BESCOM - Part-II - ML&C Statement
BESCOM - Part-II - ML&C Statement
General Works
Labour Charge
Material
Complete (Including
SL No Particulars Unit Rate in
Erection, Excavation &
Rs
Fixing) in Rs
I RCC Pole
a) RCC Pole - 9.5 Mtr Long, 300 Kg WL for 33 kV Lines No 7627 1736
b) RCC Pole - 9 Mtr Long, 145 Kg WL No 7153 1341
c) RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section No 8226 1341
d) RCC Pole - 8 Mtr Long, 115 Kg WL No 5306 1072
II PSCC Pole
a) PSCC Pole - 11 Mtr Long, 365 Kg WL for intermediate poles only No 7874 1964
b) PSCC Pole - 9 Mtr Long, 200 Kg WL No 4276 1341
c) PSCC Pole - 9 Mtr Long, 300 Kg WL No 5050 1341
d) PSCC Pole - 8 Mtr Long, 140 Kg WL No 2496 1072
e) PSCC Pole - 8 Mtr Long, 200 Kg WL No 3578 1072
III Pre - Stressed Tubular Spun Pole
a) Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500 Kg WL No 16850 3337
IV Double Pole Structure complete including 5 Kg, 8 SWG GI Wire for Structure Grounding
a) 9M RCC Pole Set 21369 4114
b) 8M RCC Pole Set 17675 3926
c) 9M PSCC Pole with 300 Kg WL Set 17163 4114
V 3 Pole structure complete including 5 Kg, 8 SWG GI Wire for Structure Grounding
a) 9M RCC Pole Set 36273 7933
b) 9M PSCC Pole with 300 Kg WL Set 29964 7933
Double Pole Transformer Structure complete with cross arms, braces, clamps, bolts & nuts and
VI
washers including 2 No of Poles
For 25/63/100 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr
a) Set 28518 5205
Long, 300 Kg WL - MS
For 25/63/100 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr
b) Set 35286 5205
Long, 300 Kg WL - GI
For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr
c) Set 32553 5205
Long, 145 Kg WL - MS
For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr
d) Set 39271 5205
Long, 145 Kg WL - GI
For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr
e) Set 33723 5361
Long, 300 Kg WL - MS
For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr
f) Set 42379 5361
Long, 300 Kg WL - GI
For 100/300 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long,
g) Set 37594 5361
145 Kg WL - MS
For 100/300 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long,
h) Set 46150 5361
145 Kg WL - GI
Single Pole Mounted Transformer (SPMT) Kit for erection on 9 Mtr Square section RCC/PSCC 9 Mtr
VII
Long Pole (Excluding Pole and erection of poles )
For 25/63 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long,
a) Set 7206 1286
150 Kg WL Sq Section Without H Frame - MS
For 25/63 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long,
b) Set 10027 1286
150 Kg WL Sq Section Without H Frame - GI
For 25/63 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long,
c) Set 12283 1286
150 Kg WL Sq Section With H Frame - MS
For 25/63 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long,
d) Set 16902 1286
150 Kg WL Sq Section With H Frame - GI
For 25 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300
e) Set 7446 1993
Kg WL Without H Frame - MS
For 25 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300
f) Set 10338 1993
Kg WL Without H Frame - GI
For 25kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300
g) Set 12722 1993
Kg WL With H Frame - MS
For 25kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300
h) Set 17471 1993
Kg WL With H Frame - GI
Fixing Single Pole Mounted Transformer (SPMT) Kit on 11 Mtr Spun Pole (Excluding Pole and erection
VIII
of poles)
1 of 4
Labour Charge
Material
Complete (Including
SL No Particulars Unit Rate in
Erection, Excavation &
Rs
Fixing) in Rs
Single H Frame with Transformer Seating and Seating angle support
a) Set 26528 2571
cross arm for 11 Mtr Spun Pole for 25 kVA (OH Line) - MS
Single H Frame with Transformer Seating and Seating angle support
b) Set 35861 2571
cross arm for 11 Mtr Spun Pole for 25 kVA (OH Line) - GI
Three H Frame with Transformer Seating and Seating angle support
c) Set 36110 2571
cross arm for 11 Mtr Spun Pole for 25 kVA (UG Cable) - MS
Three H Frame with Transformer Seating and Seating angle support
d) Set 48481 2571
cross arm for 11 Mtr Spun Pole for 25 kVA (UG Cable) - GI
IX 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS
a) For RCC Pole Set 668 122
b) For PSCC Pole 140 KG WL Set 655 122
c) For PSCC Pole 200 KG WL Set 664 122
d) For PSCC Pole 300 KG WL Set 671 122
IX 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - GI
a) For RCC Pole Set 870 122
b) For PSCC Pole 140 KG WL Set 854 122
c) For PSCC Pole 200 KG WL Set 865 122
d) For PSCC Pole 300 KG WL Set 875 122
X 11 kV, Horizontal Cross Arm with clamps, bolts, nuts & washers for DC Line - MS
a) For RCC Pole Set 526 102
b) For PSCC Pole 140 KG WL Set 513 102
