Traffic Management Study-Sadashivnagar and Bellary Road
Traffic Management Study-Sadashivnagar and Bellary Road
JUNE 2013
TABLE OF CONTENTS
I. Sadashivanagar ..................................................................................................................... 1
1.3 METHODOLOGY................................................................................................................ 2
2 SADASHIVANAGAR ............................................................................................................... 4
2.1 LANDUSE........................................................................................................................... 5
Intersections: .................................................................................................................................. 9
Issues ................................................................................................................................... 11
Interventions ....................................................................................................................... 11
Issues ................................................................................................................................... 18
Intervention ........................................................................................................................ 18
Intervention ........................................................................................................................ 21
2.5.4 Traffic congestion in the residential roads of Sadashivanagar ........................................... 24
Interventions ....................................................................................................................... 28
Intersections ................................................................................................................................. 34
Issues ................................................................................................................................... 35
Interventions ....................................................................................................................... 36
Issues ................................................................................................................................... 41
Interventions ....................................................................................................................... 42
4 CONCLUSION ...................................................................................................................... 50
LIST OF FIGURES
LIST OF TABLES
With increasing population and a growing economic base, Bangalore has witnessed a tremendous rise in
vehicular growth. The resultant pressure on road spaces is very high, and traffic conditions are
increasingly difficult. Nonetheless, there is urgent pressure to find solutions, both short-term and long-
term, the ones that can begin to grapple with the complex demands of traffic and transport management.
What adds to the traffic pressure in Bangalore in particular is its very little scope for expansion of roads
and the need to use existing roads for smooth movement of vehicles.
The population in Bangalore Urban Region and Municipalities has increased from 30 lakh to 101 lakh
over the past four decades. The increase from 41 lakh in
1991 to a drastic increase of 96 lakh in 2011 along with
the increasing vehicular growth may be considered the
trigger for increased traffic volume leading to delay and
congestion.
A meeting was held under the chairmanship of the Chief Secretary on 26th Feb 2013, to identify and
address the traffic issues of Sadashivanagar and Bellary Road. During which, the following travel
constraints were highlighted, namely:
I. Sadashivanagar
1. Traffic congestion on inner residential roads.
DULT 1|P a g e
Traffic Management Study Introduction
3. Delays in on-going projects- CNR Rao junction, Sankey Road widening, Ramana Maharishi road
widening- between Cauvery junction and Mekhri Circle.
5. Accessibility and Pedestrian infrastructure issues between Mekhri circle and Kodigehalli cross.
In order to identify the existing travel constraints and improve ease of accessibility, as well as decongest
the residential ward of the Sadashivanagar, Directorate of Urban Land Transport (DULT) has taken up the
study on Traffic Management for Sadashivanagar and Bellary Road.
1.3 METHODOLOGY
The traffic management plan of Sadashivanagar and Bellary Road was aimed to ease and regulate the
travel constraints prevailing within the study area. A reconnaissance survey was done to identify the
issues pertaining to the intersections, parking, black spots, etc as well as identify the traffic circulation
pattern in and around the study area. This was followed by the data collection effort in the from of
primary and secondary surveys where primary surveys like traffic volume counts, bus boarding &
alighting, Bus passenger opinion, parking surveys, etc were carried out to obtain an idea of the traffic
scenario of the study area. The secondary data collected from various agencies comprised of the existing
land use patterns, accident details from Traffic Police, Bus route details from BMTC and the proposed
improvements in and around the study area which would have a significant effect on the operation
conditions of the roadways. The collected data was analyzed to identify the Roadway Segments capacity
and Level of Service (LOS), based on the Indian Roads Congress (IRC) standards sourced from
Guidelines for Capacity of Urban Roads in Plain Areas IRC 106-1990. Whereas, the delay and queue
lengths at the intersections are estimated using a micro simulation based software. The parking surveys
were also carried out to ascertain the number of parking space available within the residential area to that
of the owned vehicles by residents. The next step was to propose section specific interventions to the
identified issue and prepare their of implementation plan. Based on the need of urgency, the interventions
were classified as short, medium and long term measures.
Table 1 illustrates the methodology adopted to carry out “Traffic Management Study”.
DULT 2|P a g e
Traffic Management Study Introduction
DULT 3|P a g e
Traffic Management Study Sadashivanagar
2 SADASHIVANAGAR
In 1960s and early 1970s, the gardens of the Bangalore Palace (a summer home of the Wodeyar dynasty
of Mysore) were converted into a residential neighbourhood. Until 1990s, Sadashivanagar was known as
"Palace Orchards," as it was built in the former royal grounds. It was renamed in honor of Karnad
Sadashiva Rao, a freedom fighter and philanthropist. Situated right opposite to what is left of the official
palace grounds is now a home to many highly placed government officials, ex-governors, film stars and
millionaire businessmen. The neighbourhood is also home to various Wodeyar royals.
