Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
245 views
MC 2023-006
Uploaded by
Paul Sison
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save MC 2023-006 For Later
Download
Save
Save MC 2023-006 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
245 views
MC 2023-006
Uploaded by
Paul Sison
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save MC 2023-006 For Later
Carousel Previous
Carousel Next
Download
Save
Save MC 2023-006 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 4
Search
Fullscreen
UP. LAW CENTER FICE of ne TONAL «OMISTRATIVE REISTER| Aewncinn tae team | R JAN 20.2998 )) CEL y JE. Republic of the Philippines “= * Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD East Avenue, Quezon City MEMORANDUM CIRCULAR NUMBER 2023 - 006 SUBJECT: OPENING OF APPLICATIONS FOR THE ISSUANCE OF NEW CERTIFICATES OF PUBLIC CONVENIENCE (CPCs) OF THE APPROVED ROUTES OF THE MUNICIPALITY OF GODOD, ZAMBOANGA DEL NORTE LOCAL PUBLIC TRANSPORT ROUTE PLAN (LPTRP) UNDER THE IMPLEMENTATION OF PUBLIC UTILITY VEHICLE MODERNIZATION PROGRAM (PUVMP) WHEREAS, the Department of Transportation (DOTr) Department Order No. 2017 — 011 also known as the ‘Omnibus Guidelines on the Planning and identification of the Public Road Transportation Services and Franchise Issuance,” was issued adopting the Tules and procedures for the issuance of the franchises for public transport routes and services; WHEREAS, pursuant to Section 5(a) of Executive Order No. 202, the Board has the power to prescribe and regulate routes of service, economically viable capacities and Zones or areas of operation of public land transportation services provided by motorized vehicles; WHEREAS, the DOTr empowered LTFRB the authority to deliberate and take appropriate action on proposed new/additional routes pursuant to the Public Utility Vehicle Modernization Program (PUVMP) and Memorandum Circular No. 2018-006; WHEREAS, the Local Public Transport Route Plan (LPTRP) of the Municipality of Godod, Zamboanga Del Norte was reviewed and evaluated by the LTFRB and DOTr evaluators, and recommended for the issuance of Notice of Compliance (NOC). On 17 March 2022, the LTFRB Regional Franchising and Regulatory Office No. 9 issued NOC. to the Municipality of Godod, Zamboanga Del Norte, requesting the Sangguniang Bayan to pass an Ordinance adopting the said LPTRP pursuant to the OFG and the Joint Memorandum Circular (JMC) No. 001, s. 2017 between DOTr and the Department of Interior and Local Government (DILG), also known as the “Guidelines on the Preparation and Issuance of Local Ordinances, Orders, Rules and Regulations concerning the LPTRP;” WHEREAS, pursuant to Section 4(f) of JMC No. 001, series of 2017, updating of the LPTRPs may be done by the LGUs at least once every three (3) years after the last approval; WHEREAS, the Sangguniang Bayan in the Municipality of Godod, Zamboanga Del Norte passed Municipal Ordinance No. 02, s. 2022: “An Ordinance adopting the Local Public Transport Route Plan (LPTRP) 2021-2026 of the Municipal of Godod, Zamboanga De! Norte subject to full compliance with all applicable laws, rules and regulations.”, approved and signed by Mayor Abel M. Matildo dated 26 April 2022;Page 2 of 4 Memorandum Circular No. Ot Godod, Zamboanga De! Norte WHEREAS, pursuant to said Ordinance, a total of five (5) new routes have been approved; NOW THEREFORE, upon the recommendation of the LTFRB and DOTr, the following 5 new routes with corresponding Route Survey information are hereby APPROVED AND OPENED for the issuance of New CPCs: ROUTE (Detailed Route Structure) NO. OF AUTHORIZED UNITS ROUTE | LENGT | (KM) AUTHORIZED MODE NEW ROUTES |POBLACION- BALUNO & | VICE VERSA 1 | Poblacion- Delucot Road.