Civil Guruji Estimation

The document provides details of quantities for various construction items. These include site cleaning, excavation, sand filling, PCC, footing concrete, footing shuttering, pedestal column concrete, pedestal column shuttering, backfilling, one line brick work for ground beam, ground beam concrete, ground beam shuttering, brickwork up to DPC bottom, damp proof course, and bitumen coat. Quantities are calculated based on number of items, length, breadth, depth and other dimensions. The document contains 15 sections listing quantities of individual construction components.

Uploaded by

Eshwar Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
2K views

Civil Guruji Estimation

The document provides details of quantities for various construction items. These include site cleaning, excavation, sand filling, PCC, footing concrete, footing shuttering, pedestal column concrete, pedestal column shuttering, backfilling, one line brick work for ground beam, ground beam concrete, ground beam shuttering, brickwork up to DPC bottom, damp proof course, and bitumen coat. Quantities are calculated based on number of items, length, breadth, depth and other dimensions. The document contains 15 sections listing quantities of individual construction components.

Uploaded by

Eshwar Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 122

Sl Particulars / Description No.

Length Breadth Depth Quantity


1 Site Cleaning 1 19.50 14.50 282.75
Site Cleaning Qty 282.75

2 Excavation
F1 16 2.40 2.40 1.50 138.24
F2 8 2.10 2.10 1.50 52.92
Excavation Qty 191.16

3 Sand Filling
F1 16 2.40 2.40 0.10 9.22
F2 8 2.10 2.10 0.10 3.53
Sand Filling Qty 12.74

4 PCC
F1 16 2.40 2.40 0.10 9.22
F2 8 2.10 2.10 0.10 3.53
PCC Qty 12.74

5 Footing Concrete
F1
Rectangle 16 1.80 1.80 0.25 12.96
Trapezoial 16 0.45 0.60 0.15 3.56
F2
Rectangle 8 1.50 1.50 0.20 3.60
Trapezoial 8 0.45 0.60 0.10 0.88
Footing Qty (M25) 21.00

6 Footing Shuttering Sum of all sides


F1 16 7.2 0.25 28.8
F2 8 6.0 0.20 9.60
Footing Shuttering Qty 38.4

7 Pedestal Column Concrete


F1C1 16 0.25 0.40 0.90 1.44
F2C1 4 0.25 0.40 1.00 0.40
F2C2 4 0.25 0.40 1.00 0.40
Pedestal Column Concrete Qty 2.24

8 Pedestal Column Shuttering Sum of all sides


F1C1 16 1.30 0.90 18.72
F2C1 4 1.30 1.00 5.20
F2C2 4 1.30 1.00 5.20
Pedestal Column Shuttering Qty 29.12
9 Backfilling Backfilling Qty 142.44

One Line Brick Work for Ground


10
Beam
GB1 6 2.50 0.25 0.10 0.38
GB2 4 3.40 0.25 0.10 0.34
GB3 4 1.50 0.25 0.10 0.15
GB4 6 2.05 0.25 0.10 0.31
GB5 4 2.40 0.25 0.10 0.24
GB6 2 3.50 0.25 0.10 0.18
GB7 2 3.35 0.25 0.10 0.17
GB8 2 2.55 0.25 0.10 0.13
GB9 6 3.25 0.25 0.10 0.49
GB10 2 1.60 0.25 0.10 0.08
GB11 2 0.80 0.25 0.10 0.04
GB12 2 2.65 0.25 0.10 0.13
GB13 2 2.50 0.25 0.10 0.13
GB14 2 2.20 0.25 0.10 0.11
GB15 2 2.25 0.25 0.10 0.11
GB16 4 2.40 0.25 0.10 0.24
One Line Brick Work for Ground Beam 3.21

11 Ground Beam Concrete


GB1 6 2.50 0.25 0.30 1.13
GB2 4 3.40 0.25 0.30 1.02
GB3 4 1.50 0.25 0.30 0.45
GB4 6 2.05 0.25 0.30 0.92
GB5 4 2.40 0.25 0.30 0.72
GB6 2 3.50 0.25 0.30 0.53
GB7 2 3.35 0.25 0.30 0.50
GB8 2 2.55 0.25 0.30 0.38
GB9 6 3.25 0.25 0.30 1.46
GB10 2 1.60 0.25 0.30 0.24
GB11 2 0.80 0.25 0.30 0.12
GB12 2 2.65 0.25 0.30 0.40
GB13 2 2.50 0.25 0.30 0.38
GB14 2 2.20 0.25 0.30 0.33
GB15 2 2.25 0.25 0.30 0.34
GB16 4 2.40 0.25 0.30 0.72
Ground Beam Concrete 9.63
12 Ground Beam Shuttering 2xL H
GB1 6 5.00 0.30 9.00
GB2 4 6.80 0.30 8.16
GB3 4 3.00 0.30 3.60
GB4 6 4.10 0.30 7.38
GB5 4 4.80 0.30 5.76
GB6 2 7.00 0.30 4.20
GB7 2 6.70 0.30 4.02
GB8 2 5.10 0.30 3.06
GB9 6 6.50 0.30 11.70
GB10 2 3.20 0.30 1.92
GB11 2 1.60 0.30 0.96
GB12 2 5.30 0.30 3.18
GB13 2 5.00 0.30 3.00
GB14 2 4.40 0.30 2.64
GB15 2 4.50 0.30 2.70
GB16 4 4.80 0.30 5.76
Ground Beam Shuttering 77.04

13 Brickwork upto D.P.C Bottom


GB1 6 2.50 0.25 0.45 1.69
GB2 4 3.40 0.25 0.45 1.53
GB3 4 1.50 0.25 0.45 0.68
GB4 6 2.05 0.25 0.45 1.38
GB5 4 2.40 0.25 0.45 1.08
GB6 2 3.50 0.25 0.45 0.79
GB7 2 3.35 0.25 0.45 0.75
GB8 2 2.55 0.25 0.45 0.57
GB9 6 3.25 0.25 0.45 2.19
GB10 2 1.60 0.25 0.45 0.36
GB11 2 0.80 0.25 0.45 0.18
GB12 2 2.65 0.25 0.45 0.60
GB13 2 2.50 0.25 0.45 0.56
GB14 2 2.20 0.25 0.45 0.50
GB15 2 2.25 0.25 0.20 0.23
GB16 3 2.40 0.25 0.45 0.81
GB16 1 2.40 0.25 0.20 0.12
Brickwork upto D.P.C Bottom 14.01

14 Damp Proof Course


GB1 6 2.50 0.25 3.75
GB2 4 3.40 0.25 3.40
GB3 4 1.50 0.25 1.50
GB4 6 2.05 0.25 3.08
GB5 4 2.40 0.25 2.40
GB6 2 3.50 0.25 1.75
GB7 2 3.35 0.25 1.68
GB8 2 2.55 0.25 1.28
GB9 6 3.25 0.25 4.88
GB10 2 1.60 0.25 0.80
GB11 2 0.80 0.25 0.40
GB12 2 2.65 0.25 1.33
GB13 2 2.50 0.25 1.25
GB14 2 2.20 0.25 1.10
GB16 3 2.40 0.25 1.80
Damp Proof Course 30.38

15 Bitumen Coat
GB1 6 2.50 0.25 3.75
GB2 4 3.40 0.25 3.40
GB3 4 1.50 0.25 1.50
GB4 6 2.05 0.25 3.08
GB5 4 2.40 0.25 2.40
GB6 2 3.50 0.25 1.75
GB7 2 3.35 0.25 1.68
GB8 2 2.55 0.25 1.28
GB9 6 3.25 0.25 4.88
GB10 2 1.60 0.25 0.80
GB11 2 0.80 0.25 0.40
GB12 2 2.65 0.25 1.33
GB13 2 2.50 0.25 1.25
GB14 2 2.20 0.25 1.10
GB16 3 2.40 0.25 1.80
Bitumen Coat 30.38

16 Plinth Beam Concrete


PB15 2 2.25 0.25 0.30 0.34
PB16 1 2.4 0.25 0.30 0.18
Plinth Beam Concrete 0.52

17 Plinth Beam Shuttering 2xL H


PB15 6 4.50 0.30 8.10
PB16 4 4.80 0.30 5.76
Plinth Beam Shuttering 13.86
18 Plinth Filling
A1 2 3.40 2.80 0.80 15.23
A2 2 2.05 2.80 0.80 9.18
A3 2 2.05 1.25 0.80 4.10
A4 4 2.20 1.08 0.80 7.57
A5 2 3.25 2.40 0.80 12.48
A6 2 2.80 3.50 0.80 15.68
A7 2 3.25 2.70 0.80 14.04
A8 2 3.25 1.35 0.80 7.02
A9 1 2.40 3.45 0.80 6.62
A10 1 2.40 1.75 0.80 3.36
A11 1 2.40 2.70 0.80 5.18
Plinth Filling 100.47

19 Floor PCC
A1 2 3.40 2.80 0.10 1.90
A2 2 2.05 2.80 0.10 1.15
A3 2 2.05 1.25 0.10 0.51
A4 4 2.20 1.08 0.10 0.95
A5 2 3.25 2.40 0.10 1.56
A6 2 2.80 3.50 0.10 1.96
A7 2 3.25 2.70 0.10 1.76
A8 2 3.25 1.35 0.10 0.88
A9 1 2.40 3.45 0.10 0.83
A10 1 2.40 1.75 0.10 0.42
A11 1 2.40 2.70 0.10 0.65
Floor PCC 12.56

20 Column Concrete for Sub-Structure


C1 20 0.25 0.4 0.9 1.80
C2 4 0.25 0.4 0.9 0.36
Column Concrete for Sub-Structure 2.16

21 Column Shuttering for Sub-Structure Sum off all sides


C1 20 1.3 0.9 23.4
C2 4 1.3 0.9 4.68

Column Shuttering for Sub-Structure 28.08

22 Column Concrete for Super-Structure


C1 20 0.25 0.4 3.00 6.00
C2 4 0.25 0.4 3.00 1.20
Column Concrete for Super-Structure 7.20

Column Shuttering for Super-


23 Sum off all sides
Structure
C1 20 1.3 3.00 78
C2 4 1.3 3.00 15.6
Column Shuttering for Super-Structure 93.6

One Line Brick Work - Super


24
Structure
For 200mm wall
GB1 4 2.50 0.20 0.10 0.20
GB2 2 3.40 0.20 0.10 0.14
GB4 2 2.05 0.20 0.10 0.08
GB5 2 2.40 0.20 0.10 0.10
GB6 2 3.50 0.20 0.10 0.14
GB8 2 2.55 0.20 0.10 0.10
GB9 2 3.25 0.20 0.10 0.13
GB12 2 2.65 0.20 0.10 0.11
GB15 2 2.25 0.20 0.10 0.09
GB16 2 2.40 0.20 0.10 0.10
1.18
Deduction
MD -1 1.20 0.20 0.10 -0.02
D1 -4 1.05 0.20 0.10 -0.08
D2 -2 0.90 0.20 0.10 -0.04
Deduction -0.14
One Line Brick Work - Super Structure 1.03

One Line Brick Work - Super


25
Structure
For 100mm wall
GB1 2 2.50 0.10 0.5
GB2 2 3.40 0.10 0.68
GB4 2 2.05 0.10 0.41
GB5 2 2.40 0.10 0.48
GB7 2 3.35 0.10 0.67
GB13 2 2.50 0.10 0.5
GB14 2 2.20 0.10 0.44
3.68
Deduction
D2 -6 0.90 0.10 -0.54
D3 -4 0.75 0.10 -0.30
Deduction -0.84
One Line Brick Work - Super Structure 2.84

26 Damp Proof Course


GB1 4 2.50 0.20 2.00
GB2 2 3.40 0.20 1.36
GB4 2 2.05 0.20 0.82
GB5 2 2.40 0.20 0.96
GB6 2 3.50 0.20 1.40
GB8 2 2.55 0.20 1.02
GB9 2 3.25 0.20 1.30
GB12 2 2.65 0.20 1.06
GB15 2 2.25 0.20 0.90
GB16 2 2.40 0.20 0.96
11.78
GB1 2 2.50 0.10 0.50
GB2 2 3.40 0.10 0.68
GB4 2 2.05 0.10 0.41
GB5 2 2.40 0.10 0.48
GB7 2 3.35 0.10 0.67
GB13 2 2.50 0.10 0.50
GB14 2 2.20 0.10 0.44
3.68
Deduction
MD -1 1.20 0.20 -0.24
D1 -4 1.05 0.20 -0.84
D2 -2 0.90 0.20 -0.36
D2 -6 0.90 0.10 -0.54
D3 -4 0.75 0.10 -0.30
Deduction -2.28
Damp Proof Course - Super Structure 13.18