DULT 4|Page
Traffic Management Study Sadashivanagar
2.1 LANDUSE
One of the important characteristics in the preparation of a traffic management plan is to study and
understand the land use pattern of the study area. Sadashivanagar is a well established posh residential
neighbourhood of Bangalore. The land use is mainly of mixed residential type with public spaces such as
Indian Institute of Science, the Raman Research Institute, Microsoft Research India, etc. to the north of
the study area and an open space of Palace Ground to the east. Although the inner core of Sadashivanagar
is mainly residential, the main arterial roads are attracting a lot of commercial activities.
Figure 3 shows the existing land use pattern of the study area.
DULT 5|Page
Traffic Management Study Sadashivanagar
The study area is located around 3.5 km from the CBD of Bangalore, runs along from Mehkri Circle in
the north to Bashyam Circle a little way south with Vasanth Nagar towards East and Gutthalli towards
South. The major roadway segments surrounding the study area are CV Raman Road,Bellary Road and
Sankey Tank Road.Amoung which CV Raman Road,Bellary Road and Sankey Road (between Cauvery
Junction / Bhashyam) are six lane divided road and Sankey Road (between Bhashyam and CNR Rao
road) is four lane divided road.
The major roadway segments that state the characteristics of the study area are:
The major intersections that are expected to impact the operational efficiency of the study area are:
Figure 4 represents the major roadway segments and study intersections of the study area.
DULT 6|Page
Traffic Management Study Sadashivanagar
2.3 SURVEYS
A set of primary traffic surveys such as traffic volume counts, speed and delay surveys, road inventory
survey, parking opinion Surveys & Bus passenger opinion and boarding and alighting survey, etc were
conducted during March- April 2013 in order to assess the traffic and transport scenario.
The existing operation conditions of the study roadway networks and intersections were evaluated with
respect to the following to identify the issues with respect to vehicular and pedestrian traffic
1. Roadway Segments- Volume to Capacity Ratio and LOS
2. Intersections- Delay and Queue Length
Roadway Segments:
The Level of Service (LOS) and the capacity of the Roadway segments computed is based on the Indian
Roads Congress (IRC) standards sourced from Guidelines for Capacity of Urban Roads in Plain Areas
IRC 106- 1990. Table 2 provides the LOS standards adopted based on the volume to capacity (V/C) ratios
at the intersections and its performance.
DULT 7|Page
Traffic Management Study Sadashivanagar
The existing conditions of the Sadashivanagar Study area reveal that all the study roadway segments in
the study area are operating at an acceptable LOS D or better during existing peak hour conditions with
V/C ratio equal to or less than 0.77 except the Sankey Road segment between Bhashyam Circle to Circle
Maramma Circle which is operating at V/C ratio of 1.46. Table 3 shows the Existing traffic operation
conditions of the study roadway segments and Figure 5 depicts the same.
Existing Peak
Direction of Traffic
Road Name Segment hour Volume V/C LOS
Flow
(PCU/ Hr)
C V Raman Road New BEL Road - Mekhri Circle East Bound (LCW) 1064 0.27 B
DULT 8|Page
Traffic Management Study Sadashivanagar
Intersections:
The traffic analyses at the identified intersections are tabulated in table 4. All these intersection generate
large amount of traffic and are particularly choked up during the peak hours. CNR Rao circle has
recorded a delay of 18.6 sec/veh with queue of 141.2 m in the east bound direction. This queue is only
temporary and will be minimized once the proposed underpass at CNR Rao circle is completed and is
operational.
DULT 9|Page
Traffic Management Study Sadashivanagar
Cauvery Junction has over the past years become inadequate to cater to the huge growth of vehicular
volume. This inefficient carrying capacity of Cauvery junction has also reduced the operational efficiency
of Bhashyam circle as well. This may be the reason why Bhashyam circle and Cauvery junction have
queue lengths of 293.7m and 511.5 m reported in the south and east bound directions. Windsor Manor has
recorded a delay of 192.7 sec/veh with a queue length of 203.4 m in the south bound direction.
Throughput
Road Name Delay (sec/veh) Queue Length (m)
(Vehicles)
Cauvery Junction
128.5 108.9(SB) 3223
(Sankey Road / Bellary Road)
Bhashyam
108.5 155.1 (EB) 408
(Sankey Road / 13th Cross Road)
Windsor Manor
192.7 203.4 (SB) 1610
(Golf Course/Bellary Road)
DULT 10 | P a g e
Traffic Management Study Sadashivanagar
Issues
1. Especially during the peak hours, vehicles particularly buses bound to Mekhri Circle from Windsor
Manor are trapped in the bottleneck created on the covered portion of the “magic box” leading to delay
and queue length extending from Windsor Manor to Mekhri Circle.
