A B C D A B C D A B C D: Roof Storm Layout Ground Floor Storm Layout Second Floor Storm Layout
A B C D A B C D A B C D: Roof Storm Layout Ground Floor Storm Layout Second Floor Storm Layout
A B C D A B C D A B C D 4
8000 75
8000 1850 9850
3
12
3"Ø
DO 395
PIP WN 0
B
3950 4050 75
3950 1500 2550 3950 1500 2550 1850
3"Ø DOWNSPOUT
PIPE
3"Ø DOWNSPOUT
PIPE
25 E SP
OU
T
80
00 C
3"Ø DOWNSPOUT 3"Ø
4"Ø DRAINAGE PIPE @2% SLOPE BALCONY D
1275
1275
1275
1275
DO
PIPE
CB
CB
3"Ø DOWNSPOUT
PIPE
3"Ø FD 3"Ø DOWNSPOUT
PIPE
5.03 SQ.M 3"Ø DOWNSPOUT
PIPE
2 12
45
0
39
25 PIP WN 4
E SP 050
OU
T
3"Ø FD
4
4
4
CB 8 9 10 11 12 8 9 10 11 12 7
7 7 6 8 9
LAUNDRY AREA COMMON 13 13
4 5 10
1200
11
COMMON
T&B
3.00 SQ.M T&B 6
5
14
15
6
5
14
15
1 40
0 0
1
2 3
1
15 4
12
13
12
75
2575
2575
2575
2575
3"Ø 16
3500
3 3 42. OF
1375
KS BEDROOM 1 2 2 52 DE
TERRACE SQ C
15.405 SQ.M 3"Ø FD .M K
1 1
9.415 SQ.M 3"Ø
3
3
3
FD
925
925
3"Ø FD 0 5
50 77
1125
3"Ø FD 10 11
1325
FD
DINING AREA 80
3925
1500
17.10 SQ.M
12450
40
LANAI
3000
3000
50
2800
T&B BEDROOM 2 ROOF DECK
10500
DN
CARPORT 5.60 SQ.M
7.15 SQ.M 42.52 SQ.M
14450
14450
1100
3"Ø FD
12425
12425
3"Ø FD
CB
4 A
2
2
2
MASTER
BEDROOM 75
3 132"Ø
DO
2700
25
75 E S PO
UT 39
50
B
BA
C
3875
4000
4000
4000
5.0 L
LIVING AREA 25 3 S CON
13.85 SQ.M 2 00
13 4"Ø
ST SO
AC IL
B
Q.M S Y4"Ø
TA S
CK OIL 15
00
98
50
45
0 15 K
15. EDR D
5925
14 00 405 OO
11 4"Ø SQ M PIP
E FD CO 3"Ø 25
FD .M 1 DO 50
1375
PIP N
4"Ø
T& MMO
N E PIP WN
1
WC
3"Ø FD BALCONY 3"Ø FD 0 0 T& FD
N CO CO FD
N
WC
B N7 E SP
O
27 B LA LA 8 9 3 UT
5.45 SQ.M V V 5 6 10 "Ø F 18
1
1
1
50
3 4 11 D
12
1 2
675
2"Ø DOWNSPOUT 75
B MA TE 13
13
PIPE
17. EDR STE 9.4 RR 14
335 O R 15
SQ ACE 16 15
PORCH
2050
1925
DN
CB 00 SQ OM 3"Ø .M 12
75
UP 26 .M FD
8.00 SQ.M
2675
2600
0 0
3950 4050 28
1700 2350 TO SIDE 925 775 2350 39
5
3"Ø
4 50
DRANAGE 8000 0 D 14
PIPOWN
26
75
SCALE 1:100 m. SCALE 1:100 m.
P 2 P 2 P 2 SCALE 1:100 m.
4 A
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE 12. WATER METER SHOULD BE LOCATED OUTSIDE THE PROPERTY LINE. 3"Ø
EXECUTED IN ACCORDANCE TO THE REQUIREMENTS 3 5
S
TAEPT
NK IC
DO
PIP WN
E S
OF THE PHILIPPINE PLUMBING CODE. 13. WATER SUPPLY FOR CISTERN AND SUPPLY LINE TO THE BUILDING
MUST BE LOCATED ALONG PERIMETER FENCE 400m. HEIGHT ABOVE LEGENDS: 3A
257 PO
CB UT
4"
Ø
6"Ø DRA
39
50
B
2. COORDINATE THE DRAWING WITH OTHER RELATED DRIVEWAY LEVEL WITH 3 LAYERS OF JUTE SACK AND BLACK COAL TAR.
92
5
4" ØP
IPE PIP INA
E GE 80
00 C
DRAWINGS AND SPECIFICATIONS. THE ENGINEER SHALL
BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY
PITCH OR SLOPE OF PIPE LINE: USUALLY, THE WASTE PIPE IS BALL/GATE VALVE
WC WATER CLOSET
CB CATCH BASIN
2 00
0
PIP
STE4"@Ø2
AC S %
K OSILLO
15
00
FOUND THEREIN.
