10

326 KAIG3-RFI-CO-S-7897-00 Crescent 6/19/2022 Concreting for Diaphragm Wall beam axis 02/AR Zone 2N as highlighted C32/40 62% OPC+30%FA - 160+/-40 6346 10

327 C32/40 62% OPC+30%FA - 160+/-40 6343 10

328 C32/40 62% OPC+30%FA - 160+/-40 6342 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-12B/A), at Energy
329 KAIG3-RFI-EC-S-7947-00 Energy Center 2 6/19/2022 C16/20 SRC 6352 11
Center 2, as highlighted area in attached drawing's.

330 C16/20 SRC 6354 7

331 C16/20 SRC 6351 10

332 C16/20 SRC 6349 3

333 C16/20 SRC 6348 10

334 C16/20 SRC 6347 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


335 KAIG3-RFI-PC-S-7940-00 South Watch Tower 6/19/2022 Concreting for South watch tower Abutment wall at Grid 02/C (as highlighted) (3rd) 6353 10
SCREED

Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as
336 KAIG3-RFI-SW-C-5867-00 Site Works 6/20/2022 C16/20 SRC 6361 7
Highlighted)

337 C16/20 SRC 6360 10

338 KAIG3-RFI-CO-S-7936-00 Crescent 6/20/2022 Concreting for Buttress BIV 57, BOV BIV 58 Zone 1P (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6379 6

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


339 KAIG3-RFI-SM-S-7932-00 South Small Mosque 6/21/2022 Concreting for South small mosque Wall 1-B Axis A, 4-5, (as highlighted) 6397 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


340 6396 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


341 6390 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


342 6383 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


343 6382 10
SCREED

kaig-qcals 340
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD /
SI344
No. RFI NUMBER DESCRIPTION DESIGN MIX 6381No. 8
LOCATION CASTING SCREED NOTE QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
345 6380 5
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


346 6378 3
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


347 6377 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


348 6375 5
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


349 6374 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


350 6373 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


351 6362 5
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


352 6359 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


353 KAIG3-RFI-CO-S-7958-00 Crescent 6/21/2022 Concreting for Infill wall (OUTER) axis 02/L to 02/K(as highlighted) Zone 2D 6438 4
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


354 6437 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


355 6430 5
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


356 6428 11
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


357 6427 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


358 6423 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


359 6422 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


360 6418 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


361 6415 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


362 6406 7
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


363 6405 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


364 6404 10
SCREED

kaig-qcals 341
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF Concreting for mass concrete (4th layer) under strip footing between PC ( 152-158 )inner Zone 2K DELIVERY LOAD /
SI365
No. RFI NUMBER
KAIG3-RFI-CO-S-7938-00 Crescent 6/21/2022 DESCRIPTION DESIGN MIX
C16/20 SRC 6424No. 10
LOCATION CASTING (as highlighted) NOTE QUANTITY
(m³)
366 C16/20 SRC 6421 10

367 C16/20 SRC 6414 10

368 C16/20 SRC 6413 10

369 C16/20 SRC 6412 10

370 C16/20 SRC 6411 10

371 C16/20 SRC 6410 10

372 C16/20 SRC 6409 10

373 C16/20 SRC 6408 10

374 C16/20 SRC 6407 10

375 KAIG3-RFI-CO-S-7929-00 Crescent 6/21/2022 Concreting for Strip Footing between PC 132-134 Zone 2F (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6435 10

376 C32/40 62% OPC+30%FA - 160+/-40 6434 10

377 C32/40 62% OPC+30%FA - 160+/-40 6432 10

Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (16-28/R & 29-30/M-R), at
378 KAIG3-RFI-EC-S-7966-00 Energy Center 2 6/21/2022 C32/40 62% OPC+30%FA - 160+/-40 6439 6
Energy Center 2, as highlighted area in attached drawing's.

379 C32/40 62% OPC+30%FA - 160+/-40 6436 11

380 C32/40 62% OPC+30%FA - 160+/-40 6433 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


381 KAIG3-RFI-CO-S-7924-00 Crescent 6/22/2022 Concreting for RING BEAM Zone 1M (INNER) Axis 01-1, 01AJ to 01AM (as highlighted) 6505 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


382 6492 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


383 6483 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


384 6479 4
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


385 6478 7
SCREED

kaig-qcals 342
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD /
SI386
No. RFI NUMBER DESCRIPTION DESIGN MIX 6470No. 6
LOCATION CASTING SCREED NOTE QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
387 6469 7
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


388 6464 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


389 6463 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


390 6460 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


391 6459 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


392 6458 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


393 6457 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


394 6456 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


395 6455 10
SCREED

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G
396 KAIG3-RFI-SW-C-5865-00 Site Works 6/22/2022 C32/40 62% OPC+30%FA - 160+/-40 6467 10
(As Highlighted)

397 C32/40 62% OPC+30%FA - 160+/-40 6462 10

398 C32/40 62% OPC+30%FA - 160+/-40 6461 10

Water Play Garden/Wet Concrete Pouring for Slab of Wet Well (E),inside Water Garden,as highlighted in the attached
399 KAIG3-RFI-WG-S-7983-00 6/22/2022 C32/40 62% OPC+30%FA - 160+/-40 6468 11
Well drawings

400 C32/40 62% OPC+30%FA - 160+/-40 6466 11

401 C32/40 62% OPC+30%FA - 160+/-40 6465 10

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
402 KAIG3-RFI-SW-C-5865-00 Site Works 6/22/2022 6474 10
(As Highlighte SCREED

Concrete Pouring for Precast Panel Type-1 (2 no's), Type-2 (2 no) & Typical Infill (1 no's), at Grid
403 KAIG3-RFI-TG-S-7965-00 Butterfly Garden 6/22/2022 (A/13, 14, 16 and Between 15 - 16 and 17 - 18) Inside Butterfly Garden, as highlighted in attached C32/40 62% OPC+30%FA - 160+/-40 6495 8
drawings

404 C32/40 62% OPC+30%FA - 160+/-40 6489 10

405 C32/40 62% OPC+30%FA - 160+/-40 6488 10

406 C32/40 62% OPC+30%FA - 160+/-40 6487 10

407 C32/40 62% OPC+30%FA - 160+/-40 6486 10

kaig-qcals 343
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD
10 /
SI408
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 6485
LOCATION CASTING NOTE No. QUANTITY
409 C32/40 62% OPC+30%FA - 160+/-40 6484 (m³)
10

410 C32/40 62% OPC+30%FA - 160+/-40 6482 10

411 C32/40 62% OPC+30%FA - 160+/-40 6481 10

412 C32/40 62% OPC+30%FA - 160+/-40 6480 10

Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/43, B/TL/50, B/T/18,
413 KAIG3-RFI-SW-C-5893-00 Site Works 6/23/2022 C16/20 SRC 6526 10
B/TL/11, C/TL/12, C/TL/11, C/TL/15, C/TL/54, C/TL/51, C/TL/49 at Zone B & C as highlighted.

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


414 KAIG3-RFI-CO-S-7980-00 Crescent 6/23/2022 Concreting for Buttress with Beam BII 54, 55 Zone 1N 1P (as highlighted) 6547 8
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


415 6540 8
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


416 6530 6
SCREED
Concrete Pouring for Footing at gride (M/18 to 22) and ( L/4 to 9) ,as highlighted in the attached
417 KAIG3-RFI-EC-S-7986-00 Energy Center 2 6/23/2022 C32/40 62% OPC+30%FA - 160+/-40 6556 10
drawings
418 C32/40 62% OPC+30%FA - 160+/-40 6555 10

419 C32/40 62% OPC+30%FA - 160+/-40 6554 10

C32/40 62% OPC+30%FA - 160+/-40 6553 10

C32/40 62% OPC+30%FA - 160+/-40 6552 10

C32/40 62% OPC+30%FA - 160+/-40 6551 10

C32/40 62% OPC+30%FA - 160+/-40 6550 10

C32/40 62% OPC+30%FA - 160+/-40 6549 10

C32/40 62% OPC+30%FA - 160+/-40 6548 10

C32/40 62% OPC+30%FA - 160+/-40 6546 10

C32/40 62% OPC+30%FA - 160+/-40 6545 10

C32/40 62% OPC+30%FA - 160+/-40 6544 10

C32/40 62% OPC+30%FA - 160+/-40 6543 10

C32/40 62% OPC+30%FA - 160+/-40 6542 10

C32/40 62% OPC+30%FA - 160+/-40 6541 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


KAIG3-RFI-CO-S-7905-00 Crescent 6/25/2022 Concreting for Infill wall inner axis 02/K to 02/L (As highlighted) ZONE 2D (2nd STAGE ) 6618 7
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6617 10
SCREED

kaig-qcals 344
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX 6608No. 8
LOCATION CASTING SCREED NOTE QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6604 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6598 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6591 10
SCREED

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-L (SA-15) - As
KAIG3-RFI-PA-C-5938-00 Picnic Area 6/25/2022 C32/40 62% OPC+30%FA - 160+/-40 6605 10
Highlighted

C32/40 62% OPC+30%FA - 160+/-40 6595 4

C32/40 62% OPC+30%FA - 160+/-40 6594 10

Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis 03-2 to 02-2
KAIG3-RFI-MC-S-7877-00 MCPE 1 6/25/2022 C16/20 SRC 6601 3
(as highlighted)

Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (16-28/R & 29-30/M-R), at
KAIG3-RFI-EC-S-7966-00 Energy Center 2 6/25/2022 C32/40 62% OPC+30%FA - 160+/-40 6614 11
Energy Center 2, as highlighted area in attached drawing's.

C32/40 62% OPC+30%FA - 160+/-40 6602 10

Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/40, B/FS/05, B/FS/41,
KAIG3-RFI-SW-C-5894-00 Site Works 6/25/2022 C16/20 SRC 6616 10
B/FS/10, C/TL/09, C/FS/13, C/FS/08, C/FS/12, C/FS/47, C/FS/46 at Zone B as highlighted.

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


KAIG3-RFI-MC-S-8037-00 MCPE 2 6/26/2022 Concreting for MCPE 2 Inner wall Axis 02AG to 02AF at Zone 2k (as highlighted) 871.00 6644 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6635 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6634 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6627 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6623 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6622 10
SCREED

Inspection of Concrete pouring for Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G
KAIG3-RFI-SW-C-5955-00 Site Works 6/26/2022 C32/40 62% OPC+30%FA - 160+/-40 6628 10
(As Highlighted)

C32/40 62% OPC+30%FA - 160+/-40 6626 10

KAIG3-RFI-CO-S-8024-00 Crescent 6/26/2022 Concreting for Buttress with Beam BOI 54, 55 Zone 1N 1P (as highlighted) C16/20 SRC 6656 10

C16/20 SRC 6655 10

C16/20 SRC 6653 10

C16/20 SRC 6652 10

kaig-qcals 345
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C16/20 SRC DELIVERY
6651 LOAD
10 /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX
LOCATION CASTING NOTE No. QUANTITY
(m³)
C16/20 SRC 6650 10

C16/20 SRC 6647 10

C16/20 SRC 6645 10

Concrete Pouring for Blinding Under Footing 28 to 29/M , 28 to 29/R, 4 to 5/L , 1 to 2/J to L , 2 to
KAIG3-RFI-EC-S-8051-00 Energy Center 2 6/26/2022 C16/20 SRC 6654 11
3/A to B , at Energy Center 2, as highlighted area in the attached drawings.

C16/20 SRC 6649 10

Inspection of Blinding Concrete under MV Line Pit C/MV/38, C/MV/08, C/MV/25, C/MV/22,
KAIG3-RFI-SW-C-5909-00 Site Works 6/26/2022 C16/20 SRC 6648 10
C/MV/40, C/MV/24, C/MV/41 at Zone-C - as highlighted

Concreting for Buttress with Beam BII 56, BOI 56 (upto 876.00) & BOI 57 (upto 873.00) Zone 1P C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
KAIG3-RFI-CO-S-8042-00 Crescent 6/27/2022 6751 4
(as highlighted) SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6750 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6749 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6748 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6747 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6745 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6744 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6743 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6741 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6740 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6739 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6738 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6737 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6736 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6735 10
SCREED
kaig-qcals 346
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX 6720No. 10
LOCATION CASTING SCREED NOTE QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6718 5
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6709 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6707 8
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6706 10
SCREED

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35,
KAIG3-RFI-SW-C-5968-00 Site Works 6/27/2022 C32/40 62% OPC+30%FA - 160+/-40 6708 4
G/MV36, G/MV/08 at Zone-G (As Highlighted)

Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/WG/LV/1 to 4 & 6
KAIG3-RFI-WG-C-6104-00 Water Play Garden 6/27/2022 C16/20 SRC 6746 10
to 8) Inside Mist Garden,at Water Garden, as highlighted area in attached drawings.

C16/20 SRC 6742 10

C16/20 SRC 6710 4

Inspection of Blinding Concrete under MV Line Pit G/MV/33, H/MV/29, H/MV/06, H/MV/04 at
KAIG3-RFI-SW-C-5965-00 Site Works 6/27/2022 C16/20 SRC 6717 4
Zone-G&H - as highlighted

Concrete Pouring for Blinding Under Footing and Grade Beam at Grid 1 to 6 / C to J , Inside Energy
KAIG3-RFI-EC-S-8049-00 Energy Center 2 6/28/2022 C16/20 SRC 6767 10
Center ,as highlighted in the attached drawings

C16/20 SRC 6762 7

C16/20 SRC 6756 10

C16/20 SRC 6755 11

Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/10, G/TL/01 at Zone-
KAIG3-RFI-SW-C-5982-00 Site Works 6/28/2022 C16/20 SRC 6763 10
F&G - as highlighted

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/40 at Zone-C (As
KAIG3-RFI-SW-C-5995-00 Site Works 6/29/2022 C32/40 62% OPC+30%FA - 160+/-40 6831 7
Highlighted)

C32/40 62% OPC+30%FA - 160+/-40 6825 10

C32/40 62% OPC+30%FA - 160+/-40 6818 5

C32/40 62% OPC+30%FA - 160+/-40 6817 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


NO RFI 6822 7
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6815 10
SCREED

kaig-qcals 347
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX 6813No. 10
LOCATION CASTING SCREED NOTE QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6809 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6806 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6800 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6799 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6798 10
SCREED

NO RFI C32/40 62% OPC+30%FA - 160+/-40 6810 11

C32/40 62% OPC+30%FA - 160+/-40 6807 11

C32/40 62% OPC+30%FA - 160+/-40 6805 11

C32/40 62% OPC+30%FA - 160+/-40 6803 10

C32/40 62% OPC+30%FA - 160+/-40 6802 10

C32/40 62% OPC+30%FA - 160+/-40 6801 10

NO RFI C16/20 SRC 6832 10

C16/20 SRC 6830 10

C16/20 SRC 6829 10

C16/20 SRC 6828 10

C16/20 SRC 6727 10

C16/20 SRC 6816 10

C16/20 SRC 6814 10

C16/20 SRC 6812 10

C16/20 SRC 6811 10

kaig-qcals 348
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 - DELIVERY LOAD /
SI No. RFINO
NUMBER
RFI DESCRIPTION DESIGN MIX 6871No. 8
LOCATION CASTING SCREED NOTE QUANTITY
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6866 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6865 8
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6863 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6861 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6860 4
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6858 10
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6856 8
SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20 -


6855 10
SCREED

NO RFI C32/40 62% OPC+30%FA - 160+/-40 6859 7

C32/40 62% OPC+30%FA - 160+/-40 6857 10

NO RFI C32/40 62% OPC+30%FA - 160+/-40 6870 11

C32/40 62% OPC+30%FA - 160+/-40 6869 11

C32/40 62% OPC+30%FA - 160+/-40 6868 10

NO RFI C32/40 62% OPC+30%FA - 160+/-40 6864 10

NO RFI C16/20 SRC 6867 4

C16/20 SRC 6754 10

C16/20 SRC 6753 10

C16/20 SRC 6752 10

TOTAL QUANTITY TRUCK LOAD (M³): 4880.50

kaig-qcals 349
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF DELIVERY LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX
LOCATION CASTING NOTE No. QUANTITY
(m³)

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush


QC DC QC Manager

kaig-qcals 350
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER 28 DAYS
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE 7 AND
LOCATION CASTING QUANTITY
No. DAYS MORE THAN 28
(m³)
DAYS
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/23,
1 KAIG3-RFI-SW-C-5713-00 Site Works 6/1/2022 C16/20 SRC 5573 10
G/MV/21 at Zone-B&G (As Highlighted)

2 C16/20 SRC 5558 10

Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K
3 KAIG3-RFI-CO-S-7657-00 Crescent 6/1/2022 C16/20 SRC 5577 10
(as highlighted)

4 C16/20 SRC 5576 10

5 C16/20 SRC 5557 10

Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (29-30/M-R), at
6 KAIG3-RFI-EC-S-7689-00 Energy Center 2 6/1/2022 C32/40 62% OPC+30%FA - 160+/-40 5575 6
Energy Center 2, as highlighted area in attached drawing's.

7 C32/40 62% OPC+30%FA - 160+/-40 5574 10

8 C32/40 62% OPC+30%FA - 160+/-40 5571 10

9 C32/40 62% OPC+30%FA - 160+/-40 5570 10

10 C32/40 62% OPC+30%FA - 160+/-40 5569 10

11 C32/40 62% OPC+30%FA - 160+/-40 5566 10

12 C32/40 62% OPC+30%FA - 160+/-40 5565 10

13 C32/40 62% OPC+30%FA - 160+/-40 5564 10

14 C32/40 62% OPC+30%FA - 160+/-40 5562 10

15 C32/40 62% OPC+30%FA - 160+/-40 5561 10

16 C32/40 62% OPC+30%FA - 160+/-40 5560 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-14/L and
17 KAIG3-RFI-EC-S-7687-00 Energy Center 2 6/1/2022 C16/20 SRC 5580 5
R/16-22), at Energy Center 2, as highlighted area in attached drawing's.

18 C16/20 SRC 5579 10

19 C16/20 SRC 5578 10

Concreting for RING BEAM Zone 2R (INNER) Axis 02-1, 02AZ to 02BC (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
20 KAIG3-RFI-CO-S-7662-00 Crescent 6/1/2022 5582 10
highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


21 5568 5 6
- SCREED
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-G
22 KAIG3-RFI-PA-C-5636-00 Picnic Area 6/2/2022 C32/40 62% OPC+30%FA - 160+/-40 5608 5
(SA-12) - As Highlighted
Promenade Concreting for Retaining Wall Promenade Bridge Abutment at Grid M Zone 4 as
23 KAIG3-RFI-PC-S-7667-00 6/2/2022 C32/40 62% OPC+30%FA - 160+/-40 5641 5
Bridge highlighted

kaig-qcals 351
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI24
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 5635
NOTE
LOCATION CASTING QUANTITY
No.
(m³)

kaig-qcals 352
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI25
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 5634
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
26 C32/40 62% OPC+30%FA - 160+/-40 5630 10

27 C32/40 62% OPC+30%FA - 160+/-40 5629 10

28 C32/40 62% OPC+30%FA - 160+/-40 5619 10

29 C32/40 62% OPC+30%FA - 160+/-40 5618 10

Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone-
30 KAIG3-RFI-SW-C-5695-00 Site Works 6/4/2022 C16/20 SRC 5723 5
M - As Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)

31 C16/20 SRC 5714 10

32 C16/20 SRC 5708 10

33 KAIG3-RFI-CF-S-7675-00 Cafeteria 6/4/2022 Shuttering for walls(W14 ,W15,W19) at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 5718 5

34 C32/40 62% OPC+30%FA - 160+/-40 5717 10

35 C32/40 62% OPC+30%FA - 160+/-40 5711 10

36 C32/40 62% OPC+30%FA - 160+/-40 5710 10

Concreting for walls (W10) and Isolated Circular Columns (C9 )at CAFETERIA zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
37 KAIG3-RFI-CO-S-7696-00 Cafeteria 6/4/2022 5740 7
2A (as highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
38 5738 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
39 5737 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
40 5735 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
41 5733 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
42 5731 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
43 5728 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
44 5727 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
45 5725 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
46 5722 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
47 5712 10
- SCREED

New Ticketing Concrete pouring & Shuttering for walls of New ticketing booth # 3A, As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
48 KAIG3-RFI-TB-S-7726-00 6/4/2022 5716 7
Booth Highlighted Drawing's. - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


49 5715 7
- SCREED
kaig-qcals 353
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for slab on grade inside the large mosque,two electricity box for Large C32/40 62% OPC+30%FA+8% LOAD /
SI50
No. RFI NUMBER
KAIG3-RFI-LM-S-7724-00 Large Mosque 6/5/2022 DESCRIPTION DESIGN MIX MS - 220+/-20 Y 5793
NOTE 10
LOCATION CASTING Mosque at grid (C1,1,2-F,1,2) ZONE 1G (as highlighetd) - SCREED QUANTITY
No.
(m³)

51 C32/40 62% OPC+30%FA - 160+/-40 5794 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


52 5777 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


53 5768 10
- SCREED

South Watch
54 KAIG3-RFI-ST-S-7711-00 6/5/2022 Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90 C32/40 62% OPC+30%FA - 160+/-40 5796 10
Tower

55 C32/40 62% OPC+30%FA - 160+/-40 5795 10

56 C32/40 62% OPC+30%FA - 160+/-40 5791 10

57 C32/40 62% OPC+30%FA - 160+/-40 5790 10

58 C32/40 62% OPC+30%FA - 160+/-40 5788 10

59 C32/40 62% OPC+30%FA - 160+/-40 5787 10

60 C32/40 62% OPC+30%FA - 160+/-40 5786 10

61 C32/40 62% OPC+30%FA - 160+/-40 5784 10

62 C32/40 62% OPC+30%FA - 160+/-40 5783 10

63 C32/40 62% OPC+30%FA - 160+/-40 5782 10

64 C32/40 62% OPC+30%FA - 160+/-40 5774 10

65 C32/40 62% OPC+30%FA - 160+/-40 5773 10

66 C32/40 62% OPC+30%FA - 160+/-40 5772 10

67 C32/40 62% OPC+30%FA - 160+/-40 5771 10

68 C32/40 62% OPC+30%FA - 160+/-40 5770 10

Water Play Concrete Pouring & shuttering for Walls of Wet Well E, (upto Level +872.10), Inside
69 KAIG3-RFI-WG-S-7728-00 6/5/2022 C32/40 62% OPC+30%FA - 160+/-40 5792 10
Garden Water Garden as highlighted area in attached drawing's.

70 C32/40 62% OPC+30%FA - 160+/-40 5789 10

71 C32/40 62% OPC+30%FA - 160+/-40 5785 10

72 C32/40 62% OPC+30%FA - 160+/-40 5781 10

73 C32/40 62% OPC+30%FA - 160+/-40 5776 10

kaig-qcals 354
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI74
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 5775
NOTE
LOCATION CASTING QUANTITY
No.
Inspection of Thrust Block for Potable Water Line ( Dia 80 & 50mm) at Zone-M - As (m³)
75 KAIG3-RFI-SW-C-5694-00 Site Works 6/5/2022 C16/20 SRC 5780 10
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)

76 C16/20 SRC 5779 10

77 C16/20 SRC 5778 10

South Watch
78 KAIG3-RFI-ST-S-7711-00 6/5/2022 Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90 C32/40 62% OPC+30%FA - 160+/-40 5807 10
Tower

79 C32/40 62% OPC+30%FA - 160+/-40 5806 10

80 C32/40 62% OPC+30%FA - 160+/-40 5805 10

81 C32/40 62% OPC+30%FA - 160+/-40 5804 10

82 C32/40 62% OPC+30%FA - 160+/-40 5803 10

83 C32/40 62% OPC+30%FA - 160+/-40 5802 10

84 C32/40 62% OPC+30%FA - 160+/-40 5801 10

85 C32/40 62% OPC+30%FA - 160+/-40 5800 10

86 C32/40 62% OPC+30%FA - 160+/-40 5799 10

87 C32/40 62% OPC+30%FA - 160+/-40 5798 10

88 C32/40 62% OPC+30%FA - 160+/-40 5797 10

Concreting for Infill wall between PC 74-75 inner between Gridline 02M- 02N (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
89 KAIG3-RFI-CO-S-7682-00 Crescent 6/6/2022 5849 5
highlighted) ZONE 2D - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
90 5838 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
91 5822 10
- SCREED
Inspection for Blinding Concrete under MV Line Pit C/MV/15, G/MV/30, H/MV/25,
92 KAIG3-RFI-SW-C-5679-00 Site Works 6/6/2022 C16/20 SRC 5839 6
H/MV/02, H/MV/11, H/MV/09, H/MV/28 - as highlighted

93 C16/20 SRC 5823 10

Concreting of Mass Concrete for Strip Footing Between PC 132 - 134 Zone 2F (as
94 KAIG3-RFI-CO-S-7735-00 Crescent 6/6/2022 C16/20 SRC 5860 10
highlighted)

95 C16/20 SRC 5855 10

96 C16/20 SRC 5854 5

97 C16/20 SRC 5846 10

98 C16/20 SRC 5845 10

kaig-qcals 355
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI99
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y 5837
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
100 C16/20 SRC 5836 10

101 C16/20 SRC 5835 10

102 C16/20 SRC 5834 10

103 C16/20 SRC 5833 10

104 C16/20 SRC 5832 10

105 C16/20 SRC 5831 10

106 C16/20 SRC 5830 10

107 C16/20 SRC 5829 10

108 C16/20 SRC 5828 10

109 C16/20 SRC 5827 10

110 C16/20 SRC 5826 10

111 C16/20 SRC 5825 10

112 C16/20 SRC 5824 10

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-G
113 KAIG3-RFI-PA-C-5576-00 Picnic Area 6/6/2022 C32/40 62% OPC+30%FA - 160+/-40 5853 10
(SA-11) - As Highlighted

Concreting for walls (W20,W21) undercroft at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
114 KAIG3-RFI-CF-S-7741-00 Cafeteria 6/7/2022 5901 4
869.10 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


115 5889 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
116 5888 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
117 5881 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
118 5880 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
119 5879 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
120 5878 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
121 5877 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
122 5876 10
- SCREED

kaig-qcals 356
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI123
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 5875
NOTE 10
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
124 5874 10
- SCREED

kaig-qcals 357
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI125
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 5873
NOTE 10
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
126 5872 10
- SCREED
Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (21-28/R), at
127 KAIG3-RFI-EC-S-7762-00 Energy Center 2 6/7/2022 C32/40 62% OPC+30%FA - 160+/-40 5892 5
Energy Center 2, as highlighted area in attached drawing's.

128 C32/40 62% OPC+30%FA - 160+/-40 5890 10

129 C32/40 62% OPC+30%FA - 160+/-40 5887 10

130 C32/40 62% OPC+30%FA - 160+/-40 5886 10

131 C32/40 62% OPC+30%FA - 160+/-40 5885 10

132 C32/40 62% OPC+30%FA - 160+/-40 5884 10

133 C32/40 62% OPC+30%FA - 160+/-40 5883 10

134 C32/40 62% OPC+30%FA - 160+/-40 5882 10

Concreting for walls (W20,W21) undercroft at CAFETERIA zone 2A (as highlighted)


135 KAIG3-RFI-CF-S-7741-00 Cafeteria 6/7/2022 C16/20 SRC 5906 4
869.10

136 C16/20 SRC 5905 10

137 C16/20 SRC 5904 10

138 C16/20 SRC 5903 10

139 C16/20 SRC 5902 10

Concreting for RING BEAM Zone 2R (OUTER) Axis 02-2, 02AZ to 02BC (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
140 KAIG3-RFI-CO-S-7769-00 Crescent 6/8/2022 5948 10
highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


141 5945 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


142 5938 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


143 5937 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


144 5936 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


145 5935 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


146 5934 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


147 5933 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


148 5932 10
- SCREED

kaig-qcals 358
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI149
No. RFI NUMBER DESCRIPTION DESIGN MIX Y 5931
NOTE 10
LOCATION CASTING - SCREED QUANTITY
No.
(m³)

kaig-qcals 359
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI150
No. RFI NUMBER DESCRIPTION DESIGN MIX Y 5930
NOTE 10
LOCATION CASTING - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
151 5929 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


152 5928 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


153 5927 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


154 5926 10
- SCREED

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
155 KAIG3-RFI-SW-C-5676-00 Site Works 6/8/2022 C16/20 SRC 5947 5
B/TL/30 to B/TL/31 at Zone-B - As Highlighted

156 C16/20 SRC 5940 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


157 KAIG3-RFI-CO-S-7795-00 Crescent 6/9/2022 Concreting for Infill wall between Gridline 02F- 02E (As highlighted) ZONE 2B 6024 4
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


158 6023 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


159 6022 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


160 6021 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


161 6020 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


162 6019 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


163 6018 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


164 6017 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


165 6016 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


166 6015 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


167 6014 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


168 6013 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


169 6008 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


170 6001 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


171 5994 10
- SCREED

kaig-qcals 360
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI172
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 5992
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-G
173 KAIG3-RFI-PA-C-5576-00 Picnic Area 6/9/2022 C32/40 62% OPC+30%FA - 160+/-40 5996 3
(SA-11) - As Highlighted
Concreting for plinding under slab on grade at Large Mosque grid C,1-2, C1,1-2 ZONE
174 KAIG3-RFI-LM-S-7786-00 Large Mosque 6/9/2022 C16/20 SRC 6012 9
1G (as highlighetd)

175 C16/20 SRC 6006 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (M/15-22),
176 KAIG3-RFI-EC-S-7730-00 Energy Center 2 6/9/2022 C16/20 SRC 6010 10
at Energy Center 2, as highlighted area in attached drawing's.

177 C16/20 SRC 6009 10

178 C16/20 SRC 6007 10

179 KAIG3-RFI-CF-S-7775-00 Cafeteria 6/11/2022 Shuttering for walls(W13 ,W9,W8) at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6038 10

180 C32/40 62% OPC+30%FA - 160+/-40 6039 10

181 C32/40 62% OPC+30%FA - 160+/-40 6040 10

182 C32/40 62% OPC+30%FA - 160+/-40 6041 5

183 C32/40 62% OPC+30%FA - 160+/-40 6062 10

Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted)
184 KAIG3-RFI-PC-S-7813-00 Central Bridge 6/11/2022 C16/20 SRC 6045 10
Zone 4 Grid 1M, 02AH

185 C16/20 SRC 6046 10

186 C16/20 SRC 6047 10

187 C16/20 SRC 6048 10

Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted)
188 KAIG3-RFI-PC-S-7813-00 Central Bridge 6/11/2022 C32/40 62% OPC+30%FA - 160+/-40 6050 10
Zone 4 Grid 1M, 02AH

189 C32/40 62% OPC+30%FA - 160+/-40 6051 10

190 C32/40 62% OPC+30%FA - 160+/-40 6052 10

191 C32/40 62% OPC+30%FA - 160+/-40 6053 10

192 C32/40 62% OPC+30%FA - 160+/-40 6054 10

193 C32/40 62% OPC+30%FA - 160+/-40 6055 10

194 C32/40 62% OPC+30%FA - 160+/-40 6056 10

195 C32/40 62% OPC+30%FA - 160+/-40 6057 10

196 C32/40 62% OPC+30%FA - 160+/-40 6058 10

197 C32/40 62% OPC+30%FA - 160+/-40 6059 10

kaig-qcals 361
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI198
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 6060
NOTE
LOCATION CASTING QUANTITY
No.
(m³)

kaig-qcals 362
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
5 /
SI199
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 6061
NOTE
LOCATION CASTING QUANTITY
No.
Concreting for mass concrete (2nd layer) for Central Bridge foundation Zone 4 grid 1M (m³)
200 KAIG3-RFI-PC-S-7764-00 Crescent 6/12/2022 C16/20 SRC 6101 10
(as highlighted)

201 C16/20 SRC 6099 10

202 C16/20 SRC 6096 10

203 C16/20 SRC 6094 10

204 C16/20 SRC 6092 10

205 C16/20 SRC 6091 10

206 C16/20 SRC 6089 10

207 C16/20 SRC 6088 10

208 C16/20 SRC 6087 10

209 C16/20 SRC 6086 10

210 C16/20 SRC 6085 10

211 C16/20 SRC 6084 10

212 C16/20 SRC 6083 10

213 C16/20 SRC 6082 10

214 C16/20 SRC 6079 10

215 C16/20 SRC 6078 10

216 C16/20 SRC 6077 10

217 C16/20 SRC 6075 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


218 KAIG3-RFI-CF-S-7797-00 Cafeteria 6/12/2022 Shuttering for walls (W12, W11) at CAFETERIA zone 2A (as highlighted) 6109 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
219 6108 6
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
220 6107 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
221 6105 4
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
222 6104 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
223 6098 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
224 6097 10
- SCREED

kaig-qcals 363
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI225
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 6095
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

kaig-qcals 364
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI226
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 6080
NOTE 10
LOCATION CASTING QUANTITY
No.
Inspection for Blinding Concrete under Potable Water Line Pit F/PW/15, F/PW/08, (m³)
227 KAIG3-RFI-SW-C-5667-00 Site Works 6/12/2022 C16/20 SRC 6102 10
F/PW/02 - as highlighted

228 C16/20 SRC 6090 10

Surface Prepation prior to start back filling around Non-Potable water line Pit - NPW-
229 KAIG3-RFI-SW-C-5660-00 Site Works 6/13/2022 C16/20 SRC 6148 6
ISC-12, NPW-ISC-13 , NPW-ISC-20 at Zone B - as highlighted

230 C16/20 SRC 6137 10

Water Play Concrete Pouring & Shuttering for Walls of Wet Well F, (upto +872.00), Inside Water
231 KAIG3-RFI-WG-S-7839-00 6/13/2022 C32/40 62% OPC+30%FA - 160+/-40 6150 5
Garden/Wet Well Garden as highlighted area in attached drawing's

232 C32/40 62% OPC+30%FA - 160+/-40 6149 10

233 C32/40 62% OPC+30%FA - 160+/-40 6147 10

234 C32/40 62% OPC+30%FA - 160+/-40 6146 10

235 C32/40 62% OPC+30%FA - 160+/-40 6145 10

236 C32/40 62% OPC+30%FA - 160+/-40 6142 10

237 C32/40 62% OPC+30%FA - 160+/-40 6141 10

238 C32/40 62% OPC+30%FA - 160+/-40 6140 10

239 C32/40 62% OPC+30%FA - 160+/-40 6138 10

South Watch Concreting for abutment wall of Bridge South watch tower grid 02/C Zone 7 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
240 KAIG3-RFI-PC-S-7807-00 6/14/2022 6172 8
Tower highlighted) - SCREED
Concreting for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as
241 KAIG3-RFI-PC-S-7866-00 Crescent 6/14/2022 C16/20 SRC 6199 4
highlighted)

242 C16/20 SRC 6180 5

243 C16/20 SRC 6193 5

Inspection of Concrete Pouring for MV Line Pulling Pit - B/MV/23 at Zone-B (As
244 KAIG3-RFI-SW-C-5585-01 Site Works 6/14/2022 C32/40 62% OPC+30%FA - 160+/-40 6197 6
Highlighted)

245 C32/40 62% OPC+30%FA - 160+/-40 6194 6

Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146
246 KAIG3-RFI-CO-S-7860-00 Crescent 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6234 10
Zone 2H (as highlighted)

247 C32/40 62% OPC+30%FA - 160+/-40 6232 10

248 C32/40 62% OPC+30%FA - 160+/-40 6231 10

249 C32/40 62% OPC+30%FA - 160+/-40 6230 10

250 C32/40 62% OPC+30%FA - 160+/-40 6229 10

kaig-qcals 365
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI251
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 6228
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
252 C32/40 62% OPC+30%FA - 160+/-40 6222 10

253 C32/40 62% OPC+30%FA - 160+/-40 6221 10

254 C32/40 62% OPC+30%FA - 160+/-40 6211 8

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at
255 KAIG3-RFI-SW-C-5828-00 Site Works 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6224 8
Zone-B&G (As Highlighted)

256 C32/40 62% OPC+30%FA - 160+/-40 6213 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L &
257 KAIG3-RFI-EC-S-7881-00 Energy Center 2 6/15/2022 C16/20 SRC 6241 5
4-8/L), at Energy Center 2, as highlighted area in attached drawing's.

258 C16/20 SRC 6240 10

259 C16/20 SRC 6862 2.5

260 C16/20 SRC 6215 5

261 C16/20 SRC 6214 10

Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (L/8-14), at
262 KAIG3-RFI-EC-S-7864-00 Energy Center 2 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6227 10
Energy Center 2, as highlighted area in attached drawing's.

263 C32/40 62% OPC+30%FA - 160+/-40 6223 10

264 C32/40 62% OPC+30%FA - 160+/-40 6220 10

265 C32/40 62% OPC+30%FA - 160+/-40 6218 10

266 C32/40 62% OPC+30%FA - 160+/-40 6217 10

267 C32/40 62% OPC+30%FA - 160+/-40 6216 10

Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 C32/40 62% OPC+30%FA+8% MS - 220+/-20
268 KAIG3-RFI-CO-S-7860-00 Crescent 6/15/2022 6239 10
Zone 2H (as highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
269 6233 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
270 6219 10
- SCREED
New Ticket Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 2A As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
271 KAIG3-RFI-TB-S-7822-00 6/15/2022 6235 4
Booth Highlighted Drawing's. - SCREED

272 KAIG3-RFI-SW-C-5822-00 Site Works 6/15/2022 Inspection for Blinding Concrete under Potable Water Line Pit C/PW/02 - as highlighted C16/20 SRC 6236 5

Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis
273 KAIG3-RFI-MC-S-7877-00 MCPE 1 6/15/2022 C16/20 SRC 6242 10
03-2 to 02-2 (as highlighted)
274 C16/20 SRC 6238 10

275 C16/20 SRC 6237 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


276 KAIG3-RFI-CO-S-7874-00 Crescent 6/16/2022 Concreting for Buttress BOV BIV 56, BOV 57 Zone 1P (as highlighted) 6269 2
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
277 6264 6
- SCREED

kaig-qcals 366
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI278
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 6263
NOTE 10
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
279 6259 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
280 6258 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
281 6256 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
282 6254 10
- SCREED

Sand Bedding for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer
283 KAIG3-RFI-PG-C-5853-00 Physic Garden 6/16/2022 C32/40 62% OPC+30%FA - 160+/-40 6257 7
Canopy 3 (Outer side), at Physic garden, as highlighted area in attached drawing's.

284 C32/40 62% OPC+30%FA - 160+/-40 6255 10

Concrete Pouring & Shuttering for Footings of Seat Walls (Inner), Inside Physic Garden
285 KAIG3-RFI-PG-S-7821-01 Physic Garden 6/16/2022 C32/40 62% OPC+30%FA - 160+/-40 6262 6
as highlighted area in attached drawing's.

286 C32/40 62% OPC+30%FA - 160+/-40 6261 10

287 C32/40 62% OPC+30%FA - 160+/-40 6260 10

Concreting for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as
288 KAIG3-RFI-PC-S-7866-00 Crescent 6/16/2022 C16/20 SRC 6279 10
highlighted)

289 C16/20 SRC 6278 10

290 C16/20 SRC 6277 10

Concreting for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st C32/40 62% OPC+30%FA+8% MS - 220+/-20
291 KAIG3-RFI-CO-S-7900-00 Crescent 6/18/2022 6321 8
STAGE ) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


292 6317 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


293 6313 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


294 6310 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


295 6307 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


296 6304 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


297 6299 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


298 6297 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


299 6296 10
- SCREED

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-K
300 KAIG3-RFI-PA-C-5869-00 Picnic Area 6/18/2022 C32/40 62% OPC+30%FA - 160+/-40 6315 4
(SA-14) - As Highlighted

kaig-qcals 367
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI301
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y 6298
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L &
302 KAIG3-RFI-EC-S-7881-00 Energy Center 2 6/18/2022 C16/20 SRC 6308 10
4-8/L), at Energy Center 2, as highlighted area in attached drawing's.

303 C16/20 SRC 6303 10

304 C16/20 SRC 6302 10

Inspection for Blinding Concrete under Fire Water Line Pit for C/F/05, K/F/07 at Zone-
305 KAIG3-RFI-SW-C-5823-00 Site Works C16/20 SRC 6316 10
C&K - as highlighted

306 C16/20 SRC 6306 10

Concreting for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st
307 KAIG3-RFI-CO-S-7900-00 Crescent 6/18/2022 C32/40 62% OPC+30%FA - 160+/-40 6319 10
STAGE )

Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as
308 KAIG3-RFI-SW-C-5867-00 Site Works 6/19/2022 C16/20 SRC 6345 7
Highlighted)

309 C16/20 SRC 6335 10

Concreting of 3rd layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K
310 KAIG3-RFI-CO-S-7887-00 Crescent 6/18/2022 C16/20 SRC 6322 10
(as highlighted)

Water Play Concrete Pouring & Shuttering for Footing of Boundary Wall at Span 12, at Water
311 KAIG3-RFI-WG-S-7920-00 6/19/2022 C32/40 62% OPC+30%FA - 160+/-40 6340 10
Garden Garden, as Highlighted area in the attached drawing's.

312 C32/40 62% OPC+30%FA - 160+/-40 6339 10

313 KAIG3-RFI-CO-S-7897-00 Crescent 6/19/2022 Concreting for Diaphragm Wall beam axis 02/AR Zone 2N as highlighted C32/40 62% OPC+30%FA - 160+/-40 6346 10

314 C32/40 62% OPC+30%FA - 160+/-40 6343 10

315 C32/40 62% OPC+30%FA - 160+/-40 6342 10

Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-12B/A),
316 KAIG3-RFI-EC-S-7947-00 Energy Center 2 6/19/2022 C16/20 SRC 6352 11
at Energy Center 2, as highlighted area in attached drawing's.

317 C16/20 SRC 6354 7

318 C16/20 SRC 6351 10

319 C16/20 SRC 6349 3

320 C16/20 SRC 6348 10

321 C16/20 SRC 6347 10

kaig-qcals 368
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/
South Watch DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI322
No. RFI NUMBER
KAIG3-RFI-PC-S-7940-00 DESCRIPTION
6/19/2022 Concreting for South watch tower Abutment wall at Grid 02/C (as highlighted) (3rd) DESIGN MIX Y 6353
NOTE 10
LOCATION
Tower CASTING - SCREED QUANTITY
No.
(m³)
Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as
323 KAIG3-RFI-SW-C-5867-00 Site Works 6/20/2022 C16/20 SRC 6361 7
Highlighted)

324 C16/20 SRC 6360 10

325 KAIG3-RFI-CO-S-7936-00 Crescent 6/20/2022 Concreting for Buttress BIV 57, BOV BIV 58 Zone 1P (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6379 6

South Small C32/40 62% OPC+30%FA+8% MS - 220+/-20


326 KAIG3-RFI-SM-S-7932-00 6/21/2022 Concreting for South small mosque Wall 1-B Axis A, 4-5, (as highlighted) 6397 10
Mosque - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


327 6396 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


328 6390 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


329 6383 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


330 6382 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


331 6381 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


332 6380 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


333 6378 3
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


334 6377 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


335 6375 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


336 6374 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


337 6373 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


338 6362 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


339 6359 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


340 KAIG3-RFI-CO-S-7958-00 Crescent 6/21/2022 Concreting for Infill wall (OUTER) axis 02/L to 02/K(as highlighted) Zone 2D 6438 4
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


341 6437 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


342 6430 5
- SCREED

kaig-qcals 369
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI343
No. RFI NUMBER DESCRIPTION DESIGN MIX Y 6428
NOTE 11
LOCATION CASTING - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
344 6427 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


345 6423 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


346 6422 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


347 6418 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


348 6415 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


349 6406 7
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


350 6405 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


351 6404 10
- SCREED

Concreting for mass concrete (4th layer) under strip footing between PC ( 152-158 )inner
352 KAIG3-RFI-CO-S-7938-00 Crescent 6/21/2022 C16/20 SRC 6424 10
Zone 2K (as highlighted)

353 C16/20 SRC 6421 10

354 C16/20 SRC 6414 10

355 C16/20 SRC 6413 10

356 C16/20 SRC 6412 10

357 C16/20 SRC 6411 10

358 C16/20 SRC 6410 10

359 C16/20 SRC 6409 10

360 C16/20 SRC 6408 10

361 C16/20 SRC 6407 10

362 KAIG3-RFI-CO-S-7929-00 Crescent 6/21/2022 Concreting for Strip Footing between PC 132-134 Zone 2F (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6435 10

363 C32/40 62% OPC+30%FA - 160+/-40 6434 10

kaig-qcals 370
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI364
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y 6432
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (16-28/R & 29-
365 KAIG3-RFI-EC-S-7966-00 Energy Center 2 6/21/2022 C32/40 62% OPC+30%FA - 160+/-40 6439 6
30/M-R), at Energy Center 2, as highlighted area in attached drawing's.

366 C32/40 62% OPC+30%FA - 160+/-40 6436 11

367 C32/40 62% OPC+30%FA - 160+/-40 6433 10

Concreting for RING BEAM Zone 1M (INNER) Axis 01-1, 01AJ to 01AM (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
368 KAIG3-RFI-CO-S-7924-00 Crescent 6/22/2022 6505 10
highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


369 6492 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


370 6483 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


371 6479 4
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


372 6478 7
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


373 6470 6
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


374 6469 7
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


375 6464 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


376 6463 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


377 6460 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


378 6459 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


379 6458 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


380 6457 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


381 6456 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


382 6455 10
- SCREED

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at
383 KAIG3-RFI-SW-C-5865-00 Site Works 6/22/2022 C32/40 62% OPC+30%FA - 160+/-40 6467 10
Zone-F&G (As Highlighted)

384 C32/40 62% OPC+30%FA - 160+/-40 6462 10

kaig-qcals 371
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI385
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y 6461
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Water Play Concrete Pouring for Slab of Wet Well (E),inside Water Garden,as highlighted in the
386 KAIG3-RFI-WG-S-7983-00 6/22/2022 C32/40 62% OPC+30%FA - 160+/-40 6468 11
Garden/Wet Well attached drawings

387 C32/40 62% OPC+30%FA - 160+/-40 6466 11

388 C32/40 62% OPC+30%FA - 160+/-40 6465 10

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at C32/40 62% OPC+30%FA+8% MS - 220+/-20
389 KAIG3-RFI-SW-C-5865-00 Site Works 6/22/2022 6474 10
Zone-F&G (As Highlighte - SCREED

Concrete Pouring for Precast Panel Type-1 (2 no's), Type-2 (2 no) & Typical Infill (1
390 KAIG3-RFI-TG-S-7965-00 Butterfly Garden 6/22/2022 no's), at Grid (A/13, 14, 16 and Between 15 - 16 and 17 - 18) Inside Butterfly Garden, as C32/40 62% OPC+30%FA - 160+/-40 6495 8
highlighted in attached drawings

391 C32/40 62% OPC+30%FA - 160+/-40 6489 10

392 C32/40 62% OPC+30%FA - 160+/-40 6488 10

393 C32/40 62% OPC+30%FA - 160+/-40 6487 10

394 C32/40 62% OPC+30%FA - 160+/-40 6486 10

395 C32/40 62% OPC+30%FA - 160+/-40 6485 10

396 C32/40 62% OPC+30%FA - 160+/-40 6484 10

397 C32/40 62% OPC+30%FA - 160+/-40 6482 10

398 C32/40 62% OPC+30%FA - 160+/-40 6481 10

399 C32/40 62% OPC+30%FA - 160+/-40 6480 10

Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/43, B/TL/50,
400 KAIG3-RFI-SW-C-5893-00 Site Works 6/23/2022 B/T/18, B/TL/11, C/TL/12, C/TL/11, C/TL/15, C/TL/54, C/TL/51, C/TL/49 at Zone B & C16/20 SRC 6526 10
C as highlighted.