- Godod Rd.- Baluno & Vice Versa. PUJ Class 1 9.06 POBLACION: LOMO: VIA BUNAWAN & VERSA Poblacion- Delucot Road.- 2 | Godod Road.- Bunawan Road.- Bunawan Pi Market- Sianan Road.- Lomogom & Vice Versa PUJ Class 2 15.13 POBLACION- RABIA VIA DIPOPOR & VICE VERSA Poblacion- Delucot Road.- 3 | Godod Road. - Dipopor- Salug- Godod Road.- Raba & Vice Versa PUJ Class 2 14.42 POBLACION- DELUCOT RD. & VICE VERSA 4 | Poblacion- Delucot Road.- Delucot Public Market & Vice Versa PUJ Class 1 5.85 SARAWAGAN-DIPOPOR VIA RAMBON & VICE VERSA 5 | Sarawagan- Salug- Godod Road.- Rambon- Godod Road: Dipopor & Vice Versa PUJ Class 2 7.00 TOTAL NUMBER OF UNITS TOTAL NUMBER OF ROUTES in case there are affected Transport Service En 'S (TSEs), due to the resuilts of the LPTRP study, LTFRB-RFRO No. 9 shall conduct a stakeholders’ consultation Meeting to discuss the Transfer Plan and Social Support mechanism, in coordination with the concerned local government unit.Page 3 of 4 Memorandum Circular No. ©© tp Godod, Zamboanga Del Norte For NEW routes, the procedures in the selection of the operator under Section V-B of MC 2019-013 shall apply except Item No. 6 thereof. In which case, the provisions under MC No. 2021-021 Item 1.A.1.v. regarding the compliance period of the compliant units shall apply, which shall be within the following period: © 6 months - 25% of the total number of authorized units * — 9months - 50% of the total number of authorized units © 12 months - 100% of the total number of authorized units “The Board shall issue a Certificate of Public Convenience to the applicant when the latter complies with the following required number of units: * Ifthe number of authorized units (NAU) is more than fifteen (15), the applicant shalll have at least fifteen (15) OFG - compliant units; * If the number of authorized units (NAU) is fifteen (15) or less, the applicant shall comply with all the NAU." Only those units compliant with the OFG and DTI-PNS shall be required for selected entities, Once an operator has been selected and issued a Notice of Selection (NOS), the corresponding Provisional Authority shall be subsequently issued after the submission of the required documents, subject to existing policies of the Board. No units shall be allowed to operate without the required Provisional Authority. Fallure (0 comply with the abovementioned timeline shall automatically cause the revocation of the NOS and shall result in the commencement of a new selection process for the route involved following the applicable provisions of MC 2019-013 and MC 2022-033, ‘The pre-qualification conferences shall be held at LTFRB Regional Office No. 9 on 1 March 2023 at 8:30 AM. Letters of Intent and qualification documents shall be submitted NOT LATER THAN the indicated deadline below: Region. Route | Deadline Venue of Submission | Region9 | AllRoutes | 20 March 2023 @ 11:00AM | RFROQ, Dipolog City Opening of the sealed documents will immediately follow at 1:00 PM of the same date. A qualified Applicant may be selected for more than one (1) route and subsequently processed for the grant of CPC following the applicable provisions of MC No. 2019-013, and Memorandum Circular No. 2021-021. In case of failure on the initial qualification process, the Selection Committee shall issue a Resolution declaring the failure on the selection process, with the corresponding date for the resubmission of the Letters of Intent and qualification documents by the interested applicants, which Resolution shall be posted or published in the official website of the LTFRB.Page 4 of 4 Memorandum Circular No. © Ly Godod, Zamboanga Del Norte This Memorandum Circular shall take effect immediately following its publication in a newspaper of general circulation and the filing of three (3) copies hereof with the U.P. Law Center pursuant to Presidential Memorandum Circular No. 11 dated 09 October 1992 SO ORDERED. APPROVED this day of ws 2023, Quezon City, Metro Manila, Ad \ Th b A CF ATTY TEOFILO E. GUADIZM, CESO V Chairman ENGR. RIZA MARJET PACHES, MNSA —_ATTY. MERCY JANE PARAS-LEYNES, LLM B, ery Board Member Attested by’ a ATTY. ROBERT D. PEIG, CESO V Executive Director
You might also like
Dotr Do 2017-011 PDF
PDF
0% (2)
Dotr Do 2017-011 PDF
19 pages
LPTRP Template (Draft) As of 21nov2022
PDF
100% (1)
LPTRP Template (Draft) As of 21nov2022
42 pages
DOTr Presentation
PDF
No ratings yet
DOTr Presentation
45 pages
Joint Memorandum Circular 1
PDF
100% (2)
Joint Memorandum Circular 1
7 pages
LTFRB Franchise Guidelines PDF
PDF
100% (1)
LTFRB Franchise Guidelines PDF
19 pages
Local Publi C Transport Route Plan Manual
PDF
100% (2)
Local Publi C Transport Route Plan Manual
76 pages
LPTRP San Narciso Quezon
PDF
No ratings yet
LPTRP San Narciso Quezon
86 pages
MC 2023-007
PDF
No ratings yet
MC 2023-007
4 pages
MC 2023-010
PDF
No ratings yet
MC 2023-010
4 pages
MC 2023-008
PDF
No ratings yet
MC 2023-008
6 pages
Dilg Memocircular 201853 92b18a9709
PDF
No ratings yet
Dilg Memocircular 201853 92b18a9709
4 pages
Dilg Memocircular 201853 LPTRP
PDF
0% (1)
Dilg Memocircular 201853 LPTRP
4 pages
DILG DOTr JMC 1 S 2017 Guidelines Issuance Local Ordinance Rules Regulations Local Public Transport Route Plan LTPRP June 19 2017
PDF
No ratings yet
DILG DOTr JMC 1 S 2017 Guidelines Issuance Local Ordinance Rules Regulations Local Public Transport Route Plan LTPRP June 19 2017
7 pages
JMC-LPTRP (Final Draft 12 June 2017)
PDF
No ratings yet
JMC-LPTRP (Final Draft 12 June 2017)
9 pages
Republic of The Philippines DILG-NAPOLCOM Center, EDSA Cor. Quezon Avenue, West Triangle, Quezon City
PDF
No ratings yet
Republic of The Philippines DILG-NAPOLCOM Center, EDSA Cor. Quezon Avenue, West Triangle, Quezon City
4 pages
E.O No. 2018-09-033 S. 2018
PDF
No ratings yet
E.O No. 2018-09-033 S. 2018
9 pages
Joint Memo Circular No.001
PDF
No ratings yet
Joint Memo Circular No.001
7 pages
17 LPTRP Briefer
PDF
No ratings yet
17 LPTRP Briefer
7 pages
Dilg LPTRP RTD-TSSP
PDF
No ratings yet
Dilg LPTRP RTD-TSSP
11 pages
Board Resolution No. 198 S. 2020 1
PDF
No ratings yet
