Concrete Pouring Log
Concrete Pouring Log
Boundary Wall Nick Concrete Pouring for Retaining Wall - Corebel Extension (for span76-90) as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 -
3 KAIG3-RFI-BO-S-0364-00 07.03.2020 C32/40 62% OPC+30%FA P 29-11660 9
Wall for Cladding 76-90 Very Severe. Boundary Wall done by 2nd Stage Contractor.
PASSED
Concrete Pouring for Retaining Wall - Corebel Extension (for span76-90) as per attached SCR-BO-S-0012-00; Concrete Mix Design C32/40 -
4 C32/40 62% OPC+30%FA P 28-19885 8
Very Severe. Boundary Wall done by 2nd Stage Contractor.
Crescent - PC
5 KAIG3-RFI-CO-S-0368-00 (91,92,93)
02.03.2020 Concreting of Blinding / Mass concrete for PC 91-93. C16/20 SRC P 29-11493 9
PASSED
6 C16/20 SRC P 28-19801 9
7 KAIG3-RFI-TT-S-0370-00 Tower 1 - S.O.G 02.03.2020 Blinding Concrete for Slab on Grade of Tower-1; "Done by 2nd Stage Contractor". Mix Design - C 16/20 (SRC). C16/20 SRC P 28-19804 12 PASSED
Crescent - PC
8 KAIG3-RFI-CO-S-0374-00 (81,79,77) 03.03.2020 Inspection Blinding Concrete (C16/20) under pile cap at PC 81, 79 & 77. C16/20 SRC P 28-19828 9
9 P 28-19830 12
10 P 28-19831 9
11 P 28-19836 9 PASSED
12 P 28-19837 9
13 P 28-19840 9
14 P 28-19848 10
Crescent - PC
15 KAIG3-RFI-CO-S-0380-00 (94,95,96,97 & 98)
05.03.2020 Inspection of Blinding Concrete casting C(16-20) at PC (94,95,96,97 & 98). C16/20 SRC P 29-11586 9
16 P 2911590 9
17 P 29-11592 9 PASSED
18 P 29-11594 9
19 P 29-11596 9
C32/40
20 KAIG3-RFI-BO-S-0381-00 67%OPC+25%FA 05.03.2020 Concrete Pouring for Columns of Boundary, Column # 76-80. Conc Mix Design C32/40 - Very Severe C32/40 67% OPC+25%FA P 29-11608 5 PASSED
Crescent 1 - PC
21 KAIG3-RFI-CO-S-0388-00 (78,80,82)
07.03.2020 Inspection of concrete casting SRC, C(16-20) under PC (82,80 & 78). C16/20 SRC P 28-19892 9
22 P 28-19896 9
23 P 28-19899 9
24 P 28-19901 9 PASSED
25 P 28-19907 9
26 P 28-19909 9
27 P 28-19910 8
28 KAIG3-RFI-MB-S-0394-00 Management Buiding 08.03.2020 Concrete Pouring for Post beside existing Column of Management Building (as per SCR-MB-G-0031-00); done by 2nd Stage Contractor. C32/40 62% OPC+30%FA P 29-11674 8 PASSED
29 09.03.2020 P 29-11725 5
Crescent - 2 PC
30 KAIG3-RFI-CO-S-0396-00 (188,189,190,191,192)
08.03.2020 Inspection of concrete casting SRC, C(16-20) under PC (188-192) C16/20 SRC P 29-11678 9.5
32 P 29-11681 10
Crescent 2 - PC (71,73
33 KAIG3-RFI-CO-S-0401-00 & 71) 09.03.2020 Inspection of concrete casting SRC, C(16-20) under PC (181, 183, 185 & 187) C16/20 SRC P 29-11727 9
kaig-qcals 1
PASSED
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1272
35 P 29-11729 10
Crescent 1 - PC
KAIG3-RFI-CO-S-0406-00 (71,73,75)
10.03.2020 Inspection of concrete casting SRC, C(16-20) under PC (71, 73 & 75). C16/20 SRC P 29-11785 9
P 29-11786 9
P 29-11788 9 PASSED
P 29-11791 9
P 29-11793 9
36 KAIG3-RFI-TT-S-0407-00 Management Buiding 10.03.2020 Concrete Pouring for Slab on Grade of Tower 1, Mix Design C32/40 - (Severe Exposed). C32/40 62% OPC+30%FA P 29-11781 9
PASSED
P 29-11891 6
38 P 29-11907 9
39 P 29-11908 10 PASSED
40 P 29-11912 10
41 P 29-11919 4
42 KAIG3-RFI-PB-S-0420-00 Ticket Booth 1 14.03.2020 Concrete pouring for Kicker of Ticketing booth 1, (H=100mm). C32/40 62% OPC+30%FA P 29-11980 2 PASSED
Crescent 1 - PC (65,67
43 KAIG3-RFI-CO-S-0422-00 & 69)
14.03.2020 Inspection of concrete casting SRC, C (16-20) under Pile Cap PC (65, 67 & 69). C16/20 SRC P 29-11977 9
44 P 29-11986 9
45 P 29-11987 9
PASSED
46 P 29-11988 9
47 P 29-11989 9
48 P 29-11990 6
49 KAIG3-RFI-CO-S-0426-00 Crescent 1 15.03.2020 Inspection of concrete SRC, C (16-20) casting under strip footing between axis 01/AP-01/AQ outer line of crescent 1. C16/20 SRC P 29-12031 10
P 29-12026 10 PASSED
50 P 29-12033 6
Crescent 1 - PC
51 KAIG3-RFI-CO-S-0429-00 (55,57,59,61 & 63) 16.03.2020 Inspection of concrete casting SRC, C (16-20) under Pile Cap PC (55, 57, 59, 61 & 63). C16/20 SRC P 29-12086 9
53 P 29-12089 9 PASSED
54 P 29-12091 8
Crescent 1 - PC (72,74
55 KAIG3-RFI-CO-S-0433-00 & 76) 17.03.2020 Inspection of concrete casting SRC, C (16-20) under Pile Cap PC (72, 74 & 76). C16/20 SRC P 29-12147 9
56 P 29-12149 9
57 P 29-12150 9
58 P 29-12151 9 PASSED
59 P 29-12152 9
60 P 29-12154 9
61 P 29-12155 9
Crescent 1 - PC (66,68
62 KAIG3-RFI-CO-S-0439-00 & 70) 18.03.2020 Inspection of concrete casting SRC, C (16-20) under Pile Cap PC (66, 68 & 70). C16/20 SRC P 29-12204 12
kaig-qcals 2
PASSED
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1272
64 P 29-12207 10 PASSED
65 P 29-12208 9
66 P 29-12209 9
Concrete pouring for post beam beside existing column/grade beam of management building (as per KAIG3-SD-MB-A-BW-1014-00) as per
67 KAIG3-RFI-MB-S-0452-00 Management Buiding 21.03.2020 C32/40 62% OPC+30%FA P 29-12313 6 PASSED
attached highlighted drawing; Mix Design C32/40 - (Moderate Exposed). Done by 2nd stage Contractor.
Crescent 1 - PC
68 KAIG3-RFI-CO-S-0454-00 (54,56,58,60,62 & 69) 19.03.2020 Inspection of Concrete Casting SRC, C (16-20) at PC (62 & 64). C16/20 SRC P 29-12255 10
69 P 29-12257 10
70 P 29-12266 9
71 P 29-12267 9
72 P 29-12268 11 PASSED
73 P 29-12269 9
74 P 29-12269 9
75 P 29-12270 9
76 P 29-12271 9
77 KAIG3-RFI-TT-S-0456-00 Tower 1 21.03.2020 Concrete pouringof blinding concrete for Slab on Grade - Entrance Area; Tower-1 Mix-1 Mi Design-C 16/20 (SRC). C16/20 SRC P 29-12323 3 PASSED
Crescent 1 - PC
78 KAIG3-RFI-CO-S-0458-00 (54,56,58 & 60)
21.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps PC (54,56,58 & 60). C16/20 SRC P 29-12325 9
79 P 29-12326 9
80 P 29-12327 9
81 P 29-12328 9
82 P 29-12331 9 PASSED
83 P 29-12332 9
kaig-qcals 3
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1272
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
Sl No. RFI NUMBER COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
DESCRIPTION DESIGN MIX QUANTITY
84 LOCATION CASTING No.
P 28-20138 9)
(m³
85 P 28-20139 9
86 P 29-12343 6
87 KAIG3-RFI-PT-S-0460-00 Toilet 1 22.03.2020 Concrete pouringof blinding concrete for Slab on Grade - Toilet-1 Mix Design-C 16/20 (SRC). C16/20 SRC P 29-12402 9 PASSED
88 KAIG3-RFI-TB-S-0464-00 Ticketing Booth 1 22.03.2020 Concrete pouring for Wall - Ticketing Booth -1 Mix Design 32/40 Screed Concrete (Severe Exposed to Climate). C32/40 62% OPC+30%FA P 29-12378 9
PASSED
89 P 29-12395 5
90 KAIG3-RFI-CO-S-0466-00 Crescent 1 & 2 22.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps PC (53,51,49,47,45,43,41) PC (186 second layer) & (182,184 first layer). C16/20 SRC P 29-12404 9
91 P 29-12405 9 PASSED
92 P 29-12406 9
93 KAIG3-RFI-TT-S-0470-00 Tower 1 23.03.2020 Concrete Pouring for Slab on Grade of Entrance Area of Tower 1, Mix Design C32/40 - (Severe Exposed). done by 2nd stage Contractor. C32/40 67% OPC+25%FA P 29-12450 5 PASSED
Crescent 1 - PC
94 KAIG3-RFI-CO-S-0486-00 (44,42,40,38,36,34 & 32) 23.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (44,42,40,38,36,34 & 32). C16/20 SRC P 29-12464 11
95 P 29-12467 11
96 P 29-12472 11
97 P 29-12474 11 PASSED
98 P 29-12477 11
99 P 29-12480 11
100 P 29-12481 4
Concrete pouring for post beam beside existing column/grade beam of management building (as per KAIG3-SD-MB-A-BW-1014-00) as per
101 KAIG3-RFI-MB-S-0463-00 Management Buiding 24.03.2020 C32/40 62% OPC+30%FA P 29-12499 6 PASSED
attached highlighted drawing; Mix Design C32/40 - (Moderate Exposed). Done by 2nd stage Contractor.
102 KAIG3-RFI-PT-S-0481-00 Toilet 1 24.03.2020 Concrete pouring of blinding concrete for Slab on Grade - Toilet-1 Mix Design-C 32/40 Severe Exposed, done by 2nd stage Contractor. C32/40 67% OPC+25%FA P 29-12508 8 PASSED
103 KAIG3-RFI-CO-S-0475-00 Crescent 1 & 2 24.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (46,48,50 & 52). C16/20 SRC P 29-12519 10
PASSED
104 P 29-12521 8
105 KAIG3-RFI-PT-S-0481-00 Toilet 1 25.03.2020 Concrete pouring of blinding concrete for Slab on Grade - Toilet-1 Mix Design-C 32/40 Severe Exposed, done by 2nd stage Contractor. C32/40 67% OPC+25%FA P 29-12530 9 PASSED
106 KAIG3-RFI-CO-S-0489-00 Crescent 1 25.03.2020 Inspection of Anti termite prior to concrete casting under pile cap PC (33,35,37,39,42 & 44). C16/20 SRC P 29-12541 7
107 P 29-12551 9
108 P 29-12555 9
PASSED
109 P 28-20184 9
110 P 28-20185 9
111 P 28-20189 5
112 KAIG3-RFI-TB-S-0491-00 Ticketing Booth 3 26.03.2020 Concrete pouring for Existing Foundation - Ticketing Booth 3; Mix Design - 32/40 Screed Concrete (Severe Exposed to Climate). C32/40 62% OPC+30%FA P 29-12574 3 PASSED
113 KAIG3-RFI-CO-S-0500-00 Crescent 1 26.03.2020 Inspection of Anti termite prior to concrete casting under pile cap PC (40,38,36 & 34). C16/20 SRC P 29-12561 9
114 P 29-12564 9
115 P 29-12566 9
PASSED
116 P 29-12568 9
117 P 29-12569 10
118 P 29-12576 9
kaig-qcals 4
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1272
120 P 28-20217 9
PASSED
121 P 28-20218 8
122 P 28-20215 9
Concrete Pouring for Post and Beam beside existing column Grade beam of Management building (as per KAIG3-SD-MB-A-BW-1014-00); and
123 KAIG3-RFI-MB-S-0495-00 Management Buiding 28.03.2020 C32/40 62% OPC+30%FA P 29-12590 6 PASSED
highlighted in attached drawing; Mix Design C32/40 - (Very Severe Expose).
124 KAIG3-RFI-TB-S-0502-00 Ticketing Booth 3 28.03.2020 Concrete Pouring for Kicker at Ticketing Booth 3. C32/40 62% OPC+30%FA P 29-12592 3 PASSED
125 KAIG3-RFI-PT-S-0493-00 Toilet 2 29.03.2020 Concrete pouring for Slab on Grade - Toilet-2 Mix Design-C 32/40 (Very Severe Exposed). C32/40 67% OPC+25%FA P 29-12600 10 PASSED
126 KAIG3-RFI-CO-S-0499-00 Crescent 2 29.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (180,178,176,174,172,170,168 & 186). C16/20 SRC P 29-12609 10
127 P 29-12613 9
PASSED
128 P 29-12615 9
129 P 29-12616 7
130 KAIG3-RFI-CO-S-0511-00 Crescent 2 30.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (174,172 & 170). C16/20 SRC P 29-12628 12
131 P 29-12628 12
133 P 29-12631 9
134 P 29-12640 6
135 KAIG3-RFI-PT-S-0493-00 Toilet 2 31.03.2020 Concrete pouring for Slab on Grade - Toilet-2 Mix Design-C 32/40 (Very Severe Exposed). C32/40 67% OPC+25%FA P 29-12659 9
PASSED
136 P 29-12670 2
Concrete Pouring for Post and Beam beside existing column Grade beam of Management building (as per KAIG3-SD-MB-A-BW-1014-00); and
137 KAIG3-RFI-MB-S-0509-00 Management Buiding 31.03.2020 C32/40 62% OPC+30%FA P 29-12664 5 PASSED
highlighted in attached drawing; Mix Design C32/40 - (Very Severe Expose).
138 KAIG3-RFI-CO-S-0490-00 Crescent 1 28.03.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (33,35,37,39,42 & 44). C16/20 SRC P 29-12579 10
139 P 28-20217 9
PASSED
140 P 28-20218 8
141 P 28-20215 9
kaig-qcals 5
RUN DATE: February 12, 2023
1 KAIG3-RFI-CO-S-0516-00 Crescent 2 01.04.2020 Inspection of Concrete Casting SRC, C (16-20) under Pile Caps Shear Key PC (163,161,159,157,155,153,151,149,147 & 145). C16/20 SRC P 28-20263 9
2 P 28-20264 9
3 P 28-20270 9
PASSED
4 P 28-20272 9
5 P 28-20273 9
6 P 28-20274 9
7 KAIG3-RFI-TB-S-0503-00 Ticketing Booth 1 04.04.2020 Concrete pouring for Roof Slab of Ticketing Booth # 1; Mix Design - C32/40 Sceed Concrete (Severe Exposed to Climate). C32/40 62% OPC+30%FA P 29-12737 4 PASSED
8 KAIG3-RFI-CO-S-0519-00 Crescent 2 04.04.2020 Inspection of Concrete Casting SRC, C (16-20) at PC (143,141,139,137,135,133,131 & 129). C16/20 SRC P 28-20312 9
9 P 28-20313 9
PASSED
kaig-qcals 6
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 264
11 P 28-20315 10
12 P 28-20316 7
Concrete Pouring for Column - Corebel extension outer face for (column 75 to 89, except col. 81)as per attached SCR-BO-S-0010-00 Concrete
13 KAIG3-RFI-BO-S-0514-00 Boundary Wall 05.04.2020 C32/40 62% OPC+30%FA P 29-12754 2 PASSED
Mix Design C32/40 - (Very Severe).
14 KAIG3-RFI-CO-S-0529-00 Crescent 2 06.04.2020 Inspection of Concrete Casting SRC, C (16-20) at PC (153,161,165,166,168 & 177). C16/20 SRC P 28-20338 9
15 P 28-20339 9
16 P 28-20346 9
PASSED
17 P 28-20347 9
18 P 28-20349 9
19 P 29-12784 9
20 KAIG3-RFI-TB-S-0544-00 Ticket Booth 3 & 4 27.04.2020 Concrete pouring Existing wall - Ticketing Booth - 4 Mix Design 32/40 Screed Concrete (Severe Exposure 3 cu m.). P 29-12812 7
PASSED
21 P 29-12813 10
22 KAIG3-RFI-CO-S-0530-01 Crescent 2 28.04.2020 Inspection of Concrete Casting SRC, C (16-20) at PC (127,125,123,121,119,117,115 & 113). P 29-12817 9
23 P 29-12818 9
24 P 29-12819 9
PASSED
25 P 29-12820 9
26 P 29-12821 9
27 P 29-12823 9
28 KAIG3-RFI-PT-S-0556-00 Toilet 5 30.04.2020 Concrete Pouring of Blinding Concrete for Slab on Grade, Toilet 5 as per attached drawing, Mix Design - C 16/20 (SRC). P 29-12838 4 PASSED
29 KAIG3-RFI-CO-S-0548-00 Crescent 2 30.04.2020 Concreting SRC C16/20 under pile caps PC (151,149,145 & 143). P 29-12840 10
30 P 29-12842 10 PASSED
31 P 29-12847 10
kaig-qcals 7
RUN DATE: February 12, 2023
1 KAIG3-RFI-TB-S-0557-00 Ticket Booth 3 02.05.2020 Concrete Pouring for Kicker at Ticketing Booth 4. C32/40 62% OPC+30%FA P 29-12857 4 PASSED
2 KAIG3-RFI-PT-S-0556-00 Public Toilet 5 04.05.2020 Concrete Pouring of Blinding Concrete for Slab on Grade, Toilet 5 as per attached drawing, Mix Design - C 16/20 (SRC). C16/20 SRC P 29-12897 4 PASSED
3 KAIG3-RFI-CO-S-0559-00 Crescent 2 04.05.2020 Inspection of Concrete casting SRC, C (16-20) under Pile Caps (141,139 & 135). C16/20 SRC P 29-12899 9
6 KAIG3-RFI-CO-S-0568-00 Crescent 2 05.05.2020 Inspection of casting concrete SRC C (15-20) under pile caps (125,123,119,115 & 113). C16/20 SRC P 29-12932 10
PASSED
7 C16/20 SRC P 29-12936 10
8 KAIG3-RFI-PT-S-0564-00 Public Toilet 5 06.05.2020 Concrete Pouring and checking of level for Slab on Grade of Toilet 5; Mix Design C 32/40 OPC - (Very Severe Expose). C32/40 62% OPC+30%FA P 29-12949 10 PASSED
9 KAIG3-RFI-CO-S-0568-00 Crescent 2 06.05.2020 Inspection of casting concrete SRC C (15-20) under pile caps (125,123,119,115 & 113). C16/20 SRC P 29-12954 9
PASSED
10 C16/20 SRC P 29-12955 6
11 KAIG3-RFI-TT-S-0592-00 Site Tower 2 07.05.2020 Concreting of SOG for Tower 2. C16/20 SRC P 29-12962 5 PASSED
12 KAIG3-RFI-CO-S-0566-00 Crescent 2 07.05.2020 Inspection of casting concrete SRC C (15-20) under pile caps (179,175,173,171,169 & 167). C16/20 SRC P 29-12971 9
21 KAIG3-RFI-CO-S-0582-00 Crescent 2 10.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (163,159,157 & 155). C16/20 SRC P 29-13011 9
26 KAIG3-RFI-CO-S-0585-00 Crescent 1 11.05.2020 Inspection to check concreting SRC C(16-20) under shear Key PC (11,12,13,14,15,16 & 18). C16/20 SRC P 29-13033 9
29 KAIG3-RFI-CO-S-0596-00 Crescent 12.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (126,130,134,137 & 147). C16/20 SRC P 28-20495 9
kaig-qcals 8
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 856
35 KAIG3-RFI-CO-S-0601-00 Crescent 13.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (13,14,16 & 18). C16/20 SRC P 29-13047 9
39 KAIG3-RFI-TB-S-0579-00 Ticket Booth 14.05.2020 Concrete Pouring for Slab of Ticketing Booth 3; Mix Design - 32/40 (Very Severe Exposed) C32/40 62% OPC+30%FA P 29-13061 3
PASSED
40 C32/40 62% OPC+30%FA P 29-13065 2
41 KAIG3-RFI-TT-S-0592-00 Site Tower 2 14.05.2020 Concreting of SOG for Tower 2. C32/40 62% OPC+30%FA P 28-20533 10 PASSED
42 KAIG3-RFI-CO-S-0604-00 Crescent 16.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (19,20,21,22,27,28,29 & 30). C16/20 SRC P 28-20537 9
52 KAIG3-RFI-CO-S-0611-00 Crescent 17.05.2020 Inspection to check concreting SRC C(16-20) for Shear Key PC (100,102,104,106,108,110,112,114,116,118 & 120). C16/20 SRC P 28-20556 10
58 KAIG3-RFI-PT-S-0607-00 Crescent 18.05.2020 Pouring of Blinding concrete (16/20) for ramp area at Toilet 1. C16/20 SRC P 28-20567 3 PASSED
59 KAIG3-RFI-CO-S-0624-00 Crescent 2 18.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (122,124,128,132,136,138,140 & 142). C16/20 SRC P 28-20572 9
65 KAIG3-RFI-CO-S-0626-00 Crescent 2 19.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (108 & 110). C16/20 SRC P 28-20585 9
kaig-qcals 9
KING ABDULLAH INTERNATIONAL GARDENS PROJECT PASSED
TOTAL QUANTITY TRUCK LOAD (M³): 856
74 KAIG3-RFI-CO-S-0631-00 Crescent 1 20.05.2020 Inspection to check concreting SRC C(16-20) under Pile Caps PC (19,20,21 & 22). C16/20 SRC P 28-20603 10
75 KAIG3-RFI-CO-S-0633-00 Crescent 2 20.05.2020 Inspection to check concreting SRC C(16-20) for Shear Key PC (148,150,162 & 164). C16/20 SRC P 28-20604 10
PASSED
76 C16/20 SRC P 28-20606 10
78 KAIG3-RFI-TB-S-0634-00 Crescent 2 21.05.2020 Concreting of Wall for Ticket Booth 4. C16/20 SRC P 28-20618 8
PASSED
79 C16/20 SRC P 28-20622 10
80 KAIG3-RFI-CO-S-0644-00 Crescent 2 28.05.2020 Inspection to check Concreting SRC, C (16-20) under Pile Caps PC (108,110) Second Layer and (122,124,128 & 132). C16/20 SRC P 28-20630 9
88 KAIG3-RFI-TB-S-0640-00 Ticket Booth 1 28.05.2020 Concrete pouring for DOME - Ticketing booth 1 (C32/40) - Very Severe Exposed. C32/40 62% OPC+30%FA P 28-20631 7 PASSED
89 KAIG3-RFI-CO-S-0649-00 Crescent 30.05.2020 Inspection to check concreting SRC C(16/20) for Shear Key of Retaining Wall from Axis AO to AV. C16/20 SRC P 28-20642 9
90 KAIG3-RFI-CO-S-0644-00 Inspection to check Concreting SRC, C (16-20) under Pile Caps PC (108,110) Second Layer and (122,124,128 & 132). C16/20 SRC P 28-20643 9
95 KAIG3-RFI-CO-S-0658-00 Crescent 31.05.2020 Inspection to check Concreting SRC, C (16-20) under Pile Caps PC (129,131,133,136 & 138). C16/20 SRC P 29-13117 9
101 KAIG3-RFI-TB-S-0653-00 Ticketing Booth 5 31.05.2020 Concrete Pouring for Kicker at Ticketing Booth 5. C32/40 62% OPC+30%FA P 28-20651 3 PASSED
kaig-qcals 10
RUN DATE: February 12, 2023
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534
1 KAIG3-RFI-CO-S-0664-00 Crescent 6/1/20 Inspection to check Concreting SRC,C(16-20) under PC (140,142,148,150)(152,154) First layer. C16/20 SRC P 28-20654 9
2 P 28-20655 9
3 P 28-20656 9
4 P 28-20657 9
5 P 28-20658 9
6 P 28-20659 9 PASSED
7 P 28-20660 9
8 P 28-20661 9
9 P 28-20662 9
10 P 28-20666 8
11 P 28-20668 10
Inspection to check Concreting SRC,C(16-20)under strip footings between PC(77-79)to PC(79-81)from axis (01/AM-01/AN) and
12 KAIG3-RFI-CO-S-0672-00 Crescent 1 6/2/20 C16/20 SRC P 28-20670 9
(01/AN-01/AO) outer line.
13 P 28-20672 9
14 P 28-20673 9
15 P 28-20674 9
16 P 28-20675 9
17 P 28-20679 9
18 P 28-20680 9
19 P 28-20682 9
20 P 28-20683 9
21 P 28-20684 9
22 P 28-20685 9
23 P 28-20686 9
24 P 28-20687 9 PASSED
25 P 28-20689 9
26 P 28-20690 9
27 P 28-20693 9
28 P 28-20695 9
29 P 28-20696 9
30 P 28-20697 9
31 P 28-20698 9
32 P 28-20700 9
33 P 28-20701 9
kaig-qcals 11
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534
35 P 28-20703 9
36 P 28-20704 9
37 KAIG3-RFI-TT-SU-0560-00 Site Tower 3 6/3/20 Level of concrete fro Slab on Grade at Site Tower 3. C32/40 62% OPC+30%FA P 28-20719 10
PASSED
38 P 28-20745 10
39 KAIG3-RFI-CO-S-0670-00 Crescent 1 & 2 6/4/20 Inspection to check Concreting SRC,C(16-20) under PC (156,158) & (24,25) First layer and PC(27). C16/20 SRC P 28-20739 9
40 P 28-20740 9
41 P 28-20741 9
42 P 28-20742 9
43 P 28-20743 9
44 P 28-20744 9
45 P 28-20746 9
46 P 28-20747 9
47 P 28-20748 9
48 P 28-20749 9
49 P 28-20750 9 PASSED
50 P 28-20751 9
51 P 28-20752 9
52 P 28-20753 9
53 P 28-20756 9
54 P 28-20757 9
55 P 28-20758 9
56 P 28-20759 9
57 P 28-20760 9
58 P 28-20761 9
59 P 28-20764 6
60 KAIG3-RFI-CO-S-0691-00 Crescent 1 & 2 6/7/20 Inspection to check Concreting SRC,C(16-20) under pile caps (162,164)Crescent -2 & PC(25) Crecent-1. Third layer. C16/20 SRC P 28-20801 9
61 P 28-20802 9
62 P 28-20803 9
PASSED
63 P 28-20810 9
64 P 28-20814 9
65 P 28-20815 9
66 KAIG3-RFI-CO-S-0708-00 Crescent 1 6/8/20 Inspection to check Concreting SRC,C(16-20) under retaining wall footings from axis AV to axis AO. C16/20 SRC P 28-20847 9
67 P 28-20851 9
68 P 28-20853 9
PASSED
kaig-qcals 12
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534
70 P 28-20859 9
71 P 28-20861 5
72 KAIG3-RFI-CO-S-0708-00 Ticket Booth 4 6/8/20 Inspection to check Concreting SRC,C(16-20) under retaining wall footings from axis AV to axis AO. C32/40 62% OPC+30%FA P 28-20862 3 PASSED
73 KAIG3-RFI-PT-S-0721-00 Public Toilet 4 6/9/20 Blinding Concrete for Toilet 4. C16/20 SRC P 28-20869 10
PASSED
74 P 2820887 9
KAIG3-+C361:K370RFI-TB-S-
75 Ticket Booth 6 6/10/20 Concrete Pouring for Footing at Ticket Booth 6. C32/40 62% OPC+30%FA P 28-20899 7
0730-00
76 P 28-20906 8
77 KAIG3-RFI-CO-S-0720-00 Crescent 2 6/10/20 Inspection to check Concreting SRC,C(16-20) under pile caps (152 third layer)&(158 second layer). C16/20 SRC P 28-20896 9
78 P 28-20897 9
79 P 28-20898 9
80 P 28-20900 9
81 P 28-20901 9
82 P 28-20902 9
83 P 28-20903 9
PASSED
84 P 28-20904 9
85 P 28-20905 9
86 P 28-20907 9
87 P 28-20908 9
88 P 28-20909 9
89 P 28-20910 9
90 P 28-20911 9
91 P 28-20912 11
92 P 28-20913 9
93 KAIG3-RFI-TT-S-0713-00 Site Tower 2 6/11/20 Concrete Pouring C (32/40) Severe Exposed for Ramp SOG at Tower 2. C32/40 62% OPC+30%FA P 28-20928 10 PASSED
KAIG3-RFI-CO-S-0713-00, KAIG3-
Concrete Pouring C (32/40) Severe Exposed for Ramp SOG at Tower 2., Inspection to check Concreting SRC,C(16-20) under pile cap PC(24)
94 RFI-CO-S-0726-00, KAIG3-RFI- Cresce+D380:I406nt 6/14/20 C16/20 SRC P 28-20976 9
second layer., Inspection to check Concreting SRC,C(16-20) under pile cap PC(23) First layer.
CO-S-0729-00
95 P 28-20977 9
96 P 28-20979 9
97 P 28-20980 9
98 P 28-20982 9
99 P 28-20983 9
100 P 28-20984 9
101 P 28-20985 9
PASSED
102 P 28-20986 9
103 P 28-20987 9
kaig-qcals 13
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): PASSED
1534
105 P 28-20989 9
106 P 28-20992 9
107 P 28-20993 9
108 P 28-20994 9
109 P 28-21000 9
110 KAIG3-RFI-TB-S-0734-00 Ticket Booth 6 6/14/20 Concrete Pouring of Kicker for Ticket Booth 6. C32/40 62% OPC+30%FA P 28-21001 3 PASSED
111 KAIG3-RFI-TT-S-0736-00 Site Tower 5 6/15/20 Concrete Pouring of SOG at Tower 5. C32/40 62% OPC+30%FA P 28-21013 10 PASSED
112 KAIG3-RFI-BO-S-0725-00 Boundary Wall 6/16/20 Closing of Shutter and Casting of Concrete for Kicker of Boundary Wall at Span 37. C32/40 62% OPC+30%FA P 28-21052 10 PASSED
113 KAIG3-RFI-CO-S-0746-00 Crescent 1 & 2 6/16/20 Inspection to check Concreting SRC,C(16-20) under pile cap PC(24-3rd layer,26 -2nd layer & 160-2nd layer). C16/20 SRC P 28-21078 9
114 P 28-21082 9
116 P 28-21084 9
117 P 28-21085 5
118 KAIG3-RFI-CO-S-0746-00 Crescent 1 & 2 6/17/20 Inspection to check Concreting SRC,C(16-20) under pile cap PC(24-3rd layer,26 -2nd layer & 160-2nd layer). C16/20 SRC P 28-21086 9
119 P 28-21087 9
120 P 28-21091 9
PASSED
121 P 28-21094 9
122 P 28-21096 8
123 P 28-21097 6
124 KAIG3-RFI-TB-S-0743-00 Ticket Booth 3 6/18/20 Concrete Pouring for Dome at Ticket booth No. 3. C16/20 SRC P 28-21137 9
125 P 28-21147 9
PASSED
126 P 28-21149 4
127 P 28-21149 9
128 KAIG3-RFI-MB-S-0756-00 Management Buiding 6/18/20 Concrete Pouring of Blinding for SOG (Grid 3-6 / A-E) of Management Building. C16/20 SRC P 28-21157 9
PASSED
129 P 28-21160 9
130 KAIG3-RFI-CO-S-0758-00 Crescent 1 & 2 6/20/20 Inspection to check Concreting SRC,C(16-20) under pile cap PC(23-2nd layer & 160-3rd layer). C16/20 SRC P 28-21178 11
131 P 28-21179 11
132 P 28-21181 10
133 P 28-21182 9
PASSED
134 P 28-21186 11
135 P 28-21187 11
136 P 28-21190 9
137 P 28-21193 6
138 KAIG3-RFI-BO-S-0759-00 Boundary Wall 6/21/20 Concrete Pouring for Kicker at Booundary Wall Span 38. C32/40 62% OPC+30%FA P 28-21221 6 PASSED
kaig-qcals 14
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534
140 KAIG3-RFI-BO-S-0762-00 Boundary Wall 6/22/20 Concrete Pouring for wall at Boundary wall Span 37. C32/40 62% OPC+30%FA P 28-21273 9
141 KAIG3-RFI-PT-S-0766-00 Public Toilet 4 6/22/20 Pouring of Concrete for SOG at Toilet 4. C32/40 62% OPC+30%FA P 28-21281 9
PASSED
142 6/23/20 P 28-21297 9
143 KAIG3-RFI-CO-S-0771-00 Cresent 1 6/23/20 Inspection to check concreting SRC C (16-20) under pile cap PC (23) Third Layer. C16/20 SRC P 28-21298 9
144 P 28-21299 9
PASSED
145 P 28-21300 9
146 P 28-21301 9
147 KAIG3-RFI-CO-S-0758-00 Crescent 1 & 2 6/20/20 Inspection to check Concreting SRC,C(16-20) under pile cap PC(23-2nd layer & 160-3rd layer). C16/20 SRC P 28-21302 8
149 P 28-21304 11
150 KAIG3-RFI-TB-S-0767-00 Ticket Booth 6 6/24/20 Concrete Pouring of Wall for Ticket Booth 6. C32/40 62% OPC+30%FA P 28-21340 7
PASSED
151 P 28-21342 8
152 KAIG3-RFI-CO-S-0769-00 Crescent 2 6/24/20 Inspection to check concreting SRC C (16-20) under Strip Footing between PC (97-99). C16/20 SRC P 28-21346 9
153 P 28-21348 11
155 P 28-21350 9
156 P 28-21352 5
157 KAIG3-RFI-PT-S-0777-00 Public Toilet 2 6/24/20 Pouring of Concrete for Ramp at Toilet 2. C16/20 SRC P 28-21347 3
158 P 28-21368 9
159 P 28-21369 9
PASSED
160 P 28-21373 8
161 P 28-21375 9
162 P 28-21378 10
163 KAIG3-RFI-BO-S-0776-00 Boundary Wall 6/25/20 Concrete Pouring for Boundary Wall Footing at Span 19,20 & 21. C32/40 62% OPC+30%FA P 28-21386 10
165 KAIG3-RFI-BO-S-0781-00 Boundary Wall 6/25/20 Concrete Pouring of Wall at Span 38 for Boundary Wall. P 28-21400 12
166 KAIG3-RFI-CO-S-0783-00 Crescent 1 6/27/20 Inspection to Check Concreting SRC, C (16-20) under Pile Cap PC (23) 4th Layer. C16/20 SRC P 28-21410 9
167 KAIG3-RFI-CO-S-0774-00 Inspection to check concreting SRC C (16-20) under pile cap PC (32). P 28-21412 9
PASSED
168 P 28-21415 9
169 P 28-21420 9
170 KAIG3-RFI-TB-S-0791-00 Ticket Booth 5 6/27/20 Concrete Pouring of Slab for Ticket Booth 5. C32/40 62% OPC+30%FA P 28-21418 10
PASSED
171 KAIG3-RFI-TB-S-0790-00 Ticket Booth 7 6/27/20 Concreting for Kicker at Ticket Booth 7. P 28-21422 4
172 KAIG3-RFI-BO-S-0797-00 Boundary Wall 6/28/20 Concrete Pouring for Boundary Wall Footing at Span 21. C32/40 62% OPC+30%FA P 28-21456 6 PASSED
173 KAIG3-RFI-TB-S-0790-00 Ticket Booth 7 6/29/20 Concreting for Kicker at Ticket Booth 7. C32/40 62% OPC+30%FA P 28-21499 3 PASSED
kaig-qcals 15
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1534
kaig-qcals 16
RUN DATE: February 12, 2023
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5
1 KAIG3-RFI-PT-S-0804-00 Public Toilet 3 7/1/20 Concrete Pouring for blinding at SOG (Toilet 3) except EE room. C16/20 SRC P 28-21549 10 PASSED
2 KAIG3-RFI-BO-S-0808-00 Boundary Wall 7/4/20 Concrete Pouring for Kicker of Wall in Boundary Wall Span 26, 27 & 28. C32/40 62% OPC+30%FA P 28-21648 9 PASSED
3 KAIG3-RFI-BO-S-0840-00 Boundary Wall 7/4/20 Concrete Pouring for Wall Kicker at span 23,24 & 25. C32/40 62% OPC+30%FA P 28-21650 9 PASSED
4 KAIG3-RFI-BO-S-0842-00 Boundary Wall 7/5/20 Concrete Pouring for Wall at span 36 as per attached drawing. C32/40 62% OPC+30%FA P 28-21691 10 PASSED
5 KAIG3-RFI-BO-S-0822-00 Boundary Wall 7/5/20 Concrete Pouring for Kicker and Wall at Span 33 of Boundary Wall. C32/40 62% OPC+30%FA P 28-21694 11
6 KAIG3-RFI-BO-S-0822-00 Boundary Wall 7/6/20 Concrete Pouring for Kicker and Wall at Span 33 of Boundary Wall. C16/20 SRC P 28-21719 10 PASSED
8 KAIG3-RFI-CO-S-0824-00 Crescent 2 7/6/20 Inspection to check concreting SRC, C (16-20) under Pile Caps PC 15 & 17 1st layer 144 1st layer. C16/20 SRC P 28-21729 9
14 KAIG3-RFI-CO-S-0826-00 Crescent 2 7/7/20 Inspection to check Concreting SRC, C (16-20) under Strip Footing between PC (99-101). C16/20 SRC P 28-21771 10
kaig-qcals 17
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5
20 KAIG3-RFI-BO-S-0841-00 Boundary Wall 7/9/20 Concrete Pouring for Kicker at span 35 as per attached drawing. C32/40 62% OPC+30%FA P 28-21835 10 PASSED
21 KAIG3-RFI-BO-S-0842-00 Boundary Wall 7/9/20 Concrete Pouring for Wall at span 36 as per attached drawing. C32/40 67%OPC+25%FA P 28-21845 10 PASSED
Management
22 KAIG3-RFI-MB-S-0845-00 7/9/20 Concrete Pouring for Blinding Grade Beam SOG for the highlighted drawing (Grid 6 to 10/A to E). C32/40 62% OPC+30%FA P 28-21847 6 PASSED
Building
23 KAIG3-RFI-CO-S-0848-00 Crescent 1 & 2 7/11/20 Inspection to check Concreting SRC, C (16-20) under pile cap PC (144 & 17) second layer. C16/20 SRC P 28-21865 9
32 KAIG3-RFI-TB-S-0914-00 Ticket Booth 7/9/20 Concrete Pouring for Blinding of footing of Canopy at old Ticket Booth (7 footing). C16/20 SRC P 28-21833 9.5 PASSED
33 KAIG3-RFI-BO-S-0868-00 Boundary Wall 7/13/20 Concrete pouring for Kicker inside at Span 34 as per attached drawing C (32/40) very severe. C32/40 62% OPC+30%FA P 28-21978 12 PASSED
34 KAIG3-RFI-BO-S-0867-00 Boundary Wall 7/13/20 Concrete Pouring for Wall at Span 35 as per attached drawing C (32/40 severe). C32/40 67%OPC+25%FA P 28-21987 10 PASSED
35 KAIG3-RFI-TB-S-0862-00 Ticket Booth 6 7/13/20 Concrete Pouring of Slab at Ticket Booth 6. C32/40 62% OPC+30%FA P 28-21998 3 PASSED
Management
36 KAIG3-RFI-MB-S-0869-00 7/13/20 Inspection for Formwork for Grade Beam at Management Building. C32/40 62% OPC+30%FA P 28-21999 8 PASSED
Building
37 KAIG3-RFI-CO-S-0854-00 Crescent 1 7/14/20 Inspection to check Concreting SRC, C (16-20) under pile cap PC (31). C16/20 SRC P 28-22040 9
KAIG3-RFI-TB-S-0899-00 /
40 Ticket Booth 7/15/20 Inspection of Concrete Pouring for Blinding (16-20) of Canopy Footing (5 Footings). C16/20 SRC P 28-22107 6 PASSED
KAIG3-RFI-TB-S-0901-00
41 KAIG3-RFI-BO-S-0864-00 Boundary Wall 7/15/20 Concrete Pouring for Column (69,70,71,72 & 73). C32/40 67%OPC+25%FA P 28-22102 6 PASSED
42 KAIG3-RFI-CO-S-0891-00 Crescent 7/15/20 Inspection to check concreting SRC, C (16-20) under Pile Cap (144-17) Third Layer. C16/20 SRC P 28-22079 9
Inspection to check concrete (C-32/40) Very Severe) of Retaining Wall Footing between Axis AV) and Axis (AT) and between (AR) and (AP) as
46 KAIG3-RFI-CO-S-0894-00 Crescent 7/15/20 C32/40 62% OPC+30%FA P 28-22103 9
highlighted.
kaig-qcals 18
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5
56 KAIG3-RFI-BO-S-0904-00 Boundary Wall 7/16/20 Concrete Pouring for Kicker at Span 19 & 20 (outside level) as per attached drawing. C32/40 62% OPC+30%FA P 28-22135 7 PASSED
57 KAIG3-RFI-CO-S-0928-00 Crescent 7/18/20 Inspection to check concrete (c-32/40 very severe) of retaining wall footing between axis (AT) and axis (AR) as highlighted. C32/40 62% OPC+30%FA P 28-22166 11
65 KAIG3-RFI-CO-S-0928-00 Crescent 7/19/20 Inspection to check concrete (c-32/40 very severe) of retaining wall footing between axis (AT) and axis (AR) as highlighted. C32/40 62% OPC+30%FA P 28-22199 9
70 KAIG3-RFI-BO-S-0930-00 Boundary Wall 7/20/20 Concrete Pouring of Wall at Span 33 and the Kicker inside Span 32 and Kicker outside Span 31. C16/20 SRC P 28-22228 9
73 KAIG3-RFI-BO-S-0929-00 Boundary Wall 7/20/20 Concrete Pouring of Columns 37 & 38 from Top of Wall up to Top Level of Columns. C32/40 62% OPC+30%FA P 28-22239 7 PASSED
74 KAIG3-RFI-BO-S-0930-00 Boundary Wall 7/20/20 Concrete Pouring of Wall at Span 33 and the Kicker inside Span 32 and Kicker outside Span 31. C32/40 62% OPC+30%FA P 28-22239 7
77 KAIG3-RFI-BO-S-0929-00 Boundary Wall 7/20/20 Concrete Pouring of Columns 37 & 38 from Top of Wall up to Top Level of Columns. C32/40 67%OPC+25%FA P 28-22252 9
PASSED
78 C32/40 67%OPC+25%FA P 28-22253 3
Management
79 KAIG3-RFI-MB-S-0932-00 7/21/20 Concrete Pouring of Blinding Concrete under Grade Beam GL 6-9/A; GL 9-10/B. C16/20 SRC P 28-22256 9
Building
kaig-qcals 19
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1289.5
94 KAIG3-RFI-TB-S-0914-00 Ticket Booth 7/21/20 Concrete Pouring for Blinding of footing of Canopy at old Ticket Booth (7 footing). C16/20 SRC P 28-22272 9
PASSED
95 C16/20 SRC P 28-22275 10
96 KAIG3-RFI-CO-S-0928-00 Crescent 7/22/20 Inspection to check concrete (c-32/40 very severe) of retaining wall footing between axis (AT) and axis (AR) as highlighted. C32/40 62% OPC+30%FA P 28-22296 9
103 KAIG3-RFI-TB-S-0947-00 Ticket Booth 7/22/20 Concrete Pouring of Doom at Ticket Booth 4. C32/40 62% OPC+30%FA P 28-22310 10
106 KAIG3-RFI-BO-S-0925-00 Boundary Wall 7/23/20 Inspection of steel reinforcement for wall and kicker of boundary wall span 31. C32/40 62% OPC+30%FA P 28-22350 10 PASSED
Management
107 KAIG3-RFI-MB-S-0951-00 7/23/20 Concrete Pouring for Slab on Grade at GL 3-6/A-E. C32/40 62% OPC+30%FA P 28-22331 9
Building
113 KAIG3-RFI-BO-S-0898-00 Boundary Wall 7/23/20 Concrete Pouring for Wall Span 34, Kicker inside Span 33 & Kicker outside Span 32 as per attached drawing. C32/40 67%OPC+25%FA P 28-22355 9 PASSED
114 KAIG3-RFI-BO-S-0959-00 Boundary Wall 7/25/20 Concrete Pouring for 5 footings Canopy. C32/40 62% OPC+30%FA P 28-22401 6 PASSED
115 KAIG3-RFI-CO-S-0982-00 Crescent 7/25/20 Inspection to check mass Concreting SRC, C (16-20) 45 cm from the wall footing foundation width (+ or - 60cm). C16/20 SRC P 28-22376 9
125 KAIG3-RFI-CO-S-0933-00 Crescent 7/26/20 Installation of Protection for Waterproofing for PC (97,98,99,100,101 & 103). C32/40 62% OPC+30%FA P 28-22440 4 PASSED
126 KAIG3-RFI-CO-S-0977-00 Crescent 7/26/20 Inspection to check concrete (C 32-40 very severe) of retaining wall footing between axis (AT) and axis (AR) as highlighted (part 2). C32/40 62% OPC+30%FA P 28-22420 9
Management
134 KAIG3-RFI-MB-S-0979-00 7/27/20 Concrete Pouring for Blinding for SOG and Grade Beam at Management Building Grid 1-2 / I-R. C16/20 SRC P 28-22474 8
Building
PASSED
135 C16/20 SRC P 28-22475 7
136 KAIG3-RFI-TB-S-0988-00 Ticket Booth Canopy 7/27/20 Inspection prior to Pour Blinding Concrete for footings 2 no. Grid 2-A, 1-A @Ticket Booth Canopy. C32/40 62% OPC+30%FA P 28-22479 10
PASSED
137 C32/40 62% OPC+30%FA P 28-22480 5
138 KAIG3-RFI-TB-S-0989-00 Ticket Booth Canopy 7/27/20 Inspection prior to Pour Blinding Concrete for footings 2 no. Grid 2-A, 1-A @Ticket Booth Canopy. C16/20 SRC P 28-22481 10
PASSED
139 C16/20 SRC P 28-22482 6
140 KAIG3-RFI-CO-S-1004-00 Crescent 2 7/29/20 Inspection to check concrete OPC (C-32-40 very severe) for PC (99 & 101). C32/40 62% OPC+30%FA P 28-22543 9
144 KAIG3-RFI-CO-S-0911-00 Crescent 7/29/20 Installation of protection board for Waterproofing at PC (102 & 104). C32/40 62% OPC+30%FA P 28-22538 3 PASSED
145 KAIG3-RFI-BO-S-1009-00 Boundary Wall 7/29/20 Inspection prior to concrete pouring for Wall at Span 26, 27 & 28 as per attached drawing. C32/40 67%OPC+25%FA P 28-22544 10
PASSED
146 C32/40 67%OPC+25%FA P 28-22549 12
147 KAIG3-RFI-TB-S-1006-00 Ticket Booth Canopy 7/29/20 Inspection prior to concrete pouring for 4 footings at Grids (A/5, 6, 7 & 8) for Ticket Booth Canopy as highlighted in attached drawing. C32/40 62% OPC+30%FA P 25-22551 3 PASSED
148 KAIG3-RFI-BO-S-0990-00 Boundary Wall 7/29/20 Inspection prior to Pour Columns concrete 3 no. (C34, C35 & C36) from T.O.W. to T.O.C. in Boundary Wall. C32/40 67%OPC+25%FA P 28-22557 7.5
PASSED
148 C32/40 67%OPC+25%FA P 28-22559 7.5
kaig-qcals 21
RUN DATE: February 12, 2023
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546
1 KAIG3-RFI-BO-S-1009-00 Boundary Wall 8/3/20 Inspection prior to concrete pouring for Wall at Span 26, 27 & 28 as per attached drawing. C32/40 67%OPC+25%FA P 28-22586 7
4 KAIG3-RFI-TB-S-1006-00 Ticket Booth Canopy 8/3/20 Inspection prior to concrete pouring for 4 footings at Grids (A/5, 6, 7 & 8) for Ticket Booth Canopy as highlighted in attached drawing. C32/40 62% OPC+30%FA P 28-22595 7.5
7 KAIG3-RFI-CO-S-0996-00 Crescent 2 8/3/20 Inspection to check concreting SRC, C (16-20) under Pile Cap (146 1st layer). C16/20 SRC P 28-22603 10
10 KAIG3-RFI-CO-S-0996-01 Crescent 2 8/4/20 Inspection to check concreting SRC, C (16-20) under Pile Cap (146 1st layer). C16/20 SRC P 28-22636 10
13 KAIG3-RFI-MB-S-1001-00 Management Building 8/5/20 Concrete pouring for the Slab on Grade at Grid 12 to 18 / A to F as highlighted in attached drawing at Management Building. C32/40 62% OPC+30%FA P 28-22667 9
kaig-qcals 22
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546
20 KAIG3-RFI-CO-S-1045-00 Crescent 2 8/5/20 Inspection to check concreting C (32-40)(62% OPC, 32%FA, 8%MC) very severe expose for PC (99 & 102). C32/40 62% OPC+30%FA P 28-22676 9
PASSED
21 C32/40 62% OPC+30%FA P 28-22671 10
22 KAIG3-RFI-TB-S-1041-00 Ticket Booth 6 8/6/20 Concrete Pouring for Dome at Ticket Booth 6 as per attached drawing. C32/40 62% OPC+30%FA P 28-22710 5 PASSED
23 KAIG3-RFI-MB-S-1038-00 Management Building 8/6/20 Concrete Pouring for the Grade Beam at Grid 1 and 2 / I to R as highhlighted in attached drawing at Management Building. C32/40 62% OPC+30%FA P 28-22720 8
PASSED
24 C32/40 62% OPC+30%FA P 28-22718 10
25 KAIG3-RFI-BO-S-1010-00 Boundary Wall 8/6/20 Inspection prior to concrete pouring for Wall at Span 19 & 20 as per attached drawing. C32/40 67%OPC+25%FA P 28-22726 11
PASSED
26 C32/40 67%OPC+25%FA P 28-22722 9
27 KAIG3-RFI-CO-S-1074-00 Crescent 1 8/8/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C32/40 62% OPC+30%FA P 28-22754 10
Concrete Pouring for Column & Corebel Extension Outer face for column @ Span 70, 71, 72 & 73. As per Attached (KAIG3-SCR-BO-S-0010-
30 KAIG3-RFI-BO-S-1024-00 Boundary Wall 8/8/20 C16/20 SRC P 28-22773 11
00) SCR & Drawing.
PASSED
31 C32/40 62% OPC+30%FA P 28-22800 5
32 KAIG3-RFI-MB-S-1067-00 Management Building 8/9/20 Concrete Pouring for Blinding at Grid 18 to 20 / E to P as highlighted in attached drawing at Management Building. C16/20 SRC P 28-22806 9
35 KAIG3-RFI-BO-S-1054-00 Ticket Booth 3 8/9/20 Surface preparation for external elevation of Ticket Booth 3 as per attahced drawing. C16/20 SRC P 28-22808 7
PASSED
36 C16/20 SRC P 28-22807 9
37 KAIG3-RFI-CO-S-1074-00 Crescent 1 8/10/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C16/20 SRC P 28-22836 10
40 KAIG3-RFI-CO-S-0996-00 Crescent 2 8/11/20 Inspection to check concreting SRC, C (16-20) under Pile Cap (146 1st layer). C32/40 62% OPC+30%FA P 28-22878 7 PASSED
41 KAIG3-RFI-CO-S-1074-00 Crescent 1 8/11/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C32/40 62% OPC+30%FA P 28-22898 9
46 KAIG3-RFI-MB-S-1141-00 Management Building 8/11/20 Concrete Pouring for Slab on Grade at Grid 15-18/D-E, 13-18/E-Q, 18-20/F-Q & 12-20/Q-X as highlighted in attached drawing. C32/40 62% OPC+30%FA P 28-22895 9 PASSED
47 KAIG3-RFI-TB-S-1058-00 Ticket Booth 7 8/12/20 Concrete Pouring for Dome at Ticket Booth 7 as per attached drawing. C32/40 62% OPC+30%FA P 28-22919 5 PASSED
48 KAIG3-RFI-BO-S-1149-00 Boundary Wall 8/12/20 Concrete Pouring for coloum from top of wall to top of column C22, C23, C24, C24A, C25, C26, C27, C27A as per attached drawing. C32/40 67%OPC+25%FA P 28-22924 9
kaig-qcals 23
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546
55 KAIG3-RFI-MB-S-1193-00 Management Building 8/13/20 Concrete Pouring for Grade Beam at Grid X/7-9, 9/X-W & W/9-12 as highlighted in attched drawing. C32/40 62% OPC+30%FA P 28-22968 5
70 KAIG3-RFI-CO-S-1083-00 Crescent 1 8/15/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C32/40 62% OPC+30%FA P 28-23005 10
75 KAIG3-RFI-CO-S-1083-00 Crescent 1 8/15/20 Inspection to check Concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) as highlighted. C32/40 62% OPC+30%FA P 28-22999 5 PASSED
76 KAIG3-RFI-BO-S-1180-00 Boundary Wall 8/15/20 Concrete Pouring for Foundation of Boundary wall @ span 49A, 49B & 50A. C32/40 67%OPC+25%FA P 28-23023 7
81 KAIG3-RFI-CO-S-1151-00 Crescent 1 8/16/20 Inspection to check blinding Concrete SRC,C(16-20) under retaining wall footing between Axis (AV) to North watch tower(Outer and Inner). C16/20 SRC P 28-23054 10
84 KAIG3-RFI-TB-S-1164-00 Ticket Booth Canopy 8/16/20 Concrete Pouring for footing & Pedestal 3 no's Grid A/ 2, 3 & 4 @ Ticket Booth Canopy. C32/40 62% OPC+30%FA P 28-23062 8
85 P 28-23061 8
86 P 28-23057 9
PASSED
87 P 28-23056 9
88 P 28-23055 9
kaig-qcals 24
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546
91 KAIG3-RFI-MB-S-1199-00 Management Building 8/18/20 Concrete Pouring of Blinding for SOG and Grade Beam at Grid 6-10/H-Q, as Highlighted in attached Drawing, at Management Building. C32/40 62% OPC+30%FA P 28-23127 10 PASSED
92 KAIG3-RFI-BO-S-1208-00 Boundary Wall 8/18/20 Concrete Pouring for blinding 7 no's of Spans @ 63, 66A, 66B, 67B, 67C, 68A, & 68B at Boundary Wall. C16/20 SRC P 28-23142 6
PASSED
93 P 28-23141 10
94 KAIG3-RFI-CO-S-1203-00 Crescent 2 8/19/20 Inspection to check mass Concrete SRC,C(16-20) under pile cap PC(146) Second layer. C16/20 SRC P 28-23173 9
95 P 28-23170 10
96 P 28-23168 10 PASSED
97 P 28-23165 10
98 KAIG3-RFI-CO-S-1172-00 Crescent 1 8/19/20 Inspection to check concreting C (32-40) very severe for pile cap foundation for PC (79,80,81 & 82). C32/40 62% OPC+30%FA P 28-23185 5
99 P 28-23184 7
PASSED
100 P 28-23183 10
101 P 28-23182 10
102 KAIG3-RFI-BO-S-1223-00 Boundary Wall 8/22/20 Concrete Pouring for Kicker at Span 49A, 49B & 50A at Boundary Wall. C32/40 62% OPC+30%FA P 28-23270 9 PASSED
103 KAIG3-RFI-BO-S-1225-00 Boundary Wall 8/22/20 Concrete Pouring for Boundary Wall @ Span 56, 57 & 58 at Boundary Wall. C32/40 62% OPC+30%FA P 28-23268 9
104 P 28-23267 9
106 P 28-23257 10
107 P 28-23256 10
108 KAIG3-RFI-MB-S-1199-00 Management Building 8/22/20 Concrete Pouring of Blinding for SOG and Grade Beam at Grid 6-10/H-Q as highlighted in attached drawing, at Management Building. C16/20 SRC P 28-23272 12
PASSED
109 P 28-23271 10
110 KAIG3-RFI-CO-S-1172-00 Crescent 1 8/23/20 Inspection to check concreting C (32-40) very severe for pile cap foundation for PC (79,80,81 & 82). C32/40 62% OPC+30%FA P 28-23314 4
111 P 28-23313 7
113 P 28-23308 10
114 P 28-23305 10
115 KAIG3-RFI-MB-S-1193-00 Management Building 8/23/20 Concrete Pouring for Grade Beam at Grid X/7-9, 9/X-W & W/9-12 as highlighted in attached drawing. C32/40 62% OPC+30%FA P 28-23322 7
116 P 28-23321 7
117 P 28-23320 10
119 P 28-23318 10
120 P 28-23317 10
121 P 28-23316 9
122 KAIG3-RFI-CO-S-1185-00 Crescent 2 8/24/20 Inspection to check protection layer of Geotextile sheet and protection screed for strip footing between axis (E to D). C32/40 62% OPC+30%FA P 28-23357 9 PASSED
123 KAIG3-RFI-BO-S-1149-00 Boundary Wall 8/24/20 Concrete Pouring for coloum from top of wall to top of column C22, C23, C24, C24A, C25, C26, C27, C27A as per attached drawing. C32/40 67%OPC+25%FA P 28-23361 11 PASSED
124 KAIG3-RFI-CO-S-1221-00 Crescent 2 8/24/20 Inspection to check blinding Concrete SRC,C(16-20) for Deviding wall at Axis T. C16/20 SRC P 28-23363 10 PASSED
125 KAIG3-RFI-BO-S-1223-00 Boundary Wall 8/24/20 Concrete Pouring for Kicker at Span 49A, 49B & 50A at Boundary Wall. C32/40 62% OPC+30%FA P 28-23365 9
PASSED
126 P 28-23364 9
kaig-qcals 25
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1546
129 KAIG3-RFI-MB-S-1234-00 Management Building 8/25/20 Concrete pouring for Grade Beam at Grid 6/I-Q as highlighted in attached drawing at Management Building. C32/40 62% OPC+30%FA P 28-23417 4 PASSED
Surface preparation prior to start Rip Rap Geotextile and filter for the bottom and slope area at North Culvert and open Channel (SBC-02 to SBC-
130 KAIG3-RFI-GN-S-1030-01 Site Works 8/26/20 C32/40 67%OPC+25%FA P 28-23469 10
03 as highlighted).
135 KAIG3-RFI-CO-S-1236-00 Crescent 8/26/20 Inspection to check concreting C (32-40) very severe for Retaining Wall Kicker between Axis (AT) to (AV) outer as highlighted. C32/40 62% OPC+30%FA P 28-23473 7
136 P 28-23471 9
PASSED
137 P 28-23467 10
138 P 28-23465 10
139 KAIG3-RFI-BO-S-1225-00 Boundary Wall 8/27/20 Concrete Pouring for Boundary Wall @ Span 56, 57 & 58 at Boundary Wall. C32/40 67%OPC+25%FA P 28-23510 10
PASSED
140 C32/40 67%OPC+25%FA P 28-23509 10
141 KAIG3-RFI-BO-S-1227-00 Boundary Wall 8/27/20 Concrete Pouring for Footing of Boundary Wall at span 59, 60A & 60B at Boundary Wall. C32/40 62% OPC+30%FA P 28-23516 7
142 P 28-23515 10
PASSED
143 P 28-23514 10
144 P 28-23513 10
145 KAIG3-RFI-BO-S-1231-00 Boundary Wall 8/29/20 Concrete Pouring for Blinding 2 nos. of Span 61B & 62B at Boundary Wall. C32/40 62% OPC+30%FA P 28-23545 6 PASSED
146 KAIG3-RFI-MB-S-1234-00 Management Building 8/29/20 Concrete pouring for Grade Beam at Grid 6/I-Q as highlighted in attached drawing at Management Building. C32/40 62% OPC+30%FA P 28-23559 10
147 P 28-23558 10
148 P 28-23557 10
149 P 28-23556 10
PASSED
150 P 28-23555 10
151 P 28-23552 10
152 P 28-23551 10
153 P 28-23537 9
154 KAIG3-RFI-CO-S-1151-01 Crescent 1 8/30/20 Inspection to check blinding Concrete SRC,C(16-20) under retaining wall footing between Axis (AV) to North watch tower(Outer and Inner). C16/20 SRC P 28-23579 5 PASSED
155 KAIG3-RFI-BO-S-1231-00 Boundary Wall 8/29/20 Concrete Pouring for Blinding 2 nos. of Span 61B & 62B at Boundary Wall. C16/20 SRC P 28-23598 7 PASSED
156 KAIG3-RFI-BO-S-1248-00 Boundary Wall 8/31/20 Concrete Pouring for Wall at Span 49A, 49B & 50A at Boundary Wall. C32/40 62% OPC+30%FA P 28-23618 9
157 P 28-23614 9
158 P 28-23609 10
159 P 28-23608 10
PASSED
160 P 28-23607 10
161 P 28-23606 10
162 P 28-23604 10
163 P 28-23603 10
164 KAIG3-RFI-MB-S-1242-00 Management Building 8/31/20 Concrete Pouring for Slab on Grade at Grid 6-10/I-Q as highlighted in attached drawing at Management Building. C16/20 SRC P 28-23619 5
PASSED
165 P 28-23616 10
kaig-qcals 26
RUN DATE: February 12, 2023
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5
1 KAIG3-RFI-CO-S-1267-00 Crescent 9/1/20 Inspection to check concreting C(32-40)very severe for retaining wall Foundation between axis AV to till end (outer side) as highlighted. C32/40 62% OPC+30%FA P 28-23648 10
2 KAIG3-RFI-CO-S-1269-00 Crescent 9/1/20 Inspection to check concreting C(32-40)very severe for retaining wall Foundation between axis AV to till end (Inner side) as highlighted. C32/40 62% OPC+30%FA P 28-23649 10
6 KAIG3-RFI-PA-S-1304-00 Picnic Area 9/1/20 Inspection for casting the Blinding Concrete under foundation of Prayer Area at Zone-I. C16/20 SRC P 28-23658 8 PASSED
Concrete Pouring for Blinding prior to Slab on Grade and Grade Beam at Grid 6-7/Q-R & 5-7/R-X as highlighted in attached drawing at
7 KAIG3-RFI-MB-S-1273-00 Management Building 9/1/20 C32/40 62% OPC+30%FA P 28-23661 7 PASSED
Management Building.
8 KAIG3-RFI-CO-S-1284-00 Crescent 2 9/3/20 Inspection to check 50mm protection screed below PC(193,194,195,196,197,198,199 & 200). C32/40 62% OPC+30%FA P 28-23735 2 PASSED
9 KAIG3-RFI-CO-S-1315-00 Crescent 9/3/20 Inspection to check mass Concrete SRC,C(16-20) First layer under Central bridge foundation as highlighted. C16/20 SRC P 28-23740 9
13 KAIG3-RFI-SW-S-1288-00 Boundary Wall 9/3/20 Concrete Pouring for Footing of Boundary Wall @ Span 66A & 66B, (Highlighted in the attached drawing's). C32/40 62% OPC+30%FA P 28-23746 9 PASSED
14 KAIG3-RFI-BO-S-1248-00 Boundary Wall 9/3/20 Concrete Pouring for Wall at Span 49A, 49B & 50A at Boundary Wall. C32/40 67%OPC+25%FA P 28-23753 9
kaig-qcals 27
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5
Concrete Pouring for Blinding under S.O.G & Grade Beam at Grid 1-2/A-E, 1-2/F-I & 10/F-Q, as Highlighted in attached Drawing, at
21 KAIG3-RFI-MB-S-1318-00 Management Building 9/5/20 C16/20 SRC P 28-23788 6
Management Building.
PASSED
22 C16/20 SRC P 28-23787 9
23 KAIG3-RFI-SW-S-1334-00 Site Works 9/5/20 Concrete Pouring for Kicker at Span 62B & 63 @ Boundary Wall, as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-23794 10
PASSED
24 C32/40 62% OPC+30%FA P 28-23793 10
25 KAIG3-RFI-CO-S-1255-00 Crescent 9/6/20 Inspection to check Protection layer of geotextile sheet and protection screed below Promenade bridge strip footing. C32/40 62% OPC+30%FA P 28-23826 5 PASSED
26 KAIG3-RFI-SW-S-1344-00 Site Works 9/7/20 Concrete Pouring for Footing at Span 67C, 68A & 68B @ Boundary wall, as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-23868 10
31 KAIG3-RFI-SW-S-1338-00 Site Works 9/7/20 Concrete Pouring for Column's 4 no's, C48A, C49A, C49B & C50A @ Boundary wall, as Highlighted in attached Drawing's(T.O.W to T.O.C). C32/40 67%OPC+25%FA P 28-23872 4 PASSED
32 KAIG3-RFI-PA-S-1371-00 Picnic Area 9/7/20 Inspection for Casting the Blinding Concrete under Footing of Prayer Area at Zone-J. C16/20 SRC P 28-23879 8 PASSED
33 KAIG3-RFI-CO-S-1352-00 Crescent 9/8/20 Inspection to check mass Concrete SRC,C(16-20) Second layer under Central bridge foundation as highlighted. C16/20 SRC P 28-23897 4
36 KAIG3-RFI-CO-S-1287-00 Crescent 9/8/20 Inspection to check concreting C(32-40)very severe for retaining wall axis AT to AR (Inner side) as highlighted. C32/40 62% OPC+30%FA P 28-23910 6
Concrete pouring for Grade Beam at Grid 1/A-E, 1/F-I, 2/A-E, 2/F-I, 1-2/A, E & F and 10/F-Q as Highlighted in attached Drawing, at
41 KAIG3-RFI-MB-S-1359-00 Management Building 9/9/20 C32/40 62% OPC+30%FA P 28-23934 6
Management Building.
44 KAIG3-RFI-SW-S-1324-00 Site Works 9/9/20 Concrete pouring for Wall at Span 59, 60A, 60B & 61A @ Boundary wall, as Highlighted in attached Drawing's. C32/40 67%OPC+25%FA P 28-23943 6
47 KAIG3-RFI-SW-S-1335-00 Site Works 9/10/20 Concrete Pouring for Footing at Span 61B @ Boundary wall, as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-23974 10
48 KAIG3-RFI-SW-S-1345-00 Site Works 9/10/20 Concrete Pouring for Kicker at Span 67C, 68A & 68B @ Boundary wall, as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-23975 10 PASSED
kaig-qcals 28
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5
54 KAIG3-RFI-CO-S-1323-00 Crescent 2 9/13/20 Inspection to check concreting C(32-40)very severe for strip footing between PC# 99 to 101. C32/40 62% OPC+30%FA P 28-24045 10
57 KAIG3-RFI-SW-S-1324-00 Site Works 9/13/20 Concrete pouring for Wall at Span 59, 60A, 60B & 61A @ Boundary wall, as Highlighted in attached Drawing's. C32/40 67%OPC+25%FA P 28-24053 5
58 KAIG3-RFI-SW-S-1332-00 Site Works 9/13/20 Concrete Pouring for Footing at Span 62B & 63 @ Boundary Wall, as Highlighted in attached Drawing's. C32/40 67%OPC+25%FA P 28-24052 10
65 KAIG3-RFI-CO-S-1424-00 Crescent 9/13/20 Inspection to check Blinding Concrete SRC,C(16-20) for retaining wall between axis AQ to AP as highlighted. C16/20 SRC P 28-24051 8 PASSED
66 KAIG3-RFI-PA-S-1437-00 Picnic Area 9/14/20 Inspection of concrete pouring for the foundation of Prayer Area at Zone-I (as highlighted). C32/40 62% OPC+30%FA P 28-24086 3
75 KAIG3-RFI-CO-S-1404-00 Crescent 2 9/15/20 Inspection to check concreting C(32-40)very severe for PC (195,196,197 & 198). C32/40 62% OPC+30%FA P 28-24126 7 PASSED
76 KAIG3-RFI-CO-S-1352-00 Crescent 9/15/20 Inspection to check mass Concrete SRC,C(16-20) Second layer under Central bridge foundation as highlighted. C16/20 SRC P 28-24134 10 PASSED
77 KAIG3-RFI-CO-S-1355-00 Crescent 9/15/20 Inspection to check concreting C(32-40)very severe for retaining wall Kicker between axis AV to till end (Inner side) as highlighted. C32/40 62% OPC+30%FA P 28-24157 4.5
84 KAIG3-RFI-MB-S-1400-00 Management Building 9/15/20 Inspection for Concrete Pouring for Slab on Grade at Grid 10-12/Q-X, 12-13/Q and 10/I-Q Management Building. C32/40 62% OPC+30%FA P 28-24154 7 PASSED
85 KAIG3-RFI-CO-S-1430-00 Crescent 2 9/16/20 Inspection to check 50mm protection screed below PC(181,182,183,184,185 & 186). C32/40 62% OPC+30%FA P 28-24185 8 PASSED
86 KAIG3-RFI-CO-S-1417-00 Crescent 9/16/20 Inspection to check mass Concrete SRC,C(16-20) Third layer under Central bridge foundation as highlighted. C16/20 SRC P 28-24188 6 PASSED
87 KAIG3-RFI-SW-S-1420-00 Site Works 9/16/20 Concrete Pouring for Wall @ Span 62B & 63 at Boundary Wall. C32/40 67%OPC+25%FA P 28-24193 10 PASSED
88 KAIG3-RFI-SW-S-1522-00 Site Works 9/16/20 Concrete pouring for Footing @ Span 67B, at Boundary Wall. C32/40 62% OPC+30%FA P 28-24194 10
PASSED
89 C32/40 62% OPC+30%FA P 28-24198 3
kaig-qcals 29
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5
100 KAIG3-RFI-SW-S-1465-00 Site Works 9/20/20 Inspection for Concrete Pouring for Foundation and kicker of SBC-02 (Part-3) As Highlighted. C32/40 62% OPC+30%FA P 28-24350 4
106 KAIG3-RFI-SW-S-1535-00 Site Works 9/21/20 Concrete Pouring for Column's @ C66A, C66B & C67A at Boundary Wall. C32/40 67%OPC+25%FA P 28-24375 10 PASSED
107 KAIG3-RFI-SW-S-1536-00 Site Works 9/21/20 Concrete Pouring for Wall @ Span 68B, at Boundary Wall. C32/40 67%OPC+25%FA P 28-24378 10 PASSED
108 KAIG3-RFI-SW-S-1530-00 Site Works 9/21/20 Concrete pouring for Kicker @ Span 67B, at Boundary Wall. C32/40 62% OPC+30%FA P 28-24380 9 PASSED
109 KAIG3-RFI-PA-S-1499-00 Picnic Area 9/22/20 Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-J (as Highlighted). C32/40 62% OPC+30%FA P 28-24420 9
114 KAIG3-RFI-PA-S-1501-00 Picnic Area 9/22/20 Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-I (as Highlighted). C32/40 62% OPC+30%FA P 28-24433 7
117 KAIG3-RFI-CO-S-1382-00 Crescent 2 9/22/20 Inspection to check 50mm protection screed below PC(187,188,189,190,191 & 192). C32/40 62% OPC+30%FA P 28-24439 5 PASSED
118 KAIG3-RFI-CO-S-1471-00 Crescent 1 9/22/20 Inspection to check 50mm protection screed below PC (1,2,3,4,5,6,7 & 8). C16/20 SRC P 28-24444 5
PASSED
119 C16/20 SRC P 28-24440 10
120 KAIG3-RFI-SW-S-1512-00 Site Works 9/24/20 Inspection of Concrete Pouring for Foundation and Kicker of SBC-02 (Part-1) as highlighted. C32/40 62% OPC+30%FA P 28-24477 10
126 KAIG3-RFI-CO-S-1503-00 Crescent 9/26/20 Inspection to check Mass Concrete SRC,C(16-20 )for strip footing between PC(195 to 197) & (196 to 198). C16/20 SRC P 28-24505 10
kaig-qcals 30
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1448.5
137 KAIG3-RFI-PA-S-1554-00 Picnic Area 9/27/20 Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-B (as highlighted). C16/20 SRC P 28-24555 8 PASSED
138 KAIG3-RFI-SW-S-1522-00 Site Works 9/28/20 Concrete pouring for Footing @ Span 67B at Boundary Wall. C32/40 67%OPC+25%FA P 28-24586 9
143 KAIG3-RFI-PA-S-1555-00 Picnic Area 9/28/20 Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-K (as highlighted). C16/20 SRC P 28-24589 8 PASSED
144 KAIG3-RFI-SM-S-1559-00 South Small Mosque 9/28/20 Inspection to check blinding Concrete SRC,C(16-20 ) for South Small Mosque. C16/20 SRC P 28-24593 10
148 KAIG3-RFI-CO-S-1547-00 Crescent 9/28/20 Inspection to check concreting C(32-40)very severe for PC(199 & 200). C32/40 62% OPC+30%FA P 28-24607 6
152 KAIG3-RFI-SW-S-1565-00 Site Works 9/29/20 Inspection of Concrete Pouring for Side Walls and Top Slab of SBC-03. C32/40 62% OPC+30%FA P 28-24625 9
Inspection to check 50mm protection screed below PC (65, 66, 67, 68, 69, 70, 71 & 72) Crescent 1, (151, 152, 153, 154, 155, 156, 157 & 158)
159 KAIG3-RFI-CO-S-1572-00 Crescent 1 & 2 9/29/20 C16/20 SRC P 28-24650 10
Crescent 2.