2. The ‘magic box’ is now insufficient to cater increased volume of right turning traffic. Vehicles
plying through the “Magic Box” were found to be standing on an unsafe gradient.
Figure 6 illustrate the junction alignment and the traffic volume in PCUs at the Cauvery Junction.
Interventions
In order to address the immediate need of traffic management at Cauvery Junction, a set of interventions
have been suggested.
a. Signalization of Cauvery Junction: As a short term measure, an installation a traffic signal has
been suggested. As per the existing scenario, the vehicles plying through the magic box find
DULT 11 | P a g e
Traffic Management Study Sadashivanagar
themselves trapped between the longer queues and steep gradients. Thus, Signalization of Cauvery
Junction was checked as an alternative for its operational efficiency under two scenarios:
Scenario 1 will include signalization of the junction with vehicles bound right (from Sankey Road
towards Winsor Manor) traversing through the “Magic Box” whereas Scenario 2 will include
signalization of the junction with vehicles bound right (from Sankey Road towards Winsor Manor)
moving at ground gradient i.e the magic box will be closed/filled to provide a safe and effective
gradient for the vehicles to traverse upon.
Based on the vehicular volume and the available Right of way, signalization of the Cauvery junction has
been designed. A total signal phasing plan of 250 seconds with Sankey Road phasing of 70 seconds,
Bellary Road phasing of 60 seconds and a pedestrian signal phase of 10 seconds has been proposed.
DULT 12 | P a g e
Traffic Management Study Sadashivanagar
A Sankey Road R L L
Pedestrian
Exclusive
B Bellary Road L L S
Table 6 represents a comparison of the scenarios proposed for Cauvery Junction. As per the results, the
installation of a signal will drastically improve the operational efficiency of the junction i.e the existing
delay of 128.5 sec/veh will be reduced to 69.4 sec/veh whereas queue length has increased from 108.9 m
to 390.9 m and 511.5 m in the south bound direction with the magic box open and closed scenario
respectively. Among the two scenarios, the scenario with magic box closed may be feasible over the
magic box open conditions as a queue length of 390.9 m can be accommodated within the available
storage length whereas the queue length of 511.5m cannot be accommodated within the available storage
length.With respect to throughput, the existing throughput of 3223 will be increased to 4625 and 4631
with the magic box open and closed scenarios respectively.
b. Change in Traffic Circulation Plan: Another alternative short term measure is to change in the traffic
circulation pattern. This alternative will provide a free right turn for vehicles plying from Bhashyam to
Windsor Manor and reduce the conflict between vehicles moving north and vehicles bound from west to
south. The change in traffic circulation plans requires the traffic to change lane at Bhashyam Circle on
the leg between Bhashayam Circle to Cauvery on the Sankey road owing to which a free right turn will
DULT 13 | P a g e
Traffic Management Study Sadashivanagar
be provide at the Cauvery junction. This right turn will be made available on a 5 m wide road which is
currently being operated as a 2lane bus bay and a left turning lane for the vehicles traversing from
Guttahalli onto Cauvery.
In order to achieve this, there is a need to minimize the conflict points at the Guttahalli, interventions
like restricting the left turn and shifting of the bus stop on to the refuge island which located adjacent to
the existing bus bay may be necessary. As this change in traffic lane will merge onto the normal traffic at
the Palace road vehicular underpass; the vehicular under pass at the Palace road intersection should be
made one way ie the vehicles will only traverse from Guttahalli onto Winsor Manor and Vasanthnagar.
This making of Vehicular underpass into a one way flow will reduce the conflicts points at the Palace
Road intersection.
For a better illustration of the proposed plan, both scenarios i.e existing and proposed traffic circulation
plans are illustrated in figure 8 and 9 respectively.
Figure 8: Existing scenario at Bhashyam, Cauvery Junction and Windsor manor Circle
DULT 14 | P a g e
Traffic Management Study Sadashivanagar
Figure 9: Proposed Traffic Circulation at Bhashyam, Cauvery Junction and Windsor manor
Circle
The above mentioned alternative will affect the operational conditions at the intersections. Improvement
in operational efficiency were observed at few intersections like Cauvery, Guttahalli and Place Road
junctions but have negative impacts at Bhasyam and Winsor Manor. The implementation of this
alternative has drastically reduced the operations at Winosr Manor where the throughput reduced from
2146 to 1610. Similarly, the likely volume from the banned right turn of Guttahalli has added onto
Bhashyam reducing the throughput from 432 to 408 vehicles. Table 7 shows the comparison between the
existing and proposed scenario at Cauvery, Bhashyam, Guttahalli, Palace Road and Windsor Manor.
