Civil Guruji Estimation
Civil Guruji Estimation
2 Excavation
F1 16 2.40 2.40 1.50 138.24
F2 8 2.10 2.10 1.50 52.92
Excavation Qty 191.16
3 Sand Filling
F1 16 2.40 2.40 0.10 9.22
F2 8 2.10 2.10 0.10 3.53
Sand Filling Qty 12.74
4 PCC
F1 16 2.40 2.40 0.10 9.22
F2 8 2.10 2.10 0.10 3.53
PCC Qty 12.74
5 Footing Concrete
F1
Rectangle 16 1.80 1.80 0.25 12.96
Trapezoial 16 0.45 0.60 0.15 3.56
F2
Rectangle 8 1.50 1.50 0.20 3.60
Trapezoial 8 0.45 0.60 0.10 0.88
Footing Qty (M25) 21.00
15 Bitumen Coat
GB1 6 2.50 0.25 3.75
GB2 4 3.40 0.25 3.40
GB3 4 1.50 0.25 1.50
GB4 6 2.05 0.25 3.08
GB5 4 2.40 0.25 2.40
GB6 2 3.50 0.25 1.75
GB7 2 3.35 0.25 1.68
GB8 2 2.55 0.25 1.28
GB9 6 3.25 0.25 4.88
GB10 2 1.60 0.25 0.80
GB11 2 0.80 0.25 0.40
GB12 2 2.65 0.25 1.33
GB13 2 2.50 0.25 1.25
GB14 2 2.20 0.25 1.10
GB16 3 2.40 0.25 1.80
Bitumen Coat 30.38
19 Floor PCC
A1 2 3.40 2.80 0.10 1.90
A2 2 2.05 2.80 0.10 1.15
A3 2 2.05 1.25 0.10 0.51
A4 4 2.20 1.08 0.10 0.95
A5 2 3.25 2.40 0.10 1.56
A6 2 2.80 3.50 0.10 1.96
A7 2 3.25 2.70 0.10 1.76
A8 2 3.25 1.35 0.10 0.88
A9 1 2.40 3.45 0.10 0.83
A10 1 2.40 1.75 0.10 0.42
A11 1 2.40 2.70 0.10 0.65
Floor PCC 12.56
Deduction
MD -1 1.20 0.20 0.10 -0.02
D1 -4 1.05 0.20 0.10 -0.08
D2 -2 0.90 0.20 0.10 -0.04
D2 -6 0.90 0.10 0.10 -0.05
D3 -4 0.75 0.10 0.10 -0.03
Deduction -0.23
Sill Band Concrete 1.32
Deduction
MD -1 2.40 0.10 -0.24
D1 -4 2.10 0.10 -0.84
D2 -2 1.80 0.10 -0.36
D2 -6 1.80 0.10 -1.08
D3 -4 1.50 0.10 -0.60
Deduction -3.12
Sill Band Shuttering 16.02
39 Slab Concrete
S1 2 3.40 2.80 0.125 2.38
S2 2 2.05 2.80 0.125 1.44
S3 2 2.05 1.25 0.125 0.64
S4 4 2.20 1.08 0.125 1.18
S5 2 3.25 2.40 0.125 1.95
S6 2 2.80 3.50 0.125 2.45
S7 2 3.25 2.70 0.125 2.19
S8 2 3.25 1.35 0.125 1.10
S10 1 2.40 1.75 0.125 0.53
S11 1 2.40 2.45 0.125 0.74
Slab Concrete 14.59
40 Slab Shuttering
S1 2 3.40 2.80 19.04
S2 2 2.05 2.80 11.48
S3 2 2.05 1.25 5.13
S4 4 2.20 1.08 9.46
S5 2 3.25 2.40 15.60
S6 2 2.80 3.50 19.60
S7 2 3.25 2.70 17.55
S8 2 3.25 1.35 8.78
S10 1 2.40 1.75 4.20
S11 1 2.40 2.45 5.88
Slab Slab Shuttering 116.71
41 Chhajja Concrete
W1 (1.5 x 1.2) 4 1.7 0.6 0.1125 0.459
W2 (0.9 x 1.2) 8 1.1 0.6 0.1125 0.594
Chhajja Concrete 1.053
42 Chhajja Shuttering
W1 (1.5 x 1.2)
Bottom face 4 1.7 0.60 4.08
Front face 4 1.7 0.10 0.68
Left & Right face 8 0.60 0.1125 0.54
W2 (0.9 x 1.2)
Bottom face 8 1.1 0.60 5.28
Front face 8 1.1 0.10 0.88
Left & Right face 16 0.60 0.1125 1.08
Chhajja Shuttering 12.54
44 Staircase Concrete
Waist Slab 2 2.62 1.175 0.15 0.92
Steps 18 1.175 0.25 0.15 0.40
Landing 1 2.40 1.20 0.15 0.43
Mid-Landing Beam 1 2.40 0.25 0.35 0.21
Volume of Extra Space 1 1.175 0.291 0.175 0.03
Staircase Concrete 1.99
45 Staircase Shuttering
Waist Slab Bottom 2 2.62 1.175 6.16
Waist Slab Side Face 4 2.62 0.30 3.14
Bottom face of Landing 1 2.40 1.175 2.82
Landing Side Face 2 1.20 0.15 0.36
Mid-Landing Beam
Bottom Face 1 2.40 0.25 0.60
Back Face 1 2.40 0.35 0.84
Inner Face 1 2.40 0.20 0.48
Riser 19 1.175 0.15 3.35
Staircase Shuttering 17.75
Finishing Works
Plastering
46 6mm Plaster (Slab)
Bedroom 2 3.00 3.60 21.60
Toilet 4 2.40 1.20 11.52
