Turbine Technologies Services (TTS) has over 30 years of experience in the turbine industry. They provide parts, engineering services, and upgrades for gas turbine power plants. Their Turbine Monitoring and Operator Station (TMOS) is a human-machine interface system that provides improved monitoring, control, and redundancy compared to outdated original equipment manufacturer systems. TMOS has been implemented on over 110 turbine units worldwide.

Uploaded by

Amit B Mak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views

TTS Presentation TMOS

Turbine Technologies Services (TTS) has over 30 years of experience in the turbine industry. They provide parts, engineering services, and upgrades for gas turbine power plants. Their Turbine Monitoring and Operator Station (TMOS) is a human-machine interface system that provides improved monitoring, control, and redundancy compared to outdated original equipment manufacturer systems. TMOS has been implemented on over 110 turbine units worldwide.

Uploaded by

Amit B Mak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

TurbineTech.

com
Over 400 clients, 90 countries, and more than 30 years in the
turbine industry.
Turbine Technologies Services
Since 1983, TTS has provided innovation, high quality solutions and engineering
expertise to clients worldwide.
Our offering to the mature gas turbine market includes:
• Parts supply
• Conversions, modifications and upgrades
• Engineering and on site services
• Power plant services
• Combustion and performance
services

We know gas turbines.


Why upgrade your operator interface?
ISSUES WITH ORIGINAL <I> & <HMI> SYSTEMS

• Current system is based on obsolete


hardware and software
• Not user friendly
• Difficult to get spares and or support
• Decreasing reliability
• Limited functionality, flexibility and
connectivity
• No automatic fail over redundancy
• New plant layout engineering

TurbineTech.com
Outdated Network
ORIGINAL OEM DESIGN

• Point to Point Architecture

• Limited Update Speeds

• Limited Redundancy

• No Auto Failover

• One license per HMI

TurbineTech.com
Introducing TMOS
SPECIFICALLY DESIGNED HMI FOR POWER GENERATION INDUSTRY

With its unmatched performance, high reliability and ease of functionality, TMOS is being used on 110+ units
with millions of running hours and 4,177 MW at ISO conditions.

TurbineTech.com
Server Client Network
TMOS Redundant Architecture

• Server – Client Architecture

• Redundant Servers Possible

• Redundant Comms Network

• Auto Failover Design

• One License per Server

TurbineTech.com
Server Client Network
TMOS REDUNDANT ARCHITECTURE

Benefits
• Optimized Comms
• Can parallel to old system
• No shutdown required
• No PROM change required
• Upgrades provided across network
• Expandable
• Increased reliability/availability
• RAID 5

TurbineTech.com
TMOS Features & Benefits
SPECIFICALLY DESIGNED HMI FOR POWER GENERATION INDUSTRY

With its unmatched performance, high reliability and ease of functionality, TMOS is being used on 110+ units
with millions of running hours and 4,177 MW at ISO conditions.

TurbineTech.com
Features Overview
PROVEN & FIELD TESTED

• Signal Information
• Historian
• Alarms Help
• Dynamic Rung Display
• Logic Forcing
• Control Constants Adjust
• SERVO Auto Calibrator
• Pre-vote Data Display
• EEPROM Programmer
• ARCNet Diagnostic
• Mark V Diagnostic Counters
• I/O Config

TurbineTech.com
Historian

• Historian included in base offering


• Stores desired signals in hard disks (analog
and digitals)
• Customizable sampling rates (up to max
62.5 ms/sample)
• Easy to retrieve information for trend
analysis
• Log view for Alarms and Events, with
printable report style

TurbineTech.com
Interface Options
• STAGELINK
• MODBUS
• OPC DA (3.0)
• OPC EA (1.0)
• GE GSM
• PROFIBUS
• DDUMP
• MAMSP
• EGD
• CUSTOMIZED options

TurbineTech.com
TMOS Key Benefits

• No shutdown or unit outage required


• No Mark V EEPROM upgrade required
• Works in parallel with existing <HMI> or <I>s
• Customizable Solutions
• Maximized User Experience

TurbineTech.com
Upgrade Considerations
• Important to consider life cycle cost
• Hardware costs
• Software costs
• Installation costs
• Validation costs
• Support costs
• Maintenance costs
• Expansion/Migration costs

TurbineTech.com
Sample Screens
SPECIFICALLY DESIGNED HMI FOR POWER GENERATION INDUSTRY

With its unmatched performance, high reliability and ease of functionality, TMOS is being used on 110+ units
with millions of running hours and 4,177 MW at ISO conditions.

TurbineTech.com
Signal Information
FUNCTION

TurbineTech.com
Signal Information
TREND

TurbineTech.com
Signal Information
MODIFICATION

TurbineTech.com
Signal Information
DOCUMENTS

TurbineTech.com
Historian
LOGICS & ANALOGS

TurbineTech.com
Historian
ALARMS & EVENTS

TurbineTech.com
Alarm Help & Rung Display
QUICK ACCESS SHORTCUT

TurbineTech.com
Alarm Help & Rung Display
QUICK ACCESS SHORTCUT

TurbineTech.com
Alarm Help & Rung Display
QUICK ACCESS SHORTCUT

TurbineTech.com
Logic Forcing & Control Constants Adjust

TurbineTech.com
Automatic Servo Regulator Calibration Tool

TurbineTech.com
Pre-vote Data Display

TurbineTech.com
EEPROM Programming Interface

TurbineTech.com
ARCWHO and PROM Version Checker

TurbineTech.com
Diagnostic Counter Display

TurbineTech.com
I/O Configurator

TurbineTech.com
Customized Display
UNIT STARTUP

TurbineTech.com
Customized Display
UNIT IGV CONTROL

TurbineTech.com
Customized Display
UNIT WHEELSPACE TEMPERATURES MONITORING

TurbineTech.com
Customized Display
UNIT LUBE OIL MONITORING

TurbineTech.com
Customized Display
COMBUSTION ANALYSIS MONITORING

TurbineTech.com
Customized Display
LUBE OIL PID

TurbineTech.com
<I> Display
UNIT CONTROL

TurbineTech.com
<I> Display
MOTORS STATUS AND CONTROL

TurbineTech.com
Case Study
TNB PAKA MALAYSIA HMI TO TMOS UPGRADE

Site Information 3 x blocks of 2 GE Frame 9E


Upgrade from 6 HMI Servers + 9 HMI Viewers (total block)
Upgrade to 6 redundant TMOS SCADA Servers with Historian +
9 Clients + new Server Cabinets
Project Execution Partial Upgrade with HMI and TMOS running
parallel for Operators to be familiarized with TMOS
for 1 week, then proceed to total replacement.
No shutdown caused. Finished in around 2 weeks