C32/40 62% OPC+30%FA+8% MS - 220+/-20


401 KAIG3-RFI-CO-S-7980-00 Crescent 6/23/2022 Concreting for Buttress with Beam BII 54, 55 Zone 1N 1P (as highlighted) 6547 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


402 6540 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


403 6530 6
- SCREED
Concrete Pouring for Footing at gride (M/18 to 22) and ( L/4 to 9) ,as highlighted in the
404 KAIG3-RFI-EC-S-7986-00 Energy Center 2 6/23/2022 C32/40 62% OPC+30%FA - 160+/-40 6556 10
attached drawings
405 C32/40 62% OPC+30%FA - 160+/-40 6555 10

406 C32/40 62% OPC+30%FA - 160+/-40 6554 10

407 C32/40 62% OPC+30%FA - 160+/-40 6553 10

408 C32/40 62% OPC+30%FA - 160+/-40 6552 10

kaig-qcals 372
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI409
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 6551
NOTE
LOCATION CASTING QUANTITY
No.
410 C32/40 62% OPC+30%FA - 160+/-40 6550 (m³)
10

411 C32/40 62% OPC+30%FA - 160+/-40 6549 10

412 C32/40 62% OPC+30%FA - 160+/-40 6548 10

413 C32/40 62% OPC+30%FA - 160+/-40 6546 10

414 C32/40 62% OPC+30%FA - 160+/-40 6545 10

415 C32/40 62% OPC+30%FA - 160+/-40 6544 10

416 C32/40 62% OPC+30%FA - 160+/-40 6543 10

417 C32/40 62% OPC+30%FA - 160+/-40 6542 10

418 C32/40 62% OPC+30%FA - 160+/-40 6541 10

Concreting for Infill wall inner axis 02/K to 02/L (As highlighted) ZONE 2D (2nd C32/40 62% OPC+30%FA+8% MS - 220+/-20
419 KAIG3-RFI-CO-S-7905-00 Crescent 6/25/2022 6618 7
STAGE ) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


420 6617 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


421 6608 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


422 6604 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


423 6598 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


424 6591 10
- SCREED

Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-L
425 KAIG3-RFI-PA-C-5938-00 Picnic Area 6/25/2022 C32/40 62% OPC+30%FA - 160+/-40 6605 10
(SA-15) - As Highlighted

426 C32/40 62% OPC+30%FA - 160+/-40 6595 4

427 C32/40 62% OPC+30%FA - 160+/-40 6594 10

Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis
428 KAIG3-RFI-MC-S-7877-00 MCPE 1 6/25/2022 C16/20 SRC 6601 3
03-2 to 02-2 (as highlighted)

Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (16-28/R & 29-
429 KAIG3-RFI-EC-S-7966-00 Energy Center 2 6/25/2022 C32/40 62% OPC+30%FA - 160+/-40 6614 11
30/M-R), at Energy Center 2, as highlighted area in attached drawing's.

430 C32/40 62% OPC+30%FA - 160+/-40 6602 10

Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/40, B/FS/05,
431 KAIG3-RFI-SW-C-5894-00 Site Works 6/25/2022 B/FS/41, B/FS/10, C/TL/09, C/FS/13, C/FS/08, C/FS/12, C/FS/47, C/FS/46 at Zone B as C16/20 SRC 6616 10
highlighted.

Concreting for MCPE 2 Inner wall Axis 02AG to 02AF at Zone 2k (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
432 KAIG3-RFI-MC-S-8037-00 MCPE 2 6/26/2022 6644 10
871.00 - SCREED

kaig-qcals 373
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI433
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 6635
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
434 6634 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
435 6627 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
436 6623 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
437 6622 10
- SCREED

Inspection of Concrete pouring for Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at
438 KAIG3-RFI-SW-C-5955-00 Site Works 6/26/2022 C32/40 62% OPC+30%FA - 160+/-40 6628 10
Zone-F&G (As Highlighted)

439 C32/40 62% OPC+30%FA - 160+/-40 6626 10

440 KAIG3-RFI-CO-S-8024-00 Crescent 6/26/2022 Concreting for Buttress with Beam BOI 54, 55 Zone 1N 1P (as highlighted) C16/20 SRC 6656 10

441 C16/20 SRC 6655 10

442 C16/20 SRC 6653 10

443 C16/20 SRC 6652 10

444 C16/20 SRC 6651 10

445 C16/20 SRC 6650 10

446 C16/20 SRC 6647 10

447 C16/20 SRC 6645 10

Concrete Pouring for Blinding Under Footing 28 to 29/M , 28 to 29/R, 4 to 5/L , 1 to 2/J
448 KAIG3-RFI-EC-S-8051-00 Energy Center 2 6/26/2022 C16/20 SRC 6654 11
to L , 2 to 3/A to B , at Energy Center 2, as highlighted area in the attached drawings.

449 C16/20 SRC 6649 10

Inspection of Blinding Concrete under MV Line Pit C/MV/38, C/MV/08, C/MV/25,


450 KAIG3-RFI-SW-C-5909-00 Site Works 6/26/2022 C16/20 SRC 6648 10
C/MV/22, C/MV/40, C/MV/24, C/MV/41 at Zone-C - as highlighted

Concreting for Buttress with Beam BII 56, BOI 56 (upto 876.00) & BOI 57 (upto C32/40 62% OPC+30%FA+8% MS - 220+/-20
451 KAIG3-RFI-CO-S-8042-00 Crescent 6/27/2022 6751 4
873.00) Zone 1P (as highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


452 6750 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


453 6749 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


454 6748 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


455 6747 10
- SCREED

kaig-qcals 374
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI456
No. RFI NUMBER DESCRIPTION DESIGN MIX Y 6745
NOTE 10
LOCATION CASTING - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
457 6744 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


458 6743 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


459 6741 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


460 6740 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


461 6739 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


462 6738 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


463 6737 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


464 6736 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


465 6735 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


466 6720 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


467 6718 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


468 6709 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


469 6707 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


470 6706 10
- SCREED

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/09


471 KAIG3-RFI-SW-C-5968-00 Site Works 6/27/2022 C32/40 62% OPC+30%FA - 160+/-40 6708 4
G/MV/34, G/MV/35, G/MV36, G/MV/08 at Zone-G (As Highlighted)

Concrete Pouring for Blinding under Electrical Handholes of Low Voltage


Water Play
472 KAIG3-RFI-WG-C-6104-00 6/27/2022 (MH/WG/LV/1 to 4 & 6 to 8) Inside Mist Garden,at Water Garden, as highlighted area C16/20 SRC 6746 10
Garden
in attached drawings.

473 C16/20 SRC 6742 10

474 C16/20 SRC 6710 4

Inspection of Blinding Concrete under MV Line Pit G/MV/33, H/MV/29, H/MV/06,


475 KAIG3-RFI-SW-C-5965-00 Site Works 6/27/2022 C16/20 SRC 6717 4
H/MV/04 at Zone-G&H - as highlighted

Concrete Pouring for Blinding Under Footing and Grade Beam at Grid 1 to 6 / C to J ,
476 KAIG3-RFI-EC-S-8049-00 Energy Center 2 6/28/2022 C16/20 SRC 6767 10
Inside Energy Center ,as highlighted in the attached drawings

kaig-qcals 375
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI477
No. RFI NUMBER DESCRIPTION DESIGN MIX
C16/20 SRC Y 6762
NOTE 7
LOCATION CASTING QUANTITY
No.
(m³)
478 C16/20 SRC 6756 10

479 C16/20 SRC 6755 11

Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/10, G/TL/01
480 KAIG3-RFI-SW-C-5982-00 Site Works 6/28/2022 C16/20 SRC 6763 10
at Zone-F&G - as highlighted

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/40 at Zone-C
481 KAIG3-RFI-SW-C-5995-00 Site Works 6/29/2022 C32/40 62% OPC+30%FA - 160+/-40 6831 7
(As Highlighted)

482 C32/40 62% OPC+30%FA - 160+/-40 6825 10

483 C32/40 62% OPC+30%FA - 160+/-40 6818 5

484 C32/40 62% OPC+30%FA - 160+/-40 6817 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


485 NO RFI 6822 7
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


486 6815 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


487 6813 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


488 6809 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


489 6806 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


490 6800 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


491 6799 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


492 6798 10
- SCREED

493 NO RFI C32/40 62% OPC+30%FA - 160+/-40 6810 11

494 C32/40 62% OPC+30%FA - 160+/-40 6807 11

495 C32/40 62% OPC+30%FA - 160+/-40 6805 11

496 C32/40 62% OPC+30%FA - 160+/-40 6803 10

497 C32/40 62% OPC+30%FA - 160+/-40 6802 10

kaig-qcals 376
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI498
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y 6801
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
499 NO RFI C16/20 SRC 6832 10

500 C16/20 SRC 6830 10

501 C16/20 SRC 6829 10

502 C16/20 SRC 6828 10

503 C16/20 SRC 6727 10

504 C16/20 SRC 6816 10

505 C16/20 SRC 6814 10

506 C16/20 SRC 6812 10

507 C16/20 SRC 6811 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


508 NO RFI 6871 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


509 6866 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


510 6865 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


511 6863 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


512 6861 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


513 6860 4
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


514 6858 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


515 6856 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


516 6855 10
- SCREED

517 NO RFI C32/40 62% OPC+30%FA - 160+/-40 6859 7

518 C32/40 62% OPC+30%FA - 160+/-40 6857 10

kaig-qcals 377
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI519
No. RFINO
NUMBER
RFI DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y 6870
NOTE 11
LOCATION CASTING QUANTITY
No.
(m³)
520 C32/40 62% OPC+30%FA - 160+/-40 6869 11

521 C32/40 62% OPC+30%FA - 160+/-40 6868 10

522 NO RFI C32/40 62% OPC+30%FA - 160+/-40 6864 10

523 NO RFI C16/20 SRC 6867 4

524 C16/20 SRC 6754 10

525 C16/20 SRC 6753 10

526 C16/20 SRC 6752 10

TOTAL QUANTITY TRUCK LOAD (M³): 4880.50

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush


QC DC QC Manager

kaig-qcals 378
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER 28 DAYS
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE 7 AND
LOCATION CASTING QUANTITY
No. DAYS MORE THAN 28
(m³)
DAYS

South Watch Concreting for South Watch Tower Wall (internal & external) (858.9 to 860.70) (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-ST-S-8113-00 7/2/2022 6940 4
Tower Wall highlighted) Zone 7 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


2 7/2/2022 6939 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
3 7/2/2022 6938 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
4 7/2/2022 6935 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
5 7/2/2022 6934 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
6 7/2/2022 6909 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
7 7/2/2022 6903 10
- SCREED
Inspection of Blinding Concrete under MV Line Pit B/MV/05, H/MV/10 at Zone-B&H -
8 KAIG3-RFI-SW-C-5996-00 Site Works 7/2/2022 C16/20 SRC 6918 5
as highlighted

9 C16/20 SRC 6906 10

Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/PG/LV/
10 KAIG3-RFI-PG-C-6166-00 Physic Garden 7/2/2022 02,04,05,06) & Emergency (MH/PG/EM/ 02,03,04,07,08),Inside Physic Garden as C16/20 SRC 6937 8
highlighted area in attached drawing's.

South Small Concreting for Blinding of SOG of South small Mosque Zone 2A (as highlighted) axis
11 KAIG3-RFI-SM-S-8020-00 7/2/2022 C16/20 SRC 6920 6
Mosque A-B, 4-5

12 C16/20 SRC 6936 5

Concreting for Infill wall (INNER) axis 02/L to 02/M(as highlighted) Zone 2D (2nd C32/40 62% OPC+30%FA+8% MS - 220+/-20
13 KAIG3-RFI-CO-S-8115-00 Crescent 7/3/2022 6993 6
STAGE). - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
14 7/3/2022 6984 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
15 7/3/2022 6970 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
16 7/3/2022 6969 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
17 7/3/2022 6968 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
18 7/3/2022 6967 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
19 7/3/2022 6966 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
20 7/3/2022 6965 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
21 7/3/2022 6964 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
22 7/3/2022 6963 10
- SCREED

kaig-qcals 379
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI23
No. RFI NUMBER 7/3/2022 DESCRIPTION DESIGN MIX
- SCREED Y 6962
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

kaig-qcals 380
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI24
No. RFI NUMBER 7/3/2022 DESCRIPTION DESIGN MIX
- SCREED Y 6961
NOTE 10
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
25 7/3/2022 6955 6
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


26 7/3/2022 6954 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


27 7/3/2022 6952 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


28 7/3/2022 6951 10
- SCREED

Inspection for Blinding Concrete under Telecom Line Pit C/TL/27, Pit C/TL/71 at Zone-
29 KAIG3-RFI-SW-C-6093-00 Site Works 7/3/2022 C16/20 SRC 6979 5
B - as highlighted

30 C16/20 SRC 6973 10

31 KAIG3-RFI-CO-S-8128-00 Crescent 7/3/2022 Concreting for RC Strip Footing grid 02/O to 02/N zone 2E (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 7006 4

32 C32/40 62% OPC+30%FA - 160+/-40 6995 10

33 C32/40 62% OPC+30%FA - 160+/-40 6994 10

34 C32/40 62% OPC+30%FA - 160+/-40 6989 10

35 C32/40 62% OPC+30%FA - 160+/-40 6988 10

36 C32/40 62% OPC+30%FA - 160+/-40 6986 10

37 C32/40 62% OPC+30%FA - 160+/-40 6985 10

Water Play Concrete Pouring & Shuttering for Kicker's (Both Inner & Outer) of Boundary Wall at
38 KAIG3-RFI-WG-S-8143-00 7/3/2022 C32/40 62% OPC+30%FA - 160+/-40 6991 10
Garden Span 12, at Water Garden, as Highlighted area in the attached drawing's.

39 C32/40 62% OPC+30%FA - 160+/-40 6987 10

Discovery Warning Tape for Electrical Lines of Low voltage Lines & Emergency Lines, Inside
40 KAIG3-RFI-DG-C-7005-00 7/3/2022 C16/20 SRC 7005 10
Garden Discovery Garden at highlighted area in attached Drawing's.

41 C16/20 SRC 7000 10

42 C16/20 SRC 6999 10

43 C16/20 SRC 6998 10

Shuttering and Scaffoldings for RING BEAM Zone 1N (OUTER) Axis 01-2, 01AM to C32/40 62% OPC+30%FA+8% MS - 220+/-20
44 KAIG3-RFI-CO-S-8141-00 Crescent 7/4/2022 7061 3
01AP (as highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
45 7/4/2022 7060 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
46 7/4/2022 7059 10
- SCREED

kaig-qcals 381
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER
47 BUILDING/ 7/4/2022
DATE OF 7058 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION - SCREED
DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
48 7/4/2022 7057 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
49 7/4/2022 7055 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
50 7/4/2022 7054 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
51 7/4/2022 7052 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
52 7/4/2022 7051 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
53 7/4/2022 7050 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
54 7/4/2022 7049 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
55 7/4/2022 7017 10
- SCREED
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit H/MV/02, H/MV/09,
56 KAIG3-RFI-SW-C-6050-00 Site Works 7/4/2022 C32/40 62% OPC+30%FA - 160+/-40 7047 5
H/MV/25 at Zone-H (As Highlighted)

57 C32/40 62% OPC+30%FA - 160+/-40 7040 10

58 C32/40 62% OPC+30%FA - 160+/-40 7029 10

59 C32/40 62% OPC+30%FA - 160+/-40 7027 10

60 C32/40 62% OPC+30%FA - 160+/-40 7019 7

61 C32/40 62% OPC+30%FA - 160+/-40 7018 10

Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-08 - Wing
62 KAIG3-RFI-SW-C-6125-00 Site Works 7/4/2022 C16/20 SRC 7023 6
Wall (Left Side) - As Highlighted

Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (5-13/C-I), at
63 KAIG3-RFI-EC-S-8145-00 Energy Center 2 7/4/2022 C16/20 SRC 7030 2
Energy Center 2, as highlighted area in attached drawing's.

64 C16/20 SRC 7024 11

New Ticketing Concrete Pouring & Shuttering for walls of New ticketing booth # 4A, As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
65 KAIG3-RFI-TB-S-8160-00 7/4/2022 7056 6
Booth Highlighted Drawing's. - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


66 7/4/2022 7053 8
- SCREED
Concreting for Infill wall (INNER) axis 02/N to 02/M (as highlighted) Zone 2D (2nd C32/40 62% OPC+30%FA+8% MS - 220+/-20
67 AIG3-RFI-CO-S-8170-00 Crescent 7/5/2022 7099 10
STAGE ) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
68 7/5/2022 7098 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
69 7/5/2022 7097 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
70 7/5/2022 7095 10
- SCREED

kaig-qcals 382
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
STRENGHT
C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER TRUCK
71 BUILDING/ 7/5/2022
DATE OF 7094 7 /
LOAD
SI No. RFI NUMBER DESCRIPTION - SCREED
DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
C32/40 62% OPC+30%FA+8% MS - 220+/-20 No.
72 7/5/2022 7090 (m³)
10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
73 7/5/2022 7089 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
74 7/5/2022 7088 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
75 7/5/2022 7083 5
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
76 7/5/2022 7070 2
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
77 7/5/2022 7069 4
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
78 7/5/2022 7063 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
79 7/5/2022 7062 10
- SCREED
Inspection for Blinding Concrete under Telecom Line Pit C/TL/49 at Zone-C - as
80 KAIG3-RFI-SW-C-6139-00 Site Works 7/5/2022 C16/20 SRC 7082 10
highlighted

81 C16/20 SRC 7080 10

82 C16/20 SRC 7066 10

83 C16/20 SRC 7065 4

84 C16/20 SRC 7064 10

Concrete Pouring for Typical Infill Precast Panels, at Grid (A/15-20), Inside Butterfly
85 KAIG3-RFI-TG-S-8175-00 Butterfly Garden 7/5/2022 C32/40 62% OPC+30%FA - 160+/-40 7091 5
Garden, as highlighted in attached drawings.

86 C32/40 62% OPC+30%FA - 160+/-40 7079 4

87 C32/40 62% OPC+30%FA - 160+/-40 7076 10

88 C32/40 62% OPC+30%FA - 160+/-40 7075 10

89 C32/40 62% OPC+30%FA - 160+/-40 7074 10

90 C32/40 62% OPC+30%FA - 160+/-40 7073 10

91 C32/40 62% OPC+30%FA - 160+/-40 7072 10

92 C32/40 62% OPC+30%FA - 160+/-40 7071 10

93 C32/40 62% OPC+30%FA - 160+/-40 7067 10

Shuttering of Mass Concrete (3rd layer) under Strip Footing Between PC 21-23-25 Zone
94 KAIG3-RFI-CO-S-8134-00 Crescent 7/6/2022 C16/20 SRC 7146 10
1D (as highlighted)

95 C16/20 SRC 7139 10

kaig-qcals 383
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
96 BUILDING/ DATE OF C16/20 SRC 7138 LOAD
10 /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
97 C16/20 SRC 7137 10

98 C16/20 SRC 7136 10

99 C16/20 SRC 7135 10

100 C16/20 SRC 7134 10

101 C16/20 SRC 7133 10

Concrete Pouring & Shuttering for Walls of Seat Walls (Inner), Inside Physic Garden as
102 KAIG3-RFI-PG-S-8161-00 Physic Garden 7/6/2022 C32/40 62% OPC+30%FA - 160+/-40 7159 8
highlighted area in attached drawing's.

103 C32/40 62% OPC+30%FA - 160+/-40 7157 10

104 C32/40 62% OPC+30%FA - 160+/-40 7143 5

105 C32/40 62% OPC+30%FA - 160+/-40 7141 10

106 C32/40 62% OPC+30%FA - 160+/-40 7140 10

Water Play Concrete Pouring & Shuttering for Concrete Pads (3 no's) on Slab (level +872.50) of
107 KAIG3-RFI-WG-S-8163-00 7/6/2022 C32/40 62% OPC+30%FA - 160+/-40 7148 7
Garden Wet Well F, Inside Water Garden as highlighted area in attached drawing's

108 C32/40 62% OPC+30%FA - 160+/-40 7147 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


109 KAIG3-RFI-CO-S-8156-00 Crescent 7/6/2022 Concreting for Buttress (with beam ), BOI ( 58 ) , BII (58) zone 1P (as highlighted) 7161 3
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
110 7/6/2022 7154 8
- SCREED
Concreting for RING BEAM Zone 1N (OUTER) Axis 01-2, 01AM to 01AP (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
111 KAIG3-RFI-CO-S-8142-00 Crescent 7/7/2022 7201 10
highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
112 7/7/2022 7200 4
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


113 7/7/2022 7197 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


114 7/7/2022 7195 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


115 7/7/2022 7194 5
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
116 7/7/2022 7192 10
- SCREED
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - C/MV/40,
117 KAIG3-RFI-SW-C-6121-00 Site Works 7/7/2022 C32/40 62% OPC+30%FA - 160+/-40 7199 10
G/MV/27, G/MV/03 at Zone-C&G (As Highlighted)

118 C32/40 62% OPC+30%FA - 160+/-40 7196 10

kaig-qcals 384
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
119 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 7193 LOAD
10 /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage
120 KAIG3-RFI-PG-C-6298-00 Physic Garden 7/7/2022 (MH/PG/LV/09, 10, 11 & 12) and Emergency (MH/PG/EM/10, 11, 12 & 13), Inside C16/20 SRC 7198 7
Physic Garden as highlighted in attached drawing's.

kaig-qcals 385
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
Concreting for Infill wall (INNER) axis 02/O to 02/P (as highlighted) Zone 2E (2nd C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER
121 KAIG3-RFI-CO-S-8210-00 BUILDING/
Crescent DATE
7/13/2022
OF 7286 LOAD
9 /
SI No. RFI NUMBER STAGE ) DESCRIPTION - SCREED
DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
122 7/13/2022 7278 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
123 7/13/2022 7266 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
124 7/13/2022 7263 10
- SCREED

Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (12B-15/D-H), at
125 KAIG3-RFI-EC-S-8208-00 Energy Center 2 7/13/2022 C16/20 SRC 7264 10
Energy Center 2, as highlighted area in attached drawing's.

126 C16/20 SRC 7265 10

127 C16/20 SRC 7267 10

Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid
128 KAIG3-RFI-EC-S-8207-00 Energy Center 2 7/13/2022 C32/40 62% OPC+30%FA - 160+/-40 7282 10
(18-28/R), at Energy Center 2, as highlighted area in attached drawing's.

129 C32/40 62% OPC+30%FA - 160+/-40 7283 7

130 KAIG3-RFI-CO-S-6140-00 Crescent 7/13/2022 Shuttering and Shear Connectors for BUTTRESS BIV 87, 88, 89, 90 Zone 2H 2G C16/20 SRC 7276 10

131 C16/20 SRC 7272 10

132 C16/20 SRC 7269 10

Concrete Pouring for Typical Precast Infill Panels, at Grid (A/9-14), Inside Butterfly
133 KAIG3-RFI-TG-S-8206-00 Butterfly Garden 7/14/2022 C32/40 62% OPC+30%FA - 160+/-40 7323 6
Garden, as highlighted in attached drawings.
Concreting of Mass concrete of Strip Footing Between PC 44-46 Zone 1G (as
134 KAIG3-RFI-CO-S-8179-00 Crescent 7/14/2022 C16/20 SRC 7347 4
highlighted)

135 C16/20 SRC 7346 10

136 C16/20 SRC 7344 10

137 C16/20 SRC 7345 10

138 C16/20 SRC 7337 10

139 C16/20 SRC 7335 10

140 C16/20 SRC 7334 10

141 C16/20 SRC 7331 10

142 KAIG3-RFI-SW-C-6161-00 Site Works 7/14/2022 Inspection of Blinding Concrete under MV Line Pit C/MV/04 at Zone-C - as highlighted C16/20 SRC 7341 10

143 C16/20 SRC 7340 10

144 C16/20 SRC 7333 10

kaig-qcals 386
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
6 /
SI145
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y 7326
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
146 C16/20 SRC 7325 10

147 C16/20 SRC 7324 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


148 KAIG3-RFI-CO-S-8199-00 Crescent 7/16/2022 Concreting for Buttress (with beam ), BOI,BII ( 57 & 58 ) zone 1P (as highlighted) 7351 6
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


149 7/16/2022 7355 8
- SCREED

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/29,


150 KAIG3-RFI-SW-C-6160-00 Site Works 7/16/2022 C32/40 62% OPC+30%FA - 160+/-40 7352 10
H/MV0/6, H/MV/04 at Zone-H (As Highlighted)

151 C32/40 62% OPC+30%FA - 160+/-40 7353 5

Inspection for Blinding Concrete under Fire Water Line Pit for B/F/14 at Zone-B - as
152 KAIG3-RFI-SW-C-6163-00 Site Works 7/16/2022 C16/20 SRC 7357 10
highlighted

Concrete Pouring & shuttering for Walls of Seat Walls (08 no's) inside Butterfly Garden,
153 KAIG3-RFI-TG-S-8215-00 Butterfly Garden 7/17/2022 C32/40 62% OPC+30%FA - 160+/-40 7370 10
as highlighted area in attached drawing's.

154 C32/40 62% OPC+30%FA - 160+/-40 7374 10

Concrete Pouring & Shuttering for Lintels of Doors & Block work & Stiffner Column's
C32/40 62% OPC+30%FA+8% MS - 220+/-20
155 KAIG3-RFI-PT-A-0959-00 Public Toilet # 3 7/17/2022 for all walls of Gents Toilet, Inside Public Toilet # 3, At highlighted area in attached 7371 4
- SCREED
Drawing's

Telecommunicati
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire &
156 KAIG3-RFI-SW-C-6172-00 on and Fire & 7/17/2022 C16/20 SRC 7372 10
Securtiy Line at Zone-F&G (As Highlighted)
Securtiy Line

157 C16/20 SRC 7373 10

158 C16/20 SRC 7375 5

C32/40 62% OPC+30%FA+8% MS - 220+/-20


159 KAIG3-RFI-CO-S-8223-00 Crescent 7/18/2022 Concreting for Infill wall inner axis 02Q - 02R zone 2E (as highlighted) 2nd STAGE 7420 7
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


160 7/18/2022 7413 10
- SCREED

Concreting for mass concrete (4th layer) under strip footing between PC ( 152-158 )inner
161 KAIG3-RFI-CO-S-7938-00 Crescent 7/18/2022 C32/40 62% OPC+30%FA - 160+/-40 7450 10
Zone 2K (as highlighted)

162 C32/40 62% OPC+30%FA - 160+/-40 7449 10

163 C32/40 62% OPC+30%FA - 160+/-40 7448 10

164 C32/40 62% OPC+30%FA - 160+/-40 7447 10

165 C32/40 62% OPC+30%FA - 160+/-40 7446 10

kaig-qcals 387
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI166
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 7445
NOTE
LOCATION CASTING QUANTITY
No.
(m³)

kaig-qcals 388
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI167
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 7444
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
168 C32/40 62% OPC+30%FA - 160+/-40 7443 10

169 C32/40 62% OPC+30%FA - 160+/-40 7441 10

170 C32/40 62% OPC+30%FA - 160+/-40 7439 10

171 C32/40 62% OPC+30%FA - 160+/-40 7437 10

172 C32/40 62% OPC+30%FA - 160+/-40 7435 10

173 C32/40 62% OPC+30%FA - 160+/-40 7428 10

174 C32/40 62% OPC+30%FA - 160+/-40 7427 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


175 KAIG3-RFI-CO-S-8240-00 Crescent 7/19/2022 Concreting for RING BEAM Zone 1H (INNER) Axis 01Z TO 01Y (as highlighted) 7509 3
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
176 7/19/2022 7508 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
177 7/19/2022 7507 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
178 7/19/2022 7503 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
179 7/19/2022 7502 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
180 7/19/2022 7499 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
181 7/19/2022 7494 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
182 7/19/2022 7493 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
183 7/19/2022 7492 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
184 7/19/2022 7488 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
185 7/19/2022 74487 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
186 7/19/2022 7486 10
- SCREED
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - C/MV/08,
187 KAIG3-RFI-SW-C-6170-00 Site Works 7/19/2022 C32/40 62% OPC+30%FA - 160+/-40 7491 5
C/MV/38, G/MV/02 at Zone-C&G (As Highlighted)

188 C32/40 62% OPC+30%FA - 160+/-40 7490 10

189 C32/40 62% OPC+30%FA - 160+/-40 7489 10

Inspection for Casting the Blinding Concrete under the Gullies for G-O-28, G-O-29, G-
190 KAIG3-RFI-SW-C-6222-00 Site Works 7/19/2022 C16/20 SRC 7496 10
O-32, G-O-33, G-O-34 & G-O-43 (as Highlighted)

191 C16/20 SRC 7495 10

kaig-qcals 389
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
Concreting for Large Mosque walls from S.O.G to the bottom of lower first slab ,Zone DELIVER
192 KAIG3-RFI-LM-S-8231-00 Large Mosque
BUILDING/ 7/19/2022
DATE OF C32/40 62% OPC+30%FA - 160+/-40 7500 10 /
LOAD
SI No. RFI NUMBER 1G (as highlighted) DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)

kaig-qcals 390
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
193 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
7504 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
194 C32/40 62% OPC+30%FA - 160+/-40 7505 (m³)
10

Concrete Pouring & Shuttering for Typical Precast Infill Panels, at Grid (A/1-8), Inside
195 KAIG3-RFI-TG-S-8270-00 Butterfly Garden 7/19/2022 C32/40 62% OPC+30%FA - 160+/-40 7506 7
Butterfly Garden, as highlighted in attached drawings.

Concreting for Infill wall (INNER) axis 01/H to 01/I (as highlighted) Zone 1C (1st C32/40 62% OPC+30%FA+8% MS - 220+/-20
196 KAIG3-RFI-CO-S-8246-00 Crescent 7/20/2022 7528 10
STAGE ) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
197 7/20/2022 7523 10
- SCREED

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
198 KAIG3-RFI-SW-C-6233-00 Site Works 7/20/2022 C16/20 SRC 7550 10
ISC-24, NPW-ISC-25 at Zone-H&L - as highlighted

199 C16/20 SRC 7542 10

200 C16/20 SRC 7533 10

201 C16/20 SRC 7525 10

202 C16/20 SRC 7524 10

203 KAIG3-RFI-MC-S-8293-00 MCPE 1 7/20/2022 Concreting for Slab at MCPE 1 axis 03R, 03/3 to 03/2 Zone 2M 2N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 7582 9

204 C32/40 62% OPC+30%FA - 160+/-40 7555 10

205 C32/40 62% OPC+30%FA - 160+/-40 7552 10

206 C32/40 62% OPC+30%FA - 160+/-40 7551 10

207 C32/40 62% OPC+30%FA - 160+/-40 7531 10

208 C32/40 62% OPC+30%FA - 160+/-40 7530 10

Water Play Concrete Pouring & Shuttering for Wall & Column of Boundary Wall at Span 12, at
209 KAIG3-RFI-WG-S-8287-00 7/20/2022 C32/40 62% OPC+30%FA - 160+/-40 7529 10
Garden Water Garden, as Highlighted area in the attached drawing's.

Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid
210 KAIG3-RFI-EC-S-8237-00 Energy Center 2 7/20/2022 C32/40 62% OPC+30%FA - 160+/-40 7536 10
(17-22/M), at Energy Center 2, as highlighted area in attached drawing's.

211 C32/40 62% OPC+30%FA - 160+/-40 7534 10

Shuttering for mass concrete under strip footing (5th layer) between PC( 23-25 )outer
212 KAIG3-RFI-CO-S-8294-00 Crescent 7/21/2022 C16/20 SRC 7674 5
Zone 1D(as highlighted)

213 C16/20 SRC 7669 10

214 C16/20 SRC 7667 10

Concrete Pouring & Shuttering for Concrete Pad on Foundation of Wet Well E, Inside
Water Play
215 KAIG3-RFI-WG-S-8332-00 7/21/2022 Water Garden as highlighted area in attached drawing's & KAIG3-SCR-SW-S-0160-00- C32/40 62% OPC+30%FA - 160+/-40 7678 7
Garden
Reply.

kaig-qcals 391
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
216 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
7677 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)

kaig-qcals 392
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
217 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
7676 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
218 C32/40 62% OPC+30%FA - 160+/-40 7675 (m³)
10

219 C32/40 62% OPC+30%FA - 160+/-40 7673 10

220 C32/40 62% OPC+30%FA - 160+/-40 7672 10

221 C32/40 62% OPC+30%FA - 160+/-40 7671 10

222 C32/40 62% OPC+30%FA - 160+/-40 7670 10

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/11 at Zone-
223 KAIG3-RFI-SW-C-6179-00 Site Works 7/21/2022 C32/40 62% OPC+30%FA - 160+/-40 7660 10
H (As Highlighted)

224 C32/40 62% OPC+30%FA - 160+/-40 7659 10

Concrete Pouring & Shuttering for Footing of Boundary wall @ Grid (C-I/0-1), at
225 KAIG3-RFI-EC-S-8301-00 Energy Center 2 7/21/2022 C32/40 62% OPC+30%FA - 160+/-40 7647 10
Energy Center 2, as highlighted area in attached drawing's.

226 C32/40 62% OPC+30%FA - 160+/-40 7646 10

227 C32/40 62% OPC+30%FA - 160+/-40 7645 10

228 C32/40 62% OPC+30%FA - 160+/-40 7641 10

229 C32/40 62% OPC+30%FA - 160+/-40 7640 10

230 C32/40 62% OPC+30%FA - 160+/-40 7639 10

231 C32/40 62% OPC+30%FA - 160+/-40 7638 10

232 C32/40 62% OPC+30%FA - 160+/-40 7637 10

233 C32/40 62% OPC+30%FA - 160+/-40 7636 10

234 C32/40 62% OPC+30%FA - 160+/-40 7635 10

235 C32/40 62% OPC+30%FA - 160+/-40 7634 10

236 C32/40 62% OPC+30%FA - 160+/-40 7633 10

237 C32/40 62% OPC+30%FA - 160+/-40 7632 10

238 C32/40 62% OPC+30%FA - 160+/-40 7630 10

239 C32/40 62% OPC+30%FA - 160+/-40 7628 10

240 C32/40 62% OPC+30%FA - 160+/-40 7627 10

241 C32/40 62% OPC+30%FA - 160+/-40 7626 10

kaig-qcals 393
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
242 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 7625 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
243 C32/40 62% OPC+30%FA - 160+/-40 7624 10

244 C32/40 62% OPC+30%FA - 160+/-40 7623 10

245 C32/40 62% OPC+30%FA - 160+/-40 7622 10

246 C32/40 62% OPC+30%FA - 160+/-40 7621 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


247 KAIG3-RFI-CO-S-8276-00 Crescent 7/21/2022 Concreting for Infill wall (outer) between axis 02/AY to 02/AX (as highlighted) Zone 2Q 7652 4
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
248 7/21/2022 7631 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
249 7/21/2022 7629 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
250 7/21/2022 7615 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
251 7/21/2022 7614 10
- SCREED
Inspection for Casting the Blinding Concrete under the Foull Water Line Manhole FW-
252 KAIG3-RFI-SW-C-6244-00 Site Works 7/23/2022 C16/20 SRC 7779 7
A-3-1, FW-A-3, FW-A-3-A (as Highlighted)

253 C16/20 SRC 7778 10

254 C16/20 SRC 7774 10

255 C16/20 SRC 7766 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


256 KAIG3-RFI-CO-S-8279-00 Crescent 7/23/2022 Concreting for Diaphragm Wall axis 02/AQ (as highlighted) Zone 2N LEVEL 874.00 7777 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
257 7/23/2022 7776 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
258 7/23/2022 7769 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
259 7/23/2022 7767 10
- SCREED
Inspection of Concrete Pouring for the Footing of SBC-08 - Wing Wall (Left Side) - As
260 KAIG3-RFI-SW-C-6208-00 Site Works 7/23/2022 C32/40 62% OPC+30%FA - 160+/-40 7775 10
Highlighted

Concrete Pouring & Shuttering for Footings of Cabin Room, ETFE Pump Room, Water
261 KAIG3-RFI-TG-S-8316-00 Butterfly Garden 7/23/2022 feature Pump Room & Remaining Boundary wall, at Butterfly Garden, as highlighted C32/40 62% OPC+30%FA - 160+/-40 7783 10
area in attached drawing's.

262 C32/40 62% OPC+30%FA - 160+/-40 7782 10

263 C32/40 62% OPC+30%FA - 160+/-40 7781 10

264 C32/40 62% OPC+30%FA - 160+/-40 7780 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


265 KAIG3-RFI-MC-S-8298-00 MCPE 2 7/24/2022 7826 10
Concreting for MCPE 2 wall at axis 02/AB to 03/I-1 zone 2H (As highlighted) - SCREED

kaig-qcals 394
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER
266 BUILDING/ 7/24/2022
DATE OF 7819 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION - SCREED
DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
267 7/24/2022 7818 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
268 7/24/2022 7810 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
269 7/24/2022 7809 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
270 7/24/2022 7807 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
271 7/24/2022 7806 10
- SCREED
Concreting for RC Foundation at MCPE 1 axis 03AP- 03/2,03/1,02/2 zone 2M 2N (as
272 KAIG3-RFI-MC-S-8314-00 MCPE 1 7/24/2022 C16/20 SRC 7808 10
highlighted)

Concreting for Tunnel 1 slab and strip footing between pc 15 & 17 (as Highlighted)
273 KAIG3-RFI-CO-S-8307-00 Crescent 7/24/2022 C32/40 62% OPC+30%FA - 160+/-40 7836 4
Zone 2H

274 C32/40 62% OPC+30%FA - 160+/-40 7834 10

275 C32/40 62% OPC+30%FA - 160+/-40 7835 10

276 C32/40 62% OPC+30%FA - 160+/-40 7832 10

277 C32/40 62% OPC+30%FA - 160+/-40 7831 10

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - B/MV/10 at Zone-B
278 KAIG3-RFI-SW-C-6292-00 Site Works 7/25/2022 C32/40 62% OPC+30%FA - 160+/-40 7903 3
(As Highlighted)

279 C32/40 62% OPC+30%FA - 160+/-40 7896 10

280 C32/40 62% OPC+30%FA - 160+/-40 7888 10

Concreting for Infill inner wall between (02-R & 02Q) (As highlighted) ZONE 2E (2nd
281 KAIG3-RFI-CO-S-8326-00 Crescent 7/25/2022 C32/40 62% OPC+30%FA - 160+/-40 7895 10
STAGE )

282 C32/40 62% OPC+30%FA - 160+/-40 7894 10

283 AIG3-RFI-SW-C-6311-00 Site Works 7/25/2022 Inspection for Casting Blinding Concrete under Manhole - MH-G-07 - as highlighted C16/20 SRC 7900 10

284 C16/20 SRC 7905 10

285 C16/20 SRC 7904 10

286 C16/20 SRC 7899 10

Water Play Concrete Pouring & Shuttering for Beams of Jetty 1 & Jetty 2 at Boat Garden inside
287 KAIG3-RFI-WG-S-8343-00 7/25/2022 C32/40 62% OPC+30%FA - 160+/-40 7921 5
Garden Water Garden , as highlighted area in the attached drawings

288 C32/40 62% OPC+30%FA - 160+/-40 7920 10

Inspection of Concrete Pouirng for WALL of MV Line Pulling Pit - C/MV/22,


289 KAIG3-RFI-SW-C-6324-00 Site Works 7/26/2022 C32/40 62% OPC+30%FA - 160+/-40 7941 10
C/MV/25, G/MV/08, G/MV/36 at Zone-C&G (As Highlighted)

kaig-qcals 395
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
290 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 7940 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
Concreting for MCPE 3 blinding under ground foundation at axis 02-P, 03-2 to 03-1 , (m³)
291 KAIG3-RFI-MC-S-8392-00 MCPE 3 7/26/2022 C16/20 SRC 7943 10
LEVEL 870.35 Zone 2E 2F (as highlighted)

292 C16/20 SRC 7942 10

293 KAIG3-RFI-SW-C-6378-00 Site Works 7/26/2022 Inspection for Blinding Concrete under Potable Water Line Pit C/PW/04 - as highlighted C16/20 SRC 7966 10

294 C16/20 SRC 7963 10

295 C16/20 SRC 7965 10

296 C16/20 SRC 7962 10

297 C16/20 SRC 7959 10

298 C16/20 SRC 7947 10

299 C16/20 SRC 7946 10

300 C16/20 SRC 7945 10

301 C16/20 SRC 7944 10

Protection layer of Geotex and 50mmScreed Under Strip Footing between PC 44-46 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
KAIG3-RFI-CO-S-8320-00 Crescent 7/26/2022 7958 3
highlighted) Zone 1G - SCREED

Concrete Pouring for Blinding Under Electrical Handholes of Emergency


Water Play (MH/WG/EM/01, 03, 04, 05 & 06) & Low Voltage (MH/WG/LV/05, 09, 10, 11, 12, 14,
302 KAIG3-RFI-WG-C-6546-00 7/27/2022 C16/20 SRC 8032 6
Garden 15 & 16), between Mist & Geyser Garden, inside water Garden, as highlighted area in
attached drawing's.

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
303 KAIG3-RFI-SW-C-6377-00 Site Works 7/27/2022 C16/20 SRC 8033 10
C/TL/54 to C/TL/51 at Zone-C - As Highlighted

Concreting for (MCPE 1) wall and counterfort from level 871 to 875.55 between axis C32/40 62% OPC+30%FA+8% MS - 220+/-20
304 KAIG3-RFI-MC-S-8362-00 MCPE 1 7/27/2022 8063 7
03-T to 02-AM at Zone 2M 2N (as highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


305 7/27/2022 8052 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


306 7/27/2022 8042 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


307 7/27/2022 8035 10
- SCREED

Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (9-12B/D-H),
308 KAIG3-RFI-EC-S-8375-00 Energy Center 2 7/27/2022 C32/40 62% OPC+30%FA - 160+/-40 8066 8
Inside Energy Center 2, as highlighted area in attached drawing's.