162 KAIG3-RFI-CO-S-1534-00 Crescent 9/29/20 Inspection to check concreting C(32-40)very severe for Promenade bridge foundation. C32/40 62% OPC+30%FA P 28-24654 12 PASSED
163 KAIG3-RFI-CO-S-1588-00 Crescent 1 & 2 9/30/20 Inspection to check 50mm protection screed above PC (79, 80, 81, 82, 195, 196, 197, 198, 199 & 200). C32/40 62% OPC+30%FA P 28-24681 7
167 KAIG3-RFI-CO-S-1545-00 Crescent 9/30/20 Inspection to check concreting C(32-40)very severe for retaining wall foundation between Axis AP to AQ. C32/40 62% OPC+30%FA P 28-24701 9
PASSED
168 C32/40 62% OPC+30%FA P 28-24703 6
kaig-qcals 31
RUN DATE: February 12, 2023
1 KAIG3-RFI-PA-S-1598-00 Picnic Area 10/1/20 Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-I (as highlighted). C32/40 62% OPC+30%FA P 28-24724 9
KAIG3-RFI-PA-S-1590-00 Picnic Area 10/1/20 Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-G (As highlighted). C32/40 62% OPC+30%FA P 28-24740 10
KAIG3-RFI-SW-S-1599-00 Site Works 10/3/20 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-02 (Part-2) as highlighted. C32/40 62% OPC+30%FA P 28-24768 9
KAIG3-RFI-CO-S-1605-00 Crescent 10/3/20 Inspection to check blinding Concrete SRC,C(16-20 ) for South bridge foundation. C16/20 SRC P 28-24804 9
Concrete Pouring for Window Bottom Sill Door Lintels and 4 no's of Stiffner column for walls at Grid 3-6/A, 3-6/E, 3/A-E, 4/A-E, 5/A-E, 1-2/A,
KAIG3-RFI-MB-S-1611-00 Management Building 10/4/20 C32/40 67%OPC+25%FA P 28-24819 9
1-2/E, 1/A-E, 2/A-E, 1/I-J, 2/I-J, 1/L-R & 2/L-R as highlighted in attached drawings.
PASSED
C32/40 67%OPC+25%FA P 28-24827 9
KAIG3-RFI-CO-S-1602-00 Crescent 2 10/4/20 Inspection to check concreting C(32-40) very severe for PC(183,184,185 & 186). C32/40 62% OPC+30%FA P 28-24837 9
kaig-qcals 32
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800
KAIG3-RFI-MB-S-1626-00 Management Building 10/6/20 Concrete Pouring for Blindig below SOG and Grade Beam at Grid 3-5/R-X as highlighted in attached drawing. C16/20 SRC P 28-24910 9
PASSED
C16/20 SRC P 28-24917 6
KAIG3-RFI-CO-S-1639-00 Crescent 2 10/6/20 Inspection to check 50mm protection screed below South Bridge foundation. C16/20 SRC P 28-24919 3
PASSED
C16/20 SRC P 28-24915 10
KAIG3-RFI-PA-S-1615-00 Picnic Area 10/7/20 Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-J (as highlighted). C32/40 62% OPC+30%FA P 28-24966 8
KAIG3-RFI-TB-S-1765-00 Ticket Booth 4, 5 & 6 10/7/20 Concrete pouring for Blinding prior to S.O.G Inside, Ticket booths # 4, 5 & 6. C32/40 62% OPC+30%FA P 28-24975 10
KAIG3-RFI-CO-S-1665-00 Crescent 2 10/8/20 Concreting for Strip Footing between PC 197-199 & 198-200 (C-32/40 Very Severe). C32/40 62% OPC+30%FA P 258-24997 9
KAIG3-RFI-PA-S-1683-00 Picnic Area 10/8/20 Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-12 to PA-17) as highlighted. C16/20 SRC P 28-25110 10 PASSED
KAIG3-RFI-MB-S-1663-00 Management Building 10/8/20 Concrete Pouring for Grade beam at Grid 3-5/R, 3-5/X & 3/R-X as Highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-25005 8 PASSED
kaig-qcals 33
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800
KAIG3-RFI-CO-S-1644-00 Crescent 2 10/12/20 Inspection to check 50mm protection screed below retaining wall foundation between axis AP to AH. C32/40 62% OPC+30%FA P 28-25126 4
PASSED
KAIG3-RFI-CO-S-1639-00 Crescent 2 10/12/20 Inspection to check 50mm protection screed below South Bridge foundation.
KAIG3-RFI-PA-S-1683-00 Picnic Area 10/12/20 Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-12 to PA-17) as highlighted. C16/20 SRC P 28-25128 5 PASSED
KAIG3-RFI-MB-S-1675-00 Management Building 10/12/20 Concrete Pouring for Slab on Grade at Grid 3-5/R-X as highlighted in attached drawings. C32/40 62% OPC+30%FA P 28-25139 9
Concrete Pouring for blinding of boundary wall foundation @ (EXC4-29/30 to EXC4-41/42) ( EXC4-11/12 to EXC4-27/28) at Physic Garden at
KAIG3-RFI-PG-S-1784-00 Physic Garden 10/12/20 C16/20 SRC P 28-25145 9
highlighted area in attached drawings.
KAIG3-RFI-SW-S-1767-00 Site Works 10/13/20 Inspection of Concrete Pouring for Foundation and Kicker of SBC-01 (Part-A) as highlighted. C32/40 62% OPC+30%FA P 28-25167 9
KAIG3-RFI-PA-S-1481-00 Picnic Area 10/13/20 Inspection of concrete pouring for the foundation of Prayer Area at Zone-B (as highlighted). C32/40 62% OPC+30%FA P 28-25180 9
Inspection to check 50mm protection screed below PC (65, 66, 67, 68, 69, 70, 71 & 72) Crescent 1, (151, 152, 153, 154, 155, 156, 157 & 158)
KAIG3-RFI-CO-S-1572-00 Crescent 1 & 2 10/14/20 C32/40 62% OPC+30%FA P 29-13152 6 PASSED
Crescent 2.
kaig-qcals 34
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800
KAIG3-RFI-PA-S-1747-00 Picnic Area 10/14/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-J (SA-7 ) as highlighted. C16/20 SRC P 29-13164 10 PASSED
KAIG3-RFI-CO-S-1890-00 Crescent 2 10/15/20 30mm Screed Protection of Waterproofing for Strip Footing between PC 200-198, 199-197, 197-195, 198-196. C16/20 SRC P 29-13207 10
PASSED
C16/20 SRC P 29-13204 10
KAIG3-RFI-CO-S-1658-00 Crescent 2 10/18/20 Concreting for Strip Footing between PC 101 to 103 (C-32/40 Very Severe). C05-20 OPC P 28-25236 10
Crescent 2/ Central
KAIG3-RFI-CO-S-1716-00 10/18/20 Concrete Pouring for Central Bridge Pier Foundation as highlighted. C32/40 62% OPC+30%FA P 28-25241 10
Bridge
Crescent 1 - Retaining
KAIG3-RFI-CO-S-1743-00 10/18/20 Concrete Pouring for Retaining Wall Foundation as highlighted at Grid 01AJ to 01/AL C-32/40 Very Severe SRC. C32/40 62% OPC+30%FA P 28-25243 11
Wall
Site Works/Boundary
KAIG3-RFI-SW-S-1775-00 10/19/20 Concrete Pouring for Corebel Extension of Boundary wall @ Span 64, 65, & 67A as per attached drawings (Inner Face). C32/40 62% OPC+30%FA P 28-25298 6
Wall
PASSED
C32/40 62% OPC+30%FA P 28-25286 6
kaig-qcals 35
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800
KAIG3-RFI-PA-S-1756-00 Picnic Area 10/19/20 Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-J (as highlighted). C32/40 62% OPC+30%FA P 28-25291 9
KAIG3-RFI-PA-S-1755-00 Picnic Area 10/19/20 Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-K (as highlighted). C32/40 62% OPC+30%FA P 28-25303 9
KAIG3-RFI-PA-S-1812-00 Picnic Area Concrete pouring for Footing's of Picnic Area PA1-07, 08, 09, 10 & 11, as highlighted in attached drawings. C32/40 62% OPC+30%FA P 28-25304 9
KAIG3-RFI-PA-S-1748-00 Picnic Area 10/20/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA-20,21,22,23,24 ) as highlighted. C16/20 SRC P 28-13232 10
PASSED
KAIG3-RFI-PA-S-1749-00 Picnic Area 10/20/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (SA-16,17 ) as highlighted. C16/20 SRC P 28-25333 10
Crescent 1/Retaining
KAIG3-RFI-CO-S-1796-00 10/20/20 Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AF to 01/AH) C-32/40 VERY SEVERE SRC. C32/40 62% OPC+30%FA P 28-13242 9
Wall
Crescent 1/Retaining
KAIG3-RFI-CO-S-1795-00 10/21/20 Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AL to 01/AN) C-32/40 VERY SEVERE SRC. C32/40 62% OPC+30%FA P 29-13294 9
Wall
KAIG3-RFI-PA-S-1757-00 Picnic Area 10/22/20 Inspection of Concrete Pouring for Footing of Picnic Area (1) at Zone-I (PA-1,2,3,4,5,6 ) as highlighted. C32/40 62% OPC+30%FA P 29-13307 6
KAIG3-RFI-PA-S-1820-00 Picnic Area 10/22/20 Inspection of Concrete Pouring for Footing of Picnic Area (1) at Zone-I (PA-13 ) as highlighted. C32/40 62% OPC+30%FA P 29-13305 10 PASSED
kaig-qcals 36
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800
Crescent 1/Retaining
KAIG3-RFI-CO-S-1836-00 10/22/20 Concrete Pouring for Retaining Wall Foundation (as highlighted at Grid 01/AH to 01/AJ) C-32/40 Very Severe SRC. C32/40 62% OPC+30%FA P 29-13315 10
Wall
KAIG3-RFI-PA-S-1881-00 Picnic Area 1 10/25/20 Concrete Pouring for Footing's of Picnic Area PA1-12, 14, 15, 16 & 17 as highlighted in attached drawings. C32/40 62% OPC+30%FA P 29-13422 4
KAIG3-RFI-PA-S-1882-00 Picnic Area 1 10/25/20 Concrete pouring for Kicker of Picnic Area PA1-07, 08, 09, 10 & 11 as highlighted in attached drawings. C32/40 62% OPC+30%FA P 29-13421 9
KAIG3-RFI-PA-S-1825-00 Picnic Area 10/25/20 Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-B (as highlighted). C32/40 62% OPC+30%FA P 29-13413 9
KAIG3-RFI-PA-S-1826-00 Picnic Area 10/25/20 Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-G (as highlighted). C32/40 62% OPC+30%FA P 29-13412 9
kaig-qcals 37
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800
PASSED
Concrete Pouring for Window Sill, window top Lintel, Lintel for walls & Doors at grid 6-9/A, 9-18/B, 3-6/R, 3/R-X, 3-9/X, 9/W-X, 9-17/W, 18/D-
KAIG3-RFI-MB-S-1851-00 Management Building 10/26/20 C32/40 62% OPC+30%FA P 29-13462 10
F, 20/J-M & 3-6/A as same as highlighted in attached drawings.
KAIG3-RFI-PA-S-1852-00 Picnic Area 10/28/20 Inspection of Cocrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-09 ) as highlighted. C32/40 62% OPC+30%FA P 28-25426 11
KAIG3-RFI-PA-S-1853-00 Picnic Area 10/28/20 Inspection of Concrete Pouring for 1st part of Wall for Picnic Area (1) at Zone-I (PA-6 & PA-13) as highlighted. C32/40 62% OPC+30%FA P 28-25421 10
KAIG3-RFI-PA-S-1897-00 Picnic Area 10/28/20 Inspection of Concrete Pouring for 1st part of Wall for Picnic Area (1) at Zone-I (PA-1, 2 & 3) as highlighted. C32/40 62% OPC+30%FA P 28-25419 10
KAIG3-RFI-PA-S-1898-00 Picnic Area 10/28/20 Inspection of Cocrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-07 ) as highlighted. C32/40 62% OPC+30%FA P28-25412 10
PASSED
C32/40 62% OPC+30%FA P 28-25404 10
Crescent 1/Retaining
KAIG3-RFI-CO-S-1841-00 10/29/20 Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AD to 01/AF) C-32/40 VERY SEVERE SRC. C32/40 62% OPC+30%FA P 28-25482 9
Wall
Concrete Pouring for Footing of boundary walls @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EXC4-41/42) at Physic Garden at highlighted
KAIG3-RFI-PG-S-1933-00 Physic Garden 10/31/20 C32/40 62% OPC+30%FA P 29-13498 8
area in attached drawings.
KAIG3-RFI-SW-S-1899-00 Site Works 10/31/20 Inspection of Concrete Pouring for the wall and Top Slab of SBC-02 (Part-2) as highlighted. C32/40 62% OPC+30%FA P 28-25528 9
kaig-qcals 38
PASSED
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1800
kaig-qcals 39
RUN DATE: February 12, 2023
1 KAIG3-RFI-PA-S-1915-00 Picnic Area 11/1/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-J (SA-10) as highlighted. C16/20 SRC P 29-13537 10
PASSED
2 C16/20 SRC P 29-13542 10
3 KAIG3-RFI-PA-S-1930-00 Picnic Area 11/2/20 Inspection of Concrete pouring for the 2nd part of Wall for Prayer Area at Zone-B (as highlighted). C32/40 62% OPC+30%FA P 29-13579 10
4 KAIG3-RFI-PA-S-1931-00 Picnic Area Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-K (as highlighted). C32/40 62% OPC+30%FA P 29-13580 10
Crescent 2/Bridge
13 KAIG3-RFI-CO-S-1714-01 11/3/20 Concrete Pouring for Foundation of Bridge to South Tower as highlighted. C32/40 62% OPC+30%FA P 29-13657 4
South Tower
PASSED
15 C32/40 62% OPC+30%FA P 29-13652 10.25
20 KAIG3-RFI-CO-S-1921-00 Crescent 2 Concrete Pouring for Strip Footing between PC 200 to 198, 199 to 197, 197 to 195 & 198 to 196 (C-32 40 SRC). C32/40 62% OPC+30%FA P 29-13675 7
Concrete Pouring for Kicker of boundary walls @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EXC4-41/42) at Physic Garden at highlighted
21 KAIG3-RFI-PG-S-1934-00 Physic Garden C32/40 62% OPC+30%FA P 29-13673 9
area in attached drawings.
25 KAIG3-RFI-PA-S-1932-00 Picnic Area 11/4/20 Inspection for casting the Blinding Concrete under Footing of Seating Area (3) (SA-20, 22, 25) - as highlighted. C16/20 SRC P 29-13676 10
PASSED
26 C16/20 SRC P 29-13671 10
27 KAIG3-RFI-WG-S-1972-00 Picnic Area 11/5/20 Concrete pouring for Blinding Under Column's & wall foundations @ Jetty # 2 at Boat Garden at highlighted area in attached drawings. C16/20 SRC P 29-13732 10
kaig-qcals 40
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730
34 KAIG3-RFI-PA-S-1965-00 Picnic Area 11/5/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-G (SA-24 ) as highlighted. C16/20 SRC P 29-13721 10 PASSED
35 KAIG3-RFI-PA-S-1966-00 Picnic Area 11/5/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-G (SA-11 ) as highlighted. C16/20 SRC P 29-13719 10
Concrete Pouring for Blinding of boundary walls @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11/20) at Physic Garden at highlighted
36 KAIG3-RFI-PG-S-1935-00 Physic Garden 11/7/20 C16/20 SRC P 28-25640 10
area in attached drawings.
41 KAIG3-RFI-PA-S-1951-00 Picnic Area 11/7/20 Inspection of Concrete Pouring for 2nd part of Wall for Picnic Area (1) at Zone-I (PA-1,2 & 3) as highlighted. C32/40 62% OPC+30%FA P 28-25647 10
PASSED
42 C32/40 62% OPC+30%FA P 28-25650 10
43 KAIG3-RFI-CO-S-1944-00 Crescent 2 11/8/20 Concreting for Strip Footing at Zone 2R (TIP) Crescent 2 Zone 2. C32/40 62% OPC+30%FA P 28-25700 10
46 KAIG3-RFI-MB-S-1995-00 Management Building 11/9/20 Concrete Pouring for Lintels of window's and Stiffner Column's @ Grid 7-8/A, 4-6/R, 3/T-V & 3-6/X, as highlighted in attached Drawing's. C32/40 62% OPC+30%FA P 28-25705 9
PASSED
Concrete Pouring for Lintels of walls, Doors and Stiffner Column's @ Grid 20/F-G, 20/P-Q, 19-20/Q and Between grid 18-20/J-L (for Toilets) as
47 KAIG3-RFI-MB-S-1993-00 Management Building 11/9/20 C32/40 62% OPC+30%FA P 28-25710 6
same as highlighted in attached Drawing's.
48 KAIG3-RFI-PA-S-1988-00 Picnic Area 11/9/20 Inspection for casting the Blinding Concrete under Footing of Seating Area (3) at Zone-G (SA-23) - As highlighted. C16/20 SRC P 28-25706 10
PASSED
49 KAIG3-RFI-PA-S-1991-00 Picnic Area 11/9/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-K (SA-28 & 32 ) As Highlighted.
50 KAIG3-RFI-PA-S-1975-00 Picnic Area 11/9/20 Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-G (as highlighted). C32/40 62% OPC+30%FA P 28-25744 10
51 KAIG3-RFI-PA-S-1976-00 Picnic Area 11/9/20 Inspection of Concrete pouring for the 2nd part of Wall for Prayer Area at Zone-K (as highlighted). C32/40 62% OPC+30%FA P 28-25742 9
62 KAIG3-RFI-TG-S-2074-00 Butterfly Garden 11/10/20 Concrete Pouring for Kicker Extension at Boundary wall (Outer Face) @ Butterfly Garden at highlighted areas in attached drawings. C32/40 62% OPC+30%FA P 28-25788 6
PASSED
63 C32/40 62% OPC+30%FA P 28-25775 4
kaig-qcals 41
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730
68 KAIG3-RFI-WG-S-2070-00 Water Play Garden 11/14/20 Concrete Pouring for Footing of Boundary Wall @ Span 14 & 15 at Water Garden as per attached drawings. C32/40 62% OPC+30%FA P 29-13830 10
Concrete Pouring for Lintels of walls, Doors and Stiffner Column's Between grid 8-10/E-H (for Toilets) Disable Toilets & Partion wall between
73 KAIG3-RFI-MB-S-2019-00 Management Building 11/14/20 C32/40 62% OPC+30%FA P 29-13817 10 PASSED
General Dinging & Private Dining as highlighted in attached drawings.
74 KAIG3-RFI-SW-S-2045-00 Site Works 11/15/20 Inspection of Concrete Pouring for the walls and Top slab of SBC-01 (Part-A) as highlighted. C32/40 62% OPC+30%FA P 29-13871 10
Water Play & Boat Concrete pouring for Footing's 11 No's (2/B,C & D) (3/4,C,D & E) (4/B,C,D,E) and Wall Raft footing @ Jetty # 1 at Boat Garden at highlighted
84 KAIG3-RFI-WG-S-2050-00 11/16/20 C32/40 62% OPC+30%FA P 28-25995 9
Garden area in attached drawings.
kaig-qcals 42
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730
Water Play & Boat Concrete pouring for Footing's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4/B,C & D) and Wall Raft footing @ Jetty # 2 at Boat
102 KAIG3-RFI-WG-S-2051-00 11/17/20 C32/40 62% OPC+30%FA P 28-26043 9
Garden Garden at highlighted area in attached drawings.
Crescent 2 - Bridge to
113 KAIG3-RFI-CO-S-2085-00 11/17/20 Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/A. C32/40 62% OPC+30%FA P 28-26046 5.5 PASSED
South Tower
114 KAIG3-RFI-PA-S-2110-00 Picnic Area 11/18/20 Inspection for casting the Blinding Concrete under Foundation of Seating Area (3) at Zone-K (SA-28) as highlighted. C16/20 SRC P 28-26083 10
115 KAIG3-RFI-PA-S-2111-00 Picnic Area 11/18/20 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-29) as highlighted. PASSED
116 KAIG3-RFI-PA-S-2112-00 Picnic Area 11/18/20 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-30) as highlighted.
117 KAIG3-RFI-WG-S-2104-00 Water Play Garden 11/19/20 Concrete pouring & Shuttering for Kicker of boundary wall @ span 15, 16 & 17 at Water Garden as per attached highlighted drawings. C32/40 62% OPC+30%FA P 28-26134 6
Concrete Pouring for Stiffner Column's 14 no's (From Lintels Top to bottom of roof beam) @ Grid 6-9/A, 9-18/B, 18/A-F & 18-20/F as highlighted
118 KAIG3-RFI-MB-S-2106-00 Management Building 11/19/20 C32/40 62% OPC+30%FA P 28-26131 10
in attached drawings.
PASSED
119 C32/40 62% OPC+30%FA P 28-26129 10
121 KAIG3-RFI-SW-S-2109-00 Site Works 11/21/20 Inspection of Thrust block for Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line from (CH- 21 to CH-22) (as highlighted). C16/20 SRC P 28-26155 5 PASSED
Crescent 2 - Bridge to
122 KAIG3-RFI-CO-S-2122-00 11/21/20 Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/A1. C32/40 62% OPC+30%FA P 28-26160 5.5 PASSED
South Tower
kaig-qcals 43
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730
127 KAIG3-RFI-PA-S-2142-00 Picnic Area 11/22/20 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-G (SA-10, 11, 12, 13 ) as highlighted. C32/40 62% OPC+30%FA P 29-13947 6
135 KAIG3-RFI-PA-S-2095-00 Picnic Area 11/23/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-21) as highlighted. C32/40 62% OPC+30%FA P 29-13960 9
136 KAIG3-RFI-PA-S-2136-00 Picnic Area 11/23/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-23) as highlighted. C32/40 62% OPC+30%FA P 29-13961 9
137 KAIG3-RFI-PA-S-2142-00 Picnic Area 11/23/20 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-G (SA-10, 11, 12, 13 ) as highlighted. C32/40 62% OPC+30%FA P 29-13962 9
PASSED
138 C32/40 62% OPC+30%FA P 29-13967 9.5
Concrete pouring & Shuttering for Footing of boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11/20) at Physic Garden at
141 KAIG3-RFI-PG-S-2153-00 Physic Garden 11/23/20 C32/40 62% OPC+30%FA P 29-13996 10
highlighted area in attached drawings.
Crescent 2 - Bridge to
KAIG3-RFI-CO-S-2130-00 11/24/20 Concrete Pouring for Column of Bridge to South Tower (as highlighted) in Axis 02/B1. C32/40 62% OPC+30%FA P 29-14014 5.5 PASSED
South Tower
KAIG3-RFI-SW-S-2145-00 Site Works 11/24/20 Inspection for Casting the Blinding Concrete under foundation of SBC - 04 for the extended area - as per the approved drawing. C16/20 SRC P 29-14013 4 PASSED
KAIG3-RFI-CO-S-2125-00 Crescent - Tunnel 1 11/26/20 Concrete Pouring for Foundation of Tunnel 1 (Crescent) as highlighted. C32/40 62% OPC+30%FA P 29-14103 2
kaig-qcals 44
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1730
KAIG3-RFI-CO-S-2150-00 Crescent 11/25/20 Application of Protection Layer of Geotextile sheet 180 gr. Per sq.m and Screed of Tunnel Zone 5 (as highlighted). C32/40 62% OPC+30%FA P 29-14055 4
148 KAIG3-RFI-PA-S-2189-00 Picnic Area 11/28/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-20) as highlighted. C32/40 62% OPC+30%FA P 29-14132 4
149 KAIG3-RFI-SW-S-2020-00 Site Works 11/28/20 Inspection of Formwork for the walls and Top slab of SBC-01 (Part-A) as highlighted. C32/40 62% OPC+30%FA P 29-14124 9 PASSED
Concrete Pouring & Shuttering of Kicker for boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11/20) at Physic Garden at
151 KAIG3-RFI-PG-S-2162-00 Physic Garden 11/28/20 C32/40 62% OPC+30%FA P 29-14157 9
highlighted area in attached drawings.
157 KAIG3-RFI-PA-S-2181-00 Picnic Area 11/29/20 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-L (SA-37) as highlighted. C16/20 SRC P 29-14173 8
PASSED
158 KAIG3-RFI-PA-S-2160-00 Picnic Area 11/29/20 Inspection for casting the Blinding Concrete under Footing of Seating Area (3) at Zone-G (SA-19) as highlighted.
Concrete Pouring for Blinding of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/10) at Physic Garden at highlighted
159 KAIG3-RFI-PG-S-2145-00 Physic Garden 11/29/20 C16/20 SRC P 29-14190 10 PASSED
area in attached drawings.
Crescent 2 - Bridge to
160 KAIG3-RFI-CO-S-2166-00 11/30/20 Concrete Pouring for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1. C32/40 62% OPC+30%FA P 29-14200 5.5 PASSED
South Tower
161 KAIG3-RFI-MB-S-2203-00 Management Building 11/30/20 Concrete Pouring for Lintels of Walls, Doors & Stiffner Column's @ Grid between 4-7/Q-X as per highlighted in attached drawings. C32/40 62% OPC+30%FA P 29-14201 8
PASSED
P 29-14203 8
162 KAIG3-RFI-PA-S-2215-00 Picnic Area 11/30/20 Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-G (as highlighted). C32/40 62% OPC+30%FA P 29-14211 6
165 KAIG3-RFI-SW-S-2201-00 Site Works 11/30/20 Inspection of Concrete Pouring for walls and Top Slab of SBC-02 (Part-1) as highlighted. C32/40 62% OPC+30%FA P 29-14223 8
172 KAIG3-RFI-AG-S-2226-00 Aviary Garden 11/30/20 Concrete Pouring for Blinding concrete for Boundary Wall (Part-1) at Aviary Garden as per attached highlighted drawings. C16/20 SRC P 29-14229 4
PASSED
173 C16/20 SRC P 29-14228 9
kaig-qcals 45
RUN DATE: February 12, 2023
2 KAIG3-RFI-MB-S-2243-00 Management Building 12/2/20 Concrete Pouring for Lintels of Walls, Doors & Window's @Grid 6/F-J, 6/M-R & 6-7/Q as per highlighted in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14285 11
Concrete Pouring for Blinding for Boundary wall (Part-2, Grid 8-23 of Left Side) at Aviary Garden as per highlighted in attached
9 KAIG3-RFI-AG-S-2238-00 Aviary Garden 12/3/20 C16/20 SRC P 29-14347 9
drawings.
PASSED
10 C16/20 SRC P 29-14346 11
16 KAIG3-RFI-CO-S-2261-00 Crescent 12/7/20 Blinding/Plain Concrete Under foundation for Dividing (zone 2P) as highlighted 9 foundations. C16/20 SRC P 29-14437 10
Crescent 2 - Bridge to
20 KAIG3-RFI-CO-S-2263-00 12/7/20 Concrete Pouring for Column of Bridge to South Tower (as highlighted) in Axis 02/C1 - 2nd stage. C32/40 62% OPC+30%FA - 160+/-40 P 29-14452 5 PASSED
South Tower
26 KAIG3-RFI-PA-S-2283-00 Picnic Area 12/8/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-22) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14479 9
27 KAIG3-RFI-PA-S-2284-00 Picnic Area 12/8/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-28) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14480 9
28 KAIG3-RFI-PA-S-2285-00 Picnic Area 12/8/20 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-11 ) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14485 9
PASSED
29 KAIG3-RFI-PA-S-2286-00 Picnic Area 12/8/20 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-29 & 30) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14486 10
kaig-qcals 46
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5
Crescent 1 - Retaining
36 KAIG3-RFI-CO-S-2265-00 12/10/20 Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AN TO AP). C32/40 62% OPC+30%FA - 160+/-40 P 29-14568 10
Wall
Concrete pouring & Shuttering for Kicker (1st lift) of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/10)
40 KAIG3-RFI-PG-S-2315-00 Physic Garden 12/10/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14563 10
at Physic Garden at highlighted area in attached drawings.
PASSED
41 C32/40 62% OPC+30%FA - 160+/-40 P 29-14564 10
42 KAIG3-RFI-CO-S-2207-00 Crescent 1 12/10/20 Protection Layer of Geotextile sheet and 30mm Screed under PC 105 to 110 (as Highlighted). C32/40 62% OPC+30%FA - 240+/-20 P 29-14553 5 PASSED
43 KAIG3-RFI-WG-S-2343-00 Water Garden 12/10/20 Concrete Pouring for Blinding of Boundary Wall @ span 20 & 21 at Water Garden. C16/20 SRC P 29-14569 7 PASSED
44 KAIG3-RFI-PA-S-2323-00 Picnic Area 12/12/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G&K (SA-24,25) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14576 9
45 KAIG3-RFI-PA-S-2332-00 Site Works 12/12/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-23) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14577 9
46 KAIG3-RFI-SW-S-2340-00 Site Works 12/12/20 Inspection of Concrete Pouring for Foundation and Kicker of SBC-04 as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14583 9
PASSED
47 C32/40 62% OPC+30%FA - 160+/-40 P 29-14585 9
Concrete Pouring for Stiffner Column's, Lintels of Doors & Walls @ Grid (between 3-4/R-V) (3-4/V) (4/R-T) & (4/V-X) as per
50 KAIG3-RFI-MB-S-2342-00 Management Building 12/12/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14586 8 PASSED
highlighted in attached drawings.
Concrete pouring & Shuttering for Wall of boundary wall @ (EXC1-12/13 to EXC3-11/20) at Physic Garden at highlighted area in
51 KAIG3-RFI-PG-S-2327-00 Physic Garden 12/12/20 C32/40 67%OPC+25%FA - 160+/-40 P 29-14596 9
attached drawings.
56 KAIG3-RFI-CO-S-2325-00 Crescent - Tunnel 1 12/12/20 Concreting for Wall of Tunnel 1 (Crescent) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14603 9
Concrete Pouring for Blinding for Boundary wall (Part-3, Grid 21-23 of Left Side) at Aviary Garden as per highlighted in attached
60 KAIG3-RFI-AG-S-2305-00 Aviary Garden 12/12/20 C16/20 SRC P 29-14607 10
drawings.
PASSED
61 C16/20 SRC P 29-14608 10
Concrete pouring & Shuttering for Kicker (2nd lift) of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/10)
62 KAIG3-RFI-PG-S-2344-00 Physic Garden 12/13/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14624 10
at Physic Garden at highlighted area in attached drawings.
Crescent Promenade
66 KAIG3-RFI-CO-S-2339-00 12/13/20 Concreting for Column of Promenade Bridge axis 01-O. C32/40 62% OPC+30%FA - 160+/-40 P 29-14638 8 PASSED
Bridge
Concrete Pouring for Stiffner Column's, Lintels of Walls, Doors & Window's @ Grid 1-2/F-I & 3-5/E as per highlighted in attached
67 KAIG3-RFI-MB-S-2329-00 Management Building 12/14/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26230 10
drawings.
Concrete Pouring for Footing & Buttress of Boundary wall (Part-1, Grid 20-23 of Left Side & Upside) at Aviary Garden as per
68 KAIG3-RFI-AG-S-2367-00 Aviary Garden 12/14/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26232 10
highlighted in attached drawings.
kaig-qcals 47
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5
73 KAIG3-RFI-PA-S-2352-00 Picnic Area 12/15/20 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-13) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14659 9
76 KAIG3-RFI-SW-S-2379-00 Site Works 12/16/20 Inspection of Concrete Pouring for Walls and Top Slab of SBC-02 (Part-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14714 10
Protection Layer of Geo-textile sheet and Screed Protection 50mm thick below Foundation Colonnadeds (dividing at Zone 2P) (as
81 KAIG3-RFI-CO-S-2336-00 Crescent 2 12/16/20 C32/40 62% OPC+30%FA - 240+/-20 P 29-14728 7 PASSED
highlighted).
Concrete Pouring & Shuttering for Wall of Boundary Wall @ (EXC1-04/05 to EXC3-01/10) at Physic Garden at highlighted area in
82 KAIG3-RFI-PG-S-2371-00 Physic Garden 12/16/20 C32/40 67%OPC+25%FA - 160+/-40 P 29-14731 10
attached drawings.
Crescent Promenade
87 KAIG3-RFI-CO-S-2366-00 12/16/20 Concreting for Column of Promenade Bridge axis 01-N. C32/40 62% OPC+30%FA -160+/-40 P 29-14738 8 PASSED
Bridge
Water Play & Boat
88 KAIG3-RFI-WG-S-2395-00 12/17/20 Concrete Pouring & Shuttering for Footing @ span 18 & 19 for boundary wall at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14757 9
Garden
Concrete Pouring for S.O.G @ Grid 17-18/F-H, 17-19/O-S & Between 10-12/R-S (Excluding Electrical Room) as per highlighted in
89 KAIG3-RFI-MB-S-2397-00 Management Building 12/17/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14759 9
attached Drawing's.
Crescent 1 - Retaining
94 KAIG3-RFI-CO-S-2265-00 12/17/20 Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AN TO AP). C32/40 62% OPC+30%FA - 240+/-20 P 29-14778 10
Wall
PASSED
95 C32/40 62% OPC+30%FA - 240+/-20 P 29-14781 10
96 KAIG3-RFI-PA-S-2390-00 Picnic Area 12/19/20 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-10) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14806 9
PASSED
97 C32/40 62% OPC+30%FA - 160+/-40 P 29-14808 9
Crescent 1 - Retaining
101 KAIG3-RFI-CO-S-2293-00 12/19/20 Concreting for Retaining Wall (Wall) (as highlighted at Axis AJ to AL). C32/40 62% OPC+30%FA - 160+/-40 P 29-14834 9
Wall
102 KAIG3-RFI-CO-S-2363-00 Crescent - Tunnel 1 12/19/20 Concreting for Wall of Tunnel 1 (crescent) as highlighted 2 outer walls. C32/40 62% OPC+30%FA - 160+/-40 P 29-14833 9
kaig-qcals 48
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5
115 KAIG3-RFI-AG-S-2414-00 Aviary Garden 12/20/20 Concrete Pouring for Footing of Boundary wall (Grid 11-20/Left Side) at Aviary Garden as per highlighted in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14850 10
120 KAIG3-RFI-CO-S-2321-00 Crescent - Tunnel 1 12/21/20 Concreting for Foundation of Tunnel 1 near MCPE (Crescent) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-14881 11
130 KAIG3-RFI-PA-S-2430-00 Picnic Area 12/21/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-21) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26264 9
131 KAIG3-RFI-PA-S-2431-00 Picnic Area 12/21/20 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-12) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26266 9 PASSED
kaig-qcals 49
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5
Concrete pouring for Lintels of Doors & Walls & Stiffner Column's, @ Grid Between 9-10/R-W, 12-14/R-W, 9-10/A-E & 8-9/G-H as
142 KAIG3-RFI-MB-S-2433-00 Management Building 12/23/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14932 9
same as highlighted in attached drawings.
Water Play & Boat Concrete Pouring & Shuttering for Kicker inside (2nd Lift) @ span 18 & 19 for boundary wall at Water Garden, as per attached
143 KAIG3-RFI-WG-S-2443-00 12/23/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14933 9
Garden drawings.
Concrete pouring for Lintels of Doors & Walls & Stiffner Column's at Shower Area @ Grid Between 7-9/R-X, as highlighted in
144 KAIG3-RFI-MB-S-2468-00 Management Building 12/23/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14937 9
attached drawings.
PASSED
145 C32/40 62% OPC+30%FA - 160+/-40 P 29-14941 9
Crescent 2 - Bridge to
148 KAIG3-RFI-CO-S-2318-00 12/22/20 Concrete Pouring for Column of Bridge to South Tower (as highlighted) in Axis 02/B1 2nd. C32/40 62% OPC+30%FA - 160+/-40 P 29-14914 3.5
South Tower
Crescent - Promenade
149 KAIG3-RFI-CO-S-2400-00 12/22/20 Concreting works for Column of CENTRAL Bridge axis 02-AI. PASSED
Bridge
Crescent 2 - Bridge to
150 KAIG3-RFI-CO-S-2425-00 12/22/20 Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/A 2nd.
South Tower
151 KAIG3-RFI-PA-S-2464-00 Picnic Area 12/24/20 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-19) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26313 10
PASSED
152 KAIG3-RFI-PA-S-2465-00 Picnic Area 12/24/20 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-25) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26311 10
Concrete pouring for Lintels of Doors & Walls & Stiffner Column's, @ Grid Between 9-10/R-W, 12-14/R-W, 9-10/A-E & 8-9/G-H as
155 KAIG3-RFI-MB-S-2433-00 Management Building 12/24/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26327 8 PASSED
same as highlighted in attached drawings.
156 KAIG3-RFI-CO-S-2460-00 Crescent 12/24/20 Concreting of foundation for Colonnades (zone 2P) as highlighted 9 foundations. C32/40 62% OPC+30%FA - 160+/-40 P 28-26331 9
Water Play & Boat Concrete Pouring & Shuttering for Kicker Inside (2nd Lift) @span 20 & 21 of boundary wall at Water Garden as per attached
KAIG3-RFI-WG-S-2482-00 12/26/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26389 10
Garden drawings.
KAIG3-RFI-SW-S-2495-00 Site Works 12/27/20 Inspection for Casting the Blinding Concrete under foundation of Cesspool-2. C16/20 SRC P 29-14953 9
PASSED
KAIG3-RFI-PA-S-2497-00 Picnic Area 12/27/20 Inspection for Casting the Blinding Concrete under the Footing of Play Area (03) at Zone-G as highlighted.
KAIG3-RFI-AG-S-2475-00 Aviary Garden 12/27/20 Concrete pouring for Footing of Boundary wall (1-11/Right side) at Aviary Garden as per highlighted in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-14960 9
Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some part of A to B) @ Butterfly
KAIG3-RFI-TG-S-2509-00 Butterfly Garden 12/27/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-14961 9
Garden at highlighted areas in attached drawings.
kaig-qcals 50
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
TOTAL QUANTITY TRUCK LOAD (M³): 1874.5
Concrete pouring for Footing of Boundary wall @ Grid (1-11/Left side) (16-20/Right side) at Aviary Garden as per highlighted in
157 KAIG3-RFI-AG-S-2519-00 Aviary Garden 12/28/20 C32/40 62% OPC+30%FA - 160+/-40 P 28-26421 9
attached drawings.
Crescent - Promenade
166 KAIG3-RFI-CO-S-2400-00 12/29/20 Concreting works for Column of CENTRAL Bridge axis 02-AI. C32/40 62% OPC+30%FA - 160+/-40 P 28-26467 5
Bridge
Crescent - Promenade
167 KAIG3-RFI-CO-S-2422-00 12/29/20 Concreting works for Column of CENTRAL Bridge axis 02-AJ. C32/40 62% OPC+30%FA - 160+/-40 P 28-26462 10
Bridge
Crescent 2 - Bridge to
168 KAIG3-RFI-CO-S-2425-00 12/29/20 Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/A 2nd. C32/40 62% OPC+30%FA - 160+/-40 P 28-26456 10
South Tower
PASSED
169 C32/40 62% OPC+30%FA - 160+/-40 P 28-26453 10
Crescent 1 - Retaining
176 KAIG3-RFI-CO-S-2463-00 12/30/20 Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AL TO AN) C32/40 62% OPC+30%FA - 160+/-40 P 29-15017 9
Wall
Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some part of A to B) @ Butterfly
181 KAIG3-RFI-TG-S-2509-00 Butterfly Garden 12/30/20 C32/40 62% OPC+30%FA - 160+/-40 P 29-15029 9 PASSED
Garden at highlighted areas in attached drawings.
182 KAIG3-RFI-CO-S-2224-01 Crescent 1 12/30/20 Geotextile sheet 180 gr. per sq.m and Screed above foundation (Inner and Outer) of Retaining Wall at Axis AP to AV (as highligted). C32/40 62% OPC+30%FA - 240+/-20 P 29-15041 10 PASSED
kaig-qcals 51
Consultant : DAR
1 KAIG3-RFI-PA-S-2532-00 Picnic Area 1/2/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-29 & 30) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15091 9 PASSED
3 KAIG3-RFI-SW-S-2535-00 Site Works 1/3/21 Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-2 (as highlighted). C32/40 62% OPC+30%FA - 240+/-20 P 29-15131 3 PASSED
11 KAIG3-RFI-CO-S-2515-00 Crescent - Tunnel 1 1/3/21 Concreting for Foundation of Tunnel 1 (crescent) as highlighted Going axis 02/1. C32/40 62% OPC+30%FA - 160+/-40 P 29-15109 10
22 KAIG3-RFI-PA-S-2577-00 Picnic Area 1/5/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-19) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15219 11 PASSED
Concrete Pouring for Lintels of Doors & Walls & Stiffner Column's at Grid between 17-18/E-I, 17-19/M-Q, 4-5/T-N, as highlighted in
23 KAIG3-RFI-MB-S-2547-00 Management Building 1/5/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-15229 9 PASSED
attached drawings.
Water Play & Boat
24 KAIG3-RFI-WG-S-2599-00 1/6/21 Concrete Pouring & Shuttering for Footing @ span 1, of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15254 10
Garden
Water Play & Boat
25 KAIG3-RFI-WG-S-2600-00 1/6/21 Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 3 & 4, of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15256 10
Garden
Water Play & Boat
26 KAIG3-RFI-WG-S-2607-00 1/6/21 Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 22 & 23, of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15261 10
Garden
Water Play & Boat
27 KAIG3-RFI-WG-S-2609-00 1/6/21 Concrete Pouring & Shuttering for Footing @ span 24 & 25, of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15264 10
Garden
PASSED
28 C32/40 62% OPC+30%FA - 160+/-40 P 29-15267 10
kaig-qcals 52
Consultant : DAR
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl29
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-15271 QUANTITY
10
LOCATION CASTING No.
(m³)
32 KAIG3-RFI-CO-S-2576-00 Crescent 1/6/21 Shuttering and Concreting of Blinding for Retaining wall Foundation Between Axis AA to AB (as highlighted). C16/20 SRC P 29-15278 10 PASSED
33 KAIG3-RFI-PA-S-2578-00 Picnic Area 1/6/21 Inspection of Concrete Pouring for the Foundation of Play Area (3) at Zone-G as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15284 9
PASSED
34 C32/40 62% OPC+30%FA - 160+/-40 P 29-15287 8
35 KAIG3-RFI-CO-S-2606-00 Crescent - Tunnel 1 1/6/21 Concreting for Mid Wall of Tunnel 1 going Axis 02/1 (crescent) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15288 9
PASSED
36 C32/40 62% OPC+30%FA - 160+/-40 P 29-15290 9
Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation "A to B to C to D & (Some part of D to A) @ Maze
37 KAIG3-RFI-ZG-S-2626-00 Maze Garden 1/7/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-15315 9
Garden at highlighted areas in attached drawings.
PASSED
38 C32/40 62% OPC+30%FA - 160+/-40 P 29-15318 7
39 KAIG3-RFI-CO-S-2576-00 Crescent 1/7/21 Shuttering and Concreting of Blinding for Retaining wall Foundation Between Axis AA to AB (as highlighted). C16/20 SRC P 29-15323 10
45 KAIG3-RFI-PA-S-2651-00 Site Works 1/10/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (1) at Zone-J (SA-8) as highlighted. C16/20 SRC P 29-15394 8 PASSED
46 KAIG3-RFI-WG-S-2642-00 Water Play Garden 1/10/21 Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 24 & 25 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15379 10
47 KAIG3-RFI-WG-S-2643-00 Water Play Garden 1/10/21 Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 22 & 23 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15380 10
48 KAIG3-RFI-WG-S-2644-00 Water Play Garden 1/10/21 Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 1 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15390 10
49 KAIG3-RFI-WG-S-2645-00 Water Play Garden 1/10/21 Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 3 & 4 of boundary wall at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15392 10 PASSED
Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation "A to B to C to D & (Some part of D to A) @ Maze
53 KAIG3-RFI-ZG-S-2626-00 Maze Garden 1/10/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-15363 10.5
Garden at highlighted areas in attached drawings.
PASSED
54 C32/40 62% OPC+30%FA - 160+/-40 P 29-15368 10.5
55 KAIG3-RFI-SW-S-2650-00 Site Works 1/11/21 Inspection of Concrete Pouring for Foundation and Kicker of Cesspool-02 (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-15411 9
57 KAIG3-RFI-CO-S-2657-00 Crescent 1/11/21 Concreting of Blinding for Foundation of Tunnel 2 (as highlighted). C16/20 SRC P 29-15437 10
kaig-qcals 53
PASSED
Consultant : DAR
62 KAIG3-RFI-PA-S-2694-00 Picnic Area 1/13/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-N (SA-5) as highlighted. C16/20 SRC P 29-15496 8 PASSED
Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation "A to B to C to D & (Some part of D to A) @ Maze
63 KAIG3-RFI-ZG-S-2626-00 Maze Garden 1/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-15497 10
Garden at highlighted areas in attached drawings.
64 KAIG3-RFI-WG-S-2690-00 Water Play Garden 1/13/21 Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 1, of boundary wall at Water Garden, as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15499 9
65 KAIG3-RFI-WG-S-2704-00 Water Play Garden 1/13/21 Concrete Pouring Kicker Inside (2nd lift) @ span 24 & 25, of boundary wall at Water Garden, as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15502 9
Crescent - Retaining
70 KAIG3-RFI-CO-S-2618-00 1/13/21 Concreting of Plain Concrete of foundation at South Administration Building (as Highlighted) Zone 2C. C16/20 SRC P 29-15500 9
Wall
71 KAIG3-RFI-CO-S-2630-00 Crescent 1/13/21 Concreting of 2nd Layer Plain Concrete Below Foundation of Strip Footing at TIP zone 1A. C16/20 SRC P 29-15501 9
78 KAIG3-RFI-PA-S-2705-00 Picnic Area 1/13/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-L (SA-37) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15529 10
PASSED
79 KAIG3-RFI-PA-S-2709-00 Picnic Area 1/13/21 Inspection of Concrete Pouring for the Wall of Play Area (3) at Zone-G as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15532 10
80 KAIG3-RFI-WG-S-2692-00 Water Play Garden 1/14/21 Concrete Pouring & Shuttering for Wall @ span 3 & 4, of boundary wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-15554 10
81 KAIG3-RFI-WG-S-2703-00 Water Play Garden 1/14/21 Concrete Pouring & Shuttering for Wall @ span 22 & 23, of boundary wall at Water Garden, as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-15555 10
85 KAIG3-RFI-CO-S-2701-00 Crescent 1 - Tunnel 1 11/14/21 Concreting for Slab of Tunnel 1 (mid section) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15571 9
kaig-qcals 54
PASSED
Consultant : DAR
98 KAIG3-RFI-PA-S-2693-00 Picnic Area 1/14/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-N (SA-1) as highlighted. C16/20 SRC P 29-15575 10
PASSED
99 KAIG3-RFI-PA-S-2735-00 Picnic Area 1/14/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone- M (SA- 6) as highlighted. C16/20 SRC P 29-15579 10
100 KAIG3-RFI-PA-S-2730-00 Site Works 1/16/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA- 8,9,10) as highlighted. C16/20 SRC P 29-15593 10
101 KAIG3-RFI-PA-S-2734-00 Picnic Area 1/16/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone- I (SA-18) as highlighted. C16/20 SRC P 29-15594 10
PASSED
102 C32/40 62% OPC+30%FA - 160+/-40 P 29-15595 9
104 KAIG3-RFI-PA-S-2736-00 Picnic Area 1/16/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-8) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15619 9
Crescent - Retaining
107 KAIG3-RFI-CO-S-2654-00 1/17/21 Concreting of Blinding of Retaining wall Foundation at Axis 01-W to 01-S. C16/20 SRC P 29-15650 10
Wall
111 KAIG3-RFI-PA-S-2731-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (15) as highlighted. C16/20 SRC P 29-15680 9
112 KAIG3-RFI-PA-S-2745-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-M (SA- 4) as highlighted. C16/20 SRC P 29-15689 10
113 KAIG3-RFI-PA-S-2758-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N (SA-1) as highlighted. C16/20 SRC P 29-15699 10 PASSED
114 KAIG3-RFI-PA-S-2767-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA-11) as highlighted. C16/20 SRC P 29-15710 9
115 KAIG3-RFI-PA-S-2768-00 Picnic Area 1/18/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA-2) as highlighted.
116 KAIG3-RFI-WG-S-2757-00 Water Play Garden 1/18/21 Shuttering & Concrete Pouring for Wall @ span 24 & 25, of boundary wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-15686 10
120 KAIG3-RFI-CO-S-2613-00 Crescent 1/19/21 Concreting of Column/Buttress for Colonnades (zone 2P) as highlighted 3 foundations axis 02 AT. C32/40 62% OPC+30%FA - 160+/-40 P 29-15736 10
121 KAIG3-RFI-CO-S-2640-00 Crescent - Tunnel 1 1/19/21 Concreting for 2 outer Wall of Tunnel 1 going Axis 02/1 (Crescent) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15737 10
kaig-qcals 55
PASSED
Consultant : DAR
128 KAIG3-RFI-PA-S-2801-00 Picnic Area 1/19/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-1) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15729 9
129 KAIG3-RFI-PA-S-2802-00 Picnic Area 1/19/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-20) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15727 9
PASSED
130 KAIG3-RFI-PA-S-2803-00 Picnic Area 1/19/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-21) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15726 9
132 KAIG3-RFI-PA-S-2812-00 Picnic Area 1/19/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 4) as highlighted. C16/20 SRC P 29-15750 10
133 KAIG3-RFI-PA-S-2818-00 Picnic Area 1/19/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 3) as highlighted. C16/20 SRC P 29-15767 8
PASSED
134 KAIG3-RFI-PA-S-2819-00 Picnic Area 1/19/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 12) as highlighted.
135 KAIG3-RFI-PA-S-2820-00 Picnic Area 1/19/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA-13) as highlighted.
136 KAIG3-RFI-WG-S-2755-00 Water Play Garden 1/20/21 Shuttering & Concrete Pouring for Wall @ span 1, of boundary wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-15778 10
140 KAIG3-RFI-WG-S-2853-00 Water Play Garden 1/21/21 Concrete Pouring for Blinding of boundary wall @ span 5, 6 & 7 @ Water Garden at highlighted area in attached drawings. C16/20 SRC P 29-15820 10
143 KAIG3-RFI-PA-S-2832-00 Picnic Area 1/21/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-5) As Highlighted C32/40 67%OPC+25%FA - 160+/-40 P 29-15827 9
146 KAIG3-RFI-PA-S-2846-00 Picnic Area 1/21/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 5) as highlighted. C16/20 SRC P 29-15839 9
PASSED
147 KAIG3-RFI-PA-S-2847-00 Picnic Area 1/21/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 6) as highlighted. C16/20 SRC P 29-15836 9
148 KAIG3-RFI-PA-S-2851-00 Picnic Area 1/23/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-J (SA-8) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26574 10
149 KAIG3-RFI-PA-S-2904-00 Picnic Area 1/23/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-M (SA-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26576 10
Crescent 1 - Retaining
153 KAIG3-RFI-CO-S-2680-00 1/23/21 Concrete Pouring for Retaining Wall (Wall) (as highlighted at AXIS AJ to AH). C32/40 67%OPC+25%FA - 160+/-40 P 28-26594 10
Wall
kaig-qcals 56
Consultant : DAR
157 KAIG3-RFI-PA-S-2898-00 Picnic Area 1/24/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15862 10
PASSED
158 KAIG3-RFI-PA-S-2901-00 Picnic Area 1/24/21 Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-22) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15868 10
159 KAIG3-RFI-PA-S-2902-00 Picnic Area 1/24/21 Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-23) as highlighted.
161 KAIG3-RFI-CO-S-2845-00 Crescent 1/25/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02 AT & 02 AW. C32/40 62% OPC+30%FA - 160+/-40 P 29-15873 9
167 KAIG3-RFI-PA-S-2848-00 Picnic Area 1/24/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 7) as highlighted. C16/20 SRC P 29-15888 10
PASSED
168 KAIG3-RFI-PA-S-2888-00 Picnic Area 1/24/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (SA-14) as highlighted.
169 KAIG3-RFI-CO-S-2615-00 Crescent 1/25/21 Concreting of Column/Buttress for PC 184 Axis 02 AU. C32/40 62% OPC+30%FA - 240+/-20 P 29-15908 7
PASSED
170 C32/40 62% OPC+30%FA - 240+/-20 P 29-15917 3
Concrete Pouring & Shuttering for Stiffner Column's at Grid Between 3-4/S-V, 6/Q, 7/Q, 8-10/N-Q, 8-10/E-H, 10/C, 11/B-E, 13/B-E,
171 KAIG3-RFI-MB-S-2923-00 Management Building 1/25/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-15914 6 PASSED
15/B-C, 15/F-Q, 14/Q & 14/N as highlighted in attached drawings. (From Lintel Top to Roof Bottom).
Concrete Pouring & Shuttering for Lintels of Doors & Walls and Stiffner Column's at Grid between 10-12/R-S, as highlighted in
172 KAIG3-RFI-MB-S-2925-00 Management Building 1/25/21
attached drawings.
173 KAIG3-RFI-CO-S-2880-00 Crescent 2 1/25/21 Concreting of Blinding for MCPE 3 @ zone 6. C16/20 SRC P 29-15921 10
178 KAIG3-RFI-PA-S-2938-00 Picnic Area 1/25/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-M (SA-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15924 10
179 KAIG3-RFI-PA-S-2934-00 Picnic Area 1/25/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-2) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15925 10
180 KAIG3-RFI-PA-S-2935-00 Picnic Area 1/25/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-2) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15934 9
PASSED
181 C32/40 62% OPC+30%FA - 160+/-40 P 29-15936 9
184 KAIG3-RFI-PA-S-2912-00 Picnic Area 1/25/21 Inspection for Casting the Blinding Concrete under the Footing of Play Area (01) at Zone-N as highlighted. C16/20 SRC P 29-15941 10 PASSED
Inspection for application of Damp Proofing (1rt Coat) on top of Primer for External Wall and Top Slab of SBC-02 (Part-4) as
185 KAIG3-RFI-SW-S-2981-00 Site Works 1/26/21 C16/20 SRC P 29-15947 10
highlighted.
PASSED
186 C16/20 SRC P 29-15955 10
kaig-qcals 57
Consultant : DAR
189 KAIG3-RFI-PA-S-2944-00 Picnic Area 1/26/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-L (SA-37) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15963 8
190 KAIG3-RFI-WG-S-2949-00 Water Play Garden 1/27/21 Concrete Pouring & Shuttering for Footing of boundary wall Span 5 & 6 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26645 10
Inspection for application of Damp Proofing (1rt Coat) on top of Primer for External Wall and Top Slab of SBC-02 (Part-4) - As
196 KAIG3-RFI-SW-S-2981-00 Site Works 1/27/21 C16/20 SRC P 28-26663 10
Highlighted
199 KAIG3-RFI-PA-S-2942-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-5) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26664 10
200 KAIG3-RFI-PA-S-2945-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-5) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26665 10
201 KAIG3-RFI-PA-S-2946-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-6) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26668 10
202 KAIG3-RFI-PA-S-2968-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-1) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26671 10 PASSED
203 KAIG3-RFI-PA-S-2969-00 Picnic Area 1/27/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-7) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26677 10
204 P 28-26678 10
205 P 28-26680 7
Installation of thrust block for the pipe (315 mmØ upvc pipes) foul water drinage lifting line )pt. 49 to pt 56 (FORCE LINE) as per
206 KAIG3-RFI-SW-S-2960-00 Site Works 1/28/21 C16/20 SRC P 28-26698 5 PASSED
highlighted.
207 KAIG3-RFI-CO-S-2955-00 Crescent 1/28/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02 AW. C32/40 67%OPC+25%FA - 160+/-40 P 28-26709 10
kaig-qcals 58
Consultant : DAR
213 KAIG3-RFI-PA-S-2943-00 Picnic Area 1/30/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-6) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15972 10
214 KAIG3-RFI-PA-S-3007-00 Picnic Area 1/30/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-3) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-15973 10
PASSED
215 KAIG3-RFI-PA-S-3021-00 Picnic Area 1/30/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-4) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-15978 10
226 KAIG3-RFI-WG-S-2983-00 Water Play Garden 1/30/21 Concrete Pouring & Shuttering for Kicker (Outside) for boundary wall @ Span 5 & 6 at Water Garden, as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15998 10
227 KAIG3-RFI-WG-S-2985-00 Water Play Garden 1/30/21 Concrete Pouring & Shuttering for Footing of boundary wall Span 7 at Water Garden as per attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-15999 10
Crescent 1 - North
232 KAIG3-RFI-CO-S-3014-00 1/31/21 Shuttering and Cconcreting of Blinding for Internal Building (Zone 2Q North Admin BLDG) as Highlighted C16/20 SRC P 28-26754 10
Admin Bldg.
kaig-qcals 59
Consultant : DAR
QC DC QC Manager
kaig-qcals 60
Consultant : DAR
1 KAIG3-RFI-PA-S-3023-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-M (SA-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26766 10
2 KAIG3-RFI-PA-S-3092-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-2) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26767 10
3 KAIG3-RFI-PA-S-3082-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26768 10
4 KAIG3-RFI-PA-S-3081-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-6) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26769 10
PASSED
5 KAIG3-RFI-PA-S-3079-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-14) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26770 10
6 KAIG3-RFI-PA-S-3080-00 Picnic Area 2/1/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-9) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26771 10
9 KAIG3-RFI-CO-S-3030-00 Crescent 2 2/1/21 Concreting of Blinding for MCPE 3 @ zone 6 (2nd). C32/40 62% OPC+30%FA - 160+/-40 P 28-26777 10 PASSED
10 KAIG3-RFI-CO-S-3027-00 Crescent 1 2/2/21 Shuttering and Cconcreting of Blinding for Internal Building (Zone 1A & 1B) as highlighted. C16/20 SRC P 29-16091 10
kaig-qcals 61
Consultant : DAR
34 KAIG3-RFI-PA-S-3062-00 Picnic Area 2/3/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 25) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26811 10
35 KAIG3-RFI-PA-S-3063-00 Picnic Area 2/3/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 26) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26812 9
36 KAIG3-RFI-PA-S-3065-00 Picnic Area 2/3/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 3) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26813 10 PASSED
37 KAIG3-RFI-PA-S-3066-00 Picnic Area 2/3/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26815 10
39 KAIG3-RFI-WG-S-3039-00 Water Play Garden 2/3/21 Concrete Pouring & Shuttering for Kicker (Inside) for boundary wall @ Span 5 & 6 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26814 10
40 KAIG3-RFI-WG-S-3040-00 Water Play Garden 2/3/21 Concrete Pouring & Shuttering for Kicker (Outside) for boundary wall @ Span 7 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26816 10
41 KAIG3-RFI-WG-S-3054-00 Water Play Garden 2/3/21 Concrete Pouring & Shuttering of Footing of boundary wall Span 8, 9 & 10 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26817 10
kaig-qcals 62
Consultant : DAR
56 KAIG3-RFI-PA-S-3009-00 Picnic Area 2/4/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-10) as highlighted. C16/20 SRC P 29-161559 10
57 KAIG3-RFI-PA-S-3010-00 Picnic Area 2/4/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-11) as highlighted. C16/20 SRC P 29-16168 5 PASSED
58 KAIG3-RFI-PA-S-3022-00 Picnic Area 2/4/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-2) As Highlighted.
Crescent 1 - Retaining
59 KAIG3-RFI-CO-S-3003-00 2/4/21 Concrete Pourng for Retaining Wall (WALL) (as Highlighted at AXIS AF TO AH). C32/40 62% OPC+30%FA - 160+/-40 P 29-16180 10
Wall
62 KAIG3-RFI-CO-S-2929-00 Crescent 1 - Tunnel 1 2/6/21 Concreting for Slab of Tunnel 1 (Near MCPE) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16207 10
70 KAIG3-RFI-WG-S-3087-00 Water Play Garden 2/4/21 Concrete Pouring & Shuttering for Kicker (Outside) of boundary wall Span 8, 9 & 10 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16219 10
75 KAIG3-RFI-PA-S-3118-00 Picnic Area 2/6/21 Inspection of Concrete Pouring for the Foundation of Play Area(2) at Zone-I As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26848 10
PASSED
76 C32/40 62% OPC+30%FA - 160+/-40 P 28-26850 10
83 KAIG3-RFI-PA-S-3115-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-24) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26866 10
84 KAIG3-RFI-PA-S-3117-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-20) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26869 9
85 KAIG3-RFI-PA-S-3116-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-21) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26873 9
PASSED
86 KAIG3-RFI-PA-S-3114-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-15) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26887 10
87 KAIG3-RFI-PA-S-3140-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-4) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26895 10
88 KAIG3-RFI-PA-S-3141-00 Picnic Area 2/7/21 Inspection of Concrete Pouring for the Wall of Play Area(1) at Zone-N as highlighted. C32/40 62% OPC+30%FA - 160+/-40
kaig-qcals 63
Consultant : DAR
91 KAIG3-RFI-PA-S-3138-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-11) as highlighted. PASSED
92 KAIG3-RFI-PA-S-3126-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-15) As Highlighted
93 KAIG3-RFI-PA-S-3139-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-N (SA-4) as highlighted.
94 KAIG3-RFI-PA-S-3126-00 Picnic Area 2/9/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-15) as highlighted. C32/40 67%OPC+25%FA - 160+/-40 P 29-16264 9
97 KAIG3-RFI-CO-S-3016-00 Crescent 2/9/21 Shuttering of Column/Buttress for PC 186 Axis 02 AV. C16/20 SRC P 29-16269 10
102 KAIG3-RFI-WG-S-3122-00 Water Play Garden 2/9/21 Concrete Pouring & Shuttering of Kicker for boundary wall @ Span 11 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16277 8 PASSED
103 KAIG3-RFI-PA-S-3143-00 Picnic Area 2/9/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-7) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16283 10
104 KAIG3-RFI-PA-S-3144-00 Picnic Area 2/9/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-17) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16288 10
105 KAIG3-RFI-PA-S-3142-00 Picnic Area 2/9/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-3) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16292 10 PASSED
106 KAIG3-RFI-PA-S-3159-00 Picnic Area 2/9/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-14) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16296 10
108 KAIG3-RFI-WG-S-3152-00 Water Play Garden 2/10/21 Concrete Pouring & Shuttering for Kicker (Inside) for boundary wall @ Span 7 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-26922 10
111 KAIG3-RFI-CO-S-3074-00 Crescent 1 2/10/21 Concreting for Internal Building (Zone 1A & 1B) Foundation as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-26942 10
kaig-qcals 64
Consultant : DAR
116 KAIG3-RFI-SW-S-3150-00 Site Works 2/11/21 Inspection for Casting the Blinding Concrete under the Manhole of Storm Water at Zone-1 as highlighted. C16/20 SRC P 28-26961 10 PASSED
117 KAIG3-RFI-PA-S-3128-00 Picnic Area 2/11/21 Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-11) As Highlighted. C16/20 SRC P 28-26962 9
118 KAIG3-RFI-PA-S-3184-00 Picnic Area 2/11/21 Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-K (SA-17) As Highlighted
Crescent - Retaining
119 KAIG3-RFI-CO-S-3071-00 2/11/21 Concreting for Retaining wall Kicker At Axis AD to AF (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-16327 7 PASSED
Wall
Application of Protection Layer of Geotextile Sheet 180 gr. Per sq.m. and 30mm Screed for TIP Under Strip Footing Zone 2A as
120 KAIG3-RFI-CO-S-3307-00 Crescent 2/11/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-16330 3 PASSED
highlighted.
121 KAIG3-RFI-CO-S-3129-00 Crescent 2/13/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW as highlighted (2nd). C32/40 62% OPC+30%FA - 160+/-40 P 28-26986 10
124 KAIG3-RFI-PA-S-3218-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-5) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26975 10
125 KAIG3-RFI-PA-S-3219-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-13) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26977 10
126 KAIG3-RFI-PA-S-3220-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-9) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26981 10
127 KAIG3-RFI-PA-S-3221-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-10) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26983 10
PASSED
128 KAIG3-RFI-PA-S-3222-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-11) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26984 10
129 KAIG3-RFI-PA-S-3223-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-25) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26988 10
130 KAIG3-RFI-PA-S-3224-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-26) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26989 10
131 KAIG3-RFI-PA-S-3225-00 Picnic Area 2/13/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-3) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-26991 10
Concrete Pouring & Shuttering of Wall up to 3.8m height of Boundary Wall, Grid 6-12/left side or (Grid 39 to 45) at Aviary Garden as
132 KAIG3-RFI-AG-S-3190-00 Aviary Garden 2/15/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-16391 10
per attached highlighted drawings.
140 KAIG3-RFI-CO-S-3204-00 Crescent 1 2/15/21 Concreting for Internal Building (Zone 1A & 1B) Foundation as Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-27033 10
kaig-qcals 65
Consultant : DAR
Crescent - Retaining
159 KAIG3-RFI-CO-S-3198-00 2/16/21 Concrete Pourng for Retaining Wall (Foundation) (as highlighted at Axis AD to AB). C32/40 62% OPC+30%FA - 160+/-40 P 29-16442 10
Wall
Crescent 1 - North
163 KAIG3-RFI-CO-S-3180-00 2/17/21 Shuttering and Concreting of Foundation for Internal Building (Zone 2Q North Admin BLDG) as Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16478 10
Admin Bldg.
