Leak Test Reservoir - XLSX Sample

The document provides details of construction joints for multiple walls of a structure. It includes items with x and y coordinates, lengths, dates, and remarks on joints. A total of 38 items across 7 walls are documented with information on lifts and joints. Sign-offs are provided by quality control and assurance personnel.

Uploaded by

jaymar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views

Leak Test Reservoir - XLSX Sample

The document provides details of construction joints for multiple walls of a structure. It includes items with x and y coordinates, lengths, dates, and remarks on joints. A total of 38 items across 7 walls are documented with information on lifts and joints. Sign-offs are provided by quality control and assurance personnel.

Uploaded by

jaymar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 30

GL 6-1/E

Item X Y Length Remarks This Wall


1 1500 300 3000 Construction Joint
2 7000 300 4000 Construction Joint
3 13100 300 4000 Construction Joint
GL E-A/1

Item X Y Length Remarks This Wall

1 5850 300 11700 Construction Joint

This Wall
GL A-E/6

Item X Y Length Remarks

1 700 300 500 Construction Joint


This Wall
GL 1-6/A

Item X Y Length Remarks

1 2000 300 4000 Construction Joint

2 7500 300 4000 Construction Joint

3 12600 300 3000 Construction Joint


GL 1-6/A

Item X Y Length Remarks This Wall


1 10350 0 2500 Between kicker wall and foundation 6/20/17

2 2600 2200 4200 Construction Joint(2nd lift) 6/20/17

3 7900 2200 5000 Construction Joint(2nd lift) 6/20/17

4 1200 300 1000 *Construction Joint(1st lift) 6/26/17

5 2800 300 600 *Construction Joint(1st lift) 6/26/17

6 4600 300 200 *Construction Joint(1st lift) 6/26/17

7 11250 300 500 **Construction Joint(1st lift) 6/29/17

7900mm

2600mm 2 3
3.55m

4200mm 5000mm
2200mm

7
.30m

4 5 6 1
10350mm
GL-A Y
2500mm

GL-6 GL-1

Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 6/E-A
Item X Y Length Remarks
1 750 2200 900 Construction Joint(2nd lift) 6/20/17
This Wall
2 5150 2200 3500 Construction Joint(2nd lift) 6/20/17
3 10600 2200 5000 Construction Joint(2nd lift) 6/20/17
4 6000 2500 600 Transverse Crack 6/20/17
5 2500 2200 2000 *Construction Joint(2nd lift) 6/25/17
6 7300 2200 2200 *Construction Joint(2nd lift) 6/25/17
7 1200 300 500 **Construction Joint(1st lift) 6/30/17
8 6200 300 700 **Construction Joint(1st lift) 7/3/17
9 7500 300 500 **Construction Joint(1st lift) 7/3/17
X

7900mm

6000mm

600mm
5150mm
750mm 4
3.55m

900mm 5 3500mm 6 5000mm


2200mm

1 2 3

7
.30m

8 9

GL-6 Y

GL-E GL-A

Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 1/A-E
Item X Y Length Remarks This Wall
1 1700 2200 1200 Construction Joint(2nd lift) 6/20/17
2 9200 2200 2000 Construction Joint(2nd lift) 6/20/17
3 3200 2200 1500 *Construction Joint(2nd lift) 6/27/17
4 7100 2200 2000 *Construction Joint(2nd lift) 6/27/17
5 11200 2200 700 *Construction Joint(2nd lift) 6/27/17
X

9200mm
3.55m

1700mm 3 4
1200mm 2000mm 5
2200m

1 2
.30m

GL-1 Y

GL-A GL-E

Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL E/1-6 This Wall

Item X Y Length Remarks


1 6650 2200 2000 Construction Joint(2nd lift)
2 7200 2200 500 Construction Joint(2nd lift)

7200mm

6150mm
3.55m

2000mm 500 2
1
2200m
.30m

GL-E Y

GL-1 GL-6

Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
LAMELLAR THICKENER LEAKTEST

14-Jun-17
Start of water pouring
Finish of water pouring up to the
18-Jun-17
design water elevation
Start of water plugging/repair and
Injection 20-Jun-17

Finish of water plugging/repair and


Injection 7/4/2017 (morning)

Water level Monitoring Start 5-Jul-17

Water Level Monitoring


GL E/1-6
GL 6/E-A Item Date Drop(mm) Signature Remarks
1 6-Jul-17 0
2 7-Jul-17 0
3 8-Jul-17
4 9-Jul-17
5 10-Jul-17
6 11-Jul-17
GL A-E/1 7 12-Jul-17