309 C32/40 62% OPC+30%FA - 160+/-40 8065 10

310 C32/40 62% OPC+30%FA - 160+/-40 8062 10

kaig-qcals 396
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
311 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 8059 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
312 C32/40 62% OPC+30%FA - 160+/-40 8058 10

313 C32/40 62% OPC+30%FA - 160+/-40 8057 10

314 C32/40 62% OPC+30%FA - 160+/-40 8056 10

315 C32/40 62% OPC+30%FA - 160+/-40 8055 10

316 C32/40 62% OPC+30%FA - 160+/-40 8054 10

317 C32/40 62% OPC+30%FA - 160+/-40 8053 10

318 C32/40 62% OPC+30%FA - 160+/-40 8045 5

319 C32/40 62% OPC+30%FA - 160+/-40 8044 10

320 C32/40 62% OPC+30%FA - 160+/-40 8043 10

321 C32/40 62% OPC+30%FA - 160+/-40 8041 10

322 C32/40 62% OPC+30%FA - 160+/-40 8040 10

323 C32/40 62% OPC+30%FA - 160+/-40 8039 10

324 C32/40 62% OPC+30%FA - 160+/-40 8038 10

325 C32/40 62% OPC+30%FA - 160+/-40 8037 10

326 C32/40 62% OPC+30%FA - 160+/-40 8036 10

Inspection of Concrete Pouring for the wall of SBC-08 - Wing Wall (Left Side) - As
327 KAIG3-RFI-SW-C-6384-00 Site Works 7/27/2022 C32/40 62% OPC+30%FA - 160+/-40 8064 5
Highlighted

Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire &
328 KAIG3-RFI-SW-C-6415-00 Site Works 7/28/2022 C16/20 SRC 8134 4
Securtiy Line at Zone-G (As Highlighted)

329 C16/20 SRC 8113 10

330 KAIG3-RFI-SW-C-6423-00 Site Works 7/31/2022 Inspection for Casting Blinding Concrete under Manhole - MH-M-03 - as highlighted C32/40 62% OPC+30%FA - 160+/-40 8274 10

331 C32/40 62% OPC+30%FA - 160+/-40 8273 10

332 C32/40 62% OPC+30%FA - 160+/-40 8260 10

333 C32/40 62% OPC+30%FA - 160+/-40 8259 10

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/23 , C/MV/40 ,
334 KAIG3-RFI-SW-C-6474-00 Site Works 7/31/2022 C16/20 SRC 8281 10
G/MV/19 , G/MV/31 , G/MV/03 , G/MV/27 at Zone-C&G (As Highlighted)

kaig-qcals 397
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI335
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y 8276
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
336 C16/20 SRC 8275 10

337 NO RFI C32/40 62% OPC+30%FA - 160+/-40 7665 5

C32/40 62% OPC+30%FA+8% MS - 220+/-20


338 NO RFI 8128 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


339 8122 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


340 8117 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


341 8107 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


342 NO RFI 8283 11
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


343 8277 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


344 8271 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


345 8270 4
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


346 8264 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


347 8256 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


348 8255 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


349 8253 10
- SCREED

350 NO RFI C32/40 62% OPC+30%FA - 160+/-40 8263 10

351 C32/40 62% OPC+30%FA - 160+/-40 8261 10

352 C32/40 62% OPC+30%FA - 160+/-40 8258 10

353 C32/40 62% OPC+30%FA - 160+/-40 8257 10

354 C32/40 62% OPC+30%FA - 160+/-40 8254 10

355 NO RFI C32/40 62% OPC+30%FA - 160+/-40 8269 7

kaig-qcals 398
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI356
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 8268
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
357 C32/40 62% OPC+30%FA - 160+/-40 8267 10

358 C32/40 62% OPC+30%FA - 160+/-40 8266 10

359 C32/40 62% OPC+30%FA - 160+/-40 8265 10

360 C32/40 62% OPC+30%FA - 160+/-40 8262 10

361 NO RFI C16/20 SRC 8282 8

362 C16/20 SRC 8279 11

363 C16/20 SRC 8278 11

TOTAL QUANTITY TRUCK LOAD (M³): 3352.00

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

kaig-qcals 399
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER 28 DAYS
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE 7 AND
LOCATION CASTING QUANTITY
No. DAYS MORE THAN 28
(m³)
DAYS
C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-CO-S-8421-00 Crescent 8/1/2022 Concreting for RING BEAM Zone 1K (OUTER) Axis 01-AG to 01-AF(as highlighted) 8304 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
2 8302 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
3 8301 10
- SCREED
Concrete Pouring & Shuttering for Lintels of Doors & Block work & Stiffner Column's
C32/40 62% OPC+30%FA+8% MS - 220+/-20
4 KAIG3-RFI-PT-A-0982-00 Public Toilet 3 8/1/2022 for all walls of Ladies Toilet, Inside Public Toilet # 3, At highlighted area in attached 8303 3
- SCREED
Drawing's

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
5 KAIG3-RFI-SW-C-6504-00 Site Work 8/2/2022 27, POC-PT2, POC-28, POC-30, POC-TT4, POC Water tank at Zone-G&K - as C16/20 SRC 8362 10
highlighted

6 C16/20 SRC 8353 10

7 C16/20 SRC 8352 10

8 C16/20 SRC 8351 10

9 C16/20 SRC 8347 10

10 C16/20 SRC 8346 10

11 C16/20 SRC 8336 6

Concreting for mass concrete under ETFE PUMP ROOM S.O.G. zone 2D axis 02-J
12 KAIG3-RFI-CO-S-8470-00 Crescent 8/1/2022 C16/20 SRC 8305 10
inner line (as highlighted) at CRESCENT ,KAIG3-SCR-CO-S-0193-00

Steel Reinforcements for Infill inner wall at Crescent Boi 74-73 between (02-M & 02-L)
13 KAIG3-RFI-CO-S-8426-00 Crescent 8/2/2022 C32/40 62% OPC+30%FA - 160+/-40 8366 10
(As highlighted) ZONE 2D

14 C32/40 62% OPC+30%FA - 160+/-40 8361 10

15 C32/40 62% OPC+30%FA - 160+/-40 8360 10

16 C32/40 62% OPC+30%FA - 160+/-40 8359 10

17 C32/40 62% OPC+30%FA - 160+/-40 8358 10

18 C32/40 62% OPC+30%FA - 160+/-40 8357 6

19 C32/40 62% OPC+30%FA - 160+/-40 8338 10

Page 400 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/
Water Play DATE OF Concrete Pouring & Shuttering for Slab of Wet Well F, (at level +876.10), Inside Water LOAD /
SI20
No. RFI NUMBER
KAIG3-RFI-WG-S-8438-00 8/2/2022 DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y 8344
NOTE 6
LOCATION
Garden CASTING Garden, as highlighted area in attached drawing's QUANTITY
No.
(m³)

21 C32/40 62% OPC+30%FA - 160+/-40 8343 10

22 C32/40 62% OPC+30%FA - 160+/-40 8342 10

23 C32/40 62% OPC+30%FA - 160+/-40 8341 10

24 C32/40 62% OPC+30%FA - 160+/-40 8340 10

Protection layer of 4mm thick bituminous protection board for Diaphragm Wall footing C32/40 62% OPC+30%FA+8% MS - 220+/-20
25 KAIG3-RFI-CO-S-8450-00 Crescent 8/2/2022 8365 10
axis 02-AR up to the top of footing (as highlighted) Zone 2N - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


26 8363 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


27 8356 10
- SCREED

Concreting for Infill outer wall at Crescent between axis (02-AA & 02-AB) (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
28 KAIG3-RFI-CO-S-8474-00 Crescent 8/4/2022 8447 10
highlighted) ZONE 2H - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
29 8446 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
30 8445 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
31 8444 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
32 8443 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
33 8438 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
34 8436 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
35 8431 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
36 8427 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
37 8418 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
38 8414 10
- SCREED

Page 401 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
39 8413 10
SI No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-5 , FW-A-
40 KAIG3-RFI-SW-C-6542-00 Site Work 8/4/2022 C32/40 62% OPC+30%FA - 160+/-40 8434 10
3-6 (as Highlighted)

41 C32/40 62% OPC+30%FA - 160+/-40 8433 10

42 C32/40 62% OPC+30%FA - 160+/-40 8432 10

43 C32/40 62% OPC+30%FA - 160+/-40 8430 10

44 C32/40 62% OPC+30%FA - 160+/-40 8429 10

45 C32/40 62% OPC+30%FA - 160+/-40 8428 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


46 KAIG3-RFI-PC-S-8462-00 Central Bridge 8/6/2022 Concreting for central bridge abutment grid 01/M zone 4 (as highlighted) 8499 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
47 8494 7
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
48 8493 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
49 8491 9
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
50 8489 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
51 8488 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
52 8487 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
53 8485 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
54 8483 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
55 8481 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
56 8480 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
57 8479 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
58 8476 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
59 8474 10
- SCREED

Page 402 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Inspection of Casting the Concrete Encasement and Surface Preperation prior to start LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
60 KAIG3-RFI-SW-C-6561-00 LOCATION
Site Work CASTING
8/6/2022 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) For Storm C16/20 SRC 8492 QUANTITY
10
No.
Water Line between MH-A-08 and G-A-23 As attached (m³)

61 C16/20 SRC 8486 10

62 C16/20 SRC 8482 10

63 C16/20 SRC 8477 10

64 C16/20 SRC 8475 10

Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (7-8/D-H), Inside
65 KAIG3-RFI-EC-S-8523-00 Energy Center 2 8/6/2022 C32/40 62% OPC+30%FA - 160+/-40 8503 6
Energy Center 2, as highlighted area in attached drawing's.

66 C32/40 62% OPC+30%FA - 160+/-40 8502 10

67 C32/40 62% OPC+30%FA - 160+/-40 8501 10

68 C32/40 62% OPC+30%FA - 160+/-40 8500 10

69 C32/40 62% OPC+30%FA - 160+/-40 8498 10

70 C32/40 62% OPC+30%FA - 160+/-40 8497 10

71 C32/40 62% OPC+30%FA - 160+/-40 8496 10

72 C32/40 62% OPC+30%FA - 160+/-40 8495 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


73 KAIG3-RFI-CF-S-8504-00 Cafeteria 8/7/2022 Concerting for walls ( W31, W32) at CAFETERIA zone 2A (as highlighted) 8543 6
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
74 8531 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
75 8510 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
76 8504 10
- SCREED

Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (A/6-12B), at
77 KAIG3-RFI-EC-S-8487-00 Energy Center 2 8/7/2022 C32/40 62% OPC+30%FA - 160+/-40 8534 8
Energy Center 2, as highlighted area in attached drawing's.

78 C32/40 62% OPC+30%FA - 160+/-40 8532 10

79 C32/40 62% OPC+30%FA - 160+/-40 8514 10

80 C32/40 62% OPC+30%FA - 160+/-40 8511 10

Page 403 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
81 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 8508 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
Concreting for Infill wall between axis 02/AO to 02/AN (as highlighted), at CRESCENT C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
82 KAIG3-RFI-CO-S-8506-00 Crescent 8/8/2022 8577 5
Zone 2M - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
83 8567 3
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
84 8562 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
85 8556 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
86 8554 10
- SCREED
Inspection for Blinding Concrete under MV Line Pulling Pit G/MV/13 and G/MV/38 -
87 KAIG3-RFI-SW-C-6585-00 Site Work 8/8/2022 C16/20 SRC 8568 10
as highlighted (SCR: KAIG3-SCR-SW-E0081-00)

88 C16/20 SRC 8563 10

89 C16/20 SRC 8555 10

Concrete Pouring & Shuttering for walls of New Ticketing Booth # 5A, As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
90 KAIG3-RFI-TB-S-8526-00 Ticket Booth 8/8/2022 8569 4
Highlighted Drawing's. - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
91 8561 6
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
92 8560 8
- SCREED

Inspection of Thrust Blocks for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110,
Water Play
93 KAIG3-RFI-WG-C-6860-00 8/9/2022 160 & 200 mm), Bottom Left Side of Geyser Garden, at Water Garden as highlighted C16/20 SRC 8614 8
Garden
area in attached drawing's.

Inspection for Casting the Blinding Concrete under the Foul Water Line Manhole FW-A-
94 KAIG3-RFI-SW-C-6594-00 Site Work 8/9/2022 C32/40 62% OPC+30%FA - 160+/-40 8624 5
4 (as Highlighted)

95 C32/40 62% OPC+30%FA - 160+/-40 8620 10

Concreting for wall (W3) at CAFETERIA from level 862.00 to level 863.55 zone 2A (as
96 KAIG3-RFI-CF-S-8578-00 Cafeteria 8/9/2022 C32/40 62% OPC+30%FA - 160+/-40 8643 3
highlighted)

97 C32/40 62% OPC+30%FA - 160+/-40 8638 5

98 C32/40 62% OPC+30%FA - 160+/-40 8637 10

99 C32/40 62% OPC+30%FA - 160+/-40 8636 10

Concreting for Internal building (colmns C17, C 19, C 79) of NORTH


100 KAIG3-RFI-CO-S-8563-00 Crescent 8/9/2022 C16/20 SRC 8644 6
ADMINSTRATION between axis 02/BC to 02/BB (as highlighted) Zone 2R

Page 404 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
101 BUILDING/ DATE OF C16/20 SRC 8642 LOAD
10 /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
Concreting for wall at MCPE 1 axis (03-1, 03-2 to 03-U) up to level 874.40 & 875.55 C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
102 KAIG3-RFI-MC-S-8553-00 MCPE 1 8/10/2022 8704 7
Zone 2M 2N (as highlighted) - SCREED

Page 405 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
103 8701 10
SI No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y NOTE
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
104 8698 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
105 8687 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
106 8678 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
107 8677 10
- SCREED
Concreting for Blinding under strip footing between PC( 128 & 130 )inner Zone 2F (as
108 KAIG3-RFI-CO-S-8546-00 Crescent 8/10/2022 C16/20 SRC 8707 11
highlighted) KAIG3-SCR-CO-S-0188-00

109 C16/20 SRC 8706 10

110 C16/20 SRC 8705 10

111 C16/20 SRC 8679 10

Inspection for Casting Blinding Concrete under Manhole - MH-M-02, MH-M-05 - as


112 KAIG3-RFI-SW-C-6595-00 Site Work 8/10/2022 C16/20 SRC 8690 10
highlighted

113 C16/20 SRC 8682 10

114 C16/20 SRC 8680 10

Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (K/4-13), at
115 KAIG3-RFI-EC-S-8566-00 Energy Center 2 8/10/2022 C16/20 SRC 8703 11
Energy Center 2, as highlighted area in attached drawing's.

116 C16/20 SRC 8702 11

117 C16/20 SRC 8681 5

Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (4-6/D-H), Inside
118 KAIG3-RFI-EC-S-8555-00 Energy Center 2 8/10/2022 C32/40 62% OPC+30%FA - 160+/-40 8700 10
Energy Center 2, as highlighted area in attached drawing's.

119 C32/40 62% OPC+30%FA - 160+/-40 8699 11

120 C32/40 62% OPC+30%FA - 160+/-40 8697 10

121 C32/40 62% OPC+30%FA - 160+/-40 8696 11

122 C32/40 62% OPC+30%FA - 160+/-40 8695 11

Page 406 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
123 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
8694 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
124 C32/40 62% OPC+30%FA - 160+/-40 8692 10

125 C32/40 62% OPC+30%FA - 160+/-40 8691 10

126 C32/40 62% OPC+30%FA - 160+/-40 8689 10

127 C32/40 62% OPC+30%FA - 160+/-40 8688 10

128 C32/40 62% OPC+30%FA - 160+/-40 8683 10

129 C32/40 62% OPC+30%FA - 160+/-40 8686 10

130 C32/40 62% OPC+30%FA - 160+/-40 8685 10

Concreting for wall (W3) at CAFETERIA from level 862.00 to level 863.55 zone 2A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
131 KAIG3-RFI-CF-S-8578-00 Cafeteria 8/11/2022 8771 7
highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
132 8770 6
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
133 8754 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
134 8747 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
135 8746 10
- SCREED

Inspection for casting concrete for short piece and Surface Preperation prior to start
136 KAIG3-RFI-SW-C-6608-00 Site Work 8/11/2022 waterproofing for short piece and Application of Primer (1st Coat, 2nd Coat and 3rd C16/20 SRC 8762 10
Coat) for MH-M-11 (As Highlighted)

137 C16/20 SRC 8749 10

Concreting for internal Column of Adminstration building at Crescent between axis 02-
138 KAIG3-RFI-CO-S-8531-00 Crescent 8/11/2022 C32/40 62% OPC+30%FA - 160+/-40 8759 4
BB & 02-BC Zone 2R up to level 873.37 (as highlighted)

139 C32/40 62% OPC+30%FA - 160+/-40 8748 10

Concrete Pouring & Shuttering for Columns (above the level +872.35) of Boundary Wall
140 KAIG3-RFI-EC-S-8557-00 Energy Center 2 8/11/2022 C32/40 67%OPC+25%FA - 160+/-40 8772 11
@ Grid (R/22-28), at Energy Center 2, as highlighted area in attached drawing's.

Concreting for walls (W1,W2) at CAFETERIA from level 862.00 to level 869.10 zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
141 KAIG3-RFI-CF-S-8576-00 Cafeteria 8/13/2022 8847 3
2A (as highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


142 8832 5
- SCREED

Page 407 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI143
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 8822
NOTE 5
LOCATION CASTING QUANTITY
No.
(m³)
144 KAIG3-RFI-SW-C-6651-00 Site Work 8/13/2022 Inspection for Casting the Blinding Concrete under the Gully for G-O-32, G-O-34 (as Highlighted) C16/20 SRC 8842 10

145 C16/20 SRC 8838 10

146 C16/20 SRC 8827 10

147 C16/20 SRC 8825 10

Concreting for bottom slab of duct tunnel at MCPE 3 axis 03-D , 03-C , 03-B , 03-A
148 KAIG3-RFI-MC-S-8611-00 MCPE 3 8/13/2022 C32/40 62% OPC+30%FA - 160+/-40 8860 10
Zone 2E 2F (as highlighted)

149 C32/40 62% OPC+30%FA - 160+/-40 8859 10

150 C32/40 62% OPC+30%FA - 160+/-40 8858 10

151 C32/40 62% OPC+30%FA - 160+/-40 8857 10

152 C32/40 62% OPC+30%FA - 160+/-40 8856 10

153 C32/40 62% OPC+30%FA - 160+/-40 8855 10

154 C32/40 62% OPC+30%FA - 160+/-40 8854 10

155 C32/40 62% OPC+30%FA - 160+/-40 8853 10

Inspection for Casting the Concrete encasement and Surface Preperation prior to start
156 KAIG3-RFI-SW-C-6661-00 Site Work 8/14/2022 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for storm C16/20 SRC 8899 10
water pipe from G-O-46 to G-O-47 and G-O-47 to SBC1 corner As attached

157 C16/20 SRC 8898 10

158 C16/20 SRC 8896 10

159 C16/20 SRC 8893 10

160 C16/20 SRC 8892 10

Page 408 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER "Inspection for Casting the ConcreteDESCRIPTION
Encasement and Surface Preperation prior to start DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for Storm C32/40 62% OPC+30%FA+8% MS - 220+/-20 No.
161 KAIG3-RFI-SW-C-6679-00 Site Work 8/15/2022 8974 (m³)
10
Water Line and Short piece for Gullies G-E-04, G-E-05, G-E-06, G-E-16, G-E-17 - As - SCREED
highlighted

C32/40 62% OPC+30%FA+8% MS - 220+/-20


162 KAIG3-RFI-SW-C-6727-00 Site Work 8/15/2022 Inspection of Concrete Pouring for the Footing and Kicker of SBC-07 - As Highlighted 8920 3
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


163 8973 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


164 8971 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


165 8967 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


166 8966 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


167 8965 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


168 8964 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


169 8963 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


170 8960 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


171 8959 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


172 8958 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
173 8955 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
174 8954 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
175 8952 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
176 8949 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
177 8944 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
178 8943 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
179 8942 10
- SCREED

Page 409 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF "Inspection of Casting the Concrete DESCRIPTION
Encasement and Surface Preperation prior to start LOAD /
SI No. RFI NUMBER DESIGN MIX Y NOTE
180 KAIG3-RFI-SW-C-6561-01 LOCATION
Site Work CASTING
8/15/2022 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) For Storm C16/20 SRC 8962 QUANTITY
10
No.
Water Line between MH-A-08 and G-A-23 As attached (m³)

181 C16/20 SRC 8961 10

182 C16/20 SRC 8956 4

183 C16/20 SRC 8948 10

184 C16/20 SRC 8947 10

Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (J-L/0-4 & L/4-
185 KAIG3-RFI-EC-S-8637-00 Energy Center 2 8/15/2022 C32/40 62% OPC+30%FA - 160+/-40 8957 3
6), at Energy Center 2, as highlighted area in attached drawing's.

186 C32/40 62% OPC+30%FA - 160+/-40 8953 11

South Small
187 KAIG3-RFI-SM-S-8564-00 8/15/2022 Concreting for 1st floor slab (stair) at south Small MOSQUE (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 8972 10
Mosque

188 C32/40 62% OPC+30%FA - 160+/-40 8970 10

189 C32/40 62% OPC+30%FA - 160+/-40 8969 10

190 C32/40 62% OPC+30%FA - 160+/-40 8968 10

"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from
191 KAIG3-RFI-SW-C-6780-00 Site Work 8/16/2022 C32/40 62% OPC+30%FA - 160+/-40 9032 10
C/FS/10 to C/FS/09 and C/FS/08 to C/FS/12 at Zone-C - As Highlighted"

192 C32/40 62% OPC+30%FA - 160+/-40 9021 10

193 C32/40 62% OPC+30%FA - 160+/-40 9019 10

194 C32/40 62% OPC+30%FA - 160+/-40 9018 10

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
195 KAIG3-RFI-SW-C-6779-00 Site Work 8/16/2022 C16/20 SRC 9014 10
B/TL/11 to C/TL/12 and C/TL/15 to C/TL/11 at Zone-C - As Highlighted

Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (A-C/0-6), at
196 KAIG3-RFI-EC-S-8666-00 Energy Center 8/16/2022 C32/40 62% OPC+30%FA - 160+/-40 9034 10
Energy Center 2, as highlighted area in attached drawing's.

197 C32/40 62% OPC+30%FA - 160+/-40 9033 10

198 C32/40 62% OPC+30%FA - 160+/-40 9030 10

Page 410 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
199 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
9027 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
200 C32/40 62% OPC+30%FA - 160+/-40 9025 (m³)
10

201 C32/40 62% OPC+30%FA - 160+/-40 9024 10

202 C32/40 62% OPC+30%FA - 160+/-40 9023 10

203 C32/40 62% OPC+30%FA - 160+/-40 9022 10

Concreting for walls ( W4, W5, W6, W7) at CAFETERIA zone 2A from level 862.00 C32/40 62% OPC+30%FA+8% MS - 220+/-20
204 KAIG3-RFI-CF-S-8682-00 Cafeteria 8/16/2022 9053 9
to 863.55 (as highlighted) - SCREED
Concreting for walls ( W4, W5, W6, W7) at CAFETERIA zone 2A from level 862.00
205 KAIG3-RFI-CF-S-8682-00 Cafeteria 8/16/2022 C32/40 62% OPC+30%FA - 160+/-40 9061 8
to 863.55 (as highlighted)

206 C32/40 62% OPC+30%FA - 160+/-40 9054 10

207 C32/40 62% OPC+30%FA - 160+/-40 9058 10

208 C32/40 62% OPC+30%FA - 160+/-40 9057 10

209 C32/40 62% OPC+30%FA - 160+/-40 9056 10

Concreting for MCPE 1 Suspended slab at axis 03S-03T TOC: 875.974 - 875.85 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
210 KAIG3-RFI-MC-S-8680-00 MCPE 8/17/2022 9116 10
highlighted) - SCREED

Concreting for walls (W22 ,W23, W24, W25, W26, W27) at CAFETERIA from level C32/40 62% OPC+30%FA+8% MS - 220+/-20
211 KAIG3-RFI-CF-S-8645-00 cafeteria 8/17/2022 9115 10
863.00 to level l 868.30 zone 2A (as highlighted) - SCREED

Concreting for Retaining Wall RC Foundation at Grid 01/C to 01/A level 866.10 Zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
212 KAIG3-RFI-CO-S-8403-00 Crescent 8/17/2022 9113 10
6 & 7 (as highlighted) at CRESCENT - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
213 9099 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
214 9094 10
- SCREED

Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from
215 KAIG3-RFI-SW-C-7579-00 Site Work 8/17/2022 C16/20 SRC 9097 5
B/FS/21 to C/FS/10 at Zone-B&C - As Highlighted

216 C16/20 SRC 9096 10

"Inspection of Thrust Block for Non-Potable Water Line ( Dia 160mm & 200mm) at
217 KAIG3-RFI-SW-C-6782-00 Site Work 8/17/2022 C32/40 62% OPC+30%FA - 160+/-40 9121 7
Zone-B,C,H - As Highlighted ( SCR : KAIG3-SCR-SW-C-0021-00 )"

Inspection of Thrust Block for RO Water Line ( Dia 200mm) at Zone-B,C,H - As


218 KAIG3-RFI-SW-C-6783-00 Site Work 8/17/2022 C32/40 62% OPC+30%FA - 160+/-40 9117 10
Highlighted ( SCR : KAIG3-SCR-SW-C-0021-00 )

Page 411 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
219 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
9114 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
220 C32/40 62% OPC+30%FA - 160+/-40 9111 (m³)
10

221 C32/40 62% OPC+30%FA - 160+/-40 9109 10

222 C32/40 62% OPC+30%FA - 160+/-40 9108 10

223 C32/40 62% OPC+30%FA - 160+/-40 9104 10

224 C32/40 62% OPC+30%FA - 160+/-40 9102 10

225 C32/40 62% OPC+30%FA - 160+/-40 9101 10

Concreting for Infill wall between Axis 01Q-01R-01S (as highlighted) Zone 1F (2 walls C32/40 62% OPC+30%FA+8% MS - 220+/-20
226 KAIG3-RFI-CO-S-8750-00 Crescent 8/20/2022 9314 10
only) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
227 9303 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
228 9301 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
229 9286 10
- SCREED
Concreting for ETFE PUMP ROOM for blinding under SOG axis 02-AD zone 2J
230 KAIG3-RFI-CO-S-8723-00 Crescent 8/20/2022 C16/20 SRC 9313 5
INNER (as highlighted) at CRESCENT

231 C16/20 SRC 9300 10

232 C16/20 SRC 9299 10

233 C16/20 SRC 9298 10

234 C16/20 SRC 9291 10

235 C16/20 SRC 9290 10

236 C16/20 SRC 9289 10

237 C16/20 SRC 9288 10

238 C16/20 SRC 9287 10

Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (13-15/D-H),
239 KAIG3-RFI-EC-S-8716-00 Energy Center 8/20/2022 C32/40 62% OPC+30%FA - 160+/-40 9316 10
Inside Energy Center 2, as highlighted area in attached drawing's.

Page 412 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
240 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
9311 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
241 C32/40 62% OPC+30%FA - 160+/-40 9308 10

242 C32/40 62% OPC+30%FA - 160+/-40 9307 10

243 C32/40 62% OPC+30%FA - 160+/-40 9306 10

244 C32/40 62% OPC+30%FA - 160+/-40 9305 11

245 C32/40 62% OPC+30%FA - 160+/-40 9302 11

246 C32/40 62% OPC+30%FA - 160+/-40 9297 11

247 C32/40 62% OPC+30%FA - 160+/-40 9296 11

248 C32/40 62% OPC+30%FA - 160+/-40 9295 11

249 C32/40 62% OPC+30%FA - 160+/-40 9294 10

250 C32/40 62% OPC+30%FA - 160+/-40 9293 10

Concreting for Ring beam Zone 1P Axis 01-AQ to 01-AP, inner and outer (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
251 KAIG3-RFI-CO-S-8712-00 Crescent 8/21/2022 9391 10
highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
252 9389 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
253 9386 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
254 9384 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
255 9383 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
256 9382 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
257 9381 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
258 9341 2
- SCREED

Inspection for casting concrete for short piece and Surface Preperation prior to start
259 KAIG3-RFI-SW-C-6903-00 Site Work 8/21/2022 waterproofing for short piece and Application of Primer (1st Coat, 2nd Coat and 3rd C32/40 62% OPC+30%FA - 160+/-40 9361 10
Coat) for MH-M-05 and MH-M-06 (As Highlighted)

260 KAIG3-RFI-SW-C-6931-00 Site Work 8/21/2022 Inspection of Concrete Pouring for the Upstand of SBC-08 (Left Side) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 9360 10

Page 413 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI261
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y 9355
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

262 C32/40 62% OPC+30%FA - 160+/-40 9348 10

263 C32/40 62% OPC+30%FA - 160+/-40 9345 10

264 C32/40 62% OPC+30%FA - 160+/-40 9343 10

Concrete Pouring & Shuttering for Columns (2nd lift, above the level +872.35) of
265 KAIG3-RFI-EC-S-8667-01 Energy center 8/21/2022 Boundary Wall @ Grid (M/17-22), at Energy Center 2, as highlighted area in attached C32/40 67%OPC+25%FA - 160+/-40 9347 9
drawing's.
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
266 KAIG3-RFI-SW-C-6919-00 Site Work 8/21/2022 C16/20 SRC 9385 5
40 and POC-44 at Zone-G&K - as highlighted

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
267 KAIG3-RFI-SW-C-6957-00 Site Work 8/22/2022 C16/20 SRC 9466 10
ISC-14, NPW-ISC-16 and NPW-ISC-18 at Zone-B&G - as highlighted

268 C16/20 SRC 9438 10

269 C16/20 SRC 9437 10

270 C16/20 SRC 9428 10

271 C16/20 SRC 9427 10

Concreting for MCPE 3 WALL & counterfort at axis 03A (as highlighted) Zone 2E & C32/40 62% OPC+30%FA+8% MS - 220+/-20
272 KAIG3-RFI-MC-S-8761-00 MCPE 8/22/2022 9470 9
2F level 874.5 & 874.55 - SCREED

Concreting for ETFE PUMP ROOM for SOG axis 02-AD zone 2J (as highlighted) at C32/40 62% OPC+30%FA+8% MS - 220+/-20
273 KAIG3-RFI-CO-S-8773-00 Crescent 8/22/2022 9469 10
CRESCENT - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


274 9468 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


275 9467 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


276 9464 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
278 9426 10
- SCREED

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/25, C/MV/22,
279 KAIG3-RFI-SW-C-6945-00 Site Work 8/22/2022 C32/40 62% OPC+30%FA - 160+/-40 9442 5
C/MV/38, C/MV/08, G/MV/37 at Zone-C&G at Zone-C&G (As Highlighted)

280 C32/40 62% OPC+30%FA - 160+/-40 9440 10

Page 414 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
"Inspection for Blinding Concrete under MV Line Pit - E/MV/02, E/MV/05, D/MV/04, DELIVER
BUILDING/ DATE OF LOAD /
SI281
No. RFI NUMBER
KAIG3-RFI-SW-C-6979-00 Site Work 8/23/2022 DESCRIPTION DESIGN MIX
C16/20 SRC Y 9538
NOTE 7
LOCATION CASTING D/MV/32, D/MV/03, D/MV/08, D/MV/33, D/MV/31 and D/MV/17 at Zone-E&D (As QUANTITY
No.
Highlighted) " (m³)

282 C16/20 SRC 9532 10

283 C16/20 SRC 9510 10

284 C16/20 SRC 9507 10

285 C16/20 SRC 9505 10

Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (B/7-11B & C/4-5),
286 KAIG3-RFI-EC-S-8743-00 Energy Center 8/23/2022 C32/40 62% OPC+30%FA - 160+/-40 9546 10
Inside Energy Center 2, as highlighted area in attached drawing's.

287 C32/40 62% OPC+30%FA - 160+/-40 9528 10

288 C32/40 62% OPC+30%FA - 160+/-40 9522 10

289 C32/40 62% OPC+30%FA - 160+/-40 9521 11

290 C32/40 62% OPC+30%FA - 160+/-40 9519 10

291 C32/40 62% OPC+30%FA - 160+/-40 9518 11

292 C32/40 62% OPC+30%FA - 160+/-40 9517 10

293 C32/40 62% OPC+30%FA - 160+/-40 9515 10

294 C32/40 62% OPC+30%FA - 160+/-40 9514 10

South Small Concreting for columns (C1,C2A,C2B,C3A,C3B)at south Small MOSQUE from level C32/40 62% OPC+30%FA+8% MS - 220+/-20
295 KAIG3-RFI-SM-S-8781-00 8/23/2022 9560 10
Mosque 873,15 up to level 876.25 & level 876.05 and 876.40 (as highlighted) ZONE 2B - SCREED

Concreting for Internal Building coumns (C11, C10, C9, C69) between axis 02BA to C32/40 62% OPC+30%FA+8% MS - 220+/-20
296 KAIG3-RFI-CO-S-8846-00 Crescent 8/23/2022 9554 10
02AZ (as highlighted) Zone 2R - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
297 9550 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
298 9549 10
- SCREED

Page 415 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
STRENGHT
C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER TRUCK
299 BUILDING/ DATE OF 9542 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION - SCREED
DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
C32/40 62% OPC+30%FA+8% MS - 220+/-20 No.
300 9523 (m³)
10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
301 9520 6
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
9509 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
302 9506 4
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
303 KAIG3-RFI-CO-S-8789-00 Crescent 8/23/2022 Concreting for (1) Infill wall between Axis 01Q-01R (as highlighted) Zone 1F 9547 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


304 9544 10
- SCREED

305 KAIG3-RFI-CO-S-8705-00 Crescent 8/24/2022 Concreting for Infill Wall at Zone 2R TIP WALL upto 873.475 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 9593 8

Concrete pouring for Blinding of Fountain (3 ) Inside Physic Garden, as per highlighted
306 KAIG3-RFI-PG-S-8794-00 Physics Garden 8/24/2022 C16/20 SRC 9595 10
area in attached drawing's.

307 C16/20 SRC 9594 10

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - G/MV/08, G/MV/09,
308 KAIG3-RFI-SW-C-6966-00 Site Work 8/24/2022 C16/20 SRC 9621 7
G/MV/34, G/MV/35 and G/MV/36 at Zone-G (As Highlighted)

Concrete Pouring for Blinding Under the Fountain at Geyser Garden, inside water
309 KAIG3-RFI-WG-S-8798-00 Water garden 8/25/2022 C16/20 SRC 9652 3
Garden, as highlighted area in attached drawing's.

310 C16/20 SRC 9648 4

311 C16/20 SRC 9647 10

Shuttering and Concreting for Energy Center Columns (TOC 875.00) at Grid 22 to 28 M
312 KAIG3-RFI-EC-S-8829-00 Energy Center 8/25/2022 C32/40 62% OPC+30%FA - 160+/-40 9623 11
(as highlighted)

Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (B/7-11B), at
313 KAIG3-RFI-EC-S-8467-00 Energy Center 8/3/2022 C16/20 SRC 8384 10
Energy Center 2, as highlighted area in attached drawing's.

314 C16/20 SRC 8383 10

Concerting for Infill inner wall at Crescent between axis (02-H & 02-G) (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
315 KAIG3-RFI-CO-S-8472-00 Crescent 8/3/2022 8382 2
highlighted) ZONE 2C - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
316 8380 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
317 8373 10
- SCREED
Page 416 of 537
Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid LOAD /
SI318
No. RFI NUMBER
KAIG3-RFI-EC-S-8424-00 Energy Center 8/3/2022 DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y 8379
NOTE 11
LOCATION CASTING (21-28/M), at Energy Center 2, as highlighted area in attached drawing's. QUANTITY
No.
(m³)
Concreting of MCPE 3 for blinding under ground slab between axis 02/S, 03-1 to 02-2 ,
319 KAIG3-RFI-MC-S-8442-00 MCPE 8/3/2022 03/B, 03-1 to 02-2 & 02/Q, 03-1 to 02-2 , 02/P, 03-1 to 02-2 Zone 2E 2F (as C16/20 SRC 8381 3
highlighted)

320 C16/20 SRC 8378 6

321 C16/20 SRC 8377 10

Concrete Pouring & Shuttering for Columns (above the level +872.35) of Boundary Wall
322 KAIG3-RFI-EC-S-8422-01 Energy Center 8/3/2022 C32/40 67%OPC+25%FA - 160+/-40 8376 9
@ Grid (R/18-22), at Energy Center 2, as highlighted area in attached drawing's.

"Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
323 KAIG3-RFI-SW-C-6520-00 Site Work 8/3/2022 C16/20 SRC 8375 10
ISC-10, NPW-ISC-11,NPW-ISC-09, POC-06 at Zone-B - as highlighted "

324 C16/20 SRC 8374 10

Concreting for internal building (walls & coumns, C10, C11,C25,C36,C49, C50, W3,
C32/40 62% OPC+30%FA+8% MS - 220+/-20
325 KAIG3-RFI-CO-S-8759-00 Crescent 8/25/2022 W14, W15) of NORTH ADMINSTRATION between axis 02-BA to 02-AZ (as 9653 10
- SCREED
highlighted) Zone 2R 873.725 & 873.075

C32/40 62% OPC+30%FA+8% MS - 220+/-20


326 9651 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


327 9649 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


328 9646 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


329 9638 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


330 9640 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


331 9639 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
332 9628 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
333 9619 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


334 9611 10
- SCREED

Page 417 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for internal building (walls & coumns, C10, C11,C25,C36,C49, C50, W3, LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
335 KAIG3-RFI-CO-S-8759-00 LOCATION
Crescent CASTING
8/25/2022 W14, W15) of NORTH ADMINSTRATION between axis 02-BA to 02-AZ (as C32/40 62% OPC+30%FA - 160+/-40 9650 QUANTITY
4
No.
highlighted) Zone 2R 873.725 & 873.075 (m³)

336 C32/40 62% OPC+30%FA - 160+/-40 9645 10

337 C32/40 62% OPC+30%FA - 160+/-40 9644 10

338 C32/40 62% OPC+30%FA - 160+/-40 9643 10

339 C32/40 62% OPC+30%FA - 160+/-40 9642 10

340 C32/40 62% OPC+30%FA - 160+/-40 9641 10

341 KAIG3-RFI-CO-S-8858-00 Crescent 8/27/2022 Concreting for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6 C32/40 62% OPC+30%FA - 160+/-40 9685 10

342 KAIG3-RFI-CO-S-8858-00 Crescent 8/27/2022 Concreting for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6 C32/40 62% OPC+30%FA - 160+/-40 9720 7

343 C32/40 62% OPC+30%FA - 160+/-40 9710 5

344 C32/40 62% OPC+30%FA - 160+/-40 9705 10

345 C32/40 62% OPC+30%FA - 160+/-40 9706 10

346 C32/40 62% OPC+30%FA - 160+/-40 9694 7

347 C32/40 62% OPC+30%FA - 160+/-40 9691 7

C32/40 62% OPC+30%FA+8% MS - 220+/-20


348 KAIG3-RFI-CO-S-8858-00 Crescent 8/27/2022 Concreting for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6 9699 6
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


349 9686 10
- SCREED

Concreting for MCPE 1 duct tunnel Blinding under foundation at axis 03U, 03S, 03T, C32/40 62% OPC+30%FA+8% MS - 220+/-20
350 KAIG3-RFI-MC-S-8776-00 MCPE 8/28/2022 9766 7
03-1 to 02-2 Zone 2M 2N (as highlighted) - SCREED
Concreting for MCPE 1 Suspended Slab at Axis 03T-03U, 03-1 to 03-2 (as per KAIG3-
351 KAIG3-RFI-MC-S-8886-00 MCPE 8/28/2022 C32/40 62% OPC+30%FA - 160+/-40 9804 2
SCR-CO-S-0138-01) As highlighted

352 C32/40 62% OPC+30%FA - 160+/-40 9803 10

Page 418 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI353
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y 9801
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
354 C32/40 62% OPC+30%FA - 160+/-40 9800 10

355 C32/40 62% OPC+30%FA - 160+/-40 9799 10

356 C32/40 62% OPC+30%FA - 160+/-40 9794 10

357 C32/40 62% OPC+30%FA - 160+/-40 9790 10

358 C32/40 62% OPC+30%FA - 160+/-40 9786 10

359 C32/40 62% OPC+30%FA - 160+/-40 9785 10

Inspection for Casting the Concrete encasement and Surface Preperation prior to start
360 KAIG3-RFI-SW-C-7039-00 Site Work 8/28/2022 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) Concrete C16/20 SRC 9777 7
encasement of storm water pipe As highlighted

Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/17 at Zone-
361 KAIG3-RFI-SW-C-7023-00 Site Work 8/28/2022 C32/40 62% OPC+30%FA - 160+/-40 9770 10
D (As Highlighted)

362 C32/40 62% OPC+30%FA - 160+/-40 9769 10

363 C32/40 62% OPC+30%FA - 160+/-40 9768 10

364 C32/40 62% OPC+30%FA - 160+/-40 9767 10

"Inspection for Blinding Concrete under MV Line Pit - D/MV/18 at Zone-D (As
365 KAIG3-RFI-SW-C-7040-00 Site Work 8/29/2022 C16/20 SRC 9851 10
Highlighted) "

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
366 KAIG3-RFI-SW-C-7080-00 Site Work 8/29/2022 C16/20 SRC 9849 5
G/DH/04, G/DH/05 and G/DC/06 at Zone-G - as highlighted

367 C16/20 SRC 9848 10

368 C16/20 SRC 9840 10

369 C16/20 SRC 9839 10

Concrete pouring for Blinding of boundary wall at Span 47 of Water Garden, as per
370 KAIG3-RFI-WG-S-8910-00 Water Garden 8/29/2022 C16/20 SRC 9850 6
highlighted Attached Drawings.
Concreting for MCPE 1 duct tunnel Blinding under foundation at axis 03U, 03S, 03T,
371 KAIG3-RFI-MC-S-8776-00 MCPE 8/29/2022 C16/20 SRC 9862 7
03-1 to 02-2 Zone 2M 2N (as highlighted)

Page 419 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI372
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y 9860
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
373 C16/20 SRC 9859 10

374 KAIG3-RFI-CO-S-8909-00 Crescent 8/29/2022 Concreting for Infill wall between axis 01P-01Q (as highlighted) Zone 1F C32/40 67%OPC+25%FA - 160+/-40 9842 11

375 C32/40 67%OPC+25%FA - 160+/-40 9841 11

North Concreting for internal RC foundation of NORTH ADMINSTRATION building at


376 KAIG3-RFI-CO-S-8914-00 8/29/2022 C32/40 62% OPC+30%FA - 160+/-40 9857 8
Administration CRESCENT between axis 02-BA to 02-AZ (as highlighted) Zone 2R

377 C32/40 62% OPC+30%FA - 160+/-40 9856 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


378 KAIG3-RFI-CO-S-8909-00 Crescent 8/29/2022 Concreting for Infill wall between axis 01P-01Q (as highlighted) Zone 1F 9864 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
379 9863 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
380 9861 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
381 9858 10
- SCREED
Concretring for plain concrete for Devonian Garden between axis 02-AO to 02-AM
382 KAIG3-RFI-VG-S-8903-00 Devonian Garden 8/30/2022 C16/20 SRC 9915 4
zone 2M (as highlighted) at CRESCENT

383 C16/20 SRC 9903 10

"Inspection for Blinding Concrete under MV Line Pit - C/MV/13 and C/MV/20 at Zone-
384 KAIG3-RFI-SW-C-7119-00 Site Work 8/30/2022 C16/20 SRC 9916 10
C (As Highlighted) "

385 C16/20 SRC 9904 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


386 KAIG3-RFI-CO-S-8947-00 Crescent 8/30/2022 Concreting for Infill wall beam (inner) at axis 02R - 02S Zone 2F (as highlighted) 9908 3
- SCREED

Concreting for MCPE 3 wall & counterfort Zone 2E 2F at axis 02-R to 03-A, 02-2 to C32/40 62% OPC+30%FA+8% MS - 220+/-20
387 KAIG3-RFI-MC-S-8917-00 MCPE 8/31/2022 9982 11
03-1 ,from LEVEL 871 to 875.55 & 874.5 (as highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


388 9980 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
389 9978 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
390 9977 10
- SCREED

Page 420 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI391
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y 9968
NOTE 10
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
392 9961 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
393 9960 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
394 9959 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
395 9958 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
396 9957 10
- SCREED

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
397 KAIG3-RFI-SW-C-7120-00 Site Work 8/31/2022 C16/20 SRC 9969 10
G/DC/15, G/DC/08, G/DC/16, K/DC/01, K/DC/02 at Zone-G&K - as highlighted

398 C16/20 SRC 9967 10

Concreting for Internal Building foundation (P1 & P7) at Zone 2R axis 02BA - 02AZ (as
399 KAIG3-RFI-CO-S-8995-00 Crescent 8/2/2022 C16/20 SRC 8345 10
highlighted)

400 C16/20 SRC 8339 10

Concreting for ETFE PUMP ROOM Slab on Grade at axis 02-AR zone 2N (as
401 KAIG3-RFI-CO-S-8640-00 Crescent 8/13/2022 C16/20 SRC 8829 5
highlighted) at CRESCENT, KAIG3-SCR-CO-S-0193-00
Shuttering for plain concrete at DEVONIAN GARDEN zone 2M BETWEEN axis 02-
402 KAIG3-RFI-CO-S-8560-00 Devonian Garden 8/17/2022 C16/20 SRC 9095 5
AN & 02-AL (as highlighted)
Concreting for Ring beam Zone 1P Axis 01-AQ to 01-AP, inner and outer (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
403 KAIG3-RFI-CO-S-8712-00 Crescent 8/20/2022 9304 10
highlighted), - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
404 9292 10
- SCREED
Concreting for ETFE PUMP ROOM Slab on Grade at axis 01-I zone 1C (as highlighted)
405 KAIG3-RFI-CO-S-8816-00 Crescent 8/22/2022 C16/20 SRC 9465 10
at CRESCENT TOC 869.20, KAIG3-SCR-CO-S-0193-00

406 C16/20 SRC 9446 4

407 C16/20 SRC 9436 10

408 C16/20 SRC 9429 10

Concreting for ETFE PUMP ROOM Slab on Grade at axis 02-AN zone 2M (as
409 KAIG3-RFI-CO-S-8801-00 Crescent 8/23/2022 C16/20 SRC 9543 10
highlighted) at CRESCENT, KAIG3-SCR-CO-S-0193-00

410 C16/20 SRC 9541 10

Page 421 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for MCPE 1 duct tunnel DESCRIPTION
Blinding under foundation at axis 03U, 03S, 03T, LOAD /
SI411
No. RFI NUMBER
KAIG3-RFI-MC-S-8776-00 MCPE 8/24/2022 DESIGN MIX
C16/20 SRC Y 9592
NOTE 10
LOCATION CASTING 03-1 to 02-2 Zone 2M 2N (as highlighted) QUANTITY
No.
(m³)

412 C16/20 SRC 9588 10

413 C16/20 SRC 9587 10

"Inspection of Concrete Pouring for the Wall and Slab of SBC-07 (Right Side) - As
414 KAIG3-RFI-SW-C-6960-00 Site Work 8/24/2022 C16/20 SRC 9591 10
Highlighted"

415 C16/20 SRC 9590 10

416 C16/20 SRC 9589 10

Concrete Design Mix Quantity m3

1335
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - SCREED

1447
C32/40 62% OPC+30%FA - 160+/-40

C16/20 SRC 1030

C32/40 67%OPC+25%FA - 160+/-40 51

TOTAL QUANTITY TRUCK LOAD (M³): 3863.00

Prepared by: Glenn Abadiano Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

Page 422 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER 28 DAYS
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE 7 AND
LOCATION CASTING QUANTITY
No. DAYS MORE THAN 28
(m³)
DAYS
Inspection for Casting the Blinding concrete under the manhole for FW-A-3-7-4; FW-A-
1 KAIG3-RFI-SW-C-7125-00 Site Work 9/1/2022 C16/20 SRC 10035 10
3-7-3 (as highlighted)

Inspection for casting concrete for short piece and Surface Preperation prior to start
2 KAIG3-RFI-SW-C-7083-00 Site Work 9/1/2022 waterproofing for short piece and Application of Primer (1st Coat, 2nd Coat and 3rd C16/20 SRC 10033 10
Coat) for FW-A-3-7, FW-A-3-7.1 and FW-A-3-7.2 (As Highlighted)

3 C16/20 SRC 10031 10

4 C16/20 SRC 10030 10

5 C16/20 SRC 10028 10

6 C16/20 SRC 10022 10

7 C16/20 SRC 10020 10

Concreting for Infill wall at zone 2R axis 02BB to 02BC (BOI 127-128) (AS C32/40 62% OPC+30%FA+8% MS - 220+/-20
8 KAIG3-RFI-CO-S-8977-00 Crescent 9/1/2022 10047 8
HIGHLIGHTED) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
9 10046 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
10 10045 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
11 10042 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


12 10039 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


13 10038 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
14 10034 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
15 10024 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
16 10023 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
17 10021 10
- SCREED
Shuttering and Concreting for Energy Center Beams at Grid 0-14-I, 7 to 11-A (as
18 KAIG3-RFI-EC-S-9022-00 Energy Center 9/1/2022 C32/40 62% OPC+30%FA - 160+/-40 10037 4
highlighted) 875.35

Page 423 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
19 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
10032 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
20 C32/40 62% OPC+30%FA - 160+/-40 10027 10

21 C32/40 62% OPC+30%FA - 160+/-40 10026 10

22 C32/40 62% OPC+30%FA - 160+/-40 10025 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


23 KAIG3-RFI-CO-S-8989-00 Crescent 9/3/2022 Concreting for outer Infill wall between Axis 02D-02E (as highlighted) Zone 2B 10111 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


24 10110 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


25 10104 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


26 10102 10
- SCREED

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
27 KAIG3-RFI-SW-C-7152-00 Site Work 9/3/2022 C16/20 SRC 10106 10
44 at Zone-K - as highlighted

Shuttering and Concreting for Energy Center Columns (37 nos) at Grid 29 to 30 N - R
28 KAIG3-RFI-EC-S-8940-00 Energy Center 9/3/2022 C32/40 67%OPC+25%FA - 160+/-40 10115 8
(as highlighted)

29 C32/40 67%OPC+25%FA - 160+/-40 10113 11

30 C32/40 67%OPC+25%FA - 160+/-40 10112 11

31 C32/40 67%OPC+25%FA - 160+/-40 10105 10

Concreting for Internal Building foundation (P1 & P7) at Zone 2R axis 02BA - 02AZ (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
32 KAIG3-RFI-CO-S-8995-00 Crescent 9/3/2022 10122 10
highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
33 10029 10
- SCREED
Inspection of Concrete Pouring for the Footing and Walls of SBC-07 - Wing Wall - As
34 KAIG3-RFI-SW-C-7050-00 Site Work 9/3/2022 C32/40 62% OPC+30%FA - 160+/-40 10121 10
Highlighted

35 KAIG3-RFI-SW-C-6931-00 Site Work 9/3/2022 Inspection of Concrete Pouring for the Upstand of SBC-08 (Left Side) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 10120 10

36 C32/40 62% OPC+30%FA - 160+/-40 10117 10

Promenade & Concreting for Central Bridge Abutment Wall (as highlighted) Zone 4 Grid 02AK level
37 KAIG3-RFI-PC-S-9058-00 9/3/2022 C32/40 62% OPC+30%FA - 160+/-40 10126 5
canopies 864.60 to 869.70

38 C32/40 62% OPC+30%FA - 160+/-40 10125 10

39 C32/40 62% OPC+30%FA - 160+/-40 10124 10

Page 424 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI40
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y10123
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
41 C32/40 62% OPC+30%FA - 160+/-40 10119 10

42 C32/40 62% OPC+30%FA - 160+/-40 10118 10

Shuttering and Concreting for Energy Center Columns (37 nos) at Grid 29 to 30 N - R
43 KAIG3-RFI-EC-S-8940-00 Energy Center 9/3/2022 C32/40 62% OPC+30%FA - 160+/-40 10103 10
(as highlighted)
Concrete Pouring for Fountain 1, At Inner Side of Plant room, Inside Physic Garden, as
44 KAIG3-RFI-PG-S-8961-00 Physics Garden 9/4/2022 C32/40 62% OPC+30%FA - 160+/-40 10179 10
highlighted in attached drawing's.

