0% found this document useful (0 votes)
193 views1 page

Admin Area Single Line Diagram

This document contains a diagram of an electrical system with various components labeled with designations like Z250+50 and 3200AT. There are low voltage switch gears, a synchronizing panel, capacitor banks, meter centers, power panels, and service elevators depicted. Wiring and cable trays connect the different electrical components throughout the system.

Uploaded by

Bobby Aguirre
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
193 views1 page

Admin Area Single Line Diagram

This document contains a diagram of an electrical system with various components labeled with designations like Z250+50 and 3200AT. There are low voltage switch gears, a synchronizing panel, capacitor banks, meter centers, power panels, and service elevators depicted. Wiring and cable trays connect the different electrical components throughout the system.

Uploaded by

Bobby Aguirre
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

4Z250+50

IN CABLE TRAY
7Z250+50 Z250+50/90
IN CABLE TRAY IN CABLE TRAY
LOW VOLTAGE SWITCH GEAR (LVSG) SYNCHRONIZING
PANEL
3200 AT 3200 AT
4P 4P
3200AT 1500AT 1500AT
ATS 4P 4P 4P
125AT 500AT 500AT 250AT 800AT 500AT 500AT 600AT 600AT 600AT 500AT SPACE 125AT 400AT
3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P
PF.1
11.25kVA
PF.2
2Z125+30/2-80

2Z125+30/2-80
11.25kVA

2Z150+30/80

2Z150+30/80

2Z150+30/80

2Z125+30/2-80

2Z125+30/2-80
Z125+30/80

Z250+50/90

Z100+30/65

Z250+50/90

PF.3 2Z150+30/80
Z38+14/50

9.375kVA
TEF
3.125kVA
ACCU EL.1
7.875kVA
SERVICE
ACCU 2.1 ELEVATOR
2.1kVA

CAPACITOR BANK

(2nd FLR), 373.697kVA


MCB METER CENTER
STP

MCB METER CENTER


250kVA

(Gnd FLR), 370.39kVA


PP-ADMIN

PP-E
154.807kVA

105kVA

DP-3, MTS
PP-RD

388.39kVA

SERVICE EL. MTS


71kVA

35kVA
DP-5, MTS
388.39kVA

DP-6 MTS
388.39kVA
ACCU 1.1 Z22+8.0/32
7.125kVA
LP-7
5.61kVA
Z200+50/90
WIRING SCHEDULE
LP-6
5.265kVA
Z30+8.0/40

LP-5 Z5.5+5.5/20
5.415kVA Z250+50/90 Z200+50/90
LP-3
5.45kVA

PP-AC3
198.9kVA

PP-AC6
PP-AC5
198.9kVA

198.kVA
LP-2 3X PASSENGER

15 HP
ESCALATOR
TELCO 1

TELCO 2
34.64kVA

15 HP
34.64kVA

ESCALATOR
Z8.0+5.5/20
15.321kVA ELEVATOR
LP-G
16.506kVA FEEDER ADM

PP-FC3

PP-FC5

PP-FC6
7.9kVA

7.9kVA

7.9kVA
Z14+8.0/25 48.117kVA
SINGLE LINE DIAGRAM (ADMIN AREA)