DULT 15 | P a g e
Traffic Management Study Sadashivanagar
Table 7 : Operating Conditions on the implementation of the change in traffic circulation plan.
Existing Proposed
Intersection
Delay Queue Length Delay Queue Length
Throughput Throughput
(sec/veh) (m) (sec/veh) (m)
Palace Road 49.3 262.5 (WB) 4257 38.2 221.2 (WB) 4693
Windsor Manor 150.2 270.3 (SB) 2146 192.7 203.4 (SB) 1610
As a medium term measure, a 2 lane one directional grade separator has been proposed. This includes the
construction of a grade separator along the west south direction (ie for vehicles from Sankey Road onto
Winsor Manor). This proposal has to go alongside the road widening proposal of BBMP to a Right of
way of 24m so as to provide 2 lanes for right turning vehicles as well as provide 2.5 lanes for the straight
turning vehicles.
This intervention will provide a signal free junction at Cauvery, thereby reducing increased queue lengths
at Winsor manor and Mekhri Circle.
Note: This two lane flyover over can also be substituted with a single lane flyover. However, a 2 lane
grade separator may be necessary estimating the likely increase of traffic on Bellary Road.
DULT 16 | P a g e
Traffic Management Study Sadashivanagar
The scenarios with their operational efficiency are tabulated in table 8.As per the analysis, the existing
delay of 128.5 sec/veh has been reduced to 8.6 sec /veh and 4.8 sec/veh under the single lane and two lane
scenario respectively. The implementation of either a signal or two lanes will increase double the
throughput when compared to the existing scenario. Queue lengths have also been reduced from the
existing 108.9 m to 71.4 and 43 m in the south bound direction under the single and two lane grade
separator scenario.
DULT 17 | P a g e
Traffic Management Study Sadashivanagar
Issues
Although the increase in vehicular volume has no drastic effect on the operational efficiency of the
junction, it is observed that the roadway segment of Sankey Tank road between Mariamma Circle and
Bhashyam with a narrow carriageway width of 12m is reported to be creating bottle neck leading to
longer queue of vehicular traffic during peak hour.
Intervention
As per Revised Master Plan 2015, a proposal to widen the Sankey Road to a ROW 30m has been made.
However, due the land acquisition and tree cutting objections the road widening proposal has been
delayed.
As a short term proposal, improvising of the signal timing plan has been suggested. The short term
proposal is as illustrated below.
DULT 18 | P a g e
Traffic Management Study Sadashivanagar
The illustrated short term proposal of improvising the signal phasing plan proposes the following changes
in signal plan:
1. Increasing the signal phasing time for the circle Mariamma leg from existing 70 seconds to 100
seconds.
2. Decreasing the signal phasing time for the Sadashivanagar leg from existing 60 seconds to 50 seconds.
3. Increasing the signal phasing time for the Cauvery leg from existing 50 seconds to 55 seconds.
Note: The above proposed signal phase is based upon the existing vehicular volume at Bhashyam Circle.
The results on the operational efficiency of Bhashyam Circle are tabulated in table 9. All three parameters
ie delay, queue length and throughput have shown better results when compared to the existing
conditions. The existing delay of 145.9 sec/veh has reduced to 102.7 sec/veh with increase of throughput
from 642 vehicles to 3530 vehicles.
DULT 19 | P a g e
Traffic Management Study Sadashivanagar
In order to analyse the safety issues, it is first necessary to understand the BBMP proposal of the CNR
Rao underpass.
CNR Rao underpass is aligned along the East-West direction (Overall length of 330m) as well as East-
North direction (Overall length of 145m). The proposed underpass will provide a signal free flow for
vehicles bound from Yeshwanthpur to Circle Mariamma and vice versa as well as for vehicles bound
from Yeshwanthpur to Mekhri Circle. The proposed alignment is as shown in figure 12.
DULT 20 | P a g e
Traffic Management Study Sadashivanagar
1. The left turning lane from Mekhri Circle to Cirlce Maramma may not be sufficient to cater to the
left turning vehicular volume.
2. Conflict between vehicles bound from Circle Maramma to Mekhri Circle and vehicles bound
from Mekhri Circle to Yeshwantpur.
3. No designated bus stop on the C V Raman Road between Sadashivanagar and CNR Rao Circle.
Intervention
1. As per IRC 38-1988, design of horizontal curves, the maximum turning radius required for a
vehicle greater than 10.973 (bus) m is 13m .The existing alignment has a turning radius of
15m.Thus, the left turning lane may be sufficient to cater to the vehicular volume 1535veh/hr (no.
of vehicles turning left).