Master Bed Room 2 3.60 3.00 21.60
Kitchen 2 2.10 3.00 12.60
Hall 2 3.30 5.25 34.65
Corridor 1 2.40 3.70 8.88
Entrance Passage 1 2.40 1.30 3.12
Front Balcony 2 3.70 1.60 11.84
Rear Balcony 2 2.55 1.50 7.65
Stair Case
Waist Slab 2 2.62 1.175 6.16
Landing Bottom 1 2.40 1.25 3.00
Side Face of Waist Slab 2 2.62 0.15 0.79
Side Face of Step 18 0.25 0.15 0.34
Chhajja
Top
W1 4 1.70 0.60 4.08
W2 8 1.10 0.60 5.28
Bottom
W1 4 1.70 0.60 4.08
W2 8 1.10 0.60 5.28
Side Face (Left & Right)
W1 8 0.60 0.1125 0.54
W2 16 0.60 0.1125 1.08
Front
W1 4 1.70 0.10 0.68
W2 8 1.10 0.10 0.88
6mm Plaster (Slab) 165.64
Deduction
D1 -2 1.05 2.10 -4.41
D2 -8 0.90 2.10 -15.12
D3 -4 0.75 2.10 -6.30
50 % Deduction -12.915
15mm Plaster - Inner 143.20
Deduction
MD -1 1.20 2.10 -2.52
D1 -2 1.05 2.10 -4.41
D2 -2 0.90 2.10 -3.78
W1 -6 1.50 1.20 -10.80
W2 -10 0.90 1.20 -10.80
V
50 % Deduction -16.16
15mm Plaster - Outer Qty 200.69
Painitng
50 White wash
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
15mm Plastering Surface - Outer 200.69
White wash Qty 774.90
51 Putty
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
Putty Qty 574.21
52 Inner Paint
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
Inner Paint Qty 574.21
53 Outer Paint
15mm Plastering Surface - Outer 200.69
Outer Paint Qty 200.69
Flooring
54 Kota Stone
Flooring
Front Balcony 2 3.70 1.60 11.84
Rear Balcony 2 2.55 1.50 7.65
Flooring 19.49
Dado / Skirting
Front Balcony (x-direction) 2 3.50 0.15 1.05
Front Balcony (y-direction) 2 0.80 0.15 0.24
Rear Balcony (x-direction) 2 2.55 0.15 0.765
2.055
Deduction
D1 -2 1.05 0.15 -0.315
D2 -2 0.9 0.15 -0.27
-0.585
Dado / Skirting 1.47
Kota Stone Qty 20.96
55 Vitrified Tiles
Flooring
Staircase Below 1 2.40 3.50 8.40
Corridor 1 2.40 3.70 8.88
Entrance Passage 1 2.40 1.30 3.12
Hall 2 3.30 5.25 34.65
Bedroom 2 3.00 3.60 21.60
Master Bedroom 2 3.60 3.00 21.60
Kitchen 2 2.10 3.00 12.60
Flooring 110.85
Dado / Skirting
Staircase Below
x-direction 1 2.40 0.15 0.36
y-direction 2 3.50 0.15 1.05
Corridor
x-direction 1 2.40 0.15 0.36
y-direction 2 3.70 0.15 1.11
Entrance Passage
x-direction 1 2.40 0.15 0.36
y-direction 2 1.30 0.15 0.39
Hall
x-direction 4 3.30 0.15 1.98
y-direction 4 5.25 0.15 3.15
Bedroom
x-direction 4 3.00 0.15 1.80
y-direction 4 3.60 0.15 2.16
Master Bedroom
x-direction 4 3.60 0.15 2.16
y-direction 4 3.00 0.15 1.80
16.68
Deduction
MD -2 1.20 0.15 -0.36
D1 -6 1.05 0.15 -0.95
D2 -10 0.90 0.15 -1.35
D3 -4 0.75 0.15 -0.45
-3.11
Dado / Skirting 13.58
Vetrified Tile Qty 124.43
56 Ceramic Tiles
Flooring
Toilet 4 2.40 1.20 11.52
Flooring 11.52
Dado / Skirting
Toilet
x-direction 8 2.40 2.10 40.32
y-direction 8 1.20 2.10 20.16
Kitchen
x-direction 4 2.10 2.10 17.64
y-direction 4 3.00 2.10 25.20
Staircase
Sidewall near Riser & Treads 18 0.25 0.9 4.05
Staircase Landing
x-direction 1 2.40 0.90 2.16
y-direction 2 1.25 0.90 2.25
111.78
Deduction
D2 -4 0.90 2.10 -7.56
D3 -4 0.75 2.10 -6.30
W2 -2 0.90 1.20 -2.16
-16.02
Dado / Skirting 95.76
Ceramic Tiles Qty 107.28
57 Granite
Entrance Step
Tread 6 2.4 0.275 3.96
Riser 6 2.4 0.15 2.16
Entrance Step 6.12