GL 6-1/A

Surface Area=160 m2
Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 6-1/A
This Wall
Item X Y Length Remarks
1 2100 300 100 Construction Joint(1st lift) 7/7/16
2 5500 300 200 Construction Joint(1st lift) 7/7/16

5500mm
3.55m

2100mm
0.3

100mm 200mm
m
GL 6/E-A This Wall
Item X Y Length Remarks
1 12200 300 200 Construction Joint(1st lift) 7/7/16

12200mm
3.55m
0.3

200mm
m
GL E/1-6 Daily Monitoring
Item X Y Length Remarks 21-Jun-17 22-Jun-17 23-Jun-17 24-Jun-17

Chipped-off, Leak source found, Removal/ cutting of tubes and


1 6650 2200 2000 Construction Joint(2nd lift) Injected with epoxy Under observation - - - - - - -
9 Tubes embeded for Injection grinding

2 7200 2200 500 Construction Joint(2nd lift) - Chipped-off, Leak source found, Injected with epoxy Removal/ cutting of tubes and - - - - - - -
4 Tubes embeded for Injection grinding

GL A/1-6 Daily Monitoring


Item X Y Length Remarks 20-Jun-17 22-Jun-17 23-Jun-17 24-Jun-17 25-Jun-17 26-Jun-17 27-Jun-17 28-Jun-17 29-Jun-17 30-Jun-17 1-Jul-17

1 10350 0 2500 Between kicker wall and foundation 6/20/17 - Chipped-off, Leak source found, Chipped-off, Leak source found, Injected with epoxy Under observation - - - - - -
21 Tubes embeded for Injection

Chipped-off, Leak source found, Chipped-off, Leak source found,


2 2600 2200 4200 Construction Joint(2nd lift) 6/20/17 - Injected with epoxy Under observation - - - - - -
21 Tubes embeded for Injection

3 7900 2200 5000 Construction Joint(2nd lift) 6/20/17 - Chipped-off, Leak source found, Chipped-off, Leak source found, Injected with epoxy Under observation - - - - - -
10 Tubes embeded for Injection

Chipped-off, Leak source


4 1200 300 1000 *Construction Joint(1st lift) 6/26/17 - - - - - found, Injected with epoxy Under observation - - -

Chipped-off,Leak source not


5 2800 300 600 *Construction Joint(1st lift) 6/26/17 - - - - - found,Moist only-For Applied with water plug - For Under observation - - -
observation observation
3 Tubes embeded for Injection

Chipped-off, Leak source


6 4600 300 200 *Construction Joint(1st lift) 6/26/17 - - - - - found, Injected with epoxy Under observation - - -

Chipped-off,Leak source
not found,Moist only-For
11250 300 500 - - - - - - - - Applied with water plug - Under observation
7 **Construction Joint(1st lift) 6/29/17 observation For observation
3 Tubes embeded for
Injection

GL 1/A-E Daily Monitoring


Item X Y Length Remarks 27-Jun-17 28-Jun-17 29-Jun-17 30-Jun-17 1-Jul-17 3-Jul-17

1 1700 2200 1200 Construction Joint(2nd lift) 6/20/17


Chipped-off, Leak source found, Injected with epoxy Removal/ cutting of tubes and Under observation - - - - - - -
grinding

Chipped-off, Leak source found, Removal/ cutting of tubes and


2 9200 2200 2000 Construction Joint(2nd lift) 6/20/17 Injected with epoxy Under observation - - - - - - -
grinding

Chipped-off, Leak source found,


3 3200 2200 1500 *Construction Joint(2nd lift) 6/27/17 - - - Injected with epoxy Under observation - - - - -

Chipped-off,Leak source not


- - - Applied with water plug - For Under observation - - - - -
4 7100 2200 2000 *Construction Joint(2nd lift) 6/27/17 found,Moist only-For observation observation
3 Tubes embeded for Injection
Chipped-off, Leak source found,
5 11200 2200 700 *Construction Joint(2nd lift) 6/27/17 - - - Injected with epoxy Under observation - - - - -

GL 6/E-A Daily Monitoring


Item X Y Length Length 26-Jun-17 27-Jun-17 28-Jun-17 29-Jun-17 30-Jun-17 1-Jul-17 3-Jul-17 4-Jul-17 5-Jul-17

1 750 2200 900 Construction Joint(2nd lift) 6/20/17


Chipped-off, Leak source found, Chipped-off, Leak source found, Injected with epoxy Under observation - - - - - - -
6 Tubes embeded for Injection

2 5150 2200 3500 Construction Joint(2nd lift) 6/20/17


Chipped-off, Leak source found, Chipped-off, Leak source found, Injected with epoxy Under observation - - - - - - -
8 Tubes embeded for Injection