164 KAIG3-RFI-CO-S-3255-00 Crescent - Tunnel 1 2/17/21 Concreting for Slab of Tunnel 1 (near Axis 02-1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16480 10
kaig-qcals 66
Consultant : DAR
179 KAIG3-RFI-PA-S-3285-00 Picnic Area 2/17/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-6) As Highlighted. C16/20 SRC
180 KAIG3-RFI-PA-S-3303-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-1) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16491 10
181 KAIG3-RFI-PA-S-3309-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-19) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16496 10
182 KAIG3-RFI-PA-S-3310-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-11) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16500 10
PASSED
183 KAIG3-RFI-PA-S-3311-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-12) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16505 10
184 KAIG3-RFI-PA-S-3312-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-15) As Highlighted
185 KAIG3-RFI-PA-S-3313-00 Picnic Area 2/17/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N(SA-4) As Highlighted
186 KAIG3-RFI-WG-S-3248-00 Water Play Garden 2/18/21 Concrete pouring & Shuttering for Wall of Span 7 for boundary wall at Water Garden as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-16515 9
PASSED
187 C32/40 67%OPC+25%FA - 160+/-40 P 29-16516 5
188 KAIG3-RFI-CO-S-3195-00 Crescent 2/18/21 Concreting of Column/Buttress for PC 184 Axis 02 AV / 02 1 (2nd) C32/40 62% OPC+30%FA - 220+/-20 P 29-16518 10 PASSED
189 KAIG3-RFI-WG-S-3291-00 Water Play Garden 2/18/21 Concrete Pouring & Shuttering of Kicker (Inside) for boundary wall @ Span 11 at Water Garden, as per Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16525 10
192 KAIG3-RFI-CO-S-3208-00 Crescent 2/18/21 Formworks & Concreting of Plain Concrete of foundation at South Administration Building (as Highlighted) Zone 2C. C16/20 SRC P 29-16532 10
193 KAIG3-RFI-CO-S-3235-00 Crescent 2/18/21 Formworks & Concreting of Plain Concrete of foundation at North Administration Building (as Highlighted) Zone 2Q. C16/20 SRC P 29-16533 10
194 KAIG3-RFI-CO-S-3271-00 Crescent 2/18/21 Formworks & Concreting of Plain Concrete of foundation at North Administration Building (as Highlighted) Zone 2Q. C16/20 SRC P 29-16536 10
Application of Protection Layer of Geotextile Sheet 180 gr. Per sq.m. and 30mm Screed for TIP Under Strip Footing Zone 2A as
205 KAIG3-RFI-CO-S-3307-00 Crescent 2/18/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-16546 3 PASSED
highlighted.
kaig-qcals 67
Consultant : DAR
208 KAIG3-RFI-PA-S-3333-00 Picnic Area 2/20/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N(SA-12) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27063 6
209 KAIG3-RFI-PA-S-3286-00 Picnic Area 2/20/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-7) As Highlighted. C16/20 SRC P 28-27067 10
210 KAIG3-RFI-PA-S-3295-00 Picnic Area 2/20/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-17) as highlighted. C16/20 SRC P 28-27084 6 PASSED
211 KAIG3-RFI-PA-S-3314-00 Picnic Area 2/20/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (1) at Zone-N (SA-14) As Highlighted
212 KAIG3-RFI-SW-S-3329-00 Site Works 2/20/21 Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-4 (As Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-27078 6
PASSED
213 KAIG3-RFI-SW-S-3330-00 Site Works 2/20/21 Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-5 (As Highlighted).
214 KAIG3-RFI-CO-S-3178-00 Crescent 2/21/21 Concreting of Column/Buttress for PC 185 Axis 02 AV C32/40 62% OPC+30%FA - 220+/-20 P 28-27106 10 PASSED
215 KAIG3-RFI-CO-S-3210-00 Crescent 2/21/21 Formworks & Concreting of Plain Concrete of foundation at Internal Building (as Highlighted) Zone 2R. C16/20 SRC P 28-27119 9
PASSED
216 C16/20 SRC P 29-16556 5
Crescent - Retaining
217 KAIG3-RFI-CO-S-3201-00 2/23/21 Concreting for Retaining wall (wall) at Axis AD to AF (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-16600 10
Wall
PASSED
218 P 29-16602 10
219 KAIG3-RFI-WG-S-3364-00 Water Play Garden 2/23/21 Concrete Pouring & Shuttering for Wall of Span 10 for boundary wall at Water Garden, as per Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-16607 9
220 KAIG3-RFI-WG-S-3365-00 Water Play Garden 2/23/21 Concrete Pouring & Shuttering for Wall of Span 11 for boundary wall at Water Garden, as per Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-16611 9 PASSED
221 P 29-16612 7
222 KAIG3-RFI-CO-S-3346-00 Crescent 2/23/21 Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW AT as highlighted (2nd). C32/40 62% OPC+30%FA - 160+/-40 P 29-16619 10
225 KAIG3-RFI-PA-S-3403-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for theWall of Seating Area (2) at Zone-M (SA-11) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16627 10
226 KAIG3-RFI-PA-S-3404-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-M (SA-12) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16631 10
227 KAIG3-RFI-PA-S-3405-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-M (SA-15) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16636 10
228 KAIG3-RFI-PA-S-3406-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-03) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16638 10
PASSED
229 KAIG3-RFI-PA-S-3407-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-25) as highlighted.
230 KAIG3-RFI-PA-S-3408-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-26) as highlighted.
231 KAIG3-RFI-PA-S-3409-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-15) as highlighted.
232 KAIG3-RFI-PA-S-3415-00 Picnic Area 2/24/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-05) As Highlighted.
233 KAIG3-RFI-PA-S-3288-01 Picnic Area 2/24/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-8) As Highlighted. C16/20 SRC P 29-16650 10
234 KAIG3-RFI-PA-S-3289-01 Picnic Area 2/24/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-10) As Highlighted. C16/20 SRC P 29-16658 5 PASSED
235 KAIG3-RFI-PA-S-3287-01 Picnic Area 2/24/21 Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-9) As Highlighted.
kaig-qcals 68
Consultant : DAR
244 KAIG3-RFI-CO-S-3411-00 Crescent 2/25/21 Formworks & Concreting of Plain Concrete of foundation at South Administration Building (as Highlighted) Zone 2C. C16/20 SRC P 29-16703 6 PASSED
Concrete pouring & Shuttering for Footings @ Grid (19-23/Left Side), of Boundary wall at Aviary Garden as per highlighted in attached
249 KAIG3-RFI-AG-S-3381-00 Aviary Garden 2/25/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-16700 10
drawings.
252 KAIG3-RFI-WG-S-3377-00 Water Play Garden 2/27/21 Concrete Pouring & Shuttering for Wall of Span 8 & 9 for boundary wall at Water Garden, as per attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-16709 9
255 KAIG3-RFI-CO-S-2794-01 Crescent 1 2/27/21 Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 13 to 20 (zone 1C) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27129 10
PASSED
256 KAIG3-RFI-CO-S-2789-01 Crescent 1 2/27/21 Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 7 to 12 (zone 1B) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27141 10
Crescent - Retaining
257 KAIG3-RFI-CO-S-3420-00 2/27/21 Shuttering and Concrete Pouring of Blinding for Retaining wall Shear Key and foundation Between Axis 01-AA to 01-Z (as highlighted). C16/20 SRC P 28-27159 3 PASSED
Wall
258 KAIG3-RFI-WG-S-3434-00 Water Play Garden 2/28/21 Concrete Pouring for Blinding of boundary wall @ span 37, 38 & 39 @ Water Garden at highlighted area in attached Drawing's. C16/20 SRC P 29-16725 10
PASSED
259 C16/20 SRC P 29-16729 6
260 KAIG3-RFI-PA-S-3390-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-6) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16726 10
261 KAIG3-RFI-PA-S-3391-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-7) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16728 10
262 KAIG3-RFI-PA-S-3440-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-14) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16733 10 PASSED
263 KAIG3-RFI-PA-S-3441-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-01) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-16739 8
264 KAIG3-RFI-PA-S-3442-00 Picnic Area 2/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-19) As Highlighted
kaig-qcals 69
Consultant : DAR
QC DC QC Manager
kaig-qcals 70
Consultant : DAR
1 KAIG3-RFI-TB-S-3462-00 Ticket Booth Canopy 3/1/21 Concrete pouring & Shuttering for Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) of Ticket Booths Canopy. C32/40 62% OPC+30%FA - 160+/-40 P 29-16789 7 PASSED
2 KAIG3-RFI-SW-S-3494-00 Site Works 3/2/21 Inspection of Concrete Pouring for Wall and Slab of Cesspool-02 as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27170 10
5 KAIG3-RFI-CO-S-3213-01 Crescent - Tunnel 1 3/2/21 Concreting for Tunnel 1 Service Access (near MCPE) as Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27179 7 PASSED
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 109 to 116 (zone 2D) as
6 KAIG3-RFI-CO-S-2872-00 Crescent 2 3/2/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-27183 7
highlighted.
PASSED
7 KAIG3-RFI-CO-S-3452-00 Crescent 2 3/2/21 Application of Protection layer of Geotextile Sheet & Screed for Below Foundation of MCPE 3 Zone 2E as Highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27189 6
8 KAIG3-RFI-CO-S-3447-00 Crescent 3/2/21 Concreting of Pile Cap (Foundation) 187, 188, 193 & 194 (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 28-27194 10
9 KAIG3-RFI-CO-S-3470-00 Crescent - North Admin 3/2/21 Concreting of 6 Internal Foundation in Zone 2Q (North Admin) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27195 10
23 KAIG3-RFI-CO-S-3452-00 Crescent 2 3/3/21 Application of Protection layer of Geotextile Sheet & Screed for Below Foundation of MCPE 3 Zone 2E as Highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27220 10 PASSED
24 KAIG3-RFI-CO-S-3483-00 Crescent 3/3/21 Concreting for 8 foundation at South Administration Building (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-27237 9
28 KAIG3-RFI-CO-S-3452-00 Crescent 2 3/3/21 Application of Protection layer of Geotextile Sheet & Screed for Below Foundation of MCPE 3 Zone 2E as Highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-27252 3
PASSED
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 109 to 116 (zone 2D) as
29 KAIG3-RFI-CO-S-2872-00 Crescent 2 3/3/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-27250 9
highlighted.
30 KAIG3-RFI-WG-S-3460-00 Water Play Garden 3/4/21 Concrete pouring for Blinding of boundary wall @ span 34, 35 & 36 at Water Garden at highlighted area in attached Drawing's. C16/20 SRC P 28-27256 10
PASSED
31 KAIG3-RFI-WG-S-3461-00 Water Play Garden 3/4/21 Concrete pouring for Blinding of boundary wall @ span 30, 32 & 33 at Water Garden at highlighted area in attached Drawing's. C16/20 SRC P 28-27257 10
kaig-qcals 71
Consultant : DAR
39 KAIG3-RFI-PA-S-3350-00 Picnic Area 3/6/21 Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-25) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16801 10
42 KAIG3-RFI-CO-S-3514-00 Crescent 3/6/21 Concreting of Pile Cap (Foundation) 189 to 192 (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-16810 10
49 KAIG3-RFI-CO-S-3510-00 Crescent 3/6/21 Concreting of Pile Cap (Foundation) 175 to 182 (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-16820 9
65 KAIG3-RFI-WG-S-3563-00 Water Play Garden 3/9/21 Concrete pouring & Shuttering of Footing for boundary wall Span 38 & 39 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27336 10
kaig-qcals 72
Consultant : DAR
73 KAIG3-RFI-CO-S-3545-00 Crescent 1 3/9/21 Concreting of Column/Butress for PC 185 Axis 02 AV / 02 2 (2nd). C32/40 62% OPC+30%FA - 220+/-20 P 28-27359 7
PASSED
74 C32/40 62% OPC+30%FA - 220+/-20 P 28-27362 4
Concrete pouring & Shuttering for Wall @ Grid 1 to 7 or (1-7/Right Side), of Boundary wall at Aviary Garden, As per Highlighted in
75 KAIG3-RFI-AG-S-3533-00 Aviary Garden 3/10/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-27372 10
attached Drawing's.
84 KAIG3-RFI-CO-S-3591-00 Crescent 3/10/21 Concreting of Strip Footing Mass Concrete at Zone 2N (Between Axis 02-AT to 02 AS, 02-AS to 02-AR) as highlighted. C16/20 SRC P 28-27399 10
88 KAIG3-RFI-CO-S-3582-00 Crescent 3/11 Concreting for 12 foundation at North Administration Building (as Highlighted) Zone 2R C32/40 62% OPC+30%FA - 160+/-40 P 29-16845 10
92 KAIG3-RFI-CO-S-3448-01 Crescent 3/11/21 Concreting of Mass Concrete for TIP Foundation at Zone 1P (as highlighted) C16/20 SRC P 29-16858 10
102 KAIG3-RFI-CO-S-3612-00 Crescent 3/11/21 Concreting of Pile Cap (Foundation) 167, 169, 171, 173 (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-16862 10
108 KAIG3-RFI-CO-S-3621-00 Crescent 3/13/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G (as Highlighted). C16/20 SRC P 28-27420 10
kaig-qcals 73
Consultant : DAR
121 KAIG3-RFI-WG-S-3607-00 Water Play Garden 3/14/21 Concrete pouring & Shuttering Footing of boundary wall Span 30 & 33 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16912 10
122 KAIG3-RFI-WG-S-3625-00 Water Play Garden 3/14/21 ete pouring & Shuttering for Footing of boundary wall Span 36 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16915 10
Inspection for Casting the Blinding Concrete under the Manhole of Foul Water (FW1 ,& FW 1-1 FW 1-2, FW 1-3, FW 1-4, FW 1-2.1,
127 KAIG3-RFI-SW-S-3614-00 Site Works 3/14/21 C16/20 SRC P 29-16932 10
FW 1-2.3) at Zone-4C as highlighted.
PASSED
128 C16/20 SRC P 29-16917 10
129 KAIG3-RFI-SG-S-3636-00 Sound & Light Garden 3/14/21 Concrete pouring for Blinding of Boundary wall (A, B, G & H) at Sound & Light Garden, At highlighted area in attached Drawing's. C16/20 SRC P 29-16939 10
PASSED
130 P 29-16936 10
131 KAIG3-RFI-CO-S-3629-00 Crescent 2 3/15/21 Protection Layer of Geotextile Sheet and 30mm Screed for Below Foundation PC 157 to 164 (zone 2L) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 29-16961 5
PASSED
132 C32/40 62% OPC+30%FA - 220+/-20 P 29-16950 10
133 KAIG3-RFI-SW-S-3584-00 Site Works 3/15/21 Inspection for Casting the Blinding Concrete under the Manhole of Foul Water(FW 9-1,FW 13 &FW 14) at Zone-4C As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16949 10
Inspection for Casting the Blinding Concrete under the Manhole of Foul Water (FW1 ,& FW 1-1 FW 1-2, FW 1-3, FW 1-4, FW 1-2.1,
134 KAIG3-RFI-SW-S-3614-00 Site Works 3/15/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-16951 10
FW 1-2.3) at Zone-4C as highlighted.
135 KAIG3-RFI-PA-S-3641-00 Picnic Area 3/15/21 Inspection of concrete pouring for the Foundation of Seating Area (1) at Zone-K (SA-14) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16952 10
136 KAIG3-RFI-PA-S-3696-00 Picnic Area 3/15/21 Inspection of concrete pouring for the Foundation of Seating Area (1) at Zone-K (SA-17) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-16966 10 PASSED
140 KAIG3-RFI-CO-S-3662-00 Crescent 3/15/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2H (as Highlighted) C16/20 SRC P 29-16964 10
146 KAIG3-RFI-WG-S-3635-00 Water Play Garden 3/15/21 Concrete pouring & Shuttering for Footing of boundary wall Span 34 & 35 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-16965 10
Crescent - Retaining
150 KAIG3-RFI-CO-S-3620-00 3/15/21 Concreting for Retaining Wall (Wall) (as Highlighted at AXIS AD TO AB). C32/40 62% OPC+30%FA - 160+/-40 P 29-16975 9
Wall
153 KAIG3-RFI-CO-S-2725-00 Crescent 1 3/15/21 Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 71 to 78 (zone 1M) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 29-16986 10
154 KAIG3-RFI-CO-S-3629-00 Crescent 2 3/15/21 Protection Layer of Geotextile Sheet and 30mm Screed for Below Foundation PC 157 to 164 (zone 2L) as highlighted. C32/40 62% OPC+30%FA - 220+/-20
155 KAIG3-RFI-CO-S-3638-00 Crescent 3/16/21 Inspection to check Shuttering & Concreting of R.C. for MCPE-3 foundation. C32/40 62% OPC+30%FA - 160+/-40 P 29-16999 10
Shuttering and Concreting of Mass Concrete Under Strip Footing at Zone 2Q (Between Axis PC 193-191-189-187, 194-192-190) as
156 KAIG3-RFI-CO-S-3664-00 Crescent 3/16/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17001 10
highlighted
kaig-qcals 74
Consultant : DAR
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 37 & 39 of Water Garden, as per highlighted Attached
168 KAIG3-RFI-WG-S-3643-01 Water Play Garden 3/17/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27462 10
Drawings.
169 KAIG3-RFI-WG-S-3642-01 Water Play Garden 3/17/21 Concrete pouring & Shuttering for Kicker (Outside) for boundary wall Span 38 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27467 10
Concrete pouring & Shuttering of Kicker (Inside) for boundary wall Span 34 & 35 of Water Garden, as per highlighted Attached
170 KAIG3-RFI-WG-S-3701-00 Water Play Garden 3/17/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17021 10
Drawings.
PASSED
171 KAIG3-RFI-WG-S-3669-00 Water Play Garden 3/17/21 Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 36 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-17022 10
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 30 & 33 of Water Garden, as per highlighted Attached
172 KAIG3-RFI-WG-S-3668-00 Water Play Garden 3/17/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17028 9
Drawings.
Concrete Pouring & Shuttering for Stiffner columns & Lintel of window at Grid (6/I-M) in Management Building, as highlighted in
173 KAIG3-RFI-MB-S-3667-00 Water Play Garden 3/17/21
attached Drawing's.
174 KAIG3-RFI-CO-S-3665-00 Crescent 3/17/21 Shuttering and Concreting of Column/Buttress for PC 183 Axis 02-AU / 02-2 (2nd) C32/40 62% OPC+30%FA - 220+/-20 P 29-17025 7
PASSED
175 C32/40 62% OPC+30%FA - 220+/-20 P 29-17036 4
176 KAIG3-RFI-CO-S-3627-00 Crescent 3/18/21 Concreting of Pile Cap (Foundation) 168 & 170 (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-17053 10
177 KAIG3-RFI-CO-S-3684-00 Crescent 3/18/21 Shuttering and Concreting of Pile Cap (Foundation) 172 & 174 (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-17054 10
Shuttering and Concreting of Mass Concrete Under Strip Footing at Zone 2Q (Between Axis PC 193-191-189-187, 194-192-190) as
182 KAIG3-RFI-CO-S-3664-00 Crescent 3/18/21 C16/20 SRC P 29-17072 10
highlighted
183 KAIG3-RFI-CO-S-3674-00 Crescent 3/18/21 Application of Anti Termite Under 10 internal Foundation Plain Concrete at Zone 2Q (as Highlighted). C16/20 SRC P 29-17074 10
192 KAIG3-RFI-SG-S-3719-00 Sound & Light Garden 3/20/21 Concrete pouring for Blinding of Boundary wall (C, D, E, F & I) at Sound & Light Garden, At highlighted area in attached Drawing's. C16/20 SRC P 29-17111 10
195 KAIG3-RFI-CO-S-3621-00 Crescent 3/20/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G (as Highlighted). C16/20 SRC P 29-17121 10
198 KAIG3-RFI-CO-S-3678-00 Crescent 3/20/21 Protection Layer of Geo-Textile and Screed Under Strip Footing for TIP (Zone 1P). C32/40 62% OPC+30%FA - 220+/-20 P 29-17127 5 PASSED
199 KAIG3-RFI-CO-S-3662-00 Crescent 3/21/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2H (as Highlighted) C16/20 SRC P 29-17157 10
200 KAIG3-RFI-CO-S-3745-00 Crescent 3/21/21 Shuttering and Concreting of Plain Concrete Under 5 internal Foundation Plain Concrete at Zone 2C (as Highlighted) C16/20 SRC P 29-17159 10
PASSED
201 C16/20 SRC P 29-17162 10
Concrete Pouring & Shuttering for Wall @ Grid 7 to 12 or (6-11/Right Side), of Boundary wall at Aviary Garden, As per Highlighted in
203 KAIG3-RFI-AG-S-3731-00 Aviary Garden 3/21/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-17165 10
attached Drawing's.
209 KAIG3-RFI-PA-S-3803-00 Picnic Area 3/22/21 Inspection of concrete pouring for the Wall of Seating Area (1) at Zone-K (SA-17) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27482 10
PASSED
210 C32/40 62% OPC+30%FA - 160+/-40 P 28-27483 10
kaig-qcals 75
Consultant : DAR
213 KAIG3-RFI-WG-S-3736-00 Water Play Garden 3/22/21 Concrete pouring & Shuttering of Kicker (Outside) for boundary wall Span 37 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27500 10
219 KAIG3-RFI-CO-S-3741-00 Crescent 3/23/21 Concreting of Strip Footing in Zone 2N Between axis 02-2, 02-AT to 02-AR (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 29-17202 10
231 KAIG3-RFI-CO-S-3780-00 Crescent 3/24/21 Protection layer of Geo-textile sheet and Screed of Slab (Mid) for Tunnel 1 (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-27545 10
232 KAIG3-RFI-CO-S-3781-00 Crescent 3/24/21 Protection layer of Geo-textile sheet and Screed of Slab (Near MCPE) for Tunnel 1 (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-27548 10
PASSED
233 C32/40 62% OPC+30%FA - 220+/-20 P 28-27550 10
235 KAIG3-RFI-CO-S-3765-00 Crescent 3/24/21 Shuttering and Concreting for 2 Foundation of Internal Bldg. in Zone 2Q ( as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 28-27558 10
236 KAIG3-RFI-CO-S-3794-00 Crescent 3/24/21 Shuttering and Concreting for 5 internal Foundation at Zone 2C (as Highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 28-27559 10 PASSED
238 KAIG3-RFI-WG-S-3796-00 Water Play Garden 3/25/21 Concrete Pouring & Shuttering for wall of Span 38 & 39 for boundary wall of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27585 10
239 KAIG3-RFI-WG-S-3798-00 Water Play Garden 3/25/21 Concrete pouring for Blinding of boundary wall Span 26, 27, 28 & 29 of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27586 10
244 KAIG3-RFI-CO-S-3799-00 Crescent 3/25/21 Shuttering For 1st Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as Highlighted) Between Axis 02-1, 02-G to 02-J. C16/20 SRC P 28-27602 10
249 KAIG3-RFI-MB-S-3759-00 Management Building 4/25/21 Concrete Pouring for Thickening of Slab at Grid (6/A-E) in Management Building, as highlighted in attached Drawing's. C16/20 SRC P 28-27607 10
PASSED
250 C16/20 SRC P 28-27612 10
251 KAIG3-RFI-TB-S-3733-00 Ticket Booth Canopy 4/25/21 Concrete Pouring & Shuttering for Pedestal (Column's 03 no's @ Grids A / 3, 4 & 5) for foundation of Ticket Booths Canopy. C32/40 62% OPC+30%FA - 160+/-40 P 28-27614 3 PASSED
252 KAIG3-RFI-CO-S-3842-00 Crescent 4/28/21 Protection layer of Geo-textile sheet and 50mm Screed above blinding of Tunnel 2 (as Highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 28-27622 10
PASSED
253 C32/40 62% OPC+30%FA - 220+/-20 P 28-27632 8
254 KAIG3-RFI-PA-S-3856-00 Picnic Area 4/28/21 Inspection of concrete pouring for the Wall of Seating Area (1) at Zone-K (SA-14) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-27630 10
kaig-qcals 76
Consultant : DAR
266 KAIG3-RFI-CO-S-3810-00 Crescent 3/28/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted) C16/20 SRC P 28-27664 10
Concrete pouring for Blinding of Seat wall (B, D, E & F) & Light wall (A to H) at Sound & Light Garden at highlighted area in attached
280 KAIG3-RFI-SG-S-3839-00 Sound & Light Garden 3/29/21 C16/20 SRC P 28-27680 10
drawings.
Concrete pouring & Shuttering for Wall @ Grid 24 to 30 or (21-23/Left Side & 23/Right Side), of Boundary wall at Aviary Garden, As
283 KAIG3-RFI-AG-S-3832-00 Aviary Garden 3/29/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-27693 10
per Highlighted in attached Drawing's.
290 KAIG3-RFI-CO-S-3808-00 Crescent 3/30/21 Shuttering and Concreting for Strip Footing at TIP Zone 1P (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-27715 10
294 KAIG3-RFI-SW-S-3880-00 Picnic Area 3/30/21 Inspection for Concrete Benching Manhole for Storm Water No # (MH-B-03 & MH-B 02)at Zone-1 as highted in drawing. C16/20 SRC P 28-27719 8 PASSED
295 KAIG3-RFI-WG-S-3820-00 Water Play Garden 3/30/21 Concrete Pouring & Shuttering for wall of Span 33 & 34 for boundary wall of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27741 10
299 KAIG3-RFI-CO-S-3876-00 Crescent Retaining Wall 3/31/21 Steel Reinforcement for Retaining wall (wall) At Axis AB to Z (as Highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 28-27772 8
PASSED
300 C32/40 62% OPC+30%FA - 220+/-20 P 28-27784 5
301 KAIG3-RFI-WG-S-3852-00 Water Play Garden 3/31/21 Concrete Pouring & Shuttering for wall of Span 35, 36 & 37 for boundary wall of Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27785 10
kaig-qcals 77
Consultant : DAR
C05 OPC 77
QC DC QC Manager
kaig-qcals 78
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
1 KAIG3-RFI-CO-S-3810-00 Crescent 4/1/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted) C16/20 SRC P 28-27813 9
PASSED
2 C16/20 SRC P 28-27814 6
3 KAIG3-RFI-CO-S-3855-00 Crescent 4/1/21 Shuttering and Concreting for Blinding of Internal Buildings at Zone 2Q & 2R (as Highlighted) C16/20 SRC P 28-27827 8
PASSED
4 C16/20 SRC P 28-27832 5
Shuttering and Concreting For 2nd Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as highlighted) between PC 104 to 110
5 KAIG3-RFI-CO-S-3858-00 Crescent 4/3/21 C16/20 SRC P 28-27848 10
Axis 02-1, 02-G to 02-J.
PASSED
6 C16/20 SRC P 28-27853 10
7 KAIG3-RFI-WG-S-3867-00 Water Play Garden 4/3/21 Concrete pouring & Shuttering of Footing of Span 28 & 29 for boundary wall of Water Garden, as per highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27849 10
Shuttering and Concreting For 2nd Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as highlighted) between PC 104 to 110
12 KAIG3-RFI-CO-S-3858-00 Crescent 4/3/21 C16/20 SRC P 28-27860 10
Axis 02-1, 02-G to 02-J.
Concrete pouring of Blinding of Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along the Retaining wall @ Jetty 1 at Boat Garden at
15 KAIG3-RFI-WG-S-3868-00 Water Play Garden 4/3/21 C16/20 SRC P 28-27866 10
highlighted area in attached drawing's.
PASSED
Concrete pouring of Blinding of Columns at Grid (5/3 & 3') (5/4 & 4') & (5/A, B, C, D & E) along the Retaining wall @ Jetty 2 at Boat
16 KAIG3-RFI-WG-S-3869-00 Water Play Garden 4/3/21
Garden at highlighted area in attached drawings.
17 KAIG3-RFI-CO-S-3870-00 Crescent 4/4/21 Protection layer of Geotextile and Screed for Under foundation of MCPE 2E & 2F (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-27877 10
21 KAIG3-RFI-WG-S-3878-00 Water Play Garden 4/4/21 Concrete Pouring & Shuttering for Wall of Span 30 for boundary wall of Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-27891 10
KAIG3-RFI-MC-S-3901-00 Crescent MCPE 4/5/21 Shuttering and Concreting of embossed Blinding for MCPE Foundation at Zone 2J, 2K (as highlighted). C16/20 SRC P 28-27906 10
kaig-qcals 79
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
25 KAIG3-RFI-WG-S-3819-00 Water Play Garden 4/6/21 Concrete pouring for Blinding of boundary wall Span 40, 41 & 42 of Water Garden, as per highlighted Attached Drawings. C16/20 SRC P 29-17287 10
26 KAIG3-RFI-SG-S-3883-00 Sound & Light Garden 4/6/21 Concrete pouring for Blinding of Light wall (G & F) at Sound & Light Garden, At highlighted area in attached Drawing's. C16/20 SRC P 29-17289 10 PASSED
KAIG3-RFI-CO-S-3810-00 Crescent 4/6/21 Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted) C16/20 SRC P 29-17282 8 PASSED
Concrete Pouring & Shuttering for Footing of Boundary wall (C, D, E, F & I) at Sound & Light Garden, At highlighted area in attached
28 KAIG3-RFI-SG-S-3898-00 Sound & Light Garden 4/7/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27934 10
drawing's.
37 KAIG3-RFI-CO-S-3890-00 Crescent 4/8/21 Concreting for Buttress BIV 115 top of PC to Bottom of Ring beam. C32/40 62% OPC+30%FA - 220+/-20 P 28-27963 10
kaig-qcals 80
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENG
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
Sl41
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-27987 QUANTITY
8.5
LOCATION CASTING No.
(m³)
43 KAIG3-RFI-WG-S-3893-00 Water Play Garden 4/8/21 Concrete Pouring & Shuttering for Footings of Span 26 & 27 for boundary wall of Water Garden as per highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-27969 10
Concrete pouring & Shuttering of Kicker (Inside) of Span 28 & 29 for boundary wall of Water Garden, as per highlighted attached
44 KAIG3-RFI-WG-S-3891-00 Water Play Garden 4/8/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27970 10
drawings.
Solvent Base Primer prior to waterproofing membrane for Foundation of Boundary wall (Inner Face) @ Grid (1-11/Right Side) at Aviary
45 KAIG3-RFI-AG-S-3896-00 Aviary Garden 4/8/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-27971 10
Garden as per highlighted in attached drawing's.
59 KAIG3-RFI-MC-S-3922-00 Crescent MCPE 4/8/21 Protection Layer of Geotextile sheet and Screed Protection 50mm thk for MCPE 2 Zone 2G (as highlighted) Axis 02-X to 02-Z. C16/20 SRC P 28-27980 10
60 KAIG3-RFI-MC-S-3901-00 Crescent MCPE 4/8/21 Shuttering and Concreting of embossed Blinding for MCPE Foundation at Zone 2J, 2K (as highlighted). C16/20 SRC P 28-27981 10
kaig-qcals 81
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
KAIG3-RFI-MC-S-3922-00 Crescent MCPE 4/11/21 Protection Layer of Geotextile sheet and Screed Protection 50mm thk for MCPE 2 Zone 2G (as highlighted) Axis 02-X to 02-Z. C32/40 62% OPC+30%FA - 220+/-20 P 28-28091 7 PASSED
Concrete Pouring & Shuttering for Kicker (Outside) of Span 26 & 28 and Kicker (Inside) of Span 27 for boundary wall of Water Garden
71 KAIG3-RFI-WG-S-3933-00 Water Play Garden 4/12/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17344 10
as per highlighted attached Drawings.
Concrete Pouring & Shuttering for Kicker (Outside) of Boundary wall (A, B & G) and Kicker (Inside & Outside) of Boundary wall (C,
72 KAIG3-RFI-SG-S-3930-00 Sound & Light Garden 4/12/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17345 10
D, H & I) at Sound & Light Garden at highlighted area in attached drawings.
79 KAIG3-RFI-CO-S-3770-01 Crescent 4/12/21 Protection Layer of Geo-textile Sheet and Screed under PC 17, 23 to 32 Zone 1E 1D & 1C (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 29-17359 6
PASSED
80 C32/40 62% OPC+30%FA - 220+/-20 P 29-17372 3
81 KAIG3-RFI-WG-S-3941-00 Water Play Garden 4/12/21 Concrete pouring for Blinding of boundary wall at Span 43, 44, 45 & 46 of Water Garden, as per highlighted attached drawings. C16/20 SRC P 29-17368 10
PASSED
82 C16/20 SRC P 29-17375 10
83 KAIG3-RFI-CO-S-3906-00 Crescent 4/12/21 Concreting for Buttress BOV 113 top of PC to Bottom of Ring beam. C32/40 62% OPC+30%FA - 160+/-40 P 29-17378 10
86 KAIG3-RFI-CO-S-3770-01 Crescent 4/12/21 Protection Layer of Geo-textile Sheet and Screed under PC 17, 23 to 32 Zone 1E 1D & 1C (as Highlighted). C32/40 62% OPC+30%FA - 220+/-20 P 28-28108 10 PASSED
KAIG3-RFI-CO-S-3924-00 Crescent Retaining Wall 4/13/21 Shuttering and Concreting for Retaining wall (wall) At Axis AB to Z (as highlighted). C32/40 62% OPC+30%FA - 160+/-40 P 28-28113 9
87 KAIG3-RFI-TB-S-3971-00 New Ticket Booth 1 & 2 4/14/21 Concrete pouring & shuttering of Pedestal Beam (Kicker) for New Ticket booths # 1A & 2A as per highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28129 10
88 KAIG3-RFI-TB-S-3973-00 Ticket Booth Canopy 4/14/21 Concrete pouring and Shuttering for Pedestal Column's (03 no's @ Grids A / 6, 7 & 8) & with Anchor Bolts at Ticket Booths Canopy. C32/40 62% OPC+30%FA - 160+/-40 P 28-28130 10 PASSED
Concrete Pouring & Shuttering for Kicker (Inside & Outside) of Boundary wall (E) and Kicker (Inside-2) & (Outside) of Boundary wall
89 KAIG3-RFI-SG-S-3943-00 Sound & Light Garden 4/14/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28143 10
(F) at Sound & Light Garden at highlighted area in attached drawing's.
kaig-qcals 82
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
kaig-qcals 83
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
100 KAIG3-RFI-PA-S-3982-00 Picnic Area 4/15/21 Concrete Surface Preperation prior to start the Waterproofing at Seating Area (1) at Zone-K (SA-14) as highlighted. C16/20 SRC P 28-28192 10 PASSED
101 KAIG3-RFI-CO-S-3957-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as highlighted. C32/40 62% OPC+30%FA - 220+/-20 P 28-28210 10
PASSED
102 KAIG3-RFI-CO-S-3960-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as highlighted.
103 KAIG3-RFI-CO-S-3957-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-28214 10
104 KAIG3-RFI-CO-S-3960-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-28215 10
109 KAIG3-RFI-CO-S-3957-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as highlighted. C16/20 SRC P 28-28220 3
PASSED
110 KAIG3-RFI-CO-S-3960-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as highlighted.
KAIG3-RFI-CO-S-3957-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-28199 8
PASSED
KAIG3-RFI-CO-S-3960-00 Crescent 2 4/17/21 Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 28-28200 8
111 KAIG3-RFI-CO-S-3993-00 Crescent 2 4/18/21 Shuttering and Concreting of Strip Footing Foundation at Zone 2Q. C32/40 62% OPC+30%FA - 160+/-40 P 28-28222 10
PASSED
112 P 28-28223 10
113 KAIG3-RFI-MC-S-3945-01 Crescent MCPE 4/19/21 Protection layer of geo-textile sheet and 50mm thk screed for MCPE 2 Zone 2H (as highlighted) Axis 02-Z to 02-AB. C32/40 62% OPC+30%FA - 220+/-20 P 28-28226 10
kaig-qcals 84
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
PASSED
119 KAIG3-RFI-CO-S-3977-01 Crescent 4/20/21 Shuttering and Concreting of Pile Cap (Foundation) 109 (as highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28241 10
120 KAIG3-RFI-CO-S-4009-00 Crescent 4/20/21 Shuttering and Concreting of Pile Cap (Foundation) 160, 162, 164 (as Highlighted) Zone 2L C32/40 62% OPC+30%FA - 160+/-40 P 28-28242 10
121 KAIG3-RFI-CO-S-4024-01 Crescent 4/20/21 Shuttering and Concreting of Pile Cap (Foundation) 112 (as highlighted) Zone 2D. C32/40 62% OPC+30%FA - 160+/-40 P 28-28243 10
122 KAIG3-RFI-CO-S-4053-00 Crescent 4/20/21 Shuttering and Concreting of Pile Cap (Foundation) 114 (as Highlighted) Zone 2D C32/40 62% OPC+30%FA - 160+/-40 P 28-28244 10
132 KAIG3-RFI-WG-S-4014-00 Water Play Garden 4/20/21 Concrete pouring & Shuttering for Footing of boundary wall at Span 40, 41 & 42 of Water Garden, as per highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28247 10
Concrete pouring & Shuttering of Kicker (Inside) of Span 26 and Kicker (Outside) of Span 27 for boundary wall of Water Garden, as per
133 KAIG3-RFI-WG-S-4021-00 Water Play Garden 4/20/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28248 10
highlighted attached drawings.
137 KAIG3-RFI-CO-S-3994-01 Crescent 2 4/20/21 Steel Reinforcement of BII-BIV 122 (as Highlighted) Zone 2Q. C32/40 62% OPC+30%FA - 220+/-20 P 28-28269 8 PASSED
138 KAIG3-RFI-SG-S-4022-00 Sound & Light Garden 4/21/21 Concrete pouring & Shuttering of Wall (H) of Boundary wall at Sound & Light Garden at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28293 10
Concrete Pouring & Shuttering for footings of Light Wall (A, B, G & F) at Sound & Light Garden at highlighted area in attached
139 KAIG3-RFI-SG-S-4041-00 Sound & Light Garden 4/21/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28297 10
drawings.
PASSED
140 C32/40 62% OPC+30%FA - 160+/-40 P 28-28298 10
142 KAIG3-RFI-CO-S-4026-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 110 (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28309 10
143 KAIG3-RFI-CO-S-4029-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 106 (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28310 10
144 KAIG3-RFI-CO-S-4031-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 108 (as highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28313 10
145 KAIG3-RFI-CO-S-4033-00 Crescent 4/22/21 Shuttering and Concreting of Pile Cap (Foundation) 159 (as highlighted) Zone 2L. C32/40 62% OPC+30%FA - 160+/-40 P 28-28317 10
kaig-qcals 85
PASSED
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
154 KAIG3-RFI-SG-S-4040-00 Sound & Light Garden 4/22/21 Concrete Pouring & Shuttering for Kicker (Inside) of Boundary wall (F) at Sound & Light Garden at highlighted attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28315 10
Concrete pouring & Shuttering for Footings of boundary wall at Span 43, 44, 45 & 46 of Water Garden, as per highlighted Attached
155 KAIG3-RFI-WG-S-4048-00 Water Play Garden 4/22/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28316 10
Drawings.
Concrete pouring & Shuttering for Kicker (Inside) of Boundary wall (A & G) at Sound & Light Garden, at D4184highlighted area in
156 KAIG3-RFI-SG-S-4050-00 Sound & Light Garden 4/22/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28318 10
attached drawing's.
164 KAIG3-RFI-WG-S-4049-00 Water Play Garden 4/24/21 Concrete pouring & Shuttering of Wall at Span 28 & 29 of boundary wall of Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-28359 10
KAIG3-RFI-MC-S-4065-00 Crescent 4/25/21 Concreting of Blinding for MCPE (small area) as highlighted in Zone 2J C16/20 SRC P 28-28388 10 PASSED
169 KAIG3-RFI-WG-S-4047-00 Water Play Garden 4/25/21 Concrete pouring & Shuttering of Footings for boundary wall at Span 48 & 49 of Water Garden, as per highlighted Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-28373 10
173 KAIG3-RFI-SG-S-4058-00 Sound & Light Garden 4/25/21 Concrete pouring & Shuttering for Wall of Boundary wall (B) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-28382 7
PASSED
kaig-qcals 86
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
kaig-qcals 87
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
179 KAIG3-RFI-SW-C-0360-00 Site Works 4/26/21 C16/20 SRC P 28-28407 10 PASSED
PIECE - MH-B-04 (As Highlighted)
180 KAIG3-RFI-CO-S-4082-01 Crescent 4/26/21 Shuttering and Concreting of Pile Cap (Foundation) 165 & 166 (as Highlighted) Zone 2L. C32/40 62% OPC+30%FA - 160+/-40 P 28-28412 10
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall at Span 43, 44, 45 & 46 of Water Garden as per highlighted
184 KAIG3-RFI-WG-S-4073-00 Water Play Garden 4/27/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28416 10
attached drawings.
185 KAIG3-RFI-SG-S-4074-00 Sound & Light Garden 4/27/21 Concrete pouring & Shuttering for Wall of Boundary wall (C) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 28-28417 10
189 KAIG3-RFI-WG-S-4085-00 Water Play Garden 4/27/21 Concrete pouring & Shuttering for Footing of boundary wall at Span 41 & 42 @ Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-28437 10
192 KAIG3-RFI-CO-S-4063-00 Crescent 4/28/21 Shuttering and Concreting for Buttress BIV 113 top of PC to Bottom of Ring beam C32/40 62% OPC+30%FA - 220+/-20 P 28-28456 8 PASSED
193 KAIG3-RFI-CO-S-4024-01 Crescent 4/28/21 Shuttering and Concreting of Pile Cap (Foundation) 112 (as highlighted) Zone 2D. C32/40 62% OPC+30%FA - 160+/-40 P 28-28457 10
194 KAIG3-RFI-CO-S-4055-00 Crescent 4/28/21 Shuttering and Concreting of Strip Footing (as Highlighted) Zone 2Q. C32/40 62% OPC+30%FA - 160+/-40 P 28-28460 10
195 KAIG3-RFI-CO-S-4080-00 Crescent 4/28/21 Shuttering and Concreting of Pile Cap (Foundation) 116 (as Highlighted) Zone 2D. C32/40 62% OPC+30%FA - 160+/-40 P 28-28465 10
PASSED
196 C32/40 62% OPC+30%FA - 160+/-40 P 28-28466 10
Concrete pouring & Shuttering for Kicker (Inside) at Span 48 and Kicker (Outside) at Span 49 of boundary wall of Water Garden, as per
199 KAIG3-RFI-WG-S-4081-01 Water Play Garden 4/29/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28475 8
highlighted Attached Drawings.
PASSED
200 C32/40 62% OPC+30%FA - 160+/-40 P 28-28476 7
201 KAIG3-RFI-WG-S-4089-00 Water Play Garden 4/29/21 Concrete pouring & Shuttering for Wall at Span 26 & 27 of boundary wall @ Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-28480 10
kaig-qcals 88
Consultant : DAR RUN DATE: February 12, 2023
Main Contractor: ZHBG
C05 OPC 63
kaig-qcals 89
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 90
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 91
February 12, 2023
PASSED
TE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
PASSED
PASSED
kaig-qcals 92
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 93
February 12, 2023
PASSED
kaig-qcals 94
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 95
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 96
PASSED
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 97
February 12, 2023
PASSED
kaig-qcals 98
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 99
Consultant : DAR
1 KAIG3-RFI-CO-S-4094-00 Crescent 5/2/21 Shuttering and Concreting of Pile Cap (Foundation) 103 (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28559 8
Concrete pouring & Shuttering for Kickers of Light wall (A, B, C, D, E, F, G & H) at Sound & Light Garden at highlighted area in
4 KAIG3-RFI-SG-S-4059-01 Sound & Light Garden 5/2/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28544 10
attached drawings.
Concrete pouring & Shuttering for Kicker (Outside) of boundary wall at Span 43, 44, 45 & 46 of Water Garden, as per highlighted
7 KAIG3-RFI-WG-S-4106-00 Water Play Garden 5/2/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28531 10
attached drawings.
Concrete pouring & Shuttering for Kicker (Outside) at Span 48 and Kicker (Inside) at Span 49 of boundary wall of Water Garden, as per
8 KAIG3-RFI-WG-S-4112-00 Water Play Garden 5/2/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28532 10 PASSED
highlighted Attached Drawings.
10 KAIG3-RFI-SG-S-4114-00 Sound & Light Garden 5/3/21 Concrete pouring & Shuttering of Walls for Boundary wall (D & E) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-28571 10
17 KAIG3-RFI-CO-S-4111-00 Crescent 5/3/21 Shuttering and Concreting of Pile Cap (Foundation) 16 & 18 (as Highlighted) Zone 1C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28573 10
22 KAIG3-RFI-CO-S-4062-00 Crescent 5/4/21 Shuttering and Concreting for Buttress BII 115 top of PC to Bottom of Ring beam C32/40 62% OPC+30%FA - 220+/-20 P 28-28593 10 PASSED
23 KAIG3-RFI-CO-S-4123-00 Crescent 5/4/21 Shuttering and Concreting of Pile Cap (Foundation) 153, 154, 155, 157 (as Highlighted) Zone 2K C32/40 62% OPC+30%FA - 160+/-40 P 28-28594 10
kaig-qcals 100
Consultant : DAR
29 KAIG3-RFI-CO-S-4126-00 Crescent 5/4/21 Shuttering and Concreting of Pile Cap 104 at Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 28-28611 10
PASSED
30 C32/40 62% OPC+30%FA - 160+/-40 P 28-28612 10
31 KAIG3-RFI-SG-S-4115-00 Sound & Light Garden 5/5/21 Concrete pouring & Shuttering of Wall for Boundary wall (G) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-28623 10
PASSED
32 C32/40 67%OPC+25%FA - 160+/-40 P 28-28624 9
33 KAIG3-RFI-TB-S-4130-00 Ticket Booth Canopy 5/5/21 Primer coat Prior to Damp Proofing for Pedestal (Column's Surround) (06 no's @ Grids A / 3, 4, 5, 6, 7 & 8) at Ticket Booths Canopy. C32/40 62% OPC+30%FA - 160+/-40 P 28-28628 10
37 KAIG3-RFI-CO-S-4119-00 Crescent 5/8/21 Shuttering and concreting of 3rd layer mass concrete for Strip Footing Between PC 110-108, 108-106 (as Highlighted) Zone 2C. C16/20 SRC P 29-17393 9
43 KAIG3-RFI-SW-C-0369 -00 Site Works 5/8/21 Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW6-2, FW6-3) (as highlighted). C16/20 SRC P 29-17398 9
44 KAIG3-RFI-SW-C-0375-00 Site Works 5/8/21 Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW1, FW1-3.1) (As Highlighted).
PASSED
45 KAIG3-RFI-SW-C-0378-00 Site Works 5/8/21 Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW1-3.2, FW7) (as highlighted).
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW5, FW6, FW8, FW9-1) (as
46 KAIG3-RFI-SW-C-0389-00 Site Works 5/8/21
highlighted).
47 KAIG3-RFI-CO-S-4181-00 Crescent 5/8/21 Geotextile Sheet and 30mm thk Screed for PC-91, 92, 93, 94, 95, 96 (as highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17404 4 PASSED
48 KAIG3-RFI-CO-S-4147-00 Crescent 5/9/21 Shuttering and Concreting for PC 13 & 14 As Highlighted) Zone 1C. C32/40 62% OPC+30%FA - 160+/-40 P 29-17415 10
52 KAIG3-RFI-WG-S-4165-00 Water Play Garden 5/9/21 Concrete pouring & Shuttering of Wall at Span 43, 44 & 45 for boundary wall of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-17421 10
kaig-qcals PASSED
101
Consultant : DAR
Protection Screed 50mm on Blinding Under Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along the Retaining wall @ Jetty # 1 at
57 KAIG3-RFI-WG-S-4173-00 Water Play Garden 5/9/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-17436 3
Boat Garden at highlighted area in attached drawings.
PASSED
Protection Screed 50mm on Blinding Under Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) along the Retaining
58 KAIG3-RFI-WG-S-4174-00 Water Play Garden 5/9/21
wall @ Jetty 2 atat Boat Garden at highlighted area in attached drawings.
Concrete pouring & Shuttering of Kicker (Outside) of Span 41 and Kicker (Inside) of span 42 for boundary wall of Water Garden, as per
59 KAIG3-RFI-WG-S-4176-00 Water Play Garden 5/10/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17444 10
highlighted attached drawings.
PASSED
Concrete pouring & Shuttering of Kicker (Outside) of Span 40 for boundary wall of Water Garden, as per highlighted Attached
60 KAIG3-RFI-WG-S-4188-00 Water Play Garden 5/10/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17447 10
Drawings.
61 KAIG3-RFI-SG-S-4178-00 Sound & Light Garden 5/10/21 Concrete Pouring & Shuttering for Wall of Boundary wall (A) at Sound & Light Garden at highlighted area in attached drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 29-17456 10
64 KAIG3-RFI-CO-S-4180-00 Crescent 5/11/21 Protection layer of 4mm thk bituminous protection board for PC-91, 92, 93, 94, 95, 96 (as highlighted) Zone 2A C32/40 62% OPC+30%FA - 220+/-20 P 29-17465 5
65 KAIG3-RFI-CO-S-4202-00 Crescent 5/11/21 Protection layer of geotextile sheet and 30mm screed for Strip Footing between PC 104-106-108-110 at Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 29-17466 5
PASSED
66 C32/40 62% OPC+30%FA - 220+/-20 P 29-17469 5
Protection layer of geotextile sheet and screed protection 50mm thk above blinding for MCPE 2 Zone 2J & 2K (as Highlighted) Axis 02-
68 KAIG3-RFI-MC-S-4008-02 Crescent MCPE 5/18/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-17526 7
AH to 02-AC
Protection layer of geotextile sheet and screed protection 50mm thk above blinding for MCPE 2 Zone 2J & 2K (as Highlighted) Axis 02-
71 KAIG3-RFI-MC-S-4008-02 Crescent MCPE 5/18/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-17521 3 PASSED
AH to 02-AC
Notification to Start Removal of Disposal Materials between the 2 Retaining walls as per the Highlighted Area & Attached Survey
72 KAIG3-RFI-SW-C-0401-00 Site Works 5/19/21 C16/20 SRC P 29-17540 6
Report.
PASSED
73 C16/20 SRC P 29-17553 6
Concrete Pouring & Shuttering for Walls of Light wall (A, B, C, E, F, G & H) at Sound & Light Garden, At highlighted area in attached
74 KAIG3-RFI-SG-S-4177-00 Sound & Light Garden 5/19/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-17542 10
Drawing's.
79 KAIG3-RFI-CO-S-4198-00 Crescent 5/19/21 Shuttering and Concreting of Pile Cap (Foundation) 4 (as highlighted) Zone 1A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17549 10
80 KAIG3-RFI-CO-S-4199-00 Crescent 5/19/21 Shuttering and Concreting of Pile Cap (Foundation) 8, 10, 12 (as Highlighted) Zone 1B. C32/40 62% OPC+30%FA - 160+/-40 P 29-17550 10
kaig-qcals 102
Consultant : DAR
82 KAIG3-RFI-CO-S-4200-00 Crescent 5/19/21 Shuttering and Concreting of Duct Bank under Strip Footing at TIP zone 1A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17557 10
83 KAIG3-RFI-CO-S-4206-00 Crescent 5/19/21 Shuttering and Concreting of Pile Cap (Foundation) 6 (as Highlighted) Zone 1A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17558 10
Concrete pouring & Shuttering for Kicker (Inside) of Span 40 & 41 and Kicker (Outside) of span 42 for boundary wall of Water Garden,
91 KAIG3-RFI-WG-S-4229-00 Water Play Garden 5/19/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17560 10 PASSED
as per highlighted Attached Drawings.
92 KAIG3-RFI-CO-S-4210-00 Crescent 5/19/21 Shuttering and Concreting of Strip Footing Between PC 103-105, 107-109 (as Highlighted) Zone 2C. C16/20 SRC P 29-17573 10
97 KAIG3-RFI-CO-S-4212-01 Crescent 5/20/21 Shuttering and Concreting of Mass concrete for Strip Footing Between PC 168 to 170 (as Highlighted) Zone 2M. C16/20 SRC P 29-17590 10
PASSED
98 C16/20 SRC P 29-17593 10
Inspection for Casting the Blinding Concrete under the Manhole of Foul Water (FW1 ,& FW 1-1 FW 1-2, FW 1-3, FW 1-4, FW 1-2.1,
99 KAIG3-RFI-SW-S-3614-00 Site Works 5/20/21 C16/20 SRC P 29-17594 4 PASSED
FW 1-2.3) at Zone-4C as highlighted.
100 KAIG3-RFI-CO-S-4200-00 Crescent 5/19/21 Shuttering and Concreting of Duct Bank under Strip Footing at TIP zone 1A. C32/40 62% OPC+30%FA - 220+/-20 P 29-17600 5
103 KAIG3-RFI-CO-S-4208-00 Crescent 5/20/21 Shuttering and Concreting of Pile Cap (Foundation) 97 & 98 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17614 10
104 KAIG3-RFI-CO-S-4232-00 Crescent 5/20/21 Shuttering and Concreting of Buttress BOV-114 at Zone 2N. C32/40 62% OPC+30%FA - 160+/-40 P 29-17615 10
105 KAIG3-RFI-SA-S-4236-00 Crescent 5/20/21 Shuttering and Concreting of 1 foundation Internal Building (as Highlighted) Zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 29-17616 10
kaig-qcals 103
Consultant : DAR
PASSED
Main Contractor: ZHBG RUN DATE: February 12, 2023
111 KAIG3-RFI-WG-S-4258-00 Water Play Garden 5/22/21 Concrete pouring & Shuttering for Wall at Span 48 & 49 of boundary wall of Water Garden, as per highlighted attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-17632 10
Concrete pouring & Shuttering for Footing's at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) under Columns along the Retaining wall @
112 KAIG3-RFI-WG-S-4259-00 Water Play Garden 5/22/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-17633 10
Jetty # 1 at Boat Garden at highlighted area in attached drawing's.
Concrete pouring & Shuttering for Footing's at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) under Columns along the
113 KAIG3-RFI-WG-S-4260-00 Water Play Garden 5/22/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-17634 10
Retaining wall @ Jetty 2 atat Boat Garden at highlighted area in attached drawing's.
PASSED
114 C32/40 67%OPC+25%FA - 160+/-40 P 29-17635 10
117 KAIG3-RFI-CO-S-4256-01 Crescent 5/22/21 Shuttering And Concreting of Plain Concrete Strip Footing between PC 109, 111, 113 for zone 2D. C16/20 SRC P 29-17660 10
120 KAIG3-RFI-CO-S-4231 Crescent 5/22/21 Shuttering and Concreting of Pile Cap (Foundation) 91 & 92 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17636 10
130 KAIG3-RFI-CO-S-4244-01 Crescent 5/22/21 Two layer of 4mm thick modified bituminous WP membrane of Slab at Tunnel 1 Zone 5 (as Highlighted) (Near 02/2). C32/40 62% OPC+30%FA - 160+/-40 P 29-17646 9
PASSED
Concrete pouring of Blinding for Manhole (MH-C-3-2) prior to blinding @ East Side in Aviary garden, At Highlighted in the attached
131 KAIG3-RFI-AG-S-4245-01 Crescent 5/22/21
drawing's.
132 KAIG3-RFI-CO-S-4251-00 Crescent 5/23/21 Shuttering and Concreting of Buttress BII-113 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17703 10
133 KAIG3-RFI-CO-S-4233-00 Crescent 5/23/21 Shuttering and Concreting of Buttress BII-114 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17693 10 PASSED
134 KAIG3-RFI-CO-S-4148-01 Crescent 5/23/21 Shuttering and Concreting of Buttress BII- 116 & 117 at Zone 2N and 2P. C32/40 62% OPC+30%FA - 220+/-20 P 29-17690 10
135 KAIG3-RFI-CO-S-4253-00 Crescent 5/24/21 Shuttering And Concreting of Strip Footing between PC 104, 106, 108, 110 for zone 2C. C32/40 62% OPC+30%FA - 160+/-40 P 29-17713 7
PASSED
136 C32/40 62% OPC+30%FA - 160+/-40 P 29-17712 10
137 KAIG3-RFI-CO-S-4267-00 Crescent 5/24/21 Shuttering and Concreting of Buttress BOV-116 & 117 at Zone 2N & 2P. C32/40 62% OPC+30%FA - 220+/-20 P 29-17717 10
kaig-qcals PASSED
104
Consultant : DAR
140 KAIG3-RFI-CO-S-4303-00 Crescent 5/24/21 Protection layer of geotextile sheet and 30mm screed for below Strip footing zone 2D between PC 109-111-113.
141 KAIG3-RFI-PA-C-0438-00 Picnic Area 5/25/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-30) as highlighted C16/20 SRC P 29-17731 10
PASSED
142 KAIG3-RFI-PA-C-0448-00 Picnic Area 5/25/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-35) as highlighted. C16/20 SRC P 29-17730 10
143 KAIG3-RFI-CO-S-4281-00 Crescent 5/25/21 Shuttering and Concreting of Pile Cap (Foundation) 94 & 96 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 220+/-20 P 29-17734 10
146 KAIG3-RFI-CO-S-4281-00 Crescent 5/25/21 Shuttering and Concreting of Pile Cap (Foundation) 94 & 96 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17736 10
151 KAIG3-RFI-CO-S-4303-00 Crescent 5/25/21 Protection layer of geotextile sheet and 30mm screed for below Strip footing zone 2D between PC 109-111-113. C16/20 SRC P 29-17744 9 PASSED
152 KAIG3-RFI-PA-C-0437-00 Picnic Area 5/26/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-40) as highlighted. C16/20 SRC P 29-17760 6
PASSED
153 KAIG3-RFI-SW-C-0456-00 Site Works 5/26/21 INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE - MH-B-04, G-B-01, G-B-02 (As highlighted). C16/20 SRC P 29-17778 3
154 KAIG3-RFI-CO-S-4298-00 Crescent 5/26/21 Shuttering and Concreting for Buttress BOV-115 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17769 8 PASSED
155 KAIG3-RFI-CO-S-4249-01 Crescent 5/26/21 Shuttering and Concreting of Pile Cap (Foundation) 9 & 11 (as Highlighted) Zone 1B C32/40 62% OPC+30%FA - 160+/-40 P 29-17785 10
156 KAIG3-RFI-CO-S-4286-00 Crescent 5/26/21 Shuttering and Concrerting of Pile Cap (Foundation) 3 & 5 (as Highlighted) Zone 1A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17780 10
161 KAIG3-RFI-CO-S-4284-01 Crescent 5/29/21 Shuttering and Concreting of Foundation for Tunnel 2 (Zone 2F) C32/40 62% OPC+30%FA - 160+/-40 P 29-17805 10
162 KAIG3-RFI-CO-S-4312-00 Crescent 5/29/21 Shuttering and concreting of Pile Cap (Foundation) 93 (as Highlighted) Zone 2A C32/40 62% OPC+30%FA - 160+/-40 P 29-17807 10
163 KAIG3-RFI-CO-S-4328-00 Crescent 5/29/21 Concreting of Pile Cap (Foundation) 95 (as Highlighted) Zone 2A. C32/40 62% OPC+30%FA - 160+/-40 P 29-17808 10
kaig-qcals 105
PASSED
Consultant : DAR
178 KAIG3-RFI-SW-C-0456-00 Civil 5/29/21 INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE - MH-B-04, G-B-01, G-B-02 (As Highlighted). C16/20 SRC P 29-17822 6
PASSED
Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G-A-26, G-X-8, G-X-9 (as
179 KAIG3-RFI-SW-C-0463-00 Site Works 5/29/21 C16/20 SRC P 29-17830 6
Highlighted).
180 KAIG3-RFI-AG-S-4354-00 Aviary Garden 5/29/21 Concrete Encasement for Backdrop & Short piece of Manhole (MH-C-3-2) @ Aviary garden at highlighted in the attached drawing's. C16/20 SRC P 29-17823 3 PASSED
181 KAIG3-RFI-SW-C-0473-00 Site Works 5/30/21 Inspection for casting the Concrete Encasement for the Storm Water Line From G-B-07 to G-B-09 As Highlighted. C16/20 SRC P 29-17846 7 PASSED
182 KAIG3-RFI-SW-C-0473-00 Site Works 5/31/21 Inspection for casting the Concrete Encasement for the Storm Water Line From G-B-07 to G-B-09 As Highlighted. C16/20 SRC P 29-17868 7 PASSED
Concrete pouring & Shuttering for Column's at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) along the Retaining wall @ Jetty # 1 at Boat
183 KAIG3-RFI-WG-S-4339-00 Water Play Garden 5/31/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-17865 5
Garden at highlighted area in attached Drawing's.
PASSED
Concrete pouring & Shuttering for Column's at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) along the Retaining wall @
184 KAIG3-RFI-WG-S-4340-00 Water Play Garden 5/31/21
Jetty 2 atat Boat Garden at highlighted area in attached Drawing's.
185 KAIG3-RFI-WG-S-4341-00 Water Play Garden 5/31/21 Concrete pouring & Shuttering of Wall of Span 40, 41 & 42 for boundary wall of Water Garden, as per highlighted Attached Drawings. C32/40 67%OPC+25%FA - 160+/-40 P 29-17870 10
190 KAIG3-RFI-MC-S-4346-00 Crescent MCPE 5/31/21 Protection layer of geotextile sheet and 50mm thick screed rpotection for MCPE 2 Zone 2K (as Highlighted) Axis 02-AG to 02-AH. C32/40 62% OPC+30%FA - 220+/-20 P 29-17873 10
191 KAIG3-RFI-CO-S-2785-01 Crescent 1 5/31/21 Application of Protection Layer of Geotextile Sheet and 30mm Screed Protection Under Strip Footing TIP Zone 1A. C32/40 62% OPC+30%FA - 220+/-20 P 29-17874 10
PASSED
192 C32/40 62% OPC+30%FA - 220+/-20 P 29-17876 10
194 KAIG3-RFI-CO-S-4288-01 Crescent 5/31/21 Shuttering and Concreting of Pile Cap (Foundation) 7 (as Highlighted) Zone 1B. C32/40 62% OPC+30%FA - 160+/-40 P 29-17883 10
PASSED
195 C32/40 62% OPC+30%FA - 160+/-40 P 29-17886 10
kaig-qcals 106
Consultant : DAR
kaig-qcals 107
Consultant : DAR
C05 OPC 28
QC DC QC Manager
kaig-qcals 108
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 109
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 111
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 112
PASSED
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 114
PASSED
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 115
February 12, 2023
PASSED
kaig-qcals 116
Consultant : DAR
1 KAIG3-RFI-MC-S-4360-00 Crescent 06/01/21 Shuttering for foundation of MCPE 2 Movement joint @ axis 03-G and 02-Y (as highlighted) Zone 2G. C32/40 62% OPC+30%FA - 160+/-40 P 29-17911 10
20 KAIG3-RFI-CO-S-4333-00 Crescent 06/01/21 Concreting for Strip Footing between PC 103-105-107-109 at Zone 2C. C16/20 SRC P 29-17926 4
21 KAIG3-RFI-CO-S-4337-00 Crescent 06/01/21 Protection Layer of 4mm THK Bituminous Protection Board of Pile cap foundation 167, 168, 169, 170, 171, 172, 173, 174 at zone 2M C16/20 SRC P 29-17925 5
26 KAIG3-RFI-PA-C-0514-00 Picnic Area 06/01/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-30) as highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-17919 6
PASSED
kaig-qcals 117
Consultant : DAR
28 KAIG3-RFI-PA-C-0477-00 Picnic Area 06/01/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-K (SA-16) as highlighted. C16/20 SRC P 29-17913 10 PASSED
29 KAIG3-RFI-SW-C-0522-00 Site Works 06/01/21 Inspection for casting the Concrete Encasement for the Storm Water Line From G-A-06 to Main Line (As Highlighted). C16/20 SRC P 29-17935 5
30 KAIG3-RFI-SW-C-0523-00 Site Works 06/01/21 Inspection for Casting the Blinding Concrete under the Manhole (MH-A-06) (as Highlighted). C16/20 SRC P 29-17933 10
PASSED
31 KAIG3-RFI-PA-C-0525-00 Site Works 06/01/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-L (SA-38) As Highlighted C16/20 SRC P 29-17932 10
33 KAIG3-RFI-CO-S-4315-00 Crescent 06/02/21 Concreting for Buttress BOI-113 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17934 10
PASSED
34 KAIG3-RFI-CO-S-4318-00 Crescent 06/02/21 Concreting for Buttress BOI-114 at Zone 2N. C32/40 62% OPC+30%FA - 220+/-20 P 29-17941 10
35 KAIG3-RFI-CO-S-4364-00 Crescent 06/02/21 Concreting of RC Strip Footing between PC 109, 111, 113 for zone 2D. C32/40 62% OPC+30%FA - 160+/-40 P 29-17961 10
50 KAIG3-RFI-PA-C-0521-00 Picnic Area 06/03/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-35) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-17968 9
51 KAIG3-RFI-PA-C-0532-00 Picnic Area 06/03/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-40) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-17969 9
PASSED
52 C32/40 62% OPC+30%FA - 160+/-40 P 29-17971 3
kaig-qcals 118
Consultant : DAR
KAIG3-RFI-CO-S-4353-00 Crescent 06/03/21 Concreting of Buttress BOV 123 (1st) at Zone 2Q. C16/20 SRC P 29-17978 7
57 KAIG3-RFI-CO-S-4432-00 Crescent 06/05/21 Concretingg for 2nd layer mass concrete of strip footing at zone 2D between PC 110-112 (as highlighted) C16/20 SRC P 29-18024 5
Excavation for Foul Water Line from FW-A-3-6.9 to FW-A-3-6.12 including the Manhole FW-A-3-6.9, FW-A-3-6.10, FW-A-3-6.11,
66 KAIG3-RFI-SW-C-0565-00 Site Works 06/06/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18025 7
FW-A-3-6.12 prior to start Gravel Bedding (as Highlighted).
PASSED
67 C32/40 62% OPC+30%FA - 160+/-40 P 29-18026 5
68 KAIG3-RFI-CO-S-4550-00 Crescent 06/06/21 Shuttering for BUTRESS BIV 109 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18028 6
71 KAIG3-RFI-PA-C-0524-00 Picnic Area 06/06/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-26) As Highlighted. C16/20 SRC P 29-18030 6 PASSED
72 KAIG3-RFI-CO-S-4544-01 Crescent 06/07/21 Protection layer of geotextile sheet and 50mm screed protection under strip footing between PC 8-10-12-14 at Zone 1B C32/40 62% OPC+30%FA - 160+/-40 P 29-18078 8
PASSED
73 C32/40 62% OPC+30%FA - 160+/-40 P 29-18083 4
Inspection for casting the Concrete Encasement for the Storm Water Line from G-B-07 to MH-B-02 as per the Highlighted area in the
74 KAIG3-RFI-SW-C-0548-00 Site Works 06/07/21 C16/20 SRC P 29-18082 8
attached Drawing
75 KAIG3-RFI-PA-C-0519-01 Picnic Area 06/07/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted C16/20 SRC P 29-18084 4
76 KAIG3-RFI-PA-C-0519-01 Picnic Area 06/07/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted C16/20 SRC P 29-18087 4 PASSED
77 KAIG3-RFI-CO-S-4348-00 Crescent 06/07/21 Concreting of Buttress BII-BIV 120 and 121 (2nd) at Zone 2Q & 2P. C32/40 62% OPC+30%FA - 220+/-20 P 29-18089 5 PASSED
kaig-qcals 119
Consultant : DAR
PASSED
kaig-qcals 120
Consultant : DAR
83 KAIG3-RFI-CO-S-4452-00 Crescent 06/08/21 Concreting of Mass concrete for Strip footing at zone 1B Between PC 8-10-12-14. C16/20 SRC P 29-18121 4
88 KAIG3-RFI-CO-S-4479-00 Crescent 06/09/21 Concreting of blinding for ETFE Foundation (Mock Up) C32/40 62% OPC+30%FA - 220+/-20 P 29-18152 10
93 KAIG3-RFI-PA-C-0569-00 Picnic Area 06/09/21 Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-K (SA-16) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18149 6
94 KAIG3-RFI-PA-C-0570-00 Picnic Area 06/09/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-L (SA-38) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18146 10
PASSED
95 C32/40 62% OPC+30%FA - 160+/-40 P 29-18145 10
97 KAIG3-RFI-PA-C-0519-01 Picnic Area 06/09/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted C16/20 SRC P 29-18169 8
KAIG3-RFI-PA-C-0578-00 Picnic Area 06/09/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted C16/20 SRC P 29-18201 10
PASSED
C16/20 SRC P 29-18158 7
98
99 KAIG3-RFI-PA-C-0579-00 Picnic Area 06/12/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-26) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18194 8
100 KAIG3-RFI-PA-C-0588-00 Picnic Area 06/12/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-34) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-18190 6 PASSED
kaig-qcals 121
Consultant : DAR
106 KAIG3-RFI-CO-S-4455-00 Crescent 06/12/21 Concreting for 3rd layer mass concrete of strip footing at zone 2D between PC 110-112 (as highlighted). C16/20 SRC P 29-18193 9 PASSED
107 KAIG3-RFI-CO-S-4470-00 Crescent 06/13/21 Concreting for Pile cap 20 Zone 1C C32/40 62% OPC+30%FA - 160+/-40 P 29-18212 10
108 KAIG3-RFI-CO-S-4483-00 Crescent 06/13/21 Concreting for BUTTRESS BII-BIV 64 (1st) Zone 2B C32/40 62% OPC+30%FA - 160+/-40 P 29-18213 10
109 KAIG3-RFI-CO-S-4493-00 Crescent 06/13/21 Concreting for Pile cap 24 Zone 1D C32/40 62% OPC+30%FA - 160+/-40 P 29-18214 10
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-X-08 to G-X-09 as per the Highlighted area in the
113 KAIG3-RFI-SW-C-0589-00 Site Works 06/14/21 C16/20 SRC P 29-18233 6
attached Drawing.
PASSED
Inspection for Casting the Concrete Encasement for the Storm Water Line from Management Building to Main Line as per the
114 KAIG3-RFI-SW-C-0590-00 Site Works 06/14/21 C16/20 SRC P 29-18237 10
Highlighted area in the attached Drawing
115 KAIG3-RFI-PA-C-0578-00 Picnic Area 06/15/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted C16/20 SRC P 29-18258 4 PASSED
116 KAIG3-RFI-PA-C-0626-00 Picnic Area 06/15/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-27) As Highlighted. C32/40 62% OPC+30%FA - 160+/-40 P 29-18260 8 PASSED
KAIG3-RFI-CO-S-4544-00 Crescent 06/15/21 Protection layer of geotextile sheet and 50mm screed protection under strip footing between PC 8-10-12-14 at Zone 1B C32/40 62% OPC+30%FA - 220+/-20 P 29-18261 10
117 KAIG3-RFI-MC-S-4520-00 Crescent MCPE 06/16/21 Concreting for MCPE foundation at AXIS 02-Z to 03-I as highlighted at zone 2G and 2H C32/40 62% OPC+30%FA - 160+/-40 P 29-18283 10
kaig-qcals 122
Consultant : DAR
kaig-qcals 123
Consultant : DAR
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI125
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 29-18275 QUANTITY
10
LOCATION CASTING No.
(m³)
126 C32/40 62% OPC+30%FA - 160+/-40 P 29-18274 10
131 KAIG3-RFI-CO-S-4393-00 Crescent 06/16/21 Protection layer of geotextile sheet and 50mm screed for tunnel 1 slab (near 02/1) zone 2H. C32/40 62% OPC+30%FA - 220+/-20 P 29-18293 10
134 KAIG3-RFI-CO-S-4526-00 Crescent 06/19/21 Concreting for Strip footing at zone 2D Between PC 112-114-116-118 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-18321 10
138 KAIG3-RFI-PA-C-0641-00 Picnic Area 06/19/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-K (SA-16) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18327 10
139 KAIG3-RFI-PA-C-0635-00 Picnic Area 06/19/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18328 8 PASSED
141 KAIG3-RFI-CO-S-4563-00 Crescent 06/19/21 Concreting for BUTRESS BII-BIV 65 (1st) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18332 10
PASSED
142 C32/40 62% OPC+30%FA - 220+/-20 P 29-18330 10
143 KAIG3-RFI-CO-S-4558-00 Crescent 06/20/21 Concreting for BUTRESS BIV 124 & 125 (2ND) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18347 9
PASSED
144 C32/40 62% OPC+30%FA - 220+/-20 P 29-18343 5
145 KAIG3-RFI-PA-C-0635-00 Picnic Area 06/21/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted C16/20 SRC P 29-18355 7
PASSED
146 C16/20 SRC P 29-18354 8
Concrete pouring & Shuttering for Footings of Seat wall (B, D, E & F) at Sound & Light Garden, At highlighted area in attached
147 KAIG3-RFI-SG-S-4541-00 Sound & Light Garden 06/21/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18362 10
Drawing's.
148 KAIG3-RFI-SG-S-4572-00 Sound & Light Garden 06/21/21 Concrete pouring & Shuttering for Kickers of Light wall (D) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 29-18361 10
Concrete pouring & Shuttering for Footing and Kicker 1st Lift @ (874.50) of Whispering Cave 2, @ Sound & Light Garden, At
149 KAIG3-RFI-SG-S-4573-00 Sound & Light Garden 06/21/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18360 10
highlighted area in attached Drawing's.
kaig-qcals 124
Consultant : DAR
kaig-qcals 125
Consultant : DAR
157 KAIG3-RFI-PA-C-0675-00 Picnic Area 06/22/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-35) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18375 8 PASSED
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-A-23 to Main Line and from G-A-24 to Main Line (as
158 KAIG3-RFI-SW-C-0634-00 Site Works 06/22/21 C16/20 SRC P 29-18378 10 PASSED
Highlighted)
159 KAIG3-RFI-PA-C-0674-00 Picnic Area 06/22/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-40) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18379 8 PASSED
160 KAIG3-RFI-CO-S-4606-00 Crescent 06/22/21 Concreting for Pile cap 117, 119, 121, 123 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 29-18402 10
Concrete pouring & Shuttering for Footing and Kicker (1st lift @ 874.10) of Whispering Cave 1, @ Sound & Light Garden, At
167 KAIG3-RFI-SG-S-4595-00 Sound & Light Garden 06/23/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18405 10
highlighted area in attached Drawing's.
