Pif 00 Forms Final List

The document contains lists of forms used by the Department of Public Works and Highways (DPWH) for job control, acceptance, and testing related to building construction, roads construction and flood control, bridges, and project implementation. There are over 80 different form codes organized under categories for buildings (job control, acceptance, testing), roads and flood control (job control), bridges (job control, acceptance) and project implementation (standard forms). The forms provide a means of documentation and approval for various construction and project tasks.

Uploaded by

katy lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
488 views8 pages

Pif 00 Forms Final List

The document contains lists of forms used by the Department of Public Works and Highways (DPWH) for job control, acceptance, and testing related to building construction, roads construction and flood control, bridges, and project implementation. There are over 80 different form codes organized under categories for buildings (job control, acceptance, testing), roads and flood control (job control), bridges (job control, acceptance) and project implementation (standard forms). The forms provide a means of documentation and approval for various construction and project tasks.

Uploaded by

katy lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Job Control Forms For Buildings

DPWH-JCF-C-001 Structure Excavation Works Request


DPWH-JCF-C-002 Bar Cutting List Diagram
DPWH-JCF-C-003 Form Enclosure Request
DPWH-JCF-C-004 Concrete Pouring Request
DPWH-JCF-C-005 Steel Roof Truss- Fabrication & Erection
DPWH-JCF-C-006 Welding Permit
DPWH-JCF-C-007 Installation of Roofing Materials Request
DPWH-JCF-C-008 Wall and Partition Work Request
DPWH-JCF-C-009 Ceiling Works Request
DPWH-JCF-C-010 Installation of Doors & Windows Request
DPWH-JCF-C-011 Electrical Work Request
DPWH-JCF-C-012 Mechanical Work Request
DPWH-JCF-C-013 Plumbing & Sanitary Work Request
DPWH-JCF-C-014 Installation of Fire Protection System
DPWH-JCF-C-015 Finishing Work Request

Acceptance Forms For Buildings


DPWH-AF-C-001 Concreting Works
DPWH-AF-C-002 Installed Structural Steel
DPWH-AF-C-003 Wall and Partition Works
DPWH-AF-C-004 Installed Ceiling Works
DPWH-AF-C-005 Installed Doors and Windows
DPWH-AF-C-006 Installed-Applied Finishes
DPWH-AF-C-007 Installed Roofing Works
DPWH-AF-C-008 Installed Electrical Works
DPWH-AF-C-009 Installed Mechanical Works
DPWH-AF-C-010 Installed Plumbing and Sanitary Works
DPWH-AF-C-011 Installed Fire Protection System

Test Forms For Buildings


DPWH-TF-C-001 Insulation Resistance Test - MDP (IRT)
DPWH-TF-C-002 Insulation Resistance Test - Branch Panel (IRT)
DPWH-TF-C-003 Power System Test (PST)
Job Control Forms For Roads Constuction And Flood Conrol
DPWH-JCF-A-001 Clearing and Grubbing
DPWH-JCF-A-002 Removal of Structures and Obstructions
DPWH-JCF-A-003 Excavation
DPWH-JCF-A-004 Structure Excavation
DPWH-JCF-A-005 Embankment
DPWH-JCF-A-006 Subgrade Preparation
DPWH-JCF-A-007 Aggregate Subbase Course
DPWH-JCF-A-008 Aggregate Base Course
DPWH-JCF-A-009 Crushed Aggregate Base Course
DPWH-JCF-A-010 Lime Stabilized Road Mix Base Course
DPWH-JCF-A-011 Portland Cement Stabilized Road Mix Base Course
DPWH-JCF-A-012 Asphalt Stabilized Road Mix Base Course
DPWH-JCF-A-013 Chemically Stabilized Road Mix Subbase Course
DPWH-JCF-A-014 Portland Cement Treated Plant Mix Base Course
DPWH-JCF-A-015 Aggregate Surface Course
DPWH-JCF-A-016 Bituminous Prime Coat
DPWH-JCF-A-017 Bituminous Tack Coat
DPWH-JCF-A-018 Bituminous Seal Coat
DPWH-JCF-A-019 Bituminous Surface Treatment
DPWH-JCF-A-020 Slurry System for Road Surface Treatment
DPWH-JCF-A-021 Bituminous Penetration Macadam Pavement
DPWH-JCF-A-022 Bituminous Road Mix Surface Course
DPWH-JCF-A-023 Bituminous Plant-Mix Surface Course, Cold Laid
DPWH-JCF-A-024 Bituminous plant-mix (stockpile maintenance mixture)
DPWH-JCF-A-025 Bituminous Concrete Surface Course, Hot Laid
DPWH-JCF-A-026 Portland Cement Concrete Pavement
DPWH-JCF-A-027 Rock Asphalt, Hot Laid
DPWH-JCF-A-028 Pipe Culverts And Storm Drains
DPWH-JCF-A-029 Underdrains
DPWH-JCF-A-030 Manhole, Inlet And Catch Basin
DPWH-JCF-A-031 Drainage Steel Grating With Frame
DPWH-JCF-A-032 Cleaning and Reconditioning Existing Drainage Structures
DPWH-JCF-A-033 Riprap and Grouted Riprap
DPWH-JCF-A-034 Stone Masonry
DPWH-JCF-A-035 Rubble Concrete
DPWH-JCF-A-036 Hand-Laid Rock Embankment
DPWH-JCF-A-037 Sheet Piles
DPWH-JCF-A-038 Concrete Slope Protection
DPWH-JCF-A-039 Gabions and Mattresses