45 C32/40 62% OPC+30%FA - 160+/-40 10178 10

46 C32/40 62% OPC+30%FA - 160+/-40 10177 11

C32/40 62% OPC+30%FA+8% MS - 220+/-20


47 KAIG3-RFI-CO-S-9061-00 Crescent 9/4/2022 Concreting for (1) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F 10195 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
48 10194 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
49 10193 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
50 10190 10
- SCREED

Concreting for ETFE PUMP ROOM for blinding under SOG axis 02L zone 2D (as
51 KAIG3-RFI-CO-S-9076-00 Crescent 9/4/2022 C16/20 SRC 10192 10
highlighted) at CRESCENT, (KAIG3-SCR-CO-S-0193-00)

52 C16/20 SRC 10191 10

Concreting for Kicker of Infill wall for Zone 1A between Axis 01A-01B-01C-01D (PC
53 KAIG3-RFI-CO-S-8928-00 Crescent 9/5/2022 C32/40 62% OPC+30%FA - 160+/-40 10249 10
1-3-5, 2-4-6-8) (as highlighted)

54 C32/40 62% OPC+30%FA - 160+/-40 10248 10

55 C32/40 62% OPC+30%FA - 160+/-40 10247 10

56 C32/40 62% OPC+30%FA - 160+/-40 10246 10

57 C32/40 62% OPC+30%FA - 160+/-40 10245 10

58 C32/40 62% OPC+30%FA - 160+/-40 10243 4

59 C32/40 62% OPC+30%FA - 160+/-40 10241 11

60 C32/40 62% OPC+30%FA - 160+/-40 10238 8

Page 425 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
61 C32/40 62% OPC+30%FA - 160+/-40 DELIVER
10237 10 /
BUILDING/ DATE OF LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
62 C32/40 62% OPC+30%FA - 160+/-40 10236 (m³)
10

63 C32/40 62% OPC+30%FA - 160+/-40 10233 10

64 C32/40 62% OPC+30%FA - 160+/-40 10231 10

65 C32/40 62% OPC+30%FA - 160+/-40 10227 10

66 C32/40 62% OPC+30%FA - 160+/-40 10226 10

67 C32/40 62% OPC+30%FA - 160+/-40 10225 10

68 C32/40 62% OPC+30%FA - 160+/-40 10224 10

69 C32/40 62% OPC+30%FA - 160+/-40 10223 10

70 C32/40 62% OPC+30%FA - 160+/-40 10222 10

71 C32/40 62% OPC+30%FA - 160+/-40 10221 10

72 KAIG3-RFI-CO-S-9002-00 Crescent 9/5/2022 Concreting of Blinding for strip footing between PC 194-196 zone 2R (as highlighted) C16/20 SRC 10244 10

73 C16/20 SRC 10242 10

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
74 IG3-RFI-SW-C-7270-00 Site Works 9/6/2022 G/DH/02, G/DH/21, G/DC/01, G/DC/03, G/DC/20, G/DC/22 at Zone-B&G - as C16/20 SRC 10310 5
highlighted

75 C16/20 SRC 10301 10

76 C16/20 SRC 10295 10

77 C16/20 SRC 10287 10

78 C16/20 SRC 10285 10

Concreting for MCPE 2 Suspended Slab (as highlighted) Axis 031-I, TOC varies as C32/40 62% OPC+30%FA+8% MS - 220+/-20
79 KAIG3-RFI-MC-S-9131-00 MCPE 9/6/2022 10327 6
attached in the plan, Zone 2H - SCREED
Concreting for Internal Building Columns and Wall at Zone 2R C56, C 57, C70, C71, C32/40 62% OPC+30%FA+8% MS - 220+/-20
80 KAIG3-RFI-CO-S-9133-00 Crescent 9/6/2022 10326 5
W16 (as highlighted) upto bottom of Slab - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
81 10290 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
82 10282 8
- SCREED

Page 426 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
Concreting for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (2nd DELIVER
83 KAIG3-RFI-VG-S-9103-00 Devonian Garden
BUILDING/ 9/6/2022
DATE OF C32/40 62% OPC+30%FA - 160+/-40 10307 10 /
LOAD
SI No. RFI NUMBER part) zone 2M DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
84 C32/40 62% OPC+30%FA - 160+/-40 10306 10

85 C32/40 62% OPC+30%FA - 160+/-40 10300 10

86 C32/40 62% OPC+30%FA - 160+/-40 10299 10

87 C32/40 62% OPC+30%FA - 160+/-40 10298 10

88 C32/40 62% OPC+30%FA - 160+/-40 10293 10

89 C32/40 62% OPC+30%FA - 160+/-40 10291 10

90 C32/40 62% OPC+30%FA - 160+/-40 10289 10

91 C32/40 62% OPC+30%FA - 160+/-40 10288 10

92 C32/40 62% OPC+30%FA - 160+/-40 10286 10

93 C32/40 62% OPC+30%FA - 160+/-40 10284 10

94 C32/40 62% OPC+30%FA - 160+/-40 10283 10

"Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/11 at
95 KAIG3-RFI-SW-C-7212-00 Site works 9/6/2022 C32/40 62% OPC+30%FA - 160+/-40 10314 4
Zone-B (As Highlighted) "

96 C32/40 62% OPC+30%FA - 160+/-40 10313 10

Concrete Pouring & Shuttering for Footing of Boundary Wall at Span 47 of Water
97 KAIG3-RFI-WG-S-9114-00 Water Garden 9/6/2022 C32/40 62% OPC+30%FA - 160+/-40 10328 7
Garden, as highlighted area in attached drawing's.

98 C32/40 62% OPC+30%FA - 160+/-40 10324 10

Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 3A As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
99 KAIG3-RFI-TB-S-9122-00 Ticketing Booth 9/6/2022 10325 8
Highlighted Drawing's. - SCREED

Concreting for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F,Axis 03A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
100 KAIG3-RFI-MC-S-9168-00 MCPE 9/7/2022 10355 10
highlighted) TOC 874.80 - SCREED

Concreting for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F,Axis 03A (as
101 KAIG3-RFI-MC-S-9168-00 MCPE 9/7/2022 C32/40 62% OPC+30%FA - 160+/-40 10365 9
highlighted) TOC 874.80

Page 427 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
102 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 10364 LOAD
11 /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
103 C32/40 62% OPC+30%FA - 160+/-40 10363 10

104 C32/40 62% OPC+30%FA - 160+/-40 10362 10

105 C32/40 62% OPC+30%FA - 160+/-40 10361 10

106 C32/40 62% OPC+30%FA - 160+/-40 10360 10

107 C32/40 62% OPC+30%FA - 160+/-40 10359 10

108 C32/40 62% OPC+30%FA - 160+/-40 10358 10

109 C32/40 62% OPC+30%FA - 160+/-40 10357 10

110 C32/40 62% OPC+30%FA - 160+/-40 10356 10

Concrete Pouring & Shuttering for Footings & Grade Beams @ Grid (K/4-13), at Energy
111 KAIG3-RFI-EC-S-9151-00 Energy Center 9/8/2022 C32/40 62% OPC+30%FA - 160+/-40 10408 10
Center 2, as highlighted area in attached drawing's.

112 C32/40 62% OPC+30%FA - 160+/-40 10406 10

113 C32/40 62% OPC+30%FA - 160+/-40 10405 10

114 C32/40 62% OPC+30%FA - 160+/-40 10404 10

115 C32/40 62% OPC+30%FA - 160+/-40 10403 10

116 C32/40 62% OPC+30%FA - 160+/-40 10402 10

117 C32/40 62% OPC+30%FA - 160+/-40 10401 11

118 C32/40 62% OPC+30%FA - 160+/-40 10399 11

Concreting for Tunnel 1 wall and suspended Slab part-C (as Highlighted) Zone 2H
119 KAIG3-RFI-CO-S-9170-00 Crescent 9/8/2022 C32/40 62% OPC+30%FA - 160+/-40 10409 7
869.35

120 KAIG3-RFI-CO-S-9175-00 Crescent 9/8/2022 Concreting for (1 mid) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F C32/40 62% OPC+30%FA - 160+/-40 10400 10

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
121 KAIG3-RFI-SW-C-7287-00 Site Works 9/8/2022 C16/20 SRC 10425 10
F/DH/04, F/DC/01, F/DC/05 at Zone-F&G - as highlighted

Page 428 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
122 BUILDING/ DATE OF C16/20 SRC 10407 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
123 KAIG3-RFI-CO-S-9175-00 Crescent 9/8/2022 Concreting for (1 mid) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F 10430 7
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
124 10427 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
125 10424 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
126 10417 10
- SCREED
Concreting for Tunnel 1 wall and suspended Slab part-C (as Highlighted) Zone 2H C32/40 62% OPC+30%FA+8% MS - 220+/-20
127 KAIG3-RFI-CO-S-9170-00 Crescent 9/8/2022 10429 5
869.35 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
128 KAIG3-RFI-CO-S-9175-00 Crescent 9/8/2022 Concreting for (1 mid) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F 10428 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
129 10426 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
130 10421 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
131 10419 10
- SCREED
Concreting for ETFE PUMP ROOM for Plain Concrete under SOG at Zone 2E axis 02Q
132 KAIG3-RFI-CO-S-9173-01 Crescent 9/8/2022 C16/20 SRC 10423 10
(as highlighted) (KAIG3-SCR-CO-S-0193-00)

133 C16/20 SRC 10422 10

Concreting for Plain Concrete of Devonian Garden under AHU Foundation at zone 2M
134 KAIG3-RFI-VG-S-9209-00 Devonian Garden 9/10/2022 C16/20 SRC 10477 10
(as highlighted) (3rd)
Concrete Pouirng & Shuttering for Columns (above the level +872.35) of Boundary Wall
135 KAIG3-RFI-EC-S-9181-00 Energy Center 9/10/2022 @ Grid (28-30/M-N) (20 no's), at Energy Center 2, as highlighted area in attached C32/40 67%OPC+25%FA - 160+/-40 10463 11
drawing's.

Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05,
136 KAIG3-RFI-SW-C-6981-00 Site Works 9/10/2022 C32/40 62% OPC+30%FA - 160+/-40 10472 10
D/MV/04, D/MV/32 and D/MV/03 at Zone-E&D (As Highlighted)

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/19,


137 KAIG3-RFI-SW-C-7218-00 Site Works 9/10/2022 C32/40 62% OPC+30%FA - 160+/-40 10471 10
L/MV/16, L/MV/05 and L/MV/01 at Zone-H&L (As Highlighted)

138 C32/40 62% OPC+30%FA - 160+/-40 10466 5

139 C32/40 62% OPC+30%FA - 160+/-40 10465 10

140 C32/40 62% OPC+30%FA - 160+/-40 10464 10

Concrete Pouring & Shuttering for Kicker (1st Lift) of Boundary Wall at Span 47 of
141 KAIG3-RFI-WG-S-9200-00 Water Garden 9/10/2022 C32/40 62% OPC+30%FA - 160+/-40 10470 9
Water Garden, as highlighted area in attached drawing's.

Page 429 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
6 /
SI142
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y10467
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
Inspection for Casting the Blinding Concrete under the Manhole MH-O-11 and gullies
143 KAIG3-RFI-SW-C-7284-00 Site Works 9/10/2022 C16/20 SRC 10469 10
G-O-10, G-O-11 and G-O-12 - as Highlighted

144 C16/20 SRC 10468 10

Concrete Pouring & Shuttering for walls of New Ticketing Booth # 6A, As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
145 KAIG3-RFI-TB-S-9202-00 Ticketing Booth 9/10/2022 10476 5
Highlighted Drawing's. - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


146 10475 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


147 10473 11
- SCREED

148 KAIG3-RFI-CO-S-9002-00 Crescent 9/10/2022 Concreting of Blinding for strip footing between PC 194-196 zone 2R (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 10474 10

Concreting for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F,Axis 03A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
149 KAIG3-RFI-MC-S-9168-00 MCPE 9/10/2022 10479 5
highlighted) TOC 874.80 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
150 10478 10
- SCREED
Concreting for Retaining wall Blinding under foundation in Zone 5 at axis 01C - 01E (as
151 KAIG3-RFI-CO-S-9177-00 Crescent 9/11/2022 C16/20 SRC 10494 7
highlighted)
Inspection for Casting the Concrete encasement for mv line form G/MV/21 to G/MV/37
152 KAIG3-RFI-SW-C-7319-00 Site Works 9/11/2022 C16/20 SRC 10509 10
As highlighted

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
153 KAIG3-RFI-SW-C-7353-00 Site Works 9/11/2022 C16/20 SRC 10508 10
C/TL/12 to C/TL/15 at Zone-C - As Highlighted

154 C16/20 SRC 10495 10

Inspection of Concrete Pouring for Wall of MV Line Pit - E/MV/02, E/MV/05, E/MV/01
155 KAIG3-RFI-SW-C-7228-01 Site Works 9/11/2022 C32/40 62% OPC+30%FA - 160+/-40 10517 10
and E/MV/03 at Zone-E (As Highlighted)

concreting for Infill wall (inner) between BII 123-124 Axis 02AZ-02AY (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
156 KAIG3-RFI-CO-S-9193-00 Crescent 9/11/2022 10524 10
highlighted) Zone 2Q - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


157 10523 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


158 10522 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


159 10520 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


160 10521 7
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
161 10519 10
- SCREED

Page 430 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI162
No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y10518
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Concreting for Diaphragm Wall BEAM axis 02AQ from 877.00 to 877.50 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
163 KAIG3-RFI-CO-S-9220-00 Crescent 9/12/2022 10567 3
highlighted) Zone 2N - SCREED

Concreting for Buttress Head at BOI, BOV, BII, BIV 57,58 (as highlighted) at Zone 1P C32/40 62% OPC+30%FA+8% MS - 220+/-20
164 KAIG3-RFI-CO-S-9083-01 Crescent 9/12/2022 10566 10
(KAIG3-SCR-CO-S-198-00) - SCREED

Concreting for MCPE 3 ,Suspended Slab of Duct Tunnel at axis 03-B , zone 2E &2F (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
165 KAIG3-RFI-MC-S-9212-00 MCPE 9/12/2022 10565 10
highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


166 10564 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


167 10562 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


168 10561 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


169 10560 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


170 10559 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


171 10558 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


172 10557 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
173 10556 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
174 10555 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
175 10553 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
176 10552 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
177 10551 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
178 10550 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
179 10549 10
- SCREED

Page 431 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER
180 BUILDING/ DATE OF 10548 LOAD
10 /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX
- SCREED Y NOTE
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
181 10547 10
- SCREED
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from
182 KAIG3-RFI-SW-C-7354-00 Site Works 9/12/2022 C16/20 SRC 10563 5
C/FS/09 to C/FS/08 at Zone-C - As Highlighted
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/03 to
183 KAIG3-RFI-SW-C-7355-00 Site Works 9/12/2022 C16/20 SRC 10554 10
C/MV/30 at Zone-C (As Highlighted)

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
184 KAIG3-RFI-SW-C-7373-00 Site Works 9/13/2022 C16/20 SRC 10586 10
B/DC/02, B/DC/06, G/DC/13 at Zone-B&G - as highlighted

Inspection for Blinding Concrete under MV Line Pulling Pit L/MV/16, L/MV/05,
185 KAIG3-RFI-SW-C-7392-00 Site Works 9/13/2022 C16/20 SRC 10584 10
L/MV/01 and H/MV/19 - as highlighted
Concreting for Diaphragm Wall axis 02AQ (2nd part) from 874.00 to 877.50 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
186 KAIG3-RFI-CO-S-9217-00 Crescent 9/13/2022 10588 7
highlighted) Zone 2N - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
187 10587 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
188 10585 10
- SCREED

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
189 KAIG3-RFI-SW-C-7578-00 Site Works 9/14/2022 C16/20 SRC 10627 5
B/TL/42 to B/TL/11 at Zone-B&C - As Highlighted

190 C16/20 SRC 10623 10

191 C16/20 SRC 10619 10

Shuttering for MCPE 2 - Tunnel, Suspended Slab (as highlighted) Axis 03I-1, TOC
192 KAIG3-RFI-MC-S-9130-00 MCPE 9/14/2022 C32/40 62% OPC+30%FA - 160+/-40 10632 10
varies as attached in the plan, Zone 2G 2H 2J 2K

193 C32/40 62% OPC+30%FA - 160+/-40 10630 10

194 C32/40 62% OPC+30%FA - 160+/-40 10628 10

Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/18 at Zone-
195 KAIG3-RFI-SW-C-7272-00 Site Works 9/14/2022 C32/40 62% OPC+30%FA - 160+/-40 10629 10
D (As Highlighted)

Concreting for blinding under Slab of Cafeteria under croft Axis 02C-02D Zone2A (as
196 KAIG3-RFI-CO-S-9262-00 Crescent 9/14/2022 C16/20 SRC 10633 10
highlighted)

197 C16/20 SRC 10631 10

Concrete Pouring & Shuttering for Columns (25 no's) (3rd lift above the level +875.55)
198 KAIG3-RFI-EC-S-9232-00 Energy Center 9/15/2022 of Boundary Wall @ Grid (R/18-24), at Energy Center 2, as highlighted area in attached C32/40 67%OPC+25%FA - 160+/-40 10664 11
drawing's.

Concreting for Infill wall Stage1(outer) between Axis 02E-02F (as highlighted) Zone 2B C32/40 62% OPC+30%FA+8% MS - 220+/-20
199 KAIG3-RFI-CO-S-9268-00 Crescent 9/15/2022 10697 4
- SCREED

Page 432 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
STRENGHT
C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER TRUCK
200 BUILDING/ DATE OF 10696 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION - SCREED
DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
C32/40 62% OPC+30%FA+8% MS - 220+/-20 No.
201 10695 (m³)
10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
202 10689 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
203 10671 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
204 10670 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
205 10663 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
206 10662 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
207 10661 10
- SCREED

Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - L/MV/16 and
208 KAIG3-RFI-SW-C-7385-00 Site Works 9/15/2022 C32/40 62% OPC+30%FA - 160+/-40 10669 5
L/MV/05 at Zone-L (As Highlighted)

"Inspection for Casting the Concrete Encasement and Surface Preperation prior to start
waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for Storm
209 KAIG3-RFI-SW-C-6679-00 Site Works 9/15/2022 C32/40 62% OPC+30%FA - 160+/-40 10667 10
Water Line and Short piece for Gullies G-E-04, G-E-05, G-E-06, G-E-16, G-E-17 - As
highlighted

210 C32/40 62% OPC+30%FA - 160+/-40 10665 10

Concreting of Blinding of MCPE 2 Tunnel Duct at Axis 03E,03F,03G,03H, Zone 2G


211 KAIG3-RFI-MC-S-9271-00 MCPE 9/15/2022 C16/20 SRC 10692 10
2H 2J 2K (as highlighted)

212 C16/20 SRC 10693 10

213 C16/20 SRC 10691 10

214 C16/20 SRC 10690 10

215 C16/20 SRC 10683 3

216 C16/20 SRC 10668 10

217 C16/20 SRC 10666 10

Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
218 KAIG3-RFI-SW-C-7522-00 Site Works 9/15/2022 C16/20 SRC 10694 10
45 at Zone-K - as highlighted

Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 4A As per Attached
219 KAIG3-RFI-TB-S-9292-00 Ticket Booth 9/17/2022 C32/40 62% OPC+30%FA - 160+/-40 10728 6
Highlighted Drawing's.

Page 433 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting second part Roof Suspended Slab for MCPE 3 axis 02R ,03-1,03-2, Before LOAD /
SI220
No. RFI NUMBER
KAIG3-RFI-MC-S-9280-00 MCPE 9/17/2022 DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA Y10754
NOTE 10
LOCATION CASTING Axis of 02-Q (as highlighted) Zone 2E & 2F level 875.85 & 875.974 QUANTITY
No.
(m³)

221 C32/40 62% OPC+30%FA - 160+/-40 10753 10

222 C32/40 62% OPC+30%FA - 160+/-40 10749 10

223 C32/40 62% OPC+30%FA - 160+/-40 10748 7

224 C32/40 62% OPC+30%FA - 160+/-40 10743 10

225 C32/40 62% OPC+30%FA - 160+/-40 10742 10

226 C32/40 62% OPC+30%FA - 160+/-40 10740 10

227 C32/40 62% OPC+30%FA - 160+/-40 10739 10

228 C32/40 62% OPC+30%FA - 160+/-40 10738 10

229 C32/40 62% OPC+30%FA - 160+/-40 10737 10

230 C32/40 62% OPC+30%FA - 160+/-40 10736 10

231 C32/40 62% OPC+30%FA - 160+/-40 10735 10

232 C32/40 62% OPC+30%FA - 160+/-40 10731 10

233 C32/40 62% OPC+30%FA - 160+/-40 10729 10

Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from
234 KAIG3-RFI-SW-C-7579-00 Site Works 9/17/2022 C16/20 SRC 10741 3
B/FS/21 to C/FS/10 at Zone-B&C - As Highlighted

Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05,
235 KAIG3-RFI-SW-C-6981-00 Site Works 9/17/2022 C32/40 62% OPC+30%FA - 160+/-40 10756 5
D/MV/04, D/MV/32 and D/MV/03 at Zone-E&D (As Highlighted)

Concreting for Rc Foundations Retaining wall Between Axis 02G-02K (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
236 KAIG3-RFI-CO-S-9289-00 Crescent 9/18/2022 10782 3
Zone 6&7 - SCREED

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - L/MV/05 and
237 KAIG3-RFI-SW-C-7482-00 Site Works 9/18/2022 C32/40 62% OPC+30%FA - 160+/-40 10784 5
L/MV/16 at Zone- L (As Highlighted)
"Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - L/MV/01 at Zone- L
238 KAIG3-RFI-SW-C-7484-00 Site Works 9/18/2022 C32/40 62% OPC+30%FA - 160+/-40 10783 10
(As Highlighted) "

Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-04
239 KAIG3-RFI-SW-C-7622-00 Site Works 9/18/2022 C16/20 SRC 10790 10
at Zone-B - as highlighted

Page 434 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
240 BUILDING/ DATE OF C16/20 SRC 10789 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
Concreting for Rc Foundations Retaining wall Between Axis 02G-02K (as highlighted) (m³)
241 KAIG3-RFI-CO-S-9289-00 Crescent 9/18/2022 C32/40 62% OPC+30%FA - 160+/-40 10805 9
Zone 6&7

242 C32/40 62% OPC+30%FA - 160+/-40 10804 10

243 C32/40 62% OPC+30%FA - 160+/-40 10803 10

244 C32/40 62% OPC+30%FA - 160+/-40 10802 10

245 C32/40 62% OPC+30%FA - 160+/-40 10801 10

246 C32/40 62% OPC+30%FA - 160+/-40 10800 10

247 C32/40 62% OPC+30%FA - 160+/-40 10799 10

248 C32/40 62% OPC+30%FA - 160+/-40 10798 10

249 C32/40 62% OPC+30%FA - 160+/-40 10797 10

250 C32/40 62% OPC+30%FA - 160+/-40 10795 10

251 C32/40 62% OPC+30%FA - 160+/-40 10794 10

252 C32/40 62% OPC+30%FA - 160+/-40 10793 10

253 C32/40 62% OPC+30%FA - 160+/-40 10791 10

Concreting for Internal Bulding (2 nos.) Foundation RF3 & RF2 at Zone 1A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
254 KAIG3-RFI-CO-S-9303-00 Crescent 9/19/2022 10849 9
highlighted) Axis 01C-01D, (KAIG3-SCR-CO-S-0197-00) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


255 10846 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
256 10834 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
257 10830 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
258 10825 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
259 10824 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
260 10822 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
261 10821 10
- SCREED
"Inspection of Thrust Block for Potable Water Line ( Dia 80mm) at Zone-B - As
262 KAIG3-RFI-SW-C-7489-00 Site Works 9/19/2022 C32/40 62% OPC+30%FA - 160+/-40 10827 10
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)"

Page 435 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
263 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 10823 LOAD
10 /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
Concrete Pouring & Shuttering for Wall & Column of Boundary Wall at Span 47 of
264 KAIG3-RFI-WG-S-9317-00 Water Garden 9/19/2022 C32/40 67%OPC+25%FA - 160+/-40 10829 4
Water Garden as highlighted area in attached drawing's.

265 C32/40 67%OPC+25%FA - 160+/-40 10826 10

266 C32/40 67%OPC+25%FA - 160+/-40 10828 10

Concreting for blinding under Strip Footing Foundation Between PC 19-21 zone1D(as
267 KAIG3-RFI-CO-S-9265-00 Crescent 9/19/2022 C16/20 SRC 10848 3
highlighted) at CRESCENT

268 C16/20 SRC 10845 10

269 C16/20 SRC 10844 10

270 C16/20 SRC 10831 10

Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
271 KAIG3-RFI-SW-C-7657-00 Site Works 9/19/2022 C16/20 SRC 10841 10
33, POC-34, POC-35 at Zone-H - as highlighted

272 C16/20 SRC 10838 10

273 C16/20 SRC 10837 10

274 KAIG3-RFI-CO-S-9228-01 Crescent 9/19/2022 Concreting Infill wall on BOI 122 Axis 02AX (as highlighted) Zone 2Q C32/40 62% OPC+30%FA - 160+/-40 10840 11

Shuttering for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as
275 KAIG3-RFI-CO-S-9342-00 Crescent 9/20/2022 C16/20 SRC 10878 7
highlighted)

276 C16/20 SRC 10877 10

277 C16/20 SRC 10876 10

Shuttering and Concreting for Energy Center Internal Column (neck) at Axis 11-12, D-H
278 KAIG3-RFI-EC-S-9335-00 Energy Center 9/20/2022 C32/40 62% OPC+30%FA - 160+/-40 10891 9
(as highlighted)
Shuttering and Concreting for Columns (neck) for Energy Center-2, Grid 1-2, C-I (as
279 KAIG3-RFI-EC-S-9353-00 Energy Center 9/20/2022 C32/40 62% OPC+30%FA - 160+/-40 10890 10
highlighted)

C32/40 62% OPC+30%FA+8% MS - 220+/-20


280 KAIG3-RFI-CO-S-9325-00 Crescent 9/20/2022 Concreting for Tunnel 1 wall part-C (as Highlighted) Zone 2H from 869.35 upto 875.00 10912 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
281 10911 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
282 10909 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
283 10908 10
- SCREED

Page 436 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
STRENGHT
C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER TRUCK
284 BUILDING/ DATE OF 10897 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION - SCREED
DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
C32/40 62% OPC+30%FA+8% MS - 220+/-20 No.
285 10895 (m³)
10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
286 10882 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
287 109880 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
288 10875 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
289 10874 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
290 10873 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
291 10872 10
- SCREED

Concreting for Infill wall (inner) at Zone 1A Axis 01B to 01C to 01D Upto 869.90 (as
292 KAIG3-RFI-CO-S-9316-00 Crescent 9/20/2022 C32/40 62% OPC+30%FA - 160+/-40 10910 10
highlighted)

293 C32/40 62% OPC+30%FA - 160+/-40 10904 10

294 C32/40 62% OPC+30%FA - 160+/-40 10903 10

295 C32/40 62% OPC+30%FA - 160+/-40 10902 10

296 C32/40 62% OPC+30%FA - 160+/-40 10899 10

Concreting for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
297 KAIG3-RFI-CO-S-9027-01 Crescent 9/21/2022 10974 8
2F (KAIG3-SCR-CO-A-0204-00 with attachments) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
298 KAIG3-RFI-CO-S-9268-00 Crescent 9/21/2022 Concreting for Infill wall Stage1(outer) between Axis 02E-02F (as highlighted) Zone 2B 10973 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
299 9/21/2022 10972 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
300 9/21/2022 10971 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
301 9/21/2022 10970 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
302 9/21/2022 10968 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
303 9/21/2022 10965 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
304 9/21/2022 10953 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
305 9/21/2022 10945 10
- SCREED

Page 437 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER LOAD /
SI306
No. RFI NUMBER 9/21/2022 DESCRIPTION DESIGN MIX
- SCREED Y10937
NOTE 10
LOCATION CASTING QUANTITY
No.
Concreting for Diaphragm Wall Beam axis 02AQ from 877.00 to 877.50 (as highlighted) (m³)
307 KAIG3-RFI-CO-S-9349-00 Crescent 9/21/2022 C32/40 62% OPC+30%FA - 160+/-40 10935 10
Zone 2N

Concreting for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone
308 KAIG3-RFI-CO-S-9027-00 Crescent 9/21/2022 C32/40 62% OPC+30%FA - 160+/-40 10934 10
2F (KAIG3-SCR-CO-A-0204-00 with attachments)

Concreting for Diaphragm Wall Beam axis 02AQ from 877.00 to 877.50 (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
309 KAIG3-RFI-CO-S-9349-00 Crescent 9/21/2022 10969 5
Zone 2N - SCREED

Concreting for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
310 KAIG3-RFI-CO-S-9027-00 Crescent 9/21/2022 10964 10
2F (KAIG3-SCR-CO-A-0204-00 with attachments) - SCREED

Concreting for Infill wall Stage1(outer) between Axis 02E-02F (as highlighted) Zone 2B C32/40 62% OPC+30%FA+8% MS - 220+/-20
311 KAIG3-RFI-CO-S-9268-00 Crescent 9/21/2022 10950 10
- SCREED

Concreting for MCPE 2 wall & Counter fort at axis 03E-02Z (as highlighted) at Zone 2G C32/40 62% OPC+30%FA+8% MS - 220+/-20
312 KAIG3-RFI-MC-S-9345-00 MCPE 9/21/2022 10940 10
from 871.00 upto 875.00 & 875.85 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


313 10938 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


314 10936 10
- SCREED

315 KAIG3-RFI-SW-C-7514-00 Site Works 9/21/2022 Inspection of Concrete Pouring for the Wall of SBC-07 - Wing Wall - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 10946 10

316 C32/40 62% OPC+30%FA - 160+/-40 10947 10

Concreting for blinding under Slab of Cafeteria under croft Axis 02A - 02C Zone2A (as
317 KAIG3-RFI-CF-S-9356-00 Cafeteria 9/21/2022 C16/20 SRC 10967 7
highlighted)

318 C16/20 SRC 10963 10

319 C16/20 SRC 10954 10

320 C16/20 SRC 10951 10

321 C16/20 SRC 10949 10

Concrete Pouring & Shuttering for Bottom Slab and Starter (Kicker) for Water Fountain
322 KAIG3-RFI-WG-S-9371-00 Water Garden 9/24/2022 C32/40 62% OPC+30%FA - 160+/-40 11039 10
of Geyser Garden, inside water Garden, as highlighted area in attached drawing's.

Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/38 at Zone-G - C32/40 62% OPC+30%FA+8% MS - 220+/-20
323 KAIG3-RFI-SW-C-7851-00 Site Works 9/24/2022 11043 10
As Highlighted. ( SCR: KAIG3-SCR-SW-E0081-00) - SCREED

Concreting for blinding under Slab of Cafeteria under croft Axis 02A - 02C Zone2A (as
324 KAIG3-RFI-CF-S-9356-00 Cafeteria 9/24/2022 C16/20 SRC 11008 5
highlighted)

Page 438 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-5 , FW-A- DELIVER
BUILDING/ DATE OF LOAD
10 /
SI325
No. KAIG3-RFI-SW-C-6542-00
RFI NUMBER Site Works 9/24/2022
3-6 (as Highlighted)" DESCRIPTION C16/20 SRC
DESIGN MIX Y11013
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
Inspection for Blinding Concrete under Storm Box Culvert - SBC-07 including Wing
326 KAIG3-RFI-SW-C-6554-00 Site Works 9/24/2022 C16/20 SRC 11012 10
Wall - As Highlighted

327 C16/20 SRC 11010 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


328 KAIG3-RFI-CO-S-9325-00 Crescent 9/24/2022 Concreting for Tunnel 1 wall part-C (as Highlighted) Zone 2H from 869.35 upto 875.00 11011 8
- SCREED

Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis
329 KAIG3-RFI-CF-S-9385-00 Cafeteria 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11094 3
02C-02D (as highlighted) TOC 863.450

330 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11092 9

331 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11088 10

332 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11084 10

333 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11083 10

334 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11082 10

335 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11079 10

336 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11078 10

337 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11077 10

338 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11076 10

339 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11069 10

340 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11067 10

Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - D/MV/17, D/MV/18,
341 KAIG3-RFI-SW-C-7659-00 Site Works 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11068 10
D/MV/31, D/MV/33 at Zone- D (As Highlighted)

Inspection for Blinding Concrete under MV Line Pulling Pit L/MV/14 and L/MV/11 - as
342 KAIG3-RFI-SW-C-7660-00 Site Works 9/25/2022 C16/20 SRC 11071 10
highlighted

343 C16/20 SRC 11070 10

Concreting for Large Mosque for Upper First Floor for Wall 1& Parapet , Axis C-D, 1-2 C32/40 62% OPC+30%FA+8% MS - 220+/-20
344 KAIG3-RFI-LM-S-9378-00 Large Mosque 9/25/2022 11097 8
Zone 1G (as highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
345 11095 10
- SCREED

Page 439 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
C32/40 62% OPC+30%FA+8% MS - 220+/-20 DELIVER
346 BUILDING/ DATE OF 11089 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION - SCREED
DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 (m³)
347 11081 10
- SCREED
Inspection for Blinding Concrete under MV Line Pulling Pit L/MV/14 and L/MV/11 - as
348 KAIG3-RFI-SW-C-7660-00 Site Works 9/25/2022 C16/20 SRC 11096 10
highlighted
Shuttering and Concreting for Beams for Energy Center 2, Axis17-28 /M (as
349 KAIG3-RFI-EC-S-9394-00 Energy Center 9/26/2022 C32/40 67%OPC+25%FA - 160+/-40 11134 9
highlighted)Level 875.50

350 9/26/2022 C32/40 67%OPC+25%FA - 160+/-40 11132 9

Shuttering for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as
351 KAIG3-RFI-CO-S-9342-00 Crescent 9/26/2022 C16/20 SRC 11152 10
highlighted)
Shuttering for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1N Axis
352 KAIG3-RFI-CO-S-9413-00 Crescent 9/26/2022 C16/20 SRC 11151 10
01AM (as highlighted)

353 9/26/2022 C16/20 SRC 11150 10

354 9/26/2022 C16/20 SRC 11149 10

355 9/26/2022 C16/20 SRC 11148 10

356 9/26/2022 C16/20 SRC 11144 10

357 9/26/2022 C16/20 SRC 11143 10

358 9/26/2022 C16/20 SRC 11142 10

359 9/26/2022 C16/20 SRC 11141 10

Concrete Pouring for Blinding Under Gabions at Butterfly Garden , as Highlighted area
360 KAIG3-RFI-TG-C-7837-00 Butterfly Garden 9/26/2022 C16/20 SRC 11130 10
in attached Drawings.
Concreting for MCPE 3 Suspended Slab at duct tunnel, axis 03C, 03D TOC 874.80 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
361 KAIG3-RFI-MC-S-9313-00 MCPE 9/26/2022 11140 8
highlighted) Zone 2E, 2F - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
362 11131 6
- SCREED
Concreting for MCPE 3 Suspended Slab at duct tunnel, axis 03C, 03D TOC 874.80 (as
363 KAIG3-RFI-MC-S-9313-00 MCPE 9/26/2022 C32/40 62% OPC+30%FA - 160+/-40 11146 10
highlighted) Zone 2E, 2F

364 C32/40 62% OPC+30%FA - 160+/-40 11139 10

365 C32/40 62% OPC+30%FA - 160+/-40 11138 10

366 C32/40 62% OPC+30%FA - 160+/-40 11137 10

367 C32/40 62% OPC+30%FA - 160+/-40 11136 10

368 C32/40 62% OPC+30%FA - 160+/-40 11135 10

Page 440 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
369 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 11133 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
Concreting for blinding ETFE PUMP ROOM #6113 Axis 02-W, ZONE 2G (as (m³)
370 KAIG3-RFI-CO-S-9255-00 Crescent 9/26/2022 C16/20 SRC 11145 7
highlighted) at CRESCENT ,KAIG3-SCR-CO-S-0193-00

371 C16/20 SRC 11147 3

C32/40 62% OPC+30%FA+8% MS - 220+/-20


372 KAIG3-RFI-CO-S-9396-00 Crescent 9/27/2022 Concreting for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted) 11219 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
373 9/27/2022 11218 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
374 9/27/2022 11216 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
375 9/27/2022 11212 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
376 9/27/2022 11205 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
377 9/27/2022 11292 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
378 9/27/2022 11291 11
- SCREED

379 KAIG3-RFI-SW-C-7690-00 Site Works 9/27/2022 Inspection for Blinding Concrete under Fire Line Pit for B/F/13 - as highlighted C16/20 SRC 11193 5

380 C16/20 SRC 11177 10

381 KAIG3-RFI-CO-S-9396-00 Crescent 9/27/2022 Concreting for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 11204 6

Concreting for TIP WALL from 873.725 upto 876.80 Axis 02BC (as highlighted) Zone
382 KAIG3-RFI-CO-S-9422-00 Crescent 9/27/2022 C32/40 62% OPC+30%FA - 160+/-40 11194 10
2R

383 C32/40 62% OPC+30%FA - 160+/-40 11182 10

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - L/MV/11 and
384 KAIG3-RFI-SW-C-7662-00 Site Works 9/27/2022 C32/40 62% OPC+30%FA - 160+/-40 11197 8
L/MV/14 at Zone-L (As Highlighted)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
385 KAIG3-RFI-CO-S-9396-00 Crescent 9/27/2022 Concreting for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted) 11220 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
386 11217 10
- SCREED
Shuttering and Concreting for Columns (ext.) for Energy Center 2, Axis 7-14, L & 7-11,
387 KAIG3-RFI-EC-S-9415-00 Energy Center 9/28/2022 C32/40 67%OPC+25%FA - 160+/-40 11243 11
A (as highlighted)Level 878.00

388 9/28/2022 C32/40 67%OPC+25%FA - 160+/-40 11237 11

Concreting for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as
389 KAIG3-RFI-CO-S-9343-00 Crescent 9/28/2022 C16/20 SRC 11262 10
highlighted)

390 9/28/2022 C16/20 SRC 11261 10

Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-03
391 KAIG3-RFI-SW-C-7718-00 Site Works 9/28/2022 C16/20 SRC 11228 10
at Zone-B - as highlighted

Page 441 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for Large Mosque for Upper First Floor for Columns & Walls C32/40 62% OPC+30%FA+8% LOAD /
SI392
No. RFI NUMBER
KAIG3-RFI-LM-S-9432-00 Large Mosque 9/28/2022 DESCRIPTION DESIGN MIX MS - 220+/-20 Y11258
NOTE 10
LOCATION CASTING (C5,C4,C3A,C2A,C2C,W5) , Axis C-E, 5-6 Zone 1G (as highlighted) - SCREED QUANTITY
No.
(m³)
Concreting for Infill wall between BII 125-126 Axis 02AZ-02BA (as highlighted) Zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
393 KAIG3-RFI-CO-S-9434-00 Crescent 9/28/2022 11244 10
2R - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
394 11238 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
395 11236 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
396 11230 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
397 11229 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
398 11227 10
- SCREED

Cooncrete Pouring & Shuttering for Foundation & Kicker (Starter) for Fountain (3),
399 KAIG3-RFI-PG-S-9370-00 Physics Garden 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11260 5
inside Physic Garden as highlighted area in attached drawing's.

Concrete Pouring & Shuttering for Blinding under Fountain 2 (4 nos) Inside Physic
400 KAIG3-RFI-PG-S-9417-00 Physics Garden 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11247 8
Garden as highlighted area in attached drawing's.

Concrete Pouring & Shuttering for Wall of Fountain 1 (1 no's) at Left side of Entrance,
401 KAIG3-RFI-PG-S-9448-00 Physics Garden 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11245 8
Inside Physic Garden as highlighted area in attached drawing's.