Concrete Pouring for Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At Highlighted in the attached
172 KAIG3-RFI-AG-S-4540-00 Aviary Garden 06/26/21 C16/20 SRC P 29-18460 10
drawing's.
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-M (SA-10) As Highlighted (Note: This work
176 KAIG3-RFI-PA-C-0488-00 Picnic Area 06/27/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-18475 10
has been completed on March 01, 2021)
177 KAIG3-RFI-CO-S-4553-00 Crescent 06/27/21 Shuttering for BUTRESS BIV 111 & 112 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18470 10
178 KAIG3-RFI-CO-S-4591-00 Crescent 06/27/21 Concreting for Buttress BIV 106 & 107 Zone 2L & 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18465 10 PASSED
181 KAIG3-RFI-CO-S-4603-00 Crescent 06/27/21 Concreting for Pile cap 120 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 29-18479 8
182 KAIG3-RFI-CO-S-4604-00 Crescent 06/27/21 Concreting for Pile cap 118, 122 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 29-18478 10
183 KAIG3-RFI-CO-S-4605-01 Crescent 06/27/21 Concreting for Pile cap 124 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 29-18477 10
kaig-qcals 126
PASSED
Consultant : DAR
PASSED
kaig-qcals 127
Consultant : DAR
192 KAIG3-RFI-CO-S-4599-00 Crescent 06/27/21 Concreting for ETFE Foundation (Mock Up) C32/40 62% OPC+30%FA - 160+/-40 P 29-18489 3
200 KAIG3-RFI-PA-C-0683-00 Picnic Area 06/28/21 Soil Preparation prior to start backfilling for Seating Area (2) (SA-39A) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18491 10
201 KAIG3-RFI-PA-C-0693-00 Picnic Area 06/28/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-26) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18492 10
PASSED
202 KAIG3-RFI-PA-C-0710-00 Picnic Area 06/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18498 10
203 KAIG3-RFI-PA-C-0770-00 Picnic Area 06/28/21 Inspection of formwork for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18500 10
204 KAIG3-RFI-CO-S-4593-00 Crescent 06/28/21 Concreting for Buttress BOV 106 & 107 Zone 2L & 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18511 9
205 KAIG3-RFI-CO-S-4628-00 Crescent 06/28/21 Concreting for BUTTRESS BOI BOV - 122 (1st) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18507 6
PASSED
206 C32/40 62% OPC+30%FA - 220+/-20 P 29-18499 10
208 KAIG3-RFI-PA-C-0666-00 Picnic Area 06/28/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-33) As Highlighted C16/20 SRC P 29-18501 10
209 KAIG3-RFI-PA-C-0694-00 Picnic Area 06/28/21 Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted C16/20 SRC P 29-18503 10 PASSED
210 KAIG3-RFI-PA-C-0712-00 Picnic Area 06/28/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-L (SA-15) As Highlighted C16/20 SRC P 29-18509 10
211 KAIG3-RFI-CO-S-4656-00 Crescent 06/29/21 Concreting for BUTTRESS BII 108, 109, 110 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18531 3
kaig-qcals 128
Consultant : DAR
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGH
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI214
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 29-18519 QUANTITY
10
LOCATION CASTING No.
(m³)
kaig-qcals 129
Consultant : DAR
220 KAIG3-RFI-PG-S-4661-00 Physic Garden 06/29/21 Concrete pouring for Blinding under Foundation of Outer Canopy 1 & 3 at Physic Garden, as per highlighted area in attached drawings. C16/20 SRC P 29-18542 5
223 KAIG3-RFI-SG-S-4660-00 Sound & Light Garden 06/30/21 Concrete pouring & Shuttering of Walls for Seat wall (B, D, E & F) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 29-18560 5
224 KAIG3-RFI-SG-S-4662-00 Sound & Light Garden 06/30/21 Concrete pouring & Shuttering for Wall of Light wall (D) at Sound & Light Garden, At highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 29-18558 10
PASSED
Concrete pouring & Shuttering for Kicker (2nd lift) of Whispering Cave 1 & 2, @ Sound & Light Garden, At highlighted area in attached
225 KAIG3-RFI-SG-S-4663-00 Sound & Light Garden 06/30/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18556 10
Drawing's.
227 KAIG3-RFI-CO-S-4642-00 Crescent 06/30/21 Concreting for Strip footing between PC 110-112 zone 2D C32/40 62% OPC+30%FA - 160+/-40 P 29-18567 3 PASSED
228 KAIG3-RFI-CO-S-4630-00 Crescent 06/30/21 Concreting for BOI 111 & 112 for Zone 2M (as Highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 29-18566 10
229 KAIG3-RFI-CO-S-4649-00 Crescent 06/30/21 Concreting for BUTTRESS BII 124 & 125 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18565 5
230 KAIG3-RFI-CO-S-4651-00 Crescent 06/30/21 Concreting for BUTTRESS BII 123 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18563 5
PASSED
231 C32/40 62% OPC+30%FA - 220+/-20 P 29-18559 8
C05 OPC 40
QC DC QC Manager
kaig-qcals 130
February 12, 2023
PASSED
PASSED
PASSED
kaig-qcals 131
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 132
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 133
February 12, 2023
PASSED
kaig-qcals 134
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 135
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 136
February 12, 2023
kaig-qcals 137
February 12, 2023
PASSED
TE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 138
February 12, 2023
PASSED
kaig-qcals 139
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 140
PASSED
February 12, 2023
PASSED
kaig-qcals 141
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 142
February 12, 2023
PASSED
TE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
kaig-qcals 143
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 144
Consultant : DAR
1 KAIG3-RFI-SW-C-0679-00 Site Works 07/01/21 INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE - FW1-3 (As Highlighted) C16/20 SRC P 29-18576 6
P 29-18573 10 PASSED
P 29-18575 10
Screed Protection 50mm thk on Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At Highlighted in the
2 KAIG3-RFI-AG-S-4686-00 Aviary Garden 07/01/21 C32/40 62% OPC+30%FA - 220+/-20 P 29-18578 4
attached drawing's.
4 KAIG3-RFI-CO-S-4705-00 Crescent 07/03/21 Concreting for PILECAP 126, 128, 130, 132 ZONE 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-18587 10
13 KAIG3-RFI-CO-S-4633-01 Crescent 07/03/21 Concreting for Strip Footing at Zone 1A TIP C32/40 62% OPC+30%FA - 160+/-40 P 29-18595 5
19 KAIG3-RFI-CO-S-4645-01 Crescent 07/04/21 Concreting for Pilecap 28 & 30 Zone 1E C32/40 62% OPC+30%FA - 160+/-40 P 29-18608 6
kaig-qcals 145
Consultant : DAR
kaig-qcals 146
Consultant : DAR PASSED
Main Contractor: ZHBG
RUN DATE: February 12, 2023
26 KAIG3-RFI-CO-S-4700-00 Crescent 07/04/21 Concreting of Buttress BII 65 (2nd) zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18617 7
28 KAIG3-RFI-CO-S-4698-00 Crescent 07/04/21 Concreting for PILECAP 125, 127, 129, 131 Zone 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-18627 10
35 KAIG3-RFI-SW-C-0738-00 Site Works 07/05/21 Inspection for Casting the Concrete Encasement for the Storm Water Line inside management building (As Highlighted) C16/20 SRC P 29-18628 8
PASSED
36 C16/20 SRC P 29-18631 10
Concrete pouring & Shuttering for Kicker (2nd lift) of Whispering Cave 2, @ Sound & Light Garden, At highlighted area in attached
37 KAIG3-RFI-SG-S-4713-00 Sound & Light Garden 07/05/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18634 10 PASSED
Drawing's.
38 KAIG3-RFI-PA-C-0711-00 Picnic Area 07/05/21 Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-13) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18638 10
39 KAIG3-RFI-PA-C-0730-00 Picnic Area 07/05/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-32) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18639 7
PASSED
40 KAIG3-RFI-PA-C-0734-00 Picnic Area 07/05/21 Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-31) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18637 10
41 KAIG3-RFI-PA-C-0742-00 Picnic Area 07/05/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-33) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18635 9
42 KAIG3-RFI-CO-S-4704-00 Crescent 07/05/21 Concreting for PILECAP 84, 86, 88 ZONE 1P C32/40 62% OPC+30%FA - 160+/-40 P 29-18650 6
48 KAIG3-RFI-MC-S-4522-02 Crescent MCPE 07/06/21 COncreting for MCPE 3 WALL at AXIS 03-A as highlighted at zone 2E C32/40 62% OPC+30%FA - 220+/-20 P 29-18660 10
kaig-qcals PASSED
147
Consultant : DAR
53 KAIG3-RFI-CO-S-4653-01 Crescent 07/06/21 Concreting for BUTTRESS BOI BOV 64 (1st) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18666 7
56 KAIG3-RFI-CO-S-4715-00 Crescent 07/07/21 Concreting of Buttress BII-BIV 66 & 67 (1st) zone 2B & 2C C32/40 62% OPC+30%FA - 220+/-20 P 29-18676 5
62 KAIG3-RFI-CO-S-4730-00 Crescent 07/07/21 Concreting for PILECAP 136 Zone 2G C32/40 62% OPC+30%FA - 160+/-40 P 29-18685 10
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT PIECE -
67 KAIG3-RFI-SW-C-0749-00 Site Works 07/07/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18686 10 PASSED
MH-B-01 (As Highlighted)
68 KAIG3-RFI-PG-S-4735-00 Physic Garden 07/07/21 Concrete Pouring for Blinding under Foundation of Outer Canopy 2 at Physic Garden, as per highlighted area in attached drawings. C16/20 SRC P 29-18687 3
71 KAIG3-RFI-CO-S-4745-00 Crescent 07/07/21 Concreting for BUTTRESS BOI BOV - 120 & 121 (2nd) Zone 2P & 2Q C16/20 SRC P 29-18688 3 PASSED
72 KAIG3-RFI-CO-S-4707-00 Crescent 07/08/21 Concreting for BUTTRESS BOI & BII 106, 107 Zone 2L & 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-18701 3
kaig-qcals 148
Consultant : DAR
78 KAIG3-RFI-CO-S-4705-00 Crescent 07/08/21 Concreting for PILECAP 126, 128, 130, 132 ZONE 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-18705 10
PASSED
79 C32/40 62% OPC+30%FA - 160+/-40 P 29-18704 10
80 KAIG3-RFI-CO-S-4738-00 Crescent 07/08/21 Concreting of Mass Concrete under strip footing at Zone 1B between PC 7-9-11-13 C16/20 SRC P 29-18709 10
83 KAIG3-RFI-CO-S-4768-00 Crescent 07/10/21 Concreting for Tunnel 2 Wall (1st) as highlighted zone 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-18736 10
92 KAIG3-RFI-AG-S-4756-00 Aviary Garden 07/10/21 Concrete pouring & Shuttering for Footings (21 no's) at Back of House inside Aviary garden, At Highlighted in the attached drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 29-18719 10
97 KAIG3-RFI-CO-S-4743-00 Crescent 07/10/21 Concreting for BUTTRESS BOV - 122 & 123 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18735 3
100 KAIG3-RFI-MC-S-4635-00 Crescent MCPE 1 07/10/21 Concreting of blinding for MCPE 1 (embossed) zone 2M (as highlighted) C16/20 SRC P 29-18729 7 PASSED
Protection layer of geotextile sheet and 30mm screed protectiond for below PC 141, 142, 143, 144, 145, 146, 147, 148, 149, 150 Zone
101 KAIG3-RFI-CO-S-4301-02 Crescent 07/12/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-18749 10 PASSED
2H & 2J.
102 KAIG3-RFI-SW-C-0790-00 Site Works 07/12/21 Inspection for Casting Blinding Concrete under the Catch Basin (G-X-2, G-X-3 and G-X-4) as highlighted C16/20 SRC P 29-18746 10 PASSED
103 KAIG3-RFI-PA-C-0784-00 Picnic Area 07/12/21 Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-31) As highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18754 10
107 KAIG3-RFI-PA-C-0763-00 Picnic Area 07/12/21 Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-42) As Highlighted C16/20 SRC P 29-18750 7 PASSED
108 KAIG3-RFI-CO-S-4759-00 Crescent 07/13/21 Concreting for Pilecaps 133, 135, 137 Zone 2G C32/40 62% OPC+30%FA - 160+/-40 P 29-18762 9
112 KAIG3-RFI-CO-S-4773-00 Crescent 07/13/21 Concreting for BUTTRESS BIV 66 & 67 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18774 10
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-6.7, FW-A-3-6.8,FW-A-3-6.9, FW-A-3-6.10, FW-A-3-
117 KAIG3-RFI-SW-C-0806-00 Site Works 07/13/21 C16/20 SRC P 29-18773 7
6.11, FW-A-3-6.12 (as Highlighted)
PASSED
118 C16/20 SRC P 29-18772 8
119 KAIG3-RFI-CO-S-4740-00 Crescent 07/14/21 Shuttering for PILECAP 23, 25 zone 1D C32/40 62% OPC+30%FA - 160+/-40 P 29-18790 6
131 KAIG3-RFI-CO-S-4799-00 Crescent 07/14/21 Concreting for BUTTRESS BOV 64 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 29-18780 7 PASSED
132 KAIG3-RFI-CO-S-4809-01 Crescent 07/15/21 Concreting for PILECAPS 89 &90 Zone 1P C32/40 62% OPC+30%FA - 160+/-40 P 29-18819 5
PASSED
kaig-qcals 150
Consultant : DAR
kaig-qcals 151
Consultant : DAR
137 KAIG3-RFI-CO-S-4821-00 Crescent 07/15/21 Concreting for blinding of strip footing between PC 93-95 & 94-96 zone 2A C16/20 SRC P 29-18821 9
Concrete pouring & Shuttering of Wall (Upto Bottom of Slab) of Whispering Cave 2, @ Sound & Light Garden, At highlighted area in
143 KAIG3-RFI-SG-S-4794-00 Sound & Light Garden 07/15/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-18830 10
attached Drawing's.
147 KAIG3-RFI-CO-S-4818-00 Crescent 07/15/21 Concreting for strip footing blinding at Zone 1A Between PC 2 - 4 - 6 - 8 C16/20 SRC P 29-18835 6
155 KAIG3-RFI-MC-S-4802-00 Crescent 07/17/21 Concreting for MCPE 2 Foundation, Zone 2K, Axis 02-AG to 02-AF (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-18852 9
kaig-qcals 152
Consultant : DAR
kaig-qcals 153
Consultant : DAR
172 KAIG3-RFI-SW-C-0829-00 Site Works 07/17/21 Inspection for Casting the Concrete Encasement for the Storm Water Line Catch Basin G-B-12 (as Highlighted) C16/20 SRC P 29-18857 10 PASSED
173 KAIG3-RFI-CO-S-4833-00 Crescent 07/24/21 Concreting for BUTTRESS BII 66 & 67 Zone 2B & 2C C32/40 62% OPC+30%FA - 220+/-20 P 29-18863 5
176 KAIG3-RFI-CO-S-4830-00 Crescent 07/24/21 Concreting for BUTTRESS BOV 72 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 29-188730 5
180 KAIG3-RFI-PG-S-4823-00 Physic Garden 07/25/21 Concrete pouring & Shuttering for footing of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-18884 3
186 KAIG3-RFI-CO-S-4881-00 Crescent 07/25/21 Protection layer of geotextile sheet and 30mm screed under Strip footing Zone 2A between PC 91-93-95-97 & 94-96-98 C32/40 62% OPC+30%FA - 220+/-20 P 29-18887 10 PASSED
187 KAIG3-RFI-PA-C-0843-00 Picnic Area 07/26/21 Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-K (SA-15) as highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18898 10
191 KAIG3-RFI-CO-S-4858-00 Crescent 07/26/21 Shuttering for PILECAPS 139, 140, 141, 142, 143 & 144 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 P 29-18902 10
kaig-qcals 154
PASSED
Consultant : DAR
kaig-qcals 155
Consultant : DAR
Concrete pouring for Blinding under Foundation of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
200 KAIG3-RFI-ZG-S-4885-00 Maze Garden 07/26/21 C16/20 SRC P 29-18901 5 PASSED
drawing's.
201 KAIG3-RFI-CO-S-4845-00 Crescent 07/26/21 Concreting for BUTTRESS BOI 122 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 29-18909 2
204 KAIG3-RFI-CO-S-4871-00 Crescent 07/26/21 Concreting for blinding under strip footing between PC 1-3-5 Zone 1A C16/20 SRC P 29-18906 6
PASSED
205 C16/20 SRC P 29-18904 9
206 KAIG3-RFI-CO-S-4852-00 Crescent 07/27/21 Concreting for BUTTRESS BOI BOV 66 & 67 Zone 2B & 2C. C32/40 62% OPC+30%FA - 220+/-20 P 29-18916 7
211 KAIG3-RFI-CO-S-4871-00 Crescent 07/26/21 Concreting for blinding under strip footing between PC 1-3-5 Zone 1A C16/20 SRC P 29-18925 10
216 KAIG3-RFI-MC-S-4800-00 Crescent 07/28/21 Steel Reinforcement for MCPE 2 Foundation with starter bars, Zone 2K, Axis 02-AG to 02-AF (as highlighted) C32/40 67%OPC+25%FA - 160+/-40 P 29-18928 10
220 KAIG3-RFI-CO-S-4861-00 Crescent 07/28/21 Concreting for Buttress BII BIV 105 (1st) As highlighted Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 29-18929 10
kaig-qcals 156
Consultant : DAR
Concrete pouring for Blinding under Foundation of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
228 KAIG3-RFI-ZG-S-4885-00 Maze Garden 07/28/21 C16/20 SRC P 29-18943 5
drawing's.
231 KAIG3-RFI-PA-C-0895-00 Picnic Area 07/28/21 Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-42) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-18948 6
PASSED
232 C32/40 62% OPC+30%FA - 160+/-40 P 29-18946 9
233 KAIG3-RFI-PG-S-4909-00 Physic Garden 07/29/21 Concrete pouring & Shuttering for Kicker (1st Lift) of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-18962 3
241 KAIG3-RFI-PG-S-4823-00 Physic Garden 07/31/21 Concrete pouring & Shuttering for footing of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-18973 10
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
248 KAIG3-RFI-SW-C-0882-00 Site Works 07/31/21 C16/20 SRC P 29-18978 6
PIECE FOR - FW-A-3-6.11, FW-A-3-6.12 (As Highlighted)
PASSED
249 C16/20 SRC P 29-18980 4
250 KAIG3-RFI-CO-S-4901-00 Crescent 07/31/21 Concreting for BUTTRESS BII BIV 126 Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 29-18984 6
PASSED
251 C32/40 62% OPC+30%FA - 220+/-20 P 29-18982 6
252 KAIG3-RFI-CO-S-4918-00 Crescent 07/31/21 Concreting for PILECAPS 146 Zone 2J, 2K C32/40 62% OPC+30%FA - 160+/-40 P 29-18986 10
kaig-qcals 157
PASSED
Consultant : DAR
PASSED
kaig-qcals 158
Consultant : DAR
259 KAIG3-RFI-CO-S-4867-00 Crescent 07/31/21 Concreting for Strip footing blinding between PC 174-176-178-180-182 Zone 2N C16/20 SRC P 29-18995 10
C05 OPC 25
QC DC QC Manager
kaig-qcals 159
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 160
February 12, 2023
PASSED
kaig-qcals 161
PASSED
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 163
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 164
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 165
February 12, 2023
PASSED
kaig-qcals 166
February 12, 2023
PASSED
PASSED
PASSED
PASSED
kaig-qcals 167
February 12, 2023
kaig-qcals 168
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 169
PASSED
February 12, 2023
PASSED
kaig-qcals 170
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 171
February 12, 2023
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
kaig-qcals 172
PASSED
February 12, 2023
PASSED
kaig-qcals 173
February 12, 2023
PASSED
PASSED
kaig-qcals 174
Consultant : DAR
1 KAIG3-RFI-MC-S-4906-00 MCPE 08/01/21 Concreting for MCPE 2 Foundation Between Axis 02-AE - 02-AF (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-19000 10
14 KAIG3-RFI-PA-C-0907-00 Picnic Area 08/01/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-G (SA-39) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-19006 7
PASSED
15 C32/40 62% OPC+30%FA - 160+/-40 P 29-19011 4
16 KAIG3-RFI-CO-S-4920-00 Crescent 08/01/21 Concreting for BUTTRESS BOV 66-67 Zone 2B & 2C C32/40 62% OPC+30%FA - 220+/-20 P 29-19018 5
Concrete pouring for Blinding under Manholes (Type 'A' 4 no's and Type 'B' 2 no's) Inside Maze garden, as per highlighted area in
19 KAIG3-RFI-ZG-S-4910-00 Maze Garden 08/02/21 C16/20 SRC P 29-19025 3
attached drawing's.
22 KAIG3-RFI-CO-S-4864-01 Crescent 08/02/21 Concreting for Strip Footing Between PC 8-10-12-14 Zone 1B C32/40 62% OPC+30%FA - 160+/-40 P 29-19027 8 PASSED
23 KAIG3-RFI-CO-S-4899-00 Crescent 08/03/21 Concreting for Steel Structure & ETFE Pedestal (as highlighted) (Mock Up) C32/40 62% OPC+30%FA - 220+/-20 P 29-19030 10
kaig-qcals 175
Consultant : DAR
32 KAIG3-RFI-CO-S-4928-01 Crescent 08/03/21 Concreting for Buttress BII BIV 104 (1st) As highlighted Zone 2L C32/40 62% OPC+30%FA - 160+/-40 P 29-19032 10
Concretes pouring & Shuttering of Kicker (1st lift) for Outer Canopy 1 & 2 at Physic Garden, as per highlighted area in attached
35 KAIG3-RFI-PG-S-4965-00 Physic Garden 08/03/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19047 10
drawings.
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
39 KAIG3-RFI-SW-C-0882-00 Site Works 08/03/21 C16/20 SRC P 29-19033 4 PASSED
PIECE FOR - FW-A-3-6.11, FW-A-3-6.12 (As Highlighted)
40 KAIG3-RFI-CO-S-4941-00 Crescent 08/03/21 Concreting for PILCAPS 145, 147, 179 Zone 2J & 2H C32/40 62% OPC+30%FA - 160+/-40 P 29-19051 10
47 KAIG3-RFI-CO-S-4924-00 Crescent 08/04/21 Concreting for BUTTRESS BOI 120-121 Zone 2Q & 2P C32/40 62% OPC+30%FA - 220+/-20 P 29-19074 10
53 KAIG3-RFI-PG-S-4991-00 Physic Garden 08/04/21 Concrete pouring & Shuttering for Kicker (2nd Lift) of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 29-19064 10
kaig-qcals 176
Consultant : DAR
kaig-qcals 177
Consultant : DAR
61 KAIG3-RFI-CO-S-4953-00 Crescent 08/05/21 Concreting for Mass Concrete of strip footing at Zone 2N Between PC 180-182 C16/20 SRC P 29-19079 10
65 KAIG3-RFI-CO-S-4944-00 Crescent 08/05/21 Concreting for PILCAPS 151, 156, 158 ZONE 2K C32/40 62% OPC+30%FA - 160+/-40 P 29-19084 10
Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water Line Manhole - FW-A-22,
71 KAIG3-RFI-SW-C-0924-00 Site Works 08/07/21 C16/20 SRC P 29-19119 8
FW-A-23, FW-A-24 (As Highlighted)
PASSED
C16/20 SRC P 29-19132 3
72 KAIG3-RFI-CO-S-4948-00 Crescent 08/08/21 Concreting for BUTTRESS BOI 72, 73, 74 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 29-19121 10
77 KAIG3-RFI-CO-S-4950 Crescent 08/09/21 Concreting for BUTTRESS BOI 103, 104, 105 Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 29-19139 10
kaig-qcals 178
Consultant : DAR
Concrete pouring & Shuttering for Column's (22 no's) (upto level +883.200) at Back of House inside Aviary garden, At Highlighted in
84 KAIG3-RFI-AG-S-5021-00 Aviary Garden 08/09/21 C32/40 67%OPC+25%FA - 160+/-40 P 29-19149 10
the attached drawing's.
PASSED
85 C32/40 67%OPC+25%FA - 160+/-40 P 29-19150 7
86 KAIG3-RFI-CO-S-5038-00 Crescent 08/10/21 Concreting for Tunnel 2 Wall (2nd) zone 2F C32/40 62% OPC+30%FA - 160+/-40 P 29-19152 10
Concrete pouring & Shuttering for Footings of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
96 KAIG3-RFI-ZG-S-5032-00 Maze Garden 08/10/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19164 10
drawing's.
Concretes pouring & Shuttering of Kicker (2nd lift) for Outer Canopy 1 & 2 at Physic Garden, as per highlighted area in attached
103 KAIG3-RFI-PG-S-5031-00 Physic Garden 08/11/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19175 10
drawings.
109 KAIG3-RFI-CO-S-5034-00 Crescent 08/11/21 Concrete for BUTTRESS BIV 104 (2nd) Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 29-19181 10
kaig-qcals 179
PASSED
Consultant : DAR
Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water Line Manhole - FW-A-15,
118 KAIG3-RFI-SW-C-0974-00 Site Works 08/11/21 C16/20 SRC P 29-19186 10 PASSED
FW-A-16, FW-A-17 (As Highlighted
119 KAIG3-RFI-PG-S-5049-00 Physic Garden 08/11/21 Concrete pouring for Blinding's of Manholes (14 no's) Inside Physic garden, as per highlighted area in attached drawing's. C16/20 SRC P 29-19190 10
122 KAIG3-RFI-CO-S-5007-00 Crescent 08/11/21 Concreting for mass concrete for strip footing between PC 120-122-124-126 zone 2E C16/20 SRC P 29-19204 10
125 KAIG3-RFI-CO-S-5030-01 Crescent 08/12/21 Concreting for BUTTRESS BII 126 (2nd) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 29-19218 10
PASSED
126 C32/40 62% OPC+30%FA - 220+/-20 P 29-19220 10
127 KAIG3-RFI-CO-S-5003-00 Crescent 08/12/21 Concreting for Pilecaps 83, 85, 87 Zone 1P C32/40 62% OPC+30%FA - 160+/-40 P 29-19223 10
kaig-qcals 180
Consultant : DAR
kaig-qcals 181
Consultant : DAR
159 KAIG3-RFI-CO-S-5046-00 Crescent 08/14/21 Concreting for PILECAPS 32, 34, 36 Zone 1F C16/20 SRC P 29-19264 10
162 KAIG3-RFI-PA-C-0973-00 Picnic Area 08/14/21 Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-42) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-19270 5 PASSED
Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Foul Water Line Manhole - FW-A-15,
163 KAIG3-RFI-SW-C-0974-00 Site Works 08/14/21 C16/20 SRC P 29-19272 5 PASSED
FW-A-16, FW-A-17 (As Highlighted)
Concrete pouring for Blinding under Manholes (Type 'A' 4 no's and Type 'B' 2 no's) Inside Maze garden, as per highlighted area in
164 KAIG3-RFI-ZG-S-4910-00 Maze Garden 08/15/21 C16/20 SRC P 29-19273 6 PASSED
attached drawing's.
165 KAIG3-RFI-CO-S-5058-00 Crescent 08/15/21 Protection layer of geotextile sheet and 30 mm screed protection under Strip footing Between PC 166-168-170-172-174 Zone 2M C32/40 62% OPC+30%FA - 220+/-20 P 29-19278 7 PASSED
166 KAIG3-RFI-MC-S-5054-00 MCPE 08/15/21 Concreting for MCPE 1 Foundation (axis 03-T to 03-S) as highlighted C32/40 62% OPC+30%FA - 160+/-40 P 29-19280 10
kaig-qcals 182
PASSED
Consultant : DAR
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
180 KAIG3-RFI-SW-C-1009-00 Site Works 08/15/21 C16/20 SRC P 29-19291 4
PIECE FOR - FW-A-3-6.5, FW-A-3-6.6, FW-A-3-6.7, FW-A-3-6.8 (As Highlighted)
PASSED
181 C16/20 SRC P 29-19296 3
182 KAIG3-RFI-CO-S-5063-00 Crescent 08/16/21 Concreting for BUTTRESS BIV 72, 73, 74, 75, 76 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 29-19303 10 PASSED
183 KAIG3-RFI-CO-S-5063-00 Crescent 08/16/21 Concreting for BUTTRESS BIV 72, 73, 74, 75, 76 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 29-19309 10
187 KAIG3-RFI-DG-S-5094-00 Discovery Garden 08/17/21 Concrete pouring & Shuttering for Footing of Remaining Boundary wall at Discovery Garden at highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 28-28662 10
191 KAIG3-RFI-CO-S-5034-00 Crescent 08/17/21 Concrete for BUTTRESS BIV 104 (2nd) Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 28-28667 9
Concrete pouring & Shuttering for Footings of Circular Walls (6, 7, 8, 9 & 10) Half Part 1, inside Maze garden, as per highlighted area in
195 KAIG3-RFI-ZG-S-5095-00 Maze Garden 08/17/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28698 10
attached drawing's.
kaig-qcals 183
Consultant : DAR
203 KAIG3-RFI-CO-S-5067-00 Crescent 08/18/21 Concreting for PILECAPS 31, 33, 35 Zone 1F C32/40 62% OPC+30%FA - 160+/-40 P 28-28700 10
208 KAIG3-RFI-CO-S-5069-00 Crescent 08/19/21 Concreting for BUTTRESS BOI 65 (1st) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 28-28740 5
Concrete pouring & Shuttering of Kicker 1st lift for Remaining Boundary wall at Discovery Garden at highlighted area in attached
211 KAIG3-RFI-DG-S-5114-00 Discovery Garden 08/19/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28754 10
Drawing's.
Concrete poring & Shuttering for Kicker of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
212 KAIG3-RFI-ZG-S-5110-00 Maze Garden 08/19/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28755 10 PASSED
drawing's.
214 KAIG3-RFI-CO-S-4969-01 Crescent 08/21/21 Concreting for BUTTRESS BII BIV 68, 69 Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-28765 5
220 KAIG3-RFI-CO-S-5113-00 Crescent 08/21/21 Concreting for PILECAPS 38, 42 Zone 1G C32/40 62% OPC+30%FA - 160+/-40 P 28-28795 12
Inspection for Casting the Blinding Concrete under the Manhole (MH-D-06, MH-D-07, MH-D-08, MH-D-08-01, MH-D-08-02) (as
226 KAIG3-RFI-SW-C-1169-00 Site Works 08/21/21 C16/20 SRC P 28-28803 10 PASSED
Highlighted)
227 KAIG3-RFI-MC-S-5126-00 MCPE 1 08/22/21 Concreting for MCPE 1 Foundation at Axis 03-S to 03-R (as Highlighted) ZONE 2M 2N C32/40 62% OPC+30%FA - 160+/-40 P 28-28809 10
kaig-qcals 184
Consultant : DAR
252 KAIG3-RFI-CO-S-5100-00 Crescent 08/22/21 Concreting for Strip footing RC at Zone 2A Between PC 91-93-95-97 C32/40 62% OPC+30%FA - 220+/-20 P 28-28834 10
Concrete Pouring & Shuttering for Kicker (Inside) 2nd Lift for remaining Boundary Wall at Discovery Garden at hihglighted area in
255 KAIG3-RFI-DG-S-5130-00 Discovery Garden 08/22/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28835 10 PASSED
attached drawing.
256 KAIG3-RFI-MC-S-5089-00 Crescent 08/23/21 Concreting for MCPE 2 Foundation Axis 02-AH to 02 AG as highlighted Zone 2J 2K C32/40 62% OPC+30%FA - 160+/-40 P 28-28847 10
kaig-qcals 185
Consultant : DAR
273 KAIG3-RFI-CO-S-5121-00 Crescent 08/23/21 Concreting for BUTTRESS BII 103, 104, 105 (2nd) Zone 2L C32/40 62% OPC+30%FA - 220+/-20 P 28-28873 9
276 KAIG3-RFI-CO-S-5103-00 Crescent 08/24/21 Concretingfor BUTTRESS BOI 66-67 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 28-28884 10 PASSED
277 KAIG3-RFI-MC-S-5126-00 MCPE 1 08/24/21 Concreting for MCPE 1 Foundation at Axis 03-S to 03-R (as Highlighted) ZONE 2M 2N C32/40 62% OPC+30%FA - 160+/-40 P 28-28887 10
kaig-qcals 186
Consultant : DAR
293 KAIG3-RFI-CO-S-5135-00 Crescent 08/25/21 Concreting for the PILECAP 37, 39, 41, 43 Zone 1G C32/40 62% OPC+30%FA - 160+/-40 P 28-28914 10
301 KAIG3-RFI-CO-S-4766-00 Crescent 08/25/21 Concreting for BUTTRESS BOI BOV 124 & 125 (1st) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 28-28946 10
PASSED
302 C32/40 62% OPC+30%FA - 220+/-20 P 28-28934 10
Inspection for Casting the Blinding Concrete under the Manhole (MH-D-01, MH-D-02, MH-D-03, MH-D-04, MH-D-05) (as
303 KAIG3-RFI-SW-C-1175-00 Site Works 08/25/21 C16/20 SRC P 28-28937 10 PASSED
Highlighted)
Concrete pouring & Shuttering of Footings of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as per highlighted area in
304 KAIG3-RFI-ZG-S-5132-00 Maze Garden 08/26/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28950 10
attached drawing's.
309 KAIG3-RFI-CO-S-5128-00 Crescent 08/26/21 Concreting for BUTTRESS BII 72, 73, 74, 75, 76 Zone 2D C32/40 62% OPC+30%FA - 220+/-20 P 28-28956 9
Coordinate Pouring & Shuttering for Kicker of Circular Walls (6,7,8,9 & 10) Half Part 1 inside Maze Garden as per highlighted area in
313 KAIG3-RFI-ZG-S-5146-00 Maze Garden 08/26/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-28968 9
attached drawing.
318 KAIG3-RFI-MC-S-5149-01 Crescent 08/28/21 Concreting for MCPE 2 Foundation Axis 02AD to 03K Zone 2J 2K C32/40 62% OPC+30%FA - 160+/-40 P 28-28981 10
kaig-qcals 187
PASSED
Consultant : DAR
kaig-qcals 188
Consultant : DAR
KAIG3-RFI-PA-C-1196-00 Picnic Area 08/28/21 Inspection of Concrete Pouring for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-28989 4 PASSED
KAIG3-RFI-CO-S-5165-00 Crescent 08/28/21 Shuttering for BUTTRESS BOI 65 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 28-29002 7 PASSED
KAIG3-RFI-CO-S-5161-00 Crescent 08/28/21 Concreting for BUTTRESS BII 128 (1st) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 28-29018 9
PASSED
C32/40 62% OPC+30%FA - 220+/-20 P 28-29023 10
KAIG3-RFI-CO-S-5144-01 Crescent 08/28/21 Concreting for Mass Concrete of Strip Footing Between PC 134-136-138-140 Zone 2G C16/20 SRC P 28-29019 10
KAIG3-RFI-CO-S-5177-00 Crescent 08/29/21 Surface Preparation and Solvent base primer under Strip footing Between PC 134-136-138-140 Zone 2G C16/20 SRC P 28-29036 8 PASSED
KAIG3-RFI-CO-S-5166-00 Crescent 08/29/21 Concreting for BUTTRESS BOI 65 (2nd) Zone 2B C32/40 62% OPC+30%FA - 220+/-20 P 28-29054 10
PASSED
C32/40 62% OPC+30%FA - 220+/-20 P 28-29056 10
KAIG3-RFI-CO-S-5173-01 Crescent 08/30/21 Concreting for BUTTRESS BIV 68 & 69 (2nd) Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-29063 5
PASSED
P 28-29066 5
KAIG3-RFI-CO-S-5195-00 Crescent 08/31/21 Concreting for PILECAPS 71 & 75 Zone 1M C32/40 62% OPC+30%FA - 160+/-40 P 28-29099 10
Concrete Pouring for Blinding under foundation at Grid (2-20/B & 14/B-B') Inside Butterfly Garden, as highlighted area in attached
KAIG3-RFI-TG-S-5202-00 Butterfly Garden 08/31/21 C16/20 SRC P 28-29102 9
drawings.
C05 OPC
kaig-qcals 189
Consultant : DAR
QC DC QC Manager
kaig-qcals 190
Consultant : DAR
2 KAIG3-RFI-CO-S-5153-01 Crescent 09/01/21 Concreting for BUTTRESS BOI 75 & 76 Zone 2D & 2E C32/40 62% OPC+30%FA - 220+/-20 P 29-19332 10
PASSED
3 C32/40 62% OPC+30%FA - 220+/-20 P 29-19341 5
Concrete Pouring & Shuttering for Kicker of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as per highlighted area in
4 KAIG3-RFI-ZG-S-5212-00 Maze Garden 09/01/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19345 10
attached drawing's.
7 KAIG3-RFI-CO-S-5207-00 Crescent 09/02/21 Concreting for pilecaps 45, 47, 49, 51 Zone 1H 1G C32/40 62% OPC+30%FA - 160+/-40 P 29-19350 10
13 KAIG3-RFI-CO-S-5209-00 Crescent 09/02/21 Concreting for BUTTRESS BOI BOV 127 (1st) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 29-19360 6
Concrete pouring for Blindings Under Foundations of 4 Walls at the Entrance Boundary wall inside Maze garden, as per highlighted area
16 KAIG3-RFI-ZG-S-5216-00 Maze Garden 09/02/21 C16/20 SRC P 29-19369 10
in attached drawing's.
PASSED
17 C16/20 SRC P 29-19370 10
18 KAIG3-RFI-CO-S-5226-00 Crescent 09/04/21 Concreting for PILECAP 77 Zone 1N C32/40 62% OPC+30%FA - 160+/-40 P 29-19373 9
19 KAIG3-RFI-CO-S-5219-00 Crescent 09/04/21 Concreting for PILECAP 73 Zone 1M C32/40 62% OPC+30%FA - 160+/-40 P 29-19374 9
24 KAIG3-RFI-PA-C-1323-00 Picnic Area 09/04/21 Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-10) As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-29114 10
PASSED
25 C32/40 62% OPC+30%FA - 160+/-40 P 28-29116 3
Concrete Pouring & Shuttering for Walls of Circular Walls (2, 3, 4 & 5) inside Maze garden, as per highlighted area in attached
26 KAIG3-RFI-ZG-S-5244-00 Maze Garden 09/05/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-29132 9
drawing's.
kaig-qcals
PASSED 191
Consultant : DAR
31 KAIG3-RFI-CO-S-5232-00 Crescent 09/05/21 Concreting for PILECAP 48, 52 Zone 1H C32/40 62% OPC+30%FA - 160+/-40 P 28-29139 9
38 KAIG3-RFI-PG-S-5231-00 Physic Garden 09/05/21 Concrete Pouring & Shuttering for Wall & Columns of Outer Canopy 3 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 220+/-20 P 28-29146 10
45 KAIG3-RFI-CO-S-5236-00 Crescent 09/06/21 Concreting for BUTRESS BOI 99, 100, 101, 102 Zone 2K 2L C32/40 62% OPC+30%FA - 220+/-20 P 28-29155 5
51 KAIG3-RFI-PG-S-5248-00 Physic Garden 09/06/21 Concrete pouring for Blinding of Footings (6 no's) Inside Physic Garden, at highlighted area in attached drawings. C16/20 SRC P 28-29159 10
54 KAIG3-RFI-CO-S-5239-00 Crescent 09/06/21 Concreting for PILECAPS 74, 78 Zone 1N 1M C32/40 62% OPC+30%FA - 160+/-40 P 28-29167 10
kaig-qcals 192
PASSED
Consultant : DAR
PASSED
kaig-qcals 193
Consultant : DAR
60 KAIG3-RFI-CO-S-5242-00 Crescent 09/07/21 Concretring for SRTIP FOOTING RC Between PC 174-172, 170-68 Zone 2M, PC 176-174 Zone 2N C32/40 62% OPC+30%FA - 160+/-40 P 28-29187 10
PASSED
61 C32/40 62% OPC+30%FA - 160+/-40 P 28-29189 10
Screed Protection 50mm thk. on Blinding under foundation at Grid (2-20/B) Inside Butterfly Garden, as highlighted area in attached
62 KAIG3-RFI-TG-S-5271-00 Butterfly Garden 09/07/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-29194 9 PASSED
drawings.
63 KAIG3-RFI-DG-S-5215-01 Discovery Garden 09/08/21 Concrete pouring & Shuttering for Kicker (1st Lift) of Plant room at Discovery Garden at highlighted area in attached Drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 28-29212 5 PASSED
64 KAIG3-RFI-CO-S-5257-01 Crescent 09/08/21 Concreting for BUTTRESS BII 128 (2nd) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 28-29213 10 PASSED
65 KAIG3-RFI-DG-S-5270-00 Discovery Garden 09/08/21 Concrete Pouring & Shuttering for Wall of Remaining Boundary wall at Discovery Garden at highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-29219 9
KAIG3-RFI-CO-S-5226-00 Crescent 09/09/21 Concreting for PILECAP 77 Zone 1N C16/20 SRC P 28-29226 9
PASSED
C16/20 SRC p 28-29230 10
Concrete pouring & Shuttering for Footing of 2 Walls (Curved) along the Boundary wall at Entrance, inside Maze garden, as per
71 KAIG3-RFI-ZG-S-5284-00 Maze Garden 09/11/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-29248 9
highlighted area in attached drawing's.
77 KAIG3-RFI-SW-C-1376-00 Site Works 09/11/21 Inspection for Casting the Blinding Concrete under the SBC-06 (as Highlighted) C16/20 SRC P 28-29257 10 PASSED
78 KAIG3-RFI-PG-S-5286-00 Physic Garden 09/11/21 Concrete Pouring & Shuttering for Wall & Columns of Outer Canopy 2 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 220+/-20 P 28-29274 9
kaig-qcals
PASSED 194
Consultant : DAR
85 KAIG3-RFI-SW-C-1338-00 Site Works 09/12/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-6, FW-A-3-7 (as Highlighted C16/20 SRC P 28-29293 4 PASSED
Concrete Pouring & Shuttering for Walls of Circular Wall (1) and Straight walls (3 no's), inside Maze garden, as per highlighted area in
86 KAIG3-RFI-ZG-S-5292-00 Maze Garden 09/12/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-29314 9
attached drawing's.
93 KAIG3-RFI-CO-S-5291-00 Crescent 09/13/21 Concreting for PILECAPS 53, 55, 57 Zone 1H 1J C32/40 62% OPC+30%FA - 160+/-40 P 28-29327 9
99 KAIG3-RFI-CO-S-5296-00 Crescent 09/13/21 Concreting for BUTTRESS BOI 124 & 125 (2nd) Zone 2Q C32/40 62% OPC+30%FA - 220+/-20 P 28-29335 10
PASSED
100 C32/40 62% OPC+30%FA - 220+/-20 P 28-29338 8
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
101 KAIG3-RFI-SW-C-1358-00 Site Works 09/13/21 C16/20 SRC P 28-29339 10
Coat and 3rd Coat) for MH-D-07, MH-D-08-01 (As Highlighted)
PASSED
102 C16/20 SRC P 28-29343 5
103 KAIG3-RFI-CO-S-5291-00 Crescent 09/13/21 Concreting for PILECAPS 53, 55, 57 Zone 1H 1J C32/40 62% OPC+30%FA - 160+/-40 P 28-29344 9 PASSED
104 KAIG3-RFI-CO-S-5283-01 Crescent 09/14/21 Concreting of Slab of TUNNEL 2 Zone 6 C32/40 62% OPC+30%FA - 160+/-40 P 28-29349 9
kaig-qcals 195
Consultant : DAR
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI110
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 160+/-40
OPC+30%FA P 28-29360 QUANTITY
9
LOCATION CASTING No.
(m³)
111 C32/40 62% OPC+30%FA - 160+/-40 P 28-29362 9
114 KAIG3-RFI-CO-S-5308-00 Crescent 09/15/21 Concreting for PILECAPS 67 & 69 Zone 1L. C32/40 62% OPC+30%FA - 160+/-40 P 28-29399 9
Inspection for Casting the Blinding Concrete under the Manhole (MH-A-01, MH-A-02, MH-A-03, MH-A-10, MH-A-11, MH-A-12) as
123 KAIG3-RFI-SW-C-1413-00 Site Works 09/15/21 C16/20 SRC P 28-29413 6 PASSED
Highlighted
124 KAIG3-RFI-CO-S-5308-00 Crescent 09/15/21 Concreting for PILECAPS 67 & 69 Zone 1L. C16/20 SRC P 28-29424 10 PASSED
125 KAIG3-RFI-CO-S-5331-00 Crescent 09/15/21 Concreting for BUTTRESS BIV 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 160+/-40 P 28-29430 9
PASSED
126 C32/40 62% OPC+30%FA - 160+/-40 P 28-29431 9
Concrete Pouring & Shuttering for Walls of Circular Wall (6 & 7) Half part 1 inside Maze garden, as per highlighted area in attached
127 KAIG3-RFI-ZG-S-5325-00 Maze Garden 09/15/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-29434 10
drawing's.
130 KAIG3-RFI-CO-S-5331-00 Crescent 09/16/21 Concreting for BUTTRESS BIV 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-29450 9
134 KAIG3-RFI-TG-S-5342-00 Butterfly Garden 09/16/21 Concrete Pouring and Blinding under Foundation at Grid (A/1-21) at Butterfly Garden at highlighted area in attached drawing. C16/20 SRC P 28-29460 9
138 KAIG3-RFI-CO-S-5331-00 Crescent 09/16/21 Concreting for BUTTRESS BIV 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-29473 10
kaig-qcals 196
Consultant : DAR
kaig-qcals 197
Consultant : DAR
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI141
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-29480 QUANTITY
5
LOCATION CASTING No.
(m³)
142 KAIG3-RFI-DG-S-5335-00 Discovery Garden 09/18/21 Concrete Pouring & Shuttering for Kicker (2nd Lift) of Plant Room at Dicovery Garden at highlighted area in attached drawing. C32/40 62% OPC+30%FA - 160+/-40 P 28-29475 5 PASSED
Concrete pouring for Encasement of Shot piece's of Manholes (Type 'B' 6 no's) Inside Physic garden, as per highlighted area in attached
143 KAIG3-RFI-PG-S-5348-00 Physic Garden 09/18/21 C16/20 SRC P 28-29477 10 PASSED
drawing's.
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
144 KAIG3-RFI-SW-C-1424-00 Site Works 09/18/21 C16/20 SRC P 28-29478 8 PASSED
Coat and 3rd Coat) for MH-D-02, MH-D-03, MH-D-03-01, MH-D-04, MH-D-05, MH-D-06 (As Highlighted)
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
145 KAIG3-RFI-SW-C-1424-00 Site Works 09/18/21 C16/20 SRC P 28-29487 5 PASSED
Coat and 3rd Coat) for MH-D-02, MH-D-03, MH-D-03-01, MH-D-04, MH-D-05, MH-D-06 (As Highlighted)
146 KAIG3-RFI-CO-S-5322-00 Crescent 09/19/21 Concreting for PILECAPS 65 & 70 Zone 1K 1L C32/40 67%OPC+25%FA - 160+/-40 P 28-29488 11
153 KAIG3-RFI-CO-S-5358-00 Crescent 09/20/21 Concreting for PILECAPS 59, 61, 63 Zone 1K 1J C32/40 62% OPC+30%FA - 160+/-40 P 28-29520 12
158 KAIG3-RFI-CO-S-5370-00 Crescent 09/20/21 Concreting for BUTTRESS BOV BOI 4, 5, 7 (1st) zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29529 9
Concrete Pouring & Shuttering for Kicker (1st Lift) of Straight Wall 'A' (Right Side) and 2 Walls (Curved) along the Boundary wall at
161 KAIG3-RFI-ZG-S-5376-00 Maze Garden 09/21/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-29554 12
Entrance, inside Maze garden, as per highlighted area in attached drawing's.
167 KAIG3-RFI-CO-S-5386-00 Crescent 09/21/21 Concreting for BUTTRESS BII 68 & 69 (2nd) zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-29569 5
kaig-qcals 198
Consultant : DAR
PASSED
CONCRETE POURING LOG AND CUBE REGISTER
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI170
No. RFI NUMBER DESCRIPTION C32/40 62%DESIGN MIX - 220+/-20
OPC+30%FA P 28-29582 QUANTITY
5
LOCATION CASTING No.
(m³)
Screed Protection 50mm thk. on Blinding under foundation at Grid (A-B/1-2), (A/2-7), (A/16-21) & (20-21/A-B) Inside Butterfly
171 KAIG3-RFI-TG-S-5382-00 Butterfly Garden 09/21/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-29581 10
Garden, as highlighted area in attached drawings.
PASSED
172 C32/40 62% OPC+30%FA - 220+/-20 P 28-29584 5
173 KAIG3-RFI-CO-S-5396-00 Crescent 09/22/21 Concreting for BUTTRESS BOI BOV 6 (1st) Zone 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29590 5
PASSED
174 C32/40 62% OPC+30%FA - 220+/-20 P 28-29597 10
175 KAIG3-RFI-CO-S-5367-00 Crescent 09/22/21 Concreting for BUTTRESS BIV 70-71 (FULL) & BII 70-71 (1st) Zone 2C 2D (AS HIGHLIGHTED) C32/40 62% OPC+30%FA - 220+/-20 P 28-29609 10
PASSED
176 C32/40 62% OPC+30%FA - 220+/-20 P 28-29617 6
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
177 KAIG3-RFI-SW-C-1458-00 Site Works 09/25/21 C16/20 SRC P 28-29625 8
Coat and 3rd Coat) for MH-D-01-A1, MH-D-01-A2, MH-D-01-A1-01, MH-D-01-B1, MH-D-01-B2 (As Highlighted
PASSED
179 KAIG3-RFI-MC-S-5402-00 Crescent 09/25/21 Concreting for MCPE 3 Foundatiion Axis 02Q to 02R Zone 2E 2F C32/40 62% OPC+30%FA - 160+/-40 P 28-29666 12
kaig-qcals 199
Consultant : DAR
201 KAIG3-RFI-DG-S-5390-00 Discovery Garden 09/25/21 Concrete Pouring & Shuttering of Wall for Plant room at Discovery Garden at highlighted area in attached drawings. C32/40 67%OPC+25%FA - 160+/-40 P 28-29664 10
207 KAIG3-RFI-CO-S-5370-00 Crescent 09/26/21 Concreting for BUTTRESS BOV BOI 4, 5, 7 (1st) zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29669 12
PASSED
208 C32/40 62% OPC+30%FA - 220+/-20 P 28-29684 9
209 KAIG3-RFI-CO-S-5412-00 Crescent 09/26/21 Shuttering for Strip footing Between PC 118-120-122-124-126 Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 28-29690 9
213 KAIG3-RFI-SW-C-1510-00 Site Works 09/26/21 Inspection for Casting the Blinding Concrete under the SBC-05 (as Highlighted) C16/20 SRC P 28-29692 4 PASSED
214 KAIG3-RFI-CO-S-5422-00 Crescent 09/27/21 Concreting for mass concrete of strip footing between PC 134-136-138-140-142-144 Zone 1F 1G (as highlighted) C16/20 SRC P 28-29729 9
kaig-qcals 200
PASSED
Consultant : DAR
kaig-qcals 201
PASSED
Consultant : DAR
Concrete Pouring & Shuttering for Footing of Straight Wall (left side) at entrance inside Maze Garden as per highlighted area in attached
235 KAIG3-RFI-ZG-S-5434-00 Maze Garden 09/28/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-299734 10
drawing.
PASSED
236 C32/40 62% OPC+30%FA - 160+/-40 P 28-29733 10
237 KAIG3-RFI-CO-S-5419-00 Crescent 09/28/21 Concreting for BUTTRESS BII 99 Zone 2K C32/40 62% OPC+30%FA - 220+/-20 P 28-29736 4
PASSED
238 C32/40 62% OPC+30%FA - 220+/-20 P 28-29735 7
239 KAIG3-RFI-DG-S-5431-00 Discovery Garden 09/28/21 Concrete pouring for Blinding under Manholes (6 no's) Inside Discovery Garden at highlighted area in attached Drawing's. C16/20 SRC P 28-29737 10 PASSED
240 KAIG3-RFI-CO-S-5427-00 Crescent 09/28/21 Concreting for Strip Footing between PC 170-172 Zone 2M C32/40 62% OPC+30%FA - 160+/-40 P 28-29741 12
PASSED
241 C32/40 62% OPC+30%FA - 160+/-40 P 28-29740 10
242 KAIG3-RFI-CO-S-5389-01 Crescent 09/29/21 Concreting for RINGBEAM for Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02AW (as Highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 28-29772 5
252 KAIG3-RFI-CO-S-5464-00 Crescent 09/30/21 Concreting for BUTTRESS BIV 4, 5, 6, 7 Zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29800 9
kaig-qcals 202
Consultant : DAR
Concrete Pouring for Encasement of Shot pieces of Manholes (type A 1 no. & B 3 nos.) (MH-D-03-02-01, MH-D-05-01-02, MH-D-05-
266 KAIG3-RFI-PG-S-5440-00 Physic Garden 09/30/21 C16/20 SRC P 28-29796 10 PASSED
02 & MH-D-05-04) inside Physic Garden as per highlighted area in attached drawing.
C05 OPC 0
QC DC QC Manager
kaig-qcals 203
Consultant : DAR
1 KAIG3-RFI-CO-S-5447-01 Crescent 10/02/21 Concreting for Buttress BOI 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-29823 11
2 KAIG3-RFI-CO-S-5449-01 Crescent 10/02/21 Concreting for Buttress BOI 126 (2nd) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 28-29818 5
Concrete Pouring & Shuttering for Walls of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as per highlighted area in
6 KAIG3-RFI-ZG-S-5460-00 Maze Garden 10/02/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-29816 5
attached drawing's.
Concrete pouring & Shuttering for Ring Beam @ Grid (3-14/Left. Side) on Boundary wall at Aviary Garden, As per Highlighted in
13 KAIG3-RFI-AG-S-5473-00 Aviary Garden 10/02/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-29824 9
attached Drawing's.
18 KAIG3-RFI-CO-S-5445-00 Crescent 10/02/21 Concreting for Strip Footing at Zone 2G Inner Between PC 134-136-138-140 C32/40 62% OPC+30%FA - 160+/-40 P 28-29826 12
PASSED
19 C32/40 62% OPC+30%FA - 160+/-40 P 28-29825 12
20 KAIG3-RFI-MC-S-5407-01 MCPE 10/03/21 Concreting for MCPE 2 Foundation at axis 02-AC to 03-K as highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-29847 11
kaig-qcals 204
Consultant : DAR
Concrete pouring for Blinding under foundation at Grid (A/12-16) & (A-B/14) @ Butterfly Garden, at highlighted area in attached
32 KAIG3-RFI-TG-S-5468-00 Butterfly Garden 10/03/21 C16/20 SRC P 28-29859 10
drawings.
35 KAIG3-RFI-CO-S-5462-00 Crescent 10/04/21 Concreting for BUTTRESS BOI 4, 5, 7 Zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-29860 10 PASSED
36 KAIG3-RFI-CO-S-5478-00 Crescent 10/04/21 Concreting of strip footing (Plain Concrete) Between PC 83-85-87, 84-86-88 Zone 1P C16/20 SRC P 28-29875 12
40 KAIG3-RFI-PG-S-5486-00 Physic Garden 10/04/21 Concrete Pouring & Shuttering of Wall & Columns for Outer Canopy 1 at Physic Garden, as per highlighted area in attached drawings. C32/40 62% OPC+30%FA - 220+/-20 P 28-29887 4
46 KAIG3-RFI-CO-S-5481-00 Crescent 10/05/21 Concreting of strip footing (Plain Concrete) Between PC 37-39-41-43 Zone 1G C16/20 SRC P 28-29897 11
50 KAIG3-RFI-SW-C-1590-00 Site Works 10/05/21 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-05 C32/40 62% OPC+30%FA - 160+/-40 P 28-29901 11 PASSED
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
51 KAIG3-RFI-SW-C-1677-00 Site Works 10/05/21 C16/20 SRC P 28-29906 7 PASSED
Coat and 3rd Coat) for MH-A-01, MH-A-02, MH-A-03, MH-A-10, MH-A-11, MH-A-12 (As Highlighted)
52 KAIG3-RFI-CO-S-5475-00 Crescent 10/06/21 Concreting for BUTTRESS BII 14, 15, 16, 17 Zone 1D 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-29932 12
53 KAIG3-RFI-CO-S-5449-01 Crescent 10/06/21 Concreting for Buttress BOI 126 (2nd) Zone 2R C32/40 62% OPC+30%FA - 220+/-20 P 28-29923 12
PASSED
54 C32/40 62% OPC+30%FA - 220+/-20 P 28-29913 11
kaig-qcals 205
Consultant : DAR
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
58 KAIG3-RFI-SW-C-1677-00 Site Works 10/07/21 C16/20 SRC P 28-29952 10 PASSED
Coat and 3rd Coat) for MH-A-01, MH-A-02, MH-A-03, MH-A-10, MH-A-11, MH-A-12 (As Highlighted)
Casting Blinding Concret under Manhole MH-F-01, MH-F-02, MH-F-03, MH-F-04 and Gullies G-F-01, G-F-02, G-F-03, G-F-04, G-F-
59 KAIG3-RFI-SW-C-1661-00 Site Works 10/09/21
05, G-F-06, G-F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14 as highlighted
Casting Blinding Concret under Manhole MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4 and Gullies G-F-01, G-F-02, G- C16/20 SRC P 28-29960 7 PASSED
60 KAIG3-RFI-SW-C-1634-00 Site Works 10/09/21 F-03, G-F-04, G-F-05, G-F-06, G-F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14, G-F-15, G-F-16, G-F-17, G-F-18,
G-F-19 to G-H-41 as highlighted.
61 KAIG3-RFI-CO-S-5503-01 Crescent 10/09/21 Concreting for INFILL WALL Between Buttress outer 114-115 Axis 02-2, 02AR to 02AS Zone 2N C32/40 62% OPC+30%FA - 220+/-20 P 28-29996 4
Concrete pouring for Encasement of Pipes for Manholes (4 no's) (MH-D-09-01, MH-D-09-02, MH-D-09-03 & MH-D-10) (Type A-1
74 KAIG3-RFI-DG-S-5511-00 Discovery Garden 10/09/21 C16/20 SRC P 28-29976 12 PASSED
no's, B-3 no's) Inside Discovery Garden at highlighted area in attached Drawing's.
75 KAIG3-RFI-CO-S-5520-00 Crescent 10/10/21 Concreting for Ring Beam @ Zone 2P (outer) Between Axis 02-2, 02AT to 02AW C32/40 62% OPC+30%FA - 220+/-20 P 28-30026 8
kaig-qcals
PASSED 206
Consultant : DAR
Surface Preparation prior to Waterproofing for Foundation of remaining Boundary Wall (Outer Side & Both End Sides) at Discovery
87 KAIG3-RFI-DG-S-5323-00 Discovery Garden 10/10/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-30015 12 PASSED
Garden at highlighted area in attached drawings.
KAIG3-RFI-SW-C-1654-01 Site Works 10/11/21 Inspection of Concrete Pouring for Walls and Top Slab of SBC-09 As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-30035 5
88 KAIG3-RFI-CO-S-5518-00 Crescent 10/11/21 Concreting of Plain Concrete for Strip footing in Zone 1P Between PC 83-85, 87-89 (as highlighted) C16/20 SRC P 28-30036 7
Concrete Pouring & shuttering for Slab & Beam of Whispering Cave 1, @ Sound & Light Garden, At highlighted area in attached
91 KAIG3-RFI-SG-S-5537-00 Sound & Light Garden 10/11/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-30046 5
Drawing's
94 KAIG3-RFI-CO-S-5536-00 Crescent 10/11/21 Concrerting for BUTTRESS BII 4 & 5 Zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-30047 6
PASSED
95 KAIG3-RFI-CO-S-5528-00 Crescent 10/11/21 Concreting for BUTTRESS BII 6 Zone 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-20044 12
96 KAIG3-RFI-CO-S-5543-00 Crescent 10/12/21 Concreting for BUTTRESS BOV 97, 98 & BIV 100 Zone 2J 2K C32/40 62% OPC+30%FA - 220+/-20 P 28-30057 8
PASSED
97 C32/40 62% OPC+30%FA - 220+/-20 P 28-30051 10
Casting Blinding Concret under Manhole MH-F-01, MH-F-02, MH-F-03, MH-F-04 and Gullies G-F-01, G-F-02, G-F-03, G-F-04, G-F-
98 KAIG3-RFI-SW-C-1661-00 Site Works 10/12/21 C16/20 SRC P 28-30052 4 PASSED
05, G-F-06, G-F-07, G-F-08, G-F-09, G-F-10, G-F-11, G-F-12, G-F-13, G-F-14 as highlighted
Concrete pouring & Shuttering for Ring Beam @ Grid (17-23/Right Side upto B.O.H) on Boundary wall at Aviary Garden, As per
99 KAIG3-RFI-AG-S-5539-00 Aviary Garden 10/12/21 C32/40 62% OPC+30%FA - 220+/-20 P 28-30065 9
Highlighted in attached Drawing's.
103 KAIG3-RFI-CO-S-5534-01 Crescent 10/13/21 Concreting for BUTTRESS BOI BOV 18 (1ST) Zone 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-30095 5
kaig-qcals 207
PASSED
Consultant : DAR
110 KAIG3-RFI-CO-S-5550-00 13-Oct Crescent Geotextile and 30mm screed under Strip footing between PC 34-36-38-40-42-44 Zone 1F 1G C16/20 SRC P 28-30097 5
Sleeve Installation & Concrete Pouring for Encasement of Sleeve Pipes (2 no's of 200mm Dia.) for Water Feature, beside Plant Room,
117 KAIG3-RFI-AG-S-5584-00 Aviary Garden 10/14/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-30132 9
Passing under the Boundary wall of Aviary garden, At Highlighted area in the attached drawing's.
118 KAIG3-RFI-DG-S-5554-00 Sound & Light Garden 10/14/21 Concrete pouring & Shuttering for Slab & Beams of Plant Room at Discovery Garden at highlighted area in attached Drawing's. C32/40 67%OPC+25%FA - 160+/-40 P 28-30115 12
PASSED
Concrete Pouring & Shuttering for Walls of 2 (Curved) walls along the Boundary wall at Entrance, inside Maze garden, as per
119 KAIG3-RFI-ZG-S-5560-00 Maze Garden 10/14/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-30114 12
highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Kicker (2nd Lift) of Straight Wall (Right Side) at Entrance, inside Maze garden, as per highlighted
121 KAIG3-RFI-ZG-S-5561-00 Water Play Garden 10/14/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-30118 7
area in attached drawing's.
PASSED
122 C32/40 62% OPC+30%FA - 160+/-40 P 28-30117 8
123 KAIG3-RFI-SW-C-1587-01 Site Works 10/16/21 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06 C32/40 62% OPC+30%FA - 160+/-40 P 28-30149 3
Water Play/Geyser Concrete pouring for Blinding of Manholes (10 no's: MH-C-1, MH-C-4, MH-C-5, MH-C-6, MH-C-7, MH-C-1-1, MH-C-1-2, MH-C-1-
128 KAIG3-RFI-WG-S-5571-00 10/16/21 C16/20 SRC P 28-30156 10
Garden 3, MH-C-1-4 & MH-C-3-1), at Geyser Garden, Inside Water Garden, at highlighted area in attached drawings.
PASSED
129 C16/20 SRC P 28-30153 10
131 KAIG3-RFI-CO-S-5570-00 Crescent 10/16/21 Concreting for BUTTRESS BOI 69 (1st) Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-30155 5
PASSED
132 C32/40 62% OPC+30%FA - 220+/-20 P 28-30150 5
133 KAIG3-RFI-CO-S-5577-00 Crescent 10/18/21 Concreting for BUTTRESS BOV 11, BIV 11 & 10 Zone 1C C32/40 62% OPC+30%FA - 220+/-20 P 28-30193 11
kaig-qcals 208
Consultant : DAR
138 KAIG3-RFI-CO-S-5532-01 Crescent 10/19/21 Concreting for BUTTRESS BIV 18 (2ND) Zone 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-30226 4
141 KAIG3-RFI-CO-S-5573-00 Crescent 10/20/21 Concreting for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as highlighted) C32/40 62% OPC+30%FA - 220+/-20 P 28-30262 12
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
146 KAIG3-RFI-SW-C-1788-00 Site Works 10/20/21 C16/20 SRC P 28-30249 9
Coat and 3rd Coat) for MH-H-01, MH-H-02, MH-H-03 (As Highlighted)
PASSED
148 KAIG3-RFI-TG-S-5592-00 Butterfly Garden 10/20/21 Concrete pouring & Shuttering for Footing at Grid (2-20/B) Inside Butterfly Garden, as highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 P 28-30270 10
157 KAIG3-RFI-CO-S-5594-00 Crescent 10/21/21 Concreting for BUTTRESS BOV BIV 01 Zone 1A C32/40 62% OPC+30%FA - 220+/-20 P 28-30310 4
158 KAIG3-RFI-CO-S-5581-00 Crescent 10/21/21 Concreting for BUTTRESS BII 4, 5, 6 (2ND) Zone 1A 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-30307 11
Concrete pouring for Blinding of Manholes (6 no's: MH-C-2, MH-C-3, MH-C-8, MH-C-4-1, MH-C-4-2 & MH-C-4-3), Inside Water
162 KAIG3-RFI-WG-S-5626-00 Water Play Garden 10/21/21 C16/20 SRC P 28-30301 10 PASSED
Garden, at highlighted area in attached drawings.
163 KAIG3-RFI-MC-S-5613-01 MCPE 2 10/23/21 Concreting of MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H C32/40 62% OPC+30%FA - 160+/-40 P 28-30347 8
kaig-qcals 209
PASSED
Consultant : DAR
PASSED
kaig-qcals 210
Consultant : DAR
175 KAIG3-RFI-CO-S-5590-00 Crescent 10/24/21 Concreting for BUTTRESS BOI 97, 98 Zone 2J 2K C32/40 62% OPC+30%FA - 220+/-20 P 28-30375 12
179 KAIG3-RFI-CO-S-5605-01 Crescent 10/24/21 Concreting for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30373 9
182 KAIG3-RFI-SW-C-1715-01 Site Works 10/24/21 Inspection of Concrete Pouring for Walls and Top Slab of SBC-05 As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-30382 10
186 KAIG3-RFI-CO-S-5621-00 Crescent 10/24/21 Concreting for 1st layer mass concrete of Strip footing between PC 146-148-150 Zone 2J (as highlighted) C16/20 SRC P 28-30383 8
PASSED
187 C16/20 SRC P 28-30379 12
188 KAIG3-RFI-MC-S-5627-00 MCPE 2 10/25/21 Steel Reinforcement of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G C32/40 62% OPC+30%FA - 220+/-20 P 28-30423 12
193 KAIG3-RFI-MC-S-5629-00 MCPE 2 10/25/21 Concreting of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G C32/40 62% OPC+30%FA - 160+/-40 P 28-30414 12
205 KAIG3-RFI-MC-S-5629-00 MCPE 2 10/25/21 Concreting of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G C32/40 62% OPC+30%FA - 160+/-40 P 28-30424 12 PASSED
206 KAIG3-RFI-CO-S-5647-00 Crescent 10/27/21 Concreting for BUTTRESS BOI 70 & 71 (1st) Zone 2C 2D C32/40 62% OPC+30%FA - 220+/-20 P 28-30507 8
Concrete pouring for Encasement of Pipes for Manholes (14 no's: MH-C-1, MH-C-2, MH-C-3, MH-C-4, MH-C-5, MH-C-6, MH-C-8,
210 KAIG3-RFI-WG-S-5658-00 Water Play Garden 10/27/21 MH-C-1-1, MH-C-1-2, MH-C-1-3, MH-C-1-4, MH-C-4-1, MH-C-4-2 & MH-C-4-3), Inside Water Garden, at highlighted area in C16/20 SRC P 28-30508 10
attached drawings. PASSED
212 KAIG3-RFI-SW-C-1812-00 Site Works 10/28/21 Inspection for Casting the Blinding Concrete under the SBC-06 (as Highlighted) C16/20 SRC P 28-30522 9
PASSED
213 C16/20 SRC P 28-30519 10
Concrete pouring for Encasement of Pipes for Manholes (14 no's: MH-C-1, MH-C-2, MH-C-3, MH-C-4, MH-C-5, MH-C-6, MH-C-8,
214 KAIG3-RFI-WG-S-5658-00 Water Play Garden 10/28/21 MH-C-1-1, MH-C-1-2, MH-C-1-3, MH-C-1-4, MH-C-4-1, MH-C-4-2 & MH-C-4-3), Inside Water Garden, at highlighted area in C16/20 SRC P 28-30533 3
attached drawings. PASSED
216 KAIG3-RFI-CO-S-5656-00 Crescent 10/28/21 Concreting for BUTTRESS BOI 69 (2nd) Zone 2C C32/40 62% OPC+30%FA - 220+/-20 P 28-30535 10
PASSED
217 C32/40 62% OPC+30%FA - 220+/-20 P 28-30531 5
218 KAIG3-RFI-CO-S-5651-00 Crescent 10/30/21 Concreting for BUTTRESS BII 18, 19 (2ND) Zone 1E C32/40 62% OPC+30%FA - 220+/-20 P 28-30555 5
221 KAIG3-RFI-CO-S-5694-00 Crescent 10/31/21 Concreting for Plain Concrete of Strip footing between PC 193-195 Zone 2R C16/20 SRC P 28-30562 9 PASSED
Concrete Pouring & Shuttering for Footing at Grid (1-2 & 20-21/A-B), (2-6/A) & (12-20/A) Inside Butterfly Garden, as highlighted area
222 KAIG3-RFI-TG-S-5685-00 Butterfly Garden 10/31/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-30595 4
in attached drawings.
kaig-qcals 212
PASSED
Consultant : DAR
PASSED
kaig-qcals 213
Consultant : DAR
240 KAIG3-RFI-CO-S-5665-01 Crescent 10/31/21 Concreting for BUTTRESS BII 07 (1st) Zone 1B C32/40 62% OPC+30%FA - 220+/-20 P 28-30588 8
PASSED
241 C32/40 62% OPC+30%FA - 220+/-20 P 28-30577 12
242 KAIG3-RFI-SW-C-1866-00 Site Works 10/31/21 Inspection for Blinding Concrete under Transition Area (As Highlighted) C16/20 SRC P 28-30581 6 PASSED
C05 OPC 44
QC DC QC Manager
kaig-qcals 214
Consultant : DAR
1 KAIG3-RFI-SW-C-1920-00 Site Works 11/01/21 Inspection for Casting Blinding Concret under Manhole MH-K-01, MH-K-02 - as highlighted C16/20 SRC P 28-30605 7
PASSED
2 KAIG3-RFI-SW-C-1906-00 Site Works 11/01/21 Inspection for Casting Blinding Concret under Manhole MH-K-03, MH-K-04, MH-K-05, MH-K-06, MH-K-07 - as highlighted C16/20 SRC P 28-30598 10
3 KAIG3-RFI-CO-S-5698-00 Crescent 11/01/21 Concreting for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30616 12
Concrete pouring for Blinding of Manholes (6 no's: MH-C-2, MH-C-3, MH-C-8, MH-C-4-1, MH-C-4-2 & MH-C-4-3), Inside Water
7 KAIG3-RFI-WG-S-5626-00 Water Play Garden 11/01/21 C16/20 SRC P 28-30613 9 PASSED
Garden, at highlighted area in attached drawings.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
8 KAIG3-RFI-CO-S-5698-00 Crescent 11/01/21 Concreting for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N (as Highlighted) P 28-30620 12 PASSED
SCREED
9 KAIG3-RFI-MC-S-5610-01 MCPE 3 11/02/21 Concreting of MCPE 3 Wall at Axis 02R to 02Q (as highlighted) Zone 2E C32/40 62% OPC+30%FA - 160+/-40 P 28-30658 12
Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-12, FW-A-3-13, FW-A-3-14, FW-A-3-15, FW-A-3-16, FW-A-
16 KAIG3-RFI-SW-C-1924-00 Site Works 11/03/21 C16/20 SRC P 28-30680 6
3-17 (as Highlighted)
PASSED
17 KAIG3-RFI-SW-C-1905-00 Site Works 11/03/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-3-11 (as Highlighted C16/20 SRC P 28-30671 10
18 KAIG3-RFI-SW-C-1972-00 Site Works 11/03/21 Inspection of Concrete Pouring for Walls and Top Slab of SBC-08 As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-30694 12
Concrete pouring & Shuttering for Kicker of Circular Walls (10) (Remaining part at Entrance wall) Half Part 2, inside Maze garden, as
21 KAIG3-RFI-ZG-S-5726-00 Crescent 11/04/21
per highlighted area in attached drawing's.