3 10600 2200 5000 Construction Joint(2nd lift) 6/20/17


Chipped-off, Leak source found, Chipped-off, Leak source found, Injected with epoxy Under observation - - - - - - -
3 Tubes embeded for Injection

4 6000 2500 600 Transverse Crack 6/20/17


Chipped-off, Leak source found, Chipped-off, Leak source found, Injected with epoxy Under observation - - - - - - -
3 Tubes embeded for Injection
Chipped-off, Leak source found,
5 2500 2200 2000 *Construction Joint(2nd lift) 6/25/17 - Chipped-off, Leak source found, 5 Tubes embeded for Injection Under observation - - - - - - -
Injected with epoxy

Chipped-off, Leak source found, Chipped-off, Leak source found,


6 7300 2200 2200 *Construction Joint(2nd lift) 6/25/17 - 3 Tubes embeded for Injection Under observation - - - - - - -
Injected with epoxy

Chipped-off, Leak source


7 1200 300 500 **Construction Joint(1st lift) 6/30/17 - - - - found, Under observation - - - - -
Injected with epoxy

Chipped-off, Leak source


8 6200 300 700 **Construction Joint(1st lift) 7/3/17 - - - - - - found, Under observation - - -
Injected with epoxy

Chipped-off, Leak source


9 7500 300 500 **Construction Joint(1st lift) 7/4/17 - - - - - - - found, Under observation - -
Injected with epoxy

Prepared by: Checked by: Approved:


Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QC Engineer
Name & Position Name & Position Name & Position
TREATED WATER RESERVOIR LEAKTEST

Water Level Monitoring


Item Date Drop(mm) Signature Remarks
1 7-Oct-17 0
2 8-Oct-17 0
3 9-Oct-17 0
4 10-Oct-17 0
GL A/3-5 5 11-Oct-17 0
6 12-Oct-17 0
GL 3/B-G
7 13-Oct-17 0
8 14-Oct-17 0
9 15-Oct-17 0
10 16-Oct-17 0
Surface Area=180 m2 11 17-Oct-17 0
12 18-Oct-17 0
13 19-Oct-17 0
14 20-Oct-17 0
GL 5/B-G
15 21-Oct-17 0
GL G/3-5
16 22-Oct-17 0
17 23-Oct-17 0
18 24-Oct-17 0
19 25-Oct-17 0
20 26-Oct-17 0
21 27-Oct-17 0
22 28-Oct-17 0
23 29-Oct-17 0
24 30-Oct-17 0
Surface Area 25 31-Oct-17 0

=1107.43 m2
Prepared by: Noted by: Witnessed and Confirmed by:

Adam Jay D. Resultay /QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 5/B-G

Item X Y Length Remarks

1 24300 300 48600 Construction Joint

2 14200 4500 - Tierod

3 15400 4500 - Tierod

4 16600 4500 - Tierod

5 17800 4500 - Tierod

6 21000 3500 900 Transeverse Crack

7 31100 3500 1200 Transeverse Crack This Wall

8 43200 2900 1300 Coldjoint

43200mm
2 3 4 5
7
1200mm 6
8
6.11m

21000mm
3500mm

3500mm

1 24300mm
.30m

48600mm
GL-5 Y
GL-G

GL-B

Prepared by: Noted by: Witnessed and Confirmed by:

Adam Jay D. Resultay / QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL G/3-5
Item X Y Length Remarks
1 12750 300 24550 Construction Joint
2 2500 2600 1200 Transeverse Crack
3 13600 1900 600 Transeverse Crack
4 15600 3700 900 Transeverse Crack
5 17700 3300 800 Transeverse Crack

6 17700 2900 - Tierod


X

15600mm
4 This Wall
17700mm
5

13600mm 3 6
6.11m

2900mm
2000mm
2
24550mm

1 12750mm
.30m

GL-G Y

GL-3 GL-5

Prepared by: Noted by: Witnessed and Confirmed by:

Adam Jay D. Resultay / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 3/B-G
This Wall
Item X Y Length Remarks
1 1200 3800 700 Transeverse Crack
2 1600 4500 800 Transeverse Crack
3 9400 3300 - Tierod
4 10600 4100 500 Transeverse Crack
5 13600 3900 800 Transeverse Crack
6 15600 2000 200 Transeverse Crack
7 20400 3500 1200 Transeverse Crack
8 27650 1900 400 Transeverse Crack
X