27 Brickwork upto Sill Band Bottom


For 200mm wall
GB1 4 2.50 0.20 0.65 1.30
GB2 2 3.40 0.20 0.65 0.88
GB4 2 2.05 0.20 0.65 0.53
GB5 2 2.40 0.20 0.65 0.62
GB6 2 3.50 0.20 0.65 0.91
GB8 2 2.55 0.20 0.65 0.66
GB9 2 3.25 0.20 0.65 0.85
GB12 2 2.65 0.20 0.65 0.69
GB15 2 2.25 0.20 0.65 0.59
GB16 2 2.40 0.20 0.65 0.62
7.66
Deduction
MD -1 1.20 0.20 0.65 -0.16
D1 -4 1.05 0.20 0.65 -0.55
D2 -2 0.90 0.20 0.65 -0.23
Deduction -0.94
Brickwork upto Sill Band Bottom 6.72

28 Brickwork upto Sill Band Bottom


For 100mm wall
GB1 2 2.50 0.65 3.25
GB2 2 3.40 0.65 4.42
GB4 2 2.05 0.65 2.665
GB5 2 2.40 0.65 3.12
GB7 2 3.35 0.65 4.355
GB13 2 2.50 0.65 3.25
GB14 2 2.20 0.65 2.86
23.92
Deduction
D2 -6 0.90 0.65 -3.51
D3 -4 0.75 0.65 -1.95
Deduction -5.46
Brickwork upto Sill Band Bottom 18.46

29 Sill Band Concrete


GB1 4 2.50 0.20 0.10 0.20
GB2 2 3.40 0.20 0.10 0.14
GB4 2 2.05 0.20 0.10 0.08
GB5 2 2.40 0.20 0.10 0.10
GB6 2 3.50 0.20 0.10 0.14
GB8 2 2.55 0.20 0.10 0.10
GB9 2 3.25 0.20 0.10 0.13
GB12 2 2.65 0.20 0.10 0.11
GB15 2 2.25 0.20 0.10 0.09
GB16 2 2.40 0.20 0.10 0.10
1.18

GB1 2 2.50 0.10 0.10 0.05


GB2 2 3.40 0.10 0.10 0.07
GB4 2 2.05 0.10 0.10 0.04
GB5 2 2.40 0.10 0.10 0.05
GB7 2 3.35 0.10 0.10 0.07
GB13 2 2.50 0.10 0.10 0.05
GB14 2 2.20 0.10 0.10 0.04
0.37

Deduction
MD -1 1.20 0.20 0.10 -0.02
D1 -4 1.05 0.20 0.10 -0.08
D2 -2 0.90 0.20 0.10 -0.04
D2 -6 0.90 0.10 0.10 -0.05
D3 -4 0.75 0.10 0.10 -0.03
Deduction -0.23
Sill Band Concrete 1.32

30 Sill Band Shuttering 2xL H


GB1 4 5.00 0.10 2.00
GB2 2 6.80 0.10 1.36
GB4 2 4.10 0.10 0.82
GB5 2 4.80 0.10 0.96
GB6 2 7.00 0.10 1.40
GB8 2 5.10 0.10 1.02
GB9 2 6.50 0.10 1.30
GB12 2 5.30 0.10 1.06
GB15 2 4.50 0.10 0.90
GB16 2 4.80 0.10 0.96
11.78

GB1 2 5.00 0.10 1.00


GB2 2 6.80 0.10 1.36
GB4 2 4.10 0.10 0.82
GB5 2 4.80 0.10 0.96
GB7 2 6.70 0.10 1.34
GB13 2 5.00 0.10 1.00
GB14 2 4.40 0.10 0.88
7.36

Deduction
MD -1 2.40 0.10 -0.24
D1 -4 2.10 0.10 -0.84
D2 -2 1.80 0.10 -0.36
D2 -6 1.80 0.10 -1.08
D3 -4 1.50 0.10 -0.60
Deduction -3.12
Sill Band Shuttering 16.02

31 Brickwork upto Lintel Level


For 200mm wall
GB1 4 2.50 0.20 1.20 2.40
GB2 2 3.40 0.20 1.20 1.63
GB4 2 2.05 0.20 1.20 0.98
GB5 2 2.40 0.20 1.20 1.15
GB6 2 3.50 0.20 1.20 1.68
GB8 2 2.55 0.20 1.20 1.22
GB9 2 3.25 0.20 1.20 1.56
GB12 2 2.65 0.20 1.20 1.27
GB15 2 2.25 0.20 1.20 1.08
GB16 2 2.40 0.20 1.20 1.15
14.14
Deduction
MD -1 1.20 0.20 1.20 -0.29
D1 -4 1.05 0.20 1.20 -1.01
D2 -2 0.90 0.20 1.20 -0.43
W1 -6 1.50 0.20 1.20 -2.16
W2 -10 0.90 0.20 1.20 -2.16
Deduction -6.05
Brickwork upto Lintel Level 8.09

32 Brickwork upto Lintel Level


For 100mm wall
GB1 2 2.50 1.20 6.00
GB2 2 3.40 1.20 8.16
GB4 2 2.05 1.20 4.92
GB5 2 2.40 1.20 5.76
GB7 2 3.35 1.20 8.04
GB13 2 2.50 1.20 6.00
GB14 2 2.20 1.20 5.28
44.16
Deduction
D2 -6 0.90 1.20 -6.48
D3 -4 0.75 1.20 -3.60
Deduction -10.08
Brickwork upto Lintel Level 34.08

33 Lintel Beam Concrete


For 200mm wall
GB1 4 2.50 0.20 0.20 0.40
GB2 2 3.40 0.20 0.20 0.27
GB4 2 2.05 0.20 0.20 0.16
GB5 2 2.40 0.20 0.20 0.19
GB6 2 3.50 0.20 0.20 0.28
GB8 2 2.55 0.20 0.20 0.20
GB9 2 3.25 0.20 0.20 0.26
GB12 2 2.65 0.20 0.20 0.21
GB15 2 2.25 0.20 0.20 0.18
GB16 1 2.40 0.20 0.20 0.10
2.26

For 100mm wall


GB1 2 2.50 0.10 0.20 0.10
GB2 2 3.40 0.10 0.20 0.14
GB4 2 2.05 0.10 0.20 0.08
GB5 2 2.40 0.10 0.20 0.10
GB7 2 3.35 0.10 0.20 0.13
GB13 2 2.50 0.10 0.20 0.10
GB14 2 2.20 0.10 0.20 0.09
0.736
Lintel Beam Concrete 3.00

34 Lintel Beam Shuttering 2xL H


For 200mm wall
GB1 4 5.00 0.2 4.00
GB2 2 6.80 0.2 2.72
GB4 2 4.10 0.2 1.64
GB5 2 4.80 0.2 1.92
GB6 2 7.00 0.2 2.80
GB8 2 5.10 0.2 2.04
GB9 2 6.50 0.2 2.60
GB12 2 5.30 0.2 2.12
GB15 2 4.50 0.2 1.80
GB16 1 4.80 0.2 0.96
22.60

For 100mm wall


GB1 2 5.00 0.2 2.00
GB2 2 6.80 0.2 2.72
GB4 2 4.10 0.2 1.64
GB5 2 4.80 0.2 1.92
GB7 2 6.70 0.2 2.68
GB13 2 5.00 0.2 2.00
GB14 2 4.40 0.2 1.76
14.72
37.32
Addition of Door & Window Bottom
For 200mm wall
MD 1 1.20 0.20 0.24
D1 4 1.05 0.20 0.84
D2 2 0.90 0.20 0.36
W1 6 1.50 0.20 1.8
W2 10 0.90 0.20 1.8
For 100mm wall
D2 6 0.90 0.10 0.54
D3 4 0.75 0.10 0.3
5.88
Lintel Beam Shuttering 43.20

35 Brickwork upto Slab Beam bottom


For 200mm wall
GB1 4 2.50 0.20 0.35 0.70
GB2 2 3.40 0.20 0.35 0.48
GB4 2 2.05 0.20 0.35 0.29
GB5 2 2.40 0.20 0.35 0.34
GB6 2 3.50 0.20 0.35 0.49
GB8 2 2.55 0.20 0.35 0.36
GB9 2 3.25 0.20 0.35 0.46
GB12 2 2.65 0.20 0.35 0.37
GB15 2 2.25 0.20 0.35 0.32
GB16 2 2.40 0.20 0.35 0.34
4.12
Deduction
V -4 0.35 0.20 0.35 -0.10
Brickwork upto Slab Beam bottom 4.03

36 Brickwork upto Slab Beam bottom


For 100mm wall
GB1 2 2.50 0.35 1.75
GB2 2 3.40 0.35 2.38
GB4 2 2.05 0.35 1.44
GB5 2 2.40 0.35 1.68
GB7 2 3.35 0.35 2.35
GB13 2 2.50 0.35 1.75
GB14 2 2.20 0.35 1.54
Brickwork upto Slab Beam bottom 12.88

37 Slab Beam Concrete


SB1 6 2.50 0.25 0.35 1.31
SB2 4 3.40 0.25 0.35 1.19
SB3 4 1.50 0.25 0.35 0.53
SB4 6 2.05 0.25 0.35 1.08
SB5 4 2.40 0.25 0.35 0.84
SB6 2 3.50 0.25 0.35 0.61
SB7 2 3.35 0.25 0.35 0.59
SB8 2 2.55 0.25 0.35 0.45
SB9 6 3.25 0.25 0.35 1.71
SB10 2 1.60 0.25 0.35 0.28
SB11 2 0.80 0.25 0.35 0.14
SB12 2 2.65 0.25 0.35 0.46
SB13 2 2.50 0.25 0.35 0.44
SB14 2 2.20 0.25 0.35 0.39
SB15 2 2.25 0.25 0.35 0.39
SB16 5 2.40 0.25 0.35 1.05
Slab Beam Concrete 11.45

38 Slab Beam Shuttering


SB1
Outer Face 4 2.50 0.825 8.25
Inner Face 2 2.50 0.70 3.50
SB2 4
Outer Face 2 3.40 0.825 5.61
Inner Face 2 3.40 0.70 4.76
SB3
Outer Face 4 1.50 0.825 4.95
SB4
Outer Face 2 2.05 0.825 3.38
Inner Face 4 2.05 0.70 5.74
SB5
Outer Face 2 2.40 0.825 3.96
Inner Face 2 2.40 0.70 3.36
SB6
Outer Face 2 3.50 0.825 5.78
SB7
Inner Face 2 3.35 0.70 4.69
SB8
Inner Face 2 2.55 0.70 3.57
SB9
Outer Face 2 3.25 0.825 5.36
Inner Face 4 3.25 0.70 9.10
SB10
Outer Face 2 1.60 0.825 2.64
SB11
Outer Face 2 0.80 0.825 1.32
SB12
Outer Face 2 2.65 0.825 4.37
SB13
Inner Face 2 2.50 0.70 3.50
SB14
Inner Face 2 2.20 0.70 3.08
SB15
Inner Face 2 2.25 0.70 3.15
SB16
Outer Face** 1 2.40 0.95 2.28
Outer Face 2 2.40 0.825 3.96
Inner Face 2 2.40 0.70 3.36
Slab Beam Shuttering 99.67

39 Slab Concrete
S1 2 3.40 2.80 0.125 2.38
S2 2 2.05 2.80 0.125 1.44
S3 2 2.05 1.25 0.125 0.64
S4 4 2.20 1.08 0.125 1.18
S5 2 3.25 2.40 0.125 1.95
S6 2 2.80 3.50 0.125 2.45
S7 2 3.25 2.70 0.125 2.19
S8 2 3.25 1.35 0.125 1.10
S10 1 2.40 1.75 0.125 0.53
S11 1 2.40 2.45 0.125 0.74
Slab Concrete 14.59

40 Slab Shuttering
S1 2 3.40 2.80 19.04
S2 2 2.05 2.80 11.48
S3 2 2.05 1.25 5.13
S4 4 2.20 1.08 9.46
S5 2 3.25 2.40 15.60
S6 2 2.80 3.50 19.60
S7 2 3.25 2.70 17.55
S8 2 3.25 1.35 8.78
S10 1 2.40 1.75 4.20
S11 1 2.40 2.45 5.88
Slab Slab Shuttering 116.71

41 Chhajja Concrete
W1 (1.5 x 1.2) 4 1.7 0.6 0.1125 0.459
W2 (0.9 x 1.2) 8 1.1 0.6 0.1125 0.594
Chhajja Concrete 1.053

42 Chhajja Shuttering
W1 (1.5 x 1.2)
Bottom face 4 1.7 0.60 4.08
Front face 4 1.7 0.10 0.68
Left & Right face 8 0.60 0.1125 0.54
W2 (0.9 x 1.2)
Bottom face 8 1.1 0.60 5.28
Front face 8 1.1 0.10 0.88
Left & Right face 16 0.60 0.1125 1.08
Chhajja Shuttering 12.54

43 Entrance Step (Brickwork)


A1 1 2.40 0.25 0.15 0.09
A2 1 2.40 0.50 0.15 0.18
A3 1 2.40 0.75 0.15 0.27
A4 1 2.40 1.00 0.15 0.36
A5 1 2.40 1.25 0.15 0.45
A6 1 2.40 1.50 0.15 0.54
Entrance Step (Brickwork) 1.89