Window Sill
W1 6 1.50 0.20 1.80
W2 10 0.9 0.20 1.80
Window Sill 3.60
Door Threshold
MD 1 1.20 0.20 0.24
D1 4 1.05 0.20 0.84
D2 (200mm Wall) 2 0.90 0.20 0.36
D2 (100mm Wall) 6 0.90 0.10 0.54
D3 4 0.75 0.10 0.30
Door Sill 2.28
Staircase
Tread 18 1.175 0.275 5.82
Riser 20 1.175 0.15 3.53
Landing 1 2.40 1.25 3.00
Staircase 12.34
Granite Qty 24.34
Doors
58 Door Frame
Wodden Sal wood Frame
MD 1 0.125 0.075 5.4 0.05
D1 4 0.125 0.075 5.25 0.20
D2 8 0.125 0.075 5.1 0.38
Wodden Sal wood Frame 0.63
59 Door Frame
FRP
D3 4 4.95 19.8
Door Frame(FRP) 19.8
Windows
64 Aluminium Fixed Frame
W1 6 Unit Wt.
Bottom Section 6 1.50 1.037 9.33
Top Section 6 1.50 0.855 7.70
Left & Right Section 12 1.20 0.825 11.88
W2 10
Bottom Section 10 0.90 1.037 9.33
Top Section 10 0.90 0.855 7.70
Left & Right Section 20 1.20 0.825 19.80
Aluminium Fixed Frame 65.74
W2 10
Top & Bottom Section 60 0.405 0.557 13.54
Vertical Section with Lock 20 1.20 0.566 13.58
Vertical Section without Lock 40 1.20 0.557 26.74
Aluminium Sliding Frame 91.58
66 Glass
W1 12 0.75 1.20 10.80
W2 20 0.45 1.20 10.80
Glass 21.60
68 Window Grills
W1 6
Wt. of Horizontal Plate (35mm x 5mm) 12 1.50 0.035 0.005 24.73
Wt. of Vertical Plate (35mm x 5mm) 12 1.20 0.035 0.005 19.78
Wt. of Horizontal Rod (10mm x 10mm) 12 1.50 0.01 0.01 14.13
Wt. of Vertical Rod (10mm x 10mm) 84 1.20 0.01 0.01 79.13
Wt. of Hold Fastener 48 0.10 0.035 0.005 6.59
W2 10
Wt. of Horizontal Plate (35mm x 5mm) 20 0.90 0.035 0.005 24.73
Wt. of Vertical Plate (35mm x 5mm) 20 1.20 0.035 0.005 32.97
Wt. of Horizontal Rod (10mm x 10mm) 40 0.90 0.01 0.01 28.26
Wt. of Vertical Rod (10mm x 10mm) 80 1.20 0.01 0.01 75.36
Wt. of Hold Fastener 80 0.10 0.035 0.005 10.99
V 4
Wt. of Horizontal Plate (35mm x 5mm) 8 0.35 0.035 0.005 3.85
Wt. of Vertical Plate (35mm x 5mm) 8 0.35 0.035 0.005 3.85
Wt. of Horizontal Rod (10mm x 10mm) 4 0.35 0.01 0.01 1.10
Wt. of Vertical Rod (10mm x 10mm) 12 0.35 0.01 0.01 3.30
Wt. of Hold Fastener 16 0.10 0.035 0.005 2.20
Window Grills Qty 330.96
First Floor
Deduction
MD -1 1.20 0.20 0.10 -0.02
D1 -4 1.05 0.20 0.10 -0.08
D2 -2 0.90 0.20 0.10 -0.04
D2 -6 0.90 0.10 0.10 -0.05
D3 -4 0.75 0.10 0.10 -0.03
-0.23
Sill Band Concrete 1.32
Deduction
MD -1 2.40 0.10 -0.24
D1 -4 2.10 0.10 -0.84
D2 -2 1.80 0.10 -0.36
D2 -6 1.80 0.10 -1.08
D3 -4 1.50 0.10 -0.60
-3.12
Sill Band Shuttering 16.02
88 Chhajja Concrete
W1 (1.5 x 1.2) 4 1.7 0.6 0.1125 0.459
W2 (0.9 x 1.2) 8 1.1 0.6 0.1125 0.594
Chhajja Concrete Qty 1.053
89 Chhajja Shuttering
W1 (1.5 x 1.2)
Bottom face 4 1.7 0.60 4.08
Front face 4 1.7 0.10 0.68
Left & Right face 8 0.60 0.1125 0.54
W2 (0.9 x 1.2)
Bottom face 8 1.1 0.60 5.28
Front face 8 1.1 0.10 0.88
Left & Right face 16 0.60 0.1125 1.08
Chhajja Shuttering Qty 12.54
90 Staircase Concrete
Waist Slab 2 2.62 1.175 0.15 0.92
Steps 18 1.175 0.25 0.15 0.40
Landing 1 2.40 1.20 0.15 0.43
Mid-Landing Beam 1 2.40 0.25 0.35 0.21
Volume of Extra Space 1 1.175 0.291 0.175 0.03
Staircase Concrete Qty 1.99
91 Staircase Shuttering
Waist Slab Bottom 2 2.62 1.175 6.16
Waist Slab Side Face 4 2.62 0.30 3.14
Bottom face of Landing 1 2.40 1.175 2.82