20400mm
7
6.11m

4 5
1 3
1200mm
13600mm
6
4100mm

1900m
3900m

2 8
.30m

1600mm

m
m

GL-A Y
9400mm

GL-2' GL-3
Prepared by: Noted by: Witnessed and Confirmed by:

Adam Jay D. Resultay / QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL A/1-1' Daily Monitoring

Item X Y Length Remarks 14-Jul-17 15-Jul-17 16-Jul-17 7-Aug-17 8-Aug-17

Drillling and Injection of ALPHATEC


1 900 3000 1800 Construction Joint(2nd lift) Under observation
340
Drillling and Injection of ALPHATEC
2 1400 3000 1000 Construction Joint(2nd lift)
341 Under observation

3 2800 1500 3000 Transeverse Crack


Chipped-off, Leak source found, Injected with epoxy Under observation

Chipped-off, Leak source found,


4 3500 800 800 Transeverse Crack Injected with epoxy Under observation

Chipped-off, Leak source found,


5 5000 300 300 Construction Joint(1st lift) Injected with epoxy Under observation

6 5600 500 1000 Transeverse Crack

GL A'/1'-2' Daily Monitoring

Item X Y Length Remarks 7-Aug-17 8-Aug-17 9-Aug-17 10-Aug-17

1 0 2000 2000 Transeverse Crack


Drillling and Injection of ALPHATEC Under observation
340
Drillling and Injection of ALPHATEC
2 400 3000 800 Construction Joint(2nd lift) Under observation
341
Drillling and Injection of ALPHATEC
3 4150 3000 2500 Construction Joint(2nd lift)
340 Under observation

GL A/2'-3 Daily Monitoring

Item X Y Length Remarks 7-Aug-17 8-Aug-17 9-Aug-17 10-Aug-17

Drillling and Injection of ALPHATEC


1 1900 3000 3800 Construction Joint(2nd lift) Under observation
340
Drillling and Injection of ALPHATEC
2 1900 1500 3000 Transeverse Crack
341 Under observation

Drillling and Injection of ALPHATEC


3 100 300 200 Construction Joint(1st lift) Under observation
340
Drillling and Injection of ALPHATEC
4 3400 300 800 Construction Joint(1st lift) Under observation
341
Drillling and Injection of ALPHATEC
5 250 3000 500 Construction Joint(2nd lift)
340 Under observation

6 900 2750 500 Transeverse Crack


Drillling and Injection of ALPHATEC Under observation
341
GL A-C/3 Daily Monitoring

Item X Y Length Length 8-Aug-17 9-Aug-17 10-Aug-17 11-Aug-17

Drillling and Injection of ALPHATEC


1 1250 3000 2500 Construction Joint(2nd lift)
340 Under observation

2 250 300 500 Construction Joint(1st lift)


Drillling and Injection of ALPHATEC Under observation
341
Drillling and Injection of ALPHATEC
3 3600 300 4000 Construction Joint(1st lift)
340 Under observation

Drillling and Injection of ALPHATEC


4 5500 300 2000 Construction Joint(1st lift) Under observation
341
Drillling and Injection of ALPHATEC
5 500 300 1000 Transeverse Crack Under observation
340
Drillling and Injection of ALPHATEC
6 13600 300 2000 Construction Joint(1st lift)
341 Under observation

GL C'/1'-3 Daily Monitoring

Item X Y Length Length 9-Aug-17 10-Aug-17 11-Aug-17

Drillling and Injection of ALPHATEC


1 500 300 1000 Construction Joint(2nd lift) Under observation
340
Drillling and Injection of ALPHATEC
2 1250 1000 500 Construction Joint(1st lift)
341 Under observation

Drillling and Injection of ALPHATEC


3 3000 300 2000 Construction Joint(1st lift) Under observation
340
Drillling and Injection of ALPHATEC
4 5500 300 1000 Construction Joint(1st lift) Under observation
341
Drillling and Injection of ALPHATEC
5 8250 300 300 Transeverse Crack
340 Under observation

Drillling and Injection of ALPHATEC


6 8350 300 200 Construction Joint(1st lift) Under observation
341

GL C'/1-1' Daily Monitoring

Item X Y Length Length 15-Jul-17 16-Jul-17 17-Jul-17 9-Aug-17 10-Aug-17


Chipped-off, Leak source found,
Chipped-off, Leak source found,
1 1000 300 2000 Construction Joint(1st lift) 6 Tubes embeded for Injection Under observation -
Injected with epoxy
2 3750 1500 3000 Transeverse Crack
Drillling and Injection of ALPHATEC Under observation
340
Drillling and Injection of ALPHATEC
3 4850 3000 300 Construction Joint(2nd lift)
341 Under observation