44 Staircase Concrete
Waist Slab 2 2.62 1.175 0.15 0.92
Steps 18 1.175 0.25 0.15 0.40
Landing 1 2.40 1.20 0.15 0.43
Mid-Landing Beam 1 2.40 0.25 0.35 0.21
Volume of Extra Space 1 1.175 0.291 0.175 0.03
Staircase Concrete 1.99

45 Staircase Shuttering
Waist Slab Bottom 2 2.62 1.175 6.16
Waist Slab Side Face 4 2.62 0.30 3.14
Bottom face of Landing 1 2.40 1.175 2.82
Landing Side Face 2 1.20 0.15 0.36
Mid-Landing Beam
Bottom Face 1 2.40 0.25 0.60
Back Face 1 2.40 0.35 0.84
Inner Face 1 2.40 0.20 0.48
Riser 19 1.175 0.15 3.35
Staircase Shuttering 17.75

Finishing Works
Plastering
46 6mm Plaster (Slab)
Bedroom 2 3.00 3.60 21.60
Toilet 4 2.40 1.20 11.52
Master Bed Room 2 3.60 3.00 21.60
Kitchen 2 2.10 3.00 12.60
Hall 2 3.30 5.25 34.65
Corridor 1 2.40 3.70 8.88
Entrance Passage 1 2.40 1.30 3.12
Front Balcony 2 3.70 1.60 11.84
Rear Balcony 2 2.55 1.50 7.65
Stair Case
Waist Slab 2 2.62 1.175 6.16
Landing Bottom 1 2.40 1.25 3.00
Side Face of Waist Slab 2 2.62 0.15 0.79
Side Face of Step 18 0.25 0.15 0.34
Chhajja
Top
W1 4 1.70 0.60 4.08
W2 8 1.10 0.60 5.28
Bottom
W1 4 1.70 0.60 4.08
W2 8 1.10 0.60 5.28
Side Face (Left & Right)
W1 8 0.60 0.1125 0.54
W2 16 0.60 0.1125 1.08
Front
W1 4 1.70 0.10 0.68
W2 8 1.10 0.10 0.88
6mm Plaster (Slab) 165.64

47 12mm Plaster (Red)


Bedroom (x-direction) 4 3.00 2.875 34.50
Bedroom (y-direction) 4 3.60 2.875 41.40
Toilet (x-direction) 4 2.40 2.875 27.60
Toilet (y-direction) 8 1.20 2.875 27.60
Master Bedroom (x-direction) 2 3.60 2.875 20.70
Master Bedroom (y-direction) 4 3.00 2.875 34.50
Kitchen (x-direction) 4 2.10 2.875 24.15
Kitchen (y-direction) 2 3.00 2.875 17.25
Hall (x-direction) 2 3.30 2.875 18.98
Hall (y-direction) 2 5.25 2.875 30.19
Corridor (x-direction) 2 2.4 2.875 13.80
12mm Plaster (without detection) 290.66
Deduction
MD -1 1.20 2.10 -2.52
D1 -4 1.05 2.10 -8.82
D2 -6 0.90 2.10 -11.34
D3 -4 0.75 2.10 -6.30
W1 -6 1.50 1.20 -10.80
W2 -10 0.90 1.20 -10.80
V
50 % Deduction -25.29
12mm Plaster Qty 265.37

48 15mm Plaster - Inner (Blue)


Toilet (x-direction) 4 2.40 2.875 27.60
Master Bedroom (x-direction) 2 3.60 2.875 20.70
Kitchen (y-direction) 2 3.00 2.875 17.25
Hall (x-direction) 2 3.30 2.875 18.98
Hall (y-direction) 2 5.25 2.875 30.19
Corridor (y-direction) 2 7.20 2.875 41.40

15mm Plaster - Inner (without detection) 156.11

Deduction
D1 -2 1.05 2.10 -4.41
D2 -8 0.90 2.10 -15.12
D3 -4 0.75 2.10 -6.30
50 % Deduction -12.915
15mm Plaster - Inner 143.20

49 15mm Plaster - Outer (Blue)


Front Side 1 20.2 3.90 78.78
Rear Side 1 14.8 3.90 57.72
Left & Right Side 2 10.3 3.90 80.34
15mm Plaster - Outer (without detection) 216.84

Deduction
MD -1 1.20 2.10 -2.52
D1 -2 1.05 2.10 -4.41
D2 -2 0.90 2.10 -3.78
W1 -6 1.50 1.20 -10.80
W2 -10 0.90 1.20 -10.80
V
50 % Deduction -16.16
15mm Plaster - Outer Qty 200.69

Painitng
50 White wash
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
15mm Plastering Surface - Outer 200.69
White wash Qty 774.90

51 Putty
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
Putty Qty 574.21

52 Inner Paint
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
Inner Paint Qty 574.21

53 Outer Paint
15mm Plastering Surface - Outer 200.69
Outer Paint Qty 200.69

Flooring
54 Kota Stone
Flooring
Front Balcony 2 3.70 1.60 11.84
Rear Balcony 2 2.55 1.50 7.65
Flooring 19.49
Dado / Skirting
Front Balcony (x-direction) 2 3.50 0.15 1.05
Front Balcony (y-direction) 2 0.80 0.15 0.24
Rear Balcony (x-direction) 2 2.55 0.15 0.765
2.055
Deduction
D1 -2 1.05 0.15 -0.315
D2 -2 0.9 0.15 -0.27
-0.585
Dado / Skirting 1.47
Kota Stone Qty 20.96

55 Vitrified Tiles
Flooring
Staircase Below 1 2.40 3.50 8.40
Corridor 1 2.40 3.70 8.88
Entrance Passage 1 2.40 1.30 3.12
Hall 2 3.30 5.25 34.65
Bedroom 2 3.00 3.60 21.60
Master Bedroom 2 3.60 3.00 21.60
Kitchen 2 2.10 3.00 12.60
Flooring 110.85
Dado / Skirting
Staircase Below
x-direction 1 2.40 0.15 0.36
y-direction 2 3.50 0.15 1.05
Corridor
x-direction 1 2.40 0.15 0.36
y-direction 2 3.70 0.15 1.11
Entrance Passage
x-direction 1 2.40 0.15 0.36
y-direction 2 1.30 0.15 0.39
Hall
x-direction 4 3.30 0.15 1.98
y-direction 4 5.25 0.15 3.15
Bedroom
x-direction 4 3.00 0.15 1.80
y-direction 4 3.60 0.15 2.16
Master Bedroom
x-direction 4 3.60 0.15 2.16
y-direction 4 3.00 0.15 1.80
16.68
Deduction
MD -2 1.20 0.15 -0.36
D1 -6 1.05 0.15 -0.95
D2 -10 0.90 0.15 -1.35
D3 -4 0.75 0.15 -0.45
-3.11
Dado / Skirting 13.58
Vetrified Tile Qty 124.43

56 Ceramic Tiles
Flooring
Toilet 4 2.40 1.20 11.52
Flooring 11.52
Dado / Skirting
Toilet
x-direction 8 2.40 2.10 40.32
y-direction 8 1.20 2.10 20.16
Kitchen
x-direction 4 2.10 2.10 17.64
y-direction 4 3.00 2.10 25.20
Staircase
Sidewall near Riser & Treads 18 0.25 0.9 4.05
Staircase Landing
x-direction 1 2.40 0.90 2.16
y-direction 2 1.25 0.90 2.25
111.78
Deduction
D2 -4 0.90 2.10 -7.56
D3 -4 0.75 2.10 -6.30
W2 -2 0.90 1.20 -2.16
-16.02
Dado / Skirting 95.76
Ceramic Tiles Qty 107.28

57 Granite
Entrance Step
Tread 6 2.4 0.275 3.96
Riser 6 2.4 0.15 2.16
Entrance Step 6.12
Window Sill
W1 6 1.50 0.20 1.80
W2 10 0.9 0.20 1.80
Window Sill 3.60
Door Threshold
MD 1 1.20 0.20 0.24
D1 4 1.05 0.20 0.84
D2 (200mm Wall) 2 0.90 0.20 0.36
D2 (100mm Wall) 6 0.90 0.10 0.54
D3 4 0.75 0.10 0.30
Door Sill 2.28
Staircase
Tread 18 1.175 0.275 5.82
Riser 20 1.175 0.15 3.53
Landing 1 2.40 1.25 3.00
Staircase 12.34
Granite Qty 24.34

Doors
58 Door Frame
Wodden Sal wood Frame
MD 1 0.125 0.075 5.4 0.05
D1 4 0.125 0.075 5.25 0.20
D2 8 0.125 0.075 5.1 0.38
Wodden Sal wood Frame 0.63

59 Door Frame
FRP
D3 4 4.95 19.8
Door Frame(FRP) 19.8

60 Door Shutter (panelled)


MD 1 1.05 2.025 2.13
D1 4 0.9 2.025 7.29
Door Shutter (Panelled) 9.42

61 Door Shutter (Flush)


D2 8 0.75 2.025 12.15
Door Shutter (Flush) 12.15

62 Door Shutter (FRP)


D3 4 0.625 2.0375 5.09
Door Shutter (FRP) 5.09

63 Door Fitting Items Door


MD D1 D2 D3
1 4 8 4
L-Drop 2 8 8 0 18
Handle 2 8 16 8 34
Door Stopper 1 4 8 0 13
Door Handler 1 4 8 4 17
Tower Bolt 1 4 16 8 29
Hinges 3 12 24 12 51

Windows
64 Aluminium Fixed Frame
W1 6 Unit Wt.
Bottom Section 6 1.50 1.037 9.33
Top Section 6 1.50 0.855 7.70
Left & Right Section 12 1.20 0.825 11.88

W2 10
Bottom Section 10 0.90 1.037 9.33
Top Section 10 0.90 0.855 7.70
Left & Right Section 20 1.20 0.825 19.80
Aluminium Fixed Frame 65.74

65 Aluminium Sliding Frame


W1 6 Unit Wt.
Top & Bottom Section 36 0.675 0.557 13.54
Vertical Section with Lock 12 1.20 0.566 8.15
Vertical Section without Lock 24 1.20 0.557 16.04

W2 10
Top & Bottom Section 60 0.405 0.557 13.54
Vertical Section with Lock 20 1.20 0.566 13.58
Vertical Section without Lock 40 1.20 0.557 26.74
Aluminium Sliding Frame 91.58

66 Glass
W1 12 0.75 1.20 10.80
W2 20 0.45 1.20 10.80
Glass 21.60

67 Mosquito net (Steel Wire Goure)


W1 6 0.75 1.20 5.40
W2 10 0.45 1.20 5.40
Mosquito net 10.80

68 Window Grills
W1 6
Wt. of Horizontal Plate (35mm x 5mm) 12 1.50 0.035 0.005 24.73
Wt. of Vertical Plate (35mm x 5mm) 12 1.20 0.035 0.005 19.78
Wt. of Horizontal Rod (10mm x 10mm) 12 1.50 0.01 0.01 14.13
Wt. of Vertical Rod (10mm x 10mm) 84 1.20 0.01 0.01 79.13
Wt. of Hold Fastener 48 0.10 0.035 0.005 6.59

W2 10
Wt. of Horizontal Plate (35mm x 5mm) 20 0.90 0.035 0.005 24.73
Wt. of Vertical Plate (35mm x 5mm) 20 1.20 0.035 0.005 32.97
Wt. of Horizontal Rod (10mm x 10mm) 40 0.90 0.01 0.01 28.26
Wt. of Vertical Rod (10mm x 10mm) 80 1.20 0.01 0.01 75.36
Wt. of Hold Fastener 80 0.10 0.035 0.005 10.99

V 4
Wt. of Horizontal Plate (35mm x 5mm) 8 0.35 0.035 0.005 3.85
Wt. of Vertical Plate (35mm x 5mm) 8 0.35 0.035 0.005 3.85
Wt. of Horizontal Rod (10mm x 10mm) 4 0.35 0.01 0.01 1.10
Wt. of Vertical Rod (10mm x 10mm) 12 0.35 0.01 0.01 3.30
Wt. of Hold Fastener 16 0.10 0.035 0.005 2.20
Window Grills Qty 330.96

First Floor

69 Column Concrete for Super-Structure


C1 20 0.25 0.4 3.00 6.00
C2 4 0.25 0.4 3.00 1.20
Column Concrete for Super-Structure 7.20

Column Shuttering for Super-


70
Structure
C1 20 1.3 3.00 78
C2 4 1.3 3.00 15.6
Column Shuttering for Super-Structure 93.6

One Line Brick Work - Super


71
Structure
For 200mm wall
GB1 4 2.50 0.20 0.10 0.20
GB2 2 3.40 0.20 0.10 0.14
GB4 2 2.05 0.20 0.10 0.08
GB5 2 2.40 0.20 0.10 0.10
GB6 2 3.50 0.20 0.10 0.14
GB8 2 2.55 0.20 0.10 0.10
GB9 2 3.25 0.20 0.10 0.13
GB12 2 2.65 0.20 0.10 0.11
GB15 2 2.25 0.20 0.10 0.09
GB16 2 2.40 0.20 0.10 0.10
1.18
Deduction
MD -1 1.20 0.20 0.10 -0.02
D1 -4 1.05 0.20 0.10 -0.08
D2 -2 0.90 0.20 0.10 -0.04
-0.14
One Line Brick Work - Super Structure 1.03

