0% found this document useful (0 votes)
72 views

NGCP Estimates

The document provides specifications for various structural elements of a building including foundations, footings, columns, walls, and tie beams. It includes dimensions of elements, reinforcement bar sizes and lengths, number of ties and stirrups, and quantities of cement, sand and gravel needed. All of the structural elements are defined with precise measurements and reinforcement requirements.

Uploaded by

Aggasid Arnel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

NGCP Estimates

The document provides specifications for various structural elements of a building including foundations, footings, columns, walls, and tie beams. It includes dimensions of elements, reinforcement bar sizes and lengths, number of ties and stirrups, and quantities of cement, sand and gravel needed. All of the structural elements are defined with precise measurements and reinforcement requirements.

Uploaded by

Aggasid Arnel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 19

FOUNDATION

FOOTING (2.5mx2.5m)

Reinforcements

16mm dia. (both ways) Length of Bar Total length of


bar needed
26 2.7 70.2

Ties

# of intersections Length of cut # of cut

169 0.4 67.6

Cement, Sand & Gravel

Volume Cement multiplier Sand multiplier

2.8125 9 0.5

COLUMN (0.5mx0.5m)

Reinforcements

Length of Bar Total length of


16mm dia. (vert. bars) (plus bend) bar needed
12 4.85 58.2

Lateral ties

10mm dia. (# of Lateral Cut length of Cut length of


ties) Lateral ties Lateral ties

24 2.2 1.5

Tie wire
# of intersections Length of cut # of cut

16 0.4 6.4

Cement, Sand & Gravel

Volume Cement multiplier Sand multiplier

1.1375 9 0.5

FOOTING TIE BEAM


Reinforecments

L/3 L/4 Middle

1.609 1.20675 2.01125

Stirrups

10mm dia. (# of Lateral Cut length of Total length of


ties) stirrups stirrups in one
column
29 1.6 46.4

Tie wire

# of intersections Length of cut # of cut

8 0.4 3.2

Cement, Sand & Gravel

Volume Cement multiplier Sand multiplier

0.57924 9 0.5

1 1/2"x18"x18" Base
plate
Anchor bolt 1" dia. Nut & Washer
10 10

Wall footing
Footing

Length width Height

4.2 0.5 0.2

10mm dia. Horizontal Total length of


bars Length of Bar bend
3 4.2 0.2

10mm dia. Ties Length of Bar Total length of


bend
14 0.5 0.1

Wall
Length Height Area
4.2 3 12.6

Length Height Area

4.2 3 12.6

Footing

Length width Height

6 0.5 0.2

10mm dia. Horizontal Total length of


bars Length of Bar bend
3 6 0.2

Total length of
10mm dia. Ties Length of Bar bend
20 0.5 0.1

Wall
Length Height Area
6 3 18
Length Height Area

6 3 18

Footing

Length width Height

6.2 0.5 0.2

10mm dia. Horizontal Total length of


bars Length of Bar bend
3 6.2 0.2

Total length of
10mm dia. Ties Length of Bar bend
20 0.5 0.1

Wall
Length Height Area
6.2 3 18.6

Length Height Area

6.2 3 18.6

Footing

Length width Height

4.25 0.5 0.2

10mm dia. Horizontal Length of Bar Total length of


bars bend
3 4.25 0.2

Total length of
10mm dia. Ties Length of Bar
bend
14 0.5 0.1

Wall
Length Height Area
4.25 3 12.75

Length Height Area


4.25 3 12.75

Footing

Length width Height

4.25 0.5 0.2

10mm dia. Horizontal Total length of


Length of Bar
bars bend
3 4.25 0.2

Total length of
10mm dia. Ties Length of Bar bend
14 0.5 0.1

Wall
Length Height Area
4.25 3 12.75

Length Height Area