Concreting for Large Mosque for Upper First Floor for Columns & Walls
402 KAIG3-RFI-LM-S-9432-00 Large Mosque 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11264 3
(C5,C4,C3A,C2A,C2C,W5) , Axis C-E, 5-6 Zone 1G (as highlighted)

Concreting for Infill wall between BII 125-126 Axis 02AZ-02BA (as highlighted) Zone
403 KAIG3-RFI-CO-S-9434-00 Crescent 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11257 11
2R

404 C32/40 62% OPC+30%FA - 160+/-40 11256 9

405 C32/40 62% OPC+30%FA - 160+/-40 11255 10

Concreting for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E
406 KAIG3-RFI-CO-S-9443-00 Crescent 9/29/2022 C16/20 SRC 11342 7
Axis 01M (as highlighted) (3 footing & strip)
Promenade & Concreting for 4th layer Mass Concrete under Central Bridge Abutment foundation zone
407 KAIG3-RFI-PC-S-9436-00 9/29/2022 C16/20 SRC 11341 10
Canopies 4 (as highlighted) Axis 02AG

408 C16/20 SRC 11339 10

409 C16/20 SRC 11329 10

410 C16/20 SRC 11326 11

411 C16/20 SRC 11322 10

412 C16/20 SRC 11317 10

Page 442 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
413 BUILDING/ DATE OF C16/20 SRC 11321 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
414 C16/20 SRC 11320 10

415 C16/20 SRC 11319 10

416 C16/20 SRC 11318 10

417 C16/20 SRC 11315 10

418 C16/20 SRC 11314 10

419 C16/20 SRC 11309 10

420 C16/20 SRC 11307 10

421 C16/20 SRC 11306 10

422 C16/20 SRC 11305 10

423 C16/20 SRC 11302 10

424 C16/20 SRC 11301 10

425 C16/20 SRC 11299 10

426 C16/20 SRC 11297 10

427 C16/20 SRC 11295 10

428 C16/20 SRC 11293 10

429 KAIG3-RFI-CO-S-9455-00 Crescent 9/29/2022 Concreting for Retaining wall (wall) at Axis 02K to 02I Zone 6 & 7 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 11345 4

430 KAIG3-RFI-VG-S-9453-00 Devonian Garden 9/29/2022 Concreting of Devonian Garden AHU Foundation at zone 2M (as highlighted) (3rd) C32/40 62% OPC+30%FA - 160+/-40 11340 10

Concreting for MCPE 2 Bottom Slab of Duct Tunnel, axis 03G, 03H, 03E, 03F TOC
431 KAIG3-RFI-MC-S-9468-00 MCPE 9/29/2022 C32/40 62% OPC+30%FA - 160+/-40 11338 10
871.00 (as highlighted) Zone 2G
Concreting for Devonian Garden Wall (1st) at zone 2M axis 02M (as highlighted) TOC
432 KAIG3-RFI-VG-S-9382-00 Devonian Garden 9/29/2022 C32/40 62% OPC+30%FA - 160+/-40 11337 10
874.80

433 C32/40 62% OPC+30%FA - 160+/-40 11336 10

434 C32/40 62% OPC+30%FA - 160+/-40 11335 10

435 C32/40 62% OPC+30%FA - 160+/-40 11334 10

Page 443 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
436 BUILDING/ DATE OF C32/40 62% OPC+30%FA - 160+/-40 11327 10 /
LOAD
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
437 C32/40 62% OPC+30%FA - 160+/-40 11325 10

438 C32/40 62% OPC+30%FA - 160+/-40 11324 10

439 C32/40 62% OPC+30%FA - 160+/-40 11323 10

440 C32/40 62% OPC+30%FA - 160+/-40 11316 10

441 C32/40 62% OPC+30%FA - 160+/-40 11313 10

442 C32/40 62% OPC+30%FA - 160+/-40 11312 10

443 C32/40 62% OPC+30%FA - 160+/-40 11311 10

444 C32/40 62% OPC+30%FA - 160+/-40 11310 10

445 C32/40 62% OPC+30%FA - 160+/-40 11308 10

446 C32/40 62% OPC+30%FA - 160+/-40 11304 10

447 C32/40 62% OPC+30%FA - 160+/-40 11303 10

448 C32/40 62% OPC+30%FA - 160+/-40 11300 10

449 C32/40 62% OPC+30%FA - 160+/-40 11298 10

450 C32/40 62% OPC+30%FA - 160+/-40 11296 10

451 C32/40 62% OPC+30%FA - 160+/-40 11294 10

Inspection of Blinding Concrete under Heating and Chilled Water Line Pit for H/DH/29,
452 KAIG3-RFI-SW-C-7732-00 Site Works 9/29/2022 C16/20 SRC 11328 10
H/DH/30, H/DC/27 at Zone-H - As highlighted

Concrete Design Mix Quantity m3

1314
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - SCREED

1794
C32/40 62% OPC+30%FA - 160+/-40

C16/20 SRC 1043

Page 444 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 67%OPC+25%FA - 160+/-40 126 LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)

TOTAL QUANTITY TRUCK LOAD (M³): 4277.00

Prepared by: Document Controller Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

Page 445 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER 28 DAYS
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE 7 AND
LOCATION CASTING QUANTITY
No. DAYS MORE THAN 28
(m³)
DAYS

Concreting for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1N
1 KAIG3-RFI-CO-S-9447-00 Crescent Zone 1N 1-Oct-22 C16/20 SRC 11415 10
Axis 01AM (as highlighted)

2 C16/20 SRC 11414 10

3 C16/20 SRC 11413 10

4 C16/20 SRC 11412 10

5 C16/20 SRC 11411 10

6 C16/20 SRC 11410 10

7 C16/20 SRC 11409 10

8 C16/20 SRC 11404 10

9 C16/20 SRC 11403 10

10 C16/20 SRC 11402 10

11 C16/20 SRC 11401 10

12 C16/20 SRC 11397 10

13 C16/20 SRC 11399 10

14 C16/20 SRC 11398 10

15 C16/20 SRC 11394 10

16 C16/20 SRC 11392 10

17 C16/20 SRC 11391 10

18 C16/20 SRC 11388 10

Page 446 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI19
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y11387
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

20 C16/20 SRC 11386 10

Concreting for Infill wall (inner) at Zone 2H Axis 02AA-02AB TOC 876.00 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
21 KAIG3-RFI-CO-S-9445-00 Crescent Zone 2H 1-Oct-22 11408 10
highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


22 11390 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


23 11380 10
- SCREED

Concreting for MCPE 1 Roof Slab of Duct Tunnel, axis 03U TOC 874.80 (as
24 KAIG3-RFI-MC-S-9439-00 MCPE 1 1-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11406 10
highlighted) Zone 2M 2N

25 C32/40 62% OPC+30%FA - 160+/-40 11405 10

26 C32/40 62% OPC+30%FA - 160+/-40 11400 11

27 C32/40 62% OPC+30%FA - 160+/-40 11393 8

28 C32/40 62% OPC+30%FA - 160+/-40 11385 10

29 C32/40 62% OPC+30%FA - 160+/-40 11384 10

Shuttering and Concreting for Energy Center Internal Foundation and Grade Beam at
KAIG3-RFI-EC-S-9021 & Energy Center &
30 1-Oct-22 Axis 4-5, C (as highlighted) & Concrete Pouring for Fountain 1, At Inner Side of Plant C32/40 62% OPC+30%FA - 160+/-40 11407 9
KAIG3-RFI-PG-S-8961-00 Physics Garden
room, Inside Physic Garden, as highlighted in attached drawing's.

Concrete Pouring for Blinding Under Electrical Handholes of Emergency


(MH/WG/EM/20 & 21) & Low Voltage (MH/WG/LV/38, 40, 51 to 52), Between
Geyser Garden, Geyser Garden and Wadi 3, at water Garden, as highlighted area in attached drawing's.
KAIG3-RFI-WG-C-7991-00 &
31 Water Garden & 2-Oct-22 & Concrete Pouring for Blinding Under Low Current Handholes and Pits, Low current C16/20 SRC 11443 10
KAIG3-RFI-WG-C-7992-00
Wadi 3 (MH/WG/LC/14 & 51), Fire Alarm & Security (MH/WG/FA/21 & 22) and Pits
(B/TL/22 & 53) & (B/FS/25 & 45), Between Geyser Garden and Wadi 3, at water
Garden, as highlighted area

Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - L/MV/11 and
32 KAIG3-RFI-SW-C-7736-00 Site Work 2-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11450 10
L/MV/14 at Zone-L (As Highlighted)

33 C32/40 62% OPC+30%FA - 160+/-40 11446 10

Concreting for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1E
34 KAIG3-RFI-CO-S-9494-00 crescent Zone 1E 2-Oct-22 C16/20 SRC 11458 10
Axis 01M (as highlighted) (4 footing & 3 strip)

Page 447 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI35
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y11456
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

36 C16/20 SRC 11455 10

37 C16/20 SRC 11454 10

38 C16/20 SRC 11453 10

39 C16/20 SRC 11452 10

40 KAIG3-RFI-SW-C-7769-01 Site Work 2-Oct-22 Inspection for Blinding Concrete under MV Line Pulling Pit H/MV/30 - as highlighted C16/20 SRC 11457 10

Shuttering and Concreting for Columns neck (int.) of Energy Center 2, Axis 3, C-I & 4-
41 KAIG3-RFI-EC-S-9487-00 Energy Center 2-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11459 6
5, C-H (as highlighted).

Concreting for MCPE 2 inner wall with Counterfort at Zone 2H, axis 02Z to 03I (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
42 KAIG3-RFI-MC-S-9496-00 MCPE 2 3-Oct-22 11497 11
highlighted) from 871.00 to 875.55 - SCREED

Concreting for Strip footing (RC) at Zone 1D Between PC 19-21 Axis 01J-01K (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
43 KAIG3-RFI-CO-S-9499-00 Crescent Zone 1D 3-Oct-22 11493 9
highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


44 11489 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


45 11481 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


46 11480 10
- SCREED

47 KAIG3-RFI-SW-C-7620-00 Site Work SBC-07 3-Oct-22 Inspection of Concrete Pouring for the Upstand of SBC-07 - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 11483 10

48 C32/40 62% OPC+30%FA - 160+/-40 11482 10

Inspection of Blinding Concrete under Heating and Chilled Water Line Pit H/DH/21,
49 KAIG3-RFI-SW-C-7793-00 Zone H 3-Oct-22 C16/20 SRC 11490 10
H/DH/22 at Zone-H - As highlighted

Shuttering and Concreting for beam (ext.) of Energy Center 2, Axis 28-30, M-R (as
50 KAIG3-RFI-EC-S-9524-00 Energy Center 3-Oct-22 C32/40 67%OPC+25%FA - 160+/-40 11498 5
highlighted) Level 875.50

51 C32/40 67%OPC+25%FA - 160+/-40 11495 11

52 C32/40 67%OPC+25%FA - 160+/-40 11494 11

Inspection of Blinding Concrete under Heating and Chilled Water Line Pit G/DH/19,
53 KAIG3-RFI-SW-C-7794-00 Zone G 4-Oct-22 C16/20 SRC 11517 10
G/DC/18 at Zone-G - As highlighted

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/30 at Zone-
54 KAIG3-RFI-SW-C-7827-00 Zone H 4-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11518 7
H (As Highlighted)

Page 448 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting of Plain concrete under Devonian Garden Foundation in Zone 2M Axis LOAD /
SI55
No. KAIG3-RFI-VG-S-9515-00
RFI NUMBER Devonian Garden 4-Oct-22 DESCRIPTION C16/20 SRC
DESIGN MIX Y11538
NOTE 11
LOCATION CASTING 02AL-AM ,02AO-AP (as highlighted) QUANTITY
No.
(m³)

56 C16/20 SRC 11537 9

57 C16/20 SRC 11522 10

58 C16/20 SRC 11521 11

59 C16/20 SRC 11520 9

60 C16/20 SRC 11519 10

Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 5A As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
61 KAIG3-RFI-TB-S-9513-00 Ticketing Booth 4-Oct-22 11525 5
Highlighted Drawing's. - SCREED

Concreting for Front Canopy Foundation at Zone 1 Axis 01O, 01 AN, 01AM, 01AL,
62 KAIG3-RFI-CO-S-9399-00 Zone 1A 4-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11541 9
01K, 01J (as highlighted) TOC 865.060

63 C32/40 62% OPC+30%FA - 160+/-40 11540 11

64 C32/40 62% OPC+30%FA - 160+/-40 11534 6

65 C32/40 62% OPC+30%FA - 160+/-40 11531 10

66 C32/40 62% OPC+30%FA - 160+/-40 11530 9

67 C32/40 62% OPC+30%FA - 160+/-40 11529 11

Shuttering and Concreting for Energy Center 2, Wall (W4) at Axis 0-1, I-C (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
68 KAIG3-RFI-EC-S-9526-00 Energy Center 5-Oct-22 11580 10
highlighted) level 877.00 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


69 11579 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


70 11578 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


71 11573 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


72 11571 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


73 11569 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


74 11567 10
- SCREED

Page 449 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI75
No. RFI NUMBER DESCRIPTION DESIGN MIX Y11565
NOTE 10
LOCATION CASTING - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
76 11564 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


77 11563 10
- SCREED

Concreting for Cafeteria undercroft Slab on Grade, Axis 02A to 02C zone 2A (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
78 KAIG3-RFI-CF-S-9544-00 Cafeteria 5-Oct-22 11585 10
highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


79 11584 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


80 11581 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


81 11575 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


82 11570 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


83 11566 10
- SCREED

Page 450 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI84
No. KAIG3-RFI-CO-S-9508-00
RFI NUMBER Crescent Zone 1A 5-Oct-22 Concreting for TIP WALL upto 872.70 Axis 01A (as highlighted) Zone 1A
DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y11583
NOTE 4
LOCATION CASTING QUANTITY
No.
(m³)

85 C32/40 62% OPC+30%FA - 160+/-40 11577 10

86 C32/40 62% OPC+30%FA - 160+/-40 11576 10

87 C32/40 62% OPC+30%FA - 160+/-40 11574 10

88 C32/40 62% OPC+30%FA - 160+/-40 11572 10

ng for Mass Concrete (3rd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M
89 KAIG3-RFI-CO-S-9520-00 Crescent Zone 1E 5-Oct-22 C16/20 SRC 11582 6
(as highlighted) (4 footing & 3 strip)

Concreting for Foundation & Strip Footing of Diaphragm wall at Zone 1E Axis 01P (4
90 KAIG3-RFI-CO-S-9559-00 Crescent Zone 1E 6-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11663 11
Foudations) up to Expansion joint (as highlighted)

91 C32/40 62% OPC+30%FA - 160+/-40 11659 10

92 C32/40 62% OPC+30%FA - 160+/-40 11658 10

93 C32/40 62% OPC+30%FA - 160+/-40 11657 10

94 C32/40 62% OPC+30%FA - 160+/-40 11656 10

95 C32/40 62% OPC+30%FA - 160+/-40 11655 10

96 C32/40 62% OPC+30%FA - 160+/-40 11635 11

97 C32/40 62% OPC+30%FA - 160+/-40 11632 10

98 C32/40 62% OPC+30%FA - 160+/-40 11631 10

99 C32/40 62% OPC+30%FA - 160+/-40 11628 10

Inspection of Blinding Concrete under Potable Water Line Pit L/PW/05 at Zone-L - as
100 KAIG3-RFI-SW-C-7796-00 Zone L C16/20 SRC 11644 10
highlighted

101 C16/20 SRC 11629 10

Page 451 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for Foundation & Strip Footing of Diaphragm wall at Zone 1E Axis 01P (4 LOAD /
SI102
No. KAIG3-RFI-CO-S-9559-00
RFI NUMBER Crescent Zone 1E 6-Oct-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y11649
NOTE 8
LOCATION CASTING Foudations) up to Expansion joint (as highlighted) QUANTITY
No.
(m³)

103 C32/40 62% OPC+30%FA - 160+/-40 11641 8

Concreting for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E
104 KAIG3-RFI-CO-S-9554-00 Crescent Zone 1E 6-Oct-22 C16/20 SRC 11665 10
Axis 01M (As highlighted)

South Concreting of blinding for retaining block wall strip footing Zone 2C South Admin
105 KAIG3-RFI-SA-S-9574-00 6-Oct-22 C16/20 SRC 11664 10
Administration building (KAIG3-SCR-GN-S-0147-00)

106 C16/20 SRC 11662 10

107 C16/20 SRC 11661 10

108 C16/20 SRC 11660 10

109 C16/20 SRC 11654 10

110 C16/20 SRC 11653 10

111 C16/20 SRC 11652 10

112 C16/20 SRC 11651 10

113 C16/20 SRC 11650 10

114 C16/20 SRC 11648 10

115 C16/20 SRC 11647 10

116 C16/20 SRC 11646 10

117 C16/20 SRC 11645 10

118 C16/20 SRC 11643 10

119 C16/20 SRC 11642 10

120 C16/20 SRC 11640 10

121 C16/20 SRC 11639 10

Page 452 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI122
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y11638
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

123 C16/20 SRC 11637 10

124 C16/20 SRC 11636 10

125 C16/20 SRC 11634 10

126 C16/20 SRC 11633 10

127 C16/20 SRC 11630 10

128 C16/20 SRC 11627 10

129 C16/20 SRC 11626 10

130 C16/20 SRC 11625 11

131 C16/20 SRC 11624 9

132 C16/20 SRC 11623 10

133 C16/20 SRC 11622 10

134 C16/20 SRC 11621 10

Inspection of Blinding Concrete under Potable Water Line Pit L/PW/05 at Zone-L - as
135 KAIG3-RFI-SW-C-7796-00 Zone L 8-Oct-22 C16/20 SRC 11720 10
highlighted

136 C16/20 SRC 11700 10

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/30 at Zone-
137 KAIG3-RFI-SW-C-7827-00 Zone H 8-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11732 7
H (As Highlighted)

138 C32/40 62% OPC+30%FA - 160+/-40 11723 8

Concreting of Mass Concrete Under strip Footing ( Inner ) Between (PC 66-68 , 70-72)
139 KAIG3-RFI-CO-S-9539-00 Crescent Zone 1L 8-Oct-22 C16/20 SRC 11738 10
(As highlighted) Zone1L

140 C16/20 SRC 11737 10

141 C16/20 SRC 11736 10

Page 453 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI142
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y11735
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

143 C16/20 SRC 11734 10

144 C16/20 SRC 11733 10

145 C16/20 SRC 11731 10

146 C16/20 SRC 11728 10

147 C16/20 SRC 11727 10

148 C16/20 SRC 11726 10

149 C16/20 SRC 11725 10

150 C16/20 SRC 11724 10

151 C16/20 SRC 11722 10

152 C16/20 SRC 11721 10

South Small
153 KAIG3-RFI-SM-S-9556-00 8-Oct-22 Concreting for South Small Mosque Second Floor Suspended slab (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 11717 8
Mosque

154 C32/40 62% OPC+30%FA - 160+/-40 11713 10

155 C32/40 62% OPC+30%FA - 160+/-40 11706 9

156 C32/40 62% OPC+30%FA - 160+/-40 11705 11

157 C32/40 62% OPC+30%FA - 160+/-40 11703 10

158 C32/40 62% OPC+30%FA - 160+/-40 11701 10

Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-46
159 KAIG3-RFI-SW-C-7818-00 Zone G 9-Oct-22 C16/20 SRC 11760 10
at Zone-G - as highlighted

C32/40 62% OPC+30%FA+8% MS - 220+/-20


160 KAIG3-RFI-CO-S-9597-00 Crescent Zone 2K 9-Oct-22 Concreting for Infill wall (inner) at Zone 2K between Axis 02AE-02AF (as highlighted) 11781 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


161 11780 10
- SCREED

Page 454 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI162
No. RFI NUMBER DESCRIPTION DESIGN MIX Y11779
NOTE 10
LOCATION CASTING - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
163 11776 11
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


164 11775 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


165 11774 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


166 11773 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


167 11771 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


168 11769 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


169 11768 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


170 11767 9
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


171 11761 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


172 11757 10
- SCREED

Shuttering for 2nd Layer mass Concrete at Diaphragm wall Foundation at Zone 1E Axis
173 KAIG3-RFI-CO-S-9598-00 Crescent Zone 1E 9-Oct-22 C16/20 SRC 11790 10
01M (5 Footings and Strip Footing) (As Highlighted)

174 C16/20 SRC 11789 10

175 C16/20 SRC 11788 10

176 C16/20 SRC 11787 10

177 C16/20 SRC 11786 10

178 C16/20 SRC 11785 10

179 C16/20 SRC 11784 10

Page 455 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI180
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y11783
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

181 C16/20 SRC 11782 10

182 C16/20 SRC 11762 10

183 C16/20 SRC 11759 10

184 C16/20 SRC 11758 10

Shuttering for Duct Tunnel wall for MCPE 2, Axis 03G,03H,(as highlighted) Zone 2G , C32/40 62% OPC+30%FA+8% MS - 220+/-20
185 KAIG3-RFI-MC-S-9592-00 MCPE 2 10-Oct-22 11825 8
Level at 874.50 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


186 11821 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


187 11819 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


188 11815 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


189 11812 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


190 11811 10
- SCREED

Inspection for Blinding Concrete under MV Line Pulling Pit C/MV/44, C/MV/17,
191 KAIG3-RFI-SW-C-7835-00 Zone C & D 10-Oct-22 C16/20 SRC 11820 10
D/MV/05, D/MV/20 at Zone C&D - as highlighted

192 C16/20 SRC 11813 5

Water & Geyser Concrete Pouring & Shuttering for Wall of Fountain inside Geyser Garden, inside water
193 KAIG3-RFI-WG-S-9567-00 10-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11816 7
Garden Garden, as highlighted area in attached drawing's.

194 C32/40 62% OPC+30%FA - 160+/-40 11814 8

Concreting for Front Canopy Foundation at Zone 1 Axis 01Z, 01AA, 01AB, 01AC (as
195 KAIG3-RFI-CO-S-9611-00 Crescent Zone 1 10-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11818 8
highlighted) TOC 865.060

Crescent Zone 1N & Concreting for Wall 20 & 21 at Zone 1N & 1P internal buildings axis 01AR (as
196 KAIG3-RFI-CO-S-9595-00 10-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11817 10
1P highlighted) TOC 869.10

Concrete Pouring for Blinding under Fountain 2 (4 nos) Inside Physic Garden as
197 KAIG3-RFI-PG-S-9627-00 Physics Garden 10-Oct-22 C16/20 SRC 11824 4
highlighted area in attached drawing's.

Shuttering and Concreting for Energy Center (27nos) columns at Grid 0-7 / I-L,upto
198 KAIG3-RFI-EC-S-9686-00 Energy Center 10-Oct-22 C16/20 SRC 11826 10
Level 878.00 (As Highlighted)

Crescent Zone G 6& C32/40 62% OPC+30%FA+8% MS - 220+/-20


199 KAIG3-RFI-CO-S-9638-00 11-Oct-22 Concreting of Retaining wall (wall) at Axis 02I to 02G Zone 6 & 7 (as highlighted) 11871 7
7 - SCREED

Page 456 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting of Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21- LOAD /
SI200
No. KAIG3-RFI-EC-S-9924-00
RFI NUMBER Energy Center 11-Oct-22 DESCRIPTION C16/20 SRC
DESIGN MIX Y11874
NOTE 9
LOCATION CASTING 22/N , 12-19/O-P , 21-22/O-P (as highlighted) QUANTITY
No.
(m³)

201 C16/20 SRC 11873 11

Crescent Zone G 6&


202 KAIG3-RFI-CO-S-9638-00 11-Oct-22 Concreting of Retaining wall (wall) at Axis 02I to 02G Zone 6 & 7 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 11877 10
7

203 C32/40 62% OPC+30%FA - 160+/-40 11876 10

204 C32/40 62% OPC+30%FA - 160+/-40 11875 10

Concreting for (2nd layer) Mass Concrete of strip Footing ( Inner ) Between (PC 66-68
205 KAIG3-RFI-CO-S-9647-00 Crescent Zone 1L 12-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11913 10
& 70-72) (As highlighted) Zone1L

Inspection for Blinding Concrete under MV Line Pulling Pit C/MV/03 at Zone C - as
206 KAIG3-RFI-SW-C-7909-00 Zone C 12-Oct-22 C16/20 SRC 11930 10
highlighted

Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-09
207 KAIG3-RFI-SW-C-7929-00 Zone B 12-Oct-22 C16/20 SRC 11928 10
at Zone-B - as highlighted

208 C16/20 SRC 11927 10

209 C16/20 SRC 11920 10

Concreting of Blinding for Diaphragm wall Foundation and Strip footing at Zone 1E
210 KAIG3-RFI-CO-S-9586-00 Crescent Zone 1E 12-Oct-22 C16/20 SRC 11923 10
Axis 01P (As Highlighted)

211 C16/20 SRC 11922 10

212 C16/20 SRC 11921 10

Concreting for (2nd layer) Mass Concrete of strip Footing ( Inner ) Between (PC 66-68 C32/40 62% OPC+30%FA+8% MS - 220+/-20
213 KAIG3-RFI-CO-S-9647-00 Crescent Zone 1L 12-Oct-22 11925 4
& 70-72) (As highlighted) Zone1L - SCREED

South Concreting for retaining block wall strip footing Zone 2C South Admin building
214 KAIG3-RFI-SA-S-9644-00 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12008 10
Administration (KAIG3-SCR-GN-S-0147-00)

Concreting for Cafeteria undercroft AHU pad (5 nos.) , Axis 02A - 02C zone 2A (As
215 KAIG3-RFI-CF-S-9626-00 Cafeteria 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12007 10
highlighted)

Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis
216 KAIG3-RFI-CF-S-9684-00 Cafeteria 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12006 10
02C-02B (as highlighted) TOC 863.450

Concreting for First Floor Suspended Slab of Internal Building at Zone 2R axis 02AZ -
217 KAIG3-RFI-CO-S-9623-00 Crescent Zone 2R 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12005 10
02BC (as highlighted)

Concreting for slab, Beams ( for Upper 1st Floor ) for Large Mosque, Axis C-E / 1.1-5.1
218 KAIG3-RFI-LM-S-9653-00 Large Mosque 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12004 10
Zone 1G (As Highlighted)

Concreting of Devonian Garden Wall at zone 2M Axis 02AL to 02AM (as highlighted)
219 KAIG3-RFI-VG-S-9640-00 Devonian Garden 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12003 10
Level upto 874.80 ( 2nd Part )

Page 457 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for Diaphragm wall (Foundation) at zone 1E Axis 01P (as highlighted) TOC LOAD /
SI220
No. KAIG3-RFI-CO-S-9697-00
RFI NUMBER Crescent Zone 1E 13-Oct-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12002
NOTE 10
LOCATION CASTING 866.00 & 866.50 QUANTITY
No.
(m³)
Concreting of Duct Tunnel wall for MCPE 2, Axis 03G,03H,(as highlighted) Zone 2G
221 KAIG3-RFI-MC-S-9593-00 MCPE 2 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12001 10
Level at 874.50

Concreting for RC strip Footing Between (PC 65-67 ), Axis 01 AG-AH , Zone1L(As
222 KAIG3-RFI-CO-S-9661-00 Crescent Zone 1L 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12000 10
highlighted)

223 C32/40 62% OPC+30%FA - 160+/-40 11999 10

224 C32/40 62% OPC+30%FA - 160+/-40 11998 10

225 C32/40 62% OPC+30%FA - 160+/-40 11997 10

226 C32/40 62% OPC+30%FA - 160+/-40 11996 10

227 C32/40 62% OPC+30%FA - 160+/-40 11995 10

228 C32/40 62% OPC+30%FA - 160+/-40 11994 10

229 C32/40 62% OPC+30%FA - 160+/-40 11993 10

230 C32/40 62% OPC+30%FA - 160+/-40 11992 10

231 C32/40 62% OPC+30%FA - 160+/-40 11991 10

232 C32/40 62% OPC+30%FA - 160+/-40 11990 10

233 C32/40 62% OPC+30%FA - 160+/-40 11989 10

234 C32/40 62% OPC+30%FA - 160+/-40 11988 10

235 C32/40 62% OPC+30%FA - 160+/-40 11987 10

236 C32/40 62% OPC+30%FA - 160+/-40 11986 10

237 C32/40 62% OPC+30%FA - 160+/-40 11985 10

238 C32/40 62% OPC+30%FA - 160+/-40 11984 10

239 C32/40 62% OPC+30%FA - 160+/-40 11983 10

Page 458 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI240
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y11982
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

241 C32/40 62% OPC+30%FA - 160+/-40 11981 10

242 C32/40 62% OPC+30%FA - 160+/-40 11980 10

243 C32/40 62% OPC+30%FA - 160+/-40 11979 10

244 C32/40 62% OPC+30%FA - 160+/-40 11978 10

245 C32/40 62% OPC+30%FA - 160+/-40 11977 10

246 C32/40 62% OPC+30%FA - 160+/-40 11976 10

247 C32/40 62% OPC+30%FA - 160+/-40 11975 10

248 C32/40 62% OPC+30%FA - 160+/-40 11974 10

249 C32/40 62% OPC+30%FA - 160+/-40 11973 10

250 C32/40 62% OPC+30%FA - 160+/-40 11972 10

251 C32/40 62% OPC+30%FA - 160+/-40 11971 10

252 C32/40 62% OPC+30%FA - 160+/-40 11970 10

253 C32/40 62% OPC+30%FA - 160+/-40 11969 10

254 C32/40 62% OPC+30%FA - 160+/-40 11968 10

255 C32/40 62% OPC+30%FA - 160+/-40 11967 10

256 C32/40 62% OPC+30%FA - 160+/-40 11966 10

257 C32/40 62% OPC+30%FA - 160+/-40 11965 10

258 C32/40 62% OPC+30%FA - 160+/-40 11964 10

259 C32/40 62% OPC+30%FA - 160+/-40 11963 10

Page 459 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI260
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y11962
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

261 C32/40 62% OPC+30%FA - 160+/-40 11961 10

262 C32/40 62% OPC+30%FA - 160+/-40 11960 10

263 C32/40 62% OPC+30%FA - 160+/-40 11959 10

264 C32/40 62% OPC+30%FA - 160+/-40 11958 10

265 C32/40 62% OPC+30%FA - 160+/-40 11957 10

266 C32/40 62% OPC+30%FA - 160+/-40 11956 10

Concreting for Cafeteria undercroft AHU pad (5 nos.) , Axis 02A - 02C zone 2A (As
KAIG3-RFI-CF-S-9626-00, highlighted), Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone
Cafeteria, Zone 1E
KAIG3-RFI-CF-S-9684-00, 2A Axis 02C-02B (as highlighted) TOC 863.450,Concreting for Diaphragm wall (1st C32/40 62% OPC+30%FA+8% MS - 220+/-20
267 & South 16-Oct-22 12143 10
KAIG3-RFI-CO-S-9712-00 & Part ) ( Vertical only ) at Zone 1E Axis 01P (As Highlighted) ( Level 868.50 ) & - SCREED
Administration
KAIG3-RFI-SA-S-9644-00 Concreting for retaining block wall strip footing Zone 2C South Admin building
(KAIG3-SCR-GN-S-0147-00)

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/11 at Zone-B
268 KAIG3-RFI-SW-C-7891-00 Site Work 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12133 5
(As Highlighted)

269 C32/40 62% OPC+30%FA - 160+/-40 12122 5

270 C32/40 62% OPC+30%FA - 160+/-40 12120 10

Concreting for Cafeteria undercroft AHU pad (5 nos.) Axis 02A - 02C zone 2A (As
271 KAIG3-RFI-CF-S-9626-00 Cafeteria 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12145 10
highlighted)

Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis
272 KAIG3-RFI-CF-S-9684-00 Cafeteria 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12144 11
02C-02B (as highlighted) TOC 863.450

Concreting for Diaphragm wall (1st Part ) ( Vertical only ) at Zone 1E Axis 01P (As
273 KAIG3-RFI-CO-S-9712-00 Crescent Zone 1E 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12137 10
Highlighted) ( Level 868.50 )

Concreting for RC Strip Footing Between PC 67-69-71, Axis 01-2, 01AH-01AI-01AJ at


274 KAIG3-RFI-CO-S-9707-00 Crescent Zone 1L 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12126 10
Zone 1L (As Highlighted)

275 C32/40 62% OPC+30%FA - 160+/-40 12121 10

Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis
276 KAIG3-RFI-CF-S-9684-00 Cafeteria 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12150 10
02C-02B (as highlighted) TOC 863.450

Concreting for Diaphragm wall (1st Part ) ( Vertical only ) at Zone 1E Axis 01P (As
277 KAIG3-RFI-CO-S-9712-00 Crescent Zone 1E 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12149 10
Highlighted) ( Level 868.50 )

Page 460 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for RC Strip Footing Between PC 67-69-71, Axis 01-2, 01AH-01AI-01AJ at LOAD /
SI278
No. KAIG3-RFI-CO-S-9707-00
RFI NUMBER Crescent Zone 1L 16-Oct-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12148
NOTE 9
LOCATION CASTING Zone 1L (As Highlighted) QUANTITY
No.
(m³)
South Concreting for retaining block wall strip footing Zone 2C South Admin building
279 KAIG3-RFI-SA-S-9644-00 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12147 10
Administration (KAIG3-SCR-GN-S-0147-00)

280 C32/40 62% OPC+30%FA - 160+/-40 12146 11

281 C32/40 62% OPC+30%FA - 160+/-40 12141 10

282 C32/40 62% OPC+30%FA - 160+/-40 12140 11

283 C32/40 62% OPC+30%FA - 160+/-40 12139 10

284 C32/40 62% OPC+30%FA - 160+/-40 12138 9

285 C32/40 62% OPC+30%FA - 160+/-40 12135 10

286 C32/40 62% OPC+30%FA - 160+/-40 12136 10

287 C32/40 62% OPC+30%FA - 160+/-40 12132 10

288 C32/40 62% OPC+30%FA - 160+/-40 12131 10

289 C32/40 62% OPC+30%FA - 160+/-40 12130 10

290 C32/40 62% OPC+30%FA - 160+/-40 12134 10

291 C32/40 62% OPC+30%FA - 160+/-40 12129 10

292 C32/40 62% OPC+30%FA - 160+/-40 12128 10

293 C32/40 62% OPC+30%FA - 160+/-40 12127 10

294 C32/40 62% OPC+30%FA - 160+/-40 12125 10

295 C32/40 62% OPC+30%FA - 160+/-40 12124 10

296 C32/40 62% OPC+30%FA - 160+/-40 12123 10

Page 461 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 1A, As per LOAD /
SI No. KAIG3-RFI-TB-S-9687-00
RFI NUMBER & DESCRIPTION DESIGN MIX MS - 220+/-20 Y NOTE
C32/40 62% OPC+30%FA+8%
297 LOCATION
Ticketing Booth CASTING
16-Oct-22 Attached Highlighted Drawing's. & Concrete Pouring & Shuttering for Slab of New 12142 QUANTITY
6
KAIG3-RFI-TB-S-9667-00 - SCREED No.
Ticketing Booth # 6A As per Attached Highlighted Drawing's. (m³)

Concreting for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to
South Small
298 KAIG3-RFI-SM-S-9717-00 17-Oct-22 1st Floor, zone 2B at Axis F-G & 1-3 ,from 869.25 to 873.150 ( KAIG3-SCR-SM-S- C32/40 62% OPC+30%FA - 160+/-40 12207 10
Mosque
0205-00 ),(As Highlighted)

South Small Concreting for South Small Mosque Second Floor Parapet at Axis A-G & 2-8 , Zone 2B
299 KAIG3-RFI-SM-S-9719-00 17-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12204 10
Mosque (as highlighted) TOC- 877.80

Concreting for RC Strip Footing Between PC 67-69-71, Axis 01-2, 01AH-01AI-01AJ at


300 KAIG3-RFI-CO-S-9707-00 Crescent Zone 1L 17-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12203 10
Zone 1L (As Highlighted)

301 C32/40 62% OPC+30%FA - 160+/-40 12202 10

302 C32/40 62% OPC+30%FA - 160+/-40 12198 10

303 C32/40 62% OPC+30%FA - 160+/-40 12197 10

304 C32/40 62% OPC+30%FA - 160+/-40 12193 10

305 C32/40 62% OPC+30%FA - 160+/-40 12192 10

306 C32/40 62% OPC+30%FA - 160+/-40 12189 10

307 C32/40 62% OPC+30%FA - 160+/-40 12187 10

308 C32/40 62% OPC+30%FA - 160+/-40 12186 10

309 C32/40 62% OPC+30%FA - 160+/-40 12185 10

310 C32/40 62% OPC+30%FA - 160+/-40 12184 10

311 C32/40 62% OPC+30%FA - 160+/-40 12183 10

312 C32/40 62% OPC+30%FA - 160+/-40 12182 10

313 C32/40 62% OPC+30%FA - 160+/-40 12181 10

314 C32/40 62% OPC+30%FA - 160+/-40 12180 10

315 C32/40 62% OPC+30%FA - 160+/-40 12179 10

Page 462 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI316
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12178
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

317 C32/40 62% OPC+30%FA - 160+/-40 12177 10

318 C32/40 62% OPC+30%FA - 160+/-40 12176 10

319 C32/40 62% OPC+30%FA - 160+/-40 12175 10

Concreting for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to
KAIG3-RFI-SM-S-9717-00 & South Small 1st Floor, zone 2B at Axis F-G & 1-3 ,from 869.25 to 873.150 ( KAIG3-SCR-SM-S- C32/40 62% OPC+30%FA+8% MS - 220+/-20
320 17-Oct-22 12200 10
KAIG3-RFI-SM-S-9719-00 Mosque 0205-00 ),(As Highlighted) & Concreting for South Small Mosque Second Floor Parapet - SCREED
at Axis A-G & 2-8 , Zone 2B (as highlighted) TOC- 877.80

Concreting for RC Strip Footing Between PC 67-69-71, Axis 01-2, 01AH-01AI-01AJ at C32/40 62% OPC+30%FA+8% MS - 220+/-20
321 KAIG3-RFI-CO-S-9707-00 Crescent Zone 1L 17-Oct-22 12194 10
Zone 1L (As Highlighted) - SCREED

Inspection for Blinding Concrete under MV Line Pulling Pit K/MV/04 at Zone-K - as
322 KAIG3-RFI-SW-C-7962-00 Zone K 17-Oct-22 C16/20 SRC 12199 7
highlighted

Concreting for Diaphragm wall Mass Concrete 3rd Layer of strip footing at Zone 1E
323 KAIG3-RFI-CO-S-9714-00 Crescent Zone 1E 17-Oct-22 C16/20 SRC 12208 10
Axis 01M (As Highlighted)

324 C16/20 SRC 12205 10

325 C16/20 SRC 12201 10

Concreting for Cafeteria (undercroft level) Wall (W 16, 17, 18) as highlighted, (W16
C32/40 62% OPC+30%FA+8% MS - 220+/-20
326 KAIG3-RFI-CF-S-9699-00 Cafeteria 18-Oct-22 from 863.45 upto 868.60), (W17 & 18 from 863.45 upto 868.30 zone 2A (KAIG3-SCR- 12253 10
- SCREED
CF-S-0194-00 with attachments)

Concreting for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
327 KAIG3-RFI-CO-S-9664-00 Crescent Zone 4 18-Oct-22 12245 7
highlighted) Zone 4 - SCREED

Concreting for Foundation of Retaining wall at Axis 01S-01U ( from Movement Joint to C32/40 62% OPC+30%FA+8% MS - 220+/-20
328 KAIG3-RFI-CO-S-9740-00 Crsecent Zone 1G 18-Oct-22 12240 8
Movement Joint ) (as highlighted) Zone 1G - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


329 12239 8
- SCREED

Concreting for Cafeteria (undercroft level) Wall (W 16, 17, 18) as highlighted, (W16
330 KAIG3-RFI-CF-S-9699-00 Cafeteria 18-Oct-22 from 863.45 upto 868.60), (W17 & 18 from 863.45 upto 868.30 zone 2A (KAIG3-SCR- C32/40 62% OPC+30%FA - 160+/-40 12251 10
CF-S-0194-00 with attachments)

Concreting for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as
331 KAIG3-RFI-CO-S-9664-00 Crescent Zone 4 18-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12250 10
highlighted) Zone 4

332 C32/40 62% OPC+30%FA - 160+/-40 12249 10

333 C32/40 62% OPC+30%FA - 160+/-40 12241 6

Concrete Pouring & Shuttering for Wall of Fountain (3), inside Physic Garden as
334 KAIG3-RFI-PG-S-9708-00 Physics Garden 18-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12243 7
highlighted area in attached drawing's.

Page 463 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concrete Pouring & Shuttering for Fountain 2 (Inner) (4 nos), Inside Physic Garden as LOAD /
SI335
No. KAIG3-RFI-PG-S-9856-00
RFI NUMBER Physics Garden 18-Oct-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12242
NOTE 8
LOCATION CASTING highlighted area in attached drawing's. QUANTITY
No.
(m³)
Inspection of Blinding Concrete under MV Line Pit - B/MV/14 at Zone-B - as
336 KAIG3-RFI-SW-C-8012-00 Zone B 18-Oct-22 C16/20 SRC 12252 10
highlighted

Concrete Pouring for Screed protection with Geo Textile on Blinding of Decant Sump- C32/40 62% OPC+30%FA+8% MS - 220+/-20
337 KAIG3-RFI-WG-S-9846-00 Water Garden 18-Oct-22 12256 3
D4 Inside Water Play garden, at Water Garden as highlighted area in attached drawing's. - SCREED

Concreting of Blinding for Diaphragm wall Foundation and Strip footing at Zone 1E
338 KAIG3-RFI-CO-S-9586-00 Crescent Zone 1E 18-Oct-22 C16/20 SRC 12257 7
Axis 01P (As Highlighted)

339 C16/20 SRC 12255 10

Concreting for Columns C2 at Zone 2N Child Care as highlighted (C2 -5 nos.) up to C32/40 62% OPC+30%FA+8% MS - 220+/-20
340 KAIG3-RFI-CC-S-9742-00 Child Care 19-Oct-22 12294 10
bottom of Slab. - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


341 12288 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


342 12285 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


343 12282 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


344 12276 10
- SCREED

345 KAIG3-RFI-SW-C-8075-00 Zone K 19-Oct-22 Blinding Concrete under LV line Pit K-LV-05,14,42,10,08,41 at zone-k C16/20 SRC 12277 10

Sotuh Shuttering for blinding of retaining block wall strip footing Zone 2C South Admin
346 KAIG3-RFI-SA-S-9573-00 19-Oct-22 C16/20 SRC 12283 7
Administration building (KAIG3-SCR-GN-S-0147-00)

Concreting for Infill wall (inner) at zone 2A Between 02C-02D from 863.55 to 869.16 C32/40 62% OPC+30%FA+8% MS - 220+/-20
347 KAIG3-RFI-CO-S-9762-00 Crescent Zone 2A 20-Oct-22 12324 5
(As Highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


348 12323 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


349 12320 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


350 12319 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


351 12316 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


352 12308 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


353 12307 10
- SCREED

Concreting for Blinding under Foundation for North Watch Tower in zone 1 (as
354 KAIG3-RFI-NT-S-9753-00 North watch Tower 20-Oct-22 C16/20 SRC 12317 5
highlighted)

Page 464 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI355
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y12311
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

356 C16/20 SRC 12310 10

357 C16/20 SRC 12309 10

Concreting for MCPE 2 Roof slab at Zone 2K axis 03E to 02X (As Highlighted) TOC
358 KAIG3-RFI-MC-S-9767-00 MCPE 2 20-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12318 4
875.974 & 875.850

359 C32/40 62% OPC+30%FA - 160+/-40 12314 10

360 C32/40 62% OPC+30%FA - 160+/-40 12313 10

361 C32/40 62% OPC+30%FA - 160+/-40 12312 10

362 KAIG3-RFI-SW-C-8076-00 Site Work 20-Oct-22 BLinding Concrete under MV line Pit G-MV-23, 04 C16/20 SRC 12321 10

363 C16/20 SRC 12315 10

Concreting for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC
364 KAIG3-RFI-CO-S-9869-00 Crescent Zone 1M 22-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12403 7
72-74 & PC 76-78(as highlighted)

365 C32/40 62% OPC+30%FA - 160+/-40 12402 10

366 C32/40 62% OPC+30%FA - 160+/-40 12392 10

367 C32/40 62% OPC+30%FA - 160+/-40 12391 10

368 C32/40 62% OPC+30%FA - 160+/-40 12388 9

369 C32/40 62% OPC+30%FA - 160+/-40 12387 11

370 C32/40 62% OPC+30%FA - 160+/-40 12386 10

Concreting for blinding of retaining wall foundation zone 5 from axis 01G upto after 01E
371 KAIG3-RFI-CO-S-9793-00 Crescent Zone 5 22-Oct-22 C16/20 SRC 12393 10
(as highligted)

"Inspection of Casting Concrete for Short Piece and Surface Preperation prior to start
C32/40 62% OPC+30%FA+8% MS - 220+/-20
372 KAIG3-RFI-SW-C-7882-00 Site Work 22-Oct-22 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for short 12394 4
- SCREED
piece of Manhole MH-O-11 and Gullies G-O-11, G-O-12, G-O-13 (As Highlighted)

Page 465 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
Concrete Pouring for Screed protection with Geo Textile for Wet area's inside Toilets DELIVER
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER Management (GF-5004, 5006, 5035, 5036 & 5037) DESCRIPTION
Hand Wash (GF-5038) area, At Management and DESIGN MIX MS - 220+/-20 Y NOTE
C32/40 62% OPC+30%FA+8%
373 KAIG3-RFI-MB-A-1168-00 LOCATION CASTING
22-Oct-22 12396 QUANTITY
4
Building Maintenance Building as highlighted area in attached Drawing's and KAIG3-SCR-PT- - SCREED No.
(m³)
A-0084-00

Shuttering and Concreting for Energy Center, Beam Grid 18-30/R (As Highlighted) at
374 KAIG3-RFI-EC-S-9806-00 Energy Center 22-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12409 10
Level 878.50

Shuttering and Concreting for Energy Center Internal Column (neck) at Axis 7/D-G , 8-
375 KAIG3-RFI-EC-S-9805-00 Energy Center 22-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12408 10
10/D-H , 11-12/ D (as highlighted)

Concreting for Diaphragm wall (1st part) foundationat zone 1E Axis 01M (As
376 KAIG3-RFI-CO-S-9801-00 Crescent Zone 1E 22-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12407 10
Highlighted)

377 C32/40 62% OPC+30%FA - 160+/-40 12406 10

378 C32/40 62% OPC+30%FA - 160+/-40 12395 10

379 C32/40 62% OPC+30%FA - 160+/-40 12405 10

380 C32/40 62% OPC+30%FA - 160+/-40 12404 10

381 C32/40 62% OPC+30%FA - 160+/-40 12401 10

382 C32/40 62% OPC+30%FA - 160+/-40 12400 9

383 C32/40 62% OPC+30%FA - 160+/-40 12398 11

384 C32/40 62% OPC+30%FA - 160+/-40 12397 10

Concreting for Front Canopy Foundation at Zone 6 Axis 0101C, 01D, 01E, 01F (as
385 KAIG3-RFI-CO-S-9799-00 Crescent Zone 6 23-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12441 10
highlighted) TOC 865.060

Concreting for Diaphragm wall foundation (4) & strip footing (3) at zone 1E Axis 01P
386 KAIG3-RFI-CO-S-9815-00 Crescent Zone 1E 23-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12439 10
(As Highlighted)

Shuttering and Concreting for Columns of Energy Center, Grid 22-27/M ( 21 nos ) &
387 KAIG3-RFI-EC-S-9812-00 Energy Center 23-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12436 10
Grid 28-30/R-N ( 27 nos ) upto Level 878.00 (As Highlighted)

388 C32/40 62% OPC+30%FA - 160+/-40 12435 10

389 C32/40 62% OPC+30%FA - 160+/-40 12434 10

390 C32/40 62% OPC+30%FA - 160+/-40 12433 10

391 C32/40 62% OPC+30%FA - 160+/-40 12426 8

Page 466 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI392
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12425
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Concreting for Front Canopy Foundation at Zone 6 Axis 0101C, 01D, 01E, 01F (as
KAIG3-RFI-CO-S-9799-00 & Crescent Zone 6 &
393 23-Oct-22 highlighted) TOC 865.060 & Concreting for Diaphragm wall foundation (4) & strip C32/40 67%OPC+25%FA - 160+/-40 12437 11
KAIG3-RFI-CO-S-9815-00 Crescent Zone 1E
footing (3) at zone 1E Axis 01P (As Highlighted)

Shuttering and Concreting for Columns of Energy Center, Grid 22-27/M ( 21 nos ) &
394 KAIG3-RFI-EC-S-9812-00 Energy Center 23-Oct-22 C32/40 67%OPC+25%FA - 160+/-40 12432 11
Grid 28-30/R-N ( 27 nos ) upto Level 878.00 (As Highlighted)

Concreting for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC
395 KAIG3-RFI-CO-S-9869-00 Crescent Zone 1M 23-Oct-22 C32/40 67%OPC+25%FA - 160+/-40 12440 6
72-74 & PC 76-78(as highlighted)

Concreting for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
396 KAIG3-RFI-CO-S-9808-00 Crescent Zone 2A 24-Oct-22 12467 10
Highlighted) Level from 863.55 - 869.10 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


397 KAIG3-RFI-MC-S-9823-00 MCPE 2 24-Oct-22 Concreting for MCPE 2 Roof Slab,Axis 02X-03F,Zone 2G(As Highlighted ) 12464 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


