0% found this document useful (0 votes)
36 views

Design: Construction Notes

This document provides construction notes and details for reinforcing bars, masonry concrete blocks, formworks, and aggregate sizes. It notes that splices on beams should be avoided at points of critical bending stress. Lap splices must develop 125% of the bar yield strength, and no more than 50% of bars may be spliced at any one section. Reinforcing details are provided for masonry walls of different thicknesses. Formworks must be adequately maintained until concrete reaches working strength.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Design: Construction Notes

This document provides construction notes and details for reinforcing bars, masonry concrete blocks, formworks, and aggregate sizes. It notes that splices on beams should be avoided at points of critical bending stress. Lap splices must develop 125% of the bar yield strength, and no more than 50% of bars may be spliced at any one section. Reinforcing details are provided for masonry walls of different thicknesses. Formworks must be adequately maintained until concrete reaches working strength.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CONSTRUCTION NOTES : PLACED DIRECTLY ABOVE THOSE IN THE BOTTOM LAYER.

GENERALLY, NO SPLICES SHALL PERMITTED ON BEAMS @ POINTS WHERE CRITICAL BENDING STRESSES OCCUR.
NOTE:
1. OMIT TRIMMER BARS WHERE OPENING IS FRAMED BY BEAM.
LENGTH OF LAPPED SPLICES, WHERE SO PERMITTED, SHALL BE ON THE SPECIFICATIONS FOR WELDING OR REINFORCING BARS
REFERENCE TO OTHER DRAWINGS 2. PROVIDE THESE ADDITIONAL BARS FOR ALL OPENING (NOT SHOWN) PARALLEL TO SIDE OF
SPLICES SHALL DEVELOP IN TENSION @LEAST 125% OF THE SPECIFIED YIELD STRENGTH OF THE BARS, NOT MORE THAN 50% OF THE OPENING EQUAL TO THE NUMBER OF TERMINATED BARS @ OPENING.
SEE ARCHITECTURAL DRAWINGS FOR KINDS OF FLOOR FRAMES FINISHES, DEPRESSIONS IN FLOOR SLABS, OPENINGS IN WALLS,
BARS @ ANY ONE SECTION SHALL BE ALLOWED TO BE THERE IN. 3. SEE ARCHITECTURAL & MECHANICAL PLANS FOR SLAB OPENING LOCATION.
SLABS, INTERIOR PARTITIONS, & LOCATIONS OF DRAINS ETC.