14. WATER LINE LAYOUT FOR WASHROOM TO SUPPLY UNITS. INSTALLED AT 2% OR 20mm SLOPE PER METER RUN. WATER LINE
UR URINAL
HB
KS
HOSE BIBBED FAUCET
KITCHEN SINK
12
42
5 3 CO
ST4"Ø
AC SO
K IL E
CO PE
CB 3
"Ø 25
D
15. ALL WATER LINE SUPPLY FOR WASHROOMS SHALL NOT BE EMBEDDED IN SOIL PIPE PIP FD
N CO DO 50
3. THE PLUMBING LAYOUT IS ONLY DIAGRAMMATIC. PIPES LAV LAVATORY 4"Ø PIP WN
AC AIR CHAMBER
T& MMO
SLAB, BLOCKS OUT SHALL BE PROVIDED FOR POSSIBLE DIRECTION OF PIPES.
1 00
CO FD WC E SP
OU
2%
DS DOWNSPOUT 19 KS
5. AIR CHAMBER : ALL INDIVIDUAL BRANCHES TO FIXTURE 17. DOUBLE DRAINS FOR BATH TUBS. 17. ING HEN LO
P E
10 S
OR GROUP OF FIXTURES AND/OR EQUIPMENT SHALL SQ ARE & E@
2%
18. DOWEL FOR DOWNSPOUTS AND REINFORCEMENT 10mmØ @ 600mm STAGGERED .M A IP
BE PROVIDED WITH AIR CHAMBER OF CAPPED VERTICAL EP 00
UP AG 12
PIPE EXTENSION OF DIMENSION AS SHOWN IN THE DETAIL. DN DR
AIN
100
water closets=2x6dfu=12dfu SIZE OF MAIN WATER LINE:
GATE VALVE
lavatories=2x2dfu =4dfu CHB WALL 12MMØ BARS @ 200
floor drains=4x2dfu =8dfu a. Total no. of fixture units = 8- fu 12MMØ LIFTING
500
800
O.C. BOTHWAYS
kitchen sink =1x2dfu =2dfu From Hunter's Curve (International Plumbing Code). HANDLE
TOTAL SEWAGE =26dfu the equivalent liters per second requirement for
300
B.SIZE OF SEPTIC TANK: predominantly flush tank is 6.31 lps (100 gpm).
a. Average of Sewage Flow Rate per Day (in every one unit): b. For fairly rough pipe ( from graph: Uniform Plumbing Code or
from American Society of Heating, Refrigeration and Air Conditioning INLET PIPE OUTLET PIPE
1,170 liters/day is EQUIVALENT TO 26dfu from FIN. FLR. LEVEL
800
600
TABLE B-2 OF RA1378 Engineers manual), 100gpm at water velocity of 2.44 m/sec= 50
mmØ pipe
INLET PIPE
b. Total sewage flow rate per day = 1,170 liters/day OUTLET PIPE
=(1,170 liters per day) x 1.5= SEPTIC TANK SIZE Use 50 mmØ water supply pipe from Snta Ignacia Water District.
SLOPE
=1,755 liters per day=463.62gals per day= 1.755cum Note: Provide water backflow preventer before the water meter.
90° ELBOW
c. Size of Septic Tank
125
water closets=2x6dfu=12dfu 15MMØ CWL WRAPPED W/
Digestive Chamber = 1.755 m³ (minimum) lavatories=2x2dfu =4dfu
SECTION BURLAP COATED W/
100
RA 9266 SEC 33 CADD BY: REVISIONS PROJECT SHEET CONTENTS SHEET NO.
Ownership of plans, specifications, and other construction
documents. AS SHOWN
drawings and specifications and other contract
documents duly signed, stamped or sealed, as instruments of P
service, are the intellectual property and documents of the
architect, whether the object for which they are made is
executed or not. it is unlawful for any person to duplicate or to
make copies of said documents for use in the repetition of and CHECKED BY: LOCATION
2
for other projects of buildings, whether executed partly or in
PRC whole, without the written consent of the architect or author of
PTR TIN said documents.
DATE PLACE