398 12463 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


399 12452 10
- SCREED

Concreting for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As
400 KAIG3-RFI-CO-S-9808-00 Crescent Zone 2A 24-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12457 10
Highlighted) Level from 863.55 - 869.10

401 KAIG3-RFI-MC-S-9823-00 MCPE 2 24-Oct-22 Concreting for MCPE 2 Roof Slab,Axis 02X-03F,Zone 2G(As Highlighted ) C32/40 62% OPC+30%FA - 160+/-40 12456 10

402 C32/40 62% OPC+30%FA - 160+/-40 12455 10

403 C32/40 62% OPC+30%FA - 160+/-40 12454 10

404 C32/40 62% OPC+30%FA - 160+/-40 12453 10

Inspection of Blinding Concrete under Potable Water Line Pit B/PW/10 at Zone-B - as
405 KAIG3-RFI-SW-C-8087-00 Zone B 24-Oct-22 C16/20 SRC 12468 4
highlighted

Concreting for Blinding of Diaphragm wall Foundation at Zone 2C Axis 02J (As
406 KAIG3-RFI-CO-S-9841-00 Crescent Zone 2C 25-Oct-22 C16/20 SRC 12503 11
Highlighted)

407 C16/20 SRC 12502 10

408 C16/20 SRC 12501 9

409 C16/20 SRC 12500 10

410 C16/20 SRC 12499 10

Page 467 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI411
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y12498
NOTE 11
LOCATION CASTING QUANTITY
No.
(m³)

412 C16/20 SRC 12497 10

413 C16/20 SRC 12496 10

414 C16/20 SRC 12495 10

415 C16/20 SRC 12494 9

416 C16/20 SRC 12492 10

417 C16/20 SRC 12491 10

418 C16/20 SRC 12490 10

419 C16/20 SRC 12489 10

420 C16/20 SRC 12488 10

421 C16/20 SRC 12486 10

422 C16/20 SRC 12485 10

423 C16/20 SRC 12484 10

424 C16/20 SRC 12483 10

425 C16/20 SRC 12482 10

Concreting for Large Mosque for Upper First Floor for Columns & Walls
426 KAIG3-RFI-LM-S-9842-00 Large Mosque 25-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12509 10
(C4,C5,C1,C1B,W5) , Axis C-E, 2-5 Zone 1G (as highlighted)

427 C32/40 62% OPC+30%FA - 160+/-40 12507 10

428 C32/40 62% OPC+30%FA - 160+/-40 12505 10

429 C32/40 62% OPC+30%FA - 160+/-40 12493 10

430 C32/40 62% OPC+30%FA - 160+/-40 12487 10

Page 468 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for Large Mosque for Upper First Floor for Columns & Walls C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI431
No. KAIG3-RFI-LM-S-9842-00
RFI NUMBER Large Mosque 25-Oct-22 DESCRIPTION DESIGN MIX Y12508
NOTE 10
LOCATION CASTING (C4,C5,C1,C1B,W5) , Axis C-E, 2-5 Zone 1G (as highlighted) - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
432 12504 10
- SCREED

Screed protection with Geo Textile for Wet Area inside Toilets (GF-5041 & 5042)
Management C32/40 62% OPC+30%FA+8% MS - 220+/-20
433 KAIG3-RFI-MB-A-1221-00 25-Oct-22 Disabled Toilet (GF-5043), inside Management and Maintenance Building as 12506 8
Building - SCREED
highlighted area in attached Drawing's & KAIG3-SCR-PT-A-0084-00-Reply

Concreting for Devonian Garden Foundation at zone 2M ,Axis 03S,03T,03U (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
434 KAIG3-RFI-VG-S-9871-00 Devonian Garden 26-Oct-22 12557 11
Highlighted) TOC 871.00 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


435 KAIG3-RFI-CO-S-9861-00 Crescent Zone 2F 26-Oct-22 Concreting for ( Outer )Infill Wall at Zone 2F, Axis between 02U-02V (As Highlighted) 12550 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


436 12549 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


437 12529 10
- SCREED

Concreting for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC
438 KAIG3-RFI-CO-S-9869-00 Crescent Zone 1M 26-Oct-22 C16/20 SRC 12559 4
72-74 & PC 76-78(as highlighted)

439 C16/20 SRC 12555 10

440 C16/20 SRC 12546 10

441 C16/20 SRC 12545 10

442 C16/20 SRC 12544 10

443 C16/20 SRC 12543 9

444 C16/20 SRC 12541 10

445 C16/20 SRC 12540 11

446 C16/20 SRC 12539 10

447 C16/20 SRC 12538 10

448 C16/20 SRC 12536 10

449 C16/20 SRC 12535 10

Page 469 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI450
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y12534
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

451 C16/20 SRC 12533 10

452 C16/20 SRC 12532 10

453 C16/20 SRC 12530 10

Inspection of Blinding Concrete under Fire Water Line Pit B/F/02 at Zone-B - as
454 KAIG3-RFI-SW-C-8088-00 Zone B 26-Oct-22 C16/20 SRC 12554 10
highlighted

455 C16/20 SRC 12542 10

456 C16/20 SRC 12537 10

457 C16/20 SRC 12531 10

458 C16/20 SRC 12525 10

Concreting for COLUMNS ( C2 - 8 nos) (C3 - 2 nos) at Zone 2N Child Care (as
459 KAIG3-RFI-CC-S-9853-00 Child Care 26-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12560 4
highlighted) Upto bottom of Slab

460 C32/40 62% OPC+30%FA - 160+/-40 12548 10

461 C32/40 62% OPC+30%FA - 160+/-40 12547 10

462 C32/40 62% OPC+30%FA - 160+/-40 12558 10

463 C32/40 62% OPC+30%FA - 160+/-40 12556 10

464 C32/40 62% OPC+30%FA - 160+/-40 12528 10

465 C32/40 62% OPC+30%FA - 160+/-40 12527 10

466 C32/40 62% OPC+30%FA - 160+/-40 12526 10

Inspection of Blinding Concrete under RO Water Line Pit ROW-ISC-17 & POC-24 at
467 KAIG3-RFI-SW-C-8089-00 Zone B 27-Oct-22 C16/20 SRC 12587 10
Zone-B - As highlighted

468 C16/20 SRC 12588 3

469 C16/20 SRC 12591 7

Page 470 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF "Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - H/MV/30 at Zone-H LOAD /
SI470
No. KAIG3-RFI-SW-C-7958-00
RFI NUMBER Zone H 27-Oct-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12595
NOTE 10
LOCATION CASTING (As Highlighted) " QUANTITY
No.
(m³)
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - D/MV/05 &
471 KAIG3-RFI-SW-C-7961-00 Zone D 27-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12594 10
D/MV/20 at Zone-D (As Highlighted)

472 KAIG3-RFI-CO-S-9901-00 Crescent Zone 6 & 7 27-Oct-22 Concreting for Retaining wall (wall) from axis 02E-02F Zone 6&7 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 12602 8

473 C32/40 62% OPC+30%FA - 160+/-40 12600 10

474 C32/40 62% OPC+30%FA - 160+/-40 12599 10

475 C32/40 62% OPC+30%FA - 160+/-40 12592 10

476 C32/40 62% OPC+30%FA - 160+/-40 12596 10

Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As
KAIG3-RFI-EC-S-9925-00 & C32/40 62% OPC+30%FA+8% MS - 220+/-20
477 Energy Center 29-Oct-22 Highlighted) & Shuttering and concreting for Energy Center, columns at Grid 28-30/R 12634 10
KAIG3-RFI-EC-S-9926-00 - SCREED
( 20 nos ) at level 878.00 (As Highlighted)

Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
478 KAIG3-RFI-MC-S-9938-00 MCPE 2 29-Oct-22 12629 10
highlighted) 874.80 Zone 2H - SCREED

Concreting for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and C32/40 62% OPC+30%FA+8% MS - 220+/-20
479 KAIG3-RFI-CO-S-9893-00 Crescent Zone 1L 29-Oct-22 12620 10
01AI to 01AJ (As Highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


480 12618 10
- SCREED

Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As
KAIG3-RFI-EC-S-9925-00 &
481 Energy Center 29-Oct-22 Highlighted) & Shuttering and concreting for Energy Center, columns at Grid 28-30/R C32/40 62% OPC+30%FA - 160+/-40 12619 10
KAIG3-RFI-EC-S-9926-00
( 20 nos ) at level 878.00 (As Highlighted)

Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As
KAIG3-RFI-EC-S-9925-00 &
482 Energy Center 29-Oct-22 Highlighted) & Shuttering and concreting for Energy Center, columns at Grid 28-30/R C32/40 67%OPC+25%FA - 160+/-40 12631 3
KAIG3-RFI-EC-S-9926-00
( 20 nos ) at level 878.00 (As Highlighted)

Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as
483 KAIG3-RFI-MC-S-9938-00 MCPE 2 29-Oct-22 C32/40 67%OPC+25%FA - 160+/-40 12621 11
highlighted) 874.80 Zone 2H

Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As
KAIG3-RFI-EC-S-9925-00 &
484 Energy Center 29-Oct-22 Highlighted) & Shuttering and concreting for Energy Center, columns at Grid 28-30/R C32/40 62% OPC+30%FA - 160+/-40 12635 10
KAIG3-RFI-EC-S-9926-00
( 20 nos ) at level 878.00 (As Highlighted)

Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as
485 KAIG3-RFI-MC-S-9938-00 MCPE 2 29-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12633 10
highlighted) 874.80 Zone 2H

Concreting for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and
486 KAIG3-RFI-CO-S-9893-00 Crescent Zone 1L 29-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12632 10
01AI to 01AJ (As Highlighted)

487 C32/40 62% OPC+30%FA - 160+/-40 12627 10

Page 471 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI488
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12625
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

489 C32/40 62% OPC+30%FA - 160+/-40 12624 10

Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/17 &
490 KAIG3-RFI-SW-C-7953-00 Zone H 30-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12636 5
C/MV/44 at Zone-H (As Highlighted)

Concreting of Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-
491 KAIG3-RFI-EC-S-9924-00 Energy Center 30-Oct-22 C16/20 SRC 12646 10
22/N , 12-19/O-P , 21-22/O-P (as highlighted)

492 C16/20 SRC 12645 10

493 C16/20 SRC 12643 10

494 C16/20 SRC 12642 10

495 C16/20 SRC 12641 10

496 C16/20 SRC 12640 10

497 C16/20 SRC 12639 10

498 C16/20 SRC 12638 10

499 C16/20 SRC 12637 10

Concreting of Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-
500 KAIG3-RFI-EC-S-9924-00 Energy Center 30-Oct-22 C16/20 SRC 12644 10
22/N , 12-19/O-P , 21-22/O-P (as highlighted)

Concreting For North Administration Building Zone 2R Axis 02AZ , 02BA , 02BB ,
North C32/40 62% OPC+30%FA+8% MS - 220+/-20
501 KAIG3-RFI-NA-S-9918-00 30-Oct-22 Walls ( W18 , W17 ,W5 , W6 , W16 , W4 , W15 , W3 ) first Floor upto 876.80 (As 12653 6
Administration - SCREED
Highlighted ) upto 876.80

C32/40 62% OPC+30%FA+8% MS - 220+/-20


502 12652 3
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


503 12651 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


504 12650 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


505 12648 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


506 12647 10
- SCREED

Concrete Pouring & Shuttering for Foundation & Kicker of Decant Sump-D4 Inside
507 KAIG3-RFI-WG-C-8475-00 Water Garden 30-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12649 9
Water Play garden, at Water Garden as highlighted area in attached drawing's.

Page 472 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for Infill wall (Inner ( Vertical ) ) at Zone 2K at Between Axis 02AE-02AF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI508
No. KAIG3-RFI-CO-S-9908-00
RFI NUMBER Crescent Zone 2K 31-Oct-22 DESCRIPTION DESIGN MIX Y12694
NOTE 9
LOCATION CASTING ( As Highlighted) - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
509 12690 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


510 12687 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


511 12686 6
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


512 12685 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


513 12684 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


514 12682 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


515 12678 10
- SCREED

Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as
516 KAIG3-RFI-MC-S-9938-00 MCPE 2 31-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12681 10
highlighted) 874.80 Zone 2H

517 C32/40 62% OPC+30%FA - 160+/-40 12680 10

518 C32/40 62% OPC+30%FA - 160+/-40 12679 10

Concreting of Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 19/P ,
519 KAIG3-RFI-EC-S-10074-00 Energy Center 31-Oct-22 C16/20 SRC 12695 10
21-24/P , 23-24/Q, (As Highlighted)

520 C16/20 SRC 12693 10

521 C16/20 SRC 12692 10

522 C16/20 SRC 12691 10

523 C16/20 SRC 12689 10

524 C16/20 SRC 12688 10

Concrete Design Mix Quantity m3

Page 473 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF 895 LOAD /
SI No. RFI NUMBER C32/40 62% OPC+30%FA+8% MSDESCRIPTION
- 220+/-20 - SCREED DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
2212
C32/40 62% OPC+30%FA - 160+/-40

C16/20 SRC 1839

C32/40 67%OPC+25%FA - 160+/-40 69

TOTAL QUANTITY TRUCK LOAD (M³): 5015.00

Prepared by: Document Controller Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

Page 474 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER 28 DAYS
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE 7 AND
LOCATION CASTING QUANTITY
No. DAYS MORE THAN 28
(m³)
DAYS

Concreting for Infill wall (inner) at Zone 1A at Axis 01A-01B-01C-01D (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-CO-S-10021-00 Crescent Zone 1A 1-Nov-22 12729 3
Highlighted) level upto 872.00 - SCREED

Concreting for Child Care Walls and Columns , Walls W6 (1 no.), W1 (1 no.)) Columns
C32/40 62% OPC+30%FA+8% MS - 220+/-20
2 KAIG3-RFI-CC-S-9954-00 Child Care 1-Nov-22 (C3 (1 no.) at Zone 2N Child Care (As Highlighted) Upto Bottom Level of Suspended 12724 10
- SCREED
Slab

C32/40 62% OPC+30%FA+8% MS - 220+/-20


3 12712 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


4 12709 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


5 12699 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


6 12697 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


7 12696 10
- SCREED

Concrete Pouring & shuttering for Wall of Fountain 1 (1 no's) at Right side of Outer
8 KAIG3-RFI-PG-S-9966-00 Physics Garden 1-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12726 7
Canopy 3, Inside Physic Garden as highlighted area in attached drawing's.

Concrete Pouring & Shuttering for Kicker of Cabin Room, ETFE Pump Room, Water
9 KAIG3-RFI-TG-S-9972-00 Butterfly Garden 1-Nov-22 feature Pump Room & Remaining Boundary wall, at Butterfly Garden, as highlighted C32/40 62% OPC+30%FA - 160+/-40 12723 8
area in attached drawing's.

Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - D/MV/04, E/MV/01,
10 KAIG3-RFI-SW-C-8003-00 Zone D & E 1-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12713 10
E/MV/03, E/MV/02, E/MV/05 at Zone-D&E (As Highlighted)

11 C32/40 62% OPC+30%FA - 160+/-40 12710 10

Concreting for walls (W1,W2) at CAFETERIA from level 862.00 to level 869.10 zone
12 KAIG3-RFI-CF-S-8576-00 Cafeteria 1-Nov-22 C16/20 SRC 12698 10
2A (as highlighted)

Concreting of Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-
13 KAIG3-RFI-EC-S-9924-00 Energy Center 1-Nov-22 C16/20 SRC 12728 5
22/N , 12-19/O-P , 21-22/O-P (as highlighted)

14 C16/20 SRC 12727 10

Page 475 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI15
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y12722
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

Page 476 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI16
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y12721
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

17 C16/20 SRC 12720 10

18 C16/20 SRC 12719 10

19 C16/20 SRC 12718 10

20 C16/20 SRC 12717 10

21 C16/20 SRC 12715 10

22 C16/20 SRC 12714 10

23 C16/20 SRC 12708 10

24 C16/20 SRC 12711 10

25 C16/20 SRC 12707 10

26 C16/20 SRC 12706 10

27 C16/20 SRC 12705 10

28 C16/20 SRC 12704 10

Concreting for Diaphragm wall Foundation and Strip footing at zone 1E Axis 01M (as
29 KAIG3-RFI-CO-S-9963-00 Crescent Zone 1E 2-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12806 10
highlighted) (left part)

Concreting for Rc Foundations of Retaining wall Between Axis 01G-01C Zone 5 (as
30 KAIG3-RFI-CO-S-9990-00 Crescent Zone 5 2-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12801 10
highlighted)

31 C32/40 62% OPC+30%FA - 160+/-40 12800 10

Page 477 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI32
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12797
NOTE
LOCATION CASTING QUANTITY
No.
(m³)

33 C32/40 62% OPC+30%FA - 160+/-40 12794 10

34 C32/40 62% OPC+30%FA - 160+/-40 12787 10

35 C32/40 62% OPC+30%FA - 160+/-40 12793 10

36 C32/40 62% OPC+30%FA - 160+/-40 12788 10

37 C32/40 62% OPC+30%FA - 160+/-40 12781 10

38 C32/40 62% OPC+30%FA - 160+/-40 12780 10

39 C32/40 62% OPC+30%FA - 160+/-40 12779 10

40 C32/40 62% OPC+30%FA - 160+/-40 12778 10

41 C32/40 62% OPC+30%FA - 160+/-40 12777 10

42 C32/40 62% OPC+30%FA - 160+/-40 12776 10

43 C32/40 62% OPC+30%FA - 160+/-40 12775 10

44 C32/40 62% OPC+30%FA - 160+/-40 12774 10

45 C32/40 62% OPC+30%FA - 160+/-40 12773 10

46 C32/40 62% OPC+30%FA - 160+/-40 12772 10

Concreting for Blinding under Retaining wall Foundation from Axis 02E-02C Zone 6&7
47 KAIG3-RFI-CO-S-10008-00 Zone 6 & 7 3-Nov-22 C16/20 SRC 12851 7
(As Highlighted)

Page 478 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI48
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y12837
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

49 C16/20 SRC 12832 10

Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 3A, As per C32/40 62% OPC+30%FA+8% MS - 220+/-20
50 KAIG3-RFI-TB-S-9994-00 Ticketing Booth 3-Nov-22 12830 4
Attached Highlighted Drawing's. - SCREED

Concreting for wall (W3 ) at CAFETERIA Zone 2A , Axis 02A-02B (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
51 KAIG3-RFI-CF-S-10005-00 Cafeteria 3-Nov-22 12847 9
Level from 863.55 to 868.75 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


52 KAIG3-RFI-CO-S-9987-00 Crescent Zone 1E 3-Nov-22 Concreting for Diaphragm wall ( Vertical ) at zone 1E Axis 01P (As Highlighted) 12840 11
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


53 12833 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


54 12831 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


55 12829 7
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


56 12828 10
- SCREED

57 KAIG3-RFI-SW-C-8450-00 Zone C 6-Nov-22 Inspection of Blinding Concrete under Sub-station - R1 at Zone-C - as highlighted C16/20 SRC 12942 10

Inspection of Blinding Concrete under Heating and Chilled Water Line Pit B/DC/07 at
58 KAIG3-RFI-SW-C-8463-00 Zone B 6-Nov-22 C16/20 SRC 12940 10
Zone-B - As highlighted

59 C16/20 SRC 12938 10

60 KAIG3-RFI-MC-S-10036-00 MCPE 2 6-Nov-22 Concreting for MCPE 2 Roof Slab , Axis 02Y-02Z, Zone 2H (As Highlighted ) C32/40 62% OPC+30%FA - 160+/-40 12941 10

Concreting for Infill wall (inner) at Zone 1A at Axis 01A-01B-01C-01D (As


61 KAIG3-RFI-CO-S-10021-00 Crescent Zone 1A 6-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12937 10
Highlighted) level upto 872.00

62 C32/40 62% OPC+30%FA - 160+/-40 12936 10

63 C32/40 62% OPC+30%FA - 160+/-40 12935 10

Page 479 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI64
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12934
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
65 KAIG3-RFI-MC-S-10036-00 MCPE 2 6-Nov-22 Concreting for MCPE 2 Roof Slab , Axis 02Y-02Z, Zone 2H (As Highlighted ) 12943 3
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


66 12939 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


67 12933 10
- SCREED

Concreting of Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N ,
68 KAIG3-RFI-EC-S-10077-00 Energy Center 7-Nov-22 C16/20 SRC 13000 10
29/O (As Highlighted)

69 C16/20 SRC 12998 10

70 C16/20 SRC 12997 10

71 C16/20 SRC 12995 10

72 C16/20 SRC 12994 10

73 C16/20 SRC 12993 10

74 C16/20 SRC 12991 10

75 C16/20 SRC 12990 10

76 C16/20 SRC 12989 10

77 C16/20 SRC 12988 11

78 C16/20 SRC 12986 10

Page 480 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI79
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y12985
NOTE 9
LOCATION CASTING QUANTITY
No.
(m³)

80 C16/20 SRC 12984 10

81 C16/20 SRC 12983 10

82 C16/20 SRC 12982 10

83 KAIG3-RFI-CO-S-10044-00 Crescent Zone 1D 7-Nov-22 Concreting for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted) C32/40 67%OPC+25%FA - 160+/-40 12977 10

Shuttering and concreting for Energy Center Beam at Grid 0-14/I-L at level 878.50 (As
84 KAIG3-RFI-EC-S-9997-00 Energy Center 7-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 12975 10
Highlighted)

Concreting for MCPE 2 Wall & Counterfort , Axis 02AD-02AE, Zone 2J (As
85 KAIG3-RFI-MC-S-10033-00 MCPE 2 7-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 12973 10
Highlighted )

86 C32/40 67%OPC+25%FA - 160+/-40 12971 10

87 KAIG3-RFI-CO-S-10044-00 Crescent Zone 1D 7-Nov-22 Concreting for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13003 2

Shuttering and concreting for Energy Center Beam at Grid 0-14/I-L at level 878.50 (As
88 KAIG3-RFI-EC-S-9997-00 Energy Center 7-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13001 11
Highlighted)

Concreting for MCPE 2 Wall & Counterfort , Axis 02AD-02AE, Zone 2J (As
89 KAIG3-RFI-MC-S-10033-00 MCPE 2 7-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12987 10
Highlighted )

90 C32/40 62% OPC+30%FA - 160+/-40 12980 10

91 C32/40 62% OPC+30%FA - 160+/-40 12979 10

92 C32/40 62% OPC+30%FA - 160+/-40 12978 10

93 C32/40 62% OPC+30%FA - 160+/-40 12976 10

94 C32/40 62% OPC+30%FA - 160+/-40 12974 10

Page 481 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI95
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y12972
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

96 C32/40 62% OPC+30%FA - 160+/-40 12970 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


97 KAIG3-RFI-CO-S-10044-00 Crescent Zone 1D 7-Nov-22 Concreting for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted) 13005 8
- SCREED

Shuttering and concreting for Energy Center Beam at Grid 0-14/I-L at level 878.50 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
98 KAIG3-RFI-EC-S-9997-00 Energy Center 7-Nov-22 13004 10
Highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


99 13002 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


100 12999 5
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


101 12996 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


102 12992 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


103 12981 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


104 12969 8
- SCREED

Concrete Pouring & Shuttering for Fountain 2 (Outer) (4 nos) Inside Physic Garden as
105 KAIG3-RFI-PG-S-10057-00 Physics Garden 8-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13058 10
highlighted area in attached drawing's.

Concrete Pouring for Blinding under Decant Sump-D1,D2 & D3 at Geyser Garden,
KAIG3-RFI-WG-C-8513-00; inside Water Garden as highlighted area in attached drawing's & KAIG3-SCR-WG-S-
106 KAIG3-RFI-WG-C-8430-00 & Water Garden 8-Nov-22 0212-00-Reply. & Concrete Pouring for Blinding under Decant Sump-D3 at Mist C16/20 SRC 13059 5
KAIG3-RFI-WG-C-8512-00 Garden, inside Water Garden as highlighted area in attached drawing's & KAIG3-SCR-
WG-S-0212-00-Reply.

107 C16/20 SRC 13051 11

Concrete Pouring & Shuttering for Ring Beams at Entrance of Back of House @ Grid
108 KAIG3-RFI-AG-S-10056-00 Aviary Garden 8-Nov-22 (17-21/Left Side) or 30 to 32, on Boundary wall at Aviary Garden, As per Highlighted in C32/40 67%OPC+25%FA - 160+/-40 13049 5
attached Drawing's.

"Inspection of Formwork and Concrete Pouring for the Expansion Joint of SBC-07 (As
109 KAIG3-RFI-SW-C-8521-00 Site Work (SBC-07) 8-Nov-22 C16/20 SRC 13060 10
Highlighted)"

Page 482 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI110
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y13048
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

111 C16/20 SRC 13144 3

"Inspection of Formwork and Concrete Pouring for Footing of MV Line Pulling Pit -
112 KAIG3-RFI-SW-C-8509-00 Zone C 8-Nov-22 C/MV/07, C/MV/08, C/MV/09, C/MV/27, C/MV/26 & C/MV/37 at Zone-C - As C32/40 62% OPC+30%FA - 160+/-40 13041 5
Highlighted (SCR: KAIG3-SCR-SW-E-0088-00)"

113 C32/40 62% OPC+30%FA - 160+/-40 13036 10

Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As
114 KAIG3-RFI-CO-S-10061-00 Crescent Zone 1M 8-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13067 9
Highlighted)

Concreting for Foundation of Retaining wall from Axis 01P-01S , Zone 2&3 (as
115 KAIG3-RFI-CO-S-10039-00 Crescent Zone 2 & 3 8-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13066 10
highlighted)

116 C32/40 62% OPC+30%FA - 160+/-40 13063 10

117 C32/40 62% OPC+30%FA - 160+/-40 13062 10

118 C32/40 62% OPC+30%FA - 160+/-40 13061 10

119 C32/40 62% OPC+30%FA - 160+/-40 13057 10

120 C32/40 62% OPC+30%FA - 160+/-40 13056 10

121 C32/40 62% OPC+30%FA - 160+/-40 13055 10

122 C32/40 62% OPC+30%FA - 160+/-40 13054 10

123 C32/40 62% OPC+30%FA - 160+/-40 13053 10

124 C32/40 62% OPC+30%FA - 160+/-40 13052 10

Page 483 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI125
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13047
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

126 C32/40 62% OPC+30%FA - 160+/-40 13046 10

127 C32/40 62% OPC+30%FA - 160+/-40 13045 10

128 C32/40 62% OPC+30%FA - 160+/-40 13044 10

129 C32/40 62% OPC+30%FA - 160+/-40 13043 10

130 C32/40 62% OPC+30%FA - 160+/-40 13042 10

131 C32/40 62% OPC+30%FA - 160+/-40 13040 10

132 C32/40 62% OPC+30%FA - 160+/-40 13039 10

133 C32/40 62% OPC+30%FA - 160+/-40 13038 10

134 C32/40 62% OPC+30%FA - 160+/-40 13037 10

135 C32/40 62% OPC+30%FA - 160+/-40 13035 10

136 C32/40 62% OPC+30%FA - 160+/-40 13034 10

137 C32/40 62% OPC+30%FA - 160+/-40 13033 10

Page 484 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI138
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13032
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

139 KAIG3-RFI-VG-S-10087-00 Devonian Garden 9-Nov-22 Concreting for Devonian Garden Wall at Zone 2M (As Highlighted) upto Level 874.60 C32/40 62% OPC+30%FA - 160+/-40 13105 10

140 C32/40 62% OPC+30%FA - 160+/-40 13092 10

141 C32/40 62% OPC+30%FA - 160+/-40 13089 5

142 C32/40 62% OPC+30%FA - 160+/-40 13087 10

143 KAIG3-RFI-VG-S-10087-00 Devonian Garden 9-Nov-22 Concreting for Devonian Garden Wall at Zone 2M (As Highlighted) upto Level 874.60 C32/40 62% OPC+30%FA - 160+/-40 13112 5

144 C32/40 62% OPC+30%FA - 160+/-40 13111 10

145 C32/40 62% OPC+30%FA - 160+/-40 13110 10

146 C32/40 62% OPC+30%FA - 160+/-40 13106 10

147 C32/40 62% OPC+30%FA - 160+/-40 13102 10

148 C32/40 62% OPC+30%FA - 160+/-40 13099 10

149 C32/40 62% OPC+30%FA - 160+/-40 13098 10

150 C32/40 62% OPC+30%FA - 160+/-40 13091 10

151 C32/40 62% OPC+30%FA - 160+/-40 13088 10

"Inspection of Formwork and Concrete Pouring for the Expansion Joint of SBC-07 (As
152 KAIG3-RFI-SW-C-8521-00 Site Work (SBC-07) 9-Nov-22 C16/20 SRC 13107 10
Highlighted)"

Page 485 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As LOAD /
SI No. KAIG3-RFI-CF-S-10089-00
RFI NUMBER & DESCRIPTION DESIGN MIX MS - 220+/-20 Y NOTE
C32/40 62% OPC+30%FA+8%
153 LOCATION
Cafeteria CASTING
10-Nov-22 Highlighted ) Level to 868.75 , KAIG3-SCR-CO-S-0194-01 & Concreting for wall (W4) 13163 QUANTITY
10
KAIG3-RFI-CF-S-10093-00 - SCREED No.
at cafeteria undercroft, Zone 2A (as highlighted) (m³)

Concreting for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As
KAIG3-RFI-CF-S-10091-00 & Highlighted ) Level Upto 864.866 ( KAIG3-SCR-CO-S-0196-00 ) & Concreting for C32/40 62% OPC+30%FA+8% MS - 220+/-20
154 Cafeteria 10-Nov-22 13156 10
KAIG3-RFI-CF-S-10095-00 Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Level - SCREED
upto 867.92 , KAIG3-SCR-CO-S-0196-00

Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
155 KAIG3-RFI-CO-S-10061-00 Crescent Zone 1M 10-Nov-22 13153 10
Highlighted) - SCREED

Shuttering and concreting for Energy Center, Beam at Grid 17-28/M at level 878.50 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
156 KAIG3-RFI-EC-S-10120-00 Energy Center 10-Nov-22 13143 10
Highlighted) - SCREED

Concreting for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As
KAIG3-RFI-CF-S-10089-00 &
157 Cafeteria 10-Nov-22 Highlighted ) Level to 868.75 , KAIG3-SCR-CO-S-0194-01 & Concreting for wall (W4) C32/40 62% OPC+30%FA - 160+/-40 13168 10
KAIG3-RFI-CF-S-10093-00
at cafeteria undercroft, Zone 2A (as highlighted)

Concreting for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As
KAIG3-RFI-CF-S-10091-00 & Highlighted ) Level Upto 864.866 ( KAIG3-SCR-CO-S-0196-00 ) & Concreting for
158 Cafeteria 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13167 8
KAIG3-RFI-CF-S-10095-00 Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Level
upto 867.92 , KAIG3-SCR-CO-S-0196-00

Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As
159 KAIG3-RFI-CO-S-10061-00 Crescent Zone 1M 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13166 10
Highlighted)

Shuttering and concreting for Energy Center, Beam at Grid 17-28/M at level 878.50 (As
160 KAIG3-RFI-EC-S-10120-00 Energy Center 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13162 10
Highlighted)

Concreting for Large Mosque Lower Second Floor Slab for , Zone 1G , Axis ( 1-2 / D-
161 KAIG3-RFI-LM-S-10124-00 Large Mosque 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13161 10
F ) (As Highlighted) Upto Level 878.1

Concreting for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As
162 KAIG3-RFI-CO-S-10116-00 Crescent Zone 1E 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13160 10
Highlighted)

163 KAIG3-RFI-CO-S-10127-00 Crescent Zone 2M 10-Nov-22 Concreting for Infill wall at Zone 2M at Axis 02AO (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 13159 10

164 C32/40 62% OPC+30%FA - 160+/-40 13158 10

165 C32/40 62% OPC+30%FA - 160+/-40 13155 10

166 C32/40 62% OPC+30%FA - 160+/-40 13152 10

Page 486 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI167
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13151
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

Page 487 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI168
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13150
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

169 C32/40 62% OPC+30%FA - 160+/-40 13149 10

170 C32/40 62% OPC+30%FA - 160+/-40 13148 10

171 C32/40 62% OPC+30%FA - 160+/-40 13147 10

172 C32/40 62% OPC+30%FA - 160+/-40 13145 10

Shuttering and concreting for Blinding under footing of Energy Center, Axis 13-16/ L-R
173 KAIG3-RFI-EC-S-10118-00 Energy Center 10-Nov-22 C16/20 SRC 13164 10
Highlighted)

174 C16/20 SRC 13146 5

Concreting for Large Mosque Lower Second Floor Slab for , Zone 1G , Axis ( 1-2 / D-
175 KAIG3-RFI-LM-S-10124-00 Large Mosque 10-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 13157 11
F ) (As Highlighted) Upto Level 878.1

Concreting for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As
176 KAIG3-RFI-CO-S-10116-00 Crescent Zone 1E 10-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 13154 11
Highlighted)

Shuttering and concreting for Blinding under footing of Energy Center, Axis 13-16/ L-R
177 KAIG3-RFI-EC-S-10118-00 Energy Center 10-Nov-22 C16/20 SRC 13165 11
Highlighted)

Shuttering & Concreting for Energy Center for Wall ( W4 ) at Grid 0-1, C-I from Level
178 KAIG3-RFI-EC-S-10139-00 Energy Center 12-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13213 10
877.00 to 882.30 (As Highlighted)

179 C32/40 62% OPC+30%FA - 160+/-40 13211 10

180 C32/40 62% OPC+30%FA - 160+/-40 13193 10

Shuttering & Concreting for Energy Center for Wall ( W4 ) at Grid 0-1, C-I from Level C32/40 62% OPC+30%FA+8% MS - 220+/-20
181 KAIG3-RFI-EC-S-10139-00 Energy Center 12-Nov-22 13216 8
877.00 to 882.30 (As Highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


182 13215 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


183 13212 10
- SCREED

Page 488 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI184
No. RFI NUMBER DESCRIPTION DESIGN MIX Y13208
NOTE 10
LOCATION CASTING - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
185 13207 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


186 13204 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


187 13200 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


188 13198 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


189 13196 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


190 13194 10
- SCREED

Concreting for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-
191 KAIG3-RFI-EC-S-10134-00 Energy Center 12-Nov-22 C16/20 SRC 13206 10
Q (As Highlighted)

192 C16/20 SRC 13205 10

193 C16/20 SRC 13201 10

194 C16/20 SRC 13199 10

195 C16/20 SRC 13197 10

Page 489 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI196
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y13195
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Concreting for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-
197 KAIG3-RFI-EC-S-10134-00 Energy Center 12-Nov-22 C16/20 SRC 13203 10
Q (As Highlighted)

198 C16/20 SRC 13202 10

199 C16/20 SRC 13210 4

Concreting for Kicker of Retaining wall from Axis 01S-01W , Zone 2&3 (as
200 KAIG3-RFI-CO-S-10122-00 Crescent Zone 2 & 3 12-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13214 6
highlighted)

201 C32/40 62% OPC+30%FA - 160+/-40 13209 10

Concreting for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-
202 KAIG3-RFI-EC-S-10134-00 Energy Center 13-Nov-22 C16/20 SRC 13256 10
Q (As Highlighted)

203 C16/20 SRC 13249 10

204 C16/20 SRC 13240 10

205 C16/20 SRC 13239 10

206 C16/20 SRC 13237 10

207 KAIG3-RFI-VG-S-10138-00 Devonian Garden 13-Nov-22 Concreting for Devonian gardens Wall (as highlighted) Zone 2M axis 03U upto 874.50 C32/40 62% OPC+30%FA - 160+/-40 13263 10

208 C32/40 62% OPC+30%FA - 160+/-40 13262 10

209 C32/40 62% OPC+30%FA - 160+/-40 13261 10

210 C32/40 62% OPC+30%FA - 160+/-40 13260 10

211 C32/40 62% OPC+30%FA - 160+/-40 13259 10

Page 490 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI212
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13258
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

213 C32/40 62% OPC+30%FA - 160+/-40 13257 10

214 C32/40 62% OPC+30%FA - 160+/-40 13255 10

215 C32/40 62% OPC+30%FA - 160+/-40 13254 10

216 C32/40 62% OPC+30%FA - 160+/-40 13248 10

217 C32/40 62% OPC+30%FA - 160+/-40 13253 10

218 C32/40 62% OPC+30%FA - 160+/-40 13252 10

219 C32/40 62% OPC+30%FA - 160+/-40 13251 10

220 C32/40 62% OPC+30%FA - 160+/-40 13250 10

221 C32/40 62% OPC+30%FA - 160+/-40 13247 10

222 C32/40 62% OPC+30%FA - 160+/-40 13246 10

223 C32/40 62% OPC+30%FA - 160+/-40 13245 10

224 C32/40 62% OPC+30%FA - 160+/-40 13244 10

225 C32/40 62% OPC+30%FA - 160+/-40 13243 10

226 C32/40 62% OPC+30%FA - 160+/-40 13242 10

227 C32/40 62% OPC+30%FA - 160+/-40 13241 10

Page 491 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI228
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13238
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Concreting for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as
229 KAIG3-RFI-CO-S-10154-00 Crescent Zone 2B 14-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13280 10
highlighted)

Concrteting for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85
230 KAIG3-RFI-MC-S-10161-00 MCPE 2 14-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13279 10
(as highlighted)

Concreting for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as


231 KAIG3-RFI-CO-S-10147-00 Crescent Zone 1M 14-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13278 10
highlighted)

232 C32/40 62% OPC+30%FA - 160+/-40 13277 10

233 C32/40 62% OPC+30%FA - 160+/-40 13276 10

234 C32/40 62% OPC+30%FA - 160+/-40 13275 10

235 C32/40 62% OPC+30%FA - 160+/-40 13274 10

236 C32/40 62% OPC+30%FA - 160+/-40 13273 10

237 C32/40 62% OPC+30%FA - 160+/-40 13272 10

238 C32/40 62% OPC+30%FA - 160+/-40 13267 10

Inspection of Blinding Concrete under MV Line Pit - C/MV/10 at Zone-C - as


239 KAIG3-RFI-SW-C-8798-00 Zone C 15-Nov-22 C16/20 SRC 13281 4
highlighted (KAIG3-SCR-SW-E-0088-00)

Inspection of Blinding Concrete under Heating and Chilled Water Line Pit B/DC/04,
240 KAIG3-RFI-SW-C-8795-00 Zone B & L 15-Nov-22 H/DC/37, H/DC/38, L/DC/17, L/DC/18, L/DH/18, L/DH/19 at Zone-B&L - As C16/20 SRC 13325 10
highlighted

Inspection of Blinding Concrete under MV Line Pit - C/MV/10 at Zone-C - as


241 KAIG3-RFI-SW-C-8798-00 Zone C 15-Nov-22 C16/20 SRC 13312 10
highlighted (KAIG3-SCR-SW-E-0088-00)

242 C16/20 SRC 13307 10

243 C16/20 SRC 13302 10

Page 492 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Shuttering and Concreting for Beams of Energy Center at Grid 28-30 /M-R (As LOAD /
SI244
No. KAIG3-RFI-EC-S-10182-00
RFI NUMBER Energy Center 15-Nov-22 DESCRIPTION C32/40 67%OPC+25%FA
DESIGN MIX - 160+/-40 Y13304
NOTE 11
LOCATION CASTING Highlighted) Level upto 878.50 QUANTITY
No.
(m³)
Concreting for Retaining wall from Axis 01S-01W , Zone 2&3 ,at Level 868.90 (as
245 KAIG3-RFI-CO-S-10207-00 Zone 2 & 3 15-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 13303 11
highlighted)

Shuttering and Concreting for Beams of Energy Center at Grid 28-30 /M-R (As
246 KAIG3-RFI-EC-S-10182-00 Energy Center 15-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13328 10
Highlighted) Level upto 878.50

Concreting for Retaining wall from Axis 01S-01W , Zone 2&3 ,at Level 868.90 (as
247 KAIG3-RFI-CO-S-10207-00 Zone 2 & 3 15-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13326 10
highlighted)

248 C32/40 62% OPC+30%FA - 160+/-40 13320 10

249 C32/40 62% OPC+30%FA - 160+/-40 13316 10

250 C32/40 62% OPC+30%FA - 160+/-40 13310 10

Concreting for Blinding under Retaining wall Foundation from Axis 01W-01Y , Zone
251 KAIG3-RFI-CO-S-10212-00 Crescent Zone 1H 15-Nov-22 C16/20 SRC 13311 4
1H ,at Level 865.0 & 865.50 (as highlighted)

Shuttering and concreting for Energy Center, Columns at Grid 0-4/C-A at level 878.00
252 KAIG3-RFI-EC-S-10236-00 Energy Center 16-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13369 2
( 16nos ) (As Highlighted)

Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to
253 KAIG3-RFI-MC-S-10181-00 MCPE 2 16-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13366 5
02AF zone 2K (as highlighted)

Concreting for Front Canopy Foundation at Zone 4 , Axis 01G , Level 865.06 (As
254 KAIG3-RFI-CO-S-10234-00 Crescent Zone 4 16-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13361 10
Highlighted)

255 C32/40 62% OPC+30%FA - 160+/-40 13355 10

256 C32/40 62% OPC+30%FA - 160+/-40 13351 10

257 C32/40 62% OPC+30%FA - 160+/-40 13350 10

Inspection of Blinding Concrete under LV Line Pit - B/LV/45 at Zone-B - as highlighted


258 KAIG3-RFI-SW-C-8811-00 Zone B 16-Nov-22 C16/20 SRC 13359 10

259 C16/20 SRC 13352 5

Page 493 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Shuttering and concreting for Energy Center, Columns at Grid 0-4/C-A at level 878.00 LOAD /
SI260
No. KAIG3-RFI-EC-S-10236-00
RFI NUMBER Energy Center 16-Nov-22 DESCRIPTION C32/40 67%OPC+25%FA
DESIGN MIX - 160+/-40 Y13364
NOTE 11
LOCATION CASTING ( 16nos ) (As Highlighted) QUANTITY
No.
(m³)
Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to
KAIG3-RFI-MC-S-10181-00 & MCPE 2 & Crescent
261 16-Nov-22 02AF zone 2K (as highlighted) & Concreting for Front Canopy Foundation at Zone 4 , C32/40 67%OPC+25%FA - 160+/-40 13363 11
KAIG3-RFI-CO-S-10234-00 Zone 4
Axis 01G , Level 865.06 (As Highlighted)

262 KAIG3-RFI-CO-S-10041-01 Crescent Zone 2K 17-Nov-22 Concreting for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13394 5

Concreting for Lower Second Slab Upstand ( UB 3 ) at Large Mosque at Zone 1G Axis (
263 KAIG3-RFI-LM-S-10156-00 Large Mosque 17-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13393 4
5-6 / C-F ) (As Highlighted) Level from 878.10 to 879.25

264 C32/40 62% OPC+30%FA - 160+/-40 13391 10

265 C32/40 62% OPC+30%FA - 160+/-40 13390 10

266 C32/40 62% OPC+30%FA - 160+/-40 13387 10

267 C32/40 62% OPC+30%FA - 160+/-40 13385 10

268 C32/40 62% OPC+30%FA - 160+/-40 13384 10

269 C32/40 62% OPC+30%FA - 160+/-40 13381 10

270 C32/40 62% OPC+30%FA - 160+/-40 13380 10

271 C32/40 62% OPC+30%FA - 160+/-40 13379 10

272 C32/40 62% OPC+30%FA - 160+/-40 13378 10

273 C32/40 62% OPC+30%FA - 160+/-40 13377 10

274 C32/40 62% OPC+30%FA - 160+/-40 13376 10

Page 494 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI275
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13375
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

276 C32/40 62% OPC+30%FA - 160+/-40 13374 10

277 C32/40 62% OPC+30%FA - 160+/-40 13373 10

278 C32/40 62% OPC+30%FA - 160+/-40 13371 10

279 C32/40 62% OPC+30%FA - 160+/-40 13370 10

Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.85 from axis 02AF to
280 KAIG3-RFI-MC-S-10129-00 MCPE 2 17-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13372 10
02AG zone 2K (as highlighted)

"Inspection of Formwork and Concrete Pouring for Wall of MV Line Pulling Pit
281 KAIG3-RFI-SW-C-08725-00 Zone C 17-Nov-22 C/MV/08, C/MV/09, C/MV/26 & C/MV/37 at Zone-C - As Highlighted (SCR: KAIG3- C32/40 62% OPC+30%FA - 160+/-40 13383 7
SCR-SW-E-0088-00)"

282 C32/40 62% OPC+30%FA - 160+/-40 13382 8

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
283 KAIG3-RFI-SW-C-7270-01 Zone B & G 17-Nov-22 G/DH/02, G/DH/21, G/DC/01, G/DC/03, G/DC/20, G/DC/22 at Zone-B&G - as C16/20 SRC 13392 7
highlighted

284 C16/20 SRC 13386 10

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
285 KAIG3-RFI-SW-C-7270-01 Zone B & G 17-Nov-22 G/DH/02, G/DH/21, G/DC/01, G/DC/03, G/DC/20, G/DC/22 at Zone-B&G - as C16/20 SRC 13389 10
highlighted

286 C16/20 SRC 13388 10

Concreting for Diaphragm wall (Inclined) at Zone 1E Axis 01P (As Highlighted) Level
287 KAIG3-RFI-CO-S-10202-00 Crescent Zone 1E 19-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13412 8
868.75

Concreting for Cafeteria (undercroft) Wall (W5 ) , Zone 2A Axis 02A-02B , Level from
288 KAIG3-RFI-CF-S-10247-00 Cafeteria 19-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13410 10
864.866-868.75 (As Highlighted )

289 KAIG3-RFI-CO-S-10249-00 Crescent Zone 6 & 7 19-Nov-22 Concreting for Retaining wall (wall) at Axis 02F to 02G , Zone 6 & 7 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 13406 10

290 C32/40 62% OPC+30%FA - 160+/-40 13404 10

Page 495 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI291
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13403
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

292 C32/40 62% OPC+30%FA - 160+/-40 13396 10

293 C32/40 62% OPC+30%FA - 160+/-40 13395 10

Concreting for Diaphragm wall (Inclined) at Zone 1E Axis 01P (As Highlighted) Level C32/40 62% OPC+30%FA+8% MS - 220+/-20
294 KAIG3-RFI-CO-S-10202-00 Crescent Zone 1E 19-Nov-22 13415 9
868.75 - SCREED