2. In order to minimize the conflict between vehicles bound from Circle Maramma to Mekhri Circle
and vehicles bound from Mekhri Circle to Yeshwantpur, a two phase signal with a pedestrian
signal phase of ten second has been proposed. The two signal phasing has been distributed with
45 seconds to the leg moving from Mekhri Circle to Yeshwantpur and 40 seconds to the leg
movong from Maramma Circle to Yeshwanthpur. The total signal phasing will be 95 seconds
during the peak hour.
DULT 21 | P a g e
Traffic Management Study Sadashivanagar
A Mekhri Circle R L
Pedestrian
Exclusive
B Maramma Circle R
Peak Hour 45 40 10 95
3. For better analysis of the need for bus stops with shelters at CNR Rao Circle, a bus stop
passenger count and bus passenger opinion survey was conducted. The results of bus stop
passenger count are shown in figure 14 and figure 15. As per the survey analysis, the peak hour at
CNR Rao Bus stop was found to be between 4:30 PM to 5:30 PM, with a total of 68 and 169
commuters commuting by buses from IISC towards Yeshwanthpur and towards Mekhri Circle
respectively.
DULT 22 | P a g e
Traffic Management Study Sadashivanagar
Further to the Bus Stop passenger count surveys, a set of bus passenger opinion survey were also
conducted to identify the accessibility issues at CNR Rao Bus Stop. The results of bus Passenger opinion
survey are shown in figure 16 and figure 17.
Figure 17: Trip Purpose Figure 16: Issues with accessibility to bus stops
During the peak hour, majority of the trips made by commuter were found to be work based trips (65%)
when compared to the study based trips (35%). The main issues with respect to bus stop accessibility
were: no bus shelter (55%) which in turn leads to insufficient passenger service time (30%) or leads to
increased walking time (15%).
In order to facilitate the safe and convenient accessibility to the commuters of IISc and BHEL, two bus
stops on either side at C V Raman Road about 30 m away from exit ramp of the CNR Rao Underpass has
DULT 23 | P a g e
Traffic Management Study Sadashivanagar
been proposed. These bus stops will be connected with table top crossing in order to ensure safe
pedestrian crossing facility.
The existing operational efficiency at CNR Rao Circle were compared to the operational efficiency with
the implementation of the above mentioned interventions, the comparisons are as tabulated in table 11.As
per the analysis, the above mentioned interventions will help achieve higher throughput, ie the existing
throughput of 3143 will be increased to 3238 and a slight decrease in delay from 20 sec/veh to 19.7
sec/veh.
DULT 24 | P a g e
Traffic Management Study Sadashivanagar
if they traverse through the main arterial roads. A similar case of passing traffic traversing through the
residential roads of Sadashivanagar has been reported by the residents of Sadashivanagar.
The residential roads that were found to have increased volume of passing traffic were: 8th Main, 9th
Main, 10th Main, 11th Cross,18th Cross and 5th Cross. As per the existing scenario, vehicles bound to
Mekhri Circle or Sadashivanagar Police Station from Cauvery or Bhashyam Circle traverse along 18th
Cross or 13th Cross road and deviate onto 8th Main before moving onto Mekhri Circle or Sadashivanagar
Police Station and this scenario is true in the opposite direction as well.
The number of motorists plying through residential roads during the recent years may also have
outnumbered due to the increased delay at Cauvery Junction or due to the delay in the on-going underpass
construction at CNR Rao Circle.
In order to discourage passing traffic from plying through the residential roads of Sadashivanagar, traffic
calming measures such as Kerb Treatment, Mini Roundabouts, Serpentine Roadway, etc may be
implemented. These are cost effective measures short term traffic management measures which help
divert non-residential traffic as well as help retain the aesthetic value of the neighbourhood. Figure 20 is a
DULT 25 | P a g e
Traffic Management Study Sadashivanagar
pictorial representation of the type of Traffic Calming measures that can be proposed to the residential
area of Sadashivanagar.
The traffic calming measure of kerb extension has been suggested on streets which are likely to have
increased traffic volume traversing at high speed. The extended kerb will act as a speed reducing
barricade as well as the extended kerb will provide ample waiting area for pedestrians at intersecitons.
Mini roundabouts are proposed at intersection that provided poor sight distances at the intersections as
well as have high traffic flow.
Based on the intensity vehicular volume plying on the residential roads and the availability of right of
way, the following traffic calming measure has been suggested for the residential roads of
Sadashivanagar:
DULT 26 | P a g e
Traffic Management Study Sadashivanagar
The above tabulated traffic measures are pictorially represented in Figure 21. The suggested traffic
calming measures are only effective at the intersections and will not hinder either the aesthetics of the
neighbourhood or cause any discrepancy to the residential traffic.