DIMENSIONS MASONRY CONCRETE BLOCKS


1. ALL CONCRETE BLOCKS SHALL BE NORMAL WEIGHT, LOAD BEARING TYPE WITH A fc' = 1000 psi.
IN THE INTERPRETATIONS OF THESE DRAWINGS, INDICATED DIMENSIONS SHALL GOVERN & DISTANCES OR SIZES SHALL NOT BE
2. PROVIDE 1 - 16 mm. DIA. VERTICAL BARS AT CORNER, INTERSECTIONS, END OF WALL IN EACH SIDE OF OPENING.
SCALED FOR CONSTRUCTION PURPOSES. MAIN REINFORCEMENTS
3. LINTEL BEAMS SHALL AT LEAST (0.20 M) ON EACH SIDE OF MASONRY WALL OPENING. TO BE CONTINUOUS
DISCREPANCIES 4. WALL REINFORCEMENT SHALL BE AS FOLLOWS:
THE CONTRACTOR SHALL COMPARE THE STRUCTURAL DRAWINGS WITH THE ARCHITECTURAL DRAWINGS, LAYOUTS, DIMENSIONS &
WALL THICKNESS VERTICAL REINFORCEMENT HORIZONTAL REINFORCEMENT
ELEVATIONS. Ø10x1000 LONG @300 O.C.
6" (150 MM) Exterior 10 MM Ø @ 0.60 M. 10 MM Ø @ 0.60 M.
POURING SCHEDULE 4" (100 MM) 10 MM Ø @ 0.60 M. 10 MM Ø @ 0.60 M. SLAB
THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF CONCRETE POURING & LOCATION OF CONSTRUCTION JOINTS TO THE 5. REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 31 Id WHERE SPLICED, DOWELS FROM CONCRETE FOOTING OR
STRUCTURAL ENGINEER @LEAST THREE (3) DAYS BEFORE POURING FOR APPROVAL, THE CONTRACTOR SHALL KEEP ALL CONCRETE SLAB SHALL EXTEND INTO THE BLOCK WALL 30 BAR DIAMETER DOWELS TO MATCH VERTICAL REINFORCING BARS IN
MOIST FOR A MINIMUM OF SEVEN (7) DAYS IMMEDIATELY AFTER POURING. WALLS.
TYPICAL DETAIL FOR BEAM
FORM WORKS 6. ALL CELLS SHALL BE SOLIDLY FILLED WITH CONCRETE GROUTS.
7. OTHER ALTERNATIVES SHALL BE SUBMITTED FOR THE STRUCTURAL ENGINEERS APPROVAL. WHERE JOINT IS AT POINT
OR SLAB CHANGE SOFFIT
A. THE CONTRACTOR SHALL FURNISH & MAINTAIN ADEQUATE FORMS & SHORING UNTIL THE CONCRETE HAVE ATTAINED THEIR STRESS, PROVIDE SHEAR RODS
WORKING CONDITIONS & STRENGTH. SIZE OF AGGREGATES TO BE USED BEAM WITH ENGINEERS APPROVAL

B. REMOVAL FORMS MINIMUM SIZES OF AGGREGATES TO BE USED FOR VARIOUS PURPOSES OF CONCRETE CONSTRUCTION.
1. COLUMNS & BEARING WALLS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ AFTER THREE (3) DAYS. TYPICAL SLAB AND BEAM
LIGHTLY REINFORCED
C. WHEN THE CONCRETE FLOOR IS TO BE POURED, @LEAST TWO (2) FLOORS SHALL BE SHORED TO SUPPORT THE LOAD. MINIMUM DIMENSIONS REINFORCED WALLS, UNREINFORCED HEAVILY REINFORCED
OR UNREINFORCED
CONSTRUCTION JOINT DETAIL
OF SECTIONS BEAMS AND COLUMNS WALLS SLABS
DESIGN CRITERIA SLABS
63.5 MM - 127 MM 12.7 MM - 19 MM 19 MM 19 MM - 25.4 MM 19 MM - 38.1 MM
LIVE LOADS:
152.4 MM - 279.4 MM 19 MM - 38.1 MM 38.1 MM 38.1 MM 38.1 MM - 76.2 MM
2ND FLOOR = 40 psf (1.92 Kpa) PARTITIONS = 25 psf (1.20 Kpa)
304.8 MM - 73.6 MM 38.1 MM - 76.2 MM 76.2 MM 38.1 MM - 76.2 MM 76.2 MM 10 MMØJOINT TIES
ROOF = 30 psf (1.44 Kpa) SPACED @ 100MM O.C.
762 MM OR MORE 38.1 MM - 76.2 MM 152.4 MM 38.1 MM - 76.2 MM 76.2 MM - 152. 4 MM
CONCRETE
fc' = 2500 psi (17.30 Mpa) - SLAB ON FILL CONCRETE STRENGTH @ 28 DAYS. RECOMMENDED SIZES OF 90° HOOKS
fc' = 3000 psi (20.67 Mpa) - FOOTINGS, FOOTING TIE BEAM, COLUMNS, R.C. BEAMS, SLAB, CONCRETE STRENGTH, @28 BAR SIZE HOOK A OR ROOF OR FLOOR
J BEAMS
DAYS ALL CONCRETE SHALL BE VIBRATED WHEN DEPOSITED & CURED, NO CHUTE LONGER THAN 1800 mm. LONG SHALL Ø B
M6 88.9 MM 101.6 MM
BE USED.
M 10 139.7 MM 152.4 MM
SPLICE 40 d @ MIDSPAN
SEISMIC ANALYSIS M 12 190.5 MM 215.4 MM
SPLICE 32db @ 2h FROM
THE FACE OF SUPPORT
M 16 228.6 MM 254.0 MM WHERE:
CONFORM TO UNIFORM BUILDING CODE 1994, ZONE = 4 db = BAR DIAMETER 10 MMØ CONFINEMENT
SOIL BEARING CAPACITY_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3000 psf (144 Kpa)
M 20 266.7 MM 317.5 MM TYPICAL DETAIL OF h = DEPTH PF BEAM TIES SPACED @ 100MM
M 25 368.3 MM 431.8 MM O.C.
TO BE VERIFIDAS PER ACTUAL SOIL CONDITION. M 28 419.1 MM 482.8 MM
BEAMS AND GIRDER SPLICE IN VERTICAL
BARS LOCATE WITHIN
D = 7d FOR M6 TO M20 THE MIDDLE THIRD OF