Concreting for Cafeteria (undercroft) Wall (W5 ) , Zone 2A Axis 02A-02B , Level from C32/40 62% OPC+30%FA+8% MS - 220+/-20
295 KAIG3-RFI-CF-S-10247-00 Cafeteria 19-Nov-22 13414 10
864.866-868.75 (As Highlighted ) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


296 KAIG3-RFI-CO-S-10249-00 Crescent Zone 6 & 7 19-Nov-22 Concreting for Retaining wall (wall) at Axis 02F to 02G , Zone 6 & 7 (as highlighted) 13411 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


297 13409 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


298 13407 6
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


299 13405 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


300 13401 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


301 13397 10
- SCREED

Inspection of Formwork and Concrete pouring for wall and Slab of Cesspool-1 at Zone-
302 KAIG3-RFI-SW-C-8850-00 Zone K 19-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13402 10
K - as highlighted

303 C32/40 62% OPC+30%FA - 160+/-40 13400 10

304 C32/40 62% OPC+30%FA - 160+/-40 13399 10

305 C32/40 62% OPC+30%FA - 160+/-40 13398 10

Page 496 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW- LOAD /
SI306
No. KAIG3-RFI-SW-C-8827-00
RFI NUMBER Zone G 19-Nov-22 DESCRIPTION C16/20 SRC
DESIGN MIX Y13408
NOTE 10
LOCATION CASTING ISC-15 and POC-31 at Zone-G - as highlighted QUANTITY
No.
(m³)
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
307 KAIG3-RFI-SW-C-8827-00 Zone G 19-Nov-22 C16/20 SRC 13413 4
ISC-15 and POC-31 at Zone-G - as highlighted

Inspection of Blinding Concrete under MV Line Pit - G/MV/32 at Zone-G - as


308 KAIG3-RFI-SW-C-8797-00 Zone G 20-Nov-22 C16/20 SRC 13416 10
highlighted

Concreting for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to
South Small
309 KAIG3-RFI-SM-S-10011-00 20-Nov-22 1st Floor, zone 2B at Axis F-G & 6-8 ,Level from 869.25 to 873.150 ( KAIG3-SCR-SM- C32/40 62% OPC+30%FA - 160+/-40 13419 6
Mosque
S-0205-00 ),(As Highlighted)

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line


310 KAIG3-RFI-SW-C-8852-00 Zone C 21-Nov-22 C16/20 SRC 13466 10
between B/TL-RC/35 and C/TL/56 at Zone-C - As Highlighted

Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between
311 KAIG3-RFI-SW-C-8853-00 Zone C 21-Nov-22 C16/20 SRC 13461 10
C/FS/04 and C/FS/21 at Zone-C - As Highlighted

312 C16/20 SRC 13445 10

313 C16/20 SRC 13440 10

Concreting for RC Foundation of Retaining wall from Axis 02C-02E , Zone 6&7 (as
314 KAIG3-RFI-CO-S-10270-00 Crescent Zone 6 & 7 21-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13450 10
highlighted)

315 C32/40 62% OPC+30%FA - 160+/-40 13444 10

316 C32/40 62% OPC+30%FA - 160+/-40 13443 10

317 C32/40 62% OPC+30%FA - 160+/-40 13442 10

318 C32/40 62% OPC+30%FA - 160+/-40 13441 10

Concreting for RC Foundation of Retaining wall from Axis 02C-02E , Zone 6&7 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
319 KAIG3-RFI-CO-S-10270-00 Crescent Zone 6 & 7 21-Nov-22 13471 10
highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


320 13467 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


321 13460 10
- SCREED

Page 497 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% LOAD /
SI322
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 Y13459
NOTE 10
LOCATION CASTING - SCREED QUANTITY
No.
(m³)

Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
323 KAIG3-RFI-CO-S-10295-00 Crescent Zone 2R 22-Nov-22 13506 8
highlighted) TOC 877.47 (KAIG3-SCR-CO-S-0216-00) - SCREED

Concreting for Large Mosque Lower Second Floor wall ( W3 ) and column ( C5 ) for, C32/40 62% OPC+30%FA+8% MS - 220+/-20
324 KAIG3-RFI-LM-S-10280-00 Large Mosque 22-Nov-22 13504 10
Zone 1G Axis ( 5-6 / E-D ) (As Highlighted) - SCREED

Concreting for Devonian garden wall , Zone 2M Axis 02AN-02AO TOW 874.50 ( As C32/40 62% OPC+30%FA+8% MS - 220+/-20
325 KAIG3-RFI-VG-S-10309-00 Devonian Garden 22-Nov-22 13499 10
Highlighted) - SCREED

Concreting for MCPE 2 wall & counterfort from 02AG-02AH Zone 2K (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
326 KAIG3-RFI-MC-S-10290-00 MCPE 2 22-Nov-22 13496 10
Highlighted) From 871.00 to 875.55 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


327 13485 10
- SCREED

Inspection of Formwork and Concrete pouring for Slab of MV Line Pulling Pit -
328 KAIG3-RFI-SW-C-8739-00 Zone C, D & H 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13487 10
C/MV/17, C/MV/44, D/MV/05, D/MV/20, H/MV/30 at Zone-C,D&H (As Highlighted)

Inspection of Formwork and Concrete Pouring for MV Line Pit - C/MV/10, C/MV/25,
329 KAIG3-RFI-SW-C-8799-00 Zone C& H 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13486 10
H/MV/27 at Zone-C&H - as highlighted (KAIG3-SCR-SW-E-0088-00)

Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as
330 KAIG3-RFI-CO-S-10295-00 Crescent Zone 2R 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13510 7
highlighted) TOC 877.47 (KAIG3-SCR-CO-S-0216-00)

Concreting for Large Mosque Lower Second Floor wall ( W3 ) and column ( C5 ) for,
331 KAIG3-RFI-LM-S-10280-00 Large Mosque 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13509 7
Zone 1G Axis ( 5-6 / E-D ) (As Highlighted)

Concreting for Devonian garden wall , Zone 2M Axis 02AN-02AO TOW 874.50 ( As
332 KAIG3-RFI-VG-S-10309-00 Devonian Garden 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13507 10
Highlighted)

Concreting for MCPE 2 wall & counterfort from 02AG-02AH Zone 2K (As
333 KAIG3-RFI-MC-S-10290-00 MCPE 2 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13505 10
Highlighted) From 871.00 to 875.55

334 C32/40 62% OPC+30%FA - 160+/-40 13502 10

335 C32/40 62% OPC+30%FA - 160+/-40 13500 10

336 C32/40 62% OPC+30%FA - 160+/-40 13493 10

337 C32/40 62% OPC+30%FA - 160+/-40 13491 10

Page 498 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
Inspection of Blinding Concrete under MV Line Pit - C/MV/43, D/MV/13, D/MV/21, DELIVER
BUILDING/ DATE OF LOAD /
SI338
No. KAIG3-RFI-SW-C-8889-00
RFI NUMBER Zone C & D 22-Nov-22 D/MV/30, D/MV/27, D/MV/01, D/MV/02, D/MV/19, D/MV/10, D/MV/16 at Zone-
DESCRIPTION C16/20 SRC
DESIGN MIX Y13497
NOTE 10
LOCATION CASTING QUANTITY
C&D - as highlighted No.
(m³)
Concreting for Plain concrete under S.O.G at Devonian Garden in Zone 2M (as
339 KAIG3-RFI-VG-S-10273-00 Devonian Garden 22-Nov-22 C16/20 SRC 13508 10
highlighted)

Concreting for mass Concrete under Strip footing at Zone 1K ( Outer ) Axis 01AD-
340 KAIG3-RFI-CO-S-10258-00 Crescent Zone 1K 24-Nov-22 C16/20 SRC 13566 11
01AE-01AF , TOC : 866.83-867-33 ( As higlighted )

341 C16/20 SRC 13546 10

342 C16/20 SRC 13544 10

343 C16/20 SRC 13543 10

344 C16/20 SRC 13540 10

345 C16/20 SRC 13537 10

346 C16/20 SRC 13536 10

347 C16/20 SRC 13535 10

348 C16/20 SRC 13534 10

349 C16/20 SRC 13532 10

350 C16/20 SRC 13530 10

351 C16/20 SRC 13529 10

Inspection of Concrete (Plain) Pouring for the Duct Bank of LV Line from B/MV/54 to
352 KAIG3-RFI-SW-C-8954-00 Zone B & C 24-Nov-22 C16/20 SRC 13565 4
B/MV/40 at Zone-B&C (As Highlighted)

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
353 KAIG3-RFI-SW-C-8977-00 Zone G 24-Nov-22 C16/20 SRC 13558 10
G/DH/06, G/DH/07 at Zone-G - as highlighted

Page 499 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC- LOAD /
SI354
No. KAIG3-RFI-SW-C-8978-00
RFI NUMBER Zone K 24-Nov-22 DESCRIPTION C16/20 SRC
DESIGN MIX Y13548
NOTE 10
LOCATION CASTING NPW/PT3 at Zone-K - as highlighted QUANTITY
No.
(m³)

355 C16/20 SRC 13545 10

356 C16/20 SRC 13542 10

357 C16/20 SRC 13541 10

358 C16/20 SRC 13533 10

359 C16/20 SRC 13531 10

Inspection of Formwork and Concrete pouring for Slab of MV Line Pulling Pit - C32/40 62% OPC+30%FA+8% MS - 220+/-20
360 KAIG3-RFI-SW-C-8739-00 Zone C, D & H 24-Nov-22 13562 10
C/MV/17, C/MV/44, D/MV/05, D/MV/20, H/MV/30 at Zone-C,D&H (As Highlighted) - SCREED

Inspection of Formwork and Concrete Pouring for MV Line Pit - C/MV/10, C/MV/25, C32/40 62% OPC+30%FA+8% MS - 220+/-20
361 KAIG3-RFI-SW-C-8799-00 Zone C& H 24-Nov-22 13554 6
H/MV/27 at Zone-C&H - as highlighted (KAIG3-SCR-SW-E-0088-00) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


362 13550 7
- SCREED

Inspection of Formwork and Concrete pouring for Slab of MV Line Pulling Pit - C32/40 62% OPC+30%FA+8% MS - 220+/-20
363 KAIG3-RFI-SW-C-8739-00 Zone C, D & H 24-Nov-22 13571 5
C/MV/17, C/MV/44, D/MV/05, D/MV/20, H/MV/30 at Zone-C,D&H (As Highlighted) - SCREED

Inspection of Formwork and Concrete Pouring for MV Line Pit - C/MV/10, C/MV/25, C32/40 62% OPC+30%FA+8% MS - 220+/-20
364 KAIG3-RFI-SW-C-8799-00 Zone C& H 24-Nov-22 13570 10
H/MV/27 at Zone-C&H - as highlighted (KAIG3-SCR-SW-E-0088-00) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


365 13560 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


366 13556 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


367 13552 7
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


368 KAIG3-RFI-CO-S-10375-00 Crescent Zone 1E 26-Nov-22 Concreting for Diaphragm wall for Kicker at Zone 1E , Axis 01M (As Highlighted) 13606 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


369 KAIG3-RFI-CO-S-10326-00 Crescent Zone 1A 26-Nov-22 Concreting for Infill wall ( outer ) , Zone 1A between axis 01C-01D (as highlighted) 13592 10
- SCREED

Page 500 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for Wall of Retaining wall from Axis 01P-01Q and 01R-01S , Zone 2&3 , C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI370
No. KAIG3-RFI-CO-S-10334-00
RFI NUMBER Crescent Zone 2 & 3 26-Nov-22 DESCRIPTION DESIGN MIX Y13587
NOTE 10
LOCATION CASTING Level Upto 868.90 (As Highlighted) - SCREED QUANTITY
No.
(m³)

371 KAIG3-RFI-CO-S-10375-00 Crescent Zone 1E 26-Nov-22 Concreting for Diaphragm wall for Kicker at Zone 1E , Axis 01M (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13613 10

372 KAIG3-RFI-CO-S-10326-00 Crescent Zone 1A 26-Nov-22 Concreting for Infill wall ( outer ) , Zone 1A between axis 01C-01D (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 13612 10

Concreting for Wall of Retaining wall from Axis 01P-01Q and 01R-01S , Zone 2&3 ,
373 KAIG3-RFI-CO-S-10334-00 Crescent Zone 2 & 3 26-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13611 10
Level Upto 868.90 (As Highlighted)

374 C32/40 62% OPC+30%FA - 160+/-40 13610 10

375 C32/40 62% OPC+30%FA - 160+/-40 13590 10

376 C32/40 62% OPC+30%FA - 160+/-40 13588 10

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
377 KAIG3-RFI-SW-C-8980-00 Zone L 26-Nov-22 C16/20 SRC 13608 5
L/DC/13 at Zone-L - as highlighted

378 C16/20 SRC 13589 10

Concreting for Plain concrete under S.O.G at Devonian Garden in Zone 2M (as
379 KAIG3-RFI-VG-S-10273-00 Devonian Garden 26-Nov-22 C16/20 SRC 13591 11
highlighted)

C32/40 62% OPC+30%FA+8% MS - 220+/-20


380 KAIG3-RFI-CO-S-10323-00 Crescent Zone 1D 27-Nov-22 Concreting for infill wall (inner) (stage 2) at zone 1D at axis 01L-01M (as highlighted) 13636 10
- SCREED

Shuttering and Concreting for Column of Energy Center at Grid 0-7/I-L ( 27 nos) (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
381 KAIG3-RFI-EC-S-10329-00 Energy Center 27-Nov-22 13632 10
Highlighted) Level upto 878.50 & 881.00 - SCREED

Inspection of Formwork and Concrete pouring for wall and Slab of Cesspool-1 at Zone-
382 KAIG3-RFI-SW-C-8850-00 Zone K 27-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13638 10
K - as highlighted

"Inspection of Formwork and Concrete Pouring for Wall of MV Line Pit - C/MV/07,
383 KAIG3-RFI-SW-C-8934-00 Zone C & H 27-Nov-22 C/MV/27, C/MV/10, C/MV/25, H/MV/27 at Zone-C&H - as highlighted (KAIG3-SCR- C32/40 62% OPC+30%FA - 160+/-40 13634 10
SW-E-0088-00)"

384 C32/40 62% OPC+30%FA - 160+/-40 13633 10

Shuttering and Concreting for Beams of Energy Center at Grid 0-4 / A-C Level Upto
385 KAIG3-RFI-EC-S-10331-00 Energy Center 27-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 13650 10
878.50 (As Highlighted)

Page 501 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for Foundation of Retaining wall from Axis 01W-01Z Zone 2 , (As LOAD /
SI386
No. KAIG3-RFI-CO-S-10364-00
RFI NUMBER Crescent Zone 2 27-Nov-22 DESCRIPTION C32/40 67%OPC+25%FA
DESIGN MIX - 160+/-40 Y13649
NOTE 10
LOCATION CASTING Highlighted) QUANTITY
No.
(m³)
Picnic Area (Seating Inspection for Casting the Blinding Concrete under Beam of Seating Area 3-20 at Zone-
387 KAIG3-RFI-PA-C-9004-00 27-Nov-22 C16/20 SRC 13653 4
Area 3) K - As Highlighted

388 C16/20 SRC 13651 10

389 KAIG3-RFI-CO-S-10323-00 Crescent Zone 1D 27-Nov-22 Concreting for infill wall (inner) (stage 2) at zone 1D at axis 01L-01M (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 13661 11

Shuttering and Concreting for Column of Energy Center at Grid 0-7/I-L ( 27 nos) (As
390 KAIG3-RFI-EC-S-10329-00 Energy Center 27-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13660 11
Highlighted) Level upto 878.50 & 881.00

Shuttering and Concreting for Beams of Energy Center at Grid 0-4 / A-C Level Upto
391 KAIG3-RFI-EC-S-10331-00 Energy Center 27-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13659 10
878.50 (As Highlighted)

Concreting for Foundation of Retaining wall from Axis 01W-01Z Zone 2 , (As
392 KAIG3-RFI-CO-S-10364-00 Crescent Zone 2 27-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13658 10
Highlighted)

393 C32/40 62% OPC+30%FA - 160+/-40 13657 10

394 C32/40 62% OPC+30%FA - 160+/-40 13656 10

395 C32/40 62% OPC+30%FA - 160+/-40 13655 10

396 C32/40 62% OPC+30%FA - 160+/-40 13652 10

397 KAIG3-RFI-MC-S-10346-00 MCPE 2 28-Nov-22 Concreting for MCPE 2 Roof Slab from Axis 02AC-03K Zone 2J (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13674 5

398 KAIG3-RFI-CC-S-10405-00 Child Care 28-Nov-22 Concreting for Child Care Grade Beam at Zone 2N (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13673 10

Concreting for Kicker of Retaining wall from Axis 02C-02E Zone 6&7 , (As
399 KAIG3-RFI-CO-S-10367-00 Crescent Zone 6 & 7 28-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13672 10
Highlighted)

400 C32/40 62% OPC+30%FA - 160+/-40 13670 10

401 C32/40 62% OPC+30%FA - 160+/-40 13668 10

Page 502 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI402
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13667
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

403 C32/40 62% OPC+30%FA - 160+/-40 13666 10

404 C32/40 62% OPC+30%FA - 160+/-40 13665 10

405 C32/40 62% OPC+30%FA - 160+/-40 13664 10

406 C32/40 62% OPC+30%FA - 160+/-40 13663 10

407 C32/40 62% OPC+30%FA - 160+/-40 13662 10

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
408 KAIG3-RFI-SW-C-7287-01 Zone F 28-Nov-22 C16/20 SRC 13671 10
F/DH/04, F/DC/01, F/DC/05 at Zone-F - as highlighted

409 C16/20 SRC 13669 10

410 KAIG3-RFI-SW-C-9034-00 Zone D 29-Nov-22 Inspection of Blinding Concrete under MV Line Pit D/MV/28 at Zone-D - as highlighted C16/20 SRC 13723 10

Inspection of Blinding Concrete under MV Line Pit - D/MV/35, D/MV/34, D/MV/09,


411 KAIG3-RFI-SW-C-9039-00 Zone D 29-Nov-22 C16/20 SRC 13712 10
D/MV/36, D/MV/16, D/MV/10 at Zone-D - as highlighted

Inspection of Blinding Concrete under LV Line Pit - B/LV/28 at Zone-B - as highlighted


412 KAIG3-RFI-SW-C-9098-00 Zone B 29-Nov-22 C16/20 SRC 13705 10

413 C16/20 SRC 13703 10

414 C16/20 SRC 13701 10

415 C16/20 SRC 13699 10

416 C16/20 SRC 13692 10

Shuttering and Concreting for Blinding under Foundation at Energy center at Axis 12-
417 KAIG3-RFI-EC-S-10408-00 Energy Center 29-Nov-22 C16/20 SRC 13724 3
13/A , Level 871.10 ( As Highlighted)

Page 503 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI418
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y13714
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

419 C16/20 SRC 13709 10

Concreting for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As
420 KAIG3-RFI-CO-S-10400-00 Crescent Zone 1L 30-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13785 10
Highlighted)

Concreting for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as
421 KAIG3-RFI-MC-S-10391-00 MCPE 2 30-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13777 10
highlighted)

Concreting for Stiffner of Diaphragm wall for ( 1st Span ) at Zone 1E , Axis 01P (As
422 KAIG3-RFI-CO-S-10403-00 Crescent Zone 1E 30-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13765 10
Highlighted)

Concreting for Diaphragm wall for Kicker and Wall ( Inclined Wall ) at Zone 1E , Axis
423 KAIG3-RFI-CO-S-10426-00 Crescent Zone 1E 30-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13755 10
01M Level 869.00(As Highlighted)

424 KAIG3-RFI-CO-S-10412-00 Crescent Zone 5 & 6 30-Nov-22 Concreting for Retaining wall from axis 01C-01E, zone 5&6 (as higlighted) C32/40 62% OPC+30%FA - 160+/-40 13746 10

425 C32/40 62% OPC+30%FA - 160+/-40 13744 10

426 C32/40 62% OPC+30%FA - 160+/-40 13743 10

Concreting for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As C32/40 62% OPC+30%FA+8% MS - 220+/-20
427 KAIG3-RFI-CO-S-10400-00 Crescent Zone 1L 30-Nov-22 13788 5
Highlighted) - SCREED

Concreting for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
428 KAIG3-RFI-MC-S-10391-00 MCPE 2 30-Nov-22 13787 10
highlighted) - SCREED

Concreting for Stiffner of Diaphragm wall for ( 1st Span ) at Zone 1E , Axis 01P (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
429 KAIG3-RFI-CO-S-10403-00 Crescent Zone 1E 30-Nov-22 13782 10
Highlighted) - SCREED

Concreting for Diaphragm wall for Kicker and Wall ( Inclined Wall ) at Zone 1E , Axis C32/40 62% OPC+30%FA+8% MS - 220+/-20
430 KAIG3-RFI-CO-S-10426-00 Crescent Zone 1E 30-Nov-22 13771 10
01M Level 869.00(As Highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


431 KAIG3-RFI-CO-S-10412-00 Crescent Zone 5 & 6 30-Nov-22 Concreting for Retaining wall from axis 01C-01E, zone 5&6 (as higlighted) 13758 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


432 13745 10
- SCREED

Concrete Pouring and Shuttering for Foundation & Kicker of Decant Sump-D3 at Mist
433 KAIG3-RFI-WG-C-9176-00 Water Garden 30-Nov-22 Garden, inside Water Garden as highlighted area in attached drawing's & KAIG3-SCR- C32/40 62% OPC+30%FA - 160+/-40 13751 10
WG-S-0212-00-Reply.

Page 504 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Inspection of Blinding Concrete under Sub-station - R2 and R12 at Zone-B&F - as LOAD /
SI434
No. KAIG3-RFI-SW-C-8923-00
RFI NUMBER Zone B & F 30-Nov-22 DESCRIPTION C16/20 SRC
DESIGN MIX Y13770
NOTE 10
LOCATION CASTING highlighted QUANTITY
No.
(m³)

435 C16/20 SRC 13760 7

Concrete Design Mix Quantity m3

679
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - SCREED

2182
C32/40 62% OPC+30%FA - 160+/-40

C16/20 SRC 1130

C32/40 67%OPC+25%FA - 160+/-40 131

TOTAL QUANTITY TRUCK LOAD (M³): 4122.00

Prepared by: Antolin V. Mauro Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

Page 505 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER 28 DAYS
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE 7 AND
LOCATION CASTING QUANTITY
No. DAYS MORE THAN 28
(m³)
DAYS

Concreting for MCPE 2 Roof Slab at Zone 2J , Between Axis 02AD-02AE (as
1 KAIG3-RFI-MC-S-10439-00 MCPE 2 1-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13831 7
highlighted)

Concreting for Diaphragm wall , Kicker and Wall ( Inclined wall ) at Zone 1E , Axis 01P
2 KAIG3-RFI-CO-S-10398-00 Crescent Zone 1E 1-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13827 10
(As Highlighted)

Concreting for Large Mosque Lower Second Floor Beam ( 137A ) for, Zone 1G , Axis
3 KAIG3-RFI-LM-S-10384-01 Large Mosque 1-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13820 10
( 2-5 / E ) Level upto 879.50 (As Highlighted)

4 C32/40 62% OPC+30%FA - 160+/-40 13809 10

5 C32/40 62% OPC+30%FA - 160+/-40 13805 10

Shuttering for Blinding Under Diaphragm Wall Foundation at Zone 2M ,Grid 02/AL (as
6 KAIG3-RFI-CO-S-10434-00 Crescent Zone 2M 1-Dec-22 C16/20 SRC 13828 10
highlighted)

7 C16/20 SRC 13819 7

8 C16/20 SRC 13818 10

9 C16/20 SRC 13814 10

10 C16/20 SRC 13813 10

11 C16/20 SRC 13799 10

Concreting for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As C32/40 62% OPC+30%FA+8% MS - 220+/-20
12 KAIG3-RFI-CO-S-10400-00 Crescent Zone 1L 1-Dec-22 13802 10
Highlighted) - SCREED

Concreting for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
13 KAIG3-RFI-MC-S-10391-00 MCPE 2 1-Dec-22 13798 10
highlighted) - SCREED

Inspection of Blinding Concrete under MV Line Pit - L/MV/18, L/MV/04 at Zone-L - as


14 KAIG3-RFI-SW-C-9106-00 Zone L 1-Dec-22 C16/20 SRC 13821 5
highlighted

"Inspection for Casting the Blinding Concrete under the Manhole MH-O-07-1, MH-O-
15 KAIG3-RFI-SW-C-9132-00 Site Works 1-Dec-22 07-2, MH-O-07-3 and Gullies G-O-22, G-O-7, G-O-5, G-O-6, G-O-4, G-O-3, G-O-2, G- C16/20 SRC 13803 10
O-1 - as Highlighted"

16 C16/20 SRC 13800 10

17 C16/20 SRC 13797 10

Shuttering and Concreting for Energy center Columns at axis 7-11/A Level upto 884.50
18 KAIG3-RFI-EC-S-10328-00 Energy Center 3-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13904 10
(As Highlighted)

Page 506 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
North
BUILDING/ DATE OF Concreting for RC Strip footing at North Administation Building ,Zone 2Q , Between LOAD /
SI19
No. KAIG3-RFI-NA-S-10449-01
RFI NUMBER 3-Dec-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13902
NOTE 10
Administration
LOCATION CASTING Axis 02AX-02AY ( As Highlighted ) KAIG3-SCR-GN-S-0147-00 QUANTITY
No.
(m³)
Concreting for Infill wall ( outer ) , Zone 2A ,between Axis 02A-02B Level From 863.55
20 KAIG3-RFI-CO-S-10424-00 Crescent Zone 2A 3-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13900 10
to 869.135 (as highlighted)

Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line


21 KAIG3-RFI-SW-C-9166-00 Zone F 3-Dec-22 C16/20 SRC 13907 10
between F/TL/04 and F/TL/03 at Zone-F - As Highlighted

22 C16/20 SRC 13892 10

23 C16/20 SRC 13878 10

Shuttering and Concreting for Energy center Columns at axis 7-11/A Level upto 884.50
24 KAIG3-RFI-EC-S-10328-00 Energy Center 3-Dec-22 C32/40 67%OPC+25%FA - 160+/-40 13881 11
(As Highlighted)

North Concreting for RC Strip footing at North Administation Building ,Zone 2Q , Between
25 KAIG3-RFI-NA-S-10449-01 3-Dec-22 C32/40 67%OPC+25%FA - 160+/-40 13866 11
Administration Axis 02AX-02AY ( As Highlighted ) KAIG3-SCR-GN-S-0147-00

Concreting for Infill wall ( outer ) , Zone 2A ,between Axis 02A-02B Level From 863.55 C32/40 62% OPC+30%FA+8% MS - 220+/-20
26 KAIG3-RFI-CO-S-10424-00 Crescent Zone 2A 3-Dec-22 13890 5
to 869.135 (as highlighted) - SCREED

Shuttering and Concreting for Columns of Energy Center at Grid 0-4 /A-C ( As C32/40 62% OPC+30%FA+8% MS - 220+/-20
27 KAIG3-RFI-EC-S-10472-00 Energy Center 3-Dec-22 13876 10
Highlighted) Level upto 881.00 - SCREED

North Concreting for RC Strip footing at North Administation Building ,Zone 2Q , Between C32/40 62% OPC+30%FA+8% MS - 220+/-20
28 KAIG3-RFI-NA-S-10449-01 3-Dec-22 13862 10
Administration Axis 02AX-02AY ( As Highlighted ) KAIG3-SCR-GN-S-0147-00 - SCREED

Concreting Mass Concrete (1st Layer ) under Rc Strip Footing ( inner ) at Zone 1K ,
29 KAIG3-RFI-CO-S-10387-00 Crescent Zone 1K 3-Dec-22 C16/20 SRC 13887 10
Between Axis 01AD-AE & 01AE-01AF (As Highlighted )

30 C16/20 SRC 13886 10

31 C16/20 SRC 13880 10

32 C16/20 SRC 13879 10

33 C16/20 SRC 13874 10

34 C16/20 SRC 13873 10

35 C16/20 SRC 13871 10

36 C16/20 SRC 13864 10

37 C16/20 SRC 13863 10

38 C16/20 SRC 13861 10

Page 507 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
Concrete Pouring and Shuttering for Foundation & Kicker of Decant Sump-D3 at Mist DELIVER
BUILDING/ DATE OF LOAD /
SI39
No. KAIG3-RFI-WG-C-9176-00
RFI NUMBER Water Garden 3-Dec-22 Garden, inside Water Garden as highlighted area in attached drawing's & KAIG3-SCR-
DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y13883
NOTE 7
LOCATION CASTING QUANTITY
WG-S-0212-00-Reply. No.
(m³)
Concreting for Infill wall ( 1st Stage ), at Zone 1L ,between Axis 01AG -01AH ,TOC :
40 KAIG3-RFI-CO-S-10451-00 Crescent Zone 1L 4-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13990 8
874.05 (as highlighted)

South Small Concreting for 2nd floor Roof Slab at south small mosque , Zone 2B , Axis F-G, 1-3 (as
41 KAIG3-RFI-SM-S-10487-00 4-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13988 10
Mosque highlighted) SSL 876.65 (with KAIG3-SCR-SM-S-0206-00 & attachements)

Concreting for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As
42 KAIG3-RFI-MC-S-10475-00 MCPE 2 4-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13984 10
Highlighted ) Level 875.85

43 C32/40 62% OPC+30%FA - 160+/-40 13980 10

44 C32/40 62% OPC+30%FA - 160+/-40 13970 10

45 C32/40 62% OPC+30%FA - 160+/-40 13969 10

46 C32/40 62% OPC+30%FA - 160+/-40 13968 10

Inspection of Blinding Concrete under LV Line Pit - F/LV/01, F/LV/12, F/LV/18,


47 KAIG3-RFI-SW-C-9164-00 Zone F & G 4-Dec-22 F/LV/14, F/LV/05, G/LV/60, G/LV/61, G/LV/04, G/LV/62 at Zone-F&G - as C16/20 SRC 13982 10
highlighted

48 C16/20 SRC 13971 5

49 C16/20 SRC 13967 10

50 C16/20 SRC 13965 10

51 C16/20 SRC 13963 10

52 C16/20 SRC 13961 10

Concreting for Infill wall ( 1st Stage ), at Zone 1L ,between Axis 01AG -01AH ,TOC : C32/40 62% OPC+30%FA+8% MS - 220+/-20
53 KAIG3-RFI-CO-S-10451-00 Crescent Zone 1L 4-Dec-22 13993 4
874.05 (as highlighted) - SCREED

South Small Concreting for 2nd floor Roof Slab at south small mosque , Zone 2B , Axis F-G, 1-3 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
54 KAIG3-RFI-SM-S-10487-00 4-Dec-22 13992 5
Mosque highlighted) SSL 876.65 (with KAIG3-SCR-SM-S-0206-00 & attachements) - SCREED

Concreting for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
55 KAIG3-RFI-MC-S-10475-00 MCPE 2 4-Dec-22 13991 10
Highlighted ) Level 875.85 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


56 13989 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


57 13987 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


58 13977 10
- SCREED

Page 508 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI59
No. RFI NUMBER DESCRIPTION DESIGN MIX Y13966
NOTE 10
LOCATION CASTING - SCREED QUANTITY
No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
60 13964 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


61 13962 10
- SCREED

Inspection of Blinding Concrete under LV Line Pit - F/LV/01, F/LV/12, F/LV/18,


62 KAIG3-RFI-SW-C-9164-00 Zone F & G 5-Dec-22 F/LV/14, F/LV/05, G/LV/60, G/LV/61, G/LV/04, G/LV/62 at Zone-F&G - as C16/20 SRC 14030 8
highlighted

63 KAIG3-RFI-CO-S-10484-00 Crescent Zone 6&7 5-Dec-22 Concreting for Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 14036 10

Concreting for North Administration Building Columns ( C1, C1A ,C2 , C3 , C4 , C5 ,


North
64 KAIG3-RFI-NA-S-10468-00 5-Dec-22 C6 , C7 , C8 , C21 , C22 , C23 , C24 ) Zone 2Q , Level Upto 873.725 ( As Highlighted C32/40 62% OPC+30%FA - 160+/-40 14026 10
Administration
)

Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as
65 KAIG3-RFI-CO-S-10295-00 Crescent Zone 2R 5-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14021 10
highlighted) TOC 877.47 (KAIG3-SCR-CO-S-0216-00)

North Concreting for RC Strip footing at North Administation Building ,Zone 2Q , Between
66 KAIG3-RFI-NA-S-10449-01 5-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14018 10
Administration Axis 02AX-02AY ( As Highlighted ) KAIG3-SCR-GN-S-0147-00

Concreting for Infill wall ( inner ) ( Stage 2 ) at Zone 1D at Axis 01J-01K (as
67 KAIG3-RFI-CO-S-10480-00 Crescent Zone 1D 5-Dec-22 C16/20 SRC 10417 10
highlighted)

Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
68 KAIG3-RFI-CO-S-10295-00 Crescent Zone 2R 5-Dec-22 14035 10
highlighted) TOC 877.47 (KAIG3-SCR-CO-S-0216-00) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


69 KAIG3-RFI-CO-S-10484-00 Crescent Zone 6&7 5-Dec-22 Concreting for Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted) 14031 8
- SCREED

Concreting for North Administration Building Columns ( C1, C1A ,C2 , C3 , C4 , C5 ,


North C32/40 62% OPC+30%FA+8% MS - 220+/-20
70 KAIG3-RFI-NA-S-10468-00 5-Dec-22 C6 , C7 , C8 , C21 , C22 , C23 , C24 ) Zone 2Q , Level Upto 873.725 ( As Highlighted 14027 10
Administration - SCREED
)

C32/40 62% OPC+30%FA+8% MS - 220+/-20


71 14022 8
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


72 14010 7
- SCREED

Inspection of Blinding Concrete under RO Water Line Pit POC-01 & POC02 at Zone-B
73 KAIG3-RFI-SW-C-9198-00 Zone B 5-Dec-22 C16/20 SRC 14029 10
- As highlighted

74 C16/20 SRC 14024 10

75 C16/20 SRC 14016 10

76 C16/20 SRC 14015 10

77 C16/20 SRC 14012 10

78 C16/20 SRC 14008 5

Page 509 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI79
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14007
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
"Inspection of Formwork and Concrete Pouring for Slab of MV Line Pulling Pit -
80 KAIG3-RFI-SW-C-9041-00 Zone C 6-Dec-22 C/MV/07, C/MV/08, C/MV/09, C/MV/27, C/MV/26 & C/MV/37 at Zone-C - As C32/40 62% OPC+30%FA - 160+/-40 14061 10
Highlighted (SCR: KAIG3-SCR-SW-E-0088-00)"

South Small Concreting for South small mosque , Sloping Slab and Parapet, Axis D-F/1-2 , F-G/1 C32/40 62% OPC+30%FA+8% MS - 220+/-20
81 KAIG3-RFI-SM-S-10341-00 6-Dec-22 14051 10
Mosque Zone 2B (as highlighted) , ( KAIG3-SCR-SM-S-0206-00 ) - SCREED

Concreting for S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 01AA , F.F.L
82 KAIG3-RFI-CO-S-10490-00 Crescent Zone 2H 6-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14059 10
869.79 (as highlighted),KAIG3-SCR-CO-S-0193-00

83 KAIG3-RFI-CO-S-10556-01 Crescent Zone 2B 6-Dec-22 Concreting for Infill wall at Zone 2B, Axis 02G , Level upto 872.3 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 14056 10

Page 510 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
South Small
BUILDING/ DATE OF Concreting for South small mosque , Sloping Slab and Parapet, Axis D-F/1-2 , F-G/1 LOAD /
SI84
No. KAIG3-RFI-SM-S-10341-00
RFI NUMBER 6-Dec-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14052
NOTE 10
Mosque
LOCATION CASTING Zone 2B (as highlighted) , ( KAIG3-SCR-SM-S-0206-00 ) QUANTITY
No.
(m³)

85 C32/40 62% OPC+30%FA - 160+/-40 14050 10

Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
86 KAIG3-RFI-SW-C-9487-00 Zone G 6-Dec-22 C16/20 SRC 14055 10
G/DC/11 at Zone-G - as highlighted

87 C16/20 SRC 14049 10

Concrete pouring & shuttering for Footing of Water feature Pump Room along Boundary
88 KAIG3-RFI-TG-S-10466-01 Butterfly Garden 7-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14088 10
wall, at Butterfly Garden, as highlighted area in attached drawing's.

"Inspection of Formwork and Concrete Pouring For Wall of Sub-station - R1 at Zone-C -


89 KAIG3-RFI-SW-C-9007-00 Zone C 7-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14086 10
as highlighted "

90 C32/40 62% OPC+30%FA - 160+/-40 14084 10

Inspection of Casting Concrete Encasement for Storm Water Line Branch from MH-Y-
91 KAIG3-RFI-SW-C-8927-00 Site Works 7-Dec-22 01 to End of Line and Surface Preperation prior to start waterproofing and Application of C16/20 SRC 14080 10
Primer (1st Coat, 2nd Coat and 3rd Coat) for branch from MH-Y-01 to End of Line

92 C16/20 SRC 14079 10

Shuttering and Concreting for Blinding under Grade Beam at Energy center at Axis 21-
93 KAIG3-RFI-EC-S-10511-00 Energy Center 7-Dec-22 C16/20 SRC 14085 10
29/N-Q ,( As Highlighted)

94 C16/20 SRC 14078 10

95 C16/20 SRC 14077 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


96 KAIG3-RFI-CO-S-10506-00 Crescent Zone 5 7-Dec-22 Concreting for Retaining wall, from Axis 01E-01F ,at Zone 5 , (As Highlighted) 14087 10
- SCREED

Concreting for Child Care Columns and Walls Upto Bottom of Suspended Slab , C32/40 62% OPC+30%FA+8% MS - 220+/-20
97 KAIG3-RFI-CC-S-10547-00 Child Care 7-Dec-22 14082 10
Columns ( C2 ( 8nos ) C1 ( 4nos ) ) at Zone 2N (As Highlighted) - SCREED

Concreting for Large Mosque WALL ( W 6 ) for, Zone 1G , Axis ( 3-3.2/B ) Level upto C32/40 62% OPC+30%FA+8% MS - 220+/-20
98 KAIG3-RFI-LM-S-10486-00 Large Mosque 7-Dec-22 14076 10
873.30 & 874.50 (As Highlighted) - SCREED

Concreting for Devonian garden AHU RC foundation (near 2nd) at Zone 2M , Axis
99 KAIG3-RFI-VG-S-10319-00 Devoniam Garden 7-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14083 10
02AM-02AL (as highlighted)

100 C32/40 62% OPC+30%FA - 160+/-40 14081 10

101 C32/40 62% OPC+30%FA - 160+/-40 14075 10

Page 511 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
Concrete Pouring & Shuttering for Slab & Walls of Cabin Room, ETFE Pump Room DELIVER
BUILDING/ DATE OF LOAD /
SI102
No. KAIG3-RFI-TG-S-10572-01
RFI NUMBER Butterfly Garden 8-Dec-22 and Remaining Boundary walls, at Butterfly Garden, as highlighted area in attached
DESCRIPTION C32/40 67%OPC+25%FA
DESIGN MIX - 160+/-40 Y14096
NOTE 10
LOCATION CASTING QUANTITY
drawing's. No.
(m³)

103 C32/40 67%OPC+25%FA - 160+/-40 14094 10

Concreting Mass Concrete (1st Layer ) under Rc Strip Footing ( inner ) at Zone 1K ,
104 KAIG3-RFI-CO-S-10387-00 Crescent Zone 1K 8-Dec-22 C16/20 SRC 14127 10
Between Axis 01AD-AE & 01AE-01AF (As Highlighted )

105 C16/20 SRC 14126 10

106 C16/20 SRC 14122 10

107 C16/20 SRC 14121 10

108 C16/20 SRC 14119 10

109 C16/20 SRC 14118 10

110 C16/20 SRC 14117 10

111 C16/20 SRC 14112 10

112 C16/20 SRC 14110 10

113 C16/20 SRC 14108 10

114 C16/20 SRC 14107 10

115 C16/20 SRC 14106 10

116 C16/20 SRC 14105 10

117 C16/20 SRC 14103 10

118 C16/20 SRC 14102 10

119 C16/20 SRC 14101 10

120 C16/20 SRC 14098 10

121 C16/20 SRC 14097 10

Page 512 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
Crescent Zone 1M
BUILDING/ DATE OF Concreting for Diaphragm wall at Zone 1M 1N , Axis 01AM , level From 872.5 to LOAD /
SI122
No. KAIG3-RFI-CO-S-10554-00
RFI NUMBER 8-Dec-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14125
NOTE 5
& 1N
LOCATION CASTING 877.0 (As Highlighted) QUANTITY
No.
(m³)
Concreting for Devonian Garden for SOG and Concrete Pad at Zone 2M ,Axis 02 AL -
123 KAIG3-RFI-VG-S-10545-00 Devonian Garden 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14115 10
02 AM (as highlighted)

Concreting for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at
124 KAIG3-RFI-LM-S-10561-00 Large Mosque 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14104 10
Zone 1G , Axis ( 2 & 5, B & B1 ) (As Highlighted)

125 C32/40 62% OPC+30%FA - 160+/-40 14095 10

126 C32/40 62% OPC+30%FA - 160+/-40 14093 10

Inspection of Blinding Concrete under MV Line Pit - C/MV/06, C/MV/41, C/MV/01,


127 KAIG3-RFI-SW-C-9383-00 Zone C 8-Dec-22 C16/20 SRC 14123 10
C/MV/11 at Zone-C - as highlighted (KAIG3-SCR-SW-E-0088-00)

128 C16/20 SRC 14100 10

129 C16/20 SRC 14092 10

Crescent Zone 1M Concreting for Diaphragm wall at Zone 1M 1N , Axis 01AM , level From 872.5 to C32/40 62% OPC+30%FA+8% MS - 220+/-20
130 KAIG3-RFI-CO-S-10554-00 8-Dec-22 14124 10
& 1N 877.0 (As Highlighted) - SCREED

Concreting for Devonian Garden for SOG and Concrete Pad at Zone 2M ,Axis 02 AL - C32/40 62% OPC+30%FA+8% MS - 220+/-20
131 KAIG3-RFI-VG-S-10545-00 Devonian Garden 8-Dec-22 14109 10
02 AM (as highlighted) - SCREED

Concreting for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at C32/40 62% OPC+30%FA+8% MS - 220+/-20
132 KAIG3-RFI-LM-S-10561-00 Large Mosque 8-Dec-22 14099 10
Zone 1G , Axis ( 2 & 5, B & B1 ) (As Highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


133 14091 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


134 14090 10
- SCREED

Crescent Zone 1M Concreting for Diaphragm wall at Zone 1M 1N , Axis 01AM , level From 872.5 to
135 KAIG3-RFI-CO-S-10554-00 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14120 10
& 1N 877.0 (As Highlighted)

Concreting for Devonian Garden for SOG and Concrete Pad at Zone 2M ,Axis 02 AL -
136 KAIG3-RFI-VG-S-10545-00 Devonian Garden 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14111 10
02 AM (as highlighted)

Concreting for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at
137 KAIG3-RFI-LM-S-10561-00 Large Mosque 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14089 7
Zone 1G , Axis ( 2 & 5, B & B1 ) (As Highlighted)

Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between
138 KAIG3-RFI-SW-C-9167-00 Zone F 11-Dec-22 C16/20 SRC 14202 10
F/FS/04 and F/FS/03 at Zone-F - As Highlighted

139 C16/20 SRC 14188 10

Shuttering and Concreting for Energy Center for foundation Axis 16-18/R(As
140 KAIG3-RFI-EC-S-10569-00 Energy Center 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14217 5
Highlighted) Level upto 871.00

Shuttering and Concreting for Energy Center for Footing Axis 14-16/L-R (As
141 KAIG3-RFI-EC-S-10584-00 Energy Center 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14213 10
Highlighted) 871.70

Page 513 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AE-02AF , TOC LOAD /
SI142
No. KAIG3-RFI-MC-S-10564-00
RFI NUMBER MCPE 2 11-Dec-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14210
NOTE 10
LOCATION CASTING 875.974 (As Highlighted) QUANTITY
No.
(m³)
Concreting for RC Strip Footing at Zone 1K , Axis 01AD-01AE-01AF (As Highlighted)
143 KAIG3-RFI-CO-S-10532-01 Crescent Zone 1K 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14206 10

Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB
144 KAIG3-RFI-MC-S-10541-01 MCPE 2 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14192 10
Level 871.00 (as highlighted)

145 C32/40 62% OPC+30%FA - 160+/-40 14190 10

146 C32/40 62% OPC+30%FA - 160+/-40 14187 10

Shuttering and Concreting for Energy Center for foundation Axis 16-18/R(As
147 KAIG3-RFI-EC-S-10569-00 Energy Center 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14216 10
Highlighted) Level upto 871.00

Shuttering and Concreting for Energy Center for Footing Axis 14-16/L-R (As
148 KAIG3-RFI-EC-S-10584-00 Energy Center 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14215 10
Highlighted) 871.70

Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AE-02AF , TOC
149 KAIG3-RFI-MC-S-10564-00 MCPE 2 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14214 10
875.974 (As Highlighted)

Concreting for RC Strip Footing at Zone 1K , Axis 01AD-01AE-01AF (As Highlighted)


150 KAIG3-RFI-CO-S-10532-01 Crescent Zone 1K 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14212 10

Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB
151 KAIG3-RFI-MC-S-10541-01 MCPE 2 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14211 10
Level 871.00 (as highlighted)

152 C32/40 62% OPC+30%FA - 160+/-40 14209 10

153 C32/40 62% OPC+30%FA - 160+/-40 14208 10

154 C32/40 62% OPC+30%FA - 160+/-40 14207 10

155 C32/40 62% OPC+30%FA - 160+/-40 14199 10

156 C32/40 62% OPC+30%FA - 160+/-40 14195 10

157 C32/40 62% OPC+30%FA - 160+/-40 14191 10

158 C32/40 62% OPC+30%FA - 160+/-40 14189 10

159 C32/40 62% OPC+30%FA - 160+/-40 14185 10

160 C32/40 62% OPC+30%FA - 160+/-40 14183 10

Page 514 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI161
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14182
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

162 C32/40 62% OPC+30%FA - 160+/-40 14181 10

Concreting for Child Care Walls Upto Bottom of Suspended Slab, Walls W4-1no ) , W7-
163 KAIG3-RFI-CC-S-10587-00 Child Care 12-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14268 10
1 no at Zone 2N (As Highlighted)

Concreting for Wall of Retaining wall, Axis 01W-01X , 01Y-01Z ,at Zone 2&3 , T.O.W.
164 KAIG3-RFI-CO-S-10607-00 Crescent Zone 2 & 3 12-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14267 10
868.90 (As Highlighted)

165 C32/40 62% OPC+30%FA - 160+/-40 14266 10

166 C32/40 62% OPC+30%FA - 160+/-40 14265 10

167 C32/40 62% OPC+30%FA - 160+/-40 14264 10

Concreting for Child Care Walls Upto Bottom of Suspended Slab, Walls W4-1no ) , W7- C32/40 62% OPC+30%FA+8% MS - 220+/-20
168 KAIG3-RFI-CC-S-10587-00 Child Care 12-Dec-22 14259 10
1 no at Zone 2N (As Highlighted) - SCREED

Concreting for Wall of Retaining wall, Axis 01W-01X , 01Y-01Z ,at Zone 2&3 , T.O.W. C32/40 62% OPC+30%FA+8% MS - 220+/-20
169 KAIG3-RFI-CO-S-10607-00 Crescent Zone 2 & 3 12-Dec-22 14250 5
868.90 (As Highlighted) - SCREED

Concreting for Mass Concrete ( 1st Layer ) ( Inner ) under Foundation , Between PC 74
170 KAIG3-RFI-CO-S-10601-00 Zone 1M 12-Dec-22 C16/20 SRC 14263 10
- PC 76 , at Zone 1M ( As Highlighted )

171 C16/20 SRC 14261 10

172 C16/20 SRC 14260 10

173 C16/20 SRC 14258 10

174 C16/20 SRC 14257 10

175 C16/20 SRC 14255 10

176 C16/20 SRC 14254 10

177 C16/20 SRC 14253 10

178 C16/20 SRC 14252 10

179 C16/20 SRC 14251 10

Page 515 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI180
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14246
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

181 C16/20 SRC 14249 10

182 C16/20 SRC 14247 10

Concrete Pouring for Blinding under Gabions along Boundary wall Inner side, (Between
183 KAIG3-RFI-AG-C-9388-00 Aviary Garden 12-Dec-22 F.O.H and B.O.H and Plant Room) Inside Aviary Garden, at highlighted area in attached C16/20 SRC 14256 10
drawings.

