CCAC Installation Checklist Page 2
CCAC Installation Checklist Page 2
(Direct Expansion/ R-22 & 410A Models -WM, FM, CM, CC, CCld & Multi Split Units)
TO BE ACOMPLISHED PRIOR TO TURNOVER TO CUSTOMER SERVICE
NOTE: COMPLETE INFORMATION IS REQUIRED TO EXPEDITE THE RELEASE OF THE WARRANTY CERTIFICATE
IMPORTANT!
Was any part of this installation completed outside the standards of the current CCAC Bluebook? Yes No
If yes, has a customer waiver been attached for all items outside the standard? Yes No
A. Location of the Installation Area: sqms..
Residential Commercial Area Industrial Area Others (Specify)
B. CDU Accessible and following Safety Standards Yes No Needed equipment or action if not:
FCU Accessible and following Safety Standards Yes No Needed equipment or action if not:
C. Were there any pre-existing elements such as refrigerant piping, drain lines, unit brackets or platforms used as part of this declared installation?
Yes No Specify:
If Yes, give details as to who installed it, its age and current condition.
If Yes, what type of AC unit used this elements (brand/model/capacity)?
D. Drain Line with P-trap with Plugged Tees Yes No Size of Drain Pipe: inch. Number of connections
For Cassette Units - What is the Height of the Drain Line Vertical Riser? inches
E. Electrical Connections to the Unit are Correctly Tightened Yes No
F. There is Weatherproofing of the Circuit Breakers or Safety Switches (required when exposed to the elements) Yes No
G. Circuit Breaker (Brand & Rating):
H. Wire Size: Control Wiring Size: Type: Length:
Power Supply Wiring Size: Type: Length:
Ground Wiring Size: Type: Length:
I. Refrigerant Pipe Sizes: Suction - Diameter: Length:
Liquid - Diameter: Length:
Were the Pipes Embedded? Yes No Are the flare connection & wielded joints accessible? Yes No
Number of Elbows Used: Vertical Separation Length:
Amount of Additional Refrigerant Charge (If any) grams
J. Refrigerant Pipe Insulation Thickness: Suction Line: Liquid Line:
K. Space Clearances - Facing the Unit (Inches):
Fan Coil Unit: Left Side: Above: Right Side:
Condensing Unit: Left Side: Above: Right Side: Behind:
L. Surrounding Area: Free from damages / Clean and organized Site still under construction
OPERATING PARAMETERS (SHOULD BE TAKEN AFTER THE UNIT HAS BEEN OPERATING FOR A MINIMUM OF 30 MINS.)
M. Unit Hertz Reading / Temp Setting (Inverter Only): /
N. Unit Operating Voltage Reading: For 3 Phase L1 L2 L3
O. Unit Operating Current Reading: For 3 Phase L1 L2 L3
P. Unit Operating Pressures: Suction Pressure psig, Liquid Pressure psig @ Ambient Temp. F
Q. FCU Temperature Readings (Degrees C): Off-Coil: C, Discharge: C, Room: C, Return: C
R. CDU Temperature Readings (Degrees C): Ambient: C, In-take: C, Suction: C
REMINDER: PROVIDING FALSE INFORMATION IS A GROUND FOR DISQUALIFICATION UNDER THE CCAC CERTIFIED INSTALLER PROGRAM
*Please submit this document together with the supplementary form*