Landing Side Face 2 1.20 0.15 0.36
Mid-Landing Beam
Bottom Face 1 2.40 0.25 0.60
Back Face 1 2.40 0.35 0.84
Inner Face 1 2.40 0.20 0.48
Riser 19 1.175 0.15 3.35
Staircase Shuttering 17.75
Finishing Works
Plastering
92 6mm Plaster (Slab)
Bedroom 2 3.00 3.60 21.60
Toilet 4 2.40 1.20 11.52
Master Bed Room 2 3.60 3.00 21.60
Kitchen 2 2.10 3.00 12.60
Hall 2 3.30 5.25 34.65
Corridor 1 2.40 3.70 8.88
Entrance Passage 1 2.40 1.30 3.12
Front Balcony 2 3.70 1.60 11.84
Rear Balcony 2 2.55 1.50 7.65
Stair Case
Waist Slab 2 2.62 1.175 6.16
Landing Bottom 1 2.40 1.25 3.00
Side Face of Waist Slab 2 2.62 0.15 0.79
Side Face of Step 18 0.25 0.15 0.34
Chhajja
Top
W1 4 1.70 0.60 4.08
W2 8 1.10 0.60 5.28
Bottom
W1 4 1.70 0.60 4.08
W2 8 1.10 0.60 5.28
Side Face (Left & Right)
W1 8 0.60 0.1125 0.54
W2 16 0.60 0.1125 1.08
Front
W1 4 1.70 0.10 0.68
W2 8 1.10 0.10 0.88
6mm Plaster (Slab) 165.64
Deduction
D1 -2 1.05 2.10 -4.41
D2 -8 0.90 2.10 -15.12
D3 -4 0.75 2.10 -6.30
50 % Deduction -12.915
15mm Plaster - Inner 143.20
Deduction
MD -1 1.20 2.10 -2.52
D1 -2 1.05 2.10 -4.41
D2 -2 0.90 2.10 -3.78
W1 -6 1.50 1.20 -10.80
W2 -10 0.90 1.20 -10.80
V
50 % Deduction -16.16
15mm Plaster - Outer Qty 206.25
Painitng
96 White wash
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
15mm Plastering Surface - Outer 206.25
White wash Qty 780.46
97 Putty
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
Putty Qty 574.21
98 Inner Paint
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
Inner Paint Qty 574.21
99 Outer Paint
15mm Plastering Surface - Outer 206.25
Outer Paint Qty 206.25
Flooring
100 Kota Stone
Flooring
Front Balcony 2 3.70 1.60 11.84
Rear Balcony 2 2.55 1.50 7.65
Flooring 19.49
Dado / Skirting
Front Balcony (x-direction) 2 3.50 0.15 1.05
Front Balcony (y-direction) 2 0.80 0.15 0.24
Rear Balcony (x-direction) 2 2.55 0.15 0.765
2.055
Deduction
D1 -2 1.05 0.15 -0.315
D2 -2 0.9 0.15 -0.27
-0.585
Dado / Skirting 1.47
Kota Stone Qty 20.96
103 Granite
Window Sill
W1 6 1.50 0.20 1.80
W2 10 0.9 0.20 1.80
Window Sill 3.60
Door Threshold
MD 1 1.20 0.20 0.24
D1 4 1.05 0.20 0.84
D2 (200mm Wall) 2 0.90 0.20 0.36
D2 (100mm Wall) 6 0.90 0.10 0.54
D3 4 0.75 0.10 0.30
Door Sill 2.28
Staircase
Tread 18 1.175 0.275 5.82
Riser 20 1.175 0.15 3.53
Landing 1 2.40 1.25 3.00
Staircase 12.34
Granite Qty 18.22
Doors
104 Door Frame
Wodden Sal wood Frame
MD 1 0.125 0.075 5.4 0.05
D1 4 0.125 0.075 5.25 0.20
D2 8 0.125 0.075 5.1 0.38
Wodden Sal wood Frame 0.63
Windows
110 Aluminium Fixed Frame
W1 6 Unit Wt.
Bottom Section 6 1.50 1.037 9.33
Top Section 6 1.50 0.855 7.70
Left & Right Section 12 1.20 0.825 11.88
W2 10
Bottom Section 10 0.90 1.037 9.33
Top Section 10 0.90 0.855 7.70
Left & Right Section 20 1.20 0.825 19.80
Aluminium Fixed Frame 65.74
W2 10
Top & Bottom Section 60 0.405 0.557 13.54
Vertical Section with Lock 20 1.20 0.566 13.58
Vertical Section without Lock 40 1.20 0.557 26.74
Aluminium Sliding Frame 91.58
112 Glass
W1 12 0.75 1.20 10.80
W2 20 0.45 1.20 10.80
Glass 21.60
W2 10
Wt. of Horizontal Plate (35mm x 5mm) 20 0.90 0.035 0.005 24.73