4 500 300 1000 Construction Joint(1st lift)


Drillling and Injection of ALPHATEC Under observation
340
GL 1/C-A Daily Monitoring

Item X Y Length Remarks 3-Aug-17 4-Aug-17 5-Aug-17

chipping of loose concreete and Drillling and Injection of ALPHATEC


1 5500 2000 1000 Honeycomb
applying of ALPHATEC 240 340 Under observation

2 7800 3000 1500 Honeycomb & Transverse Crack


chipping of loose concreete and Drillling and Injection of ALPHATEC Under observation
applying of ALPHATEC 241 341
chipping of loose concreete and Drillling and Injection of ALPHATEC
3 9000 2000 1000 Honeycomb & Transverse Crack
applying of ALPHATEC 242 342 Under observation

chipping of loose concreete and Drillling and Injection of ALPHATEC


4 9500 2000 1000 Honeycomb Under observation
applying of ALPHATEC 243 343
chipping of loose concreete and Drillling and Injection of ALPHATEC
5 11000 3000 1500 Honeycomb Under observation
applying of ALPHATEC 244 344

Prepared by: Checked by: Approved:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QC Engineer
Name & Position Name & Position Name & Position
GL A/2-4

Item X Y Length Remarks

1 1500 300 1000 Construction Joint (1st Lift)

2 3800 300 1500 Construction Joint (1st Lift)

3 6200 300 1200 Construction Joint (1st Lift)

4 9500 300 1500 Construction Joint (1st Lift)

5 4200 300 3000 Construction Joint (2nd Lift)


This Wall
6 9500 300 2500 Construction Joint (2nd Lift)

X
9500mm
4200mm

5 6
9500mm
6200mm
2.3m

3800mm

1 2 3 4
.30m

1000mm 1500mm
GL-A Y

GL-6 GL-1

Prepared by: Noted by: Witnessed and Confirmed by:

Racquel Parocha/ Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 2/A-C This Wall
Item X Y Length Remarks
1 750 2200 900
2 5150 2200 3500
3 10600 2200 5000
4 6000 2500 600
5 2500 2200 2000
6 7300 2200 2200
7 1200 300 500
8 6200 300 700
9 7500 300 500
X

7900mm

6000mm

600mm
5150mm
750mm 4
2.30m

900mm 5 3500mm 6 5000mm


2200mm

1 2 3

7
.30m

8 9

GL-6 Y

GL-E GL-A

Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 1/A-E
Item X Y Length Remarks This Wall
1 1700 2200 1200 Construction Joint(2nd lift) 6/20/17
2 9200 2200 2000 Construction Joint(2nd lift) 6/20/17
3 3200 2200 1500 *Construction Joint(2nd lift) 6/27/17
4 7100 2200 2000 *Construction Joint(2nd lift) 6/27/17
5 11200 2200 700 *Construction Joint(2nd lift) 6/27/17
X

9200mm
3.55m

1700mm 3 4
1200mm 2000mm 5
2200m

1 2
.30m

GL-1 Y

GL-A GL-E

Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL E/1-6 This Wall

Item X Y Length Remarks


1 6650 2200 2000 Construction Joint(2nd lift)
2 7200 2200 500 Construction Joint(2nd lift)

7200mm

6150mm
3.55m

2000mm 500 2
1

2200m
.30m

GL-E m Y

GL-1 GL-6

Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
LAMELLAR THICKENER LEAKTEST

14-Jun-17
Start of water pouring
Finish of water pouring up to the
18-Jun-17
design water elevation
Start of water plugging/repair and
Injection 20-Jun-17
GL 2/A-C
GL C/2-4 Finish of water plugging/repair and
Injection 7/4/2017 (morning)

Water level Monitoring Start 5-Jul-17

Water Level Monitoring


GL A/2-4
Item Date Drop(mm) Signature Remarks
GL 4/C-A 1 24-Aug-17 0
2 25-Aug-17 0
3 26-Aug-17 0
4 27-Aug-17 0
5 28-Aug-17 0
6 29-Aug-17 0
7 30-Aug-17 0

Surface Area=90 m2

Prepared by: Noted by: Witnessed and Confirmed by:

Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 6-1/A
This Wall
Item X Y Length Remarks
1 2100 300 100 Construction Joint(1st lift) 7/7/16
2 5500 300 200 Construction Joint(1st lift) 7/7/16

5500mm
3.55m

2100mm
0.3

100mm 200mm
m
GL 6/E-A This Wall
Item X Y Length Remarks
1 12200 300 200 Construction Joint(1st lift) 7/7/16

12200mm
3.55m
0.3

200mm
m