One Line Brick Work - Super


72
Structure
For 100mm wall
GB1 2 2.50 0.10 0.5
GB2 2 3.40 0.10 0.68
GB4 2 2.05 0.10 0.41
GB5 2 2.40 0.10 0.48
GB7 2 3.35 0.10 0.67
GB13 2 2.50 0.10 0.5
GB14 2 2.20 0.10 0.44
3.68
Deduction
D2 -6 0.90 0.10 -0.54
D3 -4 0.75 0.10 -0.30
-0.84
2.84

73 Damp Proof Course


GB1 4 2.50 0.20 2.00
GB2 2 3.40 0.20 1.36
GB4 2 2.05 0.20 0.82
GB5 2 2.40 0.20 0.96
GB6 2 3.50 0.20 1.40
GB8 2 2.55 0.20 1.02
GB9 2 3.25 0.20 1.30
GB12 2 2.65 0.20 1.06
GB15 2 2.25 0.20 0.90
GB16 2 2.40 0.20 0.96
11.78
GB1 2 2.50 0.10 0.50
GB2 2 3.40 0.10 0.68
GB4 2 2.05 0.10 0.41
GB5 2 2.40 0.10 0.48
GB7 2 3.35 0.10 0.67
GB13 2 2.50 0.10 0.50
GB14 2 2.20 0.10 0.44
3.68
Deduction
MD -1 1.20 0.20 -0.24
D1 -4 1.05 0.20 -0.84
D2 -2 0.90 0.20 -0.36
D2 -6 0.90 0.10 -0.54
D3 -4 0.75 0.10 -0.30
-2.28
Damp Proof Course - Super Structure 13.18

74 Brickwork upto Sill Band Bottom


For 200mm wall
GB1 4 2.50 0.20 0.65 1.30
GB2 2 3.40 0.20 0.65 0.88
GB4 2 2.05 0.20 0.65 0.53
GB5 2 2.40 0.20 0.65 0.62
GB6 2 3.50 0.20 0.65 0.91
GB8 2 2.55 0.20 0.65 0.66
GB9 2 3.25 0.20 0.65 0.85
GB12 2 2.65 0.20 0.65 0.69
GB15 2 2.25 0.20 0.65 0.59
GB16 2 2.40 0.20 0.65 0.62
7.66
Deduction
MD -1 1.20 0.20 0.65 -0.16
D1 -4 1.05 0.20 0.65 -0.55
D2 -2 0.90 0.20 0.65 -0.23
-0.94
Brickwork upto Sill Band Bottom 6.72

75 For 100mm wall


GB1 2 2.50 0.65 3.25
GB2 2 3.40 0.65 4.42
GB4 2 2.05 0.65 2.665
GB5 2 2.40 0.65 3.12
GB7 2 3.35 0.65 4.355
GB13 2 2.50 0.65 3.25
GB14 2 2.20 0.65 2.86
23.92
Deduction
D2 -6 0.90 0.65 -3.51
D3 -4 0.75 0.65 -1.95
-5.46
Brickwork upto Sill Band Bottom 18.46

76 Sill Band Concrete


GB1 4 2.50 0.20 0.10 0.20
GB2 2 3.40 0.20 0.10 0.14
GB4 2 2.05 0.20 0.10 0.08
GB5 2 2.40 0.20 0.10 0.10
GB6 2 3.50 0.20 0.10 0.14
GB8 2 2.55 0.20 0.10 0.10
GB9 2 3.25 0.20 0.10 0.13
GB12 2 2.65 0.20 0.10 0.11
GB15 2 2.25 0.20 0.10 0.09
GB16 2 2.40 0.20 0.10 0.10
1.18
GB1 2 2.50 0.10 0.10 0.05
GB2 2 3.40 0.10 0.10 0.07
GB4 2 2.05 0.10 0.10 0.04
GB5 2 2.40 0.10 0.10 0.05
GB7 2 3.35 0.10 0.10 0.07
GB13 2 2.50 0.10 0.10 0.05
GB14 2 2.20 0.10 0.10 0.04
0.37

Deduction
MD -1 1.20 0.20 0.10 -0.02
D1 -4 1.05 0.20 0.10 -0.08
D2 -2 0.90 0.20 0.10 -0.04
D2 -6 0.90 0.10 0.10 -0.05
D3 -4 0.75 0.10 0.10 -0.03
-0.23
Sill Band Concrete 1.32

77 Sill Band Shuttering 2xL H


GB1 4 5.00 0.10 2.00
GB2 2 6.80 0.10 1.36
GB4 2 4.10 0.10 0.82
GB5 2 4.80 0.10 0.96
GB6 2 7.00 0.10 1.40
GB8 2 5.10 0.10 1.02
GB9 2 6.50 0.10 1.30
GB12 2 5.30 0.10 1.06
GB15 2 4.50 0.10 0.90
GB16 2 4.80 0.10 0.96
11.78

GB1 2 5.00 0.10 1.00


GB2 2 6.80 0.10 1.36
GB4 2 4.10 0.10 0.82
GB5 2 4.80 0.10 0.96
GB7 2 6.70 0.10 1.34
GB13 2 5.00 0.10 1.00
GB14 2 4.40 0.10 0.88
7.36

Deduction
MD -1 2.40 0.10 -0.24
D1 -4 2.10 0.10 -0.84
D2 -2 1.80 0.10 -0.36
D2 -6 1.80 0.10 -1.08
D3 -4 1.50 0.10 -0.60
-3.12
Sill Band Shuttering 16.02

78 Brickwork upto Lintel Level


For 200mm wall
GB1 4 2.50 0.20 1.20 2.40
GB2 2 3.40 0.20 1.20 1.63
GB4 2 2.05 0.20 1.20 0.98
GB5 2 2.40 0.20 1.20 1.15
GB6 2 3.50 0.20 1.20 1.68
GB8 2 2.55 0.20 1.20 1.22
GB9 2 3.25 0.20 1.20 1.56
GB12 2 2.65 0.20 1.20 1.27
GB15 2 2.25 0.20 1.20 1.08
GB16 2 2.40 0.20 1.20 1.15
14.14
Deduction
MD -1 1.20 0.20 1.20 -0.29
D1 -4 1.05 0.20 1.20 -1.01
D2 -2 0.90 0.20 1.20 -0.43
W1 -6 1.50 0.20 1.20 -2.16
W2 -10 0.90 0.20 1.20 -2.16
-6.05
Brickwork upto Lintel Level 8.09

79 Brickwork upto Lintel Level


For 100mm wall
GB1 2 2.50 1.20 6.00
GB2 2 3.40 1.20 8.16
GB4 2 2.05 1.20 4.92
GB5 2 2.40 1.20 5.76
GB7 2 3.35 1.20 8.04
GB13 2 2.50 1.20 6.00
GB14 2 2.20 1.20 5.28
44.16
Deduction
D2 -6 0.90 1.20 -6.48
D3 -4 0.75 1.20 -3.60
-10.08
Brickwork upto Lintel Level 34.08

80 Lintel Beam Concrete


For 200mm wall
GB1 4 2.50 0.20 0.20 0.40
GB2 2 3.40 0.20 0.20 0.27
GB4 2 2.05 0.20 0.20 0.16
GB5 2 2.40 0.20 0.20 0.19
GB6 2 3.50 0.20 0.20 0.28
GB8 2 2.55 0.20 0.20 0.20
GB9 2 3.25 0.20 0.20 0.26
GB12 2 2.65 0.20 0.20 0.21
GB15 2 2.25 0.20 0.20 0.18
GB16 1 2.40 0.20 0.20 0.10
2.26

For 100mm wall


GB1 2 2.50 0.10 0.20 0.10
GB2 2 3.40 0.10 0.20 0.14
GB4 2 2.05 0.10 0.20 0.08
GB5 2 2.40 0.10 0.20 0.10
GB7 2 3.35 0.10 0.20 0.13
GB13 2 2.50 0.10 0.20 0.10
GB14 2 2.20 0.10 0.20 0.09
0.736
Lintel Beam Concrete 3.00

81 Lintel Beam Shuttering 2xL H


For 200mm wall
GB1 4 5.00 0.2 4.00
GB2 2 6.80 0.2 2.72
GB4 2 4.10 0.2 1.64
GB5 2 4.80 0.2 1.92
GB6 2 7.00 0.2 2.80
GB8 2 5.10 0.2 2.04
GB9 2 6.50 0.2 2.60
GB12 2 5.30 0.2 2.12
GB15 2 4.50 0.2 1.80
GB16 1 4.80 0.2 0.96
22.60

For 100mm wall


GB1 2 5.00 0.2 2.00
GB2 2 6.80 0.2 2.72
GB4 2 4.10 0.2 1.64
GB5 2 4.80 0.2 1.92
GB7 2 6.70 0.2 2.68
GB13 2 5.00 0.2 2.00
GB14 2 4.40 0.2 1.76
14.72
37.32
Addition of Door & Window Bottom
For 200mm wall
MD 1 1.20 0.20 0.24
D1 4 1.05 0.20 0.84
D2 2 0.90 0.20 0.36
W1 6 1.50 0.20 1.8
W2 10 0.90 0.20 1.8
For 100mm wall
D2 6 0.90 0.10 0.54
D3 4 0.75 0.10 0.3
5.88
Lintel Beam Shuttering 43.20

82 Brickwork upto Slab Beam bottom


For 200mm wall
GB1 4 2.50 0.20 0.35 0.70
GB2 2 3.40 0.20 0.35 0.48
GB4 2 2.05 0.20 0.35 0.29
GB5 2 2.40 0.20 0.35 0.34
GB6 2 3.50 0.20 0.35 0.49
GB8 2 2.55 0.20 0.35 0.36
GB9 2 3.25 0.20 0.35 0.46
GB12 2 2.65 0.20 0.35 0.37
GB15 2 2.25 0.20 0.35 0.32
GB16 2 2.40 0.20 0.35 0.34
4.12
Deduction
V -4 0.35 0.20 0.35 -0.10
Brickwork upto Slab Beam bottom 4.03

83 Brickwork upto Slab Beam bottom


For 100mm wall
GB1 2 2.50 0.35 1.75
GB2 2 3.40 0.35 2.38
GB4 2 2.05 0.35 1.44
GB5 2 2.40 0.35 1.68
GB7 2 3.35 0.35 2.35
GB13 2 2.50 0.35 1.75
GB14 2 2.20 0.35 1.54
Brickwork upto Slab Beam bottom 12.88

84 Roof Beam Concrete


RB1 6 2.50 0.25 0.35 1.31
RB2 4 3.40 0.25 0.35 1.19
RB3 4 1.50 0.25 0.35 0.53
RB4 6 2.05 0.25 0.35 1.08
RB5 4 2.40 0.25 0.35 0.84
RB6 2 3.50 0.25 0.35 0.61
RB7 2 3.35 0.25 0.35 0.59
RB8 2 2.55 0.25 0.35 0.45
RB9 6 3.25 0.25 0.35 1.71
RB10 2 1.60 0.25 0.35 0.28
RB11 2 0.80 0.25 0.35 0.14
RB12 2 2.65 0.25 0.35 0.46
RB13 2 2.50 0.25 0.35 0.44
RB14 2 2.20 0.25 0.35 0.39
RB15 2 2.25 0.25 0.35 0.39
RB16 5 2.40 0.25 0.35 1.05
Roof Beam Concrete Qty 11.45

85 Roof Beam Shuttering


RB1
Outer Face 4 2.50 0.825 8.25
Inner Face 2 2.50 0.70 3.50
RB2 4
Outer Face 2 3.40 0.825 5.61
Inner Face 2 3.40 0.70 4.76
RB3
Outer Face 4 1.50 0.825 4.95
RB4
Outer Face 2 2.05 0.825 3.38
Inner Face 4 2.05 0.70 5.74
RB5
Outer Face 2 2.40 0.825 3.96
Inner Face 2 2.40 0.70 3.36
RB6
Outer Face 2 3.50 0.825 5.78
RB7
Inner Face 2 3.35 0.70 4.69
RB8
Inner Face 2 2.55 0.70 3.57
RB9
Outer Face 2 3.25 0.825 5.36
Inner Face 4 3.25 0.70 9.10
RB10
Outer Face 2 1.60 0.825 2.64
RB11
Outer Face 2 0.80 0.825 1.32
RB12
Outer Face 2 2.65 0.825 4.37
RB13
Inner Face 2 2.50 0.70 3.50
RB14
Inner Face 2 2.20 0.70 3.08
RB15
Inner Face 2 2.25 0.70 3.15
RB16
Outer Face** 1 2.40 0.95 2.28
Outer Face 2 2.40 0.825 3.96
Inner Face 2 2.40 0.70 3.36
Roof Beam Shuttering Qty 99.67