Wt. of Vertical Plate (35mm x 5mm) 20 1.20 0.035 0.005 32.97
Wt. of Horizontal Rod (10mm x 10mm) 40 0.90 0.01 0.01 28.26
Wt. of Vertical Rod (10mm x 10mm) 80 1.20 0.01 0.01 75.36
Wt. of Hold Fastener 80 0.10 0.035 0.005 10.99
V 4
Wt. of Horizontal Plate (35mm x 5mm) 8 0.35 0.035 0.005 3.85
Wt. of Vertical Plate (35mm x 5mm) 8 0.35 0.035 0.005 3.85
Wt. of Horizontal Rod (10mm x 10mm) 4 0.35 0.01 0.01 1.10
Wt. of Vertical Rod (10mm x 10mm) 12 0.35 0.01 0.01 3.30
Wt. of Hold Fastener 16 0.10 0.035 0.005 2.20
Window Grills Qty 345.09
Handrail
115 Staineless Steel Handrail
a Front Balcony Unit Wt. (kg/m)
40mm dia steel pipe (Main pipe) 4 5.74 1.477 33.91
32mm dia steel pipe (Support pipe) 36 0.90 1.067 34.57
18mm dia steel pipe (Distribution Pipe) 12 5.74 0.574 39.54
Base Plate (Bottom) 36 0.1 3.60
Base Plate (Side) 32 0.1 3.20
Front Balcony 114.82
Staircase Tower
Staircase Tower
1 Brick work
A GB1, GB16 1 7.40 0.20 1.80 2.66
Brick work (along GB1, GB16, & Front
1 2.90 0.20 1.98 1.15
side of Staircase)
Brick work Qty 3.81
c Column Shuttering
C1 4 1.30 2.10 10.92
Column Shuttering Qty 10.92
e Beam Shuttering
SB1 2 2.5 0.725 3.63
SB16
Outer 1 2.4 0.725 1.74
Inner 1 2.4 0.6 1.44
Beam Shuttering Qty 6.81
1 Parapet wall
(a) Brickwork 1 53.9 0.2 1 10.78
Total Qty. of Brick work 10.78
(c ) Column Shuttering
C1 10 1.3 1 13.00
C2 4 1.3 1 5.20
Column Shuttering Qty 18.20
3 Plaster
a 6mm plaster
Staircase Tower Slab
TS1 1 2.50 2.80 7.00
TS2 1 2.90 0.65 1.89
Beam 1 2.40 0.6 1.44
6mm plaster Qty 10.33
b 12mm plaster
GB16 (backside) 1 2.50 1.975 4.94
GB16 (frontside) 1 2.50 1.975 4.94
GB1 2 3.55 1.975 14.02
12mm plaster (without deduction) 23.90
Deduciton
D2A -1 0.90 1.975 -0.89
12mm plaster Qty 23.01
c 15mm plaster
Exposed on Wall
Wall on GB1 2 3.95 2.10 16.59
Wall on GB16 1 2.40 2.10 5.04
Wall on GB16 1 2.00 2.10 4.20
Parapet Wall (Inner side) 1 53.90 1.00 53.90
Parapet Wall Column (Outer side) 1 8.00 1.00 8.00
15mm plaster Qty 87.73
d Painting work
a White wash
6mm plaster surface 10.33
12mm plaster surface 23.01
15mm plaster surface 87.73
White wash Qty 121.06
b Putty
6mm plaster surface 10.33
12mm plaster surface 23.01
Puty Qty 33.33
c Inner Paint
6mm plaster surface 10.33
12mm plaster surface 23.01
Inner Paint Qty 33.33
d Outer Paint
15mm plaster surface 87.73
Outer Paint Qty 87.73
Unit Remarks
m2 Extra 1 metre cleaned & levelled along all directions
m2
m3
m3 As per CPWD norms provide extra 300 mm on Length & Breadth
m3
m3 Depth = 100mm
m3
m3
m3 Depth = 100mm
m3
m3
m3
D/3*A1+A2+Sqrt A1+A2
m3
Length = Column Size + 100mm + 100mm
m3 Breadth = Column Size + 100mm + 100mm
m3
m3
m2
m2
m2 Perimeter of the footing as to be considerd
m3
m3 Height = Total Exavated Height - Sand Filling Height - PCC Height - Footing
m3 Height
m3
m2
m2 Bill only till point of Contact
m2
m2
m3
Total Excation - Sand Flling - PCC - Foundation Concrete - Pedestal Column
Concrete
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3 Plinth level (3ft) = Depth of One Line Brick work - Ground Beam Depth - DPC
m3 depth