DULT 27 | P a g e
Traffic Management Study Sadashivanagar
However, as per the field observations and the parking surveys carried out, it was found that most of vehicles parked on the residential roads belong to the
residents and the number of vehicles parked by the passing traffic was found negligible. Surveys finding reveal the following results:
The number of vehicles owned by the residents is more than the availability of parking space within the premises.
During the day, most residents were found to park their vehicles on-street, reducing the effective carrying capacity of the roadway segment.
DULT 28 | P a g e
Traffic Management Study Bellary Road
3 BELLARY ROAD
Bellary Road also known as the NH-7 is located in the north of Bangalore. The main connector
connecting Tumkur, Hyderabad, Dobbaballapur, Devanhalli,etc has in the recent years seen rapid growth
both with respect to traffic and land development. The opening of Bangalore International Airport (BIA)
in 2008 has also led to the increased vehicular volume on Bellary Road. This unplanned increase in
vehicular growth has led the planning/opening of several grade separators in order to ease the increased
delay and congestion.
3.1 LANDUSE
Bellary Road has mixed land use pattern with residential, commercial and industrial establishment’s
bordering the main arterial corridors. Major residential areas include R T Nagar, Anand Nagar,
Kempapura, Sanjaynagar,Ganganagar,etc. It also houses education institutes such as GKVK, Government
Vertinary College, Government Flying Training School, Atria Institute of Technology.
The Hebbal Lake is one of the major tourist attractor, located on the eastern side of the Bellary Road
DULT 30 | P a g e
Traffic Management Study Bellary Road
A roadway segment of 7.8 km from Mekhri Circel to Kodigehalli Cross has been selected for the study.
Amoung which the roadway segments connecting Bellary Road are Outer Ring Road, Kodigehalli Main
Road, CV Raman Road. The sudy intersection are listed below:
DULT 31 | P a g e
Traffic Management Study Bellary Road
Based on the survey analysis,The existing operation conditions of the study roadway networks and
intersections near the study area were evaluated to identify the deficiencies with respect to vehicle and
pedestrian traffic
Roadway Segments:
The Level of Service (LOS) and the capacity of the Roadway segments computed is based on the Indian
Roads Congress (IRC) standards sourced from Guidelines for Capacity of Urban Roads in Plain Areas
IRC 106- 1990 as tabulted in table 2.
The results/ outcomes of the survey analysis, the roadway segments along Bellary Road show varying
LOS values. This is mainly due to the incresed number of vehicular traffic as well as the on going
construction activity by NHAI. The roadway segments are operating at a LOD D or better i.e the V/C
ratio is equal to or less than 0.8 except the Hebbal flyover segment which is operating at LOS F and E i.e
the V/C ratio ranges between 0.8-1.2.
Table 12 shows the existing traffic operation condition of the study area roadway segments and figure 26
depicts the same.
DULT 32 | P a g e
Traffic Management Study Bellary Road
NOTE: *Capacity of the roadways was based on the IRC 106- 1990.*
DULT 33 | P a g e
Traffic Management Study Bellary Road
Intersections
During the existing conditions, the delay at the study intersections was found be less than 30 seconds
except at the Kodigehalli and Hebbal intersection, which have recorded a significant delay at the
intersections greater than 30 seconds. The delay at Kodigehalli was found to be 72 seconds per vehicle,
whereas the delay at Hebbal was found to be 42.6 seconds per vehicle.
The maximum queue lengths at the study intersections were found to be less than the available storage
length at the intersections,with Kodigehalli having recorded a maximum queue length of around 466
meters in the southbound direction.
Table 13 shows the delay and queue lengths at the study intersections.
DULT 34 | P a g e
Traffic Management Study Bellary Road
In order to minimize the traffic congestion and delay on Bellary Road, NHAI have proposed a set of
seven grade separators along Bellary Road between Hebbal and Bangalore International Airport.
Amongst one of which is located adjacent to Kodigehalli with its ramp starting around 500 meters from
the Kempapura Entrance. This elevated road would results in high speed traffic reaching the Kempapura
Entrance causing chaos to both vehicular as well as pedestrian traffic. The identified issues are as listed
below.
Issues
1. The Elevated road would generate high speed vehicular traffic reaching the Kempapura entrance
causing bottleneck and congestion at the Kempapura Junction as well as the Hebbal flyover
located approximately 100m from the Kempapura Junction.
2. Commuter and pedestrian safety has been a major concern. The road widening of Bellary Road to
a ROW of 24m, increased vehicular volume plying at higher speed, no bus shelters, irregular
median opening have risked the safety of pedestrian at Kempapura Entrance.