c) For PSCC Pole 200 KG WL Set 522 102
d) For PSCC Pole 300 KG WL Set 529 102
XI 11 kV, Horizontal Cross Arm with clamps, bolts, nuts & washers for DC Line - GI
a) For RCC Pole Set 683 102
b) For PSCC Pole 140 KG WL Set 667 102
c) For PSCC Pole 200 KG WL Set 678 102
d) For PSCC Pole 300 KG WL Set 688 102
XII LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS
a) For RCC Pole Set 439 122
b) For PSCC Pole 140 KG WL Set 426 122
c) For PSCC Pole 200 KG WL Set 435 122
d) For PSCC Pole 300 KG WL Set 442 122
XIII LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - GI
a) For RCC Pole Set 571 122
b) For PSCC Pole 140 KG WL Set 555 122
c) For PSCC Pole 200 KG WL Set 566 122
d) For PSCC Pole 300 KG WL Set 576 122
XIV LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MS
a) For RCC Pole Set 274 122
b) For PSCC Pole 140 KG WL Set 261 122
c) For PSCC Pole 200 KG WL Set 270 122
d) For PSCC Pole 300 KG WL Set 277 122
XV LT 2 Pin Aross Arm with clamps, bolts, nuts & washers with braces - GI
a) For RCC Pole Set 357 122
b) For PSCC Pole 140 KG WL Set 341 122
c) For PSCC Pole 200 KG WL Set 352 122
d) For PSCC Pole 300 KG WL Set 362 122
LT Cross Arm for vertical configuration with clamps, bolts,
XVI Set 968 122
nuts & washers (MS)
2 of 4
Labour Charge
Material
Complete (Including
SL No Particulars Unit Rate in
Erection, Excavation &
Rs
Fixing) in Rs
XVII HT Single Top Support with bolts, nuts & washers (MS) Set 143 81
XVIII LT Single Top Support with bolts, nuts & washers (MS) Set 113 81
XIX Insulator
a) 11 kV Ceramic Pin insulator with GI pin No 145
b) No. 15 Strain Insulator No 55
c) No. 8 Strain Insulator No 25
d) 1.1 kV Ceramic Pin Insulator With GI pin No 65
Included in stringing
e) 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) No 221
3 of 4
Labour Charge
Material
Complete (Including
SL No Particulars Unit Rate in
Erection, Excavation &
Rs
Fixing) in Rs
a) LT Distribution Box for 100 kVA DTC with MCCB's (Sheet Metal) No 22809 576
b) LT Distribution Box for 250 kVA DTC with MCCB's (Sheet Metal) No 22937 576
XXX 11 kV, GOS
a) 200 Amps, Single Break Set 9125 805
b) 400 Amps, Double Break Set 20528 894
XXXI 11 kV, Solid Core HG Fuse Unit Set (3 Nos) 1032 178
XXXII 11 kV, DOLO Cutout Set (3 Nos) 5672 178
XXXIII Lightning Arrester
a) 9 kV, 5 kA Metal Oxide Ceramic Type with ground disconnector Set (3 Nos) 975 90
b) 9 kV, 5 kA Polymeric Type with Ground disconnector Set (3 Nos) 1736 90
XXXIV Transformer grounding
GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick
Per
a) with bolts nuts, GI Strips and washers complete 1733 725
Electrode
Minimum Weight of GI Pipe: 7.3 Kgs
b) Rod Type Set 2253 725
XXXV Concreting with Material & Labour
A Base concreting CC 1:4:8
a) For 11/9.5/9/8 Mtr Pole (500x650x150 mm) Each - 273
b) For 9 Mtr Square Pole (650x650x150 mm Each - 354
c) For 11 Mtr Spun Pole (1000x1000x150 mm) Each - 840
B Pole concreting CC 1:2:4 (without coping)
a) For 9.5 Mtr Pole (650x500x1850 mm) Each - 3436
b) For 9 Mtr Pole (650x500x1700 mm) Each - 3158
c) For 9 Mtr Square Pole (650X650x1700 mm) Each - 3956
d) For 11 Mtr Spun Pole (1000x1000x2500 mm) Each - 14004
e) For 11 Mtr PSCC Pole (650x500x2000 mm) Each - 3349
f) For 7.5/8 Mtr Pole (400x400x1500 mm) Each - 1209
Guy concreting with Boulders, Mud & Sand
g) Each - 200
As per Drawing No. BESCOM/GM/CP/7 Dt: 24.10.07
C Providing Coping for Poles with CC 1:2:4 (As per actuals)
a) 150 mm around pole for an height of 300 mm for RCC/PSCC Pole Each - 542
b) 390 mm all around the pole for an height of 300 mm for Spun Pole Each - 2220
D Guy concreting in Marshy area:
Providing cement concrete 1:2:4 for Anchor Rod in Marshy/Black Cotton
a) Each - 881
Soil 600x600x450 mm
XXXVI 11 kV, 3 Core XLPE HT UG Cable (Round Armoured)
a) 95 Sqmm, (54 GI Wires - 2.5 mm Dia) KM 1115615 45284
b) 120 Sqmm, (57 GI Wires - 2.5 mm Dia) KM 1380252 45284
c) 150 Sqmm, (59 GI Wires - 2.5 mm Dia) KM 1586343 45284
d) 185 Sqmm, (51 GI Wires - 3.15 mm Dia) KM 1658484 47800
e) 240 Sqmm, (55 GI Wires - 3.15 mm Dia) KM 2069302 47800
f) 300 Sqmm, (58 GI Wires - 3.15 mm Dia) KM 2335065 50314
g) 400 Sqmm, (51 GI Wires - 4 mm Dia) KM 3096132 50314
Providing Electronic Trivector Meter with associated CT's Metering Box etc., on LT side of
XXXVII
Distribution Transformer Center (including cost of Energy Meter)
a) For 15/25 kVA DTC with CT Ratio 50/5 Amps Set 9589 1448
b) For 50/63 kVA DTC with CT Ratio 100/5 Amps Set 8890 1448
c) For 100 kVA DTC with CT Ratio 150/5 Amps Set 8407 1448
d) For 250 kVA DTC with CT Ratio 400/5 Amps Set 8665 1448
e) For 500 kVA DTC with CT Ratio 800/5 Amps Set 8845 1448
4 of 4