86 Roof Slab Concrete


R1 2 3.40 2.80 0.125 2.38
R2 2 2.05 2.80 0.125 1.44
R3 2 2.05 1.25 0.125 0.64
R4 4 2.20 1.08 0.125 1.18
R5 2 3.25 2.40 0.125 1.95
R6 2 2.80 3.50 0.125 2.45
R7 2 3.25 2.70 0.125 2.19
R8 2 3.25 1.35 0.125 1.10
R10 1 2.40 1.75 0.125 0.53
R11 1 2.40 2.45 0.125 0.74
Roof Slab Concrete Qty 14.59

87 Roof Slab Shuttering


R1 2 3.40 2.80 19.04
R2 2 2.05 2.80 11.48
R3 2 2.05 1.25 5.13
R4 4 2.20 1.08 9.46
R5 2 3.25 2.40 15.60
R6 2 2.80 3.50 19.60
R7 2 3.25 2.70 17.55
R8 2 3.25 1.35 8.78
R10 1 2.40 1.75 4.20
R11 1 2.40 2.45 5.88
Roof Slab Shuttering Qty 116.71

88 Chhajja Concrete
W1 (1.5 x 1.2) 4 1.7 0.6 0.1125 0.459
W2 (0.9 x 1.2) 8 1.1 0.6 0.1125 0.594
Chhajja Concrete Qty 1.053

89 Chhajja Shuttering
W1 (1.5 x 1.2)
Bottom face 4 1.7 0.60 4.08
Front face 4 1.7 0.10 0.68
Left & Right face 8 0.60 0.1125 0.54
W2 (0.9 x 1.2)
Bottom face 8 1.1 0.60 5.28
Front face 8 1.1 0.10 0.88
Left & Right face 16 0.60 0.1125 1.08
Chhajja Shuttering Qty 12.54

90 Staircase Concrete
Waist Slab 2 2.62 1.175 0.15 0.92
Steps 18 1.175 0.25 0.15 0.40
Landing 1 2.40 1.20 0.15 0.43
Mid-Landing Beam 1 2.40 0.25 0.35 0.21
Volume of Extra Space 1 1.175 0.291 0.175 0.03
Staircase Concrete Qty 1.99

91 Staircase Shuttering
Waist Slab Bottom 2 2.62 1.175 6.16
Waist Slab Side Face 4 2.62 0.30 3.14
Bottom face of Landing 1 2.40 1.175 2.82
Landing Side Face 2 1.20 0.15 0.36
Mid-Landing Beam
Bottom Face 1 2.40 0.25 0.60
Back Face 1 2.40 0.35 0.84
Inner Face 1 2.40 0.20 0.48
Riser 19 1.175 0.15 3.35
Staircase Shuttering 17.75

Finishing Works
Plastering
92 6mm Plaster (Slab)
Bedroom 2 3.00 3.60 21.60
Toilet 4 2.40 1.20 11.52
Master Bed Room 2 3.60 3.00 21.60
Kitchen 2 2.10 3.00 12.60
Hall 2 3.30 5.25 34.65
Corridor 1 2.40 3.70 8.88
Entrance Passage 1 2.40 1.30 3.12
Front Balcony 2 3.70 1.60 11.84
Rear Balcony 2 2.55 1.50 7.65
Stair Case
Waist Slab 2 2.62 1.175 6.16
Landing Bottom 1 2.40 1.25 3.00
Side Face of Waist Slab 2 2.62 0.15 0.79
Side Face of Step 18 0.25 0.15 0.34
Chhajja
Top
W1 4 1.70 0.60 4.08
W2 8 1.10 0.60 5.28
Bottom
W1 4 1.70 0.60 4.08
W2 8 1.10 0.60 5.28
Side Face (Left & Right)
W1 8 0.60 0.1125 0.54
W2 16 0.60 0.1125 1.08
Front
W1 4 1.70 0.10 0.68
W2 8 1.10 0.10 0.88
6mm Plaster (Slab) 165.64

93 12mm Plaster (Red)


Bedroom (x-direction) 4 3.00 2.875 34.50
Bedroom (y-direction) 4 3.60 2.875 41.40
Toilet (x-direction) 4 2.40 2.875 27.60
Toilet (y-direction) 8 1.20 2.875 27.60
Master Bedroom (x-direction) 2 3.60 2.875 20.70
Master Bedroom (y-direction) 4 3.00 2.875 34.50
Kitchen (x-direction) 4 2.10 2.875 24.15
Kitchen (y-direction) 2 3.00 2.875 17.25
Hall (x-direction) 2 3.30 2.875 18.98
Hall (y-direction) 2 5.25 2.875 30.19
Corridor (x-direction) 2 2.4 2.875 13.80
12mm Plaster (without detection) 290.66
Deduction
MD -1 1.20 2.10 -2.52
D1 -4 1.05 2.10 -8.82
D2 -6 0.90 2.10 -11.34
D3 -4 0.75 2.10 -6.30
W1 -6 1.50 1.20 -10.80
W2 -10 0.90 1.20 -10.80
V
50 % Deduction -25.29
12mm Plaster Qty 265.37

94 15mm Plaster - Inner (Blue)


Toilet (x-direction) 4 2.40 2.875 27.60
Master Bedroom (x-direction) 2 3.60 2.875 20.70
Kitchen (y-direction) 2 3.00 2.875 17.25
Hall (x-direction) 2 3.30 2.875 18.98
Hall (y-direction) 2 5.25 2.875 30.19
Corridor (y-direction) 2 7.20 2.875 41.40
15mm Plaster - Inner (without detection) 156.11

Deduction
D1 -2 1.05 2.10 -4.41
D2 -8 0.90 2.10 -15.12
D3 -4 0.75 2.10 -6.30
50 % Deduction -12.915
15mm Plaster - Inner 143.20

95 15mm Plaster - Outer (Blue)


Front Side 1 20.2 4.00 80.8
Rear Side 1 14.8 4.00 59.2
Left & Right Side 2 10.3 4.00 82.4
15mm Plaster - Outer (without detection) 222.4

Deduction
MD -1 1.20 2.10 -2.52
D1 -2 1.05 2.10 -4.41
D2 -2 0.90 2.10 -3.78
W1 -6 1.50 1.20 -10.80
W2 -10 0.90 1.20 -10.80
V
50 % Deduction -16.16
15mm Plaster - Outer Qty 206.25

Painitng
96 White wash
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
15mm Plastering Surface - Outer 206.25
White wash Qty 780.46

97 Putty
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
Putty Qty 574.21

98 Inner Paint
6mm Plastering Surface 165.64
12mm Plastering Surface 265.37
15mm Plastering Surface - Inner 143.20
Inner Paint Qty 574.21

99 Outer Paint
15mm Plastering Surface - Outer 206.25
Outer Paint Qty 206.25

Flooring
100 Kota Stone
Flooring
Front Balcony 2 3.70 1.60 11.84
Rear Balcony 2 2.55 1.50 7.65
Flooring 19.49
Dado / Skirting
Front Balcony (x-direction) 2 3.50 0.15 1.05
Front Balcony (y-direction) 2 0.80 0.15 0.24
Rear Balcony (x-direction) 2 2.55 0.15 0.765
2.055
Deduction
D1 -2 1.05 0.15 -0.315
D2 -2 0.9 0.15 -0.27
-0.585
Dado / Skirting 1.47
Kota Stone Qty 20.96

101 Vitrified Tiles


Flooring
Corridor 1 2.40 3.70 8.88
Entrance Passage 1 2.40 1.30 3.12
Hall 2 3.30 5.25 34.65
Bedroom 2 3.00 3.60 21.60
Master Bedroom 2 3.60 3.00 21.60
Kitchen 2 2.10 3.00 12.60
Flooring 102.45
Dado / Skirting
Corridor
x-direction 1 2.40 0.15 0.36
y-direction 2 3.70 0.15 1.11
Entrance Passage
x-direction 1 2.40 0.15 0.36
y-direction 2 1.30 0.15 0.39
Hall
x-direction 4 3.30 0.15 1.98
y-direction 4 5.25 0.15 3.15
Bedroom
x-direction 4 3.00 0.15 1.80
y-direction 4 3.60 0.15 2.16
Master Bedroom
x-direction 4 3.60 0.15 2.16
y-direction 4 3.00 0.15 1.80
15.27
Deduction
MD -2 1.20 0.15 -0.36
D1 -6 1.05 0.15 -0.95
D2 -10 0.90 0.15 -1.35
D3 -4 0.75 0.15 -0.45
-3.11
Dado / Skirting 12.17
Vetrified Tile Qty 114.62

102 Ceramic Tiles


Flooring
Toilet 4 2.40 1.20 11.52
Flooring 11.52
Dado / Skirting
Toilet
x-direction 8 2.40 2.10 40.32
y-direction 8 1.20 2.10 20.16
Kitchen
x-direction 4 2.10 2.10 17.64
y-direction 4 3.00 2.10 25.20
Staircase
Sidewall near Riser & Treads 18 0.25 0.9 4.05
Staircase Landing
x-direction 1 2.40 0.90 2.16
y-direction 2 1.25 0.90 2.25
111.78
Deduction
D2 -4 0.90 2.10 -7.56
D3 -4 0.75 2.10 -6.30
W2 -2 0.90 1.20 -2.16
-16.02
Dado / Skirting 95.76
Ceramic Tiles Qty 107.28

103 Granite
Window Sill
W1 6 1.50 0.20 1.80
W2 10 0.9 0.20 1.80
Window Sill 3.60
Door Threshold
MD 1 1.20 0.20 0.24
D1 4 1.05 0.20 0.84
D2 (200mm Wall) 2 0.90 0.20 0.36
D2 (100mm Wall) 6 0.90 0.10 0.54
D3 4 0.75 0.10 0.30
Door Sill 2.28
Staircase
Tread 18 1.175 0.275 5.82
Riser 20 1.175 0.15 3.53
Landing 1 2.40 1.25 3.00
Staircase 12.34
Granite Qty 18.22

Doors
104 Door Frame
Wodden Sal wood Frame
MD 1 0.125 0.075 5.4 0.05
D1 4 0.125 0.075 5.25 0.20
D2 8 0.125 0.075 5.1 0.38
Wodden Sal wood Frame 0.63

105 Door Frame


FRP
D3 4 4.95 19.8
Door Frame(FRP) 19.8
106 Door Shutter (panelled)
MD 1 1.05 2.025 2.13
D1 4 0.9 2.025 7.29
Door Shutter (Panelled) 9.42

107 Door Shutter (Flush)


D2 8 0.75 2.025 12.15
Door Shutter (Flush) 12.15

108 Door Shutter (FRP)


D3 4 0.625 2.0375 5.09
Door Shutter (FRP) 5.09

109 Door Fitting Items Door


MD D1 D2 D3
1 4 8 4
L-Drop 2 8 8 0 18
Handle 2 8 16 8 34
Door Stopper 1 4 8 0 13
Door Holder 1 4 8 4 17
Tower Bolt 1 4 16 8 29
Hinges 3 12 24 12 51

Windows
110 Aluminium Fixed Frame
W1 6 Unit Wt.
Bottom Section 6 1.50 1.037 9.33
Top Section 6 1.50 0.855 7.70
Left & Right Section 12 1.20 0.825 11.88

W2 10
Bottom Section 10 0.90 1.037 9.33
Top Section 10 0.90 0.855 7.70
Left & Right Section 20 1.20 0.825 19.80
Aluminium Fixed Frame 65.74

111 Aluminium Sliding Frame


W1 6 Unit Wt.
Top & Bottom Section 36 0.675 0.557 13.54
Vertical Section with Lock 12 1.20 0.566 8.15
Vertical Section without Lock 24 1.20 0.557 16.04

W2 10
Top & Bottom Section 60 0.405 0.557 13.54
Vertical Section with Lock 20 1.20 0.566 13.58
Vertical Section without Lock 40 1.20 0.557 26.74
Aluminium Sliding Frame 91.58
112 Glass
W1 12 0.75 1.20 10.80
W2 20 0.45 1.20 10.80
Glass 21.60

113 Mosquito net (Steel Wire Goure)


W1 6 0.75 1.20 5.40
W2 10 0.45 1.20 5.40
Mosquito net 10.80

114 Window Grills


W1 6
Wt. of Horizontal Plate (35mm x 5mm) 12 1.50 0.035 0.005 24.73
Wt. of Vertical Plate (35mm x 5mm) 12 1.20 0.035 0.005 19.78
Wt. of Horizontal Rod (10mm x 10mm) 24 1.50 0.01 0.01 28.26
Wt. of Vertical Rod (10mm x 10mm) 84 1.20 0.01 0.01 79.13
Wt. of Hold Fastener 48 0.10 0.035 0.005 6.59