DPWH-JCF-A-040 Erosion Control Mats, Roving, And Cellular Confinement Systems

DPWH-JCF-A-041 Permanent Ground Anchors


DPWH-JCF-A-042 Shotcrete (Concrete Spray)
DPWH-JCF-A-043 Mechanically-Stabilized Earth (Mse) Reataining Walls
DPWH-JCF-A-044 Wet Stone Masonry (Cobble Stone)
DPWH-JCF-A-045 Drain Pipe
DPWH-JCF-A-046 Hydroseeding
DPWH-JCF-A-047 Curb and Gutter
DPWH-JCF-A-048 Sidewalk
DPWH-JCF-A-049 Monuments, Markers and Guideposts
DPWH-JCF-A-050 Guardrail
DPWH-JCF-A-051 Fencing
DPWH-JCF-A-052 Road sign
DPWH-JCF-A-053 Pavement Markings
DPWH-JCF-A-054 Reflective Pavement Studs
DPWH-JCF-A-055 Topsoil
DPWH-JCF-A-056 Sprigging
DPWH-JCF-A-057 Sodding
DPWH-JCF-A-058 Tree planting
DPWH-JCF-A-059 Reflective Thermoplastic Striping Material (Solid Form)
DPWH-JCF-A-060 Concrete Joint Sealant (Hot-Poured Elastic and Cold-Applied Types
DPWH-JCF-A-061 Waterstops
DPWH-JCF-A-062 Reflectorized Thermoplastic Rumble Strips
DPWH-JCF-A-063 Chevron Sign
DPWH-JCF-A-064 Coconet Bio-Engineering Solutions
VOLUME IV - Appendix 3, Annex C-3

JOB CONTROL FORMS


DPWH-JCF-B-001 Bridge Lay-out and Staking
DPWH-JCF-B-002 Test Pile Data Record
DPWH-JCF-B-003 Summary of Bearing Pile Data
DPWH-JCF-B-004 Pile Driving Log
DPWH-JCF-B-005 Bored Pile Drilling Log
DPWH-JCF-B-006 Bored Pile Pouring Data
DPWH-JCF-B-007 Bar Cutting List/Diagram
DPWH-JCF-B-008 Reinforcing Steel
DPWH-JCF-B-009 Structural Concrete
DPWH-JCF-B-010 Prestressed Concrete Structures
DPWH-JCF-B-011 Elastomeric Bearing Pad
DPWH-JCF-B-012 Wire Rope/Cable
DPWH-JCF-B-013 Bridge Deck/Carriageway
DPWH-JCF-B-014 Bridge Railing
DPWH-JCF-B-015 Bridge Curb
DPWH-JCF-B-016 Bridge Painting
DPWH-JCF-B-017 Member Specifications Compliance Log (Metal Structures)
DPWH-JCF-B-018 Member Trial Assembly Record (Metal Structures)
DPWH-JCF-B-019 Erection Diagram (Metal Structures)
DPWH-JCF-B-020 Bailey Bridge
DPWH-JCF-B-021 Carbon Fiber