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3 Plinth level (3ft) = Depth of One Line Brick work - Ground Beam Depth -
m3 Ground Beam Depth
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m3
m3
m3
m2
m2
m2
100mm laying of Brick to avoid moisture capillary action & providing DPC
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3 Since only 100mm is provided only Door Dedcution are considerd
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3 Doubt
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Doubt
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
ng Works
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 W1 = 2
m2 Depth = Full Height of Wall - Thickness of Slab D2 = 2, W2 = 1
m2 D3 = 2
m2 D3 = 2, V = 4
m2 W2 = 4
m2 W1 = 2
m2 D2 = 4, W2= 2
m2 0
m2 D1 = 2, W1 = 2
m2 D1= 2
m2 MD = 1
m2
m2
m2
m2
m2
m2
m2
No Dedcution because area is less than 0.5 sqm
m2 50% dedcution
m2
m2 0
m2 D2 = 2, D3 = 2
m2 0
m2 D2 = 4
m2 D3 = 2, D2 = 2
m2 D1 = 2
m2
m2
m2
m2
m2
m2 50% dedcution
m2 MD = 1, D1 = 2, W1= 4
m2 D2 = 2, W2= 6
m2 W1 = 2, W2 = 4, V = 4
m2
m2
m2
m2
m2
m2
nitng
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
oring
m2
m2
m2
m2 D1 = 2
m2 D2 = 2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 MD = 1
m2 D1 = 2
m2 MD = 1
m2
m2 D1 = 2, D2 =4
m2 D1 = 2, D2 = 2, D3 =2
m2
m2 D2 = 2
m2 D2 = 2, D3 = 2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 D3 = 2
m2 D3 = 2
m2 D2 = 4, W2 = 2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 0.025 extra because of Granite Moulding
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 0.025 extra because of Granite Moulding
m2
m2
m2
oors
m3
m3
m3
m3
m
m
m2
m2
m2
m2
m2
m2
m2
each
each
each
each
each
each
ndows
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m2
m2
m2
m2
m2
m2
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
t Floor
m3
m3
m3
m2
m2
m2
100mm laying of Brick to avoid moisture capillary action & providing DPC
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3 Since only 100mm is provided only Door Dedcution are considerd
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3 Doubt
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Doubt
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
ng Works
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 Depth = Full Height of Wall - Thickness of Slab
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 50% dedcution
m2
m2
m2
m2
m2
m2
m2
m2
m2
nitng
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
oring
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 0.025 extra because of Granite Moulding
m2
m2
m2
oors
m3
m3
m3
m3
m
m
m2
m2
m2
m2
m2
m2
m2
each
each
each
each
each
each
ndows
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m2
m2
m2
m2
m2
m2
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
ndrail
Kg
Kg
Kg
Kg
Kg same as support pipe
Kg
Kg
Kg
Kg
Kg
Kg same as support pipe
Kg
Kg
Kg
Kg
Kg
Kg same as support pipe
Kg
Kg
se Tower
m3
m3
m3
m3
m3
m2
m2
m3
m3
m3
m2
m2
m2
m2
m3
m3
m3
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m2
m2 D2A
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Ground No.