W2 10
Wt. of Horizontal Plate (35mm x 5mm) 20 0.90 0.035 0.005 24.73
Wt. of Vertical Plate (35mm x 5mm) 20 1.20 0.035 0.005 32.97
Wt. of Horizontal Rod (10mm x 10mm) 40 0.90 0.01 0.01 28.26
Wt. of Vertical Rod (10mm x 10mm) 80 1.20 0.01 0.01 75.36
Wt. of Hold Fastener 80 0.10 0.035 0.005 10.99

V 4
Wt. of Horizontal Plate (35mm x 5mm) 8 0.35 0.035 0.005 3.85
Wt. of Vertical Plate (35mm x 5mm) 8 0.35 0.035 0.005 3.85
Wt. of Horizontal Rod (10mm x 10mm) 4 0.35 0.01 0.01 1.10
Wt. of Vertical Rod (10mm x 10mm) 12 0.35 0.01 0.01 3.30
Wt. of Hold Fastener 16 0.10 0.035 0.005 2.20
Window Grills Qty 345.09

Handrail
115 Staineless Steel Handrail
a Front Balcony Unit Wt. (kg/m)
40mm dia steel pipe (Main pipe) 4 5.74 1.477 33.91
32mm dia steel pipe (Support pipe) 36 0.90 1.067 34.57
18mm dia steel pipe (Distribution Pipe) 12 5.74 0.574 39.54
Base Plate (Bottom) 36 0.1 3.60
Base Plate (Side) 32 0.1 3.20
Front Balcony 114.82

b Rear Balcony Unit Wt. (kg/m)


40mm dia steel pipe (Main pipe) 4 5.19 1.477 30.66
32mm dia steel pipe (Support pipe) 36 0.90 1.067 34.57
18mm dia steel pipe (Distribution Pipe) 12 5.19 0.574 35.75
Base Plate (Bottom) 36 0.1 3.60
Base Plate (Side) 32 0.1 3.20
Front Balcony 107.78

c Front Side Passage (1st Floor) Unit Wt. (kg/m)


40mm dia steel pipe (Main pipe) 1 2.45 1.477 3.62
32mm dia steel pipe (Support pipe) 4 0.90 1.067 3.84
18mm dia steel pipe (Distribution Pipe) 3 2.45 0.574 4.22
Base Plate (Bottom) 4 0.1 0.40
Base Plate (Side) 8 0.1 0.80
Front Balcony 12.88
Staineless Steel Handrail Qty 235.48

Staircase Tower
Staircase Tower
1 Brick work
A GB1, GB16 1 7.40 0.20 1.80 2.66
Brick work (along GB1, GB16, & Front
1 2.90 0.20 1.98 1.15
side of Staircase)
Brick work Qty 3.81

b Column Concrete (M 25)


C1 4 0.25 0.40 2.10 0.84
Column Concrete (M25) Qty 0.84

c Column Shuttering
C1 4 1.30 2.10 10.92
Column Shuttering Qty 10.92

d Beam Concrete (M25)


SB1 2 2.50 0.25 0.30 0.38
SB16 2 2.40 0.25 0.30 0.36
Beam Concrete (M25) Qty 0.74

e Beam Shuttering
SB1 2 2.5 0.725 3.63
SB16
Outer 1 2.4 0.725 1.74
Inner 1 2.4 0.6 1.44
Beam Shuttering Qty 6.81

f Slab Concrete (M25)


TS1 1 2.4 2.8 0.125 0.84
TS2 1 2.9 0.65 0.125 0.24
Slab Concrete (M25) Qty 1.08
g Slab Shuttering
TS1 1 2.40 2.80 6.72
TS2 1 2.90 0.65 1.89
Side Slab (Left & Right) 2 0.65 0.125 0.16
Side Slab (Front) 1 2.9 0.125 0.36
Slab Shuttering Qty 9.13

1 Parapet wall
(a) Brickwork 1 53.9 0.2 1 10.78
Total Qty. of Brick work 10.78

(b) Column Concrete


C1 10 0.25 0.4 1 1.00
C2 4 0.25 0.4 1 0.40
Column Concrete Qty 1.40

(c ) Column Shuttering
C1 10 1.3 1 13.00
C2 4 1.3 1 5.20
Column Shuttering Qty 18.20

3 Plaster
a 6mm plaster
Staircase Tower Slab
TS1 1 2.50 2.80 7.00
TS2 1 2.90 0.65 1.89
Beam 1 2.40 0.6 1.44
6mm plaster Qty 10.33

b 12mm plaster
GB16 (backside) 1 2.50 1.975 4.94
GB16 (frontside) 1 2.50 1.975 4.94
GB1 2 3.55 1.975 14.02
12mm plaster (without deduction) 23.90
Deduciton
D2A -1 0.90 1.975 -0.89
12mm plaster Qty 23.01

c 15mm plaster
Exposed on Wall
Wall on GB1 2 3.95 2.10 16.59
Wall on GB16 1 2.40 2.10 5.04
Wall on GB16 1 2.00 2.10 4.20
Parapet Wall (Inner side) 1 53.90 1.00 53.90
Parapet Wall Column (Outer side) 1 8.00 1.00 8.00
15mm plaster Qty 87.73

d Painting work
a White wash
6mm plaster surface 10.33
12mm plaster surface 23.01
15mm plaster surface 87.73
White wash Qty 121.06

b Putty
6mm plaster surface 10.33
12mm plaster surface 23.01
Puty Qty 33.33

c Inner Paint
6mm plaster surface 10.33
12mm plaster surface 23.01
Inner Paint Qty 33.33

d Outer Paint
15mm plaster surface 87.73
Outer Paint Qty 87.73
Unit Remarks
m2 Extra 1 metre cleaned & levelled along all directions
m2

m3
m3 As per CPWD norms provide extra 300 mm on Length & Breadth
m3

m3 Depth = 100mm
m3
m3

m3 Depth = 100mm
m3
m3

m3
D/3*A1+A2+Sqrt A1+A2
m3
Length = Column Size + 100mm + 100mm
m3 Breadth = Column Size + 100mm + 100mm
m3
m3

m2
m2
m2 Perimeter of the footing as to be considerd

m3
m3 Height = Total Exavated Height - Sand Filling Height - PCC Height - Footing
m3 Height
m3

m2
m2 Bill only till point of Contact
m2
m2
m3
Total Excation - Sand Flling - PCC - Foundation Concrete - Pedestal Column
Concrete

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m3 Plinth level (3ft) = Depth of One Line Brick work - Ground Beam Depth - DPC
m3 depth
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3 Plinth level (3ft) = Depth of One Line Brick work - Ground Beam Depth -
m3 Ground Beam Depth
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m3
m3
m3

m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3

m2
m2

m2

m3
m3
m3

m2
m2
m2

100mm laying of Brick to avoid moisture capillary action & providing DPC
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3 Since only 100mm is provided only Door Dedcution are considerd
m3
m3
m3

As per CPWD guidelines Partition walls are considerd as m2


m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3 Doubt
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
Doubt
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3

m2
m2
m2
m2
m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m2 Height = Outer Face/Inner Face + Breadth of Beam +Outer Face/Inner Face


m2

m2
m2

m2

m2
m2

m2
m2

m2

m2

m2
m2
m2

m2
m2
m2

m2

m2

m2

m2

m2
m2
m2
m2

m3 Same as Plinth Filling or Floor PCC


m3
m3
m3
m3
m3
m3
m3
m3
m3
m3 Breadth = Breadth of Slab - Beam width (SB16)

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m3
m3
m3

m2
m2
m2

m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3

m2
m2
m2
m2

m2
m2
m2
m2
m2

ng Works

m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m2
m2

m2
m2

m2
m2

m2
m2
m2

m2 W1 = 2
m2 Depth = Full Height of Wall - Thickness of Slab D2 = 2, W2 = 1
m2 D3 = 2
m2 D3 = 2, V = 4
m2 W2 = 4
m2 W1 = 2
m2 D2 = 4, W2= 2
m2 0
m2 D1 = 2, W1 = 2
m2 D1= 2
m2 MD = 1
m2

m2
m2
m2
m2
m2
m2
No Dedcution because area is less than 0.5 sqm
m2 50% dedcution
m2

m2 0
m2 D2 = 2, D3 = 2
m2 0
m2 D2 = 4
m2 D3 = 2, D2 = 2
m2 D1 = 2

m2

m2
m2
m2
m2
m2 50% dedcution

m2 MD = 1, D1 = 2, W1= 4
m2 D2 = 2, W2= 6
m2 W1 = 2, W2 = 4, V = 4
m2

m2
m2
m2
m2
m2

m2 No Dedcution because area is less than 0.5 sqm


m2 50% dedcution

nitng

m2
m2
m2
m2
m2

m2
m2
m2
m2

m2
m2
m2
m2

m2
m2

oring

m2
m2
m2

m2 D1 = 2
m2 D2 = 2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2

m2 MD = 1
m2 D1 = 2

m2 MD = 1
m2

m2 D1 = 2, D2 =4
m2 D1 = 2, D2 = 2, D3 =2

m2
m2 D2 = 2

m2 D2 = 2, D3 = 2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2

m2 D3 = 2
m2 D3 = 2

m2 D2 = 4, W2 = 2
m2

m2

m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2 0.025 extra because of Granite Moulding
m2

m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2 0.025 extra because of Granite Moulding
m2
m2
m2

oors

m3
m3
m3
m3

m
m

m2
m2
m2

m2
m2

m2
m2

each
each
each
each
each
each

ndows

Kg
Kg
Kg
Kg
Kg
Kg
Kg

Kg
Kg
Kg

Kg
Kg
Kg
Kg

m2
m2
m2

m2
m2
m2

Kg
Kg
Kg
Kg
Kg

Kg
Kg
Kg
Kg
Kg

Kg
Kg
Kg
Kg
Kg
Kg

t Floor

m3
m3
m3

m2
m2
m2

100mm laying of Brick to avoid moisture capillary action & providing DPC
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3 Since only 100mm is provided only Door Dedcution are considerd
m3
m3
m3

As per CPWD guidelines Partition walls are considerd as m2


m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3 Doubt
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
Doubt
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3

m2
m2
m2
m2
m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m2 Height = Outer Face/Inner Face + Breadth of Beam +Outer Face/Inner Face


m2

m2
m2

m2

m2
m2

m2
m2

m2
m2

m2

m2
m2

m2
m2
m2

m2

m2

m2

m2

m2
m2
m2
m2

m3 Same as Plinth Filling or Floor PCC


m3
m3
m3
m3
m3
m3
m3
m3
m3
m3 Breadth = Breadth of Slab - Beam width (SB16)

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m3
m3
m3

m2
m2
m2

m2
m2
m2
m2

m3
m3
m3
m3
m3
m3

m2
m2
m2
m2

m2
m2
m2
m2
m2

ng Works
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m2
m2

m2
m2

m2
m2

m2
m2
m2

m2
m2 Depth = Full Height of Wall - Thickness of Slab
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2 No Dedcution because area is less than 0.5 sqm


m2 50% dedcution

m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2 50% dedcution

m2
m2
m2
m2

m2
m2
m2
m2
m2

m2 No Dedcution because area is less than 0.5 sqm


m2 50% dedcution

nitng
m2
m2
m2
m2
m2

m2
m2
m2
m2

m2
m2
m2
m2

m2
m2

oring

m2
m2
m2

m2
m2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m2
m2

m2
m2

m2
m2

m2
m2

m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m2
m2

m2
m2

m2
m2
m2

m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2 0.025 extra because of Granite Moulding
m2
m2
m2

oors

m3
m3
m3
m3

m
m
m2
m2
m2

m2
m2

m2
m2

each
each
each
each
each
each

ndows

Kg
Kg
Kg

Kg
Kg
Kg
Kg

Kg
Kg
Kg

Kg
Kg
Kg
Kg
m2
m2
m2

m2
m2
m2

Kg
Kg
Kg
Kg
Kg

Kg
Kg
Kg
Kg
Kg

Kg
Kg
Kg
Kg
Kg
Kg

ndrail

Kg
Kg
Kg
Kg
Kg same as support pipe
Kg

Kg
Kg
Kg
Kg
Kg same as support pipe
Kg

Kg
Kg
Kg
Kg
Kg same as support pipe
Kg
Kg

se Tower

m3
m3
m3

m3
m3

m2
m2

m3
m3
m3

m2

m2
m2
m2

m3
m3
m3
m2
m2
m2
m2
m2

m3
m3

m3
m3
m3

m2
m2 D2A
m2

m2
m2
m2
m2

m2
m2
m2
m2

m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m2
m2
m2

m2
m2
m2

m2
m2
Ground No.
Beam
Length
of Beam
(Clear Span)
GB1 6 2.5
GB2 4 3.4
GB3 4 1.5
GB4 6 2.05
GB5 4 2.4
GB6 2 3.5
GB7 2 3.35
GB8 2 2.55
GB9 6 3.25
GB10 2 1.6
GB11 2 0.8
GB12 2 2.65
GB13 2 2.5
GB14 2 2.2
GB15 2 2.25