DULT 35 | P a g e
Traffic Management Study Bellary Road
3. The 8 lane traffic from the Elevated road (after the construction of the expressway) which
squeeze into 6 lanes traffic on the Hebbal Flyover creating chaos.
Interventions
1. As a part of short term measure to control the difference in vehicular speed (i.e speed of the
elevated road = 80kmph (proposed) and speed of Bellary road=50kmph), a traffic calming
measure of provision of rumble strips has been suggested. This will only be provided on the down
ramp reaching from BIA to Hebbal. The implementation of which will enable the elevated road
vehicles to lower their speed to the speed of the at grade vehicles of Bellary Road. The design
criterion is as shown in figure 28 below.
DULT 36 | P a g e
Traffic Management Study Bellary Road
Figure 28: Proposed intervention for the Elevated Road, Bellary Road
2. The following short term measures have been suggested at the Kempapura Entrance in order to ensure
safe accessibility to pedestrians:
The existing signal of 20 second at a 5 min interval is insufficient for pedestrians to cross the 6-lane
Bellary road. Adding to that, the median also doest provide ample waiting/refuge area to pedestrians.
Considering the future growth of vehicles on Bellary Road, the pedestrian signal may tend to increase the
vehicular delay and congestion. Thus, removal of the pedestrian signal with a replacement of a 2m wide
skywalk will provide safe accessible path to the pedestrian.
Design Elements:
DULT 37 | P a g e
Traffic Management Study Bellary Road
>>Section at A-A
DULT 38 | P a g e
Traffic Management Study Bellary Road
The existing bus stop without shelter at the Kempapura entrance (eastern side) is located on the shoulder
that separates the main lane and the service lane. The 3m wide shoulder is not uniformly barricaded
leading to haphazard movement of vehicles to and from the main road. These vehicular movements
hinder the pedestrian access to the bus stop. Thus, a suggestion of shifting the bus stop 10 m southwards
from the existing bus stop has been suggested. A bus stop with 2 no’s bus bays can be constructed
adjacent to the Esteem Mall and connected to the proposed skywalk for better accessibility.
c. Uniform barricades
In order to resist the haphazard movement of vehicular and pedestrian traffifc an uniform barricading of
the shoulder with 10 m wide opening at a 100 m interval will resist the haphazard of vehicles to and from
the main road.
Figure 30 and Figure 31are the illustration of the existing and proposed scenario for the Kempapura
entrance.
DULT 39 | P a g e
Traffic Management Study Bellary Road
DULT 40 | P a g e
Traffic Management Study Bellary Road
3. As per the inspection report on the improvements required on NH-7 from Hebbal and Bangalore
International Airport (BIA), a 3 lane extra limb would be created for traffic from the city to airport with
partial modifications to the other limbs of the Hebbal Flyover. This modification will ease the chaos
created by the 8 lane traffic from the Elevated road (after the construction of the expressway) squeezing
into 6 lanes traffic on the Hebbal Flyover
Issues
1. Longer queues, delay and congestion is a common observation found both during peak and off-
peak. This may be due to the construction work for elevated flyover.
2. Despite heavy traffic with high speed there is no exclusive pedestrian signal phasing is provided
in the existing signal phasing plan.
4. Absence of footpath connectivity has forced pedestrian to move on the carriage way.
DULT 41 | P a g e
Traffic Management Study Bellary Road
Interventions
1. As a part of short term measure, to protect pedestrians from the high speed vehicular traffic at the
intersection, a traffic calming measure of provision of curb ramps has been suggested. This will
limit vehicular right of way as well as the speed while giving pedestrians a refuge island at the
intersection. Curb radii should be designed accordingly to balance the need to accommodate large
DULT 42 | P a g e
Traffic Management Study Bellary Road
vehicle movements and pedestrian safety. Open drains can be covered to increase the extra
walkway width.
2. The existing signal doesn’t have an exclusive pedestrian phasing. Considering the width of the
carriageway and the future growth of vehicles on Bellary Road, there is a need to provide the
pedestrian phase of 15 seconds.
3. The existing bus stops are without shelters on either side of the roadway are located on the main
carriageway which creates obstruction in the traffic movement. Thus bus bays on either side with
shelter should be relocated on the service lanes to provide a safe and accessible path to the bus
stops.
DULT 43 | P a g e
Traffic Management Study Bellary Road
pedestrian access, grade separators at Anandnagar and bus stops like Mekhri Circle lack pedestrian
facilities.
