..Price List
..Price List
METAL STRUCTURES
Material Description Unit Ave. Price (Php)
Milled Steel Plates kg 60.00
Checked FY36
Milled Steel Plates FY36 kg 60.27
Steel Sheet Stainless kg 120.09
Bridge Rollers and pc 4,575.00
Rockers
Pins and Pin Holes FY60 kg 83.55
Sliding Bearing pc 5,025.00
Structural Steel Angular kg 70.30
Bar (A36)
Structural Steel Channel kg 70.30
Bar (A36)
Structural Steel Square kg 73.00
Bar (A36)
Structural Steel I-Beam kg 73.00
Bar (A36)
Strutural Steel Wide kg 73.45
Flange (A36)
Rivets High Tension kg 73.45
Washers high Tension kg 74.36
Cork Expansion Joint Filler pc 718.82
(.019m x 1.2m x 2.44m)
Bolts High Tension kg 144.27
DOORS
Material Description Unit Amount (PhP)
Accordion Door SQ.M. 2,169.21
Aluminum Glass Door SQ.M. 5,111.61
Flush Hollow Core Door SQ.M. 863.90
Flush Type Solid Core SQ.M. 1,733.05
Door
Glass Transom on Wood SQ.M. 1,792.07
Narra Paneled Type Door SQ.M. 4,981.22
Tanguile Paneled Type SQ.M. 3,802.51
Door
Varifold Type Door SQ.M. 3,050.85
WINDOWS
Material Description Unit Amount (PhP)
Aluminum Casement SQ.M. 4,069.30
Window
Awning Steel Type SQ.M. 1,835.59
Casement Windows
Fixed Glass on Metal SQ.M. 489.46
Frame Window
Fixed Louvered Steel SQ.M. 575.80
Window
Glass Jalousie Window SQ.M. 672.52
Sliding Aluminum Window SQ.M. 4,606.58
Swing Type Steel SQ.M. 1,890.90
Casement Windows
EMBANKMENT
Borrow Pit cu.m. 340.39
Mixed Sand & Gravel cu.m. 420.14
Rock cu.m. 544.67
AGGREGATE SUBBASE
MATERIALS
Aggregate Subbase cu.m. 517.98
Course Material
AGGREGATE BASE
COURSE
Crushed Aggregate Base cu.m. 630.38
Course
Uncrushed Aggregate cu.m. 566.63
Base Course
Blended Weathered cu.m. 581.94
Limestone and Crush
Stone
Filler Material cu.m. 483.99
LIME STABILIZED ROAD
MIXED BASE COURSE
Crushed Lime Stabilized cu.m. 668.17
Mix Aggregate Base
Course
Uncrushed Lime Stabilized cu.m. 623.25
Mix Aggregate Base
Course
AGGREGATE SURFACE
COURSE
Crushed Aggregate cu.m. 709.36
Surface Course
Uncrushed Aggregate cu.m. 618.76
Surface Course
BITUMINOUS SURFACE
TREATMENT
Crushed Stone Surface cu.m. 704.20
Treatment
Crushed Slag Surface cu.m. 701.99
Treatment
Crushed Gravel Surface cu.m. 687.15
Treatment
Fencing Works
Material Description Unit Ave. Price (Php)
Gauge 10 – Cyclone Wire l.m. 374.01
Galvanized 3′
Gauge 10 – Cyclone Wire l.m. 508.03
Galvanized 4′
Gauge 10 – Cyclone Wire l.m. 635.65
Galvanized 5′
Gauge 10 – Cyclone Wire l.m. 754.92
Galvanized 6′
Gauge 12.5 Barbed Wire l.m. 30.17
Galvanized – 2 strands
Gauge 12.5 Barbed Wire l.m. 48.38
Galvanized – 3 strands
Chain Link Fence Fabric l.m. 110.57
Metal Works
Material Description Unit Amount (PhP)
High Tension Bolts kg 154.67
Checkered Milled Steel Plates kg 50.97
FY36
Milled Steel Plates FY36 kg 49.43
StainlessSteel Sheet kg 180.29
Structural Steel Angular Bar kg 54.56
(A36)
Structural Steel Channel Bar kg 54.49
(A36)
Structural Steel Square Bar kg 55.77
(A36)
Structural Steel I-Beam (A36) kg 56.20
Strutural Steel Wide Flange kg 56.88
(A36)
Painting Works
Material Description Unit Amount (PhP)
4″ Paint Brush pc 77.69
6″ Paint Brush pc 78.21
Aluminum Paint gal 609.82
Enamel Paint gal 614.96
Latex Gloss Paint gal 574.42
Latex Semi Gloss Paint gal 579.99
Tinting Color Paint ltr 152.09
Red Lead Paint gal 440.99
Metal Epoxy Paint gal 689.72
Primer Solvent gal 531.82
Thinner Paint gal 283.19
Thinner Lacquer gal 253.65
Lacquer Putty kg 361.30
Spar Varnish ltr 370.46
Oil Paint ltr 113.85