4.25 3 12.75

Footing

Length width Height

2.8 0.5 0.2

10mm dia. Horizontal Length of Bar Total length of


bars bend
3 2.8 0.2

10mm dia. Ties Length of Bar Total length of


bend
9 0.5 0.1

Wall
Length Height Area
2.8 3 8.4

Length Height Area

2.8 3 8.4
Footing

Length width Height

1.4 0.5 0.2

10mm dia. Horizontal Length of Bar Total length of


bars bend
3 1.4 0.2

10mm dia. Ties Length of Bar Total length of


bend
4 0.5 0.1

Wall
Length Height Area
1.4 3 4.2

Length Height Area

1.4 3 4.2

Footing

Length width Height

1.4 0.5 0.2

10mm dia. Horizontal Length of Bar Total length of


bars bend
3 1.4 0.2

10mm dia. Ties Length of Bar Total length of


bend
4 0.5 0.1

Wall
Length Height Area
1.4 3 4.2

Length Height Area

1.4 3 4.2
Footing

Length width Height

1.4 0.5 0.2

10mm dia. Horizontal Length of Bar Total length of


bars bend
3 1.4 0.2

10mm dia. Ties Length of Bar Total length of


bend
4 0.5 0.1

Wall
Length Height Area
1.4 3 4.2

Length Height Area

1.4 3 4.2

Footing

Length width Height

1.4 0.5 0.2

10mm dia. Horizontal Total length of


bars Length of Bar bend
3 1.4 0.2

10mm dia. Ties Length of Bar Total length of


bend
4 0.5 0.1

Wall
Length Height Area
1.4 3 4.2

Length Height Area

1.4 3 4.2

Footing
Length width Height

1.4 0.5 0.2

10mm dia. Horizontal Total length of


bars Length of Bar bend
3 1.4 0.2

Total length of
10mm dia. Ties Length of Bar bend
4 0.5 0.1

Wall
Length Height Area
1.4 3 4.2

Length Height Area

1.4 3 4.2

Footing

Length width Height

1.4 0.5 0.2

10mm dia. Horizontal Total length of


Length of Bar
bars bend
3 1.4 0.2

Total length of
10mm dia. Ties Length of Bar bend
4 0.5 0.1

Wall
Length Height Area
1.4 3 4.2

Length Height Area

1.4 3 4.2

Footing

Length width Height


5.6 0.5 0.2

10mm dia. Horizontal Total length of


bars Length of Bar bend
3 5.6 0.2

10mm dia. Ties Length of Bar Total length of


bend
18 0.5 0.1

Wall
Length Height Area
5.6 3 16.8

Length Height Area

5.6 3 16.8

Footing

Length width Height

2 0.5 0.2

10mm dia. Horizontal Length of Bar Total length of


bars bend
3 2 0.2

10mm dia. Ties Length of Bar Total length of


bend
6 0.5 0.1

Wall
Length Height Area
2 3 6

Length Height Area

2 3 6
# of 6m Bar # of units Total # of 6m
Bar
11.7 12 28 336

Total # of
Length per kilo Weight # of units weight
53 1.27547169811 28 35.71320755

# of Cement # of Sand # of Gravel Total # of Total # of Total # of


Gravel multiplier (bags) (cu.m) (cu.m) # of units Sand
Cement (bags) (cu.m) Gravel
(cu.m)
1 25.3125 1.40625 2.8125 28 708.75 39.375 78.75

Total # of 10m
# of 10m Bar # of units Bar
5.82 28 162.96 163

Total length of
Cut length of Total cut length Lateral ties in # of 6m Bar # of units Total # of 6m
Lateral ties of Lateral ties Bar
one column

1.5 5.2 124.8 20.8 28 582.4 583


Total weight Total # of
Length per kilo Weight # of Lateral ties of LT in one # of units weight
column

53 0.12075471698 24 2.89811321 28 81.147169811

# of Cement # of Sand # of Gravel Total # of Total # of Total # of


Gravel multiplier # of units Sand Gravel
(bags) (cu.m) (cu.m) Cement (bags) (cu.m) (cu.m)
1 10.2375 0.56875 1.1375 28 286.65 15.925 31.85

Total length of 16mm bottom Total length Total length # of 10m Bar # of 10mm
bends 16mm top bars bars of bar of bar (top) Bar (bot)
needed (top) needed (bot)