Concrete Pouring for Blinding under Foundations of Internal Garden, Inside Aviary
184 KAIG3-RFI-AG-S-10203-01 Aviary Garden 12-Dec-22 C16/20 SRC 14248 10
Garden, As per Highlighted in attached Drawing's.

185 C16/20 SRC 14245 10

186 C16/20 SRC 14244 10

187 C16/20 SRC 14243 10

188 C16/20 SRC 14242 10

Inspection of Blinding Concrete under Beam of Seating Area 3-21 & 3-22 at Zone-G -
189 KAIG3-RFI-PA-C-9187-00 Picnic Area 12-Dec-22 C16/20 SRC 14262 10
As Highlighted

Inspection of Blinding Concrete under Sub-station - R5 and R6 at Zone-G&K - as


190 KAIG3-RFI-SW-C-9249-00 Zone G & K 12-Dec-22 C16/20 SRC 14241 10
highlighted

191 C16/20 SRC 14240 10

192 C16/20 SRC 14239 10

Inspection of Blinding Concrete under LV Line Pit - B/LV/49, B/LV/17, B/LV/56,


193 KAIG3-RFI-SW-C-9250-00 Zone B & F 13-Dec-22 F/LV/02, F/LV/ 10, F/LV/16, F/LV/09, F/LV/22, F/LV/08, A/LV/02 at Zone-B&F - as C16/20 SRC 14269 10
highlighted

Concreting for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH -
194 KAIG3-RFI-CO-S-10594-00 Crescent Zone 1L 14-Dec-22 C16/20 SRC 14314 10
01AI , Level 874.05 (As Highlighted)

195 C16/20 SRC 14312 10

196 C16/20 SRC 14310 4

197 C16/20 SRC 14308 7

198 C16/20 SRC 14307 10

199 C16/20 SRC 14306 10

Page 516 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI200
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14305
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)
Concreting for Wall of Retaining wall, Axis 01W-01X , 01Y-01Z ,at Zone 2&3 , T.O.W. C32/40 62% OPC+30%FA+8% MS - 220+/-20
201 KAIG3-RFI-CO-S-10607-00 Crescent Zone 2 & 3 14-Dec-22 14300 10
868.90 (As Highlighted) - SCREED

Concrete Pouring & Shuttering for Slab & Walls of Cabin Room, ETFE Pump Room
202 KAIG3-RFI-TG-S-10572-01 Butterfly Garden 14-Dec-22 and Remaining Boundary walls, at Butterfly Garden, as highlighted area in attached C32/40 62% OPC+30%FA - 160+/-40 14301 10
drawing's.

203 C32/40 62% OPC+30%FA - 160+/-40 14299 10

204 C32/40 62% OPC+30%FA - 160+/-40 14293 10

205 C32/40 62% OPC+30%FA - 160+/-40 14292 10

206 C32/40 62% OPC+30%FA - 160+/-40 14291 10

Inspection for Casting the Blinding Concrete under the Manhole MH-G-08, MH-G-09,
MH-G-10, MH-G-10-1, MH-G-11 and Gullies G-G-25, G-G-23, G-G-24, G-G-22, G-G-
207 KAIG3-RFI-SW-C-9355-00 Site Works 14-Dec-22 C16/20 SRC 14311 10
21, G-G-20, G-G-19, G-G-03, G-G-05, G-G-18, G-G-17, G-G-15&16, G-G-13&14 - as
Highlighted

208 C16/20 SRC 14304 10

209 C16/20 SRC 14302 10

210 C16/20 SRC 14295 10

211 C16/20 SRC 14294 10

212 C16/20 SRC 14290 10

Concreting for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH -
213 KAIG3-RFI-CO-S-10594-00 Crescent Zone 1L 14-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14313 3
01AI , Level 874.05 (As Highlighted)

Concreting for North Administation Building Coluimns


North
214 KAIG3-RFI-NA-S-10580-00 14-Dec-22 ( C20_C29_C30_C31_C32_C33_C34_C35 ) ,Zone 2Q , Between Axis 02AX-02AZ , C32/40 62% OPC+30%FA - 160+/-40 14309 10
Administration
Level upto 873.725( As Highlighted )

215 C32/40 62% OPC+30%FA - 160+/-40 14303 10

216 C32/40 62% OPC+30%FA - 160+/-40 14298 10

217 C32/40 62% OPC+30%FA - 160+/-40 14297 10

218 C32/40 62% OPC+30%FA - 160+/-40 14296 10

Page 517 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI219
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14289
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

220 C32/40 62% OPC+30%FA - 160+/-40 14288 10

Shuttering and Concreting for Energy Center Beam at Axis 0-14, I-L (As Highlighted)
221 KAIG3-RFI-EC-S-10634-00 Energy Center 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14335 10
TOC 881.50

Shuttering and Concreting for Energy Center for foundation , Axis 12-13/A Level upto
222 KAIG3-RFI-EC-S-10637-00 Energy Center 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14331 10
871.70 (As Highlighted)

Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB
223 KAIG3-RFI-MC-S-10541-01 MCPE 2 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14324 10
Level 871.00 (as highlighted)

Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC
224 KAIG3-RFI-MC-S-10620-01 MCPE 2 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14320 10
875.974 & 875.85 (As Highlighted)

Shuttering and Concreting for Energy Center Beam at Axis 0-14, I-L (As Highlighted)
225 KAIG3-RFI-EC-S-10634-00 Energy Center 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14347 5
TOC 881.50

Shuttering and Concreting for Energy Center for foundation , Axis 12-13/A Level upto
226 KAIG3-RFI-EC-S-10637-00 Energy Center 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14346 10
871.70 (As Highlighted)

Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB
227 KAIG3-RFI-MC-S-10541-01 MCPE 2 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14337 10
Level 871.00 (as highlighted)

Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC
228 KAIG3-RFI-MC-S-10620-01 MCPE 2 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14336 4
875.974 & 875.85 (As Highlighted)

229 C32/40 62% OPC+30%FA - 160+/-40 14334 10

230 C32/40 62% OPC+30%FA - 160+/-40 14333 10

231 C32/40 62% OPC+30%FA - 160+/-40 14330 10

232 C32/40 62% OPC+30%FA - 160+/-40 14328 10

233 C32/40 62% OPC+30%FA - 160+/-40 14327 10

234 C32/40 62% OPC+30%FA - 160+/-40 14323 10

235 C32/40 62% OPC+30%FA - 160+/-40 14322 10

236 C32/40 62% OPC+30%FA - 160+/-40 14321 10

237 C32/40 62% OPC+30%FA - 160+/-40 14319 10

238 C32/40 62% OPC+30%FA - 160+/-40 14318 10

Page 518 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI239
No. KAIG3-RFI-MC-S-10541-01
RFI NUMBER MCPE 2 15-Dec-22 DESCRIPTION DESIGN MIX Y14317
NOTE 10
LOCATION CASTING Level 871.00 (as highlighted) - SCREED QUANTITY
No.
(m³)
Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC C32/40 62% OPC+30%FA+8% MS - 220+/-20
240 KAIG3-RFI-MC-S-10620-01 MCPE 2 15-Dec-22 14316 10
875.974 & 875.85 (As Highlighted) - SCREED

Inspection of Blinding Concrete under MV Line Pit - C/MV/36, D/MV/12 at Zone-C&D


241 KAIG3-RFI-SW-C-9513-00 Zone C & D 15-Dec-22 C16/20 SRC 14345 10
- as highlighted

Inspection of Blinding Concrete under MV LinePit D/MV/26, D/MV/15, D/MV/29 - as


242 KAIG3-RFI-SW-C-9533-00 Site Works 15-Dec-22 C16/20 SRC 14344 10
highlighted

243 C16/20 SRC 14343 10

244 C16/20 SRC 14342 10

245 C16/20 SRC 14341 10

246 C16/20 SRC 14340 10

247 C16/20 SRC 14339 10

248 C16/20 SRC 14338 10

249 C16/20 SRC 14332 10

250 C16/20 SRC 14329 10

251 C16/20 SRC 14326 10

252 C16/20 SRC 14325 10

253 C16/20 SRC 14315 10

Concreting for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J ,
254 KAIG3-RFI-CO-S-10661-00 Crescent Zone 1J 17-Dec-22 C16/20 SRC 14416 10
Axis 01AA-01AD (As Highlighted)

Concreting for Diaphragm wall blinding under foundation at Zone 1B , Axis 01F (As
255 KAIG3-RFI-CO-S-10592-00 Crescent Zone 1B 17-Dec-22 C16/20 SRC 14415 10
Highlighted) Level 868.10 & 867.50

256 C16/20 SRC 14414 10

257 C16/20 SRC 14412 10

258 C16/20 SRC 14411 10

Page 519 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
259 LOCATION CASTING C16/20 SRC 14409 QUANTITY
10
No.
(m³)

260 C16/20 SRC 14408 10

261 C16/20 SRC 14407 10

262 C16/20 SRC 14406 10

263 C16/20 SRC 14405 10

264 C16/20 SRC 14402 10

Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL,
265 KAIG3-RFI-CO-S-10752-00 Crescent Zone 2M 17-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14404 10
(grid 5 to 9 ) , Level upto 870.00 (as highlighted)

Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , level 869.00
266 KAIG3-RFI-CO-S-10689-00 Crescent Zone 1E 17-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14400 7
(As Highlighted)

267 C32/40 62% OPC+30%FA - 160+/-40 14399 10

268 C32/40 62% OPC+30%FA - 160+/-40 14398 10

269 C32/40 62% OPC+30%FA - 160+/-40 14397 10

270 C32/40 62% OPC+30%FA - 160+/-40 14396 10

Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
271 KAIG3-RFI-SW-C-9545-00 Zone 2C 17-Dec-22 C16/20 SRC 14413 5
ISC-26, NPW-ISC-27, and NPW-ISC-28 at Zone-C - as highlighted

272 C16/20 SRC 14410 10

273 C16/20 SRC 14403 10

274 C16/20 SRC 14401 10

275 C16/20 SRC 14395 10

276 C16/20 SRC 14394 10

277 C16/20 SRC 14393 10

Page 520 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI278
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14392
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

279 C16/20 SRC 14391 10

280 C16/20 SRC 14390 10

Concreting for Child Care Blinding Under SOG at Zone 2N (As Highlighted) Axis
281 KAIG3-RFI-CC-S-10657-00 Child Care 18-Dec-22 C16/20 SRC 14444 10
02AR-02AT

Shuttering and Concreting for Energy Center Beam , Axis 0-4/A-C , Level 881.50 (As
282 KAIG3-RFI-EC-S-10671-00 Energy Center 18-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14462 11
Highlighted )

Concreting for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level
283 KAIG3-RFI-CO-S-10652-00 Crescent Zone 1E 18-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14455 10
upto 868.5 (As Highlighted)

284 C32/40 62% OPC+30%FA - 160+/-40 14453 10

285 C32/40 62% OPC+30%FA - 160+/-40 14446 10

286 C32/40 62% OPC+30%FA - 160+/-40 14441 10

287 C32/40 62% OPC+30%FA - 160+/-40 14440 10

Concreting for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level
288 KAIG3-RFI-CO-S-10652-00 Crescent Zone 1E 18-Dec-22 C32/40 67%OPC+25%FA - 160+/-40 14439 10
upto 868.5 (As Highlighted)

Concrete pouring for wall of Decant Sump-D1 at boat Garden, inside Water Garden as
289 KAIG3-RFI-WG-C-9491-00 Water Garden 18-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14438 10
highlighted area in attached drawing's & KAIG3-SCR-WG-S-0212-00-Reply.

Shuttering and Concreting for Energy Center Beam , Axis 0-4/A-C , Level 881.50 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
290 KAIG3-RFI-EC-S-10671-00 Energy Center 18-Dec-22 14466 10
Highlighted ) - SCREED

Concreting for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level C32/40 62% OPC+30%FA+8% MS - 220+/-20
291 KAIG3-RFI-CO-S-10652-00 Crescent Zone 1E 18-Dec-22 14465 11
upto 868.5 (As Highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


292 14463 11
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


293 14454 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


294 14442 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


295 14435 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


296 14434 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


297 14433 10
- SCREED

Page 521 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 5A, As per C32/40 62% OPC+30%FA+8% MS - 220+/-20 LOAD /
SI298
No. KAIG3-RFI-TB-S-10638-00
RFI NUMBER Ticketing Booth 18-Dec-22 DESCRIPTION DESIGN MIX Y14432
NOTE 10
LOCATION CASTING Attached Highlighted Drawing's. - SCREED QUANTITY
No.
(m³)
Inspection of Blinding Concrete under MV LinePit C/MV/28, C/MV/29, C/MV/39,
299 KAIG3-RFI-SW-C-9575-00 Site Works 18-Dec-22 C16/20 SRC 14464 10
E/MV/08, E/MV/09 - as highlighted (SCR:KAIG3-SCR-SW-E-0088-00)

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from D/MV/13 to
300 KAIG3-RFI-SW-C-9584-00 Zone D 18-Dec-22 C16/20 SRC 14461 10
D/MV/06 at Zone-D (As Highlighted)

301 C16/20 SRC 14460 10

302 C16/20 SRC 14459 10

303 C16/20 SRC 14458 10

304 C16/20 SRC 14457 10

305 C16/20 SRC 14456 10

306 C16/20 SRC 14452 10

307 C16/20 SRC 14450 10

308 C16/20 SRC 14451 10

309 C16/20 SRC 14449 10

310 C16/20 SRC 14448 10

311 C16/20 SRC 14447 10

312 C16/20 SRC 14445 10

313 C16/20 SRC 14443 10

314 C16/20 SRC 14437 10

315 C16/20 SRC 14436 10

316 C16/20 SRC 14431 10

Inspection of Formwork and Concrete pouring for Footing of MV Line Pulling Pit -
317 KAIG3-RFI-SW-C-9535-00 Zone D 19-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14482 10
D/MV/12 at Zone-D (As Highlighted)

Page 522 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Inspection of Blinding Concrete under MV LinePit C/MV/28, C/MV/29, C/MV/39, LOAD /
SI318
No. KAIG3-RFI-SW-C-9575-00
RFI NUMBER Site Works 19-Dec-22 DESCRIPTION C16/20 SRC
DESIGN MIX Y14474
NOTE 9
LOCATION CASTING E/MV/08, E/MV/09 - as highlighted (SCR:KAIG3-SCR-SW-E-0088-00) QUANTITY
No.
(m³)

319 C16/20 SRC 14473 10

Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , level 869.00
320 KAIG3-RFI-CO-S-10689-00 Crescent Zone 1E 19-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14484 10
(As Highlighted)

321 KAIG3-RFI-CO-S-10655-01 Crescent Zone 1C 19-Dec-22 Concreting for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 14483 10

322 C32/40 62% OPC+30%FA - 160+/-40 14481 10

323 C32/40 62% OPC+30%FA - 160+/-40 14472 10

324 C32/40 62% OPC+30%FA - 160+/-40 14470 10

C32/40 62% OPC+30%FA+8% MS - 220+/-20


325 KAIG3-RFI-CO-S-10655-01 Crescent Zone 1C 19-Dec-22 Concreting for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted) 14469 10
- SCREED

Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , level 869.00 C32/40 62% OPC+30%FA+8% MS - 220+/-20
326 KAIG3-RFI-CO-S-10689-00 Crescent Zone 1E 19-Dec-22 14468 10
(As Highlighted) - SCREED

Inspection of Concrete Encasement for all Storm Water Line branches and Surface
327 KAIG3-RFI-SW-C-9666-00 Site Works 19-Dec-22 preparation prior to start water proofing and Water Proofing for all branches of Line-O - C16/20 SRC 14489 10
as highlighted

328 C16/20 SRC 14488 10

329 C16/20 SRC 14487 10

330 C16/20 SRC 14486 10

331 C16/20 SRC 14485 10

332 C16/20 SRC 14480 10

333 C16/20 SRC 14479 10

334 C16/20 SRC 14478 10

335 C16/20 SRC 14477 10

336 C16/20 SRC 14476 10

337 C16/20 SRC 14475 10

Page 523 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI338
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14471
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

339 C16/20 SRC 14467 10

Picnic Area (Seating "Inspection of Formwork and Concrete Pouring for Beam of Seating Area 3-21 & 3-22
340 KAIG3-RFI-PA-C-9349-00 20-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14518 10
Area) at Zone-G - As Highlighted"

Concreting for Diaphragm Wall (BEAM) at Zone 1M , Grid 01AM (As Highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
341 KAIG3-RFI-CO-S-10705-00 Crescent Zone 1M 20-Dec-22 14520 7
TOC 877.50 - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


342 KAIG3-RFI-CO-S-10694-00 Crescent Zone 2C 20-Dec-22 Concreting for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J (As Highlighted) 871.98 14519 7
- SCREED

North Concreting for North Administration Building Wall zone 2Q up 873.475 W1, W2 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
343 KAIG3-RFI-NA-S-10725-00 20-Dec-22 14517 11
Administration highlighted) - SCREED

Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, C32/40 62% OPC+30%FA+8% MS - 220+/-20
344 KAIG3-RFI-CO-S-10752-00 Crescent Zone 2M 20-Dec-22 14516 10
(grid 5 to 9 ) , Level upto 870.00 (as highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


345 14513 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


346 14512 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


347 14505 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


348 14500 10
- SCREED

Inspection of Concrete Encasement for all Storm Water Line branches and Surface
349 KAIG3-RFI-SW-C-9667-00 Site Works 20-Dec-22 preparation prior to start water proofing and Water Proofing for all branches of Line-G - C16/20 SRC 14515 10
as highlighted

350 C16/20 SRC 14514 10

351 C16/20 SRC 14511 10

352 C16/20 SRC 14503 10

353 C16/20 SRC 14502 10

354 C16/20 SRC 14498 10

Concreting for Diaphragm Wall (BEAM) at Zone 1M , Grid 01AM (As Highlighted)
355 KAIG3-RFI-CO-S-10705-00 Crescent Zone 1M 20-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14525 10
TOC 877.50

356 KAIG3-RFI-CO-S-10694-00 Crescent Zone 2C 20-Dec-22 Concreting for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J (As Highlighted) 871.98 C32/40 62% OPC+30%FA - 160+/-40 14524 10

North Concreting for North Administration Building Wall zone 2Q up 873.475 W1, W2 (as
357 KAIG3-RFI-NA-S-10725-00 20-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14523 10
Administration highlighted)

Page 524 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, LOAD /
SI358
No. KAIG3-RFI-CO-S-10752-00
RFI NUMBER Crescent Zone 2M 20-Dec-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14522
NOTE 10
LOCATION CASTING (grid 5 to 9 ) , Level upto 870.00 (as highlighted) QUANTITY
No.
(m³)

359 C32/40 62% OPC+30%FA - 160+/-40 14521 10

360 C32/40 62% OPC+30%FA - 160+/-40 14510 10

361 C32/40 62% OPC+30%FA - 160+/-40 14509 10

362 C32/40 62% OPC+30%FA - 160+/-40 14508 10

363 C32/40 62% OPC+30%FA - 160+/-40 14507 10

364 C32/40 62% OPC+30%FA - 160+/-40 14506 10

365 C32/40 62% OPC+30%FA - 160+/-40 14504 10

366 C32/40 62% OPC+30%FA - 160+/-40 14501 10

367 C32/40 62% OPC+30%FA - 160+/-40 14499 10

368 C32/40 62% OPC+30%FA - 160+/-40 14497 10

369 C32/40 62% OPC+30%FA - 160+/-40 14496 10

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/23 to
370 KAIG3-RFI-SW-C-9686-00 Zone C 21-Dec-22 C16/20 SRC 14558 5
C/MV/06 at Zone-C - As Highlighted (SCR- KAIG3-SCR-SW-E-0088-00)

371 C16/20 SRC 14557 10

372 C16/20 SRC 14549 10

373 C16/20 SRC 14536 10

374 C16/20 SRC 14529 10

Concreting for Large mosque upper second flooor (Slab, beams) at zone 1G axis B-F, 1-
375 KAIG3-RFI-LM-S-10699-00 Large Mosque 21-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14546 2
6, 880.70-880.20 (as highlighted)

Shuttering and Concreting for Energy Center Columns , Axis 7-11/A , Level from
376 KAIG3-RFI-EC-S-10688-00 Energy Center 21-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14528 10
884.50 to 887.00 (As Highlighted)

Concreting for Large mosque upper second flooor (Slab, beams) at zone 1G axis B-F, 1-
377 KAIG3-RFI-LM-S-10699-00 Large Mosque 21-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14556 10
6, 880.70-880.20 (as highlighted)

Page 525 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF Shuttering and Concreting for Energy Center Columns , Axis 7-11/A , Level from LOAD /
SI378
No. KAIG3-RFI-EC-S-10688-00
RFI NUMBER Energy Center 21-Dec-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14555
NOTE 10
LOCATION CASTING 884.50 to 887.00 (As Highlighted) QUANTITY
No.
(m³)

379 C32/40 62% OPC+30%FA - 160+/-40 14554 10

380 C32/40 62% OPC+30%FA - 160+/-40 14553 10

381 C32/40 62% OPC+30%FA - 160+/-40 14552 10

382 C32/40 62% OPC+30%FA - 160+/-40 14551 10

383 C32/40 62% OPC+30%FA - 160+/-40 14550 10

384 C32/40 62% OPC+30%FA - 160+/-40 14548 10

385 C32/40 62% OPC+30%FA - 160+/-40 14547 10

386 C32/40 62% OPC+30%FA - 160+/-40 14545 10

387 C32/40 62% OPC+30%FA - 160+/-40 14544 10

388 C32/40 62% OPC+30%FA - 160+/-40 14543 10

389 C32/40 62% OPC+30%FA - 160+/-40 14542 10

390 C32/40 62% OPC+30%FA - 160+/-40 14541 10

391 C32/40 62% OPC+30%FA - 160+/-40 14540 10

392 C32/40 62% OPC+30%FA - 160+/-40 14539 10

393 C32/40 62% OPC+30%FA - 160+/-40 14538 10

394 C32/40 62% OPC+30%FA - 160+/-40 14537 10

395 C32/40 62% OPC+30%FA - 160+/-40 14535 10

396 C32/40 62% OPC+30%FA - 160+/-40 14534 10

397 C32/40 62% OPC+30%FA - 160+/-40 14533 10

Page 526 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI398
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14532
NOTE 10
LOCATION CASTING QUANTITY
No.
(m³)

399 C32/40 62% OPC+30%FA - 160+/-40 14531 10

400 C32/40 62% OPC+30%FA - 160+/-40 14530 10

401 C32/40 62% OPC+30%FA - 160+/-40 14527 10

402 C32/40 62% OPC+30%FA - 160+/-40 14526 10

Concreting for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC
403 KAIG3-RFI-MC-S-10799-00 MCPE 2 22-Dec-22 C16/20 SRC 14599 11
870.7) ZONE 2J (as highlighted)

Concreting for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC
404 KAIG3-RFI-MC-S-10799-00 MCPE 2 22-Dec-22 C16/20 SRC 14600 3
870.7) ZONE 2J (as highlighted)

Concreting for Mass concrete ( 1st Layer ) Under Strip footing at Zone 1J , Axis 01AA-
405 KAIG3-RFI-CO-S-10521-00 Crescent Zone 1J 22-Dec-22 C16/20 SRC 14592 10
01AD (As Highlighted)

406 C16/20 SRC 14591 10

407 C16/20 SRC 14590 10

Concreting for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted ) C32/40 62% OPC+30%FA+8% MS - 220+/-20
408 KAIG3-RFI-MC-S-10703-01 MCPE 1 22-Dec-22 14584 10
Level 874.50 - SCREED

North Concreting for North Administration Building Columns C( 39-40-41-42-43-44--45-46- C32/40 62% OPC+30%FA+8% MS - 220+/-20
409 KAIG3-RFI-NA-S-10670-00 22-Dec-22 14597 10
Administration 47-48 ) Zone 2Q , Level from 872.65-873.075( As Highlighted ) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


410 14598 6
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


411 14601 8
- SCREED

Concreting for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted )
412 KAIG3-RFI-MC-S-10703-01 MCPE 1 22-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14589 10
Level 874.50

North Concreting for North Administration Building Columns C( 39-40-41-42-43-44--45-46-


413 KAIG3-RFI-NA-S-10670-00 22-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14582 11
Administration 47-48 ) Zone 2Q , Level from 872.65-873.075( As Highlighted )

414 C32/40 62% OPC+30%FA - 160+/-40 14581 11

415 C32/40 62% OPC+30%FA - 160+/-40 14580 11

Concrete Pouring & Shuttering for Wall of Decant Sump-D3 at Mist Garden, inside
416 KAIG3-RFI-WG-C-9624-00 Water Garden 22-Dec-22 Water Garden as highlighted area in attached drawing's & KAIG3-SCR-WG-S-0212-00- C32/40 62% OPC+30%FA - 160+/-40 14568 10
Reply.

Concreting for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted )
417 KAIG3-RFI-MC-S-10703-01 MCPE 1 22-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14572 10
Level 874.50

Page 527 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
North
BUILDING/ DATE OF Concreting for North Administration Building Columns C( 39-40-41-42-43-44--45-46- LOAD /
SI418
No. KAIG3-RFI-NA-S-10670-00
RFI NUMBER 22-Dec-22 DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14569
NOTE 10
Administration
LOCATION CASTING 47-48 ) Zone 2Q , Level from 872.65-873.075( As Highlighted ) QUANTITY
No.
(m³)

419 C32/40 62% OPC+30%FA - 160+/-40 14567 10

420 C32/40 62% OPC+30%FA - 160+/-40 14566 10

Inspection of Blinding Concrete under LV Line Pit - F/LV/24, F/LV/04, F/LV/21,


F/LV/03, F/LV/20, F/LV/26, F/LV/11, G/LV/24, G/LV/25, G/LV/59, G/LV/27,
421 KAIG3-RFI-SW-C-9615-00 Zone F & G 22-Dec-22 C16/20 SRC 14596 10
G/LV/03, G/LV/16, G/LV/44, G/LV/43, G/LV/53, G/LV/31, G/LV/54, G/LV/28 at
Zone-F&G - as highlighted

422 C16/20 SRC 14595 10

423 C16/20 SRC 14594 10

424 C16/20 SRC 14593 10

425 C16/20 SRC 14588 10

426 C16/20 SRC 14587 10

427 C16/20 SRC 14586 10

428 C16/20 SRC 14585 10

429 C16/20 SRC 14583 10

430 C16/20 SRC 14579 10

431 C16/20 SRC 14578 10

432 C16/20 SRC 14577 10

433 C16/20 SRC 14576 10

434 C16/20 SRC 14575 10

435 C16/20 SRC 14574 10

436 C16/20 SRC 14573 10

Page 528 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI437
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14571
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
438 C16/20 SRC 14570 10

439 C16/20 SRC 14565 10

Concreting for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J ,
440 KAIG3-RFI-CO-S-10661-00 Crescent Zone 1J 24-Dec-22 C16/20 SRC 14645 4
Axis 01AA-01AD (As Highlighted)

441 C16/20 SRC 14642 10

442 C16/20 SRC 14640 10

443 C16/20 SRC 14639 10

444 C16/20 SRC 14636 10

445 C16/20 SRC 14635 10

446 C16/20 SRC 14634 10

447 C16/20 SRC 14633 10

Concreting for Infill Perimeter wall (Outer ) ( 2nd Stage ) ( Inclined ) at Zone 1L , Axis
448 KAIG3-RFI-CO-S-10744-00 Crescent Zone 1L 24-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14644 10
01AG-01AH , Level upto 873.8 (As Highlighted)

449 KAIG3-RFI-CO-S-10779-00 Crescent Zone 1K 24-Dec-22 Concreting for Strip footing Zone 1K Axis 01AE-01AF ( As highlighted) C32/40 62% OPC+30%FA - 160+/-40 14638 10

Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL,
450 KAIG3-RFI-CO-S-10754-00 Crescent Zone 2M 24-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14637 10
(Grid 9 to 13) , Level upto 870.00 (as highlighted)

Concreting for Infill wall ( Upper Part ) at Zone 1A , Axis 01A to 01B , Level 877.50
451 KAIG3-RFI-CO-S-10421-00 Crescent Zone 1A 24-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14632 10
(As Highlighted)

Concreting for Rc Strip Foundation ( Inner ) at Zone 1L, Axis 01AH-01AI (As
452 KAIG3-RFI-CO-S-10770-00 Crescent Zone 1L 24-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14631 10
Highlighted)

453 C32/40 62% OPC+30%FA - 160+/-40 14626 10

454 C32/40 62% OPC+30%FA - 160+/-40 14624 10

455 C32/40 62% OPC+30%FA - 160+/-40 14623 10

456 C32/40 62% OPC+30%FA - 160+/-40 14622 10

457 C32/40 62% OPC+30%FA - 160+/-40 14621 10

Page 529 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI458
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14620
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
459 C32/40 62% OPC+30%FA - 160+/-40 14619 10

460 C32/40 62% OPC+30%FA - 160+/-40 14618 10

461 C32/40 62% OPC+30%FA - 160+/-40 14607 10

462 C32/40 62% OPC+30%FA - 160+/-40 14606 10

463 C32/40 62% OPC+30%FA - 160+/-40 14605 10

Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from D/MV/21 to
464 KAIG3-RFI-SW-C-9758-00 Zone D 24-Dec-22 C16/20 SRC 14643 10
D/MV/28 at Zone-D (As Highlighted)

465 C16/20 SRC 14641 10

466 C16/20 SRC 14630 10

467 C16/20 SRC 14629 10

468 C16/20 SRC 14628 10

469 C16/20 SRC 14627 10

470 C16/20 SRC 14625 10

471 C16/20 SRC 14617 10

472 C16/20 SRC 14616 10

473 C16/20 SRC 14615 10

474 C16/20 SRC 14614 10

475 C16/20 SRC 14613 10

476 C16/20 SRC 14612 10

477 C16/20 SRC 14611 10

478 C16/20 SRC 14610 10

Page 530 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI479
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14609
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
480 C16/20 SRC 14608 10

481 C16/20 SRC 14604 10

Concreting for MCPE 2 Roof Slab , Axis 02AB - 02AC , ZONE 2J , Level 875.974 &
482 KAIG3-RFI-MC-S-10809-00 MCPE 2 25-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14691 10
875.850 (as highlighted)

Concreting for Child care (SOG) Slab on Grade zone 2N , Axis 02AR-02AT (as
483 KAIG3-RFI-CC-S-10801-00 Child Care 25-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14690 10
highlighted)

484 C32/40 62% OPC+30%FA - 160+/-40 14689 10

485 C32/40 62% OPC+30%FA - 160+/-40 14688 10

486 C32/40 62% OPC+30%FA - 160+/-40 14687 10

487 C32/40 62% OPC+30%FA - 160+/-40 14686 10

488 C32/40 62% OPC+30%FA - 160+/-40 14685 10

489 C32/40 62% OPC+30%FA - 160+/-40 14684 10

490 C32/40 62% OPC+30%FA - 160+/-40 14683 10

491 C32/40 62% OPC+30%FA - 160+/-40 14682 10

492 C32/40 62% OPC+30%FA - 160+/-40 14681 10

493 C32/40 62% OPC+30%FA - 160+/-40 14680 10

494 C32/40 62% OPC+30%FA - 160+/-40 14678 10

495 C32/40 62% OPC+30%FA - 160+/-40 14677 10

496 C32/40 62% OPC+30%FA - 160+/-40 14674 10

497 C32/40 62% OPC+30%FA - 160+/-40 14673 10

498 C32/40 62% OPC+30%FA - 160+/-40 14671 5

499 C32/40 62% OPC+30%FA - 160+/-40 14668 10

Page 531 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI500
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14666
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
501 C32/40 62% OPC+30%FA - 160+/-40 14665 10

502 C32/40 62% OPC+30%FA - 160+/-40 14664 10

Inspection of Blinding Concrete under LV Line Pit - G/LV/39, G/LV/41 at Zone-G - as


503 KAIG3-RFI-SW-C-9780-00 Zone G 25-Dec-22 C16/20 SRC 14679 10
highlighted

504 C16/20 SRC 14676 10

505 C16/20 SRC 14672 10

506 C16/20 SRC 14670 10

507 C16/20 SRC 14669 10

508 C16/20 SRC 14667 10

509 C16/20 SRC 14659 10

Inspection of Formwork and Concrete pouring for Beam of Seating Area 3-34 at Zone-K
510 KAIG3-RFI-PA-C-9544-00 Zone K 25-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14662 10
- As Highlighted

Picnic Area (Seating Inspection of Formwork and Concrete pouring for Beam of Seating Area 3-33 at Zone-K
511 KAIG3-RFI-PA-C-9635-00 25-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14658 5
Area) - As Highlighted

512 C32/40 62% OPC+30%FA - 160+/-40 14657 10

Concreting for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC
513 KAIG3-RFI-MC-S-10799-00 MCPE 2 25-Dec-22 C16/20 SRC 14656 3
870.7) ZONE 2J (as highlighted)

Inspection of Blinding Concrete under LV Line Pit - G/LV/15, G/LV/33, G/LV/34,


514 KAIG3-RFI-SW-C-9783-00 Zone G 26-Dec-22 C16/20 SRC 14720 10
G/LV/35 at Zone-G - as highlighted

515 C16/20 SRC 14719 10

516 C16/20 SRC 14718 10

517 C16/20 SRC 14717 10

518 C16/20 SRC 14716 10

519 C16/20 SRC 14715 10

520 C16/20 SRC 14714 10

Page 532 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI521
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14713
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
522 C16/20 SRC 14712 10

523 C16/20 SRC 14711 10

Concreting for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J , C32/40 62% OPC+30%FA+8% MS - 220+/-20
524 KAIG3-RFI-CO-S-10661-00 Crescent Zone 1J 26-Dec-22 14710 4
Axis 01AA-01AD (As Highlighted) - SCREED

Concreting for MCPE 2 Roof Slab , Axis 02AB - 02AC , ZONE 2J , Level 875.974 & C32/40 62% OPC+30%FA+8% MS - 220+/-20
525 KAIG3-RFI-MC-S-10809-00 MCPE 2 26-Dec-22 14660 8
875.850 (as highlighted) - SCREED

Inspection of Formwork & Concrete pouring for Footing of MV Line Pit - C/MV/28,
526 KAIG3-RFI-SW-C-9577-00 Zone C & E 28-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14764 5
E/MV/08, E/MV/09 at Zone-C&E (As Highlighted) (SCR:KAIG3-SCR-SW-E-0088-00)

C32/40 62% OPC+30%FA+8% MS - 220+/-20


527 KAIG3-RFI-CO-S-10823-00 Crescent Zone 1M 28-Dec-22 Concreting for Infill wall ( Outer ) Zone 1M, Axis 01AJ-01AK (As Highlighted ) 14773 11
- SCREED

Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01C-01D , Level Upto 873.10 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
528 KAIG3-RFI-CO-S-10843-00 Crescent Zone 1A 28-Dec-22 14769 10
Highlighted) - SCREED

Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01B-01C, Level upto 873.10 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
529 KAIG3-RFI-CO-S-10841-00 Crescent Zone 1A 28-Dec-22 14768 10
Highlighted) - SCREED

Concreting for Infill wall ( Inner ) ( 2nd Stage ) at Zone 1D , Axis 01L-01M (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
530 KAIG3-RFI-CO-S-10846-00 Crescent Zone 1D 28-Dec-22 14767 10
Highlighted) - SCREED

Concreting for Diaphragm wall ( 3rd part ) at Zone 1E , Axis 01P , Level Upto 873.50 C32/40 62% OPC+30%FA+8% MS - 220+/-20
531 KAIG3-RFI-CO-S-10850-00 Crescent Zone 1E 28-Dec-22 14760 10
(as highlighted) - SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


532 14757 10
- SCREED

C32/40 62% OPC+30%FA+8% MS - 220+/-20


533 14746 10
- SCREED

Concreting for Plain Concrete Under Footing ( only ) of Diaphragam Wall , Zone 1C ,
534 KAIG3-RFI-CO-S-10862-00 Crescent Zone 1C 28-Dec-22 C16/20 SRC 14745 10
Axis 01G (as highlighted)

Concreting for Diaphragm wall ( RC Foundation and Strip footing ), at Zone 1B , Axis
535 KAIG3-RFI-CO-S-10793-01 Crescent Zone 1B 28-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14772 7
01F , Level upto 868.50 (as highlighted)

Concreting for MCPE 1 for Bottom Slab of Duct Tunnel , Axis 03/R , Zone 2M 2N ,
536 KAIG3-RFI-MC-S-10806-00 MCPE 1 28-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14771 10
TOC 871.00 (As Highlighted )

537 C32/40 62% OPC+30%FA - 160+/-40 14758 10

538 C32/40 62% OPC+30%FA - 160+/-40 14755 10

539 C32/40 62% OPC+30%FA - 160+/-40 14753 10

540 C32/40 62% OPC+30%FA - 160+/-40 14752 10

541 C32/40 62% OPC+30%FA - 160+/-40 14751 10

Page 533 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI542
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN
OPC+30%FA
MIX - 160+/-40 Y14749
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
543 C32/40 62% OPC+30%FA - 160+/-40 14744 10

544 C32/40 62% OPC+30%FA - 160+/-40 14743 10

545 C32/40 62% OPC+30%FA - 160+/-40 14742 10

546 C32/40 62% OPC+30%FA - 160+/-40 14737 10

547 C32/40 62% OPC+30%FA - 160+/-40 14736 10

548 C32/40 62% OPC+30%FA - 160+/-40 14735 10

549 C32/40 62% OPC+30%FA - 160+/-40 14734 10

550 C32/40 62% OPC+30%FA - 160+/-40 14733 10

551 C32/40 62% OPC+30%FA - 160+/-40 14732 10

552 C32/40 62% OPC+30%FA - 160+/-40 14731 10

553 C32/40 62% OPC+30%FA - 160+/-40 14730 10

554 C32/40 62% OPC+30%FA - 160+/-40 14729 10

555 C32/40 62% OPC+30%FA - 160+/-40 14728 10

556 C32/40 62% OPC+30%FA - 160+/-40 14727 10

557 C32/40 62% OPC+30%FA - 160+/-40 14726 10

558 C32/40 62% OPC+30%FA - 160+/-40 14725 10

"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start
559 KAIG3-RFI-SW-C-9773-00 Site Works 28-Dec-22 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A- C16/20 SRC 14759 10
3-4, FW-A-3-5 (As Highlighted) "

"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start
560 KAIG3-RFI-SW-C-9774-00 Site Works 28-Dec-22 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for Manhole C16/20 SRC 14756 10
FW-A-3-6 and backdrop (As Highlighted) "

561 C16/20 SRC 14754 10

Page 534 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI562
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14750
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
563 C16/20 SRC 14748 10

564 C16/20 SRC 14747 10

565 C16/20 SRC 14741 10

566 C16/20 SRC 14740 10

567 C16/20 SRC 14739 10

568 C16/20 SRC 14738 10

569 C16/20 SRC 14724 10

570 C16/20 SRC 14723 10

571 C16/20 SRC 14722 10

572 C16/20 SRC 14721 10

Inspection of Formwork & Concrete pouring for Footing of MV Line Pit - C/MV/28,
573 KAIG3-RFI-SW-C-9577-00 Site Works 29-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14797 6
E/MV/08, E/MV/09 at Zone-C&E (As Highlighted) (SCR:KAIG3-SCR-SW-E-0088-00)

Concreting for Mass concrete ( 1st Layer ) ( Outer ) Under Strip footing at Zone 1J ,
574 KAIG3-RFI-CO-S-10828-00 Crescent Zone 1J 29-Dec-22 C16/20 SRC 14796 10
Axis 01AC-01AD, TOC 867.330 (As Highlighted)

Concreting for Plain Concrete Under Diaphragam Wall Strip Footing , Zone 1C , Axis
575 KAIG3-RFI-CO-S-10883-00 Crescent Zone 1C 29-Dec-22 C16/20 SRC 14794 10
01G , Level Upto 868.03 (as highlighted)

576 C16/20 SRC 14792 10

577 C16/20 SRC 14790 10

578 C16/20 SRC 14788 10

Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 6A, As per C32/40 62% OPC+30%FA+8% MS - 220+/-20
579 KAIG3-RFI-TB-S-10893-00 Ticketing Booth 29-Dec-22 14785 10
Attached Highlighted Drawing's. - SCREED

Inspection for Casting the Blinding Concrete under the Manhole MH-Q-01, MH-Q-02,
580 KAIG3-RFI-SW-C-9794-00 Site Works 29-Dec-22 MH-Q-03, MH-Q-03-01, MH-Q-04, MH-Q-05, MH-Q-06, MH-Q-07, MH-Q-08, MH- C16/20 SRC 14798 10
Q-09, MH-Q-10, MH-Q-07-01, MH-Q-07-02 & MH-Q-07-03 - as Highlighted

581 C16/20 SRC 14795 10

582 C16/20 SRC 14793 10

Page 535 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD
10 /
SI583
No. RFI NUMBER DESCRIPTION C16/20 SRC
DESIGN MIX Y14791
NOTE
LOCATION CASTING QUANTITY
No.
(m³)
584 C16/20 SRC 14789 10

585 C16/20 SRC 14784 10

Concreting for Infill Wall ( 2nd stage ) ( Outer ) , at Zone 1L, Axis 01AH-01AI , Level C32/40 62% OPC+30%FA+8% MS - 220+/-20
586 KAIG3-RFI-CO-S-10864-00 Crescent Zone 1L 29-Dec-22 14777 5
Upto 873.8 (As Highlighted) - SCREED

Concreting for Strip Foundation ( Inner ) at Zone 1M, Axis 01AK-01AL (As
587 KAIG3-RFI-CO-S-10867-00 Crescent Zone 1M 29-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14805 6
Highlighted )

588 C32/40 62% OPC+30%FA - 160+/-40 14804 11

589 C32/40 62% OPC+30%FA - 160+/-40 14803 11

590 C32/40 62% OPC+30%FA - 160+/-40 14802 10

591 C32/40 62% OPC+30%FA - 160+/-40 14801 10

592 C32/40 62% OPC+30%FA - 160+/-40 14800 10

593 C32/40 62% OPC+30%FA - 160+/-40 14799 10

594 C32/40 62% OPC+30%FA - 160+/-40 14787 10

595 C32/40 62% OPC+30%FA - 160+/-40 14786 10

596 C32/40 62% OPC+30%FA - 160+/-40 14783 10

597 C32/40 62% OPC+30%FA - 160+/-40 14782 10

598 C32/40 62% OPC+30%FA - 160+/-40 14781 10

599 C32/40 62% OPC+30%FA - 160+/-40 14779 10

600 C32/40 62% OPC+30%FA - 160+/-40 14778 10

601 C32/40 62% OPC+30%FA - 160+/-40 14776 10

Inspection for Casting the Blinding Concrete under the Manhole MH-Q-01, MH-Q-02,
602 KAIG3-RFI-SW-C-9794-00 Site Works 29-Dec-22 MH-Q-03, MH-Q-03-01, MH-Q-04, MH-Q-05, MH-Q-06, MH-Q-07, MH-Q-08, MH- C16/20 SRC 14775 10
Q-09, MH-Q-10, MH-Q-07-01, MH-Q-07-02 & MH-Q-07-03 - as Highlighted

603 C16/20 SRC 14780 10

Page 536 of 537


Consultant : DAR

Main Contractor: ZHBG

CONCRETE POURING LOG AND CUBE REGISTER


COMPRESSIVE
TRUCK STRENGHT
DELIVER
BUILDING/ DATE OF LOAD /
SI No. RFI NUMBER DESCRIPTION DESIGN MIX Y NOTE
LOCATION CASTING QUANTITY
No.
(m³)
Concrete Design Mix Quantity m3

621
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - SCREED

2440
C32/40 62% OPC+30%FA - 160+/-40

C16/20 SRC 2741

C32/40 67%OPC+25%FA - 160+/-40 52

TOTAL QUANTITY TRUCK LOAD (M³): 5854.00

Prepared by: Antolin V. Mauro Approved by: Engr. Hassan Al Hantoush

QC DC QC Manager

Page 537 of 537