0% found this document useful (0 votes)
90 views

Part Catalog

Uploaded by

Hery yauwry
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views

Part Catalog

Uploaded by

Hery yauwry
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

REPLACEMENT PARTS GUIDE

750J Crawler Dozer (PIN: 1T0750JX_ _D141344—310257)

SECONDARY ENGINE AIR FILTER ELEMENT CAB RECIRCULATING AIR FILTER


AT314583 1 7
AT315957
Interval (hrs) - As Required Interval (hrs) - As Required.

PRIMARY ENGINE AIR FILTER ELEMENT CAB FRESH AIR FILTER


AT300487 2 8
AT191102
Interval (hrs) - As Required Interval (hrs) - As Required.
7
8

AUXILIARY FUEL FILTER AND WATER


ENGINE ROCKER ARM COVER GASKET
9
SEPARATOR (IF EQUIPPED)
R524469
2 1
AT365870
Interval (hrs) - 2000.
3 3
9 10 Interval (hrs) - 500.
12
4
11
5 6
4
FINAL FUEL FILTER 10 HYDRAULIC FAN OIL RETURN FILTER
RE522878 T175002
Interval (hrs) - 500. Interval (hrs) - 2000.

HYDRAULIC OIL FILTER,


PRIMARY FUEL FILTER 11

HYDROSTATIC CHARGE OIL FILTER


RE529643 5
AT318160
Interval (hrs) - 500.
Interval (hrs) - 2000.

ENGINE OIL FILTER ENGINE AIR CLEANER DUST UNLOADER


RE504836 6 12 M89679
Interval (hrs) - 500. Interval (hrs) - As Required.

CLICK PART NUMBER TO BUY


Apr 2022. Release Date. *See operator’s manual for addional details.
REPLACEMENT PARTS GUIDE
750J Crawler Dozer (PIN: 1T0750JX_ _D141344—310257)

Part Description Part Number Qty or capacity Change Interval In Hours

John Deere Plus-50™ II Engine Oil1 TY26669 26.0 L (7.0 gal) 500

John Deere Hydrau™ Hydrostatic System Oil1 TY27367 106.0 L (28.0 gal) 2000

John Deere Hydrau™ Hydraulic System Oil1 TY27367 106.0 L (28.0 gal) 2000

John Deere Hy-Gard™Inner Final Drive Oil (each side) TY6354 9.5 L (2.5 gal) 1000
750J (OSD)

John Deere Hy-Gard™ Inner Final Drive TY6354 9.5 L (2.5 gal) 1000
Oil (each side) 750J LT

John Deere Hy-Gard™ Inner Final Drive Oil (each side) TY6354 15.9 L (4.2 gal) 1000
750J WT and 750J LGP

John Deere Hy-Gard™ Outer Final Drive Oil1 (each TY6354 15.1 L (4.0 gal) 1000
side)

John Deere Hy-Gard™ Track Frame Pivot Shaft Oil1 TY6354 1.7 L (1.75 qt) 1000
(each side)

John Deere Cool-Gard™ II Pre-Mix TY26575 21.6 L (5.7 gal) 6000

Apr 2022. Release Date. *See operator’s manual for addional details.
REPLACEMENT PARTS GUIDE
750J Crawler Dozer (PIN: 1T0750JX_ _D141344—310257)

Fluid Analysis Kits2


Engine Oil AT346594 1 500

Transmission Oil AT346594 1 500

Final Drive Oil AT346594 4 500

Hydraulic Oil AT346594 2 500


Diesel Fuel TY27329 1 500
Engine Coolant TY26873 1 500
1
See operator’s manual for recommended oil type and oil viscosities based on operating temperatures.
2
Based on fluid analysis results, intervals may need to be adjusted for operating conditions. Consult an authorized John Deere dealer.
Plus-50 is a trademark of Deere & Company
Hy-Gard is a trademark of Deere & Company
Hydrau is a trademark of Deere & Company
COOL-GARD is a trademark of Deere & Company

Apr 2022. Release Date. *See operator’s manual for addional details.
UPTIME MAINTENANCE PLANNER

Service Intervals
Service Intervals
750J Crawler Dozer (PIN: 1T0750JX_ _D141344—310257)

As Required
□ Inspect belts □ Check engine air cleaner restriction indicator
□ Check and adjust trunnion bearing clearance (if equipped) □ Check and adjust track sag
□ Clean or replace engine air cleaner elements □ Add coolant extender as indicated by Cool-Gard™ II test strips
Every 10 Hours or Daily
□ Check engine oil level □ Lubricate C-frame dozer linkage (if equipped)
□ Check coolant level at surge tank □ Lubricate pushbeam dozer linkage (if equipped)
□ Check transmission oil level □ Check hydraulic system oil level
□ Check and drain auxiliary fuel filter and water separator (if equipped) □ Check and drain primary fuel filter
Every 50 Hours
□ Lubricate lift cylinder pivots □ Lubricate rear ripper (if equipped)
□ Lubricate left and right end crossbar pivot
Initial Service—250 Hours1
□ Drain and refill break-in engine and replace filter
Every 250 Hours
□ Take engine oil sample □ Check inner and outer final drive oil level
Every 500 Hours
□ Check air intake hoses □ Take hydraulic oil sample
□ Replace primary and final fuel filters □ Take diesel fuel sample
□ Drain and refill engine oil and replace filter □ Take engine coolant sample
□ Check fuel fired coolant heater (if equipped) □ Take transmission oil sample
□ Check battery water level; clean and tighten terminals □ Take inner and outer final drive oil sample
□ Replace auxiliary fuel filter and water separator (if equipped)
Every 1000 Hours
□ Check coolant □ Clean engine crankcase vent tube
□ Drain and refill inner and outer final drive oil □ Check track frame pivot shaft bushing oil
Every 2000 Hours
□ Check and adjust engine valve lash □ Replace hydrostatic charge filter
□ Replace hydraulic fan oil return filter □ Drain and refill hydrostatic transmission oil
□ Drain and refill hydraulic system oil and replace filter
Every 6000 Hours
□ Drain, flush, and refill engine cooling system
Cool-Gard is a trademark of Deere & Company
MB60223,0005271 -19-01OCT19-1/1

Apr 2022. Release Date. *See operator’s manual for addional details.

You might also like