Beam
Length
of Beam
(Clear Span)
GB1 6 2.5
GB2 4 3.4
GB3 4 1.5
GB4 6 2.05
GB5 4 2.4
GB6 2 3.5
GB7 2 3.35
GB8 2 2.55
GB9 6 3.25
GB10 2 1.6
GB11 2 0.8
GB12 2 2.65
GB13 2 2.5
GB14 2 2.2
GB15 2 2.25
GB16 4 2.4
Plinth Beam
No.Length
of Beam
(Clear Span)
PB15 2 2.25
PB16 1 2.4
AreaNo.of filling
L(X-direction)
Area B(Y-direction)
A1 2 3.4 2.8
A2 2 2.05 2.8
A3 2 2.05 1.25
A4 4 2.2 1.075
A5 2 3.25 2.4
A6 2 2.8 3.5
A7 2 3.25 2.7
A8 2 3.25 1.35
A9 1 2.4 3.45
A10 1 2.4 1.75
A11 1 2.4 1.7
For 200mm Wall Deduction
No.of Wall Length
MD D1 D2 D3
GB1 4 2.50
GB2 2 3.40
GB4 2 2.05 -2
GB5 2 2.40
GB6 2 3.50
GB8 2 2.55 -2
GB9 2 3.25 -2
GB12 2 2.65
GB15 2 2.25
GB16 2 2.40 -1
1.35
D1 = 2, W1= 4
W2 = 4, V = 4
32.8
D2 = 2, D3 =2
8.1504
16.0416
13.5351
9.333
7.695
14.85
Reference Data
40mm dia steel pipe (Main pipe) 1.477 Kg
32mm dia steel pipe (Support pipe) 1.067 Kg
18mm dia steel pipe (Distribution Pipe) 0.574 Kg
Base Plate (Bottom) 0.1 Kg
For
Deduction 100mm Deduction
Wall No.of Wall Length
W1 W2 V MD D1 D2 D3 W1
-2 GB1 2 2.50
-4 GB2 2 3.40 -2 -2
-2 GB4 2 2.05 -2
-4 GB5 2 2.40 -2
-4 GB7 2 3.35 -2
GB13 2 2.50
-2 GB14 2 2.20
-2
ction
W2 V
Quantity
Sl.No Description Unit
Ground Floor First Floor
1 Earthwork
Site Cleaning Sqm 282.75 0.00
Excavation Cum 191.16 0.00
Sand Filling Cum 12.74 0.00
Backfilling + Plinth Filling Cum 242.91 0.00
2 Cement Concrete (Plain & Reinforced)
PCC (M-10) Cum 12.74 0.00
Floor PCC (M-15) Cum 12.56 0.00
Footing Concrete M-25 Cum 21.00 0.00
Pedestal Column Concrete M-25 Cum 2.24 0.00
Ground Beam Concrete M-25 Cum 9.63 0.00
Plinth Beam Concrete M-25 Cum 0.52 0.00
Column Concrete for Sub Structure M-25 Cum 2.16 0.00
Column Concrete for Super Structure M-25 Cum 7.20 7.20
Sill Band M-25 Cum 1.32 1.32
Lintel Beam M-25 Cum 3.00 3.00
Slab Beam M-25 Cum 11.45 11.45
Slab M-25 Cum 14.59 14.59
Chhajja Cum 1.05 1.05
Staircase Concrete M-25 Cum 1.99 1.99
Column Concrete for Parapet wall Cum 0.00 1.40
Column concrete for Staircase Tower Cum 0.00 0.84
Staircase Tower Slab Beam Cum 0.00 0.74
Staircase Tower Slab Cum 0.00 1.08
D.P.C for Sub - Structure Sqm 30.38 0.00
D.P.C for Super - Structure Sqm 13.18 13.18
Bitumin coat Cum 30.38 0.00
3 Reinforcement
Below Plinth Level Kg 3909.80 0.00
Above Plinth Level Kg 4465.36 4910.93
4 Formwork
Footing Shuttering Sqm 38.40 0.00
Pedestal Column Shuttering Sqm 29.12 0.00
Ground Beam Shuttering Sqm 77.04 0.00
Plinth Beam Shuttering Sqm 13.86 0.00
Column Shuttering For Sub - Structure Sqm 28.08 0.00
Column Shuttering For Super - Structure Sqm 93.60 93.60
