0% found this document useful (0 votes)
87 views2 pages

Addendum-02 (88MW-GKHPP Colony, Package-3, KHRE)

AddendumNo.2

Uploaded by

Arshad Mahmood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
87 views2 pages

Addendum-02 (88MW-GKHPP Colony, Package-3, KHRE)

AddendumNo.2

Uploaded by

Arshad Mahmood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
GY, PEDO [S PAKHTUNKHWA ENERGY DEVELOPMENT ORGANIZATION Fk? GOVERNMENT OF KHYBER PAKHTUNKHWA PESHAWAR No. CE/PMO-KHRE/GKHPP-Colony/ Peshawar dated: 21/06/2022 To All Participating Contracting Firms SUBJECT: ADDENDUM-02, Package 3 - Construction of Employer's Colony (Residential Colony, Offices and Roads) of 88 MW Gabral Kalam Hydropower Project CONTRACT NO: PK-PEDO-211751-CW-RFB under KHRE Reference to the (i) advertisement for request for bids for the subject Package (Package 3 - Construction of Employer's Colony (88 MW GKHPP - CONTRACT NO: Pk-PEDO-211751-CW-RFB under KHRE), (ii) the pre-bid meeting held dated: June 07, 2022 and (iii) Addendum-01 issued vide no: CE/PMO-KHRE/GKHPP- Colony/1959-60, dated: 15/06/2022; the Addendum-02 pursuant to sub-clause 8.1 of ITB (Part-1) is attached. Chief Engineer Head PMO, PEDO-Peshawar Ce: PS to CEO, PEDO-Peshawar. Chief Engineer Head PMO, PEDO-Peshawar ice Adress: Ground Foor, Nespak Building [PEDO:WB PMO Project Office, Plt # 24, Sector: B/2 ‘phase-5, Hayatabad, Peshawar. Te: 0919219616-7 ([email protected]} ADDENDUM NO.2 TO THE REQUEST FOR BIDS (RFB) Package 3 - Construction of Employer’s Colony (Residential Colony, Offices and Roads) of 88 MW Gabral Kalam Hydropower Project, CONTRACT NO: PK-PEDO-211751-CW-RFB Khyber Pakhtunkhwa Hydropower Rene wable Energy Development (KHRE) The following amendment is being made in pursuance of Sub-Clause 8.1 of Instructions to Bidders (ITB), Part-1 of the Bidding Documents: 1, Under Sr. No. 1.1 Earth Works of Bill No.1{External Works] of Bill of Quantities Given in Section IV- Bidding Forms of PART 1-Bidding Procedures Add the following new items for Earthwork for Roads after Sr.No.1.1.8 of EARTH WORK (EXCAVATION AND FILLING): graded crushed stone aggregate: in bed: Ratio 4:8 SR. UNIT, Kan DESCRIPTION unit | Qty | pare | Cost EARTHWORK FOR ROADS I Ls ing by mechanical means [im [8973 1.1.10 | Compaction of Natural Ground for Road Sub grade | mé | 8973, Formation of Embankment from Borrow Excavation |, | 9 1-11 | in Common Material ane | 2617 Lie sand under floor or plugging | ya 1H | 2. Under Sr. No. 1.11 Roads of Bill No.1[External Works] of Bill of Quantities Given in Section 1V- Bidding Forms of PART 1-Bidding Procedures a. Nomenclature and Unit of Sr.No.1.11.3.6 is replaced as follows: SR. ‘UNIT aan DESCRIPTION unit | Qty | gare | COST | on Precast Concrete 7000 psi a | ‘TUFF Tiles 80mm thick over bed of 2" thick sand | b. Add the following new item for Roads after Sr.No.1.11.3.6: sR. UNIT No. DESCRIPTION unr | ary | pate | COST | 1113.7 | thick PCC Tining, using washed sereoned & “

You might also like