GB16 4 2.4

Plinth Beam
No.Length
of Beam
(Clear Span)
PB15 2 2.25
PB16 1 2.4
AreaNo.of filling
L(X-direction)
Area B(Y-direction)
A1 2 3.4 2.8
A2 2 2.05 2.8
A3 2 2.05 1.25
A4 4 2.2 1.075
A5 2 3.25 2.4
A6 2 2.8 3.5
A7 2 3.25 2.7
A8 2 3.25 1.35
A9 1 2.4 3.45
A10 1 2.4 1.75
A11 1 2.4 1.7
For 200mm Wall Deduction
No.of Wall Length
MD D1 D2 D3
GB1 4 2.50
GB2 2 3.40
GB4 2 2.05 -2
GB5 2 2.40
GB6 2 3.50
GB8 2 2.55 -2
GB9 2 3.25 -2
GB12 2 2.65
GB15 2 2.25
GB16 2 2.40 -1
1.35
D1 = 2, W1= 4

W2 = 4, V = 4
32.8
D2 = 2, D3 =2
8.1504
16.0416

13.5351

9.333
7.695
14.85
Reference Data
40mm dia steel pipe (Main pipe) 1.477 Kg
32mm dia steel pipe (Support pipe) 1.067 Kg
18mm dia steel pipe (Distribution Pipe) 0.574 Kg
Base Plate (Bottom) 0.1 Kg
For
Deduction 100mm Deduction
Wall No.of Wall Length
W1 W2 V MD D1 D2 D3 W1
-2 GB1 2 2.50
-4 GB2 2 3.40 -2 -2
-2 GB4 2 2.05 -2
-4 GB5 2 2.40 -2
-4 GB7 2 3.35 -2
GB13 2 2.50
-2 GB14 2 2.20
-2
ction
W2 V
Quantity
Sl.No Description Unit
Ground Floor First Floor
1 Earthwork
Site Cleaning Sqm 282.75 0.00
Excavation Cum 191.16 0.00
Sand Filling Cum 12.74 0.00
Backfilling + Plinth Filling Cum 242.91 0.00
2 Cement Concrete (Plain & Reinforced)
PCC (M-10) Cum 12.74 0.00
Floor PCC (M-15) Cum 12.56 0.00
Footing Concrete M-25 Cum 21.00 0.00
Pedestal Column Concrete M-25 Cum 2.24 0.00
Ground Beam Concrete M-25 Cum 9.63 0.00
Plinth Beam Concrete M-25 Cum 0.52 0.00
Column Concrete for Sub Structure M-25 Cum 2.16 0.00
Column Concrete for Super Structure M-25 Cum 7.20 7.20
Sill Band M-25 Cum 1.32 1.32
Lintel Beam M-25 Cum 3.00 3.00
Slab Beam M-25 Cum 11.45 11.45
Slab M-25 Cum 14.59 14.59
Chhajja Cum 1.05 1.05
Staircase Concrete M-25 Cum 1.99 1.99
Column Concrete for Parapet wall Cum 0.00 1.40
Column concrete for Staircase Tower Cum 0.00 0.84
Staircase Tower Slab Beam Cum 0.00 0.74
Staircase Tower Slab Cum 0.00 1.08
D.P.C for Sub - Structure Sqm 30.38 0.00
D.P.C for Super - Structure Sqm 13.18 13.18
Bitumin coat Cum 30.38 0.00
3 Reinforcement
Below Plinth Level Kg 3909.80 0.00
Above Plinth Level Kg 4465.36 4910.93
4 Formwork
Footing Shuttering Sqm 38.40 0.00
Pedestal Column Shuttering Sqm 29.12 0.00
Ground Beam Shuttering Sqm 77.04 0.00
Plinth Beam Shuttering Sqm 13.86 0.00
Column Shuttering For Sub - Structure Sqm 28.08 0.00
Column Shuttering For Super - Structure Sqm 93.60 93.60
Sill Band Shuttering Sqm 16.02 16.02
Lintel Beam Shuttering Sqm 43.20 43.20
Slab Beam Shuttering Sqm 99.67 99.67
Slab Shuttering Sqm 116.71 116.71
Staircase Shuttering Sqm 17.75 17.75
Chhajja Shuttering Sqm 12.54 12.54
Column Shuttering for Parapet wall Sqm 0.00 18.20
Column Shuttering for Staircase Tower Sqm 0.00 10.92
Staircase Tower Beam Shuttering Sqm 0.00 6.81
Staircase Tower Slab Shuttering Sqm 0.00 9.13
5 Brickwork
One Line Brick Work For Ground Beam Cum 3.21 0.00
Brick Work Up to D.P.C Bottom Cum 14.01 0.00
Entrance Step Cum 1.89 0.00
One Line B.W. For Super Str. 200mm Wall Cum 1.03 1.03
One Line B.W. For Super Str. 100mm Wall Sqm 2.84 2.84
B.W.Up to Sill Band Bottom For 200 mm wall Cum 6.72 6.72
B.W.Up to Sill Band Bottom For 100 mm wall Sqm 18.46 18.46
Brickwork Up to Lintel Level For 200 mm wall Cum 8.09 8.09
Brickwork Up to Lintel Level For 100 mm wall Sqm 34.08 34.08
Brickwork Up to Slab Beam For 200 mm wall Cum 4.03 4.03
Brickwork Up to Slab Beam For 100 mm wall Sqm 12.88 12.88
Parapet Wall Cum 0.00 10.78
Staircase Tower Brick Work Cum 0.00 3.81
6 Plastering Work
6mm Plaster Sqm 165.64 165.64
6mm Plaster on Staircase Tower Slab Sqm 0.00 10.33
12mm Plaster Sqm 265.37 265.37
15mm Inner Plaster Sqm 143.20 143.20
12mm Inner Plaster on Staircase Tower Wall Sqm 0.00 23.01
15mm Outer Plaster Sqm 200.69 206.25

15mm Outer Plaster on Parapet wall inner side Sqm


or Staircase Tower Outer Side 0.00 87.73
7 Painting Work
White Wash Sqm 774.90 901.52
Putty Sqm 574.21 607.54
Inner Paint Sqm 574.21 607.54
Outer Paint Sqm 200.69 293.98
8 Flooring Work
Kota Stone Sqm 20.96 20.96
Granite Sqm 24.34 18.22
Vitrified Tiles Sqm 124.43 114.62
Ceramic Tile Sqm 0.00 107.28
9 Door Work
Door Frame (MD+D1+D2) Cum 0.63 0.63
Pannelled Door Shutter (MD + D1) Sqm 9.42 9.42
Door Frame FRP (D3) Metre 19.80 19.80
Door Shutter Flush Door (D2) Sqm 12.15 12.15
Door Shutter FRP (D3) sqm 5.09 5.09
L-Drop Each 18.00 18.00
Handle Each 34.00 34.00
Tower Bolt Each 29.00 29.00
Door Holder Each 17.00 17.00
Door Stopper Each 13.00 13.00
Hinges Each 51.00 51.00
10 Window
Aluminum Fixed Frame Kg 65.74 65.74
Aluminum Sliding Frame Kg 91.58 91.58
Glass Sqm 21.60 21.60
Mosquitto Net Sqm 10.80 10.80
Window Grill Kg 330.96 345.09
Hand rail Kg 0.00 235.48
antity

Total Quantity

282.75
191.16
12.74
242.91

12.74
12.56
21.00
2.24
9.63
0.52
2.16
14.40
2.64
5.99
22.89
29.18
2.11
3.99
1.40
0.84
0.74
1.08
30.38
26.36
30.38

3909.80
9376.29

38.40
29.12
77.04
13.86
28.08
187.20
32.04
86.40
199.35
233.42 Staircase (Excluding Landing) Landing
35.50 14.57 14.57 29.14 3.18 3.18 6.36
25.08
18.20
10.92
6.81
9.13

3.21
14.01
1.89
2.07
5.68
13.44
36.92
16.18
68.16
8.05
25.76
10.78
3.81

331.28
10.33
530.75
286.40
23.01
406.93

87.73
1676.41
1181.75
1181.75 Kota
494.66 Ground Floor First Floor Total Quantity
Flooring Skirting Flooring Skirting Flooring Skirting
41.92 19.49 1.47 19.49 1.47 38.98 2.94
42.56
239.04 Vitrified Tiles
107.28 110.85 13.58 102.45 12.17 213.3 25.74

1.26 Ceramic Tiles


18.83 11.52 95.76 11.52 95.76 23.04 191.52
39.60
24.30
10.19
36.00
68.00
58.00
34.00
26.00
102.00

131.47
183.16
43.20
21.60
676.04
235.48
BILL OF QUANTITY

Name Of Work: Sainik School Complex - Staff Quarter


Engineer Name: Er. Eshwar Prasad B T
Tender Amount ₹ 8,178,001.45
S.NO. CODE NO. DESCRIPTION OF WORK QTY
1 Earthwork
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10
2.8 sqm on plan), including dressing of sides and ramming of
bottoms, lift upto 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil as
directed, within a lead of 50 m.

2.8.1 All kinds of soil. 191.16


Surface dressing of the ground including removing
vegetation and inequalities not exceeding 15 cm deep
2.28
and disposal of rubbish, lead up to 50 m and lift up to 1.5
m
2.28.1 All kinds of soil 282.75
Supplying and filling in plinth with sand under floors,
2.27 including watering, ramming, consolidating and dressing 12.74
complete.
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
2.25 exceeding 20cm in depth, consolidating each deposited 242.91
layer by ramming and watering, lead up to 50 m and lift
upto 1.5 m.

2 Cement Concrete Work


Providing and laying in position cement concrete of
4.1 specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from
4.1.4 natural sources : 4 graded stone aggregate 40 mm 12.56
nominal size derived from natural sources)
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from
4.1.6 natural sources : 6 graded stone aggregate 40 mm 12.74
nominal size derived from natural sources)
Providing and laying damp-proof course 50mm thick with
cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-
4.11 III) derived from natural sources : 4 graded stone 56.74
aggregate 20mm nominal size derived from natural
sources).

Providing & applying a coat of residual petroleum


bitumen of grade of VG-10 of approved quality using
4.13 1.7kg per square metre on damp proof course after 30.38
cleaning the surface with brushes and finally with apiece
of cloth lightly soaked in kerosene oil

3 Reinforced Cement Concrete

Providing and laying in position ready mixed or site


batched design mix cement concrete for reinforced
cement concrete work; using coarse aggregate and fine
aggregate derived from natural sources, Portland
Pozzolana / Ordinary Portland /Portland Slag cement,
admixtures in recommended proportions as per IS: 9103
5.33 to accelerate / retard setting of concrete, to improve
durability and workability without impairing strength;
including pumping of concrete to site of laying, curing,
carriage for all leads; but excluding the cost of centering,
shuttering, finishing and reinforcement as per direction of
the engineer-in-charge; for the following grades of
concrete.

5.33.1 All works upto plinth level


Concrete of M25 grade with minimum cement content
5.33.1.1 35.54
of 330 kg /cum
5.33.2 All works above plinth level upto floor V level
Concrete of M25 grade with minimum cement content of
5.33.2.1 85.24
330 kg /cum

Steel reinforcement for R.C.C. work including


5.22 straightening, cutting, bending, placing in position and
binding all complete upto plinth level.