0.15 10 10 49.77 49.77 4.977 5 4.977

Total # of 6m
# of 6m Bar # of units Bar

7.733333333333 38 293.86666667 294

Total weight Total # of


Length per kilo Weight # of stirrups of stirrups in # of units weight
one column

53 0.06037735849 29 1.750943396 38 66.535849057

Total # of Total # of
Gravel multiplier # of Cement # of Sand # of Gravel # of units Total # of Sand Gravel
(bags) (cu.m) (cu.m) Cement (bags)
(cu.m) (cu.m)
1 5.21316 0.28962 0.57924 38 198.10008 11.00556 22.01112
Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel
multiplier multiplier (bags) (cu.m) (cu.m)

0.42 9 0.5 1 3.78 0.21 0.42

Total length # of 6m Bar

13.2 2.2 3

Total length # of 6m Bar

8.4 1.4 2

Multiplier # of CHB
12.5 157.5 158

Multiplier for Multiplier for Length of bar Length of


Vertical 40cm Horizontal 3 vertical bar horizonal # of 6m bars
spacing layers
2.93 2.15 36.918 27.09 10.668 11

Cement Gravel # of Cement # of Sand # of Gravel


Volume multiplier Sand multiplier multiplier (bags) (cu.m) (cu.m)

0.6 9 0.5 1 5.4 0.3 0.6

Total length # of 6m Bar

18.6 3.1 4

Total length # of 6m Bar

12 2 2

Multiplier # of CHB
12.5 225 225
Multiplier for Multiplier for
Vertical 40cm Horizontal 3 Length of bar Length of # of 6m bars
vertical bar horizonal
spacing layers
2.93 2.15 52.74 38.7 15.24 16

Cement Gravel # of Cement # of Sand # of Gravel


Volume multiplier Sand multiplier multiplier (bags) (cu.m) (cu.m)

0.62 9 0.5 1 5.58 0.31 0.62

Total length # of 6m Bar

19.2 3.2 4

Total length # of 6m Bar

12 2 2

Multiplier # of CHB
12.5 232.5 233

Multiplier for Multiplier for Length of bar Length of


Vertical 40cm Horizontal 3 vertical bar horizonal # of 6m bars
spacing layers
2.93 2.15 54.498 39.99 15.748 16

Cement Gravel # of Cement # of Sand # of Gravel


Volume multiplier Sand multiplier multiplier (bags) (cu.m) (cu.m)

0.425 9 0.5 1 3.825 0.2125 0.425

Total length # of 6m Bar

13.35 2.225 3

Total length # of 6m Bar

8.4 1.4 2

Multiplier # of CHB
12.5 159.375 160

Multiplier for Multiplier for


Vertical 40cm Horizontal 3 Length of bar Length of # of 6m bars
spacing layers vertical bar horizonal
2.93 2.15 37.3575 27.4125 10.795 11

Cement Gravel # of Cement # of Sand # of Gravel


Volume multiplier Sand multiplier multiplier (bags) (cu.m) (cu.m)

0.425 9 0.5 1 3.825 0.2125 0.425

Total length # of 6m Bar

13.35 2.225 3

Total length # of 6m Bar

8.4 1.4 2

Multiplier # of CHB
12.5 159.375 160

Multiplier for Multiplier for


Vertical 40cm Horizontal 3 Length of bar Length of # of 6m bars
vertical bar horizonal
spacing layers
2.93 2.15 37.3575 27.4125 10.795 11

Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel


multiplier multiplier (bags) (cu.m) (cu.m)

0.28 9 0.5 1 2.52 0.14 0.28

Total length # of 6m Bar

9 1.5 2

Total length # of 6m Bar

5.4 0.9 1

Multiplier # of CHB
12.5 105 105

Multiplier for Multiplier for


Length of bar Length of
Vertical 40cm Horizontal 3 vertical bar horizonal # of 6m bars
spacing layers
2.93 2.15 24.612 18.06 7.112 8
Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel
multiplier multiplier (bags) (cu.m) (cu.m)