ACCEPTANCE FORMS
DPWH-AF-B-001 Driven Pile
DPWH-AF-B-002 Bored Pile
DPWH-AF-B-003 Prestressed Concrete Members
DPWH-AF-B-004 Reinforcing Steel
DPWH-AF-B-005 Structural Concrete
DPWH-AF-B-006 Concrete Structures
DPWH-AF-B-007 Elastomeric Bearing Pad
DPWH-AF-B-008 Wire Rope/Cable
DPWH-AF-B-009 Bridge Deck/Carriageway
DPWH-AF-B-010 Bridge Railing
DPWH-AF-B-011 Bridge Curb
DPWH-AF-B-012 Bridge Painting
DPWH-AF-B-013 Metal Structures
DPWH-AF-B-014 Carbon Fiber
STANDARD FORMS FOR PROJECT IMPLEMENTATION

FORM CODE FORM DESCRIPTION REFERENCE


PIF-01-NTP-01 Notice to Proceed
DPWH-INFR - 52 -2016 from the Procurement
Manual
Project Designation Order Forms
PIF-02-PDO-01 Project Designation Order (Project Engineer) D.O. 34, S 2021
PIF-02-PDO-02 Project Designation Order (Materials Engineer) D.O. 34, S 2021
PIF-02-PDO-03 Project Designation Order (Project Inspector) D.O. 34, S 2021
Meeting Forms
PIF-03-MF-01 Notice of Meeting QMS Manual
PIF-03-MF-02 Minutes of Meetings QMS Manual
PIF-03-MF-03 Meeting Attendance QMS Manual
Contract Status Forms
PIF-04-PSR-01 Contract Status Report
PIF-04-PSR-02 Breakdown of Accomplishment
PIF-04-PSR-03 Actual S-Curve
PIF-04-PSR-04 Weather Chart
PIF-04-PSR-05 Photograph Log
Site Instruction Forms
PIF-05-SI-01 Site Instruction (Notice to Undertake Works Included in
the Contract)
PIF-05-SI-02 Site Instruction (For Non compliance With Contract
Specifications)
Billling Forms
PIF-06-BIL-01 Monthly Certificate for Payment
PIF-06-BIL-02A Statement of Work Accomplished (w/o Variation Order)
PIF-06-BIL-02B Statement of Work Accomplished (w/ Variation Order)

PIF-06-BIL-03 Certificate of Billing


PIF-06-BIL-04 Certificate of Inspection
PIF-06-BIL-05 Certificate of Quality Control and Assurance
PIF-06-BIL-06 Certificate of Clearance for Equipment Rental
PIF-06-BIL-07 Certificate of Clearance for Payment of Labor and
Materials
PIF-06-BIL-08 Statement of Time Elapsed and Work Accomplished

Work Suspension Order Forms


PIF-07-WSO-01 WSO of DEO implemented projects with approval under
the delegated authority of the District Engineer

PIF-07-WSO-02 WSO of DEO implemented projects with approval under


the delegated authority of the Regional Director

PIF-07-WSO-03 WSO of DEO implemented projects with approval under


the delegated authority of the Assistant Secretary

PIF-07-WSO-04 WSO of DEO implemented projects with approval under


the delegated authority of the Undersecretary

PIF-07-WSO-05 WSO of DEO implemented projects with approval under


the delegated authority of the Secretary
PIF-07-WSO-06 WSO of RO implemented projects with approval under
the delegated authority of the Regional Director

PIF-07-WSO-07 WSO of RO implemented projects with approval under


the delegated authority of the Assistant Secretary
FORM CODE FORM DESCRIPTION REFERENCE
PIF-07-WSO-08 WSO of RO implemented projects with approval under
the delegated authority of the Undersecretary
PIF-07-WSO-09 WSO of RO implemented projects with approval under
the delegated authority of the Secretary
PIF-07-WSO-10 WSO of CO implemented projects (with Construction
Supervision Consultant) with approval under the
delegated authority of the Bureau/Project Director.