STEEL BARS D = 8d FOR M25 TO M36


M 32 469.9 MM 546.1 MM CLEAR COLUMN HEIGHT,
LAP 40 BAR DIAMETER
AND STAGGER SPLICE
M 36 520.7 MM 609.6 MM A MIN. DISTANCE OF
USE DEFORMED STRUCTURAL GRADE BARS FOR ALL REINFORCING BARS. 40 BAR DIAMETER, NOT
MORE THAN 33% OF THE

fs = 18,000 (124 mpa) RECOMMENDED SIZES OF 135° STIRRUPS BARS SHALL BE SPLICE
IN ANY ONE LEVEL

fy = 33,000 (228 mpa) BAR SIZE HOOK A OR BENT-UP TOP CONT.


APPROX. H
CONCRETE PROTECTION FOR REINFORCING BARS Ø B
10 MMØ CONFINEMENT
M6 88.9 MM 57.1 MM BOTTOM CONT.
TIES SPACED @ 100MM
THE FOLLOWING SHALL BE THE CLEAR COVER FOR CONCRETE PROTECTION:
M 10 101.6 MM 57.1 MM O.C.
SPLICES 32d @ SUPPORT
FOUNDATIONS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 76 MM. M 12 127 MM 76.2 MM
NOTE: THESE DETAILS ARE APPLICABLE WHEN NOT OTHERWISE SHOWN.

SLAB ON GRADE _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 38 MM. FOR M16 OR SMALLER SIZE BARS M 16 152.4 MM 95.2 MM FLOOR BEAM,
M 20 177.8 MM 114.3 MM TIE BEAM OR
SURFACE EXPOSED WEATHER_ _ _ _ _ _ _ _ _ _ _ _ _ _ 50 MM. FOR M20 OR LARGER SIZE BARS FOOTING BEAM
COLUMNS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 38 MM.
TYPICAL SLAB DETAIL
NOTE: 10 MMØJOINT
BEAMS & GIRDERS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 38 MM. WHEN SUPPORTING BARS ARE USED STIRRUP HOOKS TIES SPACED
MAYBE BENT TO THE DIAMETER OF THE SUPPORT BARS. @ 100MM O.C.
SUSPENDED SLABS & STAIRS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 19 MM. TYPICAL COLUMN
WALLS_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _19 MM. DETAIL
REINFORCING STEEL BARS
ALL REINFORCING BARS UNLESS OTHERWISE SHOWN ON PLAN SHALL BE BILLET STEEL "INTERMEDIATE" IN
ACCORDANCE WITH ASTM SPECIFICATIONS DESIGNATION A - 15 WITH DEFORMATION CONFORMING WITH ASTM SPECIFICATIONS 4-Ø12@ 1800 LONG TOP BARS BEND
MAIN REINFORCEMENT
DESIGNATION A - 36 Mpa. ALL SPLICES SHALL BE WIRED TOGETHER & SHALL LAP OR EXTEND TO A MINIMUM OF 32 X DIAMETER. UNLESS
SHOWN OTHERWISE. VERTICAL BARS SPLICES LOCATION SHALL BE STAGGERED FOR BEAMS & GIRDERS, SPLICE TOP BARS @
MID-SPAN, BOTTOM BARS @ SUPPORT BEND BARS @ BEND POINT IN SUPER STRUCTURES. ALL REINFORCING BEAMS SHALL BE FREE
Ø12x1000 LONG AT MID-DEPTH Ø12x1000 LONG AT MID-DEPTH
FROM OIL OR OTHER SUBSTANCES THAT TENDS TO WEAKEN BOND STRENGTH. OF WALL AT EACH CORNER OF WALL AT EACH CORNER

