Base Plate Detail: A B C D
Base Plate Detail: A B C D
A B C D
7.50
THICKNESS REINFORCEMENT REINFORCEMENT
20mm THK. x 300mm x 300mm
A36 BASE PLATE
3. SHOP DRAWINGS FOR ERECTION OF ALL
50.00
35.00
inside outside 4'' (100mm)
2 - 75 mm x 75mm x 6.0mm STRUCTURAL STEEL, MISCELLANEOUS ETC.
2 ANGLE BAR
ANCHOR BOLT ANCHOR BOLT SHALL BE SUBMITTED TO THE PROJECT 4. REINFORCING BARS SHALL BE LAPPED A
7.50
ENGINEER FOR HIS/HER APPROVAL BEFORE MINIMUM OF 40 BARS DIAMETER, WHERE
F1-C1 F1-C1 2 - 50 mm x 50mm x 6.0mm FABRICATION. SPLICED DOWELS FROM CONCRETE FOOTINGS
ANGLE BAR
SLABS EXTEND INTO THE BLOCK WALL IN
PLAN 4. IT SHALL BE THE CONTRACTOR'S MINIMUM OF 40 BARS DIAMETER, AND DOWEL
RESPONSIBILITY TO PROVIDE ADEQUATE TO MATCH VERTICAL REINFORCEMENT OF
SHORING AND BRACING OF THE STRUCTURE WALL.
FOR ALL LOADS THAT MAYBE IMPOSED DURING
ELEVATION SECTION CONSTRUCTION. 5. DOWEL BARS SHALL BE EXTENDED ATLEAST
40 BAR DIAMETER
3 5. THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS BEFORE ALL WORK IS TO BEGIN. 6. ALL CONCRETE HOLLOW BLOCKS SHALL BE
F1-C1 F1-C1 CHECK WITH ELECTRICAL CONDUITS, WATER 100mm thk.
AND SANITARY LINE, PIPE SLEEVES ETC. TO BE
BASE PLATE DETAIL EMBEDED IN CONCRETE.
SCALE 1:40M
B. CONCRETE AND REINFORCEMENT D. STEEL NOTES
2. ALL CONCRETE SHALL DEVELOP A MINIMUM 2. WELDS SHALL CONFORM WITH AMERICAN
F1-C1 F1-C1
COMPRESSIVE STRENGTH AT THE END OF WELDING STANDARD USING E60XX ELECTRODE
2 - 50 mm, 4 - 150 mm, 4 - 200
100 mm THK Concrete Slab on Fill mm, & REST @ 250 mm TWENTY EIGHT ( 28 ) DAYS WITH
CORRESPONDING MAXIMUM SIZE ft = 96.60 Mpa
mm O.C.B.W. 20 mm THK x 300 mm x 300 mm
A36 BASEPLATE AGGREGATES AND SLUMPS AS FOLLOWS. fv = 69 Mpa
100 mm THK. CONCRETE 28 DAYS
SP. AS SHOWN O.C. B.W SP. AS SHOWN O.C. B.W LOCATION MAX. SLUMP 3. IN ACTUAL FABRICATION OF STEEL TRUSSES,
STRENTH
50 mm THK. COMPACTED
100 mm THK. COMPACTED 100 mm THK. COMPACTED
MEMBERS MEETING AT POINT SHALL HAVE
GRAVEL BASE COLUMN & 24.14Mpa THEIR GRAVITY AXIS INTERSECT AS NEARLY AS
5 GRAVEL BASE GRAVEL BASE
FOUNDATION (3500psi)
4'' (100mm)
PRACTICABLE AT COMMON POINT.
0.80
150 mm THK. COMPACTED
1.10
F1-C1 F1-C1 EARTH FILL
SLAB ON-FILL
20.70Mpa 4'' (100mm) 4. THE CONTRACTOR SHALL PROVIDE
0.10
0.10
WALL FTG. &
0.20
0.20
(3500psi) TEMPORARY ERECTION BRACING AND
OTHERS
SHORING AND MAKE ACTUAL MEASUREMENTS
3. IN GENERAL, THE LATEST EDITION OF ACI - 315 IN THE FIELD PRIOR TO FABRICATION /
1.00
1.00
1.70
1.35
REINFORCED CONCRETE STRUCTURES SHALL BE
ADHERED TO UNLESS OTHERWISE SHOWN OR 5. FABRICATOR / CONTRACTOR SHALL
0.35
0.40
0.50
2.00
WHERE CONC. IS EXPOSED TO EARTH UNLESS OTHERWISE NOTED BY THE ENGINEER,
NO PART OF THE FOUNDATION SHALL REST ON
1.40
7 BUT POURED TO FORMS
FILL.
2 in. (50mm)
SCALE 1:40M
MINIMUM OF SEVEN (7) CONSECUTIVE DAYS
COMMISSION ON AUDIT ENGR. ANBERT JONATHAN C. CAYNA ENGR. CLYDE S. DIVA COVERED COURT BUILDING WITH STAGE
ATTY. USMIN P. DIAMEL ENGR. LUIS S. MEJIA AsComm. DELFIN P. AGUILAR
GENERAL NOTES & SPECIFICATIONS
DRAWN BY:
DATE DRAWN:
S 1
COA CENTRAL OFFICE, COMMONWEALTH AVE., Q.C.
PRC NO. : 0141739 VALIDITY: 8/31/2018 PRC NO. : 0143383 VALIDITY: 10/24/2019
LOCATION: COMMISSION ON AUDIT RO XIII COMPOUND, SOUTH MONTILLA BLVD.,BUTUAN CITY
DIRECTOR IV
REGIONAL DIRECTOR
DIRECTOR IV
GENERAL SERVICES OFFICE
ASSISTANT COMMISSIONER
ADMINISTRATION SECTOR
CHECKED BY:
4/10
PTR NO.: DATE: PLACE: PTR NO.: DATE: PLACE: COMMISSION ON AUDIT - RO XIII COMMISSION ON AUDIT COMMISSION ON AUDIT DATE REVISED