PIF-07-WSO-11 WSO of CO implemented projects (without Construction


Supervision Consultant) with approval under the
delegated authority of the Bureau/Project Director

PIF-07-WSO-12 for WSO of CO implemented projects (with Construction


Supervision Consultant) with approval under the
delegated authority of the Undersecretary

PIF-07-WSO-13 WSO of CO implemented projects (without Construction


Supervision Consultant) with approval under the
delegated authority of the Undersecretary

PIF-07-WSO-14 WSO of CO implemented projects (with Construction


Supervision Consultant) with approval under the
delegated authority of the Secretary

PIF-07-WSO-15 WSO of CO implemented projects (without Construction


Supervision Consultant) with approval under the
delegated authority of the Secretary

Work Resumption Order Forms


PIF-08-WRO-01 Work Resumption Order (for DEO implemented projects )

PIF-08-WRO-02 Work Resumption Order (RO implemented projects)

PIF-08-WRO-03 Work Resumption Order (for CO implemented projects


(locally funded))
PIF-08-WRO-04 Work Resumption Order (CO implemented projects
without consultant (foreign funded))
PIF-08-WRO-05 Work Resumption Order (CO implemented projects with
consultant (foreign funded))
Continuation of Work Suspension Order Forms
PIF-09-CWSO-01 CWSO of DEO implemented projects with approval under
the delegated authority of the Regional Director

PIF-09-CWSO-02 CWSO of DEO implemented projects with approval under


the delegated authority of the Assistant Secretary

PIF-09-CWSO-03 CWSO of DEO implemented projects with approval under


the delegated authority of the Undersecretary

PIF-09-CWSO-04 CWSO of DEO implemented projects with approval under


the delegated authority of the Secretary

PIF-09-CWSO-05 CWSO of RO implemented projects with approval under


the delegated authority of the Assistant Secretary

PIF-09-CWSO-06 CWSO of RO implemented projects with approval under


the delegated authority of the Undersecretary
FORM CODE FORM DESCRIPTION REFERENCE
PIF-09-CWSO-07 CWSO of RO implemented projects with approval under
the delegated authority of the Secretary

PIF-09-CWSO-08 for CWSO of CO implemented projects (with Construction


Supervision Consultant) with approval under the
delegated authority of the Undersecretary

PIF-09-CWSO-09 CWSO of CO implemented projects (without Construction


Supervision Consultant) with approval under the
delegated authority of the Undersecretary

PIF-09-CWSO-10 CWSO of CO implemented projects (with Construction


Supervision Consultant) with approval under the
delegated authority of the Secretary

PIF-09-CWSO-11 CWSO of CO implemented projects (without Construction


Supervision Consultant) with approval under the
delegated authority of the Secretary

Monthly Time Suspension


PIF-10-MTSR-01 Monthly Time Suspension Report
Contract Time Extension Forms
PIF-11-CTE-01 CTE of DEO implemented projects with approval under
the delegated authority of the District Engineer

PIF-11-CTE-02 CTE of DEO implemented projects with approval under


the delegated authority of the Regional Director

PIF-11-CTE-03 CTE of DEO implemented projects with approval under


the delegated authority of the Assistant Secretary

PIF-11-CTE-04 CTE of DEO implemented projects with approval under


the delegated authority of the Undersecretary
PIF-11-CTE-05 CTE of DEO implemented projects with approval under
the delegated authority of the Secretary
PIF-11-CTE-06 CTE of RO implemented projects with approval under the
delegated authority of the Regional Director