TOLERANCE IN PLACING REINFORCEMENTS


UNLESS OTHERWISE SPECIFIED BY THE ENGINEER, REINFORCEMENT SHALL BE PLACED IN 1-Ø12 TOP &
4-12MMØ @
BOT. BARS
1800 LONG
SPECIFIED POSITIONS WITH THE FOLLOWING TOLERANCES: 1- Ø16
EACH FACE
TOP BARS
(TYPICAL) 38 MM CLEAR
BEND DOWN
1. DEPTH "D" IN FLEXURAL MEMBERS, WALLS & COLUMNS WHERE "D" IS 600 MM. OR LESS ±6 MM. INTO EDGE
IN TWO WAY BEAM,
SLAB, EXTEND EXTENDED
2. DEPTH "D" IN FLEXURAL MEMBERS & COLUMNS WHERE "D" IS 600 MM. ±12 MM. BARS UP TO
BARS MIN. OF
BEAM SUPPORT
1200 (4')
3. LONGITUDINAL LOCATION OF BENDS & END OF BARS ±50 MM. EXCEPT SPECIFIED CONCRETE TYPICAL SLAB OPENING DETAIL

TYPICAL EXTERIOR WINDOWS & DOOR OPENING SLEEVELESS FOR UTILITY PROVIDE 3-10Ø EXTRA 4-Ø12 BOT BARS
COVER @ END OF MEMBERS SHALL BE REDUCED. PIPE MAX., D/5 STRRUPS EACH SIDE OF
SLEEVES
REINFORCING BAR ARRANGEMENT
WHEN A BEAM CROSSES A GIRDER, REST BEAM BARS ON TOP OF GIRDER BARS, REINFORCING
TYPICAL DETAIL FOR SLEEVES TYPICAL CORNER SLAB DETAIL
BARS SHALL BE SYMMETRICAL ABOUT THE CENTER LINE WHEREVER POSSIBLE & UPPER LAYERS SHALL BE
THRU CONCRETE BEAM

ARCHITECT - IN - CHARGE RA 9226 ART. 4 SEC. 33 ENGINEER: PROJECT TITLE: OWNER: SHEET CONTENT: SHEET NO.:
DRAWN BY: DATE:
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OF SEALED, AS INSTRUMENTS OF SERVICE,
LHEA MAY P. SARGUET
RCHI ARE THE INTELLECTUAL PROPERTY AND DOCUMENTS OF THE

BUIL DESIGN PRC #:


ARCHITECT

DATE:
ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO
DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN
THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS,
WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN PRC #:
ENGINEER

DATE:
2 STOREY RESIDENTIAL BUILDING SARGUET FAMILY
CHECKED BY: DATE:
GENERAL NOTES
S-1

1-6
CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
PTR #: DATE: PLACE: PTR #: DATE: PLACE: REVISED BY: DATE:
LOCATION: ADDRESS: CUPANG, PANDI, BULACAN
TIN #: UAP #: TIN #: PICE #:

You might also like