C32/40 62% OPC+30%FA - 160+/-40 P 28-30715 7 PASSED
Concrete pouring & Shuttering for Kicker (1st Lift) of Straight Wall (Left Side) at Entrance, inside Maze garden, as per highlighted area
22 KAIG3-RFI-ZG-S-5684-00 Maze Garden 11/04/21
in attached drawing's.
Concrete Pouring & Shuttering for Wall of Straight Wall (Right Side) at Entrance, inside Maze garden, as per highlighted area in attached
23 KAIG3-RFI-ZG-S-5678-00 Maze Garden 11/04/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-30722 5
drawing's.
PASSED
24 C32/40 67%OPC+25%FA - 160+/-40 P 28-30719 12
Concrete pouring for Pipe Encasement of Manholes (Type 'A' 3 No's, 'B' 1 no's & 'C' 1 no's)(MH-D-03-02-02, MH-D-03-02-03, MH-D-
25 KAIG3-RFI-PG-S-5750-00 Physic Garden 11/04/21 C16/20 SRC P 29-19399 5 PASSED
05-01, MH-D-05-01-01 & MH-D-05-05) Inside Physic garden, as per highlighted area in attached drawing's.
PASSED
kaig-qcals 215
Consultant : DAR
31 KAIG3-RFI-CO-S-5674-00 Crescent 11/06/21 Concreting for Strip footing Between PC 32-34-36-38 Zone 1F C32/40 62% OPC+30%FA - 160+/-40 P 28-30744 12
35 KAIG3-RFI-SW-C-1927-00 Site Works 11/07/21 Inspection of Concrete Pouring for Walls and Top Slab of SBC-06 As Highlighted C32/40 62% OPC+30%FA - 160+/-40 P 28-30788 7
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
43 KAIG3-RFI-SW-C-1907-00 Site Works 11/07/21 Coat and 3rd Coat) for MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4, MH-F-02, MH-F-03, MH-F-04 (as highlighted C16/20 SRC P 28-30792 10 PASSED
area).
44 KAIG3-RFI-CO-S-5718-00 Crescent 11/07/21 Concreting for Mass Concrete at Zone 2J between PC 146-148, 150-152 (2nd Layer) C16/20 SRC P 28-30800 5
PASSED
45 C16/20 SRC P 28-30799 12
kaig-qcals 216
PASSED
Consultant : DAR
59 KAIG3-RFI-MC-S-5753-00 MCPE 1 11/08/21 Concreting for MCPE 1 Outer Wall at Axis 03T to 03S (as Highlighted) Zone 2N 2M C32/40 62% OPC+30%FA - 160+/-40 P 28-30818 9
66 KAIG3-RFI-SW-C-2028-00 Site Works 11/09/21 Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30840 8
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
71 KAIG3-RFI-SW-C-1907-00 Site Works 11/09/21 Coat and 3rd Coat) for MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4, MH-F-02, MH-F-03, MH-F-04 (as highlighted C16/20 SRC P 28-30846 5 PASSED
area).
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
76 KAIG3-RFI-SW-C-2148-00 Site Works 11/13/21 C16/20 SRC P 28-30946 10 PASSED
Coat and 3rd Coat) for MH-K-04, MH-K-05, MH-K-06 (As Highlighted)
Concrete pouring & Shuttering for Kicker (2nd Lift) of Straight Wall (Left Side) at Entrance, inside Maze garden, as per highlighted area
77 KAIG3-RFI-ZG-S-5793-00 Maze Garden 11/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19530 12
in attached drawing's.
Concrete Pouring & Shuttering of Footings of Boundary wall @ Grid (11-16/Right Side), Behind Plant room, of Aviary garden, At
78 KAIG3-RFI-AG-S-5794-00 Aviary Garden 11/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19529 12
Highlighted area in the attached drawing's.
PASSED
Concrete pouring for Blinding of Manhole (01 no's) (MH-D-04-01) at Entrance of Physic garden, as per highlighted area in attached
79 KAIG3-RFI-PG-S-5792-00 Physic Garden 11/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19525 12
drawing's.
Concrete pouring for Encasement of Shot piece's of Manholes (Type 'B' 1 No's)(MH-D-01-B5) Inside Sound & Light garden, as per
80 KAIG3-RFI-SG-S-5704-00 Sound & Light Garden 11/13/21 C32/40 62% OPC+30%FA - 160+/-40 P 29-19524 12
highlighted area in attached drawing's.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
81 KAIG3-RFI-CO-S-5771-01 Crescent 11/13/21 Concreting for BUTTRESS BII 10, 11, 12, 13 (w/ beam) Zone 1C 1D P 29-19534 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
82 P 29-19532 10
SCREED
kaig-qcals 217
Consultant : DAR
90 KAIG3-RFI-CO-S-5791-00 Crescent 11/14/21 Concreting for Strip footing Between PC 31, 33, 35, 37 Zone 1F C32/40 62% OPC+30%FA - 160+/-40 P 28-30973 8
91 KAIG3-RFI-MC-S-5810-00 MCPE 1 11/14/21 Concreting for MCPE 1 WALL (OUTER) at axis 03S to 03R Zone 2N 2M (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30972 10
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
96 KAIG3-RFI-SW-C-2148-00 Site Works 11/14/21 C16/20 SRC P 28-30971 3 PASSED
Coat and 3rd Coat) for MH-K-04, MH-K-05, MH-K-06 (As Highlighted)
97 KAIG3-RFI-CO-S-5785-01 Crescent 11/14/21 Concreting for Mass Concrete at Zone 2J between PC 146-148 (3rd Layer) C16/20 SRC P 28-30974 10 PASSED
100 KAIG3-RFI-MC-S-5802-00 MCPE 2 11/15/21 Concreting for Foundation of MCPE 2 Axis 02X TO 03E (As highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-30997 12
109 KAIG3-RFI-CO-S-5816-00 Crescent 11/15/21 Concreting of 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H C16/20 SRC P 29-19565 12
kaig-qcals 218
PASSED
Consultant : DAR
PASSED
kaig-qcals 219
Consultant : DAR
117 KAIG3-RFI-CO-S-5798-00 Crescent 11/16/21 Concreting for Ground beam between PC 37-39-41-43 Zone 1G C32/40 62% OPC+30%FA - 160+/-40 P 29-19577 10
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
124 KAIG3-RFI-SW-C-2147-00 Site Works 11/18/21 C16/20 SRC P 29-19635 9 PASSED
Coat and 3rd Coat) for FW-A-3-8, FW-A-3-9, FW-A-3-10 (As Highlighted)
125 KAIG3-RFI-SW-C-2225-00 Site Works 11/18/21 Inspection for Casting Blinding Concrete under Manhole MH-L-01, MH-L-02, MH-L-03, MH-L-04 - as highlighted C16/20 SRC P 28-31006 7 PASSED
129 KAIG3-RFI-SW-C-2260-00 Site Works 11/20/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-13-1, FW-A-13-2, FW-A-13-3, FW-A-13-4 (as Highlighted) C16/20 SRC P 28-31036 4
PASSED
130 KAIG3-RFI-SW-C-2226-00 Site Works 11/20/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-13-5, FW-A-13-6, FW-A-13-7, FW-A-13-8 (as Highlighted) C16/20 SRC P 28-31029 10
137 KAIG3-RFI-CO-S-5851-00 Crescent 11/21/21 Concreting for Mass Concrete for Stip footing between PC 127-129 Zone 2F C16/20 SRC P 28-31066 10
kaig-qcals 220
PASSED
Consultant : DAR
159 KAIG3-RFI-SW-C-2315-00 Site Works 11/23/21 Inspection of Concrete Pouring for the Foundation and Kicker of Transition Area (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 28-31109 5
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
165 KAIG3-RFI-SW-C-1889-00 Site Works 11/23/21 C16/20 SRC P 28-31112 8 PASSED
Coat and 3rd Coat) for MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-02 (As Highlighted)
Geo-Textile (Both sides 500mm wide) on Blinding under boundary wall @ Grid (11-16/Right Side), of Aviary garden, At Highlighted
166 KAIG3-RFI-AG-S-5780-00 Aviary Garden 11/24/21 C32/40 62% OPC+30%FA - 160+/-40 P 28-31150 10
area in the attached drawing's.
kaig-qcals 221
PASSED
Consultant : DAR
PASSED
kaig-qcals 222
Consultant : DAR
Concrete pouring for Encasement of Manhole (MH-D-01-A1-02-01,Type 'B' 1 no's) Inside Maze garden, as per highlighted area in
183 KAIG3-RFI-ZG-S-5882-00 Maze Garden 11/24/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-31139 6
attached drawing's.
Concrete pouring & Shuttering for Wall of Straight Wall (Left Side) at Entrance, inside Maze garden, as per highlighted area in attached
184 KAIG3-RFI-ZG-S-5883-00 Maze Garden 11/24/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-31138 12 PASSED
drawing's.
Concrete pouring & Shuttering for Wall of Circular Walls (10) (Remaining part at Entrance wall) Half Part 2, inside Maze garden, as per
185 KAIG3-RFI-ZG-S-5886-00 Maze Garden 11/24/21 C32/40 67%OPC+25%FA - 160+/-40 P 28-31137 12
highlighted area in attached drawing's.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
186 KAIG3-RFI-PG-S-5286-00 Physic Garden 11/25/21 Concrete Pouring & Shuttering for Wall & Columns of Outer Canopy 2 at Physic Garden, as per highlighted area in attached drawings. P 28-31175 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
187 P 28-31169 10
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
188 P 28-31166 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
189 P 28-31159 10
SCREED
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd
190 KAIG3-RFI-SW-C-2057-00 Site Works 11/27/21 C16/20 SRC P 28-31189 10 PASSED
Coat and 3rd Coat) for MH-E-03 (As Highlighted)
191 KAIG3-RFI-CO-S-5896-00 Crescent 11/27/21 Concreting of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D C16/20 SRC P 29-19713 12
192 KAIG3-RFI-CO-S-5898-00 Crescent 11/27/21 Concreting of 3rd layer Mass Concrete for Stip footing between PC 24-26 Zone 1D C16/20 SRC P 29-19712 12
200 KAIG3-RFI-CO-S-5892-00 Crescent 11/28/21 Concreting of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H C16/20 SRC P 28-31225 8 PASSED
kaig-qcals 223
Consultant : DAR
206 KAIG3-RFI-SW-C-1905-00 Site Works 11/30/21 Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-3-11 (as Highlighted) C16/20 SRC P 28-31277 5
220 KAIG3-RFI-SW-C-2542-00 Site Works 11/30/21 Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at Zone-G (As Highlighted) C32/40 92%SRC+8%MS - 160+/-40 P 28-31275 12 PASSED
221 KAIG3-RFI-SW-C-2360-00 Site Works 11/27/21 Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Zone-B (As Highlighted) C32/40 92%SRC+8%MS - 160+/-40 P 28-31188 12
kaig-qcals 224
Consultant : DAR
PASSED
Main Contractor: ZHBG
RUN DATE: February 12, 2023
C05 OPC 41
QC DC QC Manager
kaig-qcals 225
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
kaig-qcals 226
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
83 KAIG3-RFI-SW-C-2835-00 LOCATION
Site Works CASTING
12/09/21 Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/36 to G/MV/35 at Zone-G (As Highlighted) C32/40 67%OPC+25%FA - 160+/-40 No.
P 28-31563 3)
(m³
kaig-qcals 227
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI150
No. RFI NUMBER
KAIG3-RFI-SW-C-2962-00 Site Works 12/16/21 DESCRIPTION
Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/34 to G/MV/09 at Zone-G (As Highlighted) DESIGN MIX - 160+/-40
C32/40 67%OPC+25%FA P 28-31749 QUANTITY
2
LOCATION CASTING No.
(m³)
PASSED
151 C32/40 67%OPC+25%FA - 160+/-40 P 29-19853 12
kaig-qcals 228
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No.
(m³)
QC DC QC Manager
kaig-qcals 229
Consultant : DAR
20 KAIG3-RFI-CO-S-6143-00 Crescent 12/25/21 Concreting for BUTTRESS BOI BII 52 (2nd) Zone 1N C16/20 SRC 0010 10
23 KAIG3-RFI-CO-S-5896-01 Crescent 12/25/21 Concreting of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D C32/40 62% OPC+30%FA - 160+/-40 0020 10 14
kaig-qcals 230
Consultant : DAR
33 KAIG3-RFI-CO-S-5891-00 Crescent 12/26/21 Shuttering of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 0034 10 24
38 KAIG3-RFI-CO-S-5816-00 Crescent 12/26/21 Concreting of 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 0031 5 21
39 KAIG3-RFI-LM-S-6158-00 Large Mosque 12/27/21 Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd) C32/40 62% OPC+30%FA - 160+/-40 0052 10 33
48 KAIG3-RFI-LM-S-6158-00 Large Mosque 12/27/21 Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd) C32/40 62% OPC+30%FA - 160+/-40 0059 10 39
49 KAIG3-RFI-WG-S-6124-01 Water Play Garden 12/27/21 Concrete Pouring & Shuttering for Wall & Column of Boundary wall @ span 2 at Water Garden, as highlighted in Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 0062 10 41
kaig-qcals 231
Consultant : DAR
58 KAIG3-RFI-CO-S-6184-00 Crescent 12/28/21 Protectiol layer of geotextile and 50mm screed under TUNNEL 1 Foundation Zone 1C (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 0071 10 49
60 KAIG3-RFI-SW-C-3164-00 Site Works 12/30/21 Inspection for Blinding Concrete under Fire Water Line Pit B/F/06, B/F/07, B/F/08, B/F/09, B/F/12, B/F/15 at Zone-B - as highlighted C32/40 62% OPC+30%FA - 160+/-40 0108 5 82
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and Application of Primer (1st Coat,
62 KAIG3-RFI-SW-C-3157-00 Site Works 12/30/21 C32/40 62% OPC+30%FA - 160+/-40 0110 7 84
2nd Coat and 3rd Coat) As attached
63 KAIG3-RFI-SW-C-3182-00 Site Works 12/30/21 Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 0114 2 88
C05 OPC
QC DC QC Manager
kaig-qcals 232
Consultant : DAR
1 KAIG3-RFI-CO-S-6143-00 Crescent 12/25/21 Concreting for BUTTRESS BOI BII 52 (2nd) Zone 1N C16/20 SRC 0006 10
4 KAIG3-RFI-CO-S-5896-01 Crescent 12/25/21 Concreting of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D C32/40 62% OPC+30%FA - 160+/-40 0014 10
14 KAIG3-RFI-CO-S-5891-00 Crescent 12/26/21 Shuttering of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 0024 10
19 KAIG3-RFI-CO-S-5816-00 Crescent 12/26/21 Concreting of 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H C32/40 62% OPC+30%FA - 160+/-40 0021 5
20 KAIG3-RFI-LM-S-6158-00 Large Mosque 12/27/21 Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd) C32/40 62% OPC+30%FA - 160+/-40 0052 10
kaig-qcals 233
Consultant : DAR
32 KAIG3-RFI-WG-S-6124-01 Water Play Garden 12/27/21 Concrete Pouring & Shuttering for Wall & Column of Boundary wall @ span 2 at Water Garden, as highlighted in Attached Drawings. C32/40 62% OPC+30%FA - 160+/-40 0062 10
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications Line from G/TL/32 to G/TL/30 at Zone-G (As
40 KAIG3-RFI-SW-C-3092-00 Site Works 12/28/21 C32/40 62% OPC+30%FA - 160+/-40 00045 10
Highlighted)
41 KAIG3-RFI-CO-S-6184-00 Crescent 12/28/21 Protectiol layer of geotextile and 50mm screed under TUNNEL 1 Foundation Zone 1C (as Highlighted) C32/40 62% OPC+30%FA - 160+/-40 00049 10
43 KAIG3-RFI-SW-C-3164-00 Site Works 12/30/21 Inspection for Blinding Concrete under Fire Water Line Pit B/F/06, B/F/07, B/F/08, B/F/09, B/F/12, B/F/15 at Zone-B - as highlighted C32/40 62% OPC+30%FA - 160+/-40 0108 5
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and Application of Primer (1st Coat,
45 KAIG3-RFI-SW-C-3157-00 Site Works 12/30/21 C32/40 62% OPC+30%FA - 160+/-40 0110 7
2nd Coat and 3rd Coat) As attached
46 KAIG3-RFI-SW-C-3182-00 Site Works 12/30/21 Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 0114 2
C05 OPC
QC DC QC Manager
kaig-qcals 234
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE 28 DAYS
SI No. RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
LOCATION CASTING No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
1 KAIG3-RFI-MC-S-6148-01 MCPE 1/2/2022 Concreting for MCPE 3 WALL (OUTER ) at axis 02S to 02R Zone 2E 2F (as highlighted) P 28-32189 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
2 P 28-32178 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
3 P 28-32172 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
4 P 28-32165 8
SCREED
Concrete Pouring & Shuttering for Ring Beam & Remaining part of Wall @ Grid (10-16/Right Side) or Grid 11 to 17, on Boundary wall C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
5 KAIG3-RFI-AG-S-6229-00 Aviary Garden 1/2/2022 P 28-32169 6
at Aviary Garden, As per Highlighted in attached Drawing's. SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
6 P 28-32167 12 PASSED
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
7 P 28-32166 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
8 KAIG3-RFI-CO-S-6179-01 Crescent 1/3/2022 Concreting for BUTTRESS BII 60 (1st with Beam) Zone 2A P 28-32225 9
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
9 KAIG3-RFI-CO-S-6189-01 Crescent 1/3/2022 Concreting for BUTTRESS BII 61 (2nd) Zone 2A P 28-32215 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
10 KAIG3-RFI-MC-S-6204-00 MCPE 2 1/4/2022 Concreting for MCPE 2 WALL (OUTER ) at axis 03G to 02Y Zone 2G (as highlighted) P 28-32256 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
11 KAIG3-RFI-CO-S-6233-00 Crescent 1/4/2022 Concreting for Ring Beam (outer) Zone 2D as highlighted P 29-19900 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
12 P 28-32255 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
13 P 28-32254 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
14 P 29-19899 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
15 P 29-19898 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
16 P 28-32251 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
17 P 29-19897 12
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
18 P 29-19896 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
19 P 28-32247 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
20 P 28-32246 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
21 P 28-32245 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
22 P 28-32243 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
23 P 28-32239 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
24 P 28-32236 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
25 P 28-32231 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
26 KAIG3-RFI-CO-S-6261-00 Crescent 1/9/2022 Concreting for RING BEAM Zone 2M (inner) Axis 02-1, 02AL to 02AP P 29-19906 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
27 P 28-32329 13
SCREED
kaig-qcals 235
PASSED
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY NOTE
SI28
No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 - P 28-32328 QUANTITY
13
LOCATION CASTING SCREED No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
29 P 29-19905 13
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
30 P 28-32326 13
SCREED
PASSED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
31 P 29-19903 12
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
32 P 28-32325 11
SCREED
44 KAIG3-RFI-CO-S-6318-00 Crescent 1/13/2022 Concreting for Blinding of Retaining Wall (shearkey) of Zone 4 axis 01M to 01K C16/20 SRC P 28-32429 3
kaig-qcals 236
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI56
No. RFI NUMBER
KAIG3-RFI-CO-S-6361-00 Crescent 1/19/2022 DESCRIPTION
Concreting for Mass Concrete of Strip Footing Between PC 131 - 133 Zone 2F DESIGN MIX
C16/20 SRC P 29-20037 QUANTITY
7
LOCATION CASTING No.
(m³)
58 KAIG3-RFI-CO-S-6353-00 Crescent 1/19/2022 Concreting for Strip Footing between PC 146-148-150 Zone 2J C32/40 62% OPC+30%FA - 160+/-40 P 29-20049 12 PASSED
kaig-qcals 237
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
BUILDING/ DATE OF DELIVERY NOTE
SI No. RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 -
C32/40 62% OPC+30%FA+8% QUANTITY
83 LOCATION CASTING No.
P 29-20162 10 )
SCREED (m³
C05 OPC 30
QC DC QC Manager
kaig-qcals 238
Consultant : DAR
1 KAIG3-RFI-CO-S-6277-00 Crescent 3/1/2022 Concreting for RING BEAM Zone 2C (OUTER) Axis 02-2, 02G to 02J (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 0163 5
13 KAIG3-RFI-SW-C-3181-00 Site Works 3/1/2022 Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/09 to G/MV/10 at Zone-G (As Highlighted) C16/20 SRC 0165 5
15 KAIG3-RFI-TG-S-6245-00 Butterfly Garden 4/1/2022 Concrete Pouring for Blinding under foundation at Grid (A/6-16) @ Butterfly Garden, at highlighted area in attached drawings. C16/20 SRC 19 10
16 C16/20 SRC 18 10
17 KAIG3-RFI-SW-C-3198-00 Site Works 5/1/2022 Inspection of Concrete Pouring for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06 at Zone-G - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 37 4
27 KAIG3-RFI-SW-C-3197-00 Site Works 5/1/2022 Inspection of Concrete Pouring for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at Zone-G - As Highlighted C16/20 SRC 40 10
28 C16/20 SRC 38 10
kaig-qcals 239
Consultant : DAR
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short piece and Application of
35 KAIG3-RFI-SW-C-3209-00 Site Works 6/1/2022 Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-G-01-3, MH-G-01-2, MH-G-01-1, MH-G-01, MH-G-02, MH-G-03, MH-G-03-1, C16/20 SRC 80 2
MH-G-03-02, MH-G-04, MH-G-05, MH-G-06 AS HIGHLIGHTED.
36 C16/20 SRC 76 2
37 C16/20 SRC 63 10
38 KAIG3-RFI-TG-S-6267-00 Butterfly Garden 6/1/2022 Concrete Pouring for Blinding under foundation at Grid (A/8) @ Butterfly Garden, at highlighted area in attached drawings. C16/20 SRC 84 5
39 C16/20 SRC 83 10
40 C16/20 SRC 82 10
41 KAIG3-RFI-CO-S-6250-00 Crescent 8/1/2022 Concreting for Mass Concrete of Strip Footing Between PC 17 - 19 Zone 1C C16/20 SRC 145 9
kaig-qcals 240
Consultant : DAR
64 KAIG3-RFI-TG-S-6299-00 Butterfly Garden 9/1/2022 Concrete Pouring for Blinding of Internal foundations, Inside Butterfly Garden, at highlighted area in attached drawings. C16/20 SRC 165 5
72 C20/25-(OPC) 175 8
73 C20/25-(OPC) 174 11
74 C20/25-(OPC) 173 11
Concrete Pouring & Shuttering for Footings & Upstands (6 no's) of Canopy Inside Physic Garden, at highlighted area in attached
75 KAIG3-RFI-PG-S-6289-00 Physic Garden 10/1/2022 C32/40 62% OPC+30%FA - 160+/-40 190 5
drawings.
kaig-qcals 241
Consultant : DAR
Concreting for Isolated Foundation for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2, D-3, D-4, D-5, D-5.1, E-5.1) ZONE 1G
88 KAIG3-RFI-LM-S-6305-00 Large Mosque 11/1/2022 C32/40 62% OPC+30%FA - 160+/-40 216 8
(as highlighetd)
kaig-qcals 242
Consultant : DAR
121 KAIG3-RFI-CO-S-6349-00 Crescent 15/01/22 Concreting for Promenade Abutment Blinding at Zone 4 Grid P (as highlighted) C16/20 SRC 284 10
122 KAIG3-RFI-SW-C-3283-00 Site Works 15/01/22 Inspection for Casting the Blinding Concrete under the Manhole for FW-A-10, FW-A-11, FW-A-12 (as Highlighted) C16/20 SRC 291 5
125 KAIG3-RFI-SW-C-3353-00 Site Works 16/01/22 Inspection of Concrete Pouring for Canopy Foundation of Seating Area (1) Zone-K (SA-14) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 302 10
128 KAIG3-RFI-CO-S-6355-00 Crescent 16/01/22 Shuttering for Mass Concrete of Strip Footing Between PC 17 - 19 (3rd Layer)Zone 1C C32/40 62% OPC+30%FA - 160+/-40 331 10
kaig-qcals 243
Consultant : DAR
157 KAIG3-RFI-SW-C-3404-00 Site Works 18/01/22 Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-B - As Highlighted in the attached drawing C16/20 SRC 372 10
161 KAIG3-RFI-ZG-S-6341-01 Maze Garden 19/01/22 Concrete pouring for Blinding of Circular Walls (Remaining part), inside Maze garden, as highlighted area in attached drawing's. C16/20 SRC 383 5
163 KAIG3-RFI-CO-S-6366-00 Crescent 20/01/22 Anti Termite application under Mass Concrete of Strip Footing Between PC 150 - 152 Zone 2J C16/20 SRC 410 10
168 KAIG3-RFI-SW-C-3405-00 Site Works 20/01/22 Inspection of Thrust Block for UPVC Pipe (200 mm Dia) for Fire Water Line at Zone- B - As Highlighted in the attached drawing C16/20 SRC 411 10
169 KAIG3-RFI-SW-C-3457-00 Site Works 20/01/22 Inspection for Casting the Blinding Concrete under the Foundation of SBC-05 -Wing Wall (as Highlighted) C16/20 SRC 413 10
Concrete Pouring for Blinding under Foundations (16 nos.) at Grid (A & B/1-8) of Canopy at New Ticketing Booths at highlighted area
170 KAIG3-RFI-TB-S-6377-00 New Ticketing Booths 20/01/22 C16/20 SRC 416 11
in attached drawings.
kaig-qcals 244
Consultant : DAR
177 KAIG3-RFI-TG-S-6374-00 Butterfly Garden 22/01/22 Concrete Pouring & Shuttering for Footing at Grid (A/5-14 & A-B/14) @ Butterfly Garden, at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 474 10
191 KAIG3-RFI-SW-C-3495-00 Site Works 22/01/22 Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/19, B/FS/21, B/FS/22, B/FS/37 at Zone-B - as highlighted C16/20 SRC 470 6
197 KAIG3-RFI-SW-C-3511-00 Site Works 24/01/22 Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/36, B/TL/35, G/TL/32 at Zone-B&G - as highlighted C16/20 SRC 536 10
200 KAIG3-RFI-CO-S-6358-00 Crescent 24/01/22 Concreting for BUTTRESS BOI 59, 60 (1st with beam) Zone 2A C32/40 62% OPC+30%FA - 160+/-40 540 10
kaig-qcals 245
Consultant : DAR
216 KAIG3-RFI-PG-S-6392-00 Physic Garden 24/01/22 Concrete Pouring & Shuttering for Footing of Plant Room at Physic Garden, at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 541 10
Concrete Pouring & Shuttering for Stair Core Wall (upto Bottom of Slab), at Grid (G-F/8) at Management Building, As Highlighted in
218 KAIG3-RFI-MB-S-6376-00 Management Building 24/01/22 C32/40 62% OPC+30%FA - 160+/-40 542 10
Attached Drawing's
Inspection for Casting Concrete for Short Piece and Surface Preperation prior to start waterproofing for short piece and Application of
219 KAIG3-RFI-SW-C-3616-00 Site Works 25/01/22 C16/20 SRC 806 10
Primer (1st Coat, 2nd Coat and 3rd Coat) for Gullies G-H-1, G-H-2, G-H-3, G-H-4, G-H-5, G-H-6, G-H-7, G-H-8, G-H-9,
Concreting for Isolated Columns (upto SOG only) for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2, D-3, D-4, D-5, D-5.1, E-
224 KAIG3-RFI-LM-S-6381-00 Large Mosque 25/01/22 C32/40 62% OPC+30%FA - 160+/-40 469 8
5.1) ZONE 1G (as highlighted)
226 KAIG3-RFI-TB-S-6420-00 New Ticketing Booths 25/01/22 Concrete Pouring & Shuttering for Footings of Canopy Foundations (8 nos) at New Ticketing Booth at highlighted in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 811 10
kaig-qcals 246
Consultant : DAR
232 KAIG3-RFI-CO-S-6361-00 Crescent 26/01/22 Concreting for Mass Concrete of Strip Footing Between PC 131 - 133 Zone 2F C16/20 SRC 832 4
238 KAIG3-RFI-SW-C-3512-00 Site Works 27/01/22 Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/36, B/FS/27, G/FS/17 at Zone-B&G - as highlighted C16/20 SRC 583 10
Concrete Pouring for Blinding Under Electrical Handholes of Low voltage (MH/DG/LV/01-08), Telecom (MH/DG/TC/01-16),
245 KAIG3-RFI-DG-C-3605-00 Discovery Garden 27/01/22 Emergency (MH/DG/EM/01-17) and Fire Alarm & Security (MH/DG/FA/01-17), Inside Discovery Garden at highlighted area in C16/20 SRC 865 10
attached Drawing's.
Concrete pouring for Blinding under Electrical Handholes of Emergency (MH/ZG/EM/01-06 & 09-10), Fire Alarm & Security
252 KAIG3-RFI-ZG-C-3612-00 Maze Garden 29/01/22 C16/20 SRC 622 7
(MH/ZG/FA/01-09) and Telecom (MH/ZG/TC/01-05 & 08-12), inside Maze garden, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Footings of Canopy Foundations (8 no's) at Grid (A & B/5-8), at New Ticketing Booths, at
253 KAIG3-RFI-TB-S-6480-00 New Ticketing Booths 30/01/22 C32/40 62% OPC+30%FA - 160+/-40 649 11
highlighted area in attached drawings.
258 KAIG3-RFI-CO-S-6443-00 Crescent 30/01/22 Concreting for BUTTRESS BOV 22, 23 Zone 1F C32/40 62% OPC+30%FA - 160+/-40 659 8
kaig-qcals 247
Consultant : DAR
266 KAIG3-RFI-CO-S-6476-00 Crescent 31/01/22 Concreting for Mass Concrete (3rd) of Strip Footing Between PC 150 - 152 Zone 2J C16/20 SRC 674 4
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing and Application of Primer (1st Coat,
KAIG3-RFI-SW-C-3157-00 Site Works 22/01/22 C16/20 SRC 65755 10
2nd Coat and 3rd Coat) As attached
KAIG3-RFI-CO-S-6128-00 Crescent 22/01/22 Concreting for RING BEAM (Inner) Axis 02-2, 02J to 02N Zone 2D C32/40 62% OPC+30%FA - 160+/-40 65749 10
kaig-qcals 248
Consultant : DAR
C05 OPC
QC DC QC Manager
kaig-qcals 249
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
Protection layer of 4mm thick bituminous protection board for Isolated Column of Large Mosque (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-
1 KAIG3-RFI-LM-S-6510-00 Large Mosque 2/3/2022 P 29-20273 5
Zone 1G 20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
2 P 29-20271 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
3 P 29-20270 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
4 P 29-20267 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
5 P 29-20266 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
6 P 29-20264 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
7 P 29-20263 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
8 P 29-20262 13
20 - SCREED
9 KAIG3-RFI-CO-S-6496-00 Crescent 2/3/2022 Concreting for Mass Concrete of Strip Footing Between (2nd layer) PC 81-83, 80-82-84 Zone 1N (as highlighted) C16/20 SRC P 29-20277 7
kaig-qcals 250
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
29 RFI NUMBER
KAIG3-RFI-CO-S-6587-00 Crescent 2/10/2022 DESCRIPTION
Concreting for RING BEAM Zone 1D (INNER) Axis 01-1, 01J to 01M (as highlighted) DESIGN MIX MS - 220+/- P 29-20442 QUANTITY
13
No. LOCATION CASTING 20 - SCREED NOTE No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-
30 P 29-20439 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
31 P 29-20434 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
32 P 29-20431 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
33 P 29-20428 10
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
34 P 29-20426 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
35 P 29-20424 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
36 KAIG3-RFI-CO-S-6620-00 Crescent 2/13/2022 Concreting for RING BEAM Zone 1C (INNER) Axis 01-1, 01G to 01J (as highlighted) P 29-20469 11
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
37 P 29-20468 12
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
38 P 29-20467 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
39 P 29-20465 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
40 P 29-20464 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
41 P 29-20463 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
42 P 29-20462 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
43 KAIG3-RFI-CO-S-6637-00 Crescent 2/16/2022 Concreting for BUTTRESS BOI BOV 33, 34, 35, 36 Zone 1H 1J (as highlighted) P 29-20543 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
44 P 29-20542 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
45 P 29-20540 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
46 P 29-20539 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
47 P 29-20537 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
48 P 29-20536 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
49 P 29-20535 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
50 P 29-20534 13
20 - SCREED
Concrete Pouring & Shuttering for Walls & Columns (for Complete Height) at Grid (A&B/1-21 and A-B/1, 2, 20 & C32/40 62% OPC+30%FA+8% MS - 220+/-
51 KAIG3-RFI-TG-S-6702-00 Butterfly Garden 2/24/2022 P 29-20663 9
21) @ Butterfly Garden, at highlighted area in attached drawings. 20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
52 P 29-20662 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
53 P 29-20660 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
54 P 29-20657 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
55 P 29-20656 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
56 P 29-20655 13
20 - SCREED
kaig-qcals 251
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
57 RFI NUMBER
KAIG3-RFI-CO-S-6707-00 Crescent 2/23/2022 DESCRIPTION
Concreting for RING BEAM Zone 2L (INNER) Axis 02-1, 02AL to 02AH (as highlighted) DESIGN MIX MS - 220+/- P 29-20647 QUANTITY
13
No. LOCATION CASTING 20 - SCREED NOTE No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-
58 P 29-20646 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
59 P 29-20645 10
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
60 P 29-20644 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
61 P 29-20643 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
62 P 29-20642 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
63 P 29-20641 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
64 P 29-20640 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
65 P 29-20639 13
20 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-
66 P 29-20637 10
20 - SCREED
C05 OPC
QC DC QC Manager
kaig-qcals 252
Consultant : DAR
1 KAIG3-RFI-CO-S-6486-00 Crescent 2/1/2022 Concreting for BUTTRESS BOI 59, 60 (2nd) Zone 2A C32/40 62% OPC+30%FA - 160+/-40 666 6
7 KAIG3-RFI-CO-S-6527-00 Crescent 2/1/2022 Concreting for Infill Wall Between BI 87-88 (Inner) as highlighted Zone 2G between Gridline 02-1W - 02-1X C32/40 62% OPC+30%FA - 160+/-40 66613 8
kaig-qcals 253
Consultant : DAR
39 KAIG3-RFI-SW-C-3732-00 Site Works 2/2/2022 Inspection for Casting Blinding Concrete under Manhole - MH-M-07, MH-M-08, MH-M-09, MH-M-10 - as highlighted C16/20 SRC 66631 7
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line between G/TL/31 to G/TL/29 at Zone-G - As
40 KAIG3-RFI-SW-C-3752-00 Site Works 2/2/2022 C32/40 62% OPC+30%FA - 160+/-40 66637 10
Highlighted
Shuttering for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) between axis (2,B-C), (1,C-F), (F,1-2),
42 KAIG3-RFI-LM-S-6414-00 Large Mosque 2/3/2022 C32/40 62% OPC+30%FA - 160+/-40 66689 10
(2,E-F), (E,2-3)
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at Zone-G - As
50 KAIG3-RFI-SW-C-3761-00 Site Works 2/3/2022 C32/40 62% OPC+30%FA - 160+/-40 66681 10
Highlighted
51 KAIG3-RFI-SW-C-3762-00 Site Works 2/3/2022 Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at Zone-G - As Highlighted C16/20 SRC 66688 3
54 KAIG3-RFI-TG-S-6492-01 Butterfly Garden 2/5/2022 Concrete Pouring & Shuttering for Footings of Internal foundations, Inside Butterfly Garden, at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 66715 10
56 KAIG3-RFI-SW-C-3780-00 Site Works 2/5/2022 Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line near G/FS/18 at Zone-G - As Highlighted C16/20 SRC 66718 10
kaig-qcals 254
Consultant : DAR
Concrete Pouring & Shutteirng for Wall (200mm thk. Outer Wall) at Grid (A/1-21) @ Butterfly Garden, as highlighted area in attached
72 KAIG3-RFI-TG-S-6540-00 Butterfly Garden 2/6/2022 C32/40 62% OPC+30%FA - 160+/-40 66843 7
drawings.
78 KAIG3-RFI-CO-S-6556-00 Crescent 2/7/2022 Geotextile sheet & Screed Protection under Strip footing between PC 80-82-84, 81-83 Zone 1N (as Highlighted) C16/20 SRC 66853 7
85 KAIG3-RFI-SW-C-3804-01 Site Works 2/7/2022 Inspection of Concrete Pouring for the Footing of SBC-09 - Wing Wall (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 66851 10
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for G/RC-FS/27 and G/RC-FS/11 at Zone-G - As
86 KAIG3-RFI-SW-C-3824-00 Site Works 2/7/2022 C16/20 SRC 66855 6
Highlighted
kaig-qcals 255
Consultant : DAR
93 KAIG3-RFI-SW-C-3804-01 Site Works 2/8/2022 Inspection of Concrete Pouring for the Footing of SBC-09 - Wing Wall (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 66876 10
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between G/RC-TL/3 and G/RC-TL/2 at Zone-G - As
97 KAIG3-RFI-SW-C-3821-00 Site Works 2/8/2022 C16/20 SRC 66887 4
Highlighted
98 KAIG3-RFI-CC-S-6572-00 Child Care 2/8/2022 Concreting of Mass Concrete, Blinding of CHILDCARE foundation Zone 2N (as highlighted) C16/20 SRC 66894 10
102 KAIG3-RFI-CO-S-6559-00 Crescent 2/9/2022 Concreting for Mass Concrete of Strip Footing Between (2nd layer) PC 79-81 Zone 1N (as highlighted) C16/20 SRC 66909 10
107 KAIG3-RFI-CO-S-6482-00 Crescent 2/9/2022 Concreting of 2 side Wall for Tunnel 1 as highlighted Zone 2H. C32/40 62% OPC+30%FA - 160+/-40 66928 2
kaig-qcals 256
Consultant : DAR
122 KAIG3-RFI-SW-C-4033-00 Site Works 2/12/2022 Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-F&G - As Highlighted in the attached drawing C16/20 SRC 1029 3
127 KAIG3-RFI-CC-S-6635-00 Child Care 2/13/2022 Concreting of CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 1054 10
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/49 and B/TL/40 at Zone-B - As
129 KAIG3-RFI-SW-C-3938-00 Site Works 2/13/2022 C16/20 SRC 1076 10
Highlighted
Concrete Pouring & Shuttering for Wall (200mm thk. Inner Wall) at Grid (A/2-20) @ Butterfly Garden, as highlighted area in attached
134 KAIG3-RFI-TG-S-6607-00 Butterfly Garden 2/13/2022 C32/40 62% OPC+30%FA - 160+/-40 1061 5
drawings.
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/TL/39 and B/RC-TL/02 at Zone-B - As
137 KAIG3-RFI-SW-C-3915-00 Site Works 2/13/2022 C32/40 62% OPC+30%FA - 160+/-40 1079 10
Highlighted
kaig-qcals 257
Consultant : DAR
149 KAIG3-RFI-CC-S-6635-00 Child Care 2/14/2022 Concreting of CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 1129 8
156 KAIG3-RFI-SW-C-3976-00 Site Works 2/15/2022 Inspection of Concrete Pouring for the Wall and Slab of Extension Area of SBC-05 - (As Highlighted). C32/40 62% OPC+30%FA - 160+/-40 1216 5
157 KAIG3-RFI-CO-S-6639-00 Crescent 2/15/2022 Shuttering for Strip Footing between PC 2-4-8 Zone 1A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 67125 10
168 KAIG3-RFI-SW-C-4062-00 Site Works 2/15/2022 Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-02 - Wing Wall (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 67117 10
kaig-qcals 258
Consultant : DAR
189 KAIG3-RFI-SW-C-4105-00 Site Works 2/19/2022 Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/11 at Zone-B - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 1413 10
190 KAIG3-RFI-MC-S-6701-00 MCPE 4 2/19/2022 Concreting for (2nd) Blinding of MCPE 4 Foundation Zone 1N (as highlighted) C16/20 SRC 1409 4
191 KAIG3-RFI-CO-S-6680-00 Crescent 2/19/2022 Concreting for BUTTRESS BIV 33, 34, 35 Zone 1H 1J C32/40 62% OPC+30%FA - 160+/-40 1414 10
192 KAIG3-RFI-SW-C-4062-00 Site Works 2/20/2022 Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-02 - Wing Wall (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 1519 10
197 KAIG3-RFI-SW-C-4113-00 Site Works 2/20/2022 Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/8 at Zone-B - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 1504 10
199 KAIG3-RFI-CO-S-6652-00 Crescent 2/20/2022 Concreting for BUTTRESS BOI 29, 30, 31, 32 (with beam) Zone 1G 1H C32/40 62% OPC+30%FA - 160+/-40 1471 10
200 KAIG3-RFI-SW-C-4146-00 Site Works 2/20/2022 Inspection of Concrete Pouring for the Footing and Kicker of Corner Connection between SBC-01 & SBC-02 - (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 1517 5
202 KAIG3-RFI-CO-S-6680-00 Crescent 2/20/2022 Concreting for BUTTRESS BIV 33, 34, 35 Zone 1H 1J C16/20 SRC 1511 3
kaig-qcals 259
Consultant : DAR
204 KAIG3-RFI-PG-S-6715-00 Physic Garden 2/21/2022 Concrete Pouring for Blinding under Seat Walls (Outer), Inside Physic garden, as highlighted area in attached drawing's. C16/20 SRC 67459 8
216 KAIG3-RFI-TB-S-6696-00 New Ticket Booth 2/23/2022 Concrete Pouring & Shuttering for Starter (Kicker) for Wall of New Ticketing Booth # 5A, at highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 67483 3
217 KAIG3-RFI-SW-C-4120-00 Site Works 2/23/2022 Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-K - As Highlighted in the attached drawing C16/20 SRC 67492 6
219 KAIG3-RFI-SW-C-4188-00 Site Works 2/24/2022 Inspection of Concrete Pouring for the Wing Wall of SBC-05 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 67534 10
Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/15, F/TL/12, F/TL/14, F/TL/03, F/TL/04, F/TL/16, G/TL/43,
221 KAIG3-RFI-SW-C-4240-00 Site Works 2/24/2022 C16/20 SRC 67556 4
G/TL/21, G/TL/13, G/TL/44, G/TL/50, G/TL/54, G/TL/16 at Zone-F&G - as highlighted
226 KAIG3-RFI-SW-C-4185-00 Site Works 2/26/2022 Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-04 - Wing Wall (As Highlighted) C16/20 SRC 1763 3
kaig-qcals 260
Consultant : DAR
Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/15, F/TL/12, F/TL/14, F/TL/03, F/TL/04, F/TL/16, G/TL/43,
237 KAIG3-RFI-SW-C-4240-00 Site Works 2/27/2022 C16/20 SRC 1820 5
G/TL/21, G/TL/13, G/TL/44, G/TL/50, G/TL/54, G/TL/16 at Zone-F&G - as highlighted
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing for short piece and Application of
240 KAIG3-RFI-SW-C-4252-00 Site Works 2/28/2022 C32/40 62% OPC+30%FA - 160+/-40 1886 10
Primer (1st Coat, 2nd Coat and 3rd Coat) for MH-M-07, MH-M-08, MH-M-09, MH-M-10 (As Highlighted)
Inspection for Blinding Concrete under Fire & Security Line Pit F/FS/17, F/FS/11, F/FS/03, F/FS/04, F/FS/14, G/FS/07, G/FS/21,
242 KAIG3-RFI-SW-C-4241-00 Site Works 2/28/2022 C16/20 SRC 1896 10
G/FS/08, G/FS/30, G/FS/52, G/FS/19 at Zone-F&G - as highlighted
244 KAIG3-RFI-CO-S-6739-00 Crescent 2/28/2022 Concreting for RETAINING WALL FOUNDATION Axis 01J to 01K (as highlighted) Zone 1D C32/40 62% OPC+30%FA - 160+/-40 1908 10
247 KAIG3-RFI-CO-S-6758-00 Crescent 2/28/2022 Concreting for Promenade Bridge Abutment Blinding under foundation at Grid M (as highlighted) C16/20 SRC 1909 10
C05 OPC
QC DC QC Manager
kaig-qcals 261
Consultant : DAR
kaig-qcals 262
Consultant : DAR
kaig-qcals 263
Consultant : DAR
C05 OPC
QC DC QC Manager
kaig-qcals 264
Consultant : DAR
GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-CO-S-6800-00 Crescent 3/5/2022 Concreting for RING BEAM Zone 2L (OUTER) Axis 02-1, 02AL to 02AH (as highlighted) P 28-32795 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
2 P 28-32794 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
3 P 28-32793 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
4 P 29-20806 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
5 P 29-20803 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
6 P 29-20802 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
7 P 29-20800 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
8 P 29-20799 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
9 P 29-20796 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
10 P 29-20794 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
11 P 29-20793 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
12 P 29-20790 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
13 KAIG3-RFI-CO-S-6805-01 Crescent 3/8/2022 Concreting for Strip Footing between PC 1-3-5 Zone 1A (as highlighted) P 28-32846 9
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
14 P 28-32842 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
15 P 28-32841 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
16 P 28-32839 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
17 P 28-32838 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
18 P 28-32837 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
19 P 28-32836 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
20 KAIG3-RFI-CO-S-6859-00 Crescent 3/10/2022 Concreting for RING BEAM Zone 2E (OUTER) Axis 02-2, 02N to 02R (as highlighted) P 29-20849 3
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
21 P 29-20847 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
22 P 29-20846 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
23 P 29-20844 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
24 P 29-20842 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
25 P 29-20841 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
26 P 29-20838 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
27 P 29-20837 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
28 P 29-20834 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
29 P 29-20833 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
30 P 29-20832 13
- SCREED
kaig-qcals 265
Consultant : DAR
GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
31 RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 P 29-20831 QUANTITY
13
No. LOCATION CASTING - SCREED NOTE No.
(m³)
kaig-qcals 266
Consultant : DAR
GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
33 RFI NUMBER
KAIG3-RFI-CO-S-6895-00 Crescent 3/15/2022 DESCRIPTION
Concreting for RING BEAM Zone 2E (INNER) Axis 02-1, 02N to 02R (as highlighted) DESIGN MIX MS - 220+/-20 P 29-20919 QUANTITY
9
No. LOCATION CASTING - SCREED NOTE No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
34 P 29-20918 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
35 P 29-20917 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
36 P 29-20916 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
37 P 29-20915 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
38 P 29-20911 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
39 P 29-20912 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
40 P 29-20910 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
41 P 29-20908 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
42 KAIG3-RFI-CO-S-6947-00 Crescent 3/17/2022 Shuttering and Shear Connector for BUTTRESS BOV 42 & 43 Zone 1K 1L (as highlighted) P 29-20955 12
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
43 P 29-20952 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
44 P 29-20950 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
45 P 29-20947 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
46 P 29-20946 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
47 P 29-20945 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
48 P 29-20944 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
49 P 29-20943 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
50 P 29-20942 13
- SCREED
Concrete Pouring Screed protection of water proofing for wet well( E ) ,at Water Garden as highlighted area in C32/40 62% OPC+30%FA+8% MS - 220+/-20
51 KAIG3-RFI-WG-S-6986-00 Water Play Garden 3/21/2022 P 29-20991 6
attached drawing's. - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
52 P 29-21014 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
53 P 29-21013 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
54 P 29-21012 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
55 P 29-21011 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
56 P 29-21010 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
57 P 29-21008 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
58 P 29-21005 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
59 P 29-21004 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
60 P 29-21001 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
61 P 29-20995 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
62 P 29-20994 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
63 P 29-20992 13
- SCREED
kaig-qcals 267
Consultant : DAR
GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
Concrete Pouring for Blinding under Electrical Handholes of 10 Nos (MH/WG/EM/7 to15 & 29), (MH/WG/LV/1 to TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY
64 RFI NUMBER
KAIG3-RFI-WG-C-4717-00 Crescent 3/21/2022 56) and 14 Nos (MH/WG/FA/1 7to 29&53 ), insideDESCRIPTION
water play Garden, at water Gardenas highlighted area in DESIGN MIX
C16/20 SRC P 29-20993 QUANTITY
7
No. LOCATION CASTING NOTE No.
attached drawing's. (m³)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) around Potable Water Line Pit for C32/40 62% OPC+30%FA+8% MS - 220+/-20
75 KAIG3-RFI-SW-C-4772-00 Site Works 3/23/2022 P 29-21085 3
C/PW/01 at Zone-C - as highlighted (SP# 133 A-1-B) - SCREED
89 KAIG3-RFI-PG-S-6989-00 Physic Garden 3/24/2022 Concrete Pouring for blinding under Fountain of (5 nos) at Physic Garden as highlighted area in attached drawing's. C16/20 SRC P 29-21160 7
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) around Potable Water Line Pit for C32/40 62% OPC+30%FA+8% MS - 220+/-20
90 KAIG3-RFI-SW-C-4771-00 Site Works 3/26/2022 P 29-21212 3
C/PW/01 at Zone-C - as highlighted (SP# 133 A-1-B) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
91 P 28-32916 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
92 P 28-32915 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
93 P 28-32914 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
94 P 28-32913 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
95 P 28-32912 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
96 P 28-32911 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
97 P 28-32910 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
98 P 28-32908 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
99 P 28-32907 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
102 KAIG3-RFI-CO-S-6939-00 Crescent 3/30/2022 Concreting for Tunnel 1 to MCPE Suspended Slab (as highlighted) P 28-33007 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
103 P 28-33006 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
104 P 28-33005 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
105 P 28-33004 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
106 P 28-33003 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
107 P 28-33001 13
- SCREED
kaig-qcals 268
Consultant : DAR
GREEN CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF MARCH 2022
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF C32/40 62% OPC+30%FA+8% DELIVERY
108 RFI NUMBER DESCRIPTION DESIGN MIX MS - 220+/-20 P 28-33000 QUANTITY
13
No. LOCATION CASTING - SCREED NOTE No.
(m³)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
109 P 28-32999 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
110 P 28-32998 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
111 3/29/2022 P 29-21327 4
- SCREED
Management Concrete Pouring & Shuttering for Slab and Parapet of Stair Core Room, at Grid (G-F/8), on Management Building
112 KAIG3-RFI-MB-S-7063-00 3/30/2022 C32/40 67%OPC+25%FA - 160+/-40 P 28-32991 7
Building as highlighted area in attached drawing's.
C32/40 62% OPC+30%FA+8% MS - 220+/-20
68 P 29-21052 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
69 P 29-21050 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
70 P 29-21051 3
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
71 P 29-21046 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
72 P 29-21038 10
- SCREED
Concrete Pouring for Electrical Handholes of Emergency (MH/WG/LV/44 to 47) and (MH/WG/FA/27 to 31) inside
32 KAIG3-RFI-WG-C-4515-00 Water Play Garden 3/12/2022 C32/40 62% OPC+30%FA - 160+/-40 P 29-20851 13
Boat Garden as highlighted area in attached draiwings.
C05 OPC
QC DC QC Manager
kaig-qcals 269
Consultant : DAR
4 KAIG3-RFI-CO-S-6767-00 Crescent 3/1/2022 Concreting for Strip Footing between PC 79-81, 82-84 Zone 1N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 1960 5
Concrete pouring for blinding under Electrical Handholes of Emergency (MH/ZG/EM/07 & 08), (MH/ZG/LV/07 & 08) & Telecom
9 KAIG3-RFI-ZG-C-4307-00 Maze Garden 3/1/2022 C16/20 SRC 1948 6
(MH/ZG/TC/09 ), inside Maze garden, as highlighted area in attached drawing's.
Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/20, K/FS/19, K/FS/08, K/FS/07, K/FS/10, K/FS/11, K/FS/16,
10 KAIG3-RFI-SW-C-4341-00 Site Works 3/2/2022 C16/20 SRC 1987 4
K/FS/18 at Zone-K - as highlighted
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
11 KAIG3-RFI-PC-S-6747-00 Crescent 3/2/2022 Concreting for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M - 01P) (as highlighted) 2031 4
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
12 2010 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
13 1988 10
SCREED
14 KAIG3-RFI-CO-S-6769-00 Crescent 3/2/2022 Concreting for BUTTRESS BIV BOV 50-51 Zone 1N 1M C32/40 62% OPC+30%FA - 160+/-40 1991 10
17 KAIG3-RFI-CF-S-6754-00 Cafeteria 3/2/2022 Concreting for Blinding of Cafeteria Foundation at Zone 2A (as highlighted). C16/20 SRC 2036 8
25 KAIG3-RFI-SW-C-4281-00 Site Works 3/2/2022 Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/6, B/RC-FS/7 at Zone-B - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 2020 10
kaig-qcals 270
Consultant : DAR
31 KAIG3-RFI-SW-C-4316-00 Site Works 3/3/2022 Inspection of Concrete Pouring for the Footing of SBC-03 - Wing Wall - (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 2070 10
Concrete pouring and Shuttering for Kicker of Plant Room at Physic Garden, at highlighted area in attached drawings. Attached KAIG3-
35 KAIG3-RFI-PG-S-6781-00 Physic Garden 3/3/2022 C32/40 62% OPC+30%FA - 160+/-40 2063 10
SCR-PG-S-0142-00-Reply.
Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/02, K/FS/24, K/FS/17, K/FS/13, K/FS/14, K/FS/12 at Zone-K - as
39 KAIG3-RFI-SW-C-4356-00 Site Works 3/3/2022 C16/20 SRC 2077 10
highlighted
41 KAIG3-RFI-CO-S-6797-00 Crescent 3/3/2022 Concreting for Blinding of Retaining Wall of Zone 1D axis 01J to 01G (as highlighted) C16/20 SRC 2061 10
50 KAIG3-RFI-CO-S-6797-00 Crescent 3/5/2022 Concreting for Blinding of Retaining Wall of Zone 1D axis 01J to 01G (as highlighted) C16/20 SRC 2120 10
52 KAIG3-RFI-CO-S-6856-00 Crescent 3/6/2022 Geotextile and Screedd under Strip Footing Between PC 143-145 Zone 2H (as Highlighted) C16/20 SRC 2180 3
Inspection for Blinding Concrete under Fire & Security Line Pit G/FS/22, G/FS/06, G/FS/05, G/FS/01, G/FS/11, G/FS/34 at Zone-G - as
53 KAIG3-RFI-SW-C-4466-00 Site Works 3/6/2022 C16/20 SRC 2181 4
highlighted
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
54 KAIG3-RFI-CO-S-6806-00 Crescent 3/6/2022 Steel Reinforcements for Tunnel 1 (mid) wall part-C (as Highlighted) Zone 2H 2188 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
55 2182 10
SCREED
56 KAIG3-RFI-SW-C-4420-00 Site Works 3/6/2022 "Inspection of Formwork for the Concrete Pouring of SBC-04 - Wing Wall - (As Highlighted)" C32/40 62% OPC+30%FA - 160+/-40 2191 10
kaig-qcals 271
Consultant : DAR
Concrete pouring for Blinding under Seat Walls (A & C) and along Whispering Cave-1, Inside Sound & Light garden, as per highlighted
61 KAIG3-RFI-SG-S-6814-00 Sound & Light Garden 3/6/2022 C16/20 SRC 2190 7
area in attached drawing's.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
62 KAIG3-RFI-CO-S-6867-00 Crescent 3/7/2022 Surface Preparation and Solvent Base Primer under Retaining Wall foundation (as Highlighted) ZONE 1D Axis 01J to 01K 2255 3
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
63 2238 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
64 2227 10
SCREED
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for C/RC-FS/5 at Zone-C - As Highlighted
65 KAIG3-RFI-SW-C-4398-00 Site Works 3/7/2022 C32/40 62% OPC+30%FA - 160+/-40 2229 10
(SCR:KAIG3-SCR-CO-S-0129-00)
kaig-qcals 272
Consultant : DAR
Grouting of Installed Anchor bolt and under Baseplate at Zone 1B OUTER ring beam (as highlighted) using MASTERFLOW 980 (main)
94 KAIG3-RFI-CO-S-6851-00 Crescent 3/8/2022 C32/40 62% OPC+30%FA - 160+/-40 2289 10
Inspection for Blinding Concrete under Fire & Security Line Pit G/FS/22, G/FS/06, G/FS/05, G/FS/01, G/FS/11, G/FS/34 at Zone-G - as
96 KAIG3-RFI-SW-C-4466-00 Site Works 3/9/2022 C16/20 SRC 2304 4
highlighted
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
97 KAIG3-RFI-CO-S-6844-00 Crescent 3/9/2022 Concreting for BUTTRESS BIV BOV 48 Zone 1M 2309 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
98 2305 10
SCREED
99 KAIG3-RFI-SW-C-4438-00 Site Works 3/9/2022 Inspection of Concrete Pouring for the Wing Wall of SBC-02 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 2308 6
100 KAIG3-RFI-LM-S-6865-00 Large Mosque 3/9/2022 Concrerting for Isolated Columns (C3, C4, D1.1, D2, D3, D4, E1.1) as highlighted at Large Mosque C32/40 62% OPC+30%FA - 160+/-40 2313 2
105 KAIG3-RFI-PC-S-6879-00 Promenade Bridge 3/12/2022 Steel Reinforcements for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M) (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 2383 10
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for C/RC-FS/34, C/RC-FS/35, C/RC-FS/33,
109 KAIG3-RFI-SW-C-4544-00 Site Works 3/12/2022 C32/40 62% OPC+30%FA - 160+/-40 2385 10
C/RC-FS/32, C/RC-FS/31, C/RC-FS/28 at Zone-C - As Highlighted (SCR:KAIG3-SCR-CO-S-0129-00)
kaig-qcals 273
Consultant : DAR
Site Works/ Boundary Concrete Pouring for Columns of Boundary wall (C- 50A, C-50B,C- 51,C- 52,C-53,C-54 and C- 55 ) As per Attached Highlighted
124 KAIG3-RFI-SW-S-6896-00 3/14/2022 C32/40 62% OPC+30%FA - 160+/-40 2452 8
Wall Drawing's.
126 KAIG3-RFI-CO-S-6903-00 Crescent 3/14/2022 Concreting for Blinding of Diaphragm wall at Zone 2N Axis 02R & 02Q (as highlighted) C16/20 SRC 2450 10
Inspection for Blinding Concrete under Fire Water Line Pit for H/F/06, H/F/07, H/F/09, H/F/12, L/F/01, L/F/02, L/F/03, L/F/06 at Zone-
128 KAIG3-RFI-SW-C-4582-00 Site Works 3/14/2022 C16/20 SRC 2453 5
H&L - as highlighted
129 KAIG3-RFI-CO-S-6888-00 Crescent 3/14/2022 Concreting for RETAINING WALL FOUNDATION Axis 01G to 01J (as highlighted) Zone 1D C32/40 62% OPC+30%FA - 160+/-40 2482 10
139 KAIG3-RFI-CO-S-6891-00 Crescent 3/15/2022 Concreting for Infill wall BO 123-124 (as highlighted) Zone 2Q outer between Gridline 02-2AY - 02-2AZ C32/40 62% OPC+30%FA - 160+/-40 2525 4
141 KAIG3-RFI-WG-S-6900-00 Water Play Garden 3/15/2022 Concrete Pouring of blinding for wet well( E ) ,at Water Garden as highlighted area in attached drawing's. C16/20 SRC 2528 10
143 KAIG3-RFI-SW-C-4589-00 Site Works 3/15/2022 Inspection of Concrete Pouring for the Wing Wall ( F1 & F2) of SBC-03 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 2526 6
145 KAIG3-RFI-CF-S-6913-00 Cafeteria 3/15/2022 Concreting for Cafeteria Foundation P1, 2, 3 & 4, RAFT 3 & 4(as highlighted) Zone 2A C32/40 62% OPC+30%FA - 160+/-40 2545 5
kaig-qcals 274
Consultant : DAR
Concrete Pouring for blinding under Seat wall (outer),(small part) and blinding of plant room (Remaining part ),at Physic Garden, at
168 KAIG3-RFI-PG-S-6932-00 Physic Garden 3/16/2022 C16/20 SRC 2566 2
highlighted area in attached drawings.
169 KAIG3-RFI-CO-S-6903-00 Crescent 3/16/2022 Concreting for Blinding of Diaphragm wall at Zone 2N Axis 02R & 02Q (as highlighted) C16/20 SRC 2571 10
171 KAIG3-RFI-SW-C-4635-00 Site Works 3/17/2022 Inspection for Blinding Concrete under Potable Water Line Pit for C/PW/05, C/PW/08, H/PW/02 at Zone-C&H - as highlighted C16/20 SRC 2624 2
173 KAIG3-RFI-CO-S-6939-00 Crescent 3/17/2022 Concreting for Tunnel 1 to MCPE Suspended Slab (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 2635 11
kaig-qcals 275
Consultant : DAR
187 KAIG3-RFI-MC-S-6949-00 MCPE 4 3/19/2022 Concreting for MCPE 4 Ground wall and roof Slab at axis 01AP Zone 1N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 2703 4
191 KAIG3-RFI-TB-S-6909-00 New Ticketing Booth 3/19/2022 Concrete pouring and shutting of starter ( Kicker ) for wall of new ticketing booth #2A As per Attached Highlighted Drawing's. C32/40 62% OPC+30%FA - 160+/-40 2693 4
192 KAIG3-RFI-SW-C-4722-00 Site Works 3/20/2022 Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/35 to B/TL/36 at Zone-B - As Highlighted C16/20 SRC 2717 6
Concreting for MCPE 3 Columns (c9 - c10 - c11 - c12 - c13 - c14 - c15 - c16) at Ground Floor axis 02S to 02P, 03-2 Zone 2E 2F (as
193 KAIG3-RFI-MC-S-6952-00 MCPE 3 3/20/2022 C32/40 62% OPC+30%FA - 160+/-40 2718 10
highlighted)
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
194 KAIG3-RFI-CO-S-6929-00 Crescent 3/20/2022 Concreting for RETAINING WALL (WALL KICKER) Axis 01G to 01J (as highlighted) Zone 1D 2726 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
195 2734 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
196 2735 6
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
197 KAIG3-RFI-CO-S-6959-00 Crescent 3/21/2022 Concreting for Buttress BOV BIV 38, 39 & 40 Zone 1K & 1J. 2791 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
198 2773 10
SCREED
199 KAIG3-RFI-SW-C-4726-00 Site Works 3/21/2022 Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from B/FS/27 to B/FS/36 at Zone-B - As Highlighted C16/20 SRC 2793 5
206 KAIG3-RFI-SW-C-4738-00 Site Works 3/22/2022 Inspection for Blinding Concrete under Fire Water Line Pit for C/F/16, C/F/17 at Zone-C - as highlighted C16/20 SRC 2853 10
kaig-qcals 276
Consultant : DAR
210 KAIG3-RFI-PC-S-6981-00 Bridge to South Tower 3/22/2022 Concreting for Blinding of Bridge to south tower abutments wall at grid 02C Zone 7 (as highlighted) C16/20 SRC 2856 10
Promenade Bridge
212 KAIG3-RFI-PC-S-7033-00 3/23/2022 Concreting for Promenage Bridge Abutment Wall (2nd) at Grid P Zone 4 C32/40 62% OPC+30%FA - 160+/-40 2884 10
Abutment
215 KAIG3-RFI-SW-C-4736-00 Site Works 3/23/2022 Inspection of Concrete Pouring for wall and Top Slab of Corner Connection between SBC-01 & SBC-02 - (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 2880 10
218 KAIG3-RFI-SW-C-4710-00 Site Works 3/23/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from G/MV/24 to G/MV/14 at Zone-G (As Highlighted) C16/20 SRC 2893 2
220 KAIG3-RFI-CO-S-7023-00 Crescent 3/24/2022 Concreting for RING BEAM Zone 2K (INNER) Axis 02-1E, 02AH to 02AE (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 2937 10
kaig-qcals 277
Consultant : DAR
250 KAIG3-RFI-SW-C-4797-00 Site Works 3/24/2022 "Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from K/FS/07 to K/FS/10 at Zone-K - As Highlighted" C16/20 SRC 2938 10
255 KAIG3-RFI-CO-S-7041-00 Crescent 3/27/2022 Concreting for BUTTRESS BII 50 51 Zone 1N 1M (as highlighted) C16/20 SRC 3028 10
kaig-qcals 278
Consultant : DAR
263 KAIG3-RFI-SW-C-4827-00 Site Works 3/28/2022 Inspection for Blinding Concrete under Fire Water Line Pit for C/F/04, B/F/17, B/F/10 at Zone-B&C - as highlighted C16/20 SRC 3158 4
Inspection of Reinforcement Concrete Pouring for the Duct Bank of MV Line from B/MV/08 to B/MV/21 at Zone B C as highlighted
264 KAIG3-RFI-SW-C-4855-00 Site Works 3/28/2022 C32/40 62% OPC+30%FA - 160+/-40 3174 7
SCR: KAIG3-SCR-CO-S-0129-00.
272 KAIG3-RFI-CO-S-7017-00 Crescent 3/29/2022 Concreting for Infill Wall between Gridline 02-2AW - 02-2AW BO 121-122 as hilighlighted at Zone 2Q. C32/40 62% OPC+30%FA - 160+/-40 3240 3
287 KAIG3-RFI-SW-C-4863-00 Site Works 3/29/2022 Inspection of Concrete Pouring for the Footing of SBC 06 Wing Wall as highlighted. C32/40 62% OPC+30%FA - 160+/-40 3211 10
kaig-qcals 279
Consultant : DAR
290 KAIG3-RFI-ZG-S-7066-00 Maze Garden 3/29/2022 Concrete Pouring for Blinding under foundation of plant room at Maze Garden, at highlighted area in attached drawing's. C16/20 SRC 3220 10
kaig-qcals 280
Consultant : DAR
C05 OPC
QC DC QC Manager
kaig-qcals 281
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
Sound & Light
1 KAIG3-RFI-ZG-S-7135-00 4/6/2022 Concrete Pouring & Shuttering for Footing of plant room at Maze Garden, at highlighted area in attached drawing's. C32/40 62% OPC+30%FA - 160+/-40 P 28-33055 10
Garden
QC DC QC Manager
kaig-qcals 282
Consultant : DAR
1 KAIG3-RFI-SW-C-4954-00 Site Works 4/2/2022 Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-08 - Wing Wall (Right Side) - As Highlighted C16/20 SRC 3367 5
8 KAIG3-RFI-SW-C-4923-00 Site Works 4/2/2022 Inspection of Concrete Pouring for the Wing Walls of SBC-06 - (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 3370 10
Concrete Pouring for Screed protection on Water proofing for wet area Inside Shower Area's (GF-5057 & 5058), Inside Management C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
9 KAIG3-RFI-MB-A-0789-00 Management Building 4/2/2022 3173 3
Building as highlighted area in attached Drawing's and KAIG3-SCR-PT-A-0084-00 & KAIG3-SCR-GN-A-0011-01. SCREED
17 KAIG3-RFI-PC-S-7090-00 Promenade Bridge 4/3/2022 Concreting for Promenade Bridge Abutment wall at Grid 1M (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 3432 10
Concrete Pouring for Blinding under Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Management Building, As Highlighted in
23 KAIG3-RFI-MB-S-7107-00 Management Building 4/3/2022 C16/20 SRC 3430 5
attached Drawings and KAIG3-SCR-MB-S-0159-00-Reply.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
24 KAIG3-RFI-CO-S-7103-00 Crescent 4/4/2022 Concreting for RING BEAM Zone 2H (OUTER) Axis 02-2, 02Y to 02AB (as highlighted) 3465 11
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
25 3463 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
26 3462 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
3461 10
SCREED
kaig-qcals 283
Consultant : DAR
kaig-qcals 284
Consultant : DAR
kaig-qcals 285
Consultant : DAR
Concrete Pouring & Shuttering for lintel and Stiffener of Block work & Doors for walls of 350mmthk(200mm wall,500 insulation &
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
65 KAIG3-RFI-MB-A-0797-00 Management Building 4/9/2022 100mm wall ) at Grid W/10-12 , 150mm wall thk at Grid R&S/10-11, 350mmthk(200mm wall,500 insulation & 100mm wall ) at Grid 3625 10
SCREED
Q/10-
66 KAIG3-RFI-SW-C-5043-00 Site Works 4/10/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from B/MV/08 to C/MV/04 at Zone-B&C (As Highlighted) C16/20 SRC 3669 10
71 KAIG3-RFI-SW-C-4158-00 Site Works 4/10/2022 "Soil Preparation prior to start backfill around SBC-06-Expansion Joint - as highlighted" C16/20 SRC 3671 10
79 KAIG3-RFI-CO-S-7133-00 Crescent 4/11/2022 Concreting for RETAINING WALL (WALL) 1st stage, Axis 01M to 01K (as highlighted) Zone 1D C32/40 62% OPC+30%FA - 160+/-40 3717 2
kaig-qcals 286
Consultant : DAR
Concrete Pouring for Screed protection on Water proofing for wet area Inside Shower Area (GF-5087) and Toilets (GF-5061, 5062, C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
92 KAIG3-RFI-MB-A-0801-00 Management Building 4/12/2022 3753 2
5063, 5064, 5065, 5066, 5070, 5071 & 5088) , Inside Management Building as highlighted area in attached Drawing's and KAIG3-SCR- SCREED
93 KAIG3-RFI-LM-S-7205-00 Large Mosque 4/13/2022 Concreting for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grid (2 to 5 & C1 to F ) C32/40 62% OPC+30%FA - 160+/-40 3805 10
103 KAIG3-RFI-SW-C-5062-00 Site Works 4/13/2022 Inspection for Casting Blinding Concrete under Manhole - MH-Y-01, MH-Y-02 - as highlighted C16/20 SRC 3806 6
109 KAIG3-RFI-SW-C-5071-00 Site Works 4/14/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/05 to C/MV/30 at Zone-C (As Highlighted) C16/20 SRC 3838 3
Concrete Pouring & Shuttering for Pedestal Column's (08 no's) of Canopy Foundations @ Grids (B/01-08), at New Ticketing Booths
110 KAIG3-RFI-TB-S-7211-00 New Ticketing Booth 4/14/2022 C32/40 62% OPC+30%FA - 160+/-40 3839 6
Canopy, at highlighted area in attached drawings.