PIF-11-CTE-07 CTE of RO implemented projects with approval under the


delegated authority of the Assistant Secretary

PIF-11-CTE-08 CTE of RO implemented projects with approval under the


delegated authority of the Undersecretary
PIF-11-CTE-09 CTE of RO implemented projects with approval under the
delegated authority of the Secretary
PIF-11-CTE-10 CTE of CO implemented projects (with Construction
Supervision Consultant) with approval under the
delegated authority of the Bureau/Project Director.
PIF-11-CTE-11 CTE of CO implemented projects (without Construction
Supervision Consultant) with approval under the
delegated authority of the Bureau/Project Director

PIF-11-CTE-12 for CTE of CO implemented projects (with Construction


Supervision Consultant) with approval under the
delegated authority of the Undersecretary

PIF-11-CTE-13 CTE of CO implemented projects (without Construction


Supervision Consultant) with approval under the
delegated authority of the Undersecretary

PIF-11-CTE-14 CTE of CO implemented projects (with Construction


Supervision Consultant) with approval under the
delegated authority of the Secretary
FORM CODE FORM DESCRIPTION REFERENCE
PIF-11-CTE-15 CTE of CO implemented projects (without Construction
Supervision Consultant) with approval under the
delegated authority of the Secretary

Variation Order Forms


PIF-12-VO-01A Proposed Variation Order (for DEO/RO implemented
projects)
PIF-12-VO-01B Proposed Variation Order (for CO implemented projects)

PIF-12-VO-02A Itemized Cost of Revision (for DEO/RO implemented


projects)
PIF-12-VO-02B Itemized Cost of Revision (for CO implemented projects)

PIF-12-VO-03A Itemized Cost of Revision w/ previous V.O. (for DEO/RO


implemented projects)
PIF-12-VO-03B Itemized Cost of Revision w/ previous V.O. (for CO
implemented projects)
PIF-12-VO-03 Technical Justification
Quality Control/Assurance Forms
PIF-13-CQA-01 Quality Control Program
PIF-13-CQA-02 Monthly Certificate of Quality Control and Assurance
PIF-13-CQA-03A Weekly of Quality Control and Assurance
PIF-13-CQA-04 Status of Field and Laboratory Tests
PIF-13-CQA-05 Status of Tests
PIF-13-CQA-06 Summary of Field Test
PIF-13-CQA-07 Materials Inspection Report
PIF-13-CQA-08 Report on Concrete Works
Project Completion and Acceptance Forms
PIF-14-PCA-01A Punchlist (Upon 95%)
PIF-14-PCA-01B Punchlist (After One-Year Defects Liability Period)
PIF-14-PCA-02A Certfication of Punchlisting (for Completion)
PIF-14-PCA-02B Certfication of Punchlisting (Acceptance)
PIF-14-PCA-03 Certficate of Correction
PIF-14-PCA-04 Certficate of Completion D.O. 99, S 2015
PIF-14-PCA-05A Completion Inspection Report (Central Office) D.O. 99, S 2015
PIF-14-PCA-05B Completion Inspection Report (Regional Office) D.O. 99, S 2015
PIF-14-PCA-05C Completion Inspection Report (District Engineering Office) D.O. 99, S 2015

PIF-14-PCA-06A Final Completion Inspection Report (Central Office) D.O. 99, S 2015
PIF-14-PCA-06B Final Completion Inspection Report (Regional Office) D.O. 99, S 2015
PIF-14-PCA-06C Final Completion Inspection Report (District Engineering D.O. 99, S 2015
Office)
PIF-14-PCA-07 Certficate of Acceptance D.O. 99, S 2015
PIF-14-PCA-08A Acceptance Inspection Report (Central Office) D.O. 99, S 2015
PIF-14-PCA-08B Acceptance Inspection Report (Regional Office) D.O. 99, S 2015
PIF-14-PCA-08C Acceptance Inspection Report (District Engineering Office) D.O. 99, S 2015

PIF-14-PCA-09A Final Acceptance Inspection Report (Central Office) D.O. 99, S 2015
PIF-14-PCA-09B Final Acceptance Inspection Report (Regional Office) D.O. 99, S 2015
PIF-14-PCA-09C Final Acceptance Inspection Report (District Engineering D.O. 99, S 2015
Office)
PIF-14-PCA-10 Notice of Defects/Deficiencies D.O. 99, S 2015