Thermo-Mechanically Treated bars of grade Fe-500D or


5.22.6 3909.80
more

Steel reinforcement for R.C.C. work including


5.22A straightening, cutting, bending, placing in position and
binding all complete above plinth level

Thermo-Mechanically Treated bars of grade Fe-500D or


5.22A.6 9376.29
more
4 Formwork
Centering and shuttering including strutting, propping
5.9
etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass
5.9.1 38.40
concrete
Suspended floors, roofs, landings, balconies and access
5.9.3 273.99
platform
Lintels, beams, plinth beams, girders, bressumers and
5.9.5 415.49
cantilevers
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts 273.52
5.9.7 Stairs, (excluding landings) except spiral-staircases 29.14
5 Brickwork
Brick work with common burnt clay modular bricks of
6.2
class designation 7.5 in foundation and plinth in

6.2.1 Cement mortar 1:4 (1 cement : 4 coarse sand) 19.11


6.2.1 Cement mortar 1:4 (1 cement : 4 coarse sand) 54.33
Extra for brick work / AAC block masonry / Tile brick
6.5 masonry in superstructure above floor V level, for each 54.33
four floors or part thereof by mechanical means
Half brick masonry with common burnt clay F.P.S. (non
6.13 modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level.
6.13.2 Cement mortar 1:4 (1 cement :4 coarse sand) 136.52
6 Finishing work - Plaster work
13.1 12 mm cement plaster of mix
13.1.1 1:4 (1 cement: 4 fine sand) 553.75
15 mm cement plaster on the rough side of single or half
13.2
brick wall of mix :
13.2.1 1:4 (1 cement: 4 fine sand) 781.06
13.16 6 mm cement plaster of mix :
13.16.1 1:3 (1 cement : 3 fine sand) 341.61
7 Finishing work - Painting work
13.37 White washing with lime to give an even shade :
13.37.1 New work (three or more coats) 1676.41

Providing and applying plaster of paris putty of 2 mm


13.26 thickness over plastered surface to prepare the surface 1181.75
even and smooth complete

Distempering with oil bound washable distemper of


13.41
approved brand and manufacture to give an even shade
New work (two or more coats) over and including water
13.41.1 1181.75
thinnable priming coat with cement primer
Finishing walls with Acrylic Smooth exterior paint of
13.46
required shade

New work (Two or more coat applied @ 1.67 ltr/10 sqm


13.46.1 over and including priming coat of exterior primer applied 494.66
@ 2.20 kg/10 sqm)

8 Flooring Work
Kota stone slab flooring over 20 mm (average) thick
base laid over and jointed with grey cement slurry mixed
11.26 with pigment to match the shade of the slab, including
rubbing and polishing complete with base of cement
mortar 1 : 4 (1 cement : 4 coarse sand) :

11.26.1 25 mm thick 38.98

Kota stone slabs 20 mm thick in risers of steps, skirting,


dado and pillars laid on 12 mm (average) thick cement
mortar 1:3 (1 cement: 3 coarse sand) and jointed with
11.27 2.94
grey cement slurry mixed with pigment to match the
shade of the slabs, including rubbing and polishing
complete

Providing and laying vitrified floor tiles in different sizes


(thickness to be specified by the manufacturer) with
water absorption less than 0.08% and conforming to IS:
15622, of approved make, in all colours and shades, laid
11.41
on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
sand), jointing with grey cement slurry @ 3.3 kg/ sqm
including grouting the joints with white cement and
matching pigments etc., complete

11.41.2 Size of Tile 600x600 mm 213.3

Providing and laying Vitrified tiles in different sizes


(thickness to be specified by manufacturer), with water
absorption less than 0.08 % and conforming to I.S.
15622, of approved make, in all colours & shade, in
11.46
skirting, riser of steps, over 12 mm thick bed of cement
mortar 1:3 (1 cement: 3 coarse sand), jointing with grey
cement slurry @ 3.3 kg/ sqm including grouting the joint
with white cement & matching pigments etc. complete.

11.46.2 Size of Tile 600x600 mm 25.74


Providing and laying Polished Granite stone flooring in
required design and patterns, in linear as well as
curvilinear portions of the building all complete as per the
architectural drawings with 18 mm thick stone slab over
20 mm (average) thick base of cement mortar 1:4 (1
11.56
cement : 4 coarse sand) laid and jointed with cement
slurry and pointing with white cement slurry admixed with
pigment of matching shade including rubbing, curing and
polishing etc. all complete as specified and as directed
by the Engineer-in-Charge

Polished Granite stone slab colour of Black, Cherry/Ruby


11.56.1 42.56
Red or equivalent

Providing and laying Ceramic glazed floor tiles of size


300x300 mm (thickness to be specified by the
manufacturer) of 1st quality conforming to IS : 15622 of
approved make in colours such as White, Ivory, Grey,
11.37 23.04
Fume Red Brown, laid on 20 mm thick cement mortar
1:4 (1 Cement : 4 Coarse sand), Jointing with grey
cement slurry @ 3.3 kg/sqm including pointing the joints
with white cement and matching pigment etc., complete

Crazy ceramic tile flooring, with under layer 12 mm thick


cement mortar 1:4 (1 cement: 4 coarse sand), with joints
not exceeding 5 mm, including filling the gaps with
ordinary cement mixture & mixing with synthetic
polyester fibre, triangular in shape having specific gravity
11.45 of 1.34 to 1.40, cross section size ranging from 10 to 40 191.52
micron & length upto 6 mm , mixing fibre @ 125 grams
per 50 kg of cement in cement mortar, including
providing and mixing water proofing material in mortar @
1 kg per 50 kg of cement, all complete as per direction of
Engineer-in-charge

9 Wood & PVC Work

Providing wood work in frames of doors, windows,


clerestory windows and other frames, wrought framed
9.1 and fixed in position with hold fast lugs or with dash
fasteners of required dia & length (hold fast lugs or dash
fastener shall be paid for separately).

9.1.2 Sal wood 1.26


Providing and fixing panelled or panelled and glazed
shutters for doors, windows and clerestory windows,
fixing with butt hinges of required size with necessary
9.5 screws, excluding panelling which will be paid for
separately, all complete as per direction of Engineer-in-
charge. (Note:Butt hinges and necessary screws shall
be paid separately)

9.5.1 9.5.1 Second class teak wood


9.5.1.1 35 mm thick shutters 18.83

Providing and fixing Fiber Glass Reinforced plastic


(FRP) Door Frames of cross-section 90 mm x 45 mm
having single rebate of 32 mm x 15 mm to receive
shutter of 30 mm thickness. The laminate shall be
moulded with fire resistant grade unsaturated polyester
9.121 39.60
resin and chopped mat. Door frame laminate shall be
2mm thick and shall be filled with suitable wooden block
in all the three legs. The frame shall be covered with
fiber glass from all sides. M.S. stay shall be provided at
the bottom to steady the frame.

Providing and fixing 35 mm thick factory made


laminated veneer lumber door shutter conforming to IS :
14616 and TADS 15:2001 (Part B), fixing with butt
9.6
hinges of required size with necessary screws, all
complete as per directions of Engineer- in-charge and
panelling with panels of

12 mm thick one side Pre-laminated particle board


(decorative lamination on one side and other sides
balancing lamination) grade -1, medium density flat
pressed, three layer particle board FPT - I or graded
9.6.3 24.30
wood particle board FPT-1 conforming to IS : 3087
bonded with BWP type synthetic resin adhesive as per
IS : 848 and pre-laminated conforming to IS : 12823,
Grade -1, Type II marked :

9.122 Providing and fixing to existing door frames.

30 mm thick Glass Fibre Reinforced Plastic (FRP)


panelled door shutter of required colour and approved
brand and manufacture, made with fire - retardant grade
unsaturated polyester resin, moulded to 3 mm thick FRP
9.122.1 laminate for forming hollow rails and styles, with wooden 10.19
frame and suitable blocks of seasoned wood inside at
required places for fixing of fittings, cast monolithically
with 5 mm thick FRP laminate for panels conforming to
IS: 14856, including fixing to frames
Providing and fixing ISI marked oxidised M.S. sliding
9.62
door bolts with nuts and screws etc. complete :
9.62.1 300x16 mm 36.00

Providing and fixing ISI marked oxidised M.S. tower bolt


9.63 black finish, (Barrel type) with necessary screws etc.
complete :

9.63.1 250x10 mm 58.00

Providing and fixing ISI marked oxidised M.S. handles


9.66 conforming to IS:4992 with necessary screws etc.
complete :

9.66.1 125 mm 68.00

Providing and fixing bright finished brass hanging type


9.82 26.00
floor door stopper with necessary screws, etc. complete

Providing and fixing ISI marked M.S. pressed butt hinges


9.55
bright finished with necessary screws etc. complete :

9.55.2 100x58x1.90 mm 102.00

Providing and fixing magnetic catcher of approved


9.114 quality in cupboard / ward robe shutters, including fixing
with necessary screws etc. complete

9.114.2 Double strip (horizontal type) 34.00


10 Aluminum Window

Providing and fixing aluminium work for doors, windows,


ventilators and partitions with extruded built up standard
tubular sections/ appropriate Z sections and other
sections of approved make conforming to IS: 733 and IS:
1285, fixing with dash fasteners of required dia and size,
including necessary filling up the gaps at junctions, i.e. at
top, bottom and sides with required EPDM rubber/
21.1 neoprene gasket etc. Aluminium sections shall be
smooth, rust free, straight, mitred and jointed
mechanically wherever required including cleat angle,
Aluminium snap beading for glazing / paneling, C.P.
brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-
charge. (Glazing, paneling and dash fasteners to be
paid for separately) :

21.1.1 For fixed portion


Anodised aluminium (anodised transparent or dyed to
21.1.1.1 required shade according to IS: 1868, Minimum anodic 131.47
coating of grade AC 15)

For shutters of doors, windows & ventilators including


providing and fixing hinges/ pivots and making provision
21.1.2 for fixing of fittings wherever required including the cost
of EPDM rubber / neoprene gasket required (Fittings
shall be paid for separately)

Anodised aluminium (anodised transparent or dyed to


21.1.2.1 required shade according to IS: 1868, Minimum anodic 183.16
coating of grade AC 15
Providing & fixing glass panes with putty and glazing
10.30 clips in steel doors, windows, clerestory windows, all
complete with
10.30.1 4.0 mm thick glass panes 43.20
Providing & fixing fly proof wire gauze to windows,
10.29 clerestory windows & doors with M.S. Flat 15x3 mm and
nuts & bolts complete
Galvanised M.S. Wire gauze with 0.63 mm dia wire and
10.29.1 21.60
1.4 mm aperture on both sides

Providing and fixing angle iron frames for doors,


windows and ventilators of mild steel Angle sections of
size 35x35x5 mm, joints mitred and welded by angle iron
35x35x5 mm or 35x 5 mm flat pieces to the existing T-
10.31 676.04
iron frame or to the wall with dash fastener, including
fixing of necessary butt hinges and screws and applying
a priming coat of approved steel primer, all complete as
per the direction of Engineer-In-charge.

Providing and fixing stainless steel ( Grade 304) railing


made of Hollow tubes, channels, plates etc., including
welding, grinding, buffing, polishing and making
curvature (wherever required) and fitting the same with
necessary stainless steel nuts and bolts complete, i/c
fixing the railing with necessary accessories & stainless
10.28 235.48
steel dash fasteners , stainless steel bolts etc., of
required size, on the top of the floor or the side of waist
slab with suitable arrangement as per approval of
Engineer-incharge, (for payment purpose only weight of
stainless steel members shall be considered excluding
fixing accessories such as nuts, bolts, fasteners etc.).

Total cost of the Project (A)

Add 10 % for Plumbing (B)


Add 10 % for Electrification (C )

Total cost of the Project (D = A+B+

Add 3% contingency charge (E )

Grand Total cost of the Project (F= D +E)


UNITS RATE AMOUNT (₹)

Cum 286.85 ₹ 54,834.25

Sqm 28.15 ₹ 7,959.41

Cum 2161.20 ₹ 27,542.33

Cum 253.95 ₹ 61,686.46

Cum 7226.95 ₹ 90,763.27

Cum 6670.25 ₹ 85,005.67


Sqm 452.25 ₹ 25,658.40

Sqm 113.85 ₹ 3,458.19

Cum 7997.30 ₹ 284,252.77

Cum 10080.15 ₹ 859,221.47

Kg 89.65 ₹ 350,513.13

Kg 89.65 ₹ 840,583.97
Sqm 307.95 ₹ 11,825.28

Sqm 766.55 ₹ 210,027.03

Sqm 608.35 ₹ 252,763.34

Sqm 804.25 ₹ 219,978.46


Sqm 657.75 ₹ 19,166.51

Cum 5746.8 ₹ 109,842.90


Cum 5746.8 ₹ 312,197.78

Cum 142.00 ₹ 7,714.22

Sqm 1018.05 ₹ 138,984.19

Sqm 294.85 ₹ 163,274.29

Sqm 339.70 ₹ 265,324.38

Sqm 253.05 ₹ 86,443.40

Sqm 32.45 ₹ 54,399.66

Sqm 214.30 ₹ 253,250.04


Sqm 162.55 ₹ 192,094.23

Sqm 166.85 ₹ 82,534.02

Sqm 1706.60 ₹ 66,523.27

Sqm 2038.55 ₹ 5,993.34

Sqm 1416.65 ₹ 302,171.45

Sqm 1466.50 ₹ 37,747.71


Sqm 3908.80 ₹ 166,368.30

Sqm 935.60 ₹ 21,556.22

Sqm 815.45 ₹ 156,174.98

Cum 106720.85 ₹ 134,468.27


Sqm 3704.45 ₹ 69,764.05

Metre 702.60 ₹ 27,822.96

Sqm 3070.05 ₹ 74,602.22

Sqm 3496.75 ₹ 35,623.14


Each 180.55 ₹ 6,499.80

Each 74.65 ₹ 4,329.70

Each 35.20 ₹ 2,393.60

Each 109.60 ₹ 2,849.60

Each 39.05 ₹ 3,983.10

Each 34.15 ₹ 1,161.10


Kg 433.95 ₹ 57,052.27

Kg 531.80 ₹ 97,406.83

Sqm 940.30 ₹ 40,620.96

Sqm 732.20 ₹ 15,815.52

Kg 103.70 ₹ 70,105.56

Kg 612.25 ₹ 144,173.02

l cost of the Project (A) ₹ 6,616,506.02

10 % for Plumbing (B) ₹ 661,650.60


10 % for Electrification (C ) ₹ 661,650.60

l cost of the Project (D = A+B+C) ₹ 7,939,807.23

3% contingency charge (E ) ₹ 238,194.22

₹ 8,178,001.45