0% found this document useful (0 votes)
258 views

Forms - Inspection and Pre-Start-up Request Checklist

start up

Uploaded by

Nova Casty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
258 views

Forms - Inspection and Pre-Start-up Request Checklist

start up

Uploaded by

Nova Casty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
BaikIN DAIKIN AIRCONDITIONING PHILIPPINES, INCORPORATED INSPECTION AND PRE-START UP REQUEST CHECKLIST ‘COMPLETION Fu ves_|_no CLEAN AREA FIKED CIRCUIT BREAKER FIXED POWER SUPPLY RAIN TRANSMISSION WIRE uct accu CLEAN AREA FIXED CIRCUIT BREAKER FIXED POWER SUPPLY ‘TRANSMISSION WIRE uct PRE-HEAT (FOR VRV ONLY) ‘AVAILABILITY ACCESSORIES ves | no REMOTE CONTROL REFRIGERANT (BRANDED) GAUGE MANIFOLD WEIGHING SCALE (O1GITA) REMARKS. TO BE FILED UP BY REQUESTING PARTIES: NAME OF PROJECT: COMPLETE ADDRESS: INSTALLER REPRESENTATIVE ON SITE: REQUESTED DATE OF INSPECTION OR START UP: INSTALLER CONTACT No, ‘TPE OF AIRCONDITION vavjary. SINGLE SPLIT/QTY. REQUESTED By: SIGNATURE: ‘TO BE FILLED UP BY INSTALLATION SUPPORT DEPARTMENT OF DAIKIN APPROVED DATE AND TIME OF INSPECTION / START UP: [APPROVED BY: SIGNATURE: TERMS AND CONDITIONS ‘To DAI OFFICE Jo NSALLATEN SUPPORT DEPARTMENT ‘4, REQUESTED DATE OF INSPECTION OR START UP MUST BE AT LEAST THREE (3) WORKING DAYS AHEAD PROJECT LOCATION SYSTEM N 4 MODULE NAME ; OUTDOOR UNIT MODEL SERIAL NO. ACCU TAG 2 3 INDOOR UNIT MODEL NO.: SERIAL NO.: FCU TAG |S ]o}on] a }oofno| =

You might also like