Key Concepts
Precedence
Critical Path Critical Chain
Diagram
Method Method
Method
(CPM) (CCM)
(PDM)
Critical Path Method
§ determines the minimum total project
duration and the earliest possible finish
date of the project as well as the amount
of scheduling flexibility (total float) in the
schedule model
§ pure CPM network allows only zero or
positive total float
Float Types
Free Float Time a task can be delayed without
delaying the early start date of its
successor
Agile scheduling,
PERT,
https://www.atlassian.com/agile/project-management/user-stories
§ Kanban is a visual system for managing
work as it moves through a process.
Summary
§ High levels of uncertainty and
unpredictability in a fast-paced, highly
competitive global marketplace, it is
becoming even more important to respond
to the changing needs of the environment.
§ Adaptive planning defines a plan but
acknowledges that once work starts, the
priorities may change and the plan needs
to reflect this new knowledge.