111 KAIG3-RFI-LM-S-7262-00 Large Mosque 4/14/2022 Shuttering for Staircase, Shaft Opening & ground beam for Large Mosque ZONE 1G (as highlighetd) at grid (A-B, 3-5, D-2, C1-5-6) C16/20 SRC 3845 6
kaig-qcals 287
Consultant : DAR
132 KAIG3-RFI-SW-C-5055-00 Site Works 4/16/2022 Inspection of Concrete Pouring for the Wall of SBC-08 - Wing Wall (Right Side) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 3891 2
135 KAIG3-RFI-CO-S-7224-00 Crescent 4/17/2022 Concreting for Buttress with Beam BII 42 43 Zone 1K 1L (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 3915 10
Concrete Pouring & Shuttering for Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Management Building, As Highlighted in
136 KAIG3-RFI-MB-S-7232-00 Management Building 4/17/2022 C32/40 62% OPC+30%FA - 160+/-40 3916 11
attached Drawings and KAIG3-SCR-MB-S-0159-00-Reply.
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
137 KAIG3-RFI-CO-S-7236-00 Crescent 4/18/2022 Concreting for RING BEAM Zone 2G (INNER) Axis 02-1, 02V to 02Y (as highlighted) 3958 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
138 3955 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
139 3952 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
140 3951 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
141 3950 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
142 3949 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
143 3948 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
144 3947 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
145 3946 7
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
146 3945 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
147 3944 10
SCREED
kaig-qcals 288
Consultant : DAR
152 KAIG3-RFI-MC-S-7239-00 MCPE 4 4/19/2022 Concreting for Blinding of MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO C16/20 SRC 3981 7
161 KAIG3-RFI-CO-S-7272-00 Crescent 4/21/2022 Concreting for Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted) C16/20 SRC 4028 5
171 KAIG3-RFI-SW-C-5184-00 Site Works 4/25/2022 Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/48, B/TL/31, B/TL/30, B/TL/51 at Zone-B - as highlighted C16/20 SRC 4167 10
Concrete Pouring & Shuttering for Roof Slabs at Grid (A/8) & (A/14-15), Inside Butterfly Garden, at highlighted area in attached
175 KAIG3-RFI-TG-S-7312-00 Butterfly Garden 4/25/2022 C32/40 62% OPC+30%FA - 160+/-40 4166 8
drawings
kaig-qcals 289
Consultant : DAR
182 KAIG3-RFI-SW-C-5194-00 Site Works 4/26/2022 "Inspection of Concrete Pouring for the Upstand of SBC-08 (Right Side) As Highlighted" C32/40 62% OPC+30%FA - 160+/-40 70005 6
202 KAIG3-RFI-MC-S-7350-00 MCPE 2 4/27/2022 Concreting for MCPE 2 Columns (C-25 to C-40) at Ground Floor axis 03E to 03I zone 2G, 2H, 2J, 2K (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 4217 5
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12, NPW-ISC-13, NPW-ISC-20, NPW-ISC-
204 KAIG3-RFI-SW-C-5222-00 Site Works 4/27/2022 C16/20 SRC 4221 2
01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC-04, NPW-ISC-21 at Zone-B,F&G - as highlighted
kaig-qcals 290
Consultant : DAR
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12, NPW-ISC-13, NPW-ISC-20, NPW-ISC-
224 KAIG3-RFI-SW-C-5222-00 Site Works 4/28/2022 C16/20 SRC 4271 3
01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC-04, NPW-ISC-21 at Zone-B,F&G - as highlighted
225 KAIG3-RFI-TG-S-7378-00 Butterfly Garden 4/28/2022 Steel Reinforcement for Wall at Grid (14/A-B), inside Butterfly Garden, as highlighted in attached drawings C16/20 SRC 4273 4
226 KAIG3-RFI-CO-S-7536-00 Crescent 4/28/2022 Concreting for Diaphragm Wall for Zone 2N grid 02/AR from level (870.5 to 874.1 ) (as highlighted) (second part) C32/40 62% OPC+30%FA - 160+/-40 4287 7
Site Works/Boundary
229 KAIG3-RFI-SW-S-7367-00 4/28/2022 Concrete Pouring for Blinding under Foundation of Boundary wall Span 74 & 75, As per Attached Highlighted Drawing's. C16/20 SRC 4288 10
Wall
kaig-qcals 291
Consultant : DAR
232 KAIG3-RFI-MB-S-7366-00 Management Building 4/30/2022 Concrete pouring & Shuttering for Grade Beam at Grid (R/1-2), at Management Building, as highlighted area in attached drawings. C32/40 62% OPC+30%FA - 160+/-40 4324 2
233 KAIG3-RFI-CO-S-7339-00 Crescent 4/30/2022 Concreting for 2nd layer Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted) C16/20 SRC 4327 10
C05 OPC
kaig-qcals 292
Consultant : DAR
kaig-qcals 293
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-CF-S-7646-00 Cafeteria 5/30/2022 Concreting for Cafeteria Wall 33, 34, 35 Zone 2A Elev. 869.100 (as highlighted) (undercroft) P 28-33928 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
2 P 28-33926 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
3 P 28-33919 4
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
4 P 28-33925 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
5 P 28-33924 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
6 P 28-33921 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
7 P 28-33920 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
8 P 28-33917 13
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
9 P 28-33916 13
- SCREED
10 KAIG3-RFI-CO-S-7657-00 Crescent 5/31/2022 Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as highlighted) C16/20 SRC P 28-33981 10
QC DC QC Manager
kaig-qcals 294
Consultant : DAR
1 KAIG3-RFI-SW-C-5332-00 Site Works 5/7/2022 Inspection for Blinding Concrete under Potable Water Line Pit F/PW/14, F/PW/15, F/PW/08, F/PW/02 - as highlighted C16/20 SRC 4386 10
4 KAIG3-RFI-MC-S-7300-00 MCPE 4 5/7/2022 Concreting for MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO C32/40 62% OPC+30%FA - 160+/-40 4399 10
16 KAIG3-RFI-VA-S-7390-00 VIP Auditorium 5/8/2022 Concreting for Blinding of VIP Auditorium strip footing at Zone 1H axis E-VA, F-VA, D-E-VA, G-VA, 7-VA (as highlighted) C16/20 SRC 4429 10
23 KAIG3-RFI-LM-S-7557-00 Large Mosque 5/8/2022 Shuttering for Large Mosque Shaft for Ground floor Slab (as highlighted) axis 1, 2, C-C-1 C32/40 62% OPC+30%FA - 160+/-40 4421 10
36 KAIG3-RFI-PC-S-7405-00 Promenade Bridge 5/9/2022 Concreting for Promenade Bridge Abutment Retaining wall foundation at Grid 2C (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 4469 10
41 KAIG3-RFI-SW-C-5344-00 Site Works 5/9/2022 Inspection for Blinding Concrete under MV Line Junction Pit B/MV/15, B/MV/22, G/MV/11, G/MV/26 - as highlighted C16/20 SRC 4461 6
42 KAIG3-RFI-CO-S-7417-00 Crescent 5/9/2022 Concreting for BUTTRESS BII 41 (with beam) Zone 1K C16/20 SRC 4477 10
kaig-qcals 296
Consultant : DAR
kaig-qcals 297
Consultant : DAR
59 KAIG3-RFI-SW-C-4856-01 Site Works 5/10/2022 Inspection of Blinding Concrete under Potable Water Line Pit for C/PW/01 at Zone C as highlighted. C16/20 SRC 4505 7
60 KAIG3-RFI-SW-C-5294-00 Site Works 5/11/2022 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted C16/20 SRC 4529 10
kaig-qcals 298
Consultant : DAR
91 KAIG3-RFI-MC-S-7431-00 MCPE 1 5/12/2022 Concreting for MCPE 1 6-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2 C32/40 62% OPC+30%FA - 160+/-40 4585 10
Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06, F/MV/05, G/MV/14, G/MV/24, G/MV/25,
94 KAIG3-RFI-SW-C-5268-00 Site Works 5/14/2022 C16/20 SRC 4703 5
G/MV/15, G/MV/01 - as highlighted
110 KAIG3-RFI-SW-C-5294-00 Site Works 5/15/2022 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted C16/20 SRC 4721 10
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12, NPW-ISC-13, NPW-ISC-20, NPW-ISC-
111 KAIG3-RFI-SW-C-5222-00 Site Works 5/16/2022 C16/20 SRC 4791 7
01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC-04, NPW-ISC-21 at Zone-B,F&G - as highlighted
kaig-qcals 299
Consultant : DAR
Site Works/Boundary Concrete Pouring & Shuttering for Kicker's (Inner & Outer both) of Boundary wall Span 74 & 75, As per Attached Highlighted
119 KAIG3-RFI-SW-S-7489-00 5/16/2022 C32/40 62% OPC+30%FA - 160+/-40 4784 11
Wall Drawing's.
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone-C (As Highlighted) SCR-
124 KAIG3-RFI-SW-C-5417-00 Site Works 5/16/2022 C32/40 62% OPC+30%FA - 160+/-40 4768 7
KAIG3-SCR-CO-S-0129-00
125 KAIG3-RFI-MC-S-7464-00 MCPE 3 5/16/2022 Concreting for MCPE 3 Counter fort & wall (inner) at axis 02-R to 03D As highlighted upto 871.00 C32/40 62% OPC+30%FA - 160+/-40 4769 5
kaig-qcals 300
Consultant : DAR
145 KAIG3-RFI-SW-C-5387-00 Site Works 5/18/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/12 to H/MV/25 at Zone-C&H (As Highlighted) C16/20 SRC 4875 7
155 KAIG3-RFI-CO-S-7478-00 Crescent 5/18/2022 Concreting for Blinding of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted) C16/20 SRC 4902 10
167 KAIG3-RFI-SW-C-5389-00 Site Works 5/19/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/02 to H/MV/11 at Zone-H (As Highlighted) C16/20 SRC 4935 3
177 KAIG3-RFI-CO-S-7523-00 Crescent 5/21/2022 Shuttering for Ground Beam between PC 78-80 Zone 1N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 4998 5
179 KAIG3-RFI-ST-S-7539-00 South Watch Tower 5/21/2022 Anti Termite application under South Watch Tower foundation at Zone 27 (as highlighted) C16/20 SRC 5027 3
183 KAIG3-RFI-CF-S-7549-00 Cefeteria 5/22/2022 Concreting for Cafeteria Circular Column C-03, 06 Zone 2A Elev. 869.100 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 5046 10
191 KAIG3-RFI-ST-S-7541-00 South Watch Tower 5/22/2022 Concreting for Blinding under South Watch Tower foundation at Zone 27 (as highlighted) C16/20 SRC 5079 8
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone-C (As Highlighted) SCR-
197 KAIG3-RFI-SW-C-5417-00 Site Works 5/23/2022 C32/40 62% OPC+30%FA - 160+/-40 5106 10
KAIG3-SCR-CO-S-0129-00
kaig-qcals 302
Consultant : DAR
206 KAIG3-RFI-SW-C-5483-00 Site Works 5/23/2022 Inspection for Casting the Blinding Concrete under the Manhole for FW-A-6 (as Highlighted) C16/20 SRC 5124 10
Concrete Pouring & Shuttering for Roof Slab of Plant Room, at Physic Garden, at highlighted area in attached drawings. Attached
209 KAIG3-RFI-PG-S-7562-00 Physic Garden 5/23/2022 C32/40 62% OPC+30%FA - 160+/-40 5123 3
KAIG3-SCR-PG-S-0142-00-Reply.
211 KAIG3-RFI-PC-S-7543-00 Promenade Bridge 5/23/2022 Concreting for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highlighted C32/40 62% OPC+30%FA - 160+/-40 5130 10
212 KAIG3-RFI-PG-S-7538-00 Physic Garden 5/23/2022 Concrete Pouring for Blinding under Foundation of Seat Walls (Inner), Inside Physic Garden as highlighted area in attached drawing's. C16/20 SRC 5133 10
214 KAIG3-RFI-SW-C-5492-00 Site Works 5/24/2022 Inspection for Blinding Concrete under MV Line Pit H/MV/07, H/MV/08, L/MV/03, L/MV/06 - as highlighted C16/20 SRC 5147 10
217 KAIG3-RFI-LM-S-7585-00 Large Mosque 5/24/2022 Concreting for Large Mosque Shaft, Electricity Box and Grade Beam for Ground floor Slab (as highlighted) axis 1, 2, C-C-1, E-F, 5-6 C32/40 62% OPC+30%FA - 160+/-40 5172 10
Site Works/Boundary Concrete Pouring & Shuttering for Wall & Columns of Boundary wall (Upto T.O.W) Span 74 & 75, As per Attached Highlighted
220 KAIG3-RFI-SW-S-7577-00 5/24/2022 C32/40 62% OPC+30%FA - 160+/-40 5171 5
Wall Drawing's & KAIG3-SCR-BO-S-0172-00-Reply
Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at Grid (9/B-E, F), Inside Management C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
224 KAIG3-RFI-MB-A-0878-00 Management Building 5/24/2022 5181 2
Building, As per Highlighted Area in Attached Drawing's. SCREED
kaig-qcals 303
Consultant : DAR
kaig-qcals 304
Consultant : DAR
235 KAIG3-RFI-SW-C-5452-00 Site Works 5/26/2022 Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/11 to H/MV/10 at Zone-H (As Highlighted) C16/20 SRC 5284 3
238 KAIG3-RFI-PC-S-7617-00 South Watch Tower 5/28/2022 Concreting for South Watch Tower Abutment wall kicker at Grid 02/C (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 5354 10
244 KAIG3-RFI-SW-C-5538-00 Site Works 5/28/2022 Inspection for Blinding Concrete under MV Line Pit B/MV/23, F/MV/08, G/MV/21, G/MV/28 - as highlighted C16/20 SRC 5337 10
kaig-qcals 305
Consultant : DAR
271 KAIG3-RFI-CO-S-7657-00 Crescent 5/31/2022 Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as highlighted) C16/20 SRC 5527 10
kaig-qcals 306
Consultant : DAR
C05 OPC
kaig-qcals 307
Consultant : DAR
kaig-qcals 308
Consultant : DAR
kaig-qcals 309
Consultant : DAR
43 KAIG3-RFI-CO-S-7417-00 Crescent 5/9/2022 Concreting for BUTTRESS BII 41 (with beam) Zone 1K C16/20 SRC 4477 10
kaig-qcals 310
Consultant : DAR
60 KAIG3-RFI-SW-C-4856-01 Site Works 5/10/2022 Inspection of Blinding Concrete under Potable Water Line Pit for C/PW/01 at Zone C as highlighted. C16/20 SRC 4505 7
61 KAIG3-RFI-SW-C-5294-00 Site Works 5/11/2022 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted C16/20 SRC 4529 10
Concreting for INFILL WALL between BIV 108-109 Gridline 02-1AM- 02-1AN (as highlighted) C32/40 62% OPC+30%FA+8% MS
68 KAIG3-RFI-CO-S-7411-00 Crescent 5/11/2022 4555 8
Zone 2M - 220+/-20 - SCREED
kaig-qcals 311
Consultant : DAR
Water Play Concrete Pouring & Shuttering for foundation of Wet Well F, Inside Water Garden as highlighted C32/40 62% OPC+30%FA - 160+/-
73 KAIG3-RFI-WG-S-7426-00 5/11/2022 4527 10
GardeN/Wet Fell area in attached drawing's. 40
C32/40 62% OPC+30%FA - 160+/-
74 4554 10
40
C32/40 62% OPC+30%FA - 160+/-
75 4548 10
40
C32/40 62% OPC+30%FA - 160+/-
76 4546 10
40
C32/40 62% OPC+30%FA - 160+/-
77 4544 10
40
C32/40 62% OPC+30%FA - 160+/-
78 4541 10
40
C32/40 62% OPC+30%FA - 160+/-
79 4540 10
40
C32/40 62% OPC+30%FA - 160+/-
80 4538 10
40
C32/40 62% OPC+30%FA - 160+/-
81 4537 10
40
C32/40 62% OPC+30%FA - 160+/-
82 4536 10
40
C32/40 62% OPC+30%FA - 160+/-
83 4525 10
40
C32/40 62% OPC+30%FA - 160+/-
84 4519 5
40
C32/40 62% OPC+30%FA - 160+/-
85 4518 10
40
C32/40 62% OPC+30%FA - 160+/-
86 KAIG3-RFI-MC-S-7431-00 MCPE 1 5/12/2022 Concreting for MCPE 1 6-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2 4585 10
40
C32/40 62% OPC+30%FA - 160+/-
87 4560 3
40
C32/40 62% OPC+30%FA - 160+/-
88 4559 10
40
Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06,
89 KAIG3-RFI-SW-C-5268-00 Site Works 5/14/2022 C16/20 SRC 4703 5
F/MV/05, G/MV/14, G/MV/24, G/MV/25, G/MV/15, G/MV/01 - as highlighted
kaig-qcals 312
Consultant : DAR
105 KAIG3-RFI-SW-C-5294-00 Site Works 5/15/2022 Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted C16/20 SRC 4721 10
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12,
106 KAIG3-RFI-SW-C-5222-00 Site Works 5/16/2022 NPW-ISC-13, NPW-ISC-20, NPW-ISC-01, NPW-ISC-08, NPW-ISC-02, NPW-ISC-03, NPW-ISC- C16/20 SRC 4791 7
04, NPW-ISC-21 at Zone-B,F&G - as highlighted
kaig-qcals 313
Consultant : DAR
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C32/40 62% OPC+30%FA - 160+/-
119 KAIG3-RFI-SW-C-5417-00 Site Works 5/16/2022 4768 7
C/MV/23 at Zone-C (As Highlighted) SCR-KAIG3-SCR-CO-S-0129-00 40
Management Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at C32/40 62% OPC+30%FA+8% MS
125 KAIG3-RFI-MB-A-0878-00 5/16/2022 4785 2
Building Grid (9/B-E, F), Inside Management Building, As per Highlighted Area in Attached Drawing's. - 220+/-20 - SCREED
kaig-qcals 314
Consultant : DAR
Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06,
139 KAIG3-RFI-SW-C-5268-00 Site Works 5/17/2022 C16/20 OPC 4817 3
F/MV/05, G/MV/14, G/MV/24, G/MV/25, G/MV/15, G/MV/01 - as highlighted
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/12 to H/MV/25 at
140 KAIG3-RFI-SW-C-5387-00 Site Works 5/18/2022 C16/20 SRC 4875 7
Zone-C&H (As Highlighted)
KAIG3-RFI-CO-S-7478-00 Crescent 5/18/2022 Concreting for Blinding of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted) C16/20 SRC 4902 10
Concreting for Isolated Circular Columns ( C1, C2 ) for CAFETERIA (as highlighted) elev. 869.10 C32/40 62% OPC+30%FA+8% MS
142 KAIG3-RFI-CF-S-7440-00 Cafeteria 5/18/2022 4904 10
ZONE 2A - 220+/-20 - SCREED
Concreting for Infill wall between BIV 107-108 between Gridline 02-1 AL - 02-1 AM (As C32/40 62% OPC+30%FA+8% MS
150 KAIG3-RFI-CO-S-7534-00 Crescent 5/19/2022 4936 10
highlighted) ZONE 2M - 220+/-20 - SCREED
kaig-qcals 315
Consultant : DAR
New Ticketing Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 1A As per Attached Highlighted C32/40 62% OPC+30%FA+8% MS
158 KAIG3-RFI-TB-S-7519-00 5/19/2022 4914 3
Booth Drawing's. - 220+/-20 - SCREED
Concrete Pouring for Blinding under Boundary Wall @ Grid (M & R/27-29) & (M-R/29-30), at
159 KAIG3-RFI-EC-S-7521-00 Energy Center 2 5/19/2022 C16/20 SRC 4927 10
Energy Center 2, as highlighted area in attached drawing's.
kaig-qcals 316
Consultant : DAR
Concreting and Scaffoldings for RING BEAM Zone 1K (2ND OUTER) Axis 01-2, 01AF to 01AG C32/40 62% OPC+30%FA+8% MS
178 KAIG3-RFI-CO-S-7553-00 Crescent 5/22/2022 5080 8
(as highlighted) - 220+/-20 - SCREED
kaig-qcals 317
Consultant : DAR
South Watch
185 KAIG3-RFI-ST-S-7541-00 5/22/2022 Concreting for Blinding under South Watch Tower foundation at Zone 27 (as highlighted) C16/20 SRC 5079 8
Tower
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C32/40 62% OPC+30%FA - 160+/-
191 KAIG3-RFI-SW-C-5417-00 Site Works 5/23/2022 5106 10
C/MV/23 at Zone-C (As Highlighted) SCR-KAIG3-SCR-CO-S-0129-00 40
200 KAIG3-RFI-SW-C-5483-00 Site Works 5/23/2022 Inspection for Casting the Blinding Concrete under the Manhole for FW-A-6 (as Highlighted) C16/20 SRC 5124 10
kaig-qcals 318
Consultant : DAR
Inspection for Blinding Concrete under MV Line Pit H/MV/07, H/MV/08, L/MV/03, L/MV/06 - as
208 KAIG3-RFI-SW-C-5492-00 Site Works 5/24/2022 C16/20 SRC 5147 10
highlighted
Concreting for MCPE 3 Columns (C17 - C18 - C19 - C20 - C21) at Ground Floor axis 02R to 02S, C32/40 62% OPC+30%FA - 160+/-
210 KAIG3-RFI-MC-S-7565-00 MCPE 3 5/24/2022 5141 9
03-2 Zone 2E 2F (as highlighted) 40
Concreting for Large Mosque Shaft, Electricity Box and Grade Beam for Ground floor Slab (as C32/40 62% OPC+30%FA - 160+/-
211 KAIG3-RFI-LM-S-7585-00 Large Mosque 5/24/2022 5172 10
highlighted) axis 1, 2, C-C-1, E-F, 5-6 40
C32/40 62% OPC+30%FA - 160+/-
212 5158 10
40
C32/40 62% OPC+30%FA - 160+/-
213 5157 10
40
Site
Concrete Pouring & Shuttering for Wall & Columns of Boundary wall (Upto T.O.W) Span 74 & 75, C32/40 67%OPC+25%FA - 160+/-
214 KAIG3-RFI-SW-S-7577-00 Works/Boundary 5/24/2022 5171 5
As per Attached Highlighted Drawing's & KAIG3-SCR-BO-S-0172-00-Reply 40
Wall
C32/40 67%OPC+25%FA - 160+/-
215 5161 11
40
C32/40 67%OPC+25%FA - 160+/-
216 5160 11
40
C32/40 67%OPC+25%FA - 160+/-
217 5159 11
40
Management Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at C32/40 62% OPC+30%FA - 160+/-
218 KAIG3-RFI-MB-A-0878-00 5/24/2022 5181 2
Building Grid (9/B-E, F), Inside Management Building, As per Highlighted Area in Attached Drawing's. 40
Protection layer of Geotex and 50mmScreed Under Strip Footing between PC 16-18 (as C32/40 62% OPC+30%FA+8% MS
223 KAIG3-RFI-CO-S-7622-00 Crescent 5/26/2022 5289 4
highlighted) Zone 1C - 220+/-20 - SCREED
kaig-qcals 319
Consultant : DAR
kaig-qcals 320
Consultant : DAR
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/11 to H/MV/10 at
230 KAIG3-RFI-SW-C-5452-00 Site Works 5/26/2022 C16/20 SRC 5284 3
Zone-H (As Highlighted)
kaig-qcals 321
Consultant : DAR
kaig-qcals 322
Consultant : DAR
kaig-qcals 323
Consultant : DAR
kaig-qcals 324
Consultant : DAR
CONCRETE POURING LOG AND CUBE REGISTER FOR THE MONTH OF DECEMBER 2021
COMPRESSIVE STRENGHT
TRUCK LOAD /
SI BUILDING/ DATE OF DELIVERY 28 DAYS
RFI NUMBER DESCRIPTION DESIGN MIX QUANTITY
No. LOCATION CASTING NOTE No. 7 DAYS AND
(m³)
MORE THAN 28 DAYS
1 KAIG3-RFI-CO-S-7753-00 Crescent 6/13/2022 Concreting for RING BEAM Zone 1K (INNER) Axis 01-1, 01AD to 01AG (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 P 29-21838 12
QC DC QC Manager
kaig-qcals 325
Consultant : DAR
Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as
3 KAIG3-RFI-CO-S-7657-00 Crescent 6/1/2022 C16/20 SRC 5577 10
highlighted)
Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (29-30/M-R), at Energy
6 KAIG3-RFI-EC-S-7689-00 Energy Center 2 6/1/2022 C32/40 62% OPC+30%FA - 160+/-40 5575 6
Center 2, as highlighted area in attached drawing's.
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-14/L and R/16-22), at
17 KAIG3-RFI-EC-S-7687-00 Energy Center 2 6/1/2022 C16/20 SRC 5580 5
Energy Center 2, as highlighted area in attached drawing's.
23 KAIG3-RFI-PC-S-7667-00 Promenade Bridge 6/2/2022 Concreting for Retaining Wall Promenade Bridge Abutment at Grid M Zone 4 as highlighted C32/40 62% OPC+30%FA - 160+/-40 5641 5
kaig-qcals 326
Consultant : DAR
kaig-qcals 327
Consultant : DAR
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- M - As
30 KAIG3-RFI-SW-C-5695-00 Site Works 6/4/2022 C16/20 SRC 5723 5
Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)
33 KAIG3-RFI-CF-S-7675-00 Cafeteria 6/4/2022 Shuttering for walls(W14 ,W15,W19) at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 5718 5
Concreting for walls (W10) and Isolated Circular Columns (C9 )at CAFETERIA zone 2A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
37 KAIG3-RFI-CO-S-7696-00 Cafeteria 6/4/2022 5740 7
highlighted) SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
38 5738 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
39 5737 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
40 5735 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
41 5733 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
42 5731 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
43 5728 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
44 5727 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
45 5725 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
46 5722 8
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
47 5712 10
SCREED
Concrete pouring & Shuttering for walls of New ticketing booth # 3A, As per Attached Highlighted C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
48 KAIG3-RFI-TB-S-7726-00 New Ticketing Booth 6/4/2022 5716 7
Drawing's. SCREED
53 KAIG3-RFI-ST-S-7711-00 South Watch Tower 6/5/2022 Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90 C32/40 62% OPC+30%FA - 160+/-40 5796 10
Concreting and Shear Connector for Buttress with Beam BOV, BIV 54, 55 Zone 1N 1P (as
68 KAIG3-RFI-CO-S-7721-00 Crescent 6/5/2022 C32/40 62% OPC+30%FA - 160+/-40 5794 10
highlighted)
Concrete Pouring & shuttering for Walls of Wet Well E, (upto Level +872.10), Inside Water Garden
83 KAIG3-RFI-WG-S-7728-00 Water Play Garden 6/5/2022 C32/40 62% OPC+30%FA - 160+/-40 5792 10
as highlighted area in attached drawing's.
kaig-qcals 329
Consultant : DAR
92 KAIG3-RFI-ST-S-7711-00 South Watch Tower 6/5/2022 Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90 C32/40 62% OPC+30%FA - 160+/-40 5807 10
Concreting for Infill wall between PC 74-75 inner between Gridline 02M- 02N (As highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
103 KAIG3-RFI-CO-S-7682-00 Crescent 6/6/2022 5849 5
ZONE 2D SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
104 5838 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
105 5822 10
SCREED
Inspection for Blinding Concrete under MV Line Pit C/MV/15, G/MV/30, H/MV/25, H/MV/02,
106 KAIG3-RFI-SW-C-5679-00 Site Works 6/6/2022 C16/20 SRC 5839 6
H/MV/11, H/MV/09, H/MV/28 - as highlighted
108 KAIG3-RFI-CO-S-7735-00 Crescent 6/6/2022 Concreting of Mass Concrete for Strip Footing Between PC 132 - 134 Zone 2F (as highlighted) C16/20 SRC 5860 10
kaig-qcals 330
Consultant : DAR
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-G (SA-11) - As
127 KAIG3-RFI-PA-C-5576-00 Picnic Area 6/6/2022 C32/40 62% OPC+30%FA - 160+/-40 5853 10
Highlighted
kaig-qcals 331
Consultant : DAR
148 KAIG3-RFI-CF-S-7741-00 Cafeteria 6/7/2022 Concreting for walls (W20,W21) undercroft at CAFETERIA zone 2A (as highlighted) 869.10 C16/20 SRC 5906 4
kaig-qcals 332
Consultant : DAR
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/30 to
168 KAIG3-RFI-SW-C-5676-00 Site Works 6/8/2022 C16/20 SRC 5947 5
B/TL/31 at Zone-B - As Highlighted
kaig-qcals 333
Consultant : DAR
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (M/15-22), at Energy
189 KAIG3-RFI-EC-S-7730-00 Energy Center 2 6/9/2022 C16/20 SRC 6010 10
Center 2, as highlighted area in attached drawing's.
192 KAIG3-RFI-CF-S-7775-00 Cafeteria 6/11/2022 Shuttering for walls(W13 ,W9,W8) at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 71845 10
Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid
197 KAIG3-RFI-PC-S-7813-00 Central Bridge 6/11/2022 C16/20 SRC 71832 10
1M, 02AH
Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid
201 KAIG3-RFI-PC-S-7813-00 Central Bridge 6/11/2022 C32/40 62% OPC+30%FA - 160+/-40 71844 5
1M, 02AH
kaig-qcals 334
Consultant : DAR
Concreting for mass concrete (2nd layer) for Central Bridge foundation Zone 4 grid 1M (as
213 KAIG3-RFI-PC-S-7764-00 Crescent 6/12/2022 C16/20 SRC 6101 10
highlighted)
kaig-qcals 335
Consultant : DAR
Surface Prepation prior to start back filling around Non-Potable water line Pit - NPW-ISC-12, NPW-
242 KAIG3-RFI-SW-C-5660-00 Site Works 6/13/2022 C16/20 SRC 6148 6
ISC-13 , NPW-ISC-20 at Zone B - as highlighted
Water Play Garden/Wet Concrete Pouring & Shuttering for Walls of Wet Well F, (upto +872.00), Inside Water Garden as
244 KAIG3-RFI-WG-S-7839-00 6/13/2022 C32/40 62% OPC+30%FA - 160+/-40 6150 5
Well highlighted area in attached drawing's
kaig-qcals 336
Consultant : DAR
257 KAIG3-RFI-SW-C-5585-01 Site Works 6/14/2022 Inspection of Concrete Pouring for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 6197 6
Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2H
259 KAIG3-RFI-CO-S-7860-00 Crescent 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6234 10
(as highlighted)
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G
268 KAIG3-RFI-SW-C-5828-00 Site Works 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6224 8
(As Highlighted)
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L & 4-8/L), at
270 KAIG3-RFI-EC-S-7881-00 Energy Center 2 6/15/2022 C16/20 SRC 6241 5
Energy Center 2, as highlighted area in attached drawing's.
kaig-qcals 337
Consultant : DAR
Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2H C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
281 KAIG3-RFI-CO-S-7860-00 Crescent 6/15/2022 6239 10
(as highlighted) SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
282 6233 10
SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
283 6219 10
SCREED
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 2A As per Attached Highlighted C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
284 KAIG3-RFI-TB-S-7822-00 New Ticket Booth 6/15/2022 6235 4
Drawing's. SCREED
285 KAIG3-RFI-SW-C-5822-00 Site Works 6/15/2022 Inspection for Blinding Concrete under Potable Water Line Pit C/PW/02 - as highlighted C16/20 SRC 6236 5
Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis 03-2 to 02-2
286 KAIG3-RFI-MC-S-7877-00 MCPE 1 6/15/2022 C16/20 SRC 6242 10
(as highlighted)
287 C16/20 SRC 6238 10
Sand Bedding for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer Canopy 3
296 KAIG3-RFI-PG-C-5853-00 Physic Garden 6/16/2022 C32/40 62% OPC+30%FA - 160+/-40 6257 7
(Outer side), at Physic garden, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Footings of Seat Walls (Inner), Inside Physic Garden as
298 KAIG3-RFI-PG-S-7821-01 Physic Garden 6/16/2022 C32/40 62% OPC+30%FA - 160+/-40 6262 6
highlighted area in attached drawing's.
kaig-qcals 338
Consultant : DAR
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-K (SA-14) -
313 KAIG3-RFI-PA-C-5869-00 Picnic Area 6/18/2022 C32/40 62% OPC+30%FA - 160+/-40 6315 4
As Highlighted
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L & 4-8/L), at
315 KAIG3-RFI-EC-S-7881-00 Energy Center 2 6/18/2022 C16/20 SRC 6308 10
Energy Center 2, as highlighted area in attached drawing's.
Inspection for Blinding Concrete under Fire Water Line Pit for C/F/05, K/F/07 at Zone-C&K - as
318 KAIG3-RFI-SW-C-5823-00 Site Works C16/20 SRC 6316 10
highlighted
320 KAIG3-RFI-CO-S-7900-00 Crescent 6/18/2022 Concreting for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st STAGE ) C32/40 62% OPC+30%FA - 160+/-40 6319 10
Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as
321 KAIG3-RFI-SW-C-5867-00 Site Works 6/19/2022 C16/20 SRC 6345 7
Highlighted)
kaig-qcals 339
Consultant : DAR
326 KAIG3-RFI-CO-S-7897-00 Crescent 6/19/2022 Concreting for Diaphragm Wall beam axis 02/AR Zone 2N as highlighted C32/40 62% OPC+30%FA - 160+/-40 6346 10
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-12B/A), at Energy
329 KAIG3-RFI-EC-S-7947-00 Energy Center 2 6/19/2022 C16/20 SRC 6352 11
Center 2, as highlighted area in attached drawing's.
Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as
336 KAIG3-RFI-SW-C-5867-00 Site Works 6/20/2022 C16/20 SRC 6361 7
Highlighted)
338 KAIG3-RFI-CO-S-7936-00 Crescent 6/20/2022 Concreting for Buttress BIV 57, BOV BIV 58 Zone 1P (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6379 6
kaig-qcals 340
Consultant : DAR
kaig-qcals 341
Consultant : DAR
375 KAIG3-RFI-CO-S-7929-00 Crescent 6/21/2022 Concreting for Strip Footing between PC 132-134 Zone 2F (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6435 10
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (16-28/R & 29-30/M-R), at
378 KAIG3-RFI-EC-S-7966-00 Energy Center 2 6/21/2022 C32/40 62% OPC+30%FA - 160+/-40 6439 6
Energy Center 2, as highlighted area in attached drawing's.
kaig-qcals 342
Consultant : DAR
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G
396 KAIG3-RFI-SW-C-5865-00 Site Works 6/22/2022 C32/40 62% OPC+30%FA - 160+/-40 6467 10
(As Highlighted)
Water Play Garden/Wet Concrete Pouring for Slab of Wet Well (E),inside Water Garden,as highlighted in the attached
399 KAIG3-RFI-WG-S-7983-00 6/22/2022 C32/40 62% OPC+30%FA - 160+/-40 6468 11
Well drawings
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
402 KAIG3-RFI-SW-C-5865-00 Site Works 6/22/2022 6474 10
(As Highlighte SCREED
Concrete Pouring for Precast Panel Type-1 (2 no's), Type-2 (2 no) & Typical Infill (1 no's), at Grid
403 KAIG3-RFI-TG-S-7965-00 Butterfly Garden 6/22/2022 (A/13, 14, 16 and Between 15 - 16 and 17 - 18) Inside Butterfly Garden, as highlighted in attached C32/40 62% OPC+30%FA - 160+/-40 6495 8
drawings
kaig-qcals 343
Consultant : DAR
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/43, B/TL/50, B/T/18,
413 KAIG3-RFI-SW-C-5893-00 Site Works 6/23/2022 C16/20 SRC 6526 10
B/TL/11, C/TL/12, C/TL/11, C/TL/15, C/TL/54, C/TL/51, C/TL/49 at Zone B & C as highlighted.
kaig-qcals 344
Consultant : DAR
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-L (SA-15) - As
KAIG3-RFI-PA-C-5938-00 Picnic Area 6/25/2022 C32/40 62% OPC+30%FA - 160+/-40 6605 10
Highlighted
Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis 03-2 to 02-2
KAIG3-RFI-MC-S-7877-00 MCPE 1 6/25/2022 C16/20 SRC 6601 3
(as highlighted)
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (16-28/R & 29-30/M-R), at
KAIG3-RFI-EC-S-7966-00 Energy Center 2 6/25/2022 C32/40 62% OPC+30%FA - 160+/-40 6614 11
Energy Center 2, as highlighted area in attached drawing's.
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/40, B/FS/05, B/FS/41,
KAIG3-RFI-SW-C-5894-00 Site Works 6/25/2022 C16/20 SRC 6616 10
B/FS/10, C/TL/09, C/FS/13, C/FS/08, C/FS/12, C/FS/47, C/FS/46 at Zone B as highlighted.
Inspection of Concrete pouring for Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G
KAIG3-RFI-SW-C-5955-00 Site Works 6/26/2022 C32/40 62% OPC+30%FA - 160+/-40 6628 10
(As Highlighted)
KAIG3-RFI-CO-S-8024-00 Crescent 6/26/2022 Concreting for Buttress with Beam BOI 54, 55 Zone 1N 1P (as highlighted) C16/20 SRC 6656 10
kaig-qcals 345
Consultant : DAR
Concrete Pouring for Blinding Under Footing 28 to 29/M , 28 to 29/R, 4 to 5/L , 1 to 2/J to L , 2 to
KAIG3-RFI-EC-S-8051-00 Energy Center 2 6/26/2022 C16/20 SRC 6654 11
3/A to B , at Energy Center 2, as highlighted area in the attached drawings.
Inspection of Blinding Concrete under MV Line Pit C/MV/38, C/MV/08, C/MV/25, C/MV/22,
KAIG3-RFI-SW-C-5909-00 Site Works 6/26/2022 C16/20 SRC 6648 10
C/MV/40, C/MV/24, C/MV/41 at Zone-C - as highlighted
Concreting for Buttress with Beam BII 56, BOI 56 (upto 876.00) & BOI 57 (upto 873.00) Zone 1P C32/40 62% OPC+30%FA+8% MS - 220+/-20 -
KAIG3-RFI-CO-S-8042-00 Crescent 6/27/2022 6751 4
(as highlighted) SCREED
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35,
KAIG3-RFI-SW-C-5968-00 Site Works 6/27/2022 C32/40 62% OPC+30%FA - 160+/-40 6708 4
G/MV36, G/MV/08 at Zone-G (As Highlighted)
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/WG/LV/1 to 4 & 6
KAIG3-RFI-WG-C-6104-00 Water Play Garden 6/27/2022 C16/20 SRC 6746 10
to 8) Inside Mist Garden,at Water Garden, as highlighted area in attached drawings.
Inspection of Blinding Concrete under MV Line Pit G/MV/33, H/MV/29, H/MV/06, H/MV/04 at
KAIG3-RFI-SW-C-5965-00 Site Works 6/27/2022 C16/20 SRC 6717 4
Zone-G&H - as highlighted
Concrete Pouring for Blinding Under Footing and Grade Beam at Grid 1 to 6 / C to J , Inside Energy
KAIG3-RFI-EC-S-8049-00 Energy Center 2 6/28/2022 C16/20 SRC 6767 10
Center ,as highlighted in the attached drawings
Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/10, G/TL/01 at Zone-
KAIG3-RFI-SW-C-5982-00 Site Works 6/28/2022 C16/20 SRC 6763 10
F&G - as highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/40 at Zone-C (As
KAIG3-RFI-SW-C-5995-00 Site Works 6/29/2022 C32/40 62% OPC+30%FA - 160+/-40 6831 7
Highlighted)
kaig-qcals 347
Consultant : DAR
kaig-qcals 348
Consultant : DAR
kaig-qcals 349
Consultant : DAR
kaig-qcals 350
Consultant : DAR
Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K
3 KAIG3-RFI-CO-S-7657-00 Crescent 6/1/2022 C16/20 SRC 5577 10
(as highlighted)
Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (29-30/M-R), at
6 KAIG3-RFI-EC-S-7689-00 Energy Center 2 6/1/2022 C32/40 62% OPC+30%FA - 160+/-40 5575 6
Energy Center 2, as highlighted area in attached drawing's.
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-14/L and
17 KAIG3-RFI-EC-S-7687-00 Energy Center 2 6/1/2022 C16/20 SRC 5580 5
R/16-22), at Energy Center 2, as highlighted area in attached drawing's.
Concreting for RING BEAM Zone 2R (INNER) Axis 02-1, 02AZ to 02BC (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
20 KAIG3-RFI-CO-S-7662-00 Crescent 6/1/2022 5582 10
highlighted) - SCREED
kaig-qcals 351
Consultant : DAR
kaig-qcals 352
Consultant : DAR
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone-
30 KAIG3-RFI-SW-C-5695-00 Site Works 6/4/2022 C16/20 SRC 5723 5
M - As Highlighted (SCR-KAIG3-SCR-SW-C-0021-00)
33 KAIG3-RFI-CF-S-7675-00 Cafeteria 6/4/2022 Shuttering for walls(W14 ,W15,W19) at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 5718 5
Concreting for walls (W10) and Isolated Circular Columns (C9 )at CAFETERIA zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
37 KAIG3-RFI-CO-S-7696-00 Cafeteria 6/4/2022 5740 7
2A (as highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
38 5738 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
39 5737 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
40 5735 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
41 5733 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
42 5731 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
43 5728 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
44 5727 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
45 5725 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
46 5722 8
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
47 5712 10
- SCREED
New Ticketing Concrete pouring & Shuttering for walls of New ticketing booth # 3A, As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
48 KAIG3-RFI-TB-S-7726-00 6/4/2022 5716 7
Booth Highlighted Drawing's. - SCREED
South Watch
54 KAIG3-RFI-ST-S-7711-00 6/5/2022 Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90 C32/40 62% OPC+30%FA - 160+/-40 5796 10
Tower
Water Play Concrete Pouring & shuttering for Walls of Wet Well E, (upto Level +872.10), Inside
69 KAIG3-RFI-WG-S-7728-00 6/5/2022 C32/40 62% OPC+30%FA - 160+/-40 5792 10
Garden Water Garden as highlighted area in attached drawing's.
kaig-qcals 354
Consultant : DAR
South Watch
78 KAIG3-RFI-ST-S-7711-00 6/5/2022 Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90 C32/40 62% OPC+30%FA - 160+/-40 5807 10
Tower
Concreting for Infill wall between PC 74-75 inner between Gridline 02M- 02N (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
89 KAIG3-RFI-CO-S-7682-00 Crescent 6/6/2022 5849 5
highlighted) ZONE 2D - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
90 5838 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
91 5822 10
- SCREED
Inspection for Blinding Concrete under MV Line Pit C/MV/15, G/MV/30, H/MV/25,
92 KAIG3-RFI-SW-C-5679-00 Site Works 6/6/2022 C16/20 SRC 5839 6
H/MV/02, H/MV/11, H/MV/09, H/MV/28 - as highlighted
Concreting of Mass Concrete for Strip Footing Between PC 132 - 134 Zone 2F (as
94 KAIG3-RFI-CO-S-7735-00 Crescent 6/6/2022 C16/20 SRC 5860 10
highlighted)
kaig-qcals 355
Consultant : DAR
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-G
113 KAIG3-RFI-PA-C-5576-00 Picnic Area 6/6/2022 C32/40 62% OPC+30%FA - 160+/-40 5853 10
(SA-11) - As Highlighted
Concreting for walls (W20,W21) undercroft at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
114 KAIG3-RFI-CF-S-7741-00 Cafeteria 6/7/2022 5901 4
869.10 - SCREED
kaig-qcals 356
Consultant : DAR
kaig-qcals 357
Consultant : DAR
Concreting for RING BEAM Zone 2R (OUTER) Axis 02-2, 02AZ to 02BC (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
140 KAIG3-RFI-CO-S-7769-00 Crescent 6/8/2022 5948 10
highlighted) - SCREED
kaig-qcals 358
Consultant : DAR
kaig-qcals 359
Consultant : DAR
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
155 KAIG3-RFI-SW-C-5676-00 Site Works 6/8/2022 C16/20 SRC 5947 5
B/TL/30 to B/TL/31 at Zone-B - As Highlighted
kaig-qcals 360
Consultant : DAR
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (M/15-22),
176 KAIG3-RFI-EC-S-7730-00 Energy Center 2 6/9/2022 C16/20 SRC 6010 10
at Energy Center 2, as highlighted area in attached drawing's.
179 KAIG3-RFI-CF-S-7775-00 Cafeteria 6/11/2022 Shuttering for walls(W13 ,W9,W8) at CAFETERIA zone 2A (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6038 10
Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted)
184 KAIG3-RFI-PC-S-7813-00 Central Bridge 6/11/2022 C16/20 SRC 6045 10
Zone 4 Grid 1M, 02AH
Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted)
188 KAIG3-RFI-PC-S-7813-00 Central Bridge 6/11/2022 C32/40 62% OPC+30%FA - 160+/-40 6050 10
Zone 4 Grid 1M, 02AH
kaig-qcals 361
Consultant : DAR
kaig-qcals 362
Consultant : DAR
kaig-qcals 363
Consultant : DAR
kaig-qcals 364
Consultant : DAR
Surface Prepation prior to start back filling around Non-Potable water line Pit - NPW-
229 KAIG3-RFI-SW-C-5660-00 Site Works 6/13/2022 C16/20 SRC 6148 6
ISC-12, NPW-ISC-13 , NPW-ISC-20 at Zone B - as highlighted
Water Play Concrete Pouring & Shuttering for Walls of Wet Well F, (upto +872.00), Inside Water
231 KAIG3-RFI-WG-S-7839-00 6/13/2022 C32/40 62% OPC+30%FA - 160+/-40 6150 5
Garden/Wet Well Garden as highlighted area in attached drawing's
South Watch Concreting for abutment wall of Bridge South watch tower grid 02/C Zone 7 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
240 KAIG3-RFI-PC-S-7807-00 6/14/2022 6172 8
Tower highlighted) - SCREED
Concreting for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as
241 KAIG3-RFI-PC-S-7866-00 Crescent 6/14/2022 C16/20 SRC 6199 4
highlighted)
Inspection of Concrete Pouring for MV Line Pulling Pit - B/MV/23 at Zone-B (As
244 KAIG3-RFI-SW-C-5585-01 Site Works 6/14/2022 C32/40 62% OPC+30%FA - 160+/-40 6197 6
Highlighted)
Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146
246 KAIG3-RFI-CO-S-7860-00 Crescent 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6234 10
Zone 2H (as highlighted)
kaig-qcals 365
Consultant : DAR
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at
255 KAIG3-RFI-SW-C-5828-00 Site Works 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6224 8
Zone-B&G (As Highlighted)
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L &
257 KAIG3-RFI-EC-S-7881-00 Energy Center 2 6/15/2022 C16/20 SRC 6241 5
4-8/L), at Energy Center 2, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (L/8-14), at
262 KAIG3-RFI-EC-S-7864-00 Energy Center 2 6/15/2022 C32/40 62% OPC+30%FA - 160+/-40 6227 10
Energy Center 2, as highlighted area in attached drawing's.
Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 C32/40 62% OPC+30%FA+8% MS - 220+/-20
268 KAIG3-RFI-CO-S-7860-00 Crescent 6/15/2022 6239 10
Zone 2H (as highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
269 6233 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
270 6219 10
- SCREED
New Ticket Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 2A As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
271 KAIG3-RFI-TB-S-7822-00 6/15/2022 6235 4
Booth Highlighted Drawing's. - SCREED
272 KAIG3-RFI-SW-C-5822-00 Site Works 6/15/2022 Inspection for Blinding Concrete under Potable Water Line Pit C/PW/02 - as highlighted C16/20 SRC 6236 5
Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis
273 KAIG3-RFI-MC-S-7877-00 MCPE 1 6/15/2022 C16/20 SRC 6242 10
03-2 to 02-2 (as highlighted)
274 C16/20 SRC 6238 10
kaig-qcals 366
Consultant : DAR
Sand Bedding for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer
283 KAIG3-RFI-PG-C-5853-00 Physic Garden 6/16/2022 C32/40 62% OPC+30%FA - 160+/-40 6257 7
Canopy 3 (Outer side), at Physic garden, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Footings of Seat Walls (Inner), Inside Physic Garden
285 KAIG3-RFI-PG-S-7821-01 Physic Garden 6/16/2022 C32/40 62% OPC+30%FA - 160+/-40 6262 6
as highlighted area in attached drawing's.
Concreting for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as
288 KAIG3-RFI-PC-S-7866-00 Crescent 6/16/2022 C16/20 SRC 6279 10
highlighted)
Concreting for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st C32/40 62% OPC+30%FA+8% MS - 220+/-20
291 KAIG3-RFI-CO-S-7900-00 Crescent 6/18/2022 6321 8
STAGE ) - SCREED
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-K
300 KAIG3-RFI-PA-C-5869-00 Picnic Area 6/18/2022 C32/40 62% OPC+30%FA - 160+/-40 6315 4
(SA-14) - As Highlighted
kaig-qcals 367
Consultant : DAR
Inspection for Blinding Concrete under Fire Water Line Pit for C/F/05, K/F/07 at Zone-
305 KAIG3-RFI-SW-C-5823-00 Site Works C16/20 SRC 6316 10
C&K - as highlighted
Concreting for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st
307 KAIG3-RFI-CO-S-7900-00 Crescent 6/18/2022 C32/40 62% OPC+30%FA - 160+/-40 6319 10
STAGE )
Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as
308 KAIG3-RFI-SW-C-5867-00 Site Works 6/19/2022 C16/20 SRC 6345 7
Highlighted)
Concreting of 3rd layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K
310 KAIG3-RFI-CO-S-7887-00 Crescent 6/18/2022 C16/20 SRC 6322 10
(as highlighted)
Water Play Concrete Pouring & Shuttering for Footing of Boundary Wall at Span 12, at Water
311 KAIG3-RFI-WG-S-7920-00 6/19/2022 C32/40 62% OPC+30%FA - 160+/-40 6340 10
Garden Garden, as Highlighted area in the attached drawing's.
313 KAIG3-RFI-CO-S-7897-00 Crescent 6/19/2022 Concreting for Diaphragm Wall beam axis 02/AR Zone 2N as highlighted C32/40 62% OPC+30%FA - 160+/-40 6346 10
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-12B/A),
316 KAIG3-RFI-EC-S-7947-00 Energy Center 2 6/19/2022 C16/20 SRC 6352 11
at Energy Center 2, as highlighted area in attached drawing's.
kaig-qcals 368
Consultant : DAR
325 KAIG3-RFI-CO-S-7936-00 Crescent 6/20/2022 Concreting for Buttress BIV 57, BOV BIV 58 Zone 1P (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6379 6
kaig-qcals 369
Consultant : DAR
Concreting for mass concrete (4th layer) under strip footing between PC ( 152-158 )inner
352 KAIG3-RFI-CO-S-7938-00 Crescent 6/21/2022 C16/20 SRC 6424 10
Zone 2K (as highlighted)
362 KAIG3-RFI-CO-S-7929-00 Crescent 6/21/2022 Concreting for Strip Footing between PC 132-134 Zone 2F (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 6435 10
kaig-qcals 370
Consultant : DAR
Concreting for RING BEAM Zone 1M (INNER) Axis 01-1, 01AJ to 01AM (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
368 KAIG3-RFI-CO-S-7924-00 Crescent 6/22/2022 6505 10
highlighted) - SCREED
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at
383 KAIG3-RFI-SW-C-5865-00 Site Works 6/22/2022 C32/40 62% OPC+30%FA - 160+/-40 6467 10
Zone-F&G (As Highlighted)
kaig-qcals 371
Consultant : DAR
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at C32/40 62% OPC+30%FA+8% MS - 220+/-20
389 KAIG3-RFI-SW-C-5865-00 Site Works 6/22/2022 6474 10
Zone-F&G (As Highlighte - SCREED
Concrete Pouring for Precast Panel Type-1 (2 no's), Type-2 (2 no) & Typical Infill (1
390 KAIG3-RFI-TG-S-7965-00 Butterfly Garden 6/22/2022 no's), at Grid (A/13, 14, 16 and Between 15 - 16 and 17 - 18) Inside Butterfly Garden, as C32/40 62% OPC+30%FA - 160+/-40 6495 8
highlighted in attached drawings
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/43, B/TL/50,
400 KAIG3-RFI-SW-C-5893-00 Site Works 6/23/2022 B/T/18, B/TL/11, C/TL/12, C/TL/11, C/TL/15, C/TL/54, C/TL/51, C/TL/49 at Zone B & C16/20 SRC 6526 10
C as highlighted.
kaig-qcals 372
Consultant : DAR
Concreting for Infill wall inner axis 02/K to 02/L (As highlighted) ZONE 2D (2nd C32/40 62% OPC+30%FA+8% MS - 220+/-20
419 KAIG3-RFI-CO-S-7905-00 Crescent 6/25/2022 6618 7
STAGE ) - SCREED
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-L
425 KAIG3-RFI-PA-C-5938-00 Picnic Area 6/25/2022 C32/40 62% OPC+30%FA - 160+/-40 6605 10
(SA-15) - As Highlighted
Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis
428 KAIG3-RFI-MC-S-7877-00 MCPE 1 6/25/2022 C16/20 SRC 6601 3
03-2 to 02-2 (as highlighted)
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (16-28/R & 29-
429 KAIG3-RFI-EC-S-7966-00 Energy Center 2 6/25/2022 C32/40 62% OPC+30%FA - 160+/-40 6614 11
30/M-R), at Energy Center 2, as highlighted area in attached drawing's.
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/40, B/FS/05,
431 KAIG3-RFI-SW-C-5894-00 Site Works 6/25/2022 B/FS/41, B/FS/10, C/TL/09, C/FS/13, C/FS/08, C/FS/12, C/FS/47, C/FS/46 at Zone B as C16/20 SRC 6616 10
highlighted.
Concreting for MCPE 2 Inner wall Axis 02AG to 02AF at Zone 2k (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
432 KAIG3-RFI-MC-S-8037-00 MCPE 2 6/26/2022 6644 10
871.00 - SCREED
kaig-qcals 373
Consultant : DAR
Inspection of Concrete pouring for Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at
438 KAIG3-RFI-SW-C-5955-00 Site Works 6/26/2022 C32/40 62% OPC+30%FA - 160+/-40 6628 10
Zone-F&G (As Highlighted)
440 KAIG3-RFI-CO-S-8024-00 Crescent 6/26/2022 Concreting for Buttress with Beam BOI 54, 55 Zone 1N 1P (as highlighted) C16/20 SRC 6656 10
Concrete Pouring for Blinding Under Footing 28 to 29/M , 28 to 29/R, 4 to 5/L , 1 to 2/J
448 KAIG3-RFI-EC-S-8051-00 Energy Center 2 6/26/2022 C16/20 SRC 6654 11
to L , 2 to 3/A to B , at Energy Center 2, as highlighted area in the attached drawings.
Concreting for Buttress with Beam BII 56, BOI 56 (upto 876.00) & BOI 57 (upto C32/40 62% OPC+30%FA+8% MS - 220+/-20
451 KAIG3-RFI-CO-S-8042-00 Crescent 6/27/2022 6751 4
873.00) Zone 1P (as highlighted) - SCREED
kaig-qcals 374
Consultant : DAR
Concrete Pouring for Blinding Under Footing and Grade Beam at Grid 1 to 6 / C to J ,
476 KAIG3-RFI-EC-S-8049-00 Energy Center 2 6/28/2022 C16/20 SRC 6767 10
Inside Energy Center ,as highlighted in the attached drawings
kaig-qcals 375
Consultant : DAR
Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/10, G/TL/01
480 KAIG3-RFI-SW-C-5982-00 Site Works 6/28/2022 C16/20 SRC 6763 10
at Zone-F&G - as highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/40 at Zone-C
481 KAIG3-RFI-SW-C-5995-00 Site Works 6/29/2022 C32/40 62% OPC+30%FA - 160+/-40 6831 7
(As Highlighted)
kaig-qcals 376
Consultant : DAR
kaig-qcals 377
Consultant : DAR
kaig-qcals 378
Consultant : DAR
South Watch Concreting for South Watch Tower Wall (internal & external) (858.9 to 860.70) (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-ST-S-8113-00 7/2/2022 6940 4
Tower Wall highlighted) Zone 7 - SCREED
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/PG/LV/
10 KAIG3-RFI-PG-C-6166-00 Physic Garden 7/2/2022 02,04,05,06) & Emergency (MH/PG/EM/ 02,03,04,07,08),Inside Physic Garden as C16/20 SRC 6937 8
highlighted area in attached drawing's.
South Small Concreting for Blinding of SOG of South small Mosque Zone 2A (as highlighted) axis
11 KAIG3-RFI-SM-S-8020-00 7/2/2022 C16/20 SRC 6920 6
Mosque A-B, 4-5
Concreting for Infill wall (INNER) axis 02/L to 02/M(as highlighted) Zone 2D (2nd C32/40 62% OPC+30%FA+8% MS - 220+/-20
13 KAIG3-RFI-CO-S-8115-00 Crescent 7/3/2022 6993 6
STAGE). - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
14 7/3/2022 6984 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
15 7/3/2022 6970 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
16 7/3/2022 6969 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
17 7/3/2022 6968 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
18 7/3/2022 6967 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
19 7/3/2022 6966 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
20 7/3/2022 6965 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
21 7/3/2022 6964 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
22 7/3/2022 6963 10
- SCREED
kaig-qcals 379
Consultant : DAR
kaig-qcals 380
Consultant : DAR
Inspection for Blinding Concrete under Telecom Line Pit C/TL/27, Pit C/TL/71 at Zone-
29 KAIG3-RFI-SW-C-6093-00 Site Works 7/3/2022 C16/20 SRC 6979 5
B - as highlighted
31 KAIG3-RFI-CO-S-8128-00 Crescent 7/3/2022 Concreting for RC Strip Footing grid 02/O to 02/N zone 2E (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 7006 4
Water Play Concrete Pouring & Shuttering for Kicker's (Both Inner & Outer) of Boundary Wall at
38 KAIG3-RFI-WG-S-8143-00 7/3/2022 C32/40 62% OPC+30%FA - 160+/-40 6991 10
Garden Span 12, at Water Garden, as Highlighted area in the attached drawing's.
Discovery Warning Tape for Electrical Lines of Low voltage Lines & Emergency Lines, Inside
40 KAIG3-RFI-DG-C-7005-00 7/3/2022 C16/20 SRC 7005 10
Garden Discovery Garden at highlighted area in attached Drawing's.
Shuttering and Scaffoldings for RING BEAM Zone 1N (OUTER) Axis 01-2, 01AM to C32/40 62% OPC+30%FA+8% MS - 220+/-20
44 KAIG3-RFI-CO-S-8141-00 Crescent 7/4/2022 7061 3
01AP (as highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
45 7/4/2022 7060 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
46 7/4/2022 7059 10
- SCREED
kaig-qcals 381
Consultant : DAR
Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-08 - Wing
62 KAIG3-RFI-SW-C-6125-00 Site Works 7/4/2022 C16/20 SRC 7023 6
Wall (Left Side) - As Highlighted
Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (5-13/C-I), at
63 KAIG3-RFI-EC-S-8145-00 Energy Center 2 7/4/2022 C16/20 SRC 7030 2
Energy Center 2, as highlighted area in attached drawing's.
New Ticketing Concrete Pouring & Shuttering for walls of New ticketing booth # 4A, As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
65 KAIG3-RFI-TB-S-8160-00 7/4/2022 7056 6
Booth Highlighted Drawing's. - SCREED
kaig-qcals 382
Consultant : DAR
Concrete Pouring for Typical Infill Precast Panels, at Grid (A/15-20), Inside Butterfly
85 KAIG3-RFI-TG-S-8175-00 Butterfly Garden 7/5/2022 C32/40 62% OPC+30%FA - 160+/-40 7091 5
Garden, as highlighted in attached drawings.
Shuttering of Mass Concrete (3rd layer) under Strip Footing Between PC 21-23-25 Zone
94 KAIG3-RFI-CO-S-8134-00 Crescent 7/6/2022 C16/20 SRC 7146 10
1D (as highlighted)
kaig-qcals 383
Consultant : DAR
Concrete Pouring & Shuttering for Walls of Seat Walls (Inner), Inside Physic Garden as
102 KAIG3-RFI-PG-S-8161-00 Physic Garden 7/6/2022 C32/40 62% OPC+30%FA - 160+/-40 7159 8
highlighted area in attached drawing's.
Water Play Concrete Pouring & Shuttering for Concrete Pads (3 no's) on Slab (level +872.50) of
107 KAIG3-RFI-WG-S-8163-00 7/6/2022 C32/40 62% OPC+30%FA - 160+/-40 7148 7
Garden Wet Well F, Inside Water Garden as highlighted area in attached drawing's
kaig-qcals 384
Consultant : DAR
kaig-qcals 385
Consultant : DAR
Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (12B-15/D-H), at
125 KAIG3-RFI-EC-S-8208-00 Energy Center 2 7/13/2022 C16/20 SRC 7264 10
Energy Center 2, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid
128 KAIG3-RFI-EC-S-8207-00 Energy Center 2 7/13/2022 C32/40 62% OPC+30%FA - 160+/-40 7282 10
(18-28/R), at Energy Center 2, as highlighted area in attached drawing's.
130 KAIG3-RFI-CO-S-6140-00 Crescent 7/13/2022 Shuttering and Shear Connectors for BUTTRESS BIV 87, 88, 89, 90 Zone 2H 2G C16/20 SRC 7276 10
Concrete Pouring for Typical Precast Infill Panels, at Grid (A/9-14), Inside Butterfly
133 KAIG3-RFI-TG-S-8206-00 Butterfly Garden 7/14/2022 C32/40 62% OPC+30%FA - 160+/-40 7323 6
Garden, as highlighted in attached drawings.
Concreting of Mass concrete of Strip Footing Between PC 44-46 Zone 1G (as
134 KAIG3-RFI-CO-S-8179-00 Crescent 7/14/2022 C16/20 SRC 7347 4
highlighted)
142 KAIG3-RFI-SW-C-6161-00 Site Works 7/14/2022 Inspection of Blinding Concrete under MV Line Pit C/MV/04 at Zone-C - as highlighted C16/20 SRC 7341 10
kaig-qcals 386
Consultant : DAR
Inspection for Blinding Concrete under Fire Water Line Pit for B/F/14 at Zone-B - as
152 KAIG3-RFI-SW-C-6163-00 Site Works 7/16/2022 C16/20 SRC 7357 10
highlighted
Concrete Pouring & shuttering for Walls of Seat Walls (08 no's) inside Butterfly Garden,
153 KAIG3-RFI-TG-S-8215-00 Butterfly Garden 7/17/2022 C32/40 62% OPC+30%FA - 160+/-40 7370 10
as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Lintels of Doors & Block work & Stiffner Column's
C32/40 62% OPC+30%FA+8% MS - 220+/-20
155 KAIG3-RFI-PT-A-0959-00 Public Toilet # 3 7/17/2022 for all walls of Gents Toilet, Inside Public Toilet # 3, At highlighted area in attached 7371 4
- SCREED
Drawing's
Telecommunicati
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire &
156 KAIG3-RFI-SW-C-6172-00 on and Fire & 7/17/2022 C16/20 SRC 7372 10
Securtiy Line at Zone-F&G (As Highlighted)
Securtiy Line
Concreting for mass concrete (4th layer) under strip footing between PC ( 152-158 )inner
161 KAIG3-RFI-CO-S-7938-00 Crescent 7/18/2022 C32/40 62% OPC+30%FA - 160+/-40 7450 10
Zone 2K (as highlighted)
kaig-qcals 387
Consultant : DAR
kaig-qcals 388
Consultant : DAR
Inspection for Casting the Blinding Concrete under the Gullies for G-O-28, G-O-29, G-
190 KAIG3-RFI-SW-C-6222-00 Site Works 7/19/2022 C16/20 SRC 7496 10
O-32, G-O-33, G-O-34 & G-O-43 (as Highlighted)
kaig-qcals 389
Consultant : DAR
kaig-qcals 390
Consultant : DAR
Concrete Pouring & Shuttering for Typical Precast Infill Panels, at Grid (A/1-8), Inside
195 KAIG3-RFI-TG-S-8270-00 Butterfly Garden 7/19/2022 C32/40 62% OPC+30%FA - 160+/-40 7506 7
Butterfly Garden, as highlighted in attached drawings.
Concreting for Infill wall (INNER) axis 01/H to 01/I (as highlighted) Zone 1C (1st C32/40 62% OPC+30%FA+8% MS - 220+/-20
196 KAIG3-RFI-CO-S-8246-00 Crescent 7/20/2022 7528 10
STAGE ) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
197 7/20/2022 7523 10
- SCREED
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
198 KAIG3-RFI-SW-C-6233-00 Site Works 7/20/2022 C16/20 SRC 7550 10
ISC-24, NPW-ISC-25 at Zone-H&L - as highlighted
203 KAIG3-RFI-MC-S-8293-00 MCPE 1 7/20/2022 Concreting for Slab at MCPE 1 axis 03R, 03/3 to 03/2 Zone 2M 2N (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 7582 9
Water Play Concrete Pouring & Shuttering for Wall & Column of Boundary Wall at Span 12, at
209 KAIG3-RFI-WG-S-8287-00 7/20/2022 C32/40 62% OPC+30%FA - 160+/-40 7529 10
Garden Water Garden, as Highlighted area in the attached drawing's.
Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid
210 KAIG3-RFI-EC-S-8237-00 Energy Center 2 7/20/2022 C32/40 62% OPC+30%FA - 160+/-40 7536 10
(17-22/M), at Energy Center 2, as highlighted area in attached drawing's.
Shuttering for mass concrete under strip footing (5th layer) between PC( 23-25 )outer
212 KAIG3-RFI-CO-S-8294-00 Crescent 7/21/2022 C16/20 SRC 7674 5
Zone 1D(as highlighted)
Concrete Pouring & Shuttering for Concrete Pad on Foundation of Wet Well E, Inside
Water Play
215 KAIG3-RFI-WG-S-8332-00 7/21/2022 Water Garden as highlighted area in attached drawing's & KAIG3-SCR-SW-S-0160-00- C32/40 62% OPC+30%FA - 160+/-40 7678 7
Garden
Reply.
kaig-qcals 391
Consultant : DAR
kaig-qcals 392
Consultant : DAR
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/11 at Zone-
223 KAIG3-RFI-SW-C-6179-00 Site Works 7/21/2022 C32/40 62% OPC+30%FA - 160+/-40 7660 10
H (As Highlighted)
Concrete Pouring & Shuttering for Footing of Boundary wall @ Grid (C-I/0-1), at
225 KAIG3-RFI-EC-S-8301-00 Energy Center 2 7/21/2022 C32/40 62% OPC+30%FA - 160+/-40 7647 10
Energy Center 2, as highlighted area in attached drawing's.
kaig-qcals 393
Consultant : DAR
Concrete Pouring & Shuttering for Footings of Cabin Room, ETFE Pump Room, Water
261 KAIG3-RFI-TG-S-8316-00 Butterfly Garden 7/23/2022 feature Pump Room & Remaining Boundary wall, at Butterfly Garden, as highlighted C32/40 62% OPC+30%FA - 160+/-40 7783 10
area in attached drawing's.
kaig-qcals 394
Consultant : DAR
Concreting for Tunnel 1 slab and strip footing between pc 15 & 17 (as Highlighted)
273 KAIG3-RFI-CO-S-8307-00 Crescent 7/24/2022 C32/40 62% OPC+30%FA - 160+/-40 7836 4
Zone 2H
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - B/MV/10 at Zone-B
278 KAIG3-RFI-SW-C-6292-00 Site Works 7/25/2022 C32/40 62% OPC+30%FA - 160+/-40 7903 3
(As Highlighted)
Concreting for Infill inner wall between (02-R & 02Q) (As highlighted) ZONE 2E (2nd
281 KAIG3-RFI-CO-S-8326-00 Crescent 7/25/2022 C32/40 62% OPC+30%FA - 160+/-40 7895 10
STAGE )
283 AIG3-RFI-SW-C-6311-00 Site Works 7/25/2022 Inspection for Casting Blinding Concrete under Manhole - MH-G-07 - as highlighted C16/20 SRC 7900 10
Water Play Concrete Pouring & Shuttering for Beams of Jetty 1 & Jetty 2 at Boat Garden inside
287 KAIG3-RFI-WG-S-8343-00 7/25/2022 C32/40 62% OPC+30%FA - 160+/-40 7921 5
Garden Water Garden , as highlighted area in the attached drawings
kaig-qcals 395
Consultant : DAR
293 KAIG3-RFI-SW-C-6378-00 Site Works 7/26/2022 Inspection for Blinding Concrete under Potable Water Line Pit C/PW/04 - as highlighted C16/20 SRC 7966 10
Protection layer of Geotex and 50mmScreed Under Strip Footing between PC 44-46 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
KAIG3-RFI-CO-S-8320-00 Crescent 7/26/2022 7958 3
highlighted) Zone 1G - SCREED
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
303 KAIG3-RFI-SW-C-6377-00 Site Works 7/27/2022 C16/20 SRC 8033 10
C/TL/54 to C/TL/51 at Zone-C - As Highlighted
Concreting for (MCPE 1) wall and counterfort from level 871 to 875.55 between axis C32/40 62% OPC+30%FA+8% MS - 220+/-20
304 KAIG3-RFI-MC-S-8362-00 MCPE 1 7/27/2022 8063 7
03-T to 02-AM at Zone 2M 2N (as highlighted) - SCREED
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (9-12B/D-H),
308 KAIG3-RFI-EC-S-8375-00 Energy Center 2 7/27/2022 C32/40 62% OPC+30%FA - 160+/-40 8066 8
Inside Energy Center 2, as highlighted area in attached drawing's.
kaig-qcals 396
Consultant : DAR
Inspection of Concrete Pouring for the wall of SBC-08 - Wing Wall (Left Side) - As
327 KAIG3-RFI-SW-C-6384-00 Site Works 7/27/2022 C32/40 62% OPC+30%FA - 160+/-40 8064 5
Highlighted
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire &
328 KAIG3-RFI-SW-C-6415-00 Site Works 7/28/2022 C16/20 SRC 8134 4
Securtiy Line at Zone-G (As Highlighted)
330 KAIG3-RFI-SW-C-6423-00 Site Works 7/31/2022 Inspection for Casting Blinding Concrete under Manhole - MH-M-03 - as highlighted C32/40 62% OPC+30%FA - 160+/-40 8274 10
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/23 , C/MV/40 ,
334 KAIG3-RFI-SW-C-6474-00 Site Works 7/31/2022 C16/20 SRC 8281 10
G/MV/19 , G/MV/31 , G/MV/03 , G/MV/27 at Zone-C&G (As Highlighted)
kaig-qcals 397
Consultant : DAR
kaig-qcals 398
Consultant : DAR
QC DC QC Manager
kaig-qcals 399
Consultant : DAR
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
5 KAIG3-RFI-SW-C-6504-00 Site Work 8/2/2022 27, POC-PT2, POC-28, POC-30, POC-TT4, POC Water tank at Zone-G&K - as C16/20 SRC 8362 10
highlighted
Concreting for mass concrete under ETFE PUMP ROOM S.O.G. zone 2D axis 02-J
12 KAIG3-RFI-CO-S-8470-00 Crescent 8/1/2022 C16/20 SRC 8305 10
inner line (as highlighted) at CRESCENT ,KAIG3-SCR-CO-S-0193-00
Steel Reinforcements for Infill inner wall at Crescent Boi 74-73 between (02-M & 02-L)
13 KAIG3-RFI-CO-S-8426-00 Crescent 8/2/2022 C32/40 62% OPC+30%FA - 160+/-40 8366 10
(As highlighted) ZONE 2D
Protection layer of 4mm thick bituminous protection board for Diaphragm Wall footing C32/40 62% OPC+30%FA+8% MS - 220+/-20
25 KAIG3-RFI-CO-S-8450-00 Crescent 8/2/2022 8365 10
axis 02-AR up to the top of footing (as highlighted) Zone 2N - SCREED
Concreting for Infill outer wall at Crescent between axis (02-AA & 02-AB) (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
28 KAIG3-RFI-CO-S-8474-00 Crescent 8/4/2022 8447 10
highlighted) ZONE 2H - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
29 8446 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
30 8445 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
31 8444 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
32 8443 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
33 8438 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
34 8436 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
35 8431 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
36 8427 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
37 8418 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
38 8414 10
- SCREED
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (7-8/D-H), Inside
65 KAIG3-RFI-EC-S-8523-00 Energy Center 2 8/6/2022 C32/40 62% OPC+30%FA - 160+/-40 8503 6
Energy Center 2, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (A/6-12B), at
77 KAIG3-RFI-EC-S-8487-00 Energy Center 2 8/7/2022 C32/40 62% OPC+30%FA - 160+/-40 8534 8
Energy Center 2, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for walls of New Ticketing Booth # 5A, As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
90 KAIG3-RFI-TB-S-8526-00 Ticket Booth 8/8/2022 8569 4
Highlighted Drawing's. - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
91 8561 6
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
92 8560 8
- SCREED
Inspection of Thrust Blocks for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110,
Water Play
93 KAIG3-RFI-WG-C-6860-00 8/9/2022 160 & 200 mm), Bottom Left Side of Geyser Garden, at Water Garden as highlighted C16/20 SRC 8614 8
Garden
area in attached drawing's.
