ITP-Line Hardware - Type Test
ITP-Line Hardware - Type Test
Type Sample
Legend:
W = Witness [by SEC/National Grid SA Engineers. and/or SEC approved 3rd Party Independent Inspection Agency (IIA) Inspector]
RC = Review of Certificates [by SEC/National Grid SA Engineers. and/or approved 3rd Party Independent Inspection Agency (IIA) Inspector]
General instructions:
1- Manufacturer’s compliance shall be indicated in front of each test.
2- Approved Data Schedule & final drawings for the equipment / Material shall be attached.
3- Test Procedure & Day-to-day activity schedule shall be attached for approval.
4- The ITP must be duly signed and stamped by manufacturer's authorized personnel.
5- This document is valid for testing after S&SD approval.
Prepared by (Mfr's authorized QC test inspector) Approved by: (Mfr's authorized QA/QC personnel)
Date:
Date:
Manufacturer Stamp
S&SD Approval