SOP - 01 - Structure Organization Chart
SOP - 01 - Structure Organization Chart
Note:
This Standard Operational Procedure is a general methodology, the implementation according to the agreed as state on
scope of work
Contents
1. PURPOSE ............................................................................................................................................................. 3
2. SCOPE ................................................................................................................................................................. 3
3. DEFINITIONS AND ABBREVIATIONS ................................................................................................................... 3
4. JOB DESCRIPTION ............................................................................................................................................... 3
4.1. Project Manager ......................................................................................................................................... 3
4.2. Project Admin ............................................................................................................................................. 3
4.3. Engineering ................................................................................................................................................ 3
4.4. Project Control............................................................................................................................................ 4
4.5. QA/QC ......................................................................................................................................................... 6
4.6. Construction ............................................................................................................................................... 6
4.7. HSE ............................................................................................................................................................. 7
4.8. HC & Finance ............................................................................................................................................. 8
5. ATTACHMENT ...................................................................................................................................................... 8
ORGANIZATION CHART
Doc No. 010.23-TK-SOP-01
Job No. 010/FAB-PTT/I/23
Rev. 0
1. PURPOSE
The purpose of Organization Chart is to give information related the person who will carry out
the work, and give clear information the person in charge as each section.
2. SCOPE
Scope of work of construction package is Engineering, Procurement and Construction for Pro
Tank Expansion Project Phase 3.
4. JOB DESCRIPTION
This will describe the job description for each position in the project organization.
4.3. Engineering
Manage, coordinate and ensure alignment of engineering efforts with the vendor’s design
activities, Operation and Maintenance requirements.
4.3.2. Engineer
4.3.3. Drafter
Coordinate with all related parties such as Procurement Staff, QA/QC, HES, for
all material management activities in order to achieve material, equipment and
consumable supply to the project in a timely manner.
Review and Check the Material Balance Status Report before issuance to
Project Management team including but not limited to:
o Status of material receiving
o Status of material issuing
o Status of material balancing
o Inventory Report as per current status
4.5. QA/QC
4.6. Construction
Review and countercheck construction drawings received are latest revision and
properly stamped “FOR CONSTRUCTION”.
Based on priorities within his area of responsibilities, plan which areas will be divided into
the number of Foremen under his supervision and discuss the specific scope of works with
the Foremen.
Prepare all the needed tools, equipment, consumables, PPE, vehicles; HES
support materials and manpower needed to start with the works.
Prepares specific SOP & JSA needed for application of Work Permit. He shall also be
responsible to obtain, extend and close the Work Permits.
Ensures that all labour under his care are properly oriented, equipped with proper
PPE, have valid badge and fit for work.
Supervise and ensure construction activity meet safety requirement.
Coordinate with QA/QC on inspection and tests needed as per ITP.
Lead or attend Pre-Job Tool Box Meetings within his jurisdiction
4.7. HSE
Accountable for the implementation of HSE management system on the project site.
Develop HSE Plan.
Coordinate/communicate with Construction & other section regarding the
implementation of HSE Plan.
Ensure all corrective actions raised to all gaps and weakness found during HSE
inspections and/or audits are being implemented.
Ensure all rules and regulations related to HSE are regularly reviewed and updated.
Ensure all project activities are conducted in a safe manner.
ORGANIZATION CHART
Doc No. 010.23-TK-SOP-01
Job No. 010/FAB-PTT/I/23
Rev. 0
4.7.3. Paramedic
Respond immediately and deliver initial stabilization for injured / illness person at the
scene prior transfer to site clinic.
Implementation of health management programs.
4.8.2. Finance
5. ATTACHMENT
ORGANIZATIONAL CHART
Fatchurochim
Inspector
Production
ProductionManager
Supervisor
QC Inspector
Manager
Ir. Taufiq Widodo Ir. Purwo Utoro M. Zainudin, ST
Project Manager Project Manager Project Coordinator
Marketing Manager
Legal, Procurement & Procurement Dept
Engineering Dept
Masruchan, ST Drafter
HSE Site Manager
Engineering Manager
Hari Widodo Adi Waluyo, ST Teguh Widianto
Elect Eng
HSEManager Site Manager Site Manager
Agung Wicaksono Subandi Oey Tjing You Legal & Secretary Procurement Dept
HSE Officer Site Manager Site Manager Andy Wijaya, AMD
Suci Yatiningtiyas, ST
Procurement Manager
Legal & Secretary
Procurement Staff
Project Manager
Site Manager
Adi Waluyo, ST
Supervisor Logistic
Mustaji M. Ervan