This risk assessment form evaluates the risks associated with painting work. It identifies two primary hazards: fire and explosion from painting activities, and working at heights. For fire and explosion risks, control measures include isolating materials, using only flame-proof electrical appliances, prohibiting painting near gas or welding work, and only allowing skilled workers. For working at heights, control measures are using full body harnesses anchored above head height and fall arrestors to prevent accidental falls. The residual risk of injury or fatality from both hazards is rated as 4 out of 10 after implementing these control measures.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
227 views

Paint Work

This risk assessment form evaluates the risks associated with painting work. It identifies two primary hazards: fire and explosion from painting activities, and working at heights. For fire and explosion risks, control measures include isolating materials, using only flame-proof electrical appliances, prohibiting painting near gas or welding work, and only allowing skilled workers. For working at heights, control measures are using full body harnesses anchored above head height and fall arrestors to prevent accidental falls. The residual risk of injury or fatality from both hazards is rated as 4 out of 10 after implementing these control measures.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Risk Assessment/Management Form

Ref:
Section / Dept: civil Risk Assessment-
Activity: Location:
Painting work
Addi
Sl Basic Job Potential Consequence Current control measure tion

Probability

Probability
N. Steps Hazard Risk rating In al Risk rating
iti cont

Residual
al rol
Ri mea

risk
P E A R sk sure P E A R

Use of Helmet with chin


strap,Rubber hand gloves
Use of safety goggles &Safety
Effects of skin Skin Irritation shoe 1 0 0 0 2 2
Painters shall be fully protected
The materials shal be isolated
from other materials
Deployment only skill workers
Proper storage shall be done on
designated place
Painting area shall be provided
proper ventilation
All electrical appliances installed
Painting Fire and Get
1 shall be flame proof through 2 0 0 0 2 4
Activity Explosion Injury/Fatality
proper ELCB,s connection

Painting work should not be done


near the Gas cutting, welding &
Grinding work

Deployment only authorised


person
Use of double rope full body
harness and anchored it above the
Working at Get head height 2 0 0 0 2 4
height Injury/Fatality
Use of Fall arrestor with the safety
belt hook for ascending and
descending to prevent from
accidental fall
Prepaired Approved by: Reviewed by