Board Resolution No. 198 S. 2020 1
4 pages
PUV Modernization Program and LPTRP Process
PDF
No ratings yet
PUV Modernization Program and LPTRP Process
133 pages
LPTRP ADOPTION Edited
PDF
No ratings yet
LPTRP ADOPTION Edited
5 pages
Local Public Transport Route Plan LPTRP 1
PDF
100% (2)
Local Public Transport Route Plan LPTRP 1
4 pages
LPTRP Adoption
PDF
No ratings yet
LPTRP Adoption
5 pages
MC 2022 034
PDF
100% (1)
MC 2022 034
4 pages
Doc 9066699142053226987RevisedDepartmentOrder GuidelinesonImplementationofPUVMP (1)
PDF
No ratings yet
Doc 9066699142053226987RevisedDepartmentOrder GuidelinesonImplementationofPUVMP (1)
23 pages
2017-011 Directing The LTFRB-NCR To Review CPCs With Modified Routes To Approved Route
PDF
No ratings yet
2017-011 Directing The LTFRB-NCR To Review CPCs With Modified Routes To Approved Route
3 pages
Briefer On The LPTRP of Butuan City
PDF
No ratings yet
Briefer On The LPTRP of Butuan City
2 pages
Local Public Transport Route Plan Kawayan (Revised on 04.08.2025)
PDF
No ratings yet
Local Public Transport Route Plan Kawayan (Revised on 04.08.2025)
96 pages
Iword Mo To
PDF
No ratings yet
Iword Mo To
21 pages
MC 2019 037
PDF
No ratings yet
MC 2019 037
5 pages
(Memo) LPTRP Manual
PDF
No ratings yet
(Memo) LPTRP Manual
2 pages
Dotr Do-2017-011
PDF
No ratings yet
Dotr Do-2017-011
19 pages
OFGnew
PDF
No ratings yet
OFGnew
22 pages
LPTRP PDF
PDF
No ratings yet
LPTRP PDF
19 pages
Of Ai (D Frotri Ivietro Manila DL, Rii (G The Feriod Gce
PDF
No ratings yet
Of Ai (D Frotri Ivietro Manila DL, Rii (G The Feriod Gce
8 pages
48 2019
PDF
No ratings yet
48 2019
9 pages
LPTRPM - Module 0 - PUVMP Presentation For The LGU CapBuild - 25 March Version
PDF
No ratings yet
LPTRPM - Module 0 - PUVMP Presentation For The LGU CapBuild - 25 March Version
84 pages
Service Contracting Agreement
PDF
No ratings yet
Service Contracting Agreement
7 pages
Public Utility Vehicle Modernization Program FAQs PDF
PDF
No ratings yet
Public Utility Vehicle Modernization Program FAQs PDF
4 pages
MC 2020 051a
PDF
No ratings yet
MC 2020 051a
4 pages
Annex A 1 LTFRB MC 2019 022
PDF
No ratings yet
Annex A 1 LTFRB MC 2019 022
4 pages
MC 2022 050
PDF
No ratings yet
MC 2022 050
17 pages
LPTRP Flowchart
PDF
0% (1)
LPTRP Flowchart
1 page
MC 2022 076
PDF
100% (1)
MC 2022 076
10 pages
Memorandum Circular
PDF
No ratings yet
Memorandum Circular
4 pages
MC 2022 074
PDF
No ratings yet
MC 2022 074
11 pages
Seminar 1 Feb
PDF
No ratings yet
Seminar 1 Feb
10 pages
Max Distance of Routes of Jeepneys
PDF
No ratings yet
Max Distance of Routes of Jeepneys
3 pages
Deed of Undertaking
PDF
100% (5)
Deed of Undertaking
2 pages
2022 - MC-2022-059 Consolidation
PDF
No ratings yet
2022 - MC-2022-059 Consolidation
2 pages
SOCSCI GROUP 4_LEGAL BASIS
PDF
No ratings yet
SOCSCI GROUP 4_LEGAL BASIS
4 pages
MC 2019-013
PDF
No ratings yet
MC 2019-013
9 pages
New LPTRP Revising
PDF
No ratings yet
New LPTRP Revising
23 pages
Process
PDF
No ratings yet
Process
26 pages
SCP Service Contract Agreement (699M)
PDF
No ratings yet
SCP Service Contract Agreement (699M)
7 pages
LTFRB Was Created Under Executive Order 202 Dated June 19, 1987. Powers & Functions
PDF
No ratings yet
LTFRB Was Created Under Executive Order 202 Dated June 19, 1987. Powers & Functions
18 pages