Sill Band Shuttering Sqm 16.02 16.02
Lintel Beam Shuttering Sqm 43.20 43.20
Slab Beam Shuttering Sqm 99.67 99.67
Slab Shuttering Sqm 116.71 116.71
Staircase Shuttering Sqm 17.75 17.75
Chhajja Shuttering Sqm 12.54 12.54
Column Shuttering for Parapet wall Sqm 0.00 18.20
Column Shuttering for Staircase Tower Sqm 0.00 10.92
Staircase Tower Beam Shuttering Sqm 0.00 6.81
Staircase Tower Slab Shuttering Sqm 0.00 9.13
5 Brickwork
One Line Brick Work For Ground Beam Cum 3.21 0.00
Brick Work Up to D.P.C Bottom Cum 14.01 0.00
Entrance Step Cum 1.89 0.00
One Line B.W. For Super Str. 200mm Wall Cum 1.03 1.03
One Line B.W. For Super Str. 100mm Wall Sqm 2.84 2.84
B.W.Up to Sill Band Bottom For 200 mm wall Cum 6.72 6.72
B.W.Up to Sill Band Bottom For 100 mm wall Sqm 18.46 18.46
Brickwork Up to Lintel Level For 200 mm wall Cum 8.09 8.09
Brickwork Up to Lintel Level For 100 mm wall Sqm 34.08 34.08
Brickwork Up to Slab Beam For 200 mm wall Cum 4.03 4.03
Brickwork Up to Slab Beam For 100 mm wall Sqm 12.88 12.88
Parapet Wall Cum 0.00 10.78
Staircase Tower Brick Work Cum 0.00 3.81
6 Plastering Work
6mm Plaster Sqm 165.64 165.64
6mm Plaster on Staircase Tower Slab Sqm 0.00 10.33
12mm Plaster Sqm 265.37 265.37
15mm Inner Plaster Sqm 143.20 143.20
12mm Inner Plaster on Staircase Tower Wall Sqm 0.00 23.01
15mm Outer Plaster Sqm 200.69 206.25
Total Quantity
282.75
191.16
12.74
242.91
12.74
12.56
21.00
2.24
9.63
0.52
2.16
14.40
2.64
5.99
22.89
29.18
2.11
3.99
1.40
0.84
0.74
1.08
30.38
26.36
30.38
3909.80
9376.29
38.40
29.12
77.04
13.86
28.08
187.20
32.04
86.40
199.35
233.42 Staircase (Excluding Landing) Landing
35.50 14.57 14.57 29.14 3.18 3.18 6.36
25.08
18.20
10.92
6.81
9.13
3.21
14.01
1.89
2.07
5.68
13.44
36.92
16.18
68.16
8.05
25.76
10.78
3.81
331.28
10.33
530.75
286.40
23.01
406.93
87.73
1676.41
1181.75
1181.75 Kota
494.66 Ground Floor First Floor Total Quantity
Flooring Skirting Flooring Skirting Flooring Skirting
41.92 19.49 1.47 19.49 1.47 38.98 2.94
42.56
239.04 Vitrified Tiles
107.28 110.85 13.58 102.45 12.17 213.3 25.74
131.47
183.16
43.20
21.60
676.04
235.48
BILL OF QUANTITY
8 Flooring Work
Kota stone slab flooring over 20 mm (average) thick
base laid over and jointed with grey cement slurry mixed
11.26 with pigment to match the shade of the slab, including
rubbing and polishing complete with base of cement
mortar 1 : 4 (1 cement : 4 coarse sand) :
Kg 89.65 ₹ 350,513.13
Kg 89.65 ₹ 840,583.97
Sqm 307.95 ₹ 11,825.28
Kg 531.80 ₹ 97,406.83
Kg 103.70 ₹ 70,105.56
Kg 612.25 ₹ 144,173.02
₹ 8,178,001.45