Inspection for Casting the Blinding Concrete under the Foul Water Line Manhole FW-A-
94 KAIG3-RFI-SW-C-6594-00 Site Work 8/9/2022 C32/40 62% OPC+30%FA - 160+/-40 8624 5
4 (as Highlighted)
Concreting for wall (W3) at CAFETERIA from level 862.00 to level 863.55 zone 2A (as
96 KAIG3-RFI-CF-S-8578-00 Cafeteria 8/9/2022 C32/40 62% OPC+30%FA - 160+/-40 8643 3
highlighted)
Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (K/4-13), at
115 KAIG3-RFI-EC-S-8566-00 Energy Center 2 8/10/2022 C16/20 SRC 8703 11
Energy Center 2, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (4-6/D-H), Inside
118 KAIG3-RFI-EC-S-8555-00 Energy Center 2 8/10/2022 C32/40 62% OPC+30%FA - 160+/-40 8700 10
Energy Center 2, as highlighted area in attached drawing's.
Concreting for wall (W3) at CAFETERIA from level 862.00 to level 863.55 zone 2A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
131 KAIG3-RFI-CF-S-8578-00 Cafeteria 8/11/2022 8771 7
highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
132 8770 6
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
133 8754 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
134 8747 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
135 8746 10
- SCREED
Inspection for casting concrete for short piece and Surface Preperation prior to start
136 KAIG3-RFI-SW-C-6608-00 Site Work 8/11/2022 waterproofing for short piece and Application of Primer (1st Coat, 2nd Coat and 3rd C16/20 SRC 8762 10
Coat) for MH-M-11 (As Highlighted)
Concreting for internal Column of Adminstration building at Crescent between axis 02-
138 KAIG3-RFI-CO-S-8531-00 Crescent 8/11/2022 C32/40 62% OPC+30%FA - 160+/-40 8759 4
BB & 02-BC Zone 2R up to level 873.37 (as highlighted)
Concrete Pouring & Shuttering for Columns (above the level +872.35) of Boundary Wall
140 KAIG3-RFI-EC-S-8557-00 Energy Center 2 8/11/2022 C32/40 67%OPC+25%FA - 160+/-40 8772 11
@ Grid (R/22-28), at Energy Center 2, as highlighted area in attached drawing's.
Concreting for walls (W1,W2) at CAFETERIA from level 862.00 to level 869.10 zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
141 KAIG3-RFI-CF-S-8576-00 Cafeteria 8/13/2022 8847 3
2A (as highlighted) - SCREED
Concreting for bottom slab of duct tunnel at MCPE 3 axis 03-D , 03-C , 03-B , 03-A
148 KAIG3-RFI-MC-S-8611-00 MCPE 3 8/13/2022 C32/40 62% OPC+30%FA - 160+/-40 8860 10
Zone 2E 2F (as highlighted)
Inspection for Casting the Concrete encasement and Surface Preperation prior to start
156 KAIG3-RFI-SW-C-6661-00 Site Work 8/14/2022 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for storm C16/20 SRC 8899 10
water pipe from G-O-46 to G-O-47 and G-O-47 to SBC1 corner As attached
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (J-L/0-4 & L/4-
185 KAIG3-RFI-EC-S-8637-00 Energy Center 2 8/15/2022 C32/40 62% OPC+30%FA - 160+/-40 8957 3
6), at Energy Center 2, as highlighted area in attached drawing's.
South Small
187 KAIG3-RFI-SM-S-8564-00 8/15/2022 Concreting for 1st floor slab (stair) at south Small MOSQUE (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 8972 10
Mosque
"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from
191 KAIG3-RFI-SW-C-6780-00 Site Work 8/16/2022 C32/40 62% OPC+30%FA - 160+/-40 9032 10
C/FS/10 to C/FS/09 and C/FS/08 to C/FS/12 at Zone-C - As Highlighted"
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
195 KAIG3-RFI-SW-C-6779-00 Site Work 8/16/2022 C16/20 SRC 9014 10
B/TL/11 to C/TL/12 and C/TL/15 to C/TL/11 at Zone-C - As Highlighted
Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (A-C/0-6), at
196 KAIG3-RFI-EC-S-8666-00 Energy Center 8/16/2022 C32/40 62% OPC+30%FA - 160+/-40 9034 10
Energy Center 2, as highlighted area in attached drawing's.
Concreting for walls ( W4, W5, W6, W7) at CAFETERIA zone 2A from level 862.00 C32/40 62% OPC+30%FA+8% MS - 220+/-20
204 KAIG3-RFI-CF-S-8682-00 Cafeteria 8/16/2022 9053 9
to 863.55 (as highlighted) - SCREED
Concreting for walls ( W4, W5, W6, W7) at CAFETERIA zone 2A from level 862.00
205 KAIG3-RFI-CF-S-8682-00 Cafeteria 8/16/2022 C32/40 62% OPC+30%FA - 160+/-40 9061 8
to 863.55 (as highlighted)
Concreting for MCPE 1 Suspended slab at axis 03S-03T TOC: 875.974 - 875.85 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
210 KAIG3-RFI-MC-S-8680-00 MCPE 8/17/2022 9116 10
highlighted) - SCREED
Concreting for walls (W22 ,W23, W24, W25, W26, W27) at CAFETERIA from level C32/40 62% OPC+30%FA+8% MS - 220+/-20
211 KAIG3-RFI-CF-S-8645-00 cafeteria 8/17/2022 9115 10
863.00 to level l 868.30 zone 2A (as highlighted) - SCREED
Concreting for Retaining Wall RC Foundation at Grid 01/C to 01/A level 866.10 Zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
212 KAIG3-RFI-CO-S-8403-00 Crescent 8/17/2022 9113 10
6 & 7 (as highlighted) at CRESCENT - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
213 9099 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
214 9094 10
- SCREED
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from
215 KAIG3-RFI-SW-C-7579-00 Site Work 8/17/2022 C16/20 SRC 9097 5
B/FS/21 to C/FS/10 at Zone-B&C - As Highlighted
"Inspection of Thrust Block for Non-Potable Water Line ( Dia 160mm & 200mm) at
217 KAIG3-RFI-SW-C-6782-00 Site Work 8/17/2022 C32/40 62% OPC+30%FA - 160+/-40 9121 7
Zone-B,C,H - As Highlighted ( SCR : KAIG3-SCR-SW-C-0021-00 )"
Concreting for Infill wall between Axis 01Q-01R-01S (as highlighted) Zone 1F (2 walls C32/40 62% OPC+30%FA+8% MS - 220+/-20
226 KAIG3-RFI-CO-S-8750-00 Crescent 8/20/2022 9314 10
only) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
227 9303 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
228 9301 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
229 9286 10
- SCREED
Concreting for ETFE PUMP ROOM for blinding under SOG axis 02-AD zone 2J
230 KAIG3-RFI-CO-S-8723-00 Crescent 8/20/2022 C16/20 SRC 9313 5
INNER (as highlighted) at CRESCENT
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (13-15/D-H),
239 KAIG3-RFI-EC-S-8716-00 Energy Center 8/20/2022 C32/40 62% OPC+30%FA - 160+/-40 9316 10
Inside Energy Center 2, as highlighted area in attached drawing's.
Concreting for Ring beam Zone 1P Axis 01-AQ to 01-AP, inner and outer (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
251 KAIG3-RFI-CO-S-8712-00 Crescent 8/21/2022 9391 10
highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
252 9389 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
253 9386 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
254 9384 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
255 9383 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
256 9382 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
257 9381 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
258 9341 2
- SCREED
Inspection for casting concrete for short piece and Surface Preperation prior to start
259 KAIG3-RFI-SW-C-6903-00 Site Work 8/21/2022 waterproofing for short piece and Application of Primer (1st Coat, 2nd Coat and 3rd C32/40 62% OPC+30%FA - 160+/-40 9361 10
Coat) for MH-M-05 and MH-M-06 (As Highlighted)
260 KAIG3-RFI-SW-C-6931-00 Site Work 8/21/2022 Inspection of Concrete Pouring for the Upstand of SBC-08 (Left Side) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 9360 10
Concrete Pouring & Shuttering for Columns (2nd lift, above the level +872.35) of
265 KAIG3-RFI-EC-S-8667-01 Energy center 8/21/2022 Boundary Wall @ Grid (M/17-22), at Energy Center 2, as highlighted area in attached C32/40 67%OPC+25%FA - 160+/-40 9347 9
drawing's.
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
266 KAIG3-RFI-SW-C-6919-00 Site Work 8/21/2022 C16/20 SRC 9385 5
40 and POC-44 at Zone-G&K - as highlighted
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
267 KAIG3-RFI-SW-C-6957-00 Site Work 8/22/2022 C16/20 SRC 9466 10
ISC-14, NPW-ISC-16 and NPW-ISC-18 at Zone-B&G - as highlighted
Concreting for MCPE 3 WALL & counterfort at axis 03A (as highlighted) Zone 2E & C32/40 62% OPC+30%FA+8% MS - 220+/-20
272 KAIG3-RFI-MC-S-8761-00 MCPE 8/22/2022 9470 9
2F level 874.5 & 874.55 - SCREED
Concreting for ETFE PUMP ROOM for SOG axis 02-AD zone 2J (as highlighted) at C32/40 62% OPC+30%FA+8% MS - 220+/-20
273 KAIG3-RFI-CO-S-8773-00 Crescent 8/22/2022 9469 10
CRESCENT - SCREED
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/25, C/MV/22,
279 KAIG3-RFI-SW-C-6945-00 Site Work 8/22/2022 C32/40 62% OPC+30%FA - 160+/-40 9442 5
C/MV/38, C/MV/08, G/MV/37 at Zone-C&G at Zone-C&G (As Highlighted)
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (B/7-11B & C/4-5),
286 KAIG3-RFI-EC-S-8743-00 Energy Center 8/23/2022 C32/40 62% OPC+30%FA - 160+/-40 9546 10
Inside Energy Center 2, as highlighted area in attached drawing's.
South Small Concreting for columns (C1,C2A,C2B,C3A,C3B)at south Small MOSQUE from level C32/40 62% OPC+30%FA+8% MS - 220+/-20
295 KAIG3-RFI-SM-S-8781-00 8/23/2022 9560 10
Mosque 873,15 up to level 876.25 & level 876.05 and 876.40 (as highlighted) ZONE 2B - SCREED
Concreting for Internal Building coumns (C11, C10, C9, C69) between axis 02BA to C32/40 62% OPC+30%FA+8% MS - 220+/-20
296 KAIG3-RFI-CO-S-8846-00 Crescent 8/23/2022 9554 10
02AZ (as highlighted) Zone 2R - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
297 9550 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
298 9549 10
- SCREED
305 KAIG3-RFI-CO-S-8705-00 Crescent 8/24/2022 Concreting for Infill Wall at Zone 2R TIP WALL upto 873.475 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 9593 8
Concrete pouring for Blinding of Fountain (3 ) Inside Physic Garden, as per highlighted
306 KAIG3-RFI-PG-S-8794-00 Physics Garden 8/24/2022 C16/20 SRC 9595 10
area in attached drawing's.
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - G/MV/08, G/MV/09,
308 KAIG3-RFI-SW-C-6966-00 Site Work 8/24/2022 C16/20 SRC 9621 7
G/MV/34, G/MV/35 and G/MV/36 at Zone-G (As Highlighted)
Concrete Pouring for Blinding Under the Fountain at Geyser Garden, inside water
309 KAIG3-RFI-WG-S-8798-00 Water garden 8/25/2022 C16/20 SRC 9652 3
Garden, as highlighted area in attached drawing's.
Shuttering and Concreting for Energy Center Columns (TOC 875.00) at Grid 22 to 28 M
312 KAIG3-RFI-EC-S-8829-00 Energy Center 8/25/2022 C32/40 62% OPC+30%FA - 160+/-40 9623 11
(as highlighted)
Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (B/7-11B), at
313 KAIG3-RFI-EC-S-8467-00 Energy Center 8/3/2022 C16/20 SRC 8384 10
Energy Center 2, as highlighted area in attached drawing's.
Concerting for Infill inner wall at Crescent between axis (02-H & 02-G) (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
315 KAIG3-RFI-CO-S-8472-00 Crescent 8/3/2022 8382 2
highlighted) ZONE 2C - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
316 8380 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
317 8373 10
- SCREED
Page 416 of 537
Consultant : DAR
Concrete Pouring & Shuttering for Columns (above the level +872.35) of Boundary Wall
322 KAIG3-RFI-EC-S-8422-01 Energy Center 8/3/2022 C32/40 67%OPC+25%FA - 160+/-40 8376 9
@ Grid (R/18-22), at Energy Center 2, as highlighted area in attached drawing's.
"Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
323 KAIG3-RFI-SW-C-6520-00 Site Work 8/3/2022 C16/20 SRC 8375 10
ISC-10, NPW-ISC-11,NPW-ISC-09, POC-06 at Zone-B - as highlighted "
Concreting for internal building (walls & coumns, C10, C11,C25,C36,C49, C50, W3,
C32/40 62% OPC+30%FA+8% MS - 220+/-20
325 KAIG3-RFI-CO-S-8759-00 Crescent 8/25/2022 W14, W15) of NORTH ADMINSTRATION between axis 02-BA to 02-AZ (as 9653 10
- SCREED
highlighted) Zone 2R 873.725 & 873.075
341 KAIG3-RFI-CO-S-8858-00 Crescent 8/27/2022 Concreting for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6 C32/40 62% OPC+30%FA - 160+/-40 9685 10
342 KAIG3-RFI-CO-S-8858-00 Crescent 8/27/2022 Concreting for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6 C32/40 62% OPC+30%FA - 160+/-40 9720 7
Concreting for MCPE 1 duct tunnel Blinding under foundation at axis 03U, 03S, 03T, C32/40 62% OPC+30%FA+8% MS - 220+/-20
350 KAIG3-RFI-MC-S-8776-00 MCPE 8/28/2022 9766 7
03-1 to 02-2 Zone 2M 2N (as highlighted) - SCREED
Concreting for MCPE 1 Suspended Slab at Axis 03T-03U, 03-1 to 03-2 (as per KAIG3-
351 KAIG3-RFI-MC-S-8886-00 MCPE 8/28/2022 C32/40 62% OPC+30%FA - 160+/-40 9804 2
SCR-CO-S-0138-01) As highlighted
Inspection for Casting the Concrete encasement and Surface Preperation prior to start
360 KAIG3-RFI-SW-C-7039-00 Site Work 8/28/2022 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) Concrete C16/20 SRC 9777 7
encasement of storm water pipe As highlighted
Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/17 at Zone-
361 KAIG3-RFI-SW-C-7023-00 Site Work 8/28/2022 C32/40 62% OPC+30%FA - 160+/-40 9770 10
D (As Highlighted)
"Inspection for Blinding Concrete under MV Line Pit - D/MV/18 at Zone-D (As
365 KAIG3-RFI-SW-C-7040-00 Site Work 8/29/2022 C16/20 SRC 9851 10
Highlighted) "
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
366 KAIG3-RFI-SW-C-7080-00 Site Work 8/29/2022 C16/20 SRC 9849 5
G/DH/04, G/DH/05 and G/DC/06 at Zone-G - as highlighted
Concrete pouring for Blinding of boundary wall at Span 47 of Water Garden, as per
370 KAIG3-RFI-WG-S-8910-00 Water Garden 8/29/2022 C16/20 SRC 9850 6
highlighted Attached Drawings.
Concreting for MCPE 1 duct tunnel Blinding under foundation at axis 03U, 03S, 03T,
371 KAIG3-RFI-MC-S-8776-00 MCPE 8/29/2022 C16/20 SRC 9862 7
03-1 to 02-2 Zone 2M 2N (as highlighted)
374 KAIG3-RFI-CO-S-8909-00 Crescent 8/29/2022 Concreting for Infill wall between axis 01P-01Q (as highlighted) Zone 1F C32/40 67%OPC+25%FA - 160+/-40 9842 11
"Inspection for Blinding Concrete under MV Line Pit - C/MV/13 and C/MV/20 at Zone-
384 KAIG3-RFI-SW-C-7119-00 Site Work 8/30/2022 C16/20 SRC 9916 10
C (As Highlighted) "
Concreting for MCPE 3 wall & counterfort Zone 2E 2F at axis 02-R to 03-A, 02-2 to C32/40 62% OPC+30%FA+8% MS - 220+/-20
387 KAIG3-RFI-MC-S-8917-00 MCPE 8/31/2022 9982 11
03-1 ,from LEVEL 871 to 875.55 & 874.5 (as highlighted) - SCREED
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
397 KAIG3-RFI-SW-C-7120-00 Site Work 8/31/2022 C16/20 SRC 9969 10
G/DC/15, G/DC/08, G/DC/16, K/DC/01, K/DC/02 at Zone-G&K - as highlighted
Concreting for Internal Building foundation (P1 & P7) at Zone 2R axis 02BA - 02AZ (as
399 KAIG3-RFI-CO-S-8995-00 Crescent 8/2/2022 C16/20 SRC 8345 10
highlighted)
Concreting for ETFE PUMP ROOM Slab on Grade at axis 02-AR zone 2N (as
401 KAIG3-RFI-CO-S-8640-00 Crescent 8/13/2022 C16/20 SRC 8829 5
highlighted) at CRESCENT, KAIG3-SCR-CO-S-0193-00
Shuttering for plain concrete at DEVONIAN GARDEN zone 2M BETWEEN axis 02-
402 KAIG3-RFI-CO-S-8560-00 Devonian Garden 8/17/2022 C16/20 SRC 9095 5
AN & 02-AL (as highlighted)
Concreting for Ring beam Zone 1P Axis 01-AQ to 01-AP, inner and outer (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
403 KAIG3-RFI-CO-S-8712-00 Crescent 8/20/2022 9304 10
highlighted), - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
404 9292 10
- SCREED
Concreting for ETFE PUMP ROOM Slab on Grade at axis 01-I zone 1C (as highlighted)
405 KAIG3-RFI-CO-S-8816-00 Crescent 8/22/2022 C16/20 SRC 9465 10
at CRESCENT TOC 869.20, KAIG3-SCR-CO-S-0193-00
Concreting for ETFE PUMP ROOM Slab on Grade at axis 02-AN zone 2M (as
409 KAIG3-RFI-CO-S-8801-00 Crescent 8/23/2022 C16/20 SRC 9543 10
highlighted) at CRESCENT, KAIG3-SCR-CO-S-0193-00
"Inspection of Concrete Pouring for the Wall and Slab of SBC-07 (Right Side) - As
414 KAIG3-RFI-SW-C-6960-00 Site Work 8/24/2022 C16/20 SRC 9591 10
Highlighted"
1335
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - SCREED
1447
C32/40 62% OPC+30%FA - 160+/-40
QC DC QC Manager
Inspection for casting concrete for short piece and Surface Preperation prior to start
2 KAIG3-RFI-SW-C-7083-00 Site Work 9/1/2022 waterproofing for short piece and Application of Primer (1st Coat, 2nd Coat and 3rd C16/20 SRC 10033 10
Coat) for FW-A-3-7, FW-A-3-7.1 and FW-A-3-7.2 (As Highlighted)
Concreting for Infill wall at zone 2R axis 02BB to 02BC (BOI 127-128) (AS C32/40 62% OPC+30%FA+8% MS - 220+/-20
8 KAIG3-RFI-CO-S-8977-00 Crescent 9/1/2022 10047 8
HIGHLIGHTED) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
9 10046 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
10 10045 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
11 10042 10
- SCREED
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
27 KAIG3-RFI-SW-C-7152-00 Site Work 9/3/2022 C16/20 SRC 10106 10
44 at Zone-K - as highlighted
Shuttering and Concreting for Energy Center Columns (37 nos) at Grid 29 to 30 N - R
28 KAIG3-RFI-EC-S-8940-00 Energy Center 9/3/2022 C32/40 67%OPC+25%FA - 160+/-40 10115 8
(as highlighted)
Concreting for Internal Building foundation (P1 & P7) at Zone 2R axis 02BA - 02AZ (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
32 KAIG3-RFI-CO-S-8995-00 Crescent 9/3/2022 10122 10
highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
33 10029 10
- SCREED
Inspection of Concrete Pouring for the Footing and Walls of SBC-07 - Wing Wall - As
34 KAIG3-RFI-SW-C-7050-00 Site Work 9/3/2022 C32/40 62% OPC+30%FA - 160+/-40 10121 10
Highlighted
35 KAIG3-RFI-SW-C-6931-00 Site Work 9/3/2022 Inspection of Concrete Pouring for the Upstand of SBC-08 (Left Side) - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 10120 10
Promenade & Concreting for Central Bridge Abutment Wall (as highlighted) Zone 4 Grid 02AK level
37 KAIG3-RFI-PC-S-9058-00 9/3/2022 C32/40 62% OPC+30%FA - 160+/-40 10126 5
canopies 864.60 to 869.70
Shuttering and Concreting for Energy Center Columns (37 nos) at Grid 29 to 30 N - R
43 KAIG3-RFI-EC-S-8940-00 Energy Center 9/3/2022 C32/40 62% OPC+30%FA - 160+/-40 10103 10
(as highlighted)
Concrete Pouring for Fountain 1, At Inner Side of Plant room, Inside Physic Garden, as
44 KAIG3-RFI-PG-S-8961-00 Physics Garden 9/4/2022 C32/40 62% OPC+30%FA - 160+/-40 10179 10
highlighted in attached drawing's.
Concreting for ETFE PUMP ROOM for blinding under SOG axis 02L zone 2D (as
51 KAIG3-RFI-CO-S-9076-00 Crescent 9/4/2022 C16/20 SRC 10192 10
highlighted) at CRESCENT, (KAIG3-SCR-CO-S-0193-00)
Concreting for Kicker of Infill wall for Zone 1A between Axis 01A-01B-01C-01D (PC
53 KAIG3-RFI-CO-S-8928-00 Crescent 9/5/2022 C32/40 62% OPC+30%FA - 160+/-40 10249 10
1-3-5, 2-4-6-8) (as highlighted)
72 KAIG3-RFI-CO-S-9002-00 Crescent 9/5/2022 Concreting of Blinding for strip footing between PC 194-196 zone 2R (as highlighted) C16/20 SRC 10244 10
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
74 IG3-RFI-SW-C-7270-00 Site Works 9/6/2022 G/DH/02, G/DH/21, G/DC/01, G/DC/03, G/DC/20, G/DC/22 at Zone-B&G - as C16/20 SRC 10310 5
highlighted
Concreting for MCPE 2 Suspended Slab (as highlighted) Axis 031-I, TOC varies as C32/40 62% OPC+30%FA+8% MS - 220+/-20
79 KAIG3-RFI-MC-S-9131-00 MCPE 9/6/2022 10327 6
attached in the plan, Zone 2H - SCREED
Concreting for Internal Building Columns and Wall at Zone 2R C56, C 57, C70, C71, C32/40 62% OPC+30%FA+8% MS - 220+/-20
80 KAIG3-RFI-CO-S-9133-00 Crescent 9/6/2022 10326 5
W16 (as highlighted) upto bottom of Slab - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
81 10290 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
82 10282 8
- SCREED
"Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/11 at
95 KAIG3-RFI-SW-C-7212-00 Site works 9/6/2022 C32/40 62% OPC+30%FA - 160+/-40 10314 4
Zone-B (As Highlighted) "
Concrete Pouring & Shuttering for Footing of Boundary Wall at Span 47 of Water
97 KAIG3-RFI-WG-S-9114-00 Water Garden 9/6/2022 C32/40 62% OPC+30%FA - 160+/-40 10328 7
Garden, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 3A As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
99 KAIG3-RFI-TB-S-9122-00 Ticketing Booth 9/6/2022 10325 8
Highlighted Drawing's. - SCREED
Concreting for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F,Axis 03A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
100 KAIG3-RFI-MC-S-9168-00 MCPE 9/7/2022 10355 10
highlighted) TOC 874.80 - SCREED
Concreting for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F,Axis 03A (as
101 KAIG3-RFI-MC-S-9168-00 MCPE 9/7/2022 C32/40 62% OPC+30%FA - 160+/-40 10365 9
highlighted) TOC 874.80
Concrete Pouring & Shuttering for Footings & Grade Beams @ Grid (K/4-13), at Energy
111 KAIG3-RFI-EC-S-9151-00 Energy Center 9/8/2022 C32/40 62% OPC+30%FA - 160+/-40 10408 10
Center 2, as highlighted area in attached drawing's.
Concreting for Tunnel 1 wall and suspended Slab part-C (as Highlighted) Zone 2H
119 KAIG3-RFI-CO-S-9170-00 Crescent 9/8/2022 C32/40 62% OPC+30%FA - 160+/-40 10409 7
869.35
120 KAIG3-RFI-CO-S-9175-00 Crescent 9/8/2022 Concreting for (1 mid) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F C32/40 62% OPC+30%FA - 160+/-40 10400 10
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
121 KAIG3-RFI-SW-C-7287-00 Site Works 9/8/2022 C16/20 SRC 10425 10
F/DH/04, F/DC/01, F/DC/05 at Zone-F&G - as highlighted
Concreting for Plain Concrete of Devonian Garden under AHU Foundation at zone 2M
134 KAIG3-RFI-VG-S-9209-00 Devonian Garden 9/10/2022 C16/20 SRC 10477 10
(as highlighted) (3rd)
Concrete Pouirng & Shuttering for Columns (above the level +872.35) of Boundary Wall
135 KAIG3-RFI-EC-S-9181-00 Energy Center 9/10/2022 @ Grid (28-30/M-N) (20 no's), at Energy Center 2, as highlighted area in attached C32/40 67%OPC+25%FA - 160+/-40 10463 11
drawing's.
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05,
136 KAIG3-RFI-SW-C-6981-00 Site Works 9/10/2022 C32/40 62% OPC+30%FA - 160+/-40 10472 10
D/MV/04, D/MV/32 and D/MV/03 at Zone-E&D (As Highlighted)
Concrete Pouring & Shuttering for Kicker (1st Lift) of Boundary Wall at Span 47 of
141 KAIG3-RFI-WG-S-9200-00 Water Garden 9/10/2022 C32/40 62% OPC+30%FA - 160+/-40 10470 9
Water Garden, as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for walls of New Ticketing Booth # 6A, As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
145 KAIG3-RFI-TB-S-9202-00 Ticketing Booth 9/10/2022 10476 5
Highlighted Drawing's. - SCREED
148 KAIG3-RFI-CO-S-9002-00 Crescent 9/10/2022 Concreting of Blinding for strip footing between PC 194-196 zone 2R (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 10474 10
Concreting for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F,Axis 03A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
149 KAIG3-RFI-MC-S-9168-00 MCPE 9/10/2022 10479 5
highlighted) TOC 874.80 - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
150 10478 10
- SCREED
Concreting for Retaining wall Blinding under foundation in Zone 5 at axis 01C - 01E (as
151 KAIG3-RFI-CO-S-9177-00 Crescent 9/11/2022 C16/20 SRC 10494 7
highlighted)
Inspection for Casting the Concrete encasement for mv line form G/MV/21 to G/MV/37
152 KAIG3-RFI-SW-C-7319-00 Site Works 9/11/2022 C16/20 SRC 10509 10
As highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
153 KAIG3-RFI-SW-C-7353-00 Site Works 9/11/2022 C16/20 SRC 10508 10
C/TL/12 to C/TL/15 at Zone-C - As Highlighted
Inspection of Concrete Pouring for Wall of MV Line Pit - E/MV/02, E/MV/05, E/MV/01
155 KAIG3-RFI-SW-C-7228-01 Site Works 9/11/2022 C32/40 62% OPC+30%FA - 160+/-40 10517 10
and E/MV/03 at Zone-E (As Highlighted)
concreting for Infill wall (inner) between BII 123-124 Axis 02AZ-02AY (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
156 KAIG3-RFI-CO-S-9193-00 Crescent 9/11/2022 10524 10
highlighted) Zone 2Q - SCREED
Concreting for Buttress Head at BOI, BOV, BII, BIV 57,58 (as highlighted) at Zone 1P C32/40 62% OPC+30%FA+8% MS - 220+/-20
164 KAIG3-RFI-CO-S-9083-01 Crescent 9/12/2022 10566 10
(KAIG3-SCR-CO-S-198-00) - SCREED
Concreting for MCPE 3 ,Suspended Slab of Duct Tunnel at axis 03-B , zone 2E &2F (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
165 KAIG3-RFI-MC-S-9212-00 MCPE 9/12/2022 10565 10
highlighted) - SCREED
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
184 KAIG3-RFI-SW-C-7373-00 Site Works 9/13/2022 C16/20 SRC 10586 10
B/DC/02, B/DC/06, G/DC/13 at Zone-B&G - as highlighted
Inspection for Blinding Concrete under MV Line Pulling Pit L/MV/16, L/MV/05,
185 KAIG3-RFI-SW-C-7392-00 Site Works 9/13/2022 C16/20 SRC 10584 10
L/MV/01 and H/MV/19 - as highlighted
Concreting for Diaphragm Wall axis 02AQ (2nd part) from 874.00 to 877.50 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
186 KAIG3-RFI-CO-S-9217-00 Crescent 9/13/2022 10588 7
highlighted) Zone 2N - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
187 10587 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
188 10585 10
- SCREED
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from
189 KAIG3-RFI-SW-C-7578-00 Site Works 9/14/2022 C16/20 SRC 10627 5
B/TL/42 to B/TL/11 at Zone-B&C - As Highlighted
Shuttering for MCPE 2 - Tunnel, Suspended Slab (as highlighted) Axis 03I-1, TOC
192 KAIG3-RFI-MC-S-9130-00 MCPE 9/14/2022 C32/40 62% OPC+30%FA - 160+/-40 10632 10
varies as attached in the plan, Zone 2G 2H 2J 2K
Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/18 at Zone-
195 KAIG3-RFI-SW-C-7272-00 Site Works 9/14/2022 C32/40 62% OPC+30%FA - 160+/-40 10629 10
D (As Highlighted)
Concreting for blinding under Slab of Cafeteria under croft Axis 02C-02D Zone2A (as
196 KAIG3-RFI-CO-S-9262-00 Crescent 9/14/2022 C16/20 SRC 10633 10
highlighted)
Concrete Pouring & Shuttering for Columns (25 no's) (3rd lift above the level +875.55)
198 KAIG3-RFI-EC-S-9232-00 Energy Center 9/15/2022 of Boundary Wall @ Grid (R/18-24), at Energy Center 2, as highlighted area in attached C32/40 67%OPC+25%FA - 160+/-40 10664 11
drawing's.
Concreting for Infill wall Stage1(outer) between Axis 02E-02F (as highlighted) Zone 2B C32/40 62% OPC+30%FA+8% MS - 220+/-20
199 KAIG3-RFI-CO-S-9268-00 Crescent 9/15/2022 10697 4
- SCREED
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - L/MV/16 and
208 KAIG3-RFI-SW-C-7385-00 Site Works 9/15/2022 C32/40 62% OPC+30%FA - 160+/-40 10669 5
L/MV/05 at Zone-L (As Highlighted)
"Inspection for Casting the Concrete Encasement and Surface Preperation prior to start
waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for Storm
209 KAIG3-RFI-SW-C-6679-00 Site Works 9/15/2022 C32/40 62% OPC+30%FA - 160+/-40 10667 10
Water Line and Short piece for Gullies G-E-04, G-E-05, G-E-06, G-E-16, G-E-17 - As
highlighted
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
218 KAIG3-RFI-SW-C-7522-00 Site Works 9/15/2022 C16/20 SRC 10694 10
45 at Zone-K - as highlighted
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 4A As per Attached
219 KAIG3-RFI-TB-S-9292-00 Ticket Booth 9/17/2022 C32/40 62% OPC+30%FA - 160+/-40 10728 6
Highlighted Drawing's.
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from
234 KAIG3-RFI-SW-C-7579-00 Site Works 9/17/2022 C16/20 SRC 10741 3
B/FS/21 to C/FS/10 at Zone-B&C - As Highlighted
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05,
235 KAIG3-RFI-SW-C-6981-00 Site Works 9/17/2022 C32/40 62% OPC+30%FA - 160+/-40 10756 5
D/MV/04, D/MV/32 and D/MV/03 at Zone-E&D (As Highlighted)
Concreting for Rc Foundations Retaining wall Between Axis 02G-02K (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
236 KAIG3-RFI-CO-S-9289-00 Crescent 9/18/2022 10782 3
Zone 6&7 - SCREED
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - L/MV/05 and
237 KAIG3-RFI-SW-C-7482-00 Site Works 9/18/2022 C32/40 62% OPC+30%FA - 160+/-40 10784 5
L/MV/16 at Zone- L (As Highlighted)
"Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - L/MV/01 at Zone- L
238 KAIG3-RFI-SW-C-7484-00 Site Works 9/18/2022 C32/40 62% OPC+30%FA - 160+/-40 10783 10
(As Highlighted) "
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-04
239 KAIG3-RFI-SW-C-7622-00 Site Works 9/18/2022 C16/20 SRC 10790 10
at Zone-B - as highlighted
Concreting for Internal Bulding (2 nos.) Foundation RF3 & RF2 at Zone 1A (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
254 KAIG3-RFI-CO-S-9303-00 Crescent 9/19/2022 10849 9
highlighted) Axis 01C-01D, (KAIG3-SCR-CO-S-0197-00) - SCREED
Concreting for blinding under Strip Footing Foundation Between PC 19-21 zone1D(as
267 KAIG3-RFI-CO-S-9265-00 Crescent 9/19/2022 C16/20 SRC 10848 3
highlighted) at CRESCENT
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-
271 KAIG3-RFI-SW-C-7657-00 Site Works 9/19/2022 C16/20 SRC 10841 10
33, POC-34, POC-35 at Zone-H - as highlighted
274 KAIG3-RFI-CO-S-9228-01 Crescent 9/19/2022 Concreting Infill wall on BOI 122 Axis 02AX (as highlighted) Zone 2Q C32/40 62% OPC+30%FA - 160+/-40 10840 11
Shuttering for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as
275 KAIG3-RFI-CO-S-9342-00 Crescent 9/20/2022 C16/20 SRC 10878 7
highlighted)
Shuttering and Concreting for Energy Center Internal Column (neck) at Axis 11-12, D-H
278 KAIG3-RFI-EC-S-9335-00 Energy Center 9/20/2022 C32/40 62% OPC+30%FA - 160+/-40 10891 9
(as highlighted)
Shuttering and Concreting for Columns (neck) for Energy Center-2, Grid 1-2, C-I (as
279 KAIG3-RFI-EC-S-9353-00 Energy Center 9/20/2022 C32/40 62% OPC+30%FA - 160+/-40 10890 10
highlighted)
Concreting for Infill wall (inner) at Zone 1A Axis 01B to 01C to 01D Upto 869.90 (as
292 KAIG3-RFI-CO-S-9316-00 Crescent 9/20/2022 C32/40 62% OPC+30%FA - 160+/-40 10910 10
highlighted)
Concreting for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
297 KAIG3-RFI-CO-S-9027-01 Crescent 9/21/2022 10974 8
2F (KAIG3-SCR-CO-A-0204-00 with attachments) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
298 KAIG3-RFI-CO-S-9268-00 Crescent 9/21/2022 Concreting for Infill wall Stage1(outer) between Axis 02E-02F (as highlighted) Zone 2B 10973 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
299 9/21/2022 10972 11
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
300 9/21/2022 10971 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
301 9/21/2022 10970 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
302 9/21/2022 10968 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
303 9/21/2022 10965 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
304 9/21/2022 10953 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
305 9/21/2022 10945 10
- SCREED
Concreting for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone
308 KAIG3-RFI-CO-S-9027-00 Crescent 9/21/2022 C32/40 62% OPC+30%FA - 160+/-40 10934 10
2F (KAIG3-SCR-CO-A-0204-00 with attachments)
Concreting for Diaphragm Wall Beam axis 02AQ from 877.00 to 877.50 (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
309 KAIG3-RFI-CO-S-9349-00 Crescent 9/21/2022 10969 5
Zone 2N - SCREED
Concreting for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone C32/40 62% OPC+30%FA+8% MS - 220+/-20
310 KAIG3-RFI-CO-S-9027-00 Crescent 9/21/2022 10964 10
2F (KAIG3-SCR-CO-A-0204-00 with attachments) - SCREED
Concreting for Infill wall Stage1(outer) between Axis 02E-02F (as highlighted) Zone 2B C32/40 62% OPC+30%FA+8% MS - 220+/-20
311 KAIG3-RFI-CO-S-9268-00 Crescent 9/21/2022 10950 10
- SCREED
Concreting for MCPE 2 wall & Counter fort at axis 03E-02Z (as highlighted) at Zone 2G C32/40 62% OPC+30%FA+8% MS - 220+/-20
312 KAIG3-RFI-MC-S-9345-00 MCPE 9/21/2022 10940 10
from 871.00 upto 875.00 & 875.85 - SCREED
315 KAIG3-RFI-SW-C-7514-00 Site Works 9/21/2022 Inspection of Concrete Pouring for the Wall of SBC-07 - Wing Wall - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 10946 10
Concreting for blinding under Slab of Cafeteria under croft Axis 02A - 02C Zone2A (as
317 KAIG3-RFI-CF-S-9356-00 Cafeteria 9/21/2022 C16/20 SRC 10967 7
highlighted)
Concrete Pouring & Shuttering for Bottom Slab and Starter (Kicker) for Water Fountain
322 KAIG3-RFI-WG-S-9371-00 Water Garden 9/24/2022 C32/40 62% OPC+30%FA - 160+/-40 11039 10
of Geyser Garden, inside water Garden, as highlighted area in attached drawing's.
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/38 at Zone-G - C32/40 62% OPC+30%FA+8% MS - 220+/-20
323 KAIG3-RFI-SW-C-7851-00 Site Works 9/24/2022 11043 10
As Highlighted. ( SCR: KAIG3-SCR-SW-E0081-00) - SCREED
Concreting for blinding under Slab of Cafeteria under croft Axis 02A - 02C Zone2A (as
324 KAIG3-RFI-CF-S-9356-00 Cafeteria 9/24/2022 C16/20 SRC 11008 5
highlighted)
Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis
329 KAIG3-RFI-CF-S-9385-00 Cafeteria 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11094 3
02C-02D (as highlighted) TOC 863.450
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - D/MV/17, D/MV/18,
341 KAIG3-RFI-SW-C-7659-00 Site Works 9/25/2022 C32/40 62% OPC+30%FA - 160+/-40 11068 10
D/MV/31, D/MV/33 at Zone- D (As Highlighted)
Inspection for Blinding Concrete under MV Line Pulling Pit L/MV/14 and L/MV/11 - as
342 KAIG3-RFI-SW-C-7660-00 Site Works 9/25/2022 C16/20 SRC 11071 10
highlighted
Concreting for Large Mosque for Upper First Floor for Wall 1& Parapet , Axis C-D, 1-2 C32/40 62% OPC+30%FA+8% MS - 220+/-20
344 KAIG3-RFI-LM-S-9378-00 Large Mosque 9/25/2022 11097 8
Zone 1G (as highlighted) - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
345 11095 10
- SCREED
Shuttering for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as
351 KAIG3-RFI-CO-S-9342-00 Crescent 9/26/2022 C16/20 SRC 11152 10
highlighted)
Shuttering for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1N Axis
352 KAIG3-RFI-CO-S-9413-00 Crescent 9/26/2022 C16/20 SRC 11151 10
01AM (as highlighted)
Concrete Pouring for Blinding Under Gabions at Butterfly Garden , as Highlighted area
360 KAIG3-RFI-TG-C-7837-00 Butterfly Garden 9/26/2022 C16/20 SRC 11130 10
in attached Drawings.
Concreting for MCPE 3 Suspended Slab at duct tunnel, axis 03C, 03D TOC 874.80 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
361 KAIG3-RFI-MC-S-9313-00 MCPE 9/26/2022 11140 8
highlighted) Zone 2E, 2F - SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
362 11131 6
- SCREED
Concreting for MCPE 3 Suspended Slab at duct tunnel, axis 03C, 03D TOC 874.80 (as
363 KAIG3-RFI-MC-S-9313-00 MCPE 9/26/2022 C32/40 62% OPC+30%FA - 160+/-40 11146 10
highlighted) Zone 2E, 2F
379 KAIG3-RFI-SW-C-7690-00 Site Works 9/27/2022 Inspection for Blinding Concrete under Fire Line Pit for B/F/13 - as highlighted C16/20 SRC 11193 5
381 KAIG3-RFI-CO-S-9396-00 Crescent 9/27/2022 Concreting for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 11204 6
Concreting for TIP WALL from 873.725 upto 876.80 Axis 02BC (as highlighted) Zone
382 KAIG3-RFI-CO-S-9422-00 Crescent 9/27/2022 C32/40 62% OPC+30%FA - 160+/-40 11194 10
2R
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - L/MV/11 and
384 KAIG3-RFI-SW-C-7662-00 Site Works 9/27/2022 C32/40 62% OPC+30%FA - 160+/-40 11197 8
L/MV/14 at Zone-L (As Highlighted)
C32/40 62% OPC+30%FA+8% MS - 220+/-20
385 KAIG3-RFI-CO-S-9396-00 Crescent 9/27/2022 Concreting for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted) 11220 10
- SCREED
C32/40 62% OPC+30%FA+8% MS - 220+/-20
386 11217 10
- SCREED
Shuttering and Concreting for Columns (ext.) for Energy Center 2, Axis 7-14, L & 7-11,
387 KAIG3-RFI-EC-S-9415-00 Energy Center 9/28/2022 C32/40 67%OPC+25%FA - 160+/-40 11243 11
A (as highlighted)Level 878.00
Concreting for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as
389 KAIG3-RFI-CO-S-9343-00 Crescent 9/28/2022 C16/20 SRC 11262 10
highlighted)
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-03
391 KAIG3-RFI-SW-C-7718-00 Site Works 9/28/2022 C16/20 SRC 11228 10
at Zone-B - as highlighted
Cooncrete Pouring & Shuttering for Foundation & Kicker (Starter) for Fountain (3),
399 KAIG3-RFI-PG-S-9370-00 Physics Garden 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11260 5
inside Physic Garden as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Blinding under Fountain 2 (4 nos) Inside Physic
400 KAIG3-RFI-PG-S-9417-00 Physics Garden 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11247 8
Garden as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Wall of Fountain 1 (1 no's) at Left side of Entrance,
401 KAIG3-RFI-PG-S-9448-00 Physics Garden 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11245 8
Inside Physic Garden as highlighted area in attached drawing's.
Concreting for Large Mosque for Upper First Floor for Columns & Walls
402 KAIG3-RFI-LM-S-9432-00 Large Mosque 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11264 3
(C5,C4,C3A,C2A,C2C,W5) , Axis C-E, 5-6 Zone 1G (as highlighted)
Concreting for Infill wall between BII 125-126 Axis 02AZ-02BA (as highlighted) Zone
403 KAIG3-RFI-CO-S-9434-00 Crescent 9/28/2022 C32/40 62% OPC+30%FA - 160+/-40 11257 11
2R
Concreting for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E
406 KAIG3-RFI-CO-S-9443-00 Crescent 9/29/2022 C16/20 SRC 11342 7
Axis 01M (as highlighted) (3 footing & strip)
Promenade & Concreting for 4th layer Mass Concrete under Central Bridge Abutment foundation zone
407 KAIG3-RFI-PC-S-9436-00 9/29/2022 C16/20 SRC 11341 10
Canopies 4 (as highlighted) Axis 02AG
429 KAIG3-RFI-CO-S-9455-00 Crescent 9/29/2022 Concreting for Retaining wall (wall) at Axis 02K to 02I Zone 6 & 7 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 11345 4
430 KAIG3-RFI-VG-S-9453-00 Devonian Garden 9/29/2022 Concreting of Devonian Garden AHU Foundation at zone 2M (as highlighted) (3rd) C32/40 62% OPC+30%FA - 160+/-40 11340 10
Concreting for MCPE 2 Bottom Slab of Duct Tunnel, axis 03G, 03H, 03E, 03F TOC
431 KAIG3-RFI-MC-S-9468-00 MCPE 9/29/2022 C32/40 62% OPC+30%FA - 160+/-40 11338 10
871.00 (as highlighted) Zone 2G
Concreting for Devonian Garden Wall (1st) at zone 2M axis 02M (as highlighted) TOC
432 KAIG3-RFI-VG-S-9382-00 Devonian Garden 9/29/2022 C32/40 62% OPC+30%FA - 160+/-40 11337 10
874.80
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit for H/DH/29,
452 KAIG3-RFI-SW-C-7732-00 Site Works 9/29/2022 C16/20 SRC 11328 10
H/DH/30, H/DC/27 at Zone-H - As highlighted
1314
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - SCREED
1794
C32/40 62% OPC+30%FA - 160+/-40
QC DC QC Manager
Concreting for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1N
1 KAIG3-RFI-CO-S-9447-00 Crescent Zone 1N 1-Oct-22 C16/20 SRC 11415 10
Axis 01AM (as highlighted)
Concreting for Infill wall (inner) at Zone 2H Axis 02AA-02AB TOC 876.00 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
21 KAIG3-RFI-CO-S-9445-00 Crescent Zone 2H 1-Oct-22 11408 10
highlighted) - SCREED
Concreting for MCPE 1 Roof Slab of Duct Tunnel, axis 03U TOC 874.80 (as
24 KAIG3-RFI-MC-S-9439-00 MCPE 1 1-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11406 10
highlighted) Zone 2M 2N
Shuttering and Concreting for Energy Center Internal Foundation and Grade Beam at
KAIG3-RFI-EC-S-9021 & Energy Center &
30 1-Oct-22 Axis 4-5, C (as highlighted) & Concrete Pouring for Fountain 1, At Inner Side of Plant C32/40 62% OPC+30%FA - 160+/-40 11407 9
KAIG3-RFI-PG-S-8961-00 Physics Garden
room, Inside Physic Garden, as highlighted in attached drawing's.
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - L/MV/11 and
32 KAIG3-RFI-SW-C-7736-00 Site Work 2-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11450 10
L/MV/14 at Zone-L (As Highlighted)
Concreting for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1E
34 KAIG3-RFI-CO-S-9494-00 crescent Zone 1E 2-Oct-22 C16/20 SRC 11458 10
Axis 01M (as highlighted) (4 footing & 3 strip)
40 KAIG3-RFI-SW-C-7769-01 Site Work 2-Oct-22 Inspection for Blinding Concrete under MV Line Pulling Pit H/MV/30 - as highlighted C16/20 SRC 11457 10
Shuttering and Concreting for Columns neck (int.) of Energy Center 2, Axis 3, C-I & 4-
41 KAIG3-RFI-EC-S-9487-00 Energy Center 2-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11459 6
5, C-H (as highlighted).
Concreting for MCPE 2 inner wall with Counterfort at Zone 2H, axis 02Z to 03I (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
42 KAIG3-RFI-MC-S-9496-00 MCPE 2 3-Oct-22 11497 11
highlighted) from 871.00 to 875.55 - SCREED
Concreting for Strip footing (RC) at Zone 1D Between PC 19-21 Axis 01J-01K (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
43 KAIG3-RFI-CO-S-9499-00 Crescent Zone 1D 3-Oct-22 11493 9
highlighted) - SCREED
47 KAIG3-RFI-SW-C-7620-00 Site Work SBC-07 3-Oct-22 Inspection of Concrete Pouring for the Upstand of SBC-07 - As Highlighted C32/40 62% OPC+30%FA - 160+/-40 11483 10
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit H/DH/21,
49 KAIG3-RFI-SW-C-7793-00 Zone H 3-Oct-22 C16/20 SRC 11490 10
H/DH/22 at Zone-H - As highlighted
Shuttering and Concreting for beam (ext.) of Energy Center 2, Axis 28-30, M-R (as
50 KAIG3-RFI-EC-S-9524-00 Energy Center 3-Oct-22 C32/40 67%OPC+25%FA - 160+/-40 11498 5
highlighted) Level 875.50
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit G/DH/19,
53 KAIG3-RFI-SW-C-7794-00 Zone G 4-Oct-22 C16/20 SRC 11517 10
G/DC/18 at Zone-G - As highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/30 at Zone-
54 KAIG3-RFI-SW-C-7827-00 Zone H 4-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11518 7
H (As Highlighted)
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 5A As per Attached C32/40 62% OPC+30%FA+8% MS - 220+/-20
61 KAIG3-RFI-TB-S-9513-00 Ticketing Booth 4-Oct-22 11525 5
Highlighted Drawing's. - SCREED
Concreting for Front Canopy Foundation at Zone 1 Axis 01O, 01 AN, 01AM, 01AL,
62 KAIG3-RFI-CO-S-9399-00 Zone 1A 4-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11541 9
01K, 01J (as highlighted) TOC 865.060
Shuttering and Concreting for Energy Center 2, Wall (W4) at Axis 0-1, I-C (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
68 KAIG3-RFI-EC-S-9526-00 Energy Center 5-Oct-22 11580 10
highlighted) level 877.00 - SCREED
Concreting for Cafeteria undercroft Slab on Grade, Axis 02A to 02C zone 2A (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
78 KAIG3-RFI-CF-S-9544-00 Cafeteria 5-Oct-22 11585 10
highlighted) - SCREED
ng for Mass Concrete (3rd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M
89 KAIG3-RFI-CO-S-9520-00 Crescent Zone 1E 5-Oct-22 C16/20 SRC 11582 6
(as highlighted) (4 footing & 3 strip)
Concreting for Foundation & Strip Footing of Diaphragm wall at Zone 1E Axis 01P (4
90 KAIG3-RFI-CO-S-9559-00 Crescent Zone 1E 6-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11663 11
Foudations) up to Expansion joint (as highlighted)
Inspection of Blinding Concrete under Potable Water Line Pit L/PW/05 at Zone-L - as
100 KAIG3-RFI-SW-C-7796-00 Zone L C16/20 SRC 11644 10
highlighted
Concreting for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E
104 KAIG3-RFI-CO-S-9554-00 Crescent Zone 1E 6-Oct-22 C16/20 SRC 11665 10
Axis 01M (As highlighted)
South Concreting of blinding for retaining block wall strip footing Zone 2C South Admin
105 KAIG3-RFI-SA-S-9574-00 6-Oct-22 C16/20 SRC 11664 10
Administration building (KAIG3-SCR-GN-S-0147-00)
Inspection of Blinding Concrete under Potable Water Line Pit L/PW/05 at Zone-L - as
135 KAIG3-RFI-SW-C-7796-00 Zone L 8-Oct-22 C16/20 SRC 11720 10
highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/30 at Zone-
137 KAIG3-RFI-SW-C-7827-00 Zone H 8-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11732 7
H (As Highlighted)
Concreting of Mass Concrete Under strip Footing ( Inner ) Between (PC 66-68 , 70-72)
139 KAIG3-RFI-CO-S-9539-00 Crescent Zone 1L 8-Oct-22 C16/20 SRC 11738 10
(As highlighted) Zone1L
South Small
153 KAIG3-RFI-SM-S-9556-00 8-Oct-22 Concreting for South Small Mosque Second Floor Suspended slab (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 11717 8
Mosque
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-46
159 KAIG3-RFI-SW-C-7818-00 Zone G 9-Oct-22 C16/20 SRC 11760 10
at Zone-G - as highlighted
Shuttering for 2nd Layer mass Concrete at Diaphragm wall Foundation at Zone 1E Axis
173 KAIG3-RFI-CO-S-9598-00 Crescent Zone 1E 9-Oct-22 C16/20 SRC 11790 10
01M (5 Footings and Strip Footing) (As Highlighted)
Shuttering for Duct Tunnel wall for MCPE 2, Axis 03G,03H,(as highlighted) Zone 2G , C32/40 62% OPC+30%FA+8% MS - 220+/-20
185 KAIG3-RFI-MC-S-9592-00 MCPE 2 10-Oct-22 11825 8
Level at 874.50 - SCREED
Inspection for Blinding Concrete under MV Line Pulling Pit C/MV/44, C/MV/17,
191 KAIG3-RFI-SW-C-7835-00 Zone C & D 10-Oct-22 C16/20 SRC 11820 10
D/MV/05, D/MV/20 at Zone C&D - as highlighted
Water & Geyser Concrete Pouring & Shuttering for Wall of Fountain inside Geyser Garden, inside water
193 KAIG3-RFI-WG-S-9567-00 10-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11816 7
Garden Garden, as highlighted area in attached drawing's.
Concreting for Front Canopy Foundation at Zone 1 Axis 01Z, 01AA, 01AB, 01AC (as
195 KAIG3-RFI-CO-S-9611-00 Crescent Zone 1 10-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11818 8
highlighted) TOC 865.060
Crescent Zone 1N & Concreting for Wall 20 & 21 at Zone 1N & 1P internal buildings axis 01AR (as
196 KAIG3-RFI-CO-S-9595-00 10-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11817 10
1P highlighted) TOC 869.10
Concrete Pouring for Blinding under Fountain 2 (4 nos) Inside Physic Garden as
197 KAIG3-RFI-PG-S-9627-00 Physics Garden 10-Oct-22 C16/20 SRC 11824 4
highlighted area in attached drawing's.
Shuttering and Concreting for Energy Center (27nos) columns at Grid 0-7 / I-L,upto
198 KAIG3-RFI-EC-S-9686-00 Energy Center 10-Oct-22 C16/20 SRC 11826 10
Level 878.00 (As Highlighted)
Concreting for (2nd layer) Mass Concrete of strip Footing ( Inner ) Between (PC 66-68
205 KAIG3-RFI-CO-S-9647-00 Crescent Zone 1L 12-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 11913 10
& 70-72) (As highlighted) Zone1L
Inspection for Blinding Concrete under MV Line Pulling Pit C/MV/03 at Zone C - as
206 KAIG3-RFI-SW-C-7909-00 Zone C 12-Oct-22 C16/20 SRC 11930 10
highlighted
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-09
207 KAIG3-RFI-SW-C-7929-00 Zone B 12-Oct-22 C16/20 SRC 11928 10
at Zone-B - as highlighted
Concreting of Blinding for Diaphragm wall Foundation and Strip footing at Zone 1E
210 KAIG3-RFI-CO-S-9586-00 Crescent Zone 1E 12-Oct-22 C16/20 SRC 11923 10
Axis 01P (As Highlighted)
Concreting for (2nd layer) Mass Concrete of strip Footing ( Inner ) Between (PC 66-68 C32/40 62% OPC+30%FA+8% MS - 220+/-20
213 KAIG3-RFI-CO-S-9647-00 Crescent Zone 1L 12-Oct-22 11925 4
& 70-72) (As highlighted) Zone1L - SCREED
South Concreting for retaining block wall strip footing Zone 2C South Admin building
214 KAIG3-RFI-SA-S-9644-00 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12008 10
Administration (KAIG3-SCR-GN-S-0147-00)
Concreting for Cafeteria undercroft AHU pad (5 nos.) , Axis 02A - 02C zone 2A (As
215 KAIG3-RFI-CF-S-9626-00 Cafeteria 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12007 10
highlighted)
Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis
216 KAIG3-RFI-CF-S-9684-00 Cafeteria 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12006 10
02C-02B (as highlighted) TOC 863.450
Concreting for First Floor Suspended Slab of Internal Building at Zone 2R axis 02AZ -
217 KAIG3-RFI-CO-S-9623-00 Crescent Zone 2R 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12005 10
02BC (as highlighted)
Concreting for slab, Beams ( for Upper 1st Floor ) for Large Mosque, Axis C-E / 1.1-5.1
218 KAIG3-RFI-LM-S-9653-00 Large Mosque 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12004 10
Zone 1G (As Highlighted)
Concreting of Devonian Garden Wall at zone 2M Axis 02AL to 02AM (as highlighted)
219 KAIG3-RFI-VG-S-9640-00 Devonian Garden 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12003 10
Level upto 874.80 ( 2nd Part )
Concreting for RC strip Footing Between (PC 65-67 ), Axis 01 AG-AH , Zone1L(As
222 KAIG3-RFI-CO-S-9661-00 Crescent Zone 1L 13-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12000 10
highlighted)
Concreting for Cafeteria undercroft AHU pad (5 nos.) , Axis 02A - 02C zone 2A (As
KAIG3-RFI-CF-S-9626-00, highlighted), Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone
Cafeteria, Zone 1E
KAIG3-RFI-CF-S-9684-00, 2A Axis 02C-02B (as highlighted) TOC 863.450,Concreting for Diaphragm wall (1st C32/40 62% OPC+30%FA+8% MS - 220+/-20
267 & South 16-Oct-22 12143 10
KAIG3-RFI-CO-S-9712-00 & Part ) ( Vertical only ) at Zone 1E Axis 01P (As Highlighted) ( Level 868.50 ) & - SCREED
Administration
KAIG3-RFI-SA-S-9644-00 Concreting for retaining block wall strip footing Zone 2C South Admin building
(KAIG3-SCR-GN-S-0147-00)
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/11 at Zone-B
268 KAIG3-RFI-SW-C-7891-00 Site Work 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12133 5
(As Highlighted)
Concreting for Cafeteria undercroft AHU pad (5 nos.) Axis 02A - 02C zone 2A (As
271 KAIG3-RFI-CF-S-9626-00 Cafeteria 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12145 10
highlighted)
Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis
272 KAIG3-RFI-CF-S-9684-00 Cafeteria 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12144 11
02C-02B (as highlighted) TOC 863.450
Concreting for Diaphragm wall (1st Part ) ( Vertical only ) at Zone 1E Axis 01P (As
273 KAIG3-RFI-CO-S-9712-00 Crescent Zone 1E 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12137 10
Highlighted) ( Level 868.50 )
Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis
276 KAIG3-RFI-CF-S-9684-00 Cafeteria 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12150 10
02C-02B (as highlighted) TOC 863.450
Concreting for Diaphragm wall (1st Part ) ( Vertical only ) at Zone 1E Axis 01P (As
277 KAIG3-RFI-CO-S-9712-00 Crescent Zone 1E 16-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12149 10
Highlighted) ( Level 868.50 )
Concreting for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to
South Small
298 KAIG3-RFI-SM-S-9717-00 17-Oct-22 1st Floor, zone 2B at Axis F-G & 1-3 ,from 869.25 to 873.150 ( KAIG3-SCR-SM-S- C32/40 62% OPC+30%FA - 160+/-40 12207 10
Mosque
0205-00 ),(As Highlighted)
South Small Concreting for South Small Mosque Second Floor Parapet at Axis A-G & 2-8 , Zone 2B
299 KAIG3-RFI-SM-S-9719-00 17-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12204 10
Mosque (as highlighted) TOC- 877.80
Concreting for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to
KAIG3-RFI-SM-S-9717-00 & South Small 1st Floor, zone 2B at Axis F-G & 1-3 ,from 869.25 to 873.150 ( KAIG3-SCR-SM-S- C32/40 62% OPC+30%FA+8% MS - 220+/-20
320 17-Oct-22 12200 10
KAIG3-RFI-SM-S-9719-00 Mosque 0205-00 ),(As Highlighted) & Concreting for South Small Mosque Second Floor Parapet - SCREED
at Axis A-G & 2-8 , Zone 2B (as highlighted) TOC- 877.80
Concreting for RC Strip Footing Between PC 67-69-71, Axis 01-2, 01AH-01AI-01AJ at C32/40 62% OPC+30%FA+8% MS - 220+/-20
321 KAIG3-RFI-CO-S-9707-00 Crescent Zone 1L 17-Oct-22 12194 10
Zone 1L (As Highlighted) - SCREED
Inspection for Blinding Concrete under MV Line Pulling Pit K/MV/04 at Zone-K - as
322 KAIG3-RFI-SW-C-7962-00 Zone K 17-Oct-22 C16/20 SRC 12199 7
highlighted
Concreting for Diaphragm wall Mass Concrete 3rd Layer of strip footing at Zone 1E
323 KAIG3-RFI-CO-S-9714-00 Crescent Zone 1E 17-Oct-22 C16/20 SRC 12208 10
Axis 01M (As Highlighted)
Concreting for Cafeteria (undercroft level) Wall (W 16, 17, 18) as highlighted, (W16
C32/40 62% OPC+30%FA+8% MS - 220+/-20
326 KAIG3-RFI-CF-S-9699-00 Cafeteria 18-Oct-22 from 863.45 upto 868.60), (W17 & 18 from 863.45 upto 868.30 zone 2A (KAIG3-SCR- 12253 10
- SCREED
CF-S-0194-00 with attachments)
Concreting for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
327 KAIG3-RFI-CO-S-9664-00 Crescent Zone 4 18-Oct-22 12245 7
highlighted) Zone 4 - SCREED
Concreting for Foundation of Retaining wall at Axis 01S-01U ( from Movement Joint to C32/40 62% OPC+30%FA+8% MS - 220+/-20
328 KAIG3-RFI-CO-S-9740-00 Crsecent Zone 1G 18-Oct-22 12240 8
Movement Joint ) (as highlighted) Zone 1G - SCREED
Concreting for Cafeteria (undercroft level) Wall (W 16, 17, 18) as highlighted, (W16
330 KAIG3-RFI-CF-S-9699-00 Cafeteria 18-Oct-22 from 863.45 upto 868.60), (W17 & 18 from 863.45 upto 868.30 zone 2A (KAIG3-SCR- C32/40 62% OPC+30%FA - 160+/-40 12251 10
CF-S-0194-00 with attachments)
Concreting for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as
331 KAIG3-RFI-CO-S-9664-00 Crescent Zone 4 18-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12250 10
highlighted) Zone 4
Concrete Pouring & Shuttering for Wall of Fountain (3), inside Physic Garden as
334 KAIG3-RFI-PG-S-9708-00 Physics Garden 18-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12243 7
highlighted area in attached drawing's.
Concrete Pouring for Screed protection with Geo Textile on Blinding of Decant Sump- C32/40 62% OPC+30%FA+8% MS - 220+/-20
337 KAIG3-RFI-WG-S-9846-00 Water Garden 18-Oct-22 12256 3
D4 Inside Water Play garden, at Water Garden as highlighted area in attached drawing's. - SCREED
Concreting of Blinding for Diaphragm wall Foundation and Strip footing at Zone 1E
338 KAIG3-RFI-CO-S-9586-00 Crescent Zone 1E 18-Oct-22 C16/20 SRC 12257 7
Axis 01P (As Highlighted)
Concreting for Columns C2 at Zone 2N Child Care as highlighted (C2 -5 nos.) up to C32/40 62% OPC+30%FA+8% MS - 220+/-20
340 KAIG3-RFI-CC-S-9742-00 Child Care 19-Oct-22 12294 10
bottom of Slab. - SCREED
345 KAIG3-RFI-SW-C-8075-00 Zone K 19-Oct-22 Blinding Concrete under LV line Pit K-LV-05,14,42,10,08,41 at zone-k C16/20 SRC 12277 10
Sotuh Shuttering for blinding of retaining block wall strip footing Zone 2C South Admin
346 KAIG3-RFI-SA-S-9573-00 19-Oct-22 C16/20 SRC 12283 7
Administration building (KAIG3-SCR-GN-S-0147-00)
Concreting for Infill wall (inner) at zone 2A Between 02C-02D from 863.55 to 869.16 C32/40 62% OPC+30%FA+8% MS - 220+/-20
347 KAIG3-RFI-CO-S-9762-00 Crescent Zone 2A 20-Oct-22 12324 5
(As Highlighted) - SCREED
Concreting for Blinding under Foundation for North Watch Tower in zone 1 (as
354 KAIG3-RFI-NT-S-9753-00 North watch Tower 20-Oct-22 C16/20 SRC 12317 5
highlighted)
Concreting for MCPE 2 Roof slab at Zone 2K axis 03E to 02X (As Highlighted) TOC
358 KAIG3-RFI-MC-S-9767-00 MCPE 2 20-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12318 4
875.974 & 875.850
362 KAIG3-RFI-SW-C-8076-00 Site Work 20-Oct-22 BLinding Concrete under MV line Pit G-MV-23, 04 C16/20 SRC 12321 10
Concreting for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC
364 KAIG3-RFI-CO-S-9869-00 Crescent Zone 1M 22-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12403 7
72-74 & PC 76-78(as highlighted)
Concreting for blinding of retaining wall foundation zone 5 from axis 01G upto after 01E
371 KAIG3-RFI-CO-S-9793-00 Crescent Zone 5 22-Oct-22 C16/20 SRC 12393 10
(as highligted)
"Inspection of Casting Concrete for Short Piece and Surface Preperation prior to start
C32/40 62% OPC+30%FA+8% MS - 220+/-20
372 KAIG3-RFI-SW-C-7882-00 Site Work 22-Oct-22 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for short 12394 4
- SCREED
piece of Manhole MH-O-11 and Gullies G-O-11, G-O-12, G-O-13 (As Highlighted)
Shuttering and Concreting for Energy Center, Beam Grid 18-30/R (As Highlighted) at
374 KAIG3-RFI-EC-S-9806-00 Energy Center 22-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12409 10
Level 878.50
Shuttering and Concreting for Energy Center Internal Column (neck) at Axis 7/D-G , 8-
375 KAIG3-RFI-EC-S-9805-00 Energy Center 22-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12408 10
10/D-H , 11-12/ D (as highlighted)
Concreting for Diaphragm wall (1st part) foundationat zone 1E Axis 01M (As
376 KAIG3-RFI-CO-S-9801-00 Crescent Zone 1E 22-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12407 10
Highlighted)
Concreting for Front Canopy Foundation at Zone 6 Axis 0101C, 01D, 01E, 01F (as
385 KAIG3-RFI-CO-S-9799-00 Crescent Zone 6 23-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12441 10
highlighted) TOC 865.060
Concreting for Diaphragm wall foundation (4) & strip footing (3) at zone 1E Axis 01P
386 KAIG3-RFI-CO-S-9815-00 Crescent Zone 1E 23-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12439 10
(As Highlighted)
Shuttering and Concreting for Columns of Energy Center, Grid 22-27/M ( 21 nos ) &
387 KAIG3-RFI-EC-S-9812-00 Energy Center 23-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12436 10
Grid 28-30/R-N ( 27 nos ) upto Level 878.00 (As Highlighted)
Shuttering and Concreting for Columns of Energy Center, Grid 22-27/M ( 21 nos ) &
394 KAIG3-RFI-EC-S-9812-00 Energy Center 23-Oct-22 C32/40 67%OPC+25%FA - 160+/-40 12432 11
Grid 28-30/R-N ( 27 nos ) upto Level 878.00 (As Highlighted)
Concreting for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC
395 KAIG3-RFI-CO-S-9869-00 Crescent Zone 1M 23-Oct-22 C32/40 67%OPC+25%FA - 160+/-40 12440 6
72-74 & PC 76-78(as highlighted)
Concreting for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
396 KAIG3-RFI-CO-S-9808-00 Crescent Zone 2A 24-Oct-22 12467 10
Highlighted) Level from 863.55 - 869.10 - SCREED
Concreting for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As
400 KAIG3-RFI-CO-S-9808-00 Crescent Zone 2A 24-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12457 10
Highlighted) Level from 863.55 - 869.10
401 KAIG3-RFI-MC-S-9823-00 MCPE 2 24-Oct-22 Concreting for MCPE 2 Roof Slab,Axis 02X-03F,Zone 2G(As Highlighted ) C32/40 62% OPC+30%FA - 160+/-40 12456 10
Inspection of Blinding Concrete under Potable Water Line Pit B/PW/10 at Zone-B - as
405 KAIG3-RFI-SW-C-8087-00 Zone B 24-Oct-22 C16/20 SRC 12468 4
highlighted
Concreting for Blinding of Diaphragm wall Foundation at Zone 2C Axis 02J (As
406 KAIG3-RFI-CO-S-9841-00 Crescent Zone 2C 25-Oct-22 C16/20 SRC 12503 11
Highlighted)
Concreting for Large Mosque for Upper First Floor for Columns & Walls
426 KAIG3-RFI-LM-S-9842-00 Large Mosque 25-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12509 10
(C4,C5,C1,C1B,W5) , Axis C-E, 2-5 Zone 1G (as highlighted)
Screed protection with Geo Textile for Wet Area inside Toilets (GF-5041 & 5042)
Management C32/40 62% OPC+30%FA+8% MS - 220+/-20
433 KAIG3-RFI-MB-A-1221-00 25-Oct-22 Disabled Toilet (GF-5043), inside Management and Maintenance Building as 12506 8
Building - SCREED
highlighted area in attached Drawing's & KAIG3-SCR-PT-A-0084-00-Reply
Concreting for Devonian Garden Foundation at zone 2M ,Axis 03S,03T,03U (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
434 KAIG3-RFI-VG-S-9871-00 Devonian Garden 26-Oct-22 12557 11
Highlighted) TOC 871.00 - SCREED
Concreting for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC
438 KAIG3-RFI-CO-S-9869-00 Crescent Zone 1M 26-Oct-22 C16/20 SRC 12559 4
72-74 & PC 76-78(as highlighted)
Inspection of Blinding Concrete under Fire Water Line Pit B/F/02 at Zone-B - as
454 KAIG3-RFI-SW-C-8088-00 Zone B 26-Oct-22 C16/20 SRC 12554 10
highlighted
Concreting for COLUMNS ( C2 - 8 nos) (C3 - 2 nos) at Zone 2N Child Care (as
459 KAIG3-RFI-CC-S-9853-00 Child Care 26-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12560 4
highlighted) Upto bottom of Slab
Inspection of Blinding Concrete under RO Water Line Pit ROW-ISC-17 & POC-24 at
467 KAIG3-RFI-SW-C-8089-00 Zone B 27-Oct-22 C16/20 SRC 12587 10
Zone-B - As highlighted
472 KAIG3-RFI-CO-S-9901-00 Crescent Zone 6 & 7 27-Oct-22 Concreting for Retaining wall (wall) from axis 02E-02F Zone 6&7 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 12602 8
Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As
KAIG3-RFI-EC-S-9925-00 & C32/40 62% OPC+30%FA+8% MS - 220+/-20
477 Energy Center 29-Oct-22 Highlighted) & Shuttering and concreting for Energy Center, columns at Grid 28-30/R 12634 10
KAIG3-RFI-EC-S-9926-00 - SCREED
( 20 nos ) at level 878.00 (As Highlighted)
Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
478 KAIG3-RFI-MC-S-9938-00 MCPE 2 29-Oct-22 12629 10
highlighted) 874.80 Zone 2H - SCREED
Concreting for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and C32/40 62% OPC+30%FA+8% MS - 220+/-20
479 KAIG3-RFI-CO-S-9893-00 Crescent Zone 1L 29-Oct-22 12620 10
01AI to 01AJ (As Highlighted) - SCREED
Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As
KAIG3-RFI-EC-S-9925-00 &
481 Energy Center 29-Oct-22 Highlighted) & Shuttering and concreting for Energy Center, columns at Grid 28-30/R C32/40 62% OPC+30%FA - 160+/-40 12619 10
KAIG3-RFI-EC-S-9926-00
( 20 nos ) at level 878.00 (As Highlighted)
Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As
KAIG3-RFI-EC-S-9925-00 &
482 Energy Center 29-Oct-22 Highlighted) & Shuttering and concreting for Energy Center, columns at Grid 28-30/R C32/40 67%OPC+25%FA - 160+/-40 12631 3
KAIG3-RFI-EC-S-9926-00
( 20 nos ) at level 878.00 (As Highlighted)
Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as
483 KAIG3-RFI-MC-S-9938-00 MCPE 2 29-Oct-22 C32/40 67%OPC+25%FA - 160+/-40 12621 11
highlighted) 874.80 Zone 2H
Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As
KAIG3-RFI-EC-S-9925-00 &
484 Energy Center 29-Oct-22 Highlighted) & Shuttering and concreting for Energy Center, columns at Grid 28-30/R C32/40 62% OPC+30%FA - 160+/-40 12635 10
KAIG3-RFI-EC-S-9926-00
( 20 nos ) at level 878.00 (As Highlighted)
Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as
485 KAIG3-RFI-MC-S-9938-00 MCPE 2 29-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12633 10
highlighted) 874.80 Zone 2H
Concreting for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and
486 KAIG3-RFI-CO-S-9893-00 Crescent Zone 1L 29-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12632 10
01AI to 01AJ (As Highlighted)
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/17 &
490 KAIG3-RFI-SW-C-7953-00 Zone H 30-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12636 5
C/MV/44 at Zone-H (As Highlighted)
Concreting of Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-
491 KAIG3-RFI-EC-S-9924-00 Energy Center 30-Oct-22 C16/20 SRC 12646 10
22/N , 12-19/O-P , 21-22/O-P (as highlighted)
Concreting of Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-
500 KAIG3-RFI-EC-S-9924-00 Energy Center 30-Oct-22 C16/20 SRC 12644 10
22/N , 12-19/O-P , 21-22/O-P (as highlighted)
Concreting For North Administration Building Zone 2R Axis 02AZ , 02BA , 02BB ,
North C32/40 62% OPC+30%FA+8% MS - 220+/-20
501 KAIG3-RFI-NA-S-9918-00 30-Oct-22 Walls ( W18 , W17 ,W5 , W6 , W16 , W4 , W15 , W3 ) first Floor upto 876.80 (As 12653 6
Administration - SCREED
Highlighted ) upto 876.80
Concrete Pouring & Shuttering for Foundation & Kicker of Decant Sump-D4 Inside
507 KAIG3-RFI-WG-C-8475-00 Water Garden 30-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12649 9
Water Play garden, at Water Garden as highlighted area in attached drawing's.
Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as
516 KAIG3-RFI-MC-S-9938-00 MCPE 2 31-Oct-22 C32/40 62% OPC+30%FA - 160+/-40 12681 10
highlighted) 874.80 Zone 2H
Concreting of Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 19/P ,
519 KAIG3-RFI-EC-S-10074-00 Energy Center 31-Oct-22 C16/20 SRC 12695 10
21-24/P , 23-24/Q, (As Highlighted)
QC DC QC Manager
Concreting for Infill wall (inner) at Zone 1A at Axis 01A-01B-01C-01D (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
1 KAIG3-RFI-CO-S-10021-00 Crescent Zone 1A 1-Nov-22 12729 3
Highlighted) level upto 872.00 - SCREED
Concreting for Child Care Walls and Columns , Walls W6 (1 no.), W1 (1 no.)) Columns
C32/40 62% OPC+30%FA+8% MS - 220+/-20
2 KAIG3-RFI-CC-S-9954-00 Child Care 1-Nov-22 (C3 (1 no.) at Zone 2N Child Care (As Highlighted) Upto Bottom Level of Suspended 12724 10
- SCREED
Slab
Concrete Pouring & shuttering for Wall of Fountain 1 (1 no's) at Right side of Outer
8 KAIG3-RFI-PG-S-9966-00 Physics Garden 1-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12726 7
Canopy 3, Inside Physic Garden as highlighted area in attached drawing's.
Concrete Pouring & Shuttering for Kicker of Cabin Room, ETFE Pump Room, Water
9 KAIG3-RFI-TG-S-9972-00 Butterfly Garden 1-Nov-22 feature Pump Room & Remaining Boundary wall, at Butterfly Garden, as highlighted C32/40 62% OPC+30%FA - 160+/-40 12723 8
area in attached drawing's.
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - D/MV/04, E/MV/01,
10 KAIG3-RFI-SW-C-8003-00 Zone D & E 1-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12713 10
E/MV/03, E/MV/02, E/MV/05 at Zone-D&E (As Highlighted)
Concreting for walls (W1,W2) at CAFETERIA from level 862.00 to level 869.10 zone
12 KAIG3-RFI-CF-S-8576-00 Cafeteria 1-Nov-22 C16/20 SRC 12698 10
2A (as highlighted)
Concreting of Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-
13 KAIG3-RFI-EC-S-9924-00 Energy Center 1-Nov-22 C16/20 SRC 12728 5
22/N , 12-19/O-P , 21-22/O-P (as highlighted)
Concreting for Diaphragm wall Foundation and Strip footing at zone 1E Axis 01M (as
29 KAIG3-RFI-CO-S-9963-00 Crescent Zone 1E 2-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12806 10
highlighted) (left part)
Concreting for Rc Foundations of Retaining wall Between Axis 01G-01C Zone 5 (as
30 KAIG3-RFI-CO-S-9990-00 Crescent Zone 5 2-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12801 10
highlighted)
Concreting for Blinding under Retaining wall Foundation from Axis 02E-02C Zone 6&7
47 KAIG3-RFI-CO-S-10008-00 Zone 6 & 7 3-Nov-22 C16/20 SRC 12851 7
(As Highlighted)
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 3A, As per C32/40 62% OPC+30%FA+8% MS - 220+/-20
50 KAIG3-RFI-TB-S-9994-00 Ticketing Booth 3-Nov-22 12830 4
Attached Highlighted Drawing's. - SCREED
Concreting for wall (W3 ) at CAFETERIA Zone 2A , Axis 02A-02B (as highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
51 KAIG3-RFI-CF-S-10005-00 Cafeteria 3-Nov-22 12847 9
Level from 863.55 to 868.75 - SCREED
57 KAIG3-RFI-SW-C-8450-00 Zone C 6-Nov-22 Inspection of Blinding Concrete under Sub-station - R1 at Zone-C - as highlighted C16/20 SRC 12942 10
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit B/DC/07 at
58 KAIG3-RFI-SW-C-8463-00 Zone B 6-Nov-22 C16/20 SRC 12940 10
Zone-B - As highlighted
60 KAIG3-RFI-MC-S-10036-00 MCPE 2 6-Nov-22 Concreting for MCPE 2 Roof Slab , Axis 02Y-02Z, Zone 2H (As Highlighted ) C32/40 62% OPC+30%FA - 160+/-40 12941 10
Concreting of Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N ,
68 KAIG3-RFI-EC-S-10077-00 Energy Center 7-Nov-22 C16/20 SRC 13000 10
29/O (As Highlighted)
83 KAIG3-RFI-CO-S-10044-00 Crescent Zone 1D 7-Nov-22 Concreting for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted) C32/40 67%OPC+25%FA - 160+/-40 12977 10
Shuttering and concreting for Energy Center Beam at Grid 0-14/I-L at level 878.50 (As
84 KAIG3-RFI-EC-S-9997-00 Energy Center 7-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 12975 10
Highlighted)
Concreting for MCPE 2 Wall & Counterfort , Axis 02AD-02AE, Zone 2J (As
85 KAIG3-RFI-MC-S-10033-00 MCPE 2 7-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 12973 10
Highlighted )
87 KAIG3-RFI-CO-S-10044-00 Crescent Zone 1D 7-Nov-22 Concreting for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13003 2
Shuttering and concreting for Energy Center Beam at Grid 0-14/I-L at level 878.50 (As
88 KAIG3-RFI-EC-S-9997-00 Energy Center 7-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13001 11
Highlighted)
Concreting for MCPE 2 Wall & Counterfort , Axis 02AD-02AE, Zone 2J (As
89 KAIG3-RFI-MC-S-10033-00 MCPE 2 7-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 12987 10
Highlighted )
Shuttering and concreting for Energy Center Beam at Grid 0-14/I-L at level 878.50 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
98 KAIG3-RFI-EC-S-9997-00 Energy Center 7-Nov-22 13004 10
Highlighted) - SCREED
Concrete Pouring & Shuttering for Fountain 2 (Outer) (4 nos) Inside Physic Garden as
105 KAIG3-RFI-PG-S-10057-00 Physics Garden 8-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13058 10
highlighted area in attached drawing's.
Concrete Pouring for Blinding under Decant Sump-D1,D2 & D3 at Geyser Garden,
KAIG3-RFI-WG-C-8513-00; inside Water Garden as highlighted area in attached drawing's & KAIG3-SCR-WG-S-
106 KAIG3-RFI-WG-C-8430-00 & Water Garden 8-Nov-22 0212-00-Reply. & Concrete Pouring for Blinding under Decant Sump-D3 at Mist C16/20 SRC 13059 5
KAIG3-RFI-WG-C-8512-00 Garden, inside Water Garden as highlighted area in attached drawing's & KAIG3-SCR-
WG-S-0212-00-Reply.
Concrete Pouring & Shuttering for Ring Beams at Entrance of Back of House @ Grid
108 KAIG3-RFI-AG-S-10056-00 Aviary Garden 8-Nov-22 (17-21/Left Side) or 30 to 32, on Boundary wall at Aviary Garden, As per Highlighted in C32/40 67%OPC+25%FA - 160+/-40 13049 5
attached Drawing's.
"Inspection of Formwork and Concrete Pouring for the Expansion Joint of SBC-07 (As
109 KAIG3-RFI-SW-C-8521-00 Site Work (SBC-07) 8-Nov-22 C16/20 SRC 13060 10
Highlighted)"
"Inspection of Formwork and Concrete Pouring for Footing of MV Line Pulling Pit -
112 KAIG3-RFI-SW-C-8509-00 Zone C 8-Nov-22 C/MV/07, C/MV/08, C/MV/09, C/MV/27, C/MV/26 & C/MV/37 at Zone-C - As C32/40 62% OPC+30%FA - 160+/-40 13041 5
Highlighted (SCR: KAIG3-SCR-SW-E-0088-00)"
Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As
114 KAIG3-RFI-CO-S-10061-00 Crescent Zone 1M 8-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13067 9
Highlighted)
Concreting for Foundation of Retaining wall from Axis 01P-01S , Zone 2&3 (as
115 KAIG3-RFI-CO-S-10039-00 Crescent Zone 2 & 3 8-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13066 10
highlighted)
139 KAIG3-RFI-VG-S-10087-00 Devonian Garden 9-Nov-22 Concreting for Devonian Garden Wall at Zone 2M (As Highlighted) upto Level 874.60 C32/40 62% OPC+30%FA - 160+/-40 13105 10
143 KAIG3-RFI-VG-S-10087-00 Devonian Garden 9-Nov-22 Concreting for Devonian Garden Wall at Zone 2M (As Highlighted) upto Level 874.60 C32/40 62% OPC+30%FA - 160+/-40 13112 5
"Inspection of Formwork and Concrete Pouring for the Expansion Joint of SBC-07 (As
152 KAIG3-RFI-SW-C-8521-00 Site Work (SBC-07) 9-Nov-22 C16/20 SRC 13107 10
Highlighted)"
Concreting for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As
KAIG3-RFI-CF-S-10091-00 & Highlighted ) Level Upto 864.866 ( KAIG3-SCR-CO-S-0196-00 ) & Concreting for C32/40 62% OPC+30%FA+8% MS - 220+/-20
154 Cafeteria 10-Nov-22 13156 10
KAIG3-RFI-CF-S-10095-00 Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Level - SCREED
upto 867.92 , KAIG3-SCR-CO-S-0196-00
Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
155 KAIG3-RFI-CO-S-10061-00 Crescent Zone 1M 10-Nov-22 13153 10
Highlighted) - SCREED
Shuttering and concreting for Energy Center, Beam at Grid 17-28/M at level 878.50 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
156 KAIG3-RFI-EC-S-10120-00 Energy Center 10-Nov-22 13143 10
Highlighted) - SCREED
Concreting for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As
KAIG3-RFI-CF-S-10089-00 &
157 Cafeteria 10-Nov-22 Highlighted ) Level to 868.75 , KAIG3-SCR-CO-S-0194-01 & Concreting for wall (W4) C32/40 62% OPC+30%FA - 160+/-40 13168 10
KAIG3-RFI-CF-S-10093-00
at cafeteria undercroft, Zone 2A (as highlighted)
Concreting for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As
KAIG3-RFI-CF-S-10091-00 & Highlighted ) Level Upto 864.866 ( KAIG3-SCR-CO-S-0196-00 ) & Concreting for
158 Cafeteria 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13167 8
KAIG3-RFI-CF-S-10095-00 Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Level
upto 867.92 , KAIG3-SCR-CO-S-0196-00
Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As
159 KAIG3-RFI-CO-S-10061-00 Crescent Zone 1M 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13166 10
Highlighted)
Shuttering and concreting for Energy Center, Beam at Grid 17-28/M at level 878.50 (As
160 KAIG3-RFI-EC-S-10120-00 Energy Center 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13162 10
Highlighted)
Concreting for Large Mosque Lower Second Floor Slab for , Zone 1G , Axis ( 1-2 / D-
161 KAIG3-RFI-LM-S-10124-00 Large Mosque 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13161 10
F ) (As Highlighted) Upto Level 878.1
Concreting for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As
162 KAIG3-RFI-CO-S-10116-00 Crescent Zone 1E 10-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13160 10
Highlighted)
163 KAIG3-RFI-CO-S-10127-00 Crescent Zone 2M 10-Nov-22 Concreting for Infill wall at Zone 2M at Axis 02AO (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 13159 10
Shuttering and concreting for Blinding under footing of Energy Center, Axis 13-16/ L-R
173 KAIG3-RFI-EC-S-10118-00 Energy Center 10-Nov-22 C16/20 SRC 13164 10
Highlighted)
Concreting for Large Mosque Lower Second Floor Slab for , Zone 1G , Axis ( 1-2 / D-
175 KAIG3-RFI-LM-S-10124-00 Large Mosque 10-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 13157 11
F ) (As Highlighted) Upto Level 878.1
Concreting for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As
176 KAIG3-RFI-CO-S-10116-00 Crescent Zone 1E 10-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 13154 11
Highlighted)
Shuttering and concreting for Blinding under footing of Energy Center, Axis 13-16/ L-R
177 KAIG3-RFI-EC-S-10118-00 Energy Center 10-Nov-22 C16/20 SRC 13165 11
Highlighted)
Shuttering & Concreting for Energy Center for Wall ( W4 ) at Grid 0-1, C-I from Level
178 KAIG3-RFI-EC-S-10139-00 Energy Center 12-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13213 10
877.00 to 882.30 (As Highlighted)
Shuttering & Concreting for Energy Center for Wall ( W4 ) at Grid 0-1, C-I from Level C32/40 62% OPC+30%FA+8% MS - 220+/-20
181 KAIG3-RFI-EC-S-10139-00 Energy Center 12-Nov-22 13216 8
877.00 to 882.30 (As Highlighted) - SCREED
Concreting for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-
191 KAIG3-RFI-EC-S-10134-00 Energy Center 12-Nov-22 C16/20 SRC 13206 10
Q (As Highlighted)
Concreting for Kicker of Retaining wall from Axis 01S-01W , Zone 2&3 (as
200 KAIG3-RFI-CO-S-10122-00 Crescent Zone 2 & 3 12-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13214 6
highlighted)
Concreting for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-
202 KAIG3-RFI-EC-S-10134-00 Energy Center 13-Nov-22 C16/20 SRC 13256 10
Q (As Highlighted)
207 KAIG3-RFI-VG-S-10138-00 Devonian Garden 13-Nov-22 Concreting for Devonian gardens Wall (as highlighted) Zone 2M axis 03U upto 874.50 C32/40 62% OPC+30%FA - 160+/-40 13263 10
Concrteting for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85
230 KAIG3-RFI-MC-S-10161-00 MCPE 2 14-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13279 10
(as highlighted)
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit B/DC/04,
240 KAIG3-RFI-SW-C-8795-00 Zone B & L 15-Nov-22 H/DC/37, H/DC/38, L/DC/17, L/DC/18, L/DH/18, L/DH/19 at Zone-B&L - As C16/20 SRC 13325 10
highlighted
Shuttering and Concreting for Beams of Energy Center at Grid 28-30 /M-R (As
246 KAIG3-RFI-EC-S-10182-00 Energy Center 15-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13328 10
Highlighted) Level upto 878.50
Concreting for Retaining wall from Axis 01S-01W , Zone 2&3 ,at Level 868.90 (as
247 KAIG3-RFI-CO-S-10207-00 Zone 2 & 3 15-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13326 10
highlighted)
Concreting for Blinding under Retaining wall Foundation from Axis 01W-01Y , Zone
251 KAIG3-RFI-CO-S-10212-00 Crescent Zone 1H 15-Nov-22 C16/20 SRC 13311 4
1H ,at Level 865.0 & 865.50 (as highlighted)
Shuttering and concreting for Energy Center, Columns at Grid 0-4/C-A at level 878.00
252 KAIG3-RFI-EC-S-10236-00 Energy Center 16-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13369 2
( 16nos ) (As Highlighted)
Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to
253 KAIG3-RFI-MC-S-10181-00 MCPE 2 16-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13366 5
02AF zone 2K (as highlighted)
Concreting for Front Canopy Foundation at Zone 4 , Axis 01G , Level 865.06 (As
254 KAIG3-RFI-CO-S-10234-00 Crescent Zone 4 16-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13361 10
Highlighted)
262 KAIG3-RFI-CO-S-10041-01 Crescent Zone 2K 17-Nov-22 Concreting for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13394 5
Concreting for Lower Second Slab Upstand ( UB 3 ) at Large Mosque at Zone 1G Axis (
263 KAIG3-RFI-LM-S-10156-00 Large Mosque 17-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13393 4
5-6 / C-F ) (As Highlighted) Level from 878.10 to 879.25
Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.85 from axis 02AF to
280 KAIG3-RFI-MC-S-10129-00 MCPE 2 17-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13372 10
02AG zone 2K (as highlighted)
"Inspection of Formwork and Concrete Pouring for Wall of MV Line Pulling Pit
281 KAIG3-RFI-SW-C-08725-00 Zone C 17-Nov-22 C/MV/08, C/MV/09, C/MV/26 & C/MV/37 at Zone-C - As Highlighted (SCR: KAIG3- C32/40 62% OPC+30%FA - 160+/-40 13383 7
SCR-SW-E-0088-00)"
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
283 KAIG3-RFI-SW-C-7270-01 Zone B & G 17-Nov-22 G/DH/02, G/DH/21, G/DC/01, G/DC/03, G/DC/20, G/DC/22 at Zone-B&G - as C16/20 SRC 13392 7
highlighted
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
285 KAIG3-RFI-SW-C-7270-01 Zone B & G 17-Nov-22 G/DH/02, G/DH/21, G/DC/01, G/DC/03, G/DC/20, G/DC/22 at Zone-B&G - as C16/20 SRC 13389 10
highlighted
Concreting for Diaphragm wall (Inclined) at Zone 1E Axis 01P (As Highlighted) Level
287 KAIG3-RFI-CO-S-10202-00 Crescent Zone 1E 19-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13412 8
868.75
Concreting for Cafeteria (undercroft) Wall (W5 ) , Zone 2A Axis 02A-02B , Level from
288 KAIG3-RFI-CF-S-10247-00 Cafeteria 19-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13410 10
864.866-868.75 (As Highlighted )
289 KAIG3-RFI-CO-S-10249-00 Crescent Zone 6 & 7 19-Nov-22 Concreting for Retaining wall (wall) at Axis 02F to 02G , Zone 6 & 7 (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 13406 10
Concreting for Diaphragm wall (Inclined) at Zone 1E Axis 01P (As Highlighted) Level C32/40 62% OPC+30%FA+8% MS - 220+/-20
294 KAIG3-RFI-CO-S-10202-00 Crescent Zone 1E 19-Nov-22 13415 9
868.75 - SCREED
Concreting for Cafeteria (undercroft) Wall (W5 ) , Zone 2A Axis 02A-02B , Level from C32/40 62% OPC+30%FA+8% MS - 220+/-20
295 KAIG3-RFI-CF-S-10247-00 Cafeteria 19-Nov-22 13414 10
864.866-868.75 (As Highlighted ) - SCREED
Inspection of Formwork and Concrete pouring for wall and Slab of Cesspool-1 at Zone-
302 KAIG3-RFI-SW-C-8850-00 Zone K 19-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13402 10
K - as highlighted
Concreting for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to
South Small
309 KAIG3-RFI-SM-S-10011-00 20-Nov-22 1st Floor, zone 2B at Axis F-G & 6-8 ,Level from 869.25 to 873.150 ( KAIG3-SCR-SM- C32/40 62% OPC+30%FA - 160+/-40 13419 6
Mosque
S-0205-00 ),(As Highlighted)
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between
311 KAIG3-RFI-SW-C-8853-00 Zone C 21-Nov-22 C16/20 SRC 13461 10
C/FS/04 and C/FS/21 at Zone-C - As Highlighted
Concreting for RC Foundation of Retaining wall from Axis 02C-02E , Zone 6&7 (as
314 KAIG3-RFI-CO-S-10270-00 Crescent Zone 6 & 7 21-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13450 10
highlighted)
Concreting for RC Foundation of Retaining wall from Axis 02C-02E , Zone 6&7 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
319 KAIG3-RFI-CO-S-10270-00 Crescent Zone 6 & 7 21-Nov-22 13471 10
highlighted) - SCREED
Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
323 KAIG3-RFI-CO-S-10295-00 Crescent Zone 2R 22-Nov-22 13506 8
highlighted) TOC 877.47 (KAIG3-SCR-CO-S-0216-00) - SCREED
Concreting for Large Mosque Lower Second Floor wall ( W3 ) and column ( C5 ) for, C32/40 62% OPC+30%FA+8% MS - 220+/-20
324 KAIG3-RFI-LM-S-10280-00 Large Mosque 22-Nov-22 13504 10
Zone 1G Axis ( 5-6 / E-D ) (As Highlighted) - SCREED
Concreting for Devonian garden wall , Zone 2M Axis 02AN-02AO TOW 874.50 ( As C32/40 62% OPC+30%FA+8% MS - 220+/-20
325 KAIG3-RFI-VG-S-10309-00 Devonian Garden 22-Nov-22 13499 10
Highlighted) - SCREED
Concreting for MCPE 2 wall & counterfort from 02AG-02AH Zone 2K (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
326 KAIG3-RFI-MC-S-10290-00 MCPE 2 22-Nov-22 13496 10
Highlighted) From 871.00 to 875.55 - SCREED
Inspection of Formwork and Concrete pouring for Slab of MV Line Pulling Pit -
328 KAIG3-RFI-SW-C-8739-00 Zone C, D & H 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13487 10
C/MV/17, C/MV/44, D/MV/05, D/MV/20, H/MV/30 at Zone-C,D&H (As Highlighted)
Inspection of Formwork and Concrete Pouring for MV Line Pit - C/MV/10, C/MV/25,
329 KAIG3-RFI-SW-C-8799-00 Zone C& H 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13486 10
H/MV/27 at Zone-C&H - as highlighted (KAIG3-SCR-SW-E-0088-00)
Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as
330 KAIG3-RFI-CO-S-10295-00 Crescent Zone 2R 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13510 7
highlighted) TOC 877.47 (KAIG3-SCR-CO-S-0216-00)
Concreting for Large Mosque Lower Second Floor wall ( W3 ) and column ( C5 ) for,
331 KAIG3-RFI-LM-S-10280-00 Large Mosque 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13509 7
Zone 1G Axis ( 5-6 / E-D ) (As Highlighted)
Concreting for Devonian garden wall , Zone 2M Axis 02AN-02AO TOW 874.50 ( As
332 KAIG3-RFI-VG-S-10309-00 Devonian Garden 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13507 10
Highlighted)
Concreting for MCPE 2 wall & counterfort from 02AG-02AH Zone 2K (As
333 KAIG3-RFI-MC-S-10290-00 MCPE 2 22-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13505 10
Highlighted) From 871.00 to 875.55
Concreting for mass Concrete under Strip footing at Zone 1K ( Outer ) Axis 01AD-
340 KAIG3-RFI-CO-S-10258-00 Crescent Zone 1K 24-Nov-22 C16/20 SRC 13566 11
01AE-01AF , TOC : 866.83-867-33 ( As higlighted )
Inspection of Concrete (Plain) Pouring for the Duct Bank of LV Line from B/MV/54 to
352 KAIG3-RFI-SW-C-8954-00 Zone B & C 24-Nov-22 C16/20 SRC 13565 4
B/MV/40 at Zone-B&C (As Highlighted)
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
353 KAIG3-RFI-SW-C-8977-00 Zone G 24-Nov-22 C16/20 SRC 13558 10
G/DH/06, G/DH/07 at Zone-G - as highlighted
Inspection of Formwork and Concrete pouring for Slab of MV Line Pulling Pit - C32/40 62% OPC+30%FA+8% MS - 220+/-20
360 KAIG3-RFI-SW-C-8739-00 Zone C, D & H 24-Nov-22 13562 10
C/MV/17, C/MV/44, D/MV/05, D/MV/20, H/MV/30 at Zone-C,D&H (As Highlighted) - SCREED
Inspection of Formwork and Concrete Pouring for MV Line Pit - C/MV/10, C/MV/25, C32/40 62% OPC+30%FA+8% MS - 220+/-20
361 KAIG3-RFI-SW-C-8799-00 Zone C& H 24-Nov-22 13554 6
H/MV/27 at Zone-C&H - as highlighted (KAIG3-SCR-SW-E-0088-00) - SCREED
Inspection of Formwork and Concrete pouring for Slab of MV Line Pulling Pit - C32/40 62% OPC+30%FA+8% MS - 220+/-20
363 KAIG3-RFI-SW-C-8739-00 Zone C, D & H 24-Nov-22 13571 5
C/MV/17, C/MV/44, D/MV/05, D/MV/20, H/MV/30 at Zone-C,D&H (As Highlighted) - SCREED
Inspection of Formwork and Concrete Pouring for MV Line Pit - C/MV/10, C/MV/25, C32/40 62% OPC+30%FA+8% MS - 220+/-20
364 KAIG3-RFI-SW-C-8799-00 Zone C& H 24-Nov-22 13570 10
H/MV/27 at Zone-C&H - as highlighted (KAIG3-SCR-SW-E-0088-00) - SCREED
371 KAIG3-RFI-CO-S-10375-00 Crescent Zone 1E 26-Nov-22 Concreting for Diaphragm wall for Kicker at Zone 1E , Axis 01M (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13613 10
372 KAIG3-RFI-CO-S-10326-00 Crescent Zone 1A 26-Nov-22 Concreting for Infill wall ( outer ) , Zone 1A between axis 01C-01D (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 13612 10
Concreting for Wall of Retaining wall from Axis 01P-01Q and 01R-01S , Zone 2&3 ,
373 KAIG3-RFI-CO-S-10334-00 Crescent Zone 2 & 3 26-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13611 10
Level Upto 868.90 (As Highlighted)
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
377 KAIG3-RFI-SW-C-8980-00 Zone L 26-Nov-22 C16/20 SRC 13608 5
L/DC/13 at Zone-L - as highlighted
Concreting for Plain concrete under S.O.G at Devonian Garden in Zone 2M (as
379 KAIG3-RFI-VG-S-10273-00 Devonian Garden 26-Nov-22 C16/20 SRC 13591 11
highlighted)
Shuttering and Concreting for Column of Energy Center at Grid 0-7/I-L ( 27 nos) (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
381 KAIG3-RFI-EC-S-10329-00 Energy Center 27-Nov-22 13632 10
Highlighted) Level upto 878.50 & 881.00 - SCREED
Inspection of Formwork and Concrete pouring for wall and Slab of Cesspool-1 at Zone-
382 KAIG3-RFI-SW-C-8850-00 Zone K 27-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13638 10
K - as highlighted
"Inspection of Formwork and Concrete Pouring for Wall of MV Line Pit - C/MV/07,
383 KAIG3-RFI-SW-C-8934-00 Zone C & H 27-Nov-22 C/MV/27, C/MV/10, C/MV/25, H/MV/27 at Zone-C&H - as highlighted (KAIG3-SCR- C32/40 62% OPC+30%FA - 160+/-40 13634 10
SW-E-0088-00)"
Shuttering and Concreting for Beams of Energy Center at Grid 0-4 / A-C Level Upto
385 KAIG3-RFI-EC-S-10331-00 Energy Center 27-Nov-22 C32/40 67%OPC+25%FA - 160+/-40 13650 10
878.50 (As Highlighted)
389 KAIG3-RFI-CO-S-10323-00 Crescent Zone 1D 27-Nov-22 Concreting for infill wall (inner) (stage 2) at zone 1D at axis 01L-01M (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 13661 11
Shuttering and Concreting for Column of Energy Center at Grid 0-7/I-L ( 27 nos) (As
390 KAIG3-RFI-EC-S-10329-00 Energy Center 27-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13660 11
Highlighted) Level upto 878.50 & 881.00
Shuttering and Concreting for Beams of Energy Center at Grid 0-4 / A-C Level Upto
391 KAIG3-RFI-EC-S-10331-00 Energy Center 27-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13659 10
878.50 (As Highlighted)
Concreting for Foundation of Retaining wall from Axis 01W-01Z Zone 2 , (As
392 KAIG3-RFI-CO-S-10364-00 Crescent Zone 2 27-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13658 10
Highlighted)
397 KAIG3-RFI-MC-S-10346-00 MCPE 2 28-Nov-22 Concreting for MCPE 2 Roof Slab from Axis 02AC-03K Zone 2J (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13674 5
398 KAIG3-RFI-CC-S-10405-00 Child Care 28-Nov-22 Concreting for Child Care Grade Beam at Zone 2N (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 13673 10
Concreting for Kicker of Retaining wall from Axis 02C-02E Zone 6&7 , (As
399 KAIG3-RFI-CO-S-10367-00 Crescent Zone 6 & 7 28-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13672 10
Highlighted)
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
408 KAIG3-RFI-SW-C-7287-01 Zone F 28-Nov-22 C16/20 SRC 13671 10
F/DH/04, F/DC/01, F/DC/05 at Zone-F - as highlighted
410 KAIG3-RFI-SW-C-9034-00 Zone D 29-Nov-22 Inspection of Blinding Concrete under MV Line Pit D/MV/28 at Zone-D - as highlighted C16/20 SRC 13723 10
Shuttering and Concreting for Blinding under Foundation at Energy center at Axis 12-
417 KAIG3-RFI-EC-S-10408-00 Energy Center 29-Nov-22 C16/20 SRC 13724 3
13/A , Level 871.10 ( As Highlighted)
Concreting for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As
420 KAIG3-RFI-CO-S-10400-00 Crescent Zone 1L 30-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13785 10
Highlighted)
Concreting for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as
421 KAIG3-RFI-MC-S-10391-00 MCPE 2 30-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13777 10
highlighted)
Concreting for Stiffner of Diaphragm wall for ( 1st Span ) at Zone 1E , Axis 01P (As
422 KAIG3-RFI-CO-S-10403-00 Crescent Zone 1E 30-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13765 10
Highlighted)
Concreting for Diaphragm wall for Kicker and Wall ( Inclined Wall ) at Zone 1E , Axis
423 KAIG3-RFI-CO-S-10426-00 Crescent Zone 1E 30-Nov-22 C32/40 62% OPC+30%FA - 160+/-40 13755 10
01M Level 869.00(As Highlighted)
424 KAIG3-RFI-CO-S-10412-00 Crescent Zone 5 & 6 30-Nov-22 Concreting for Retaining wall from axis 01C-01E, zone 5&6 (as higlighted) C32/40 62% OPC+30%FA - 160+/-40 13746 10
Concreting for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As C32/40 62% OPC+30%FA+8% MS - 220+/-20
427 KAIG3-RFI-CO-S-10400-00 Crescent Zone 1L 30-Nov-22 13788 5
Highlighted) - SCREED
Concreting for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
428 KAIG3-RFI-MC-S-10391-00 MCPE 2 30-Nov-22 13787 10
highlighted) - SCREED
Concreting for Stiffner of Diaphragm wall for ( 1st Span ) at Zone 1E , Axis 01P (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
429 KAIG3-RFI-CO-S-10403-00 Crescent Zone 1E 30-Nov-22 13782 10
Highlighted) - SCREED
Concreting for Diaphragm wall for Kicker and Wall ( Inclined Wall ) at Zone 1E , Axis C32/40 62% OPC+30%FA+8% MS - 220+/-20
430 KAIG3-RFI-CO-S-10426-00 Crescent Zone 1E 30-Nov-22 13771 10
01M Level 869.00(As Highlighted) - SCREED
Concrete Pouring and Shuttering for Foundation & Kicker of Decant Sump-D3 at Mist
433 KAIG3-RFI-WG-C-9176-00 Water Garden 30-Nov-22 Garden, inside Water Garden as highlighted area in attached drawing's & KAIG3-SCR- C32/40 62% OPC+30%FA - 160+/-40 13751 10
WG-S-0212-00-Reply.
679
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - SCREED
2182
C32/40 62% OPC+30%FA - 160+/-40
QC DC QC Manager
Concreting for MCPE 2 Roof Slab at Zone 2J , Between Axis 02AD-02AE (as
1 KAIG3-RFI-MC-S-10439-00 MCPE 2 1-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13831 7
highlighted)
Concreting for Diaphragm wall , Kicker and Wall ( Inclined wall ) at Zone 1E , Axis 01P
2 KAIG3-RFI-CO-S-10398-00 Crescent Zone 1E 1-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13827 10
(As Highlighted)
Concreting for Large Mosque Lower Second Floor Beam ( 137A ) for, Zone 1G , Axis
3 KAIG3-RFI-LM-S-10384-01 Large Mosque 1-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13820 10
( 2-5 / E ) Level upto 879.50 (As Highlighted)
Shuttering for Blinding Under Diaphragm Wall Foundation at Zone 2M ,Grid 02/AL (as
6 KAIG3-RFI-CO-S-10434-00 Crescent Zone 2M 1-Dec-22 C16/20 SRC 13828 10
highlighted)
Concreting for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As C32/40 62% OPC+30%FA+8% MS - 220+/-20
12 KAIG3-RFI-CO-S-10400-00 Crescent Zone 1L 1-Dec-22 13802 10
Highlighted) - SCREED
Concreting for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
13 KAIG3-RFI-MC-S-10391-00 MCPE 2 1-Dec-22 13798 10
highlighted) - SCREED
"Inspection for Casting the Blinding Concrete under the Manhole MH-O-07-1, MH-O-
15 KAIG3-RFI-SW-C-9132-00 Site Works 1-Dec-22 07-2, MH-O-07-3 and Gullies G-O-22, G-O-7, G-O-5, G-O-6, G-O-4, G-O-3, G-O-2, G- C16/20 SRC 13803 10
O-1 - as Highlighted"
Shuttering and Concreting for Energy center Columns at axis 7-11/A Level upto 884.50
18 KAIG3-RFI-EC-S-10328-00 Energy Center 3-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13904 10
(As Highlighted)
Shuttering and Concreting for Energy center Columns at axis 7-11/A Level upto 884.50
24 KAIG3-RFI-EC-S-10328-00 Energy Center 3-Dec-22 C32/40 67%OPC+25%FA - 160+/-40 13881 11
(As Highlighted)
North Concreting for RC Strip footing at North Administation Building ,Zone 2Q , Between
25 KAIG3-RFI-NA-S-10449-01 3-Dec-22 C32/40 67%OPC+25%FA - 160+/-40 13866 11
Administration Axis 02AX-02AY ( As Highlighted ) KAIG3-SCR-GN-S-0147-00
Concreting for Infill wall ( outer ) , Zone 2A ,between Axis 02A-02B Level From 863.55 C32/40 62% OPC+30%FA+8% MS - 220+/-20
26 KAIG3-RFI-CO-S-10424-00 Crescent Zone 2A 3-Dec-22 13890 5
to 869.135 (as highlighted) - SCREED
Shuttering and Concreting for Columns of Energy Center at Grid 0-4 /A-C ( As C32/40 62% OPC+30%FA+8% MS - 220+/-20
27 KAIG3-RFI-EC-S-10472-00 Energy Center 3-Dec-22 13876 10
Highlighted) Level upto 881.00 - SCREED
North Concreting for RC Strip footing at North Administation Building ,Zone 2Q , Between C32/40 62% OPC+30%FA+8% MS - 220+/-20
28 KAIG3-RFI-NA-S-10449-01 3-Dec-22 13862 10
Administration Axis 02AX-02AY ( As Highlighted ) KAIG3-SCR-GN-S-0147-00 - SCREED
Concreting Mass Concrete (1st Layer ) under Rc Strip Footing ( inner ) at Zone 1K ,
29 KAIG3-RFI-CO-S-10387-00 Crescent Zone 1K 3-Dec-22 C16/20 SRC 13887 10
Between Axis 01AD-AE & 01AE-01AF (As Highlighted )
South Small Concreting for 2nd floor Roof Slab at south small mosque , Zone 2B , Axis F-G, 1-3 (as
41 KAIG3-RFI-SM-S-10487-00 4-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13988 10
Mosque highlighted) SSL 876.65 (with KAIG3-SCR-SM-S-0206-00 & attachements)
Concreting for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As
42 KAIG3-RFI-MC-S-10475-00 MCPE 2 4-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 13984 10
Highlighted ) Level 875.85
Concreting for Infill wall ( 1st Stage ), at Zone 1L ,between Axis 01AG -01AH ,TOC : C32/40 62% OPC+30%FA+8% MS - 220+/-20
53 KAIG3-RFI-CO-S-10451-00 Crescent Zone 1L 4-Dec-22 13993 4
874.05 (as highlighted) - SCREED
South Small Concreting for 2nd floor Roof Slab at south small mosque , Zone 2B , Axis F-G, 1-3 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
54 KAIG3-RFI-SM-S-10487-00 4-Dec-22 13992 5
Mosque highlighted) SSL 876.65 (with KAIG3-SCR-SM-S-0206-00 & attachements) - SCREED
Concreting for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
55 KAIG3-RFI-MC-S-10475-00 MCPE 2 4-Dec-22 13991 10
Highlighted ) Level 875.85 - SCREED
63 KAIG3-RFI-CO-S-10484-00 Crescent Zone 6&7 5-Dec-22 Concreting for Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 14036 10
Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as
65 KAIG3-RFI-CO-S-10295-00 Crescent Zone 2R 5-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14021 10
highlighted) TOC 877.47 (KAIG3-SCR-CO-S-0216-00)
North Concreting for RC Strip footing at North Administation Building ,Zone 2Q , Between
66 KAIG3-RFI-NA-S-10449-01 5-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14018 10
Administration Axis 02AX-02AY ( As Highlighted ) KAIG3-SCR-GN-S-0147-00
Concreting for Infill wall ( inner ) ( Stage 2 ) at Zone 1D at Axis 01J-01K (as
67 KAIG3-RFI-CO-S-10480-00 Crescent Zone 1D 5-Dec-22 C16/20 SRC 10417 10
highlighted)
Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
68 KAIG3-RFI-CO-S-10295-00 Crescent Zone 2R 5-Dec-22 14035 10
highlighted) TOC 877.47 (KAIG3-SCR-CO-S-0216-00) - SCREED
Inspection of Blinding Concrete under RO Water Line Pit POC-01 & POC02 at Zone-B
73 KAIG3-RFI-SW-C-9198-00 Zone B 5-Dec-22 C16/20 SRC 14029 10
- As highlighted
South Small Concreting for South small mosque , Sloping Slab and Parapet, Axis D-F/1-2 , F-G/1 C32/40 62% OPC+30%FA+8% MS - 220+/-20
81 KAIG3-RFI-SM-S-10341-00 6-Dec-22 14051 10
Mosque Zone 2B (as highlighted) , ( KAIG3-SCR-SM-S-0206-00 ) - SCREED
Concreting for S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 01AA , F.F.L
82 KAIG3-RFI-CO-S-10490-00 Crescent Zone 2H 6-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14059 10
869.79 (as highlighted),KAIG3-SCR-CO-S-0193-00
83 KAIG3-RFI-CO-S-10556-01 Crescent Zone 2B 6-Dec-22 Concreting for Infill wall at Zone 2B, Axis 02G , Level upto 872.3 (As Highlighted) C32/40 62% OPC+30%FA - 160+/-40 14056 10
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for
86 KAIG3-RFI-SW-C-9487-00 Zone G 6-Dec-22 C16/20 SRC 14055 10
G/DC/11 at Zone-G - as highlighted
Concrete pouring & shuttering for Footing of Water feature Pump Room along Boundary
88 KAIG3-RFI-TG-S-10466-01 Butterfly Garden 7-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14088 10
wall, at Butterfly Garden, as highlighted area in attached drawing's.
Inspection of Casting Concrete Encasement for Storm Water Line Branch from MH-Y-
91 KAIG3-RFI-SW-C-8927-00 Site Works 7-Dec-22 01 to End of Line and Surface Preperation prior to start waterproofing and Application of C16/20 SRC 14080 10
Primer (1st Coat, 2nd Coat and 3rd Coat) for branch from MH-Y-01 to End of Line
Shuttering and Concreting for Blinding under Grade Beam at Energy center at Axis 21-
93 KAIG3-RFI-EC-S-10511-00 Energy Center 7-Dec-22 C16/20 SRC 14085 10
29/N-Q ,( As Highlighted)
Concreting for Child Care Columns and Walls Upto Bottom of Suspended Slab , C32/40 62% OPC+30%FA+8% MS - 220+/-20
97 KAIG3-RFI-CC-S-10547-00 Child Care 7-Dec-22 14082 10
Columns ( C2 ( 8nos ) C1 ( 4nos ) ) at Zone 2N (As Highlighted) - SCREED
Concreting for Large Mosque WALL ( W 6 ) for, Zone 1G , Axis ( 3-3.2/B ) Level upto C32/40 62% OPC+30%FA+8% MS - 220+/-20
98 KAIG3-RFI-LM-S-10486-00 Large Mosque 7-Dec-22 14076 10
873.30 & 874.50 (As Highlighted) - SCREED
Concreting for Devonian garden AHU RC foundation (near 2nd) at Zone 2M , Axis
99 KAIG3-RFI-VG-S-10319-00 Devoniam Garden 7-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14083 10
02AM-02AL (as highlighted)
Concreting Mass Concrete (1st Layer ) under Rc Strip Footing ( inner ) at Zone 1K ,
104 KAIG3-RFI-CO-S-10387-00 Crescent Zone 1K 8-Dec-22 C16/20 SRC 14127 10
Between Axis 01AD-AE & 01AE-01AF (As Highlighted )
Concreting for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at
124 KAIG3-RFI-LM-S-10561-00 Large Mosque 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14104 10
Zone 1G , Axis ( 2 & 5, B & B1 ) (As Highlighted)
Crescent Zone 1M Concreting for Diaphragm wall at Zone 1M 1N , Axis 01AM , level From 872.5 to C32/40 62% OPC+30%FA+8% MS - 220+/-20
130 KAIG3-RFI-CO-S-10554-00 8-Dec-22 14124 10
& 1N 877.0 (As Highlighted) - SCREED
Concreting for Devonian Garden for SOG and Concrete Pad at Zone 2M ,Axis 02 AL - C32/40 62% OPC+30%FA+8% MS - 220+/-20
131 KAIG3-RFI-VG-S-10545-00 Devonian Garden 8-Dec-22 14109 10
02 AM (as highlighted) - SCREED
Concreting for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at C32/40 62% OPC+30%FA+8% MS - 220+/-20
132 KAIG3-RFI-LM-S-10561-00 Large Mosque 8-Dec-22 14099 10
Zone 1G , Axis ( 2 & 5, B & B1 ) (As Highlighted) - SCREED
Crescent Zone 1M Concreting for Diaphragm wall at Zone 1M 1N , Axis 01AM , level From 872.5 to
135 KAIG3-RFI-CO-S-10554-00 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14120 10
& 1N 877.0 (As Highlighted)
Concreting for Devonian Garden for SOG and Concrete Pad at Zone 2M ,Axis 02 AL -
136 KAIG3-RFI-VG-S-10545-00 Devonian Garden 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14111 10
02 AM (as highlighted)
Concreting for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at
137 KAIG3-RFI-LM-S-10561-00 Large Mosque 8-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14089 7
Zone 1G , Axis ( 2 & 5, B & B1 ) (As Highlighted)
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between
138 KAIG3-RFI-SW-C-9167-00 Zone F 11-Dec-22 C16/20 SRC 14202 10
F/FS/04 and F/FS/03 at Zone-F - As Highlighted
Shuttering and Concreting for Energy Center for foundation Axis 16-18/R(As
140 KAIG3-RFI-EC-S-10569-00 Energy Center 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14217 5
Highlighted) Level upto 871.00
Shuttering and Concreting for Energy Center for Footing Axis 14-16/L-R (As
141 KAIG3-RFI-EC-S-10584-00 Energy Center 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14213 10
Highlighted) 871.70
Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB
144 KAIG3-RFI-MC-S-10541-01 MCPE 2 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14192 10
Level 871.00 (as highlighted)
Shuttering and Concreting for Energy Center for foundation Axis 16-18/R(As
147 KAIG3-RFI-EC-S-10569-00 Energy Center 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14216 10
Highlighted) Level upto 871.00
Shuttering and Concreting for Energy Center for Footing Axis 14-16/L-R (As
148 KAIG3-RFI-EC-S-10584-00 Energy Center 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14215 10
Highlighted) 871.70
Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AE-02AF , TOC
149 KAIG3-RFI-MC-S-10564-00 MCPE 2 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14214 10
875.974 (As Highlighted)
Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB
151 KAIG3-RFI-MC-S-10541-01 MCPE 2 11-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14211 10
Level 871.00 (as highlighted)
Concreting for Child Care Walls Upto Bottom of Suspended Slab, Walls W4-1no ) , W7-
163 KAIG3-RFI-CC-S-10587-00 Child Care 12-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14268 10
1 no at Zone 2N (As Highlighted)
Concreting for Wall of Retaining wall, Axis 01W-01X , 01Y-01Z ,at Zone 2&3 , T.O.W.
164 KAIG3-RFI-CO-S-10607-00 Crescent Zone 2 & 3 12-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14267 10
868.90 (As Highlighted)
Concreting for Child Care Walls Upto Bottom of Suspended Slab, Walls W4-1no ) , W7- C32/40 62% OPC+30%FA+8% MS - 220+/-20
168 KAIG3-RFI-CC-S-10587-00 Child Care 12-Dec-22 14259 10
1 no at Zone 2N (As Highlighted) - SCREED
Concreting for Wall of Retaining wall, Axis 01W-01X , 01Y-01Z ,at Zone 2&3 , T.O.W. C32/40 62% OPC+30%FA+8% MS - 220+/-20
169 KAIG3-RFI-CO-S-10607-00 Crescent Zone 2 & 3 12-Dec-22 14250 5
868.90 (As Highlighted) - SCREED
Concreting for Mass Concrete ( 1st Layer ) ( Inner ) under Foundation , Between PC 74
170 KAIG3-RFI-CO-S-10601-00 Zone 1M 12-Dec-22 C16/20 SRC 14263 10
- PC 76 , at Zone 1M ( As Highlighted )
Concrete Pouring for Blinding under Gabions along Boundary wall Inner side, (Between
183 KAIG3-RFI-AG-C-9388-00 Aviary Garden 12-Dec-22 F.O.H and B.O.H and Plant Room) Inside Aviary Garden, at highlighted area in attached C16/20 SRC 14256 10
drawings.
Concrete Pouring for Blinding under Foundations of Internal Garden, Inside Aviary
184 KAIG3-RFI-AG-S-10203-01 Aviary Garden 12-Dec-22 C16/20 SRC 14248 10
Garden, As per Highlighted in attached Drawing's.
Inspection of Blinding Concrete under Beam of Seating Area 3-21 & 3-22 at Zone-G -
189 KAIG3-RFI-PA-C-9187-00 Picnic Area 12-Dec-22 C16/20 SRC 14262 10
As Highlighted
Concreting for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH -
194 KAIG3-RFI-CO-S-10594-00 Crescent Zone 1L 14-Dec-22 C16/20 SRC 14314 10
01AI , Level 874.05 (As Highlighted)
Concrete Pouring & Shuttering for Slab & Walls of Cabin Room, ETFE Pump Room
202 KAIG3-RFI-TG-S-10572-01 Butterfly Garden 14-Dec-22 and Remaining Boundary walls, at Butterfly Garden, as highlighted area in attached C32/40 62% OPC+30%FA - 160+/-40 14301 10
drawing's.
Inspection for Casting the Blinding Concrete under the Manhole MH-G-08, MH-G-09,
MH-G-10, MH-G-10-1, MH-G-11 and Gullies G-G-25, G-G-23, G-G-24, G-G-22, G-G-
207 KAIG3-RFI-SW-C-9355-00 Site Works 14-Dec-22 C16/20 SRC 14311 10
21, G-G-20, G-G-19, G-G-03, G-G-05, G-G-18, G-G-17, G-G-15&16, G-G-13&14 - as
Highlighted
Concreting for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH -
213 KAIG3-RFI-CO-S-10594-00 Crescent Zone 1L 14-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14313 3
01AI , Level 874.05 (As Highlighted)
Shuttering and Concreting for Energy Center Beam at Axis 0-14, I-L (As Highlighted)
221 KAIG3-RFI-EC-S-10634-00 Energy Center 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14335 10
TOC 881.50
Shuttering and Concreting for Energy Center for foundation , Axis 12-13/A Level upto
222 KAIG3-RFI-EC-S-10637-00 Energy Center 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14331 10
871.70 (As Highlighted)
Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB
223 KAIG3-RFI-MC-S-10541-01 MCPE 2 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14324 10
Level 871.00 (as highlighted)
Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC
224 KAIG3-RFI-MC-S-10620-01 MCPE 2 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14320 10
875.974 & 875.85 (As Highlighted)
Shuttering and Concreting for Energy Center Beam at Axis 0-14, I-L (As Highlighted)
225 KAIG3-RFI-EC-S-10634-00 Energy Center 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14347 5
TOC 881.50
Shuttering and Concreting for Energy Center for foundation , Axis 12-13/A Level upto
226 KAIG3-RFI-EC-S-10637-00 Energy Center 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14346 10
871.70 (As Highlighted)
Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB
227 KAIG3-RFI-MC-S-10541-01 MCPE 2 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14337 10
Level 871.00 (as highlighted)
Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC
228 KAIG3-RFI-MC-S-10620-01 MCPE 2 15-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14336 4
875.974 & 875.85 (As Highlighted)
Concreting for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J ,
254 KAIG3-RFI-CO-S-10661-00 Crescent Zone 1J 17-Dec-22 C16/20 SRC 14416 10
Axis 01AA-01AD (As Highlighted)
Concreting for Diaphragm wall blinding under foundation at Zone 1B , Axis 01F (As
255 KAIG3-RFI-CO-S-10592-00 Crescent Zone 1B 17-Dec-22 C16/20 SRC 14415 10
Highlighted) Level 868.10 & 867.50
Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL,
265 KAIG3-RFI-CO-S-10752-00 Crescent Zone 2M 17-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14404 10
(grid 5 to 9 ) , Level upto 870.00 (as highlighted)
Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , level 869.00
266 KAIG3-RFI-CO-S-10689-00 Crescent Zone 1E 17-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14400 7
(As Highlighted)
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-
271 KAIG3-RFI-SW-C-9545-00 Zone 2C 17-Dec-22 C16/20 SRC 14413 5
ISC-26, NPW-ISC-27, and NPW-ISC-28 at Zone-C - as highlighted
Concreting for Child Care Blinding Under SOG at Zone 2N (As Highlighted) Axis
281 KAIG3-RFI-CC-S-10657-00 Child Care 18-Dec-22 C16/20 SRC 14444 10
02AR-02AT
Shuttering and Concreting for Energy Center Beam , Axis 0-4/A-C , Level 881.50 (As
282 KAIG3-RFI-EC-S-10671-00 Energy Center 18-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14462 11
Highlighted )
Concreting for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level
283 KAIG3-RFI-CO-S-10652-00 Crescent Zone 1E 18-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14455 10
upto 868.5 (As Highlighted)
Concreting for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level
288 KAIG3-RFI-CO-S-10652-00 Crescent Zone 1E 18-Dec-22 C32/40 67%OPC+25%FA - 160+/-40 14439 10
upto 868.5 (As Highlighted)
Concrete pouring for wall of Decant Sump-D1 at boat Garden, inside Water Garden as
289 KAIG3-RFI-WG-C-9491-00 Water Garden 18-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14438 10
highlighted area in attached drawing's & KAIG3-SCR-WG-S-0212-00-Reply.
Shuttering and Concreting for Energy Center Beam , Axis 0-4/A-C , Level 881.50 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
290 KAIG3-RFI-EC-S-10671-00 Energy Center 18-Dec-22 14466 10
Highlighted ) - SCREED
Concreting for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level C32/40 62% OPC+30%FA+8% MS - 220+/-20
291 KAIG3-RFI-CO-S-10652-00 Crescent Zone 1E 18-Dec-22 14465 11
upto 868.5 (As Highlighted) - SCREED
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from D/MV/13 to
300 KAIG3-RFI-SW-C-9584-00 Zone D 18-Dec-22 C16/20 SRC 14461 10
D/MV/06 at Zone-D (As Highlighted)
Inspection of Formwork and Concrete pouring for Footing of MV Line Pulling Pit -
317 KAIG3-RFI-SW-C-9535-00 Zone D 19-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14482 10
D/MV/12 at Zone-D (As Highlighted)
Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , level 869.00
320 KAIG3-RFI-CO-S-10689-00 Crescent Zone 1E 19-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14484 10
(As Highlighted)
321 KAIG3-RFI-CO-S-10655-01 Crescent Zone 1C 19-Dec-22 Concreting for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted) C32/40 62% OPC+30%FA - 160+/-40 14483 10
Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , level 869.00 C32/40 62% OPC+30%FA+8% MS - 220+/-20
326 KAIG3-RFI-CO-S-10689-00 Crescent Zone 1E 19-Dec-22 14468 10
(As Highlighted) - SCREED
Inspection of Concrete Encasement for all Storm Water Line branches and Surface
327 KAIG3-RFI-SW-C-9666-00 Site Works 19-Dec-22 preparation prior to start water proofing and Water Proofing for all branches of Line-O - C16/20 SRC 14489 10
as highlighted
Picnic Area (Seating "Inspection of Formwork and Concrete Pouring for Beam of Seating Area 3-21 & 3-22
340 KAIG3-RFI-PA-C-9349-00 20-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14518 10
Area) at Zone-G - As Highlighted"
Concreting for Diaphragm Wall (BEAM) at Zone 1M , Grid 01AM (As Highlighted) C32/40 62% OPC+30%FA+8% MS - 220+/-20
341 KAIG3-RFI-CO-S-10705-00 Crescent Zone 1M 20-Dec-22 14520 7
TOC 877.50 - SCREED
North Concreting for North Administration Building Wall zone 2Q up 873.475 W1, W2 (as C32/40 62% OPC+30%FA+8% MS - 220+/-20
343 KAIG3-RFI-NA-S-10725-00 20-Dec-22 14517 11
Administration highlighted) - SCREED
Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, C32/40 62% OPC+30%FA+8% MS - 220+/-20
344 KAIG3-RFI-CO-S-10752-00 Crescent Zone 2M 20-Dec-22 14516 10
(grid 5 to 9 ) , Level upto 870.00 (as highlighted) - SCREED
Inspection of Concrete Encasement for all Storm Water Line branches and Surface
349 KAIG3-RFI-SW-C-9667-00 Site Works 20-Dec-22 preparation prior to start water proofing and Water Proofing for all branches of Line-G - C16/20 SRC 14515 10
as highlighted
Concreting for Diaphragm Wall (BEAM) at Zone 1M , Grid 01AM (As Highlighted)
355 KAIG3-RFI-CO-S-10705-00 Crescent Zone 1M 20-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14525 10
TOC 877.50
356 KAIG3-RFI-CO-S-10694-00 Crescent Zone 2C 20-Dec-22 Concreting for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J (As Highlighted) 871.98 C32/40 62% OPC+30%FA - 160+/-40 14524 10
North Concreting for North Administration Building Wall zone 2Q up 873.475 W1, W2 (as
357 KAIG3-RFI-NA-S-10725-00 20-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14523 10
Administration highlighted)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/23 to
370 KAIG3-RFI-SW-C-9686-00 Zone C 21-Dec-22 C16/20 SRC 14558 5
C/MV/06 at Zone-C - As Highlighted (SCR- KAIG3-SCR-SW-E-0088-00)
Concreting for Large mosque upper second flooor (Slab, beams) at zone 1G axis B-F, 1-
375 KAIG3-RFI-LM-S-10699-00 Large Mosque 21-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14546 2
6, 880.70-880.20 (as highlighted)
Shuttering and Concreting for Energy Center Columns , Axis 7-11/A , Level from
376 KAIG3-RFI-EC-S-10688-00 Energy Center 21-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14528 10
884.50 to 887.00 (As Highlighted)
Concreting for Large mosque upper second flooor (Slab, beams) at zone 1G axis B-F, 1-
377 KAIG3-RFI-LM-S-10699-00 Large Mosque 21-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14556 10
6, 880.70-880.20 (as highlighted)
Concreting for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC
403 KAIG3-RFI-MC-S-10799-00 MCPE 2 22-Dec-22 C16/20 SRC 14599 11
870.7) ZONE 2J (as highlighted)
Concreting for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC
404 KAIG3-RFI-MC-S-10799-00 MCPE 2 22-Dec-22 C16/20 SRC 14600 3
870.7) ZONE 2J (as highlighted)
Concreting for Mass concrete ( 1st Layer ) Under Strip footing at Zone 1J , Axis 01AA-
405 KAIG3-RFI-CO-S-10521-00 Crescent Zone 1J 22-Dec-22 C16/20 SRC 14592 10
01AD (As Highlighted)
Concreting for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted ) C32/40 62% OPC+30%FA+8% MS - 220+/-20
408 KAIG3-RFI-MC-S-10703-01 MCPE 1 22-Dec-22 14584 10
Level 874.50 - SCREED
North Concreting for North Administration Building Columns C( 39-40-41-42-43-44--45-46- C32/40 62% OPC+30%FA+8% MS - 220+/-20
409 KAIG3-RFI-NA-S-10670-00 22-Dec-22 14597 10
Administration 47-48 ) Zone 2Q , Level from 872.65-873.075( As Highlighted ) - SCREED
Concreting for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted )
412 KAIG3-RFI-MC-S-10703-01 MCPE 1 22-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14589 10
Level 874.50
Concrete Pouring & Shuttering for Wall of Decant Sump-D3 at Mist Garden, inside
416 KAIG3-RFI-WG-C-9624-00 Water Garden 22-Dec-22 Water Garden as highlighted area in attached drawing's & KAIG3-SCR-WG-S-0212-00- C32/40 62% OPC+30%FA - 160+/-40 14568 10
Reply.
Concreting for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted )
417 KAIG3-RFI-MC-S-10703-01 MCPE 1 22-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14572 10
Level 874.50
Concreting for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J ,
440 KAIG3-RFI-CO-S-10661-00 Crescent Zone 1J 24-Dec-22 C16/20 SRC 14645 4
Axis 01AA-01AD (As Highlighted)
Concreting for Infill Perimeter wall (Outer ) ( 2nd Stage ) ( Inclined ) at Zone 1L , Axis
448 KAIG3-RFI-CO-S-10744-00 Crescent Zone 1L 24-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14644 10
01AG-01AH , Level upto 873.8 (As Highlighted)
449 KAIG3-RFI-CO-S-10779-00 Crescent Zone 1K 24-Dec-22 Concreting for Strip footing Zone 1K Axis 01AE-01AF ( As highlighted) C32/40 62% OPC+30%FA - 160+/-40 14638 10
Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL,
450 KAIG3-RFI-CO-S-10754-00 Crescent Zone 2M 24-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14637 10
(Grid 9 to 13) , Level upto 870.00 (as highlighted)
Concreting for Infill wall ( Upper Part ) at Zone 1A , Axis 01A to 01B , Level 877.50
451 KAIG3-RFI-CO-S-10421-00 Crescent Zone 1A 24-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14632 10
(As Highlighted)
Concreting for Rc Strip Foundation ( Inner ) at Zone 1L, Axis 01AH-01AI (As
452 KAIG3-RFI-CO-S-10770-00 Crescent Zone 1L 24-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14631 10
Highlighted)
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from D/MV/21 to
464 KAIG3-RFI-SW-C-9758-00 Zone D 24-Dec-22 C16/20 SRC 14643 10
D/MV/28 at Zone-D (As Highlighted)
Concreting for MCPE 2 Roof Slab , Axis 02AB - 02AC , ZONE 2J , Level 875.974 &
482 KAIG3-RFI-MC-S-10809-00 MCPE 2 25-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14691 10
875.850 (as highlighted)
Concreting for Child care (SOG) Slab on Grade zone 2N , Axis 02AR-02AT (as
483 KAIG3-RFI-CC-S-10801-00 Child Care 25-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14690 10
highlighted)
Inspection of Formwork and Concrete pouring for Beam of Seating Area 3-34 at Zone-K
510 KAIG3-RFI-PA-C-9544-00 Zone K 25-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14662 10
- As Highlighted
Picnic Area (Seating Inspection of Formwork and Concrete pouring for Beam of Seating Area 3-33 at Zone-K
511 KAIG3-RFI-PA-C-9635-00 25-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14658 5
Area) - As Highlighted
Concreting for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC
513 KAIG3-RFI-MC-S-10799-00 MCPE 2 25-Dec-22 C16/20 SRC 14656 3
870.7) ZONE 2J (as highlighted)
Concreting for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J , C32/40 62% OPC+30%FA+8% MS - 220+/-20
524 KAIG3-RFI-CO-S-10661-00 Crescent Zone 1J 26-Dec-22 14710 4
Axis 01AA-01AD (As Highlighted) - SCREED
Concreting for MCPE 2 Roof Slab , Axis 02AB - 02AC , ZONE 2J , Level 875.974 & C32/40 62% OPC+30%FA+8% MS - 220+/-20
525 KAIG3-RFI-MC-S-10809-00 MCPE 2 26-Dec-22 14660 8
875.850 (as highlighted) - SCREED
Inspection of Formwork & Concrete pouring for Footing of MV Line Pit - C/MV/28,
526 KAIG3-RFI-SW-C-9577-00 Zone C & E 28-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14764 5
E/MV/08, E/MV/09 at Zone-C&E (As Highlighted) (SCR:KAIG3-SCR-SW-E-0088-00)
Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01C-01D , Level Upto 873.10 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
528 KAIG3-RFI-CO-S-10843-00 Crescent Zone 1A 28-Dec-22 14769 10
Highlighted) - SCREED
Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01B-01C, Level upto 873.10 (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
529 KAIG3-RFI-CO-S-10841-00 Crescent Zone 1A 28-Dec-22 14768 10
Highlighted) - SCREED
Concreting for Infill wall ( Inner ) ( 2nd Stage ) at Zone 1D , Axis 01L-01M (As C32/40 62% OPC+30%FA+8% MS - 220+/-20
530 KAIG3-RFI-CO-S-10846-00 Crescent Zone 1D 28-Dec-22 14767 10
Highlighted) - SCREED
Concreting for Diaphragm wall ( 3rd part ) at Zone 1E , Axis 01P , Level Upto 873.50 C32/40 62% OPC+30%FA+8% MS - 220+/-20
531 KAIG3-RFI-CO-S-10850-00 Crescent Zone 1E 28-Dec-22 14760 10
(as highlighted) - SCREED
Concreting for Plain Concrete Under Footing ( only ) of Diaphragam Wall , Zone 1C ,
534 KAIG3-RFI-CO-S-10862-00 Crescent Zone 1C 28-Dec-22 C16/20 SRC 14745 10
Axis 01G (as highlighted)
Concreting for Diaphragm wall ( RC Foundation and Strip footing ), at Zone 1B , Axis
535 KAIG3-RFI-CO-S-10793-01 Crescent Zone 1B 28-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14772 7
01F , Level upto 868.50 (as highlighted)
Concreting for MCPE 1 for Bottom Slab of Duct Tunnel , Axis 03/R , Zone 2M 2N ,
536 KAIG3-RFI-MC-S-10806-00 MCPE 1 28-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14771 10
TOC 871.00 (As Highlighted )
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start
559 KAIG3-RFI-SW-C-9773-00 Site Works 28-Dec-22 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A- C16/20 SRC 14759 10
3-4, FW-A-3-5 (As Highlighted) "
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start
560 KAIG3-RFI-SW-C-9774-00 Site Works 28-Dec-22 waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for Manhole C16/20 SRC 14756 10
FW-A-3-6 and backdrop (As Highlighted) "
Inspection of Formwork & Concrete pouring for Footing of MV Line Pit - C/MV/28,
573 KAIG3-RFI-SW-C-9577-00 Site Works 29-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14797 6
E/MV/08, E/MV/09 at Zone-C&E (As Highlighted) (SCR:KAIG3-SCR-SW-E-0088-00)
Concreting for Mass concrete ( 1st Layer ) ( Outer ) Under Strip footing at Zone 1J ,
574 KAIG3-RFI-CO-S-10828-00 Crescent Zone 1J 29-Dec-22 C16/20 SRC 14796 10
Axis 01AC-01AD, TOC 867.330 (As Highlighted)
Concreting for Plain Concrete Under Diaphragam Wall Strip Footing , Zone 1C , Axis
575 KAIG3-RFI-CO-S-10883-00 Crescent Zone 1C 29-Dec-22 C16/20 SRC 14794 10
01G , Level Upto 868.03 (as highlighted)
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 6A, As per C32/40 62% OPC+30%FA+8% MS - 220+/-20
579 KAIG3-RFI-TB-S-10893-00 Ticketing Booth 29-Dec-22 14785 10
Attached Highlighted Drawing's. - SCREED
Inspection for Casting the Blinding Concrete under the Manhole MH-Q-01, MH-Q-02,
580 KAIG3-RFI-SW-C-9794-00 Site Works 29-Dec-22 MH-Q-03, MH-Q-03-01, MH-Q-04, MH-Q-05, MH-Q-06, MH-Q-07, MH-Q-08, MH- C16/20 SRC 14798 10
Q-09, MH-Q-10, MH-Q-07-01, MH-Q-07-02 & MH-Q-07-03 - as Highlighted
Concreting for Infill Wall ( 2nd stage ) ( Outer ) , at Zone 1L, Axis 01AH-01AI , Level C32/40 62% OPC+30%FA+8% MS - 220+/-20
586 KAIG3-RFI-CO-S-10864-00 Crescent Zone 1L 29-Dec-22 14777 5
Upto 873.8 (As Highlighted) - SCREED
Concreting for Strip Foundation ( Inner ) at Zone 1M, Axis 01AK-01AL (As
587 KAIG3-RFI-CO-S-10867-00 Crescent Zone 1M 29-Dec-22 C32/40 62% OPC+30%FA - 160+/-40 14805 6
Highlighted )
Inspection for Casting the Blinding Concrete under the Manhole MH-Q-01, MH-Q-02,
602 KAIG3-RFI-SW-C-9794-00 Site Works 29-Dec-22 MH-Q-03, MH-Q-03-01, MH-Q-04, MH-Q-05, MH-Q-06, MH-Q-07, MH-Q-08, MH- C16/20 SRC 14775 10
Q-09, MH-Q-10, MH-Q-07-01, MH-Q-07-02 & MH-Q-07-03 - as Highlighted
621
C32/40 62% OPC+30%FA+8% MS - 220+/-20 - SCREED
2440
C32/40 62% OPC+30%FA - 160+/-40
QC DC QC Manager