The 6-lane Bellary road is divided into 3 lane on either side by high raised median of 2.5m tall .Two bus
stops (ie) Mekhri Circle and Ganganagar Bus Stops are located 280m away on either side. However, these
two bus stops are not connected or accessible. As per the existing condition, pedestrian and commuters
are using a narrow 2m wide median opening adjacent to the Air Force Office to cross the 6 lane Bellary
Road. This median opening is connected to a pedestrian traffic signal which is not operational.
In order to analyse the issues of accessibility, a set of surveys namely, bus stop passenger opinion and
count surveys were conducted. The results are as shown Figure 36 below.
DULT 44 | P a g e
Traffic Management Study Bellary Road
As per the analysis, the commuter accessing the Mekhri Circle and Ganganagar Bus Stops have expressed
their difficulties with respect accessibility bus stop stating problems like no crossing facility (63%),
increased speed of vehicles on Bellary Road (13%) and median too high (23%).When questioned about a
suitable preference of crossing facility, they suggested that considering the lane width and high vehicular
speed, they would prefer a skywalk.
Interventions:
The skywalk of 2m wide connecting the two bus stops (Mekhri Circle and Ganganagar Bus Stops)
has been proposed by BBMP. This skywalk will be set up adjacent to the HMT Bhavan. The proposed
skywalk will be accessed through a flight of stair with a minimum of two landings. The existing footpath
width of 3m may not be feasible to provide ramp access. Elevators will also provide an alternate access to
the proposed skywalk. Thus a skywalk with vertical clearance of 5.5m with a slope of 1 in 20 has been
designed. The project is in tendering stage. The alignment is as illustrated below in figure 37.
DULT 45 | P a g e
Traffic Management Study Bellary Road
Absence of a Bus shelter, high vehicular speed and no crossing facilities are the issues observed with
respect to accessibility at Anand Nagar Bus Stop. At present the pedestrian use the vehicular underpass to
access the bus stop. However, the vehicular underpass doesn’t have any space for pedestrian walkway.
Figure 38 and 39 is an illustration of the Existing scenario at the Anand Nagar Bus Stop.
DULT 46 | P a g e
Traffic Management Study Bellary Road
In order to identify the need safe pedestrian crossing, a set of surveys at the Anandnagar Bus stop were
conducted during the morning peak hour (9:00 to 10:00am). The results are as shown in figure 40 below.
DULT 47 | P a g e
Traffic Management Study Bellary Road
1. The number of commuters accessing the bus stop towards BIA is comparitively low when
compared to the commuters accessing the bus stop towards Mekhri Circle.
2. The resons given by the commuters when questioned about poor ridership on the bus stop
towards BIA were: no dedicated crossing facility,higher speed on the main lane, poor lighting on
the service lane,etc.
3. In order of preferance, they suggested grade crossing followed by grade separated facility ie
either a skywalk or a subway.
Intervension:
In order to provide a safe and convineint pedestrain crossong facility, raised table top crossing adjacent to
the bus stop towards Mekhri Circle has been suggested. This facility will also act as a speed breaker and
also provide better visibility of the pedestrian to the motorist.
Note: It has been assumed that the vehicular speed will be reduced to 5kmph.
In future, if either the vehicular volume or the pedestrian volume are likely to increse, a pedestrian signal
can replace the table top crossing.
DULT 48 | P a g e
Traffic Management Study Bellary Road
Table 14 tabulates the improved opreational efficiency at Anand Nagar on the implementation of the
proposed interventions.
Short Term
5 49.1(SB) 3089
(Table Top Crossing)
Medium Term
11.2 68.3(SB) 3093
(Table Top Crossing+Pedestrian Signal)
DULT 49 | P a g e
Traffic Management Study Conclusion
4 CONCLUSION
In view of rapid urbanization, the city is experiencing change in environmental conditions and
disintegrated physical developments. Thus, there is a need to approach the entire galaxy of urban
problems in a more comprehensive manner and plan for its orderly development. The study aims at
achieving sustainable transport, increased public transport ridership, safe and comfortable walkways, etc
by minimizing the traffic impact on the study area.
Table 15 is a list of section specific proposals that have been suggested in the study.
Sadashivanagar
2 Cauvery Junction: 2-lane grade separator for vehicles moving from west Medium Term BBMP
to south.
3 Cauvery Junction: Change in traffic Circulation Pattern Short Term Traffic Police
5 CNR Rao Circle: Signalization and Bus Stop Short Term Traffic Police + BMTC
Bellary Road
7 Elevated Road on Bellary Road: Rumble Strips Short Term NHAI + Traffic Police
10 Anandnagar Bus Stop: Table Top Crossing Short Term BBMP + Traffic Police
DULT 50 | P a g e
Traffic Management Study Conclusion
DULT 51 | P a g e