0.14 9 0.5 1 1.26 0.07 0.14

Total length # of 6m Bar

4.8 0.8 1

Total length # of 6m Bar

2.4 0.4 1

Multiplier # of CHB
12.5 52.5 53

Multiplier for Multiplier for Length of bar Length of


Vertical 40cm Horizontal 3 vertical bar horizonal # of 6m bars
spacing layers
2.93 2.15 12.306 9.03 3.556 4

Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel


multiplier multiplier (bags) (cu.m) (cu.m)

0.14 9 0.5 1 1.26 0.07 0.14

Total length # of 6m Bar

4.8 0.8 1

Total length # of 6m Bar

2.4 0.4 1

Multiplier # of CHB
12.5 52.5 53

Multiplier for Multiplier for


Length of bar Length of
Vertical 40cm Horizontal 3 vertical bar horizonal # of 6m bars
spacing layers
2.93 2.15 12.306 9.03 3.556 4
Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel
multiplier multiplier (bags) (cu.m) (cu.m)

0.14 9 0.5 1 1.26 0.07 0.14

Total length # of 6m Bar

4.8 0.8 1

Total length # of 6m Bar

2.4 0.4 1

Multiplier # of CHB
12.5 52.5 53

Multiplier for Multiplier for Length of bar Length of


Vertical 40cm Horizontal 3 vertical bar horizonal # of 6m bars
spacing layers
2.93 2.15 12.306 9.03 3.556 4

Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel


multiplier multiplier (bags) (cu.m) (cu.m)

0.14 9 0.5 1 1.26 0.07 0.14

Total length # of 6m Bar

4.8 0.8 1

Total length # of 6m Bar

2.4 0.4 1

Multiplier # of CHB
12.5 52.5 53

Multiplier for Multiplier for Length of bar Length of


Vertical 40cm Horizontal 3 # of 6m bars
spacing layers vertical bar horizonal

2.93 2.15 12.306 9.03 3.556 4


Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel
multiplier multiplier (bags) (cu.m) (cu.m)

0.14 9 0.5 1 1.26 0.07 0.14

Total length # of 6m Bar

4.8 0.8 1

Total length # of 6m Bar

2.4 0.4 1

Multiplier # of CHB
12.5 52.5 53

Multiplier for Multiplier for Length of bar Length of # of 6m bars


Vertical 40cm Horizontal 3
spacing layers vertical bar horizonal

2.93 2.15 12.306 9.03 3.556 4

Cement Gravel # of Cement # of Sand # of Gravel


Volume multiplier Sand multiplier multiplier (bags) (cu.m) (cu.m)

0.14 9 0.5 1 1.26 0.07 0.14

Total length # of 6m Bar

4.8 0.8 1

Total length # of 6m Bar

2.4 0.4 1

Multiplier # of CHB
12.5 52.5 53

Multiplier for Multiplier for


Vertical 40cm Horizontal 3 Length of bar Length of # of 6m bars
vertical bar horizonal
spacing layers
2.93 2.15 12.306 9.03 3.556 4

Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel


multiplier multiplier (bags) (cu.m) (cu.m)
0.56 9 0.5 1 5.04 0.28 0.56

Total length # of 6m Bar

17.4 2.9 3

Total length # of 6m Bar

10.8 1.8 2

Multiplier # of CHB
12.5 210 210

Multiplier for Multiplier for Length of bar Length of # of 6m bars


Vertical 40cm Horizontal 3
vertical bar horizonal
spacing layers
2.93 2.15 49.224 36.12 14.224 15

Volume Cement Sand multiplier Gravel # of Cement # of Sand # of Gravel


multiplier multiplier (bags) (cu.m) (cu.m)

0.2 9 0.5 1 1.8 0.1 0.2

Total length # of 6m Bar

6.6 1.1 2

Total length # of 6m Bar

3.6 0.6 1

Multiplier # of CHB
12.5 75 75

Multiplier for Multiplier for Length of bar Length of


Vertical 40cm Horizontal 3 vertical bar horizonal # of 6m bars
spacing layers
2.93 2.15 17.58 12.9 5.08 6
Total # of
# of units 10m bar

5 38 380