Final Project
Final Project
Prepared by:_KEMALZIYAD
Table of content
Content Page
Unit one………………………………………………………………………………………………….5
1. Introduction…………………………………………………………………….....................5
1.1 Background of the project....................................................................5
1.2 Activity of the organization………………………………………………………………..5
1.3 Statement of the problem......................................................................5
1.4 Significance of the project………..…….…………..…..….…............................6
1.5 Objectives………………………………………………………………………………………….6
1.5.1 General (Goal) objective ..............…………………………………………….6
1.5.2 Specific or Immediate objective..............………………………………….6
1.6 Scope and Limitation of the project...………………….……………………………….7
Page 1
1.6.1 Scope of the project........................................................................7
1.6.2 Limitation of the project..................................................................7
1.7 Project Management Technique.………....………………………………………………….7
1.7.1 Project Budget (cost break down estimation)…….………………………….8
1.7.2 Risk Analysis, identification, mitigation and ........................................8
monitoring…….……..................................................................................………….8
1.8 Feasibility Analysis ...............…………………………….……….……………….....….……..9
1.8.1 Economic Feasibility.……………………………….…….…………....……………..9
1.8.2 Technical Feasibility.........................................................................9
1.8.3 Operational Feasibility....................................................................9
Unit two………………………………………………………………………………........................10
System Analysis
2.1 Methodology and Tools............................……………………….…….……………...10
2.2 Data collection methodology.............................…………….….…………….10
2.3 Systm devlopment tools ……………......………………….……………………........ 9
2.4 Hardware requirement................................................................................9
2.5 Software requirement..................................................................................9
2.6 Problem of current system……………………………………………………………………….11
2.7 Functional Requirement.............................................................................11
2.8 Non-functional requirement........................................................................12
UNIT THREE
System Design
3.1 User interface Prototype (snap shoot)..........................................................13
UNIT FOUR
Implementation
4.1 Implementation.............................................................................................18
4.2 Conclusion and recommendation..................................................................18
Page 2
Abstract
This project will concern about finance management system in Madda walabu University.
In the existing system the transactions are done only manually and there are errors due to
carelessness or oversight that may result in loss to the data and as to the organization. For an
organization, time is very important factor. They works manually, unsatisfactory and very
difficult to work because their current work system has many problems such as lack of security
of data, needs manual calculations using paper, excel and calculator, no fast retrieval of data
time, consume large volume of paper work and more man power, waste of too many hardware
materials and lose of their files. All the necessary records of the above management activities
are kept manually on papers and stored in file cabinet.
The main objective of this system is to develop a new system which solves the above
mentioned problems with the existing system.
The new system implements for mwu finance department to oversee and govern its income,
employee payroll system, expenses, credit interest, profit and loss, day book and assets or
capital with the objectives of maximizing profits and ensuring sustainability.
UNIT ONE
1 Introduction
1.1 Background of the project
FMGT is organization which found in mwu main campus and other branch like Goba. The
main branch of this universities found in Bale Robe. It has more than two branches and in
each branch has more than 13 employees. The main branch has 18 Employees. The
university has main services such as learning and distributes modern system to the student
like photocopy machines, printers, household electronic devices and computers, maintain
electronic devices and give technical services. A financial management system is the
methodology and software that an organization uses to oversee and govern its income,
expenses, and assets with the objectives of maximizing profits and ensuring sustainability.
1.2 Activity of the organization
It’s obvious that in some Ethiopian higher institutions work on FMGTS is not introduced as
much as its expected to be some activities are manually which leads wastage of time, labor
and accuracy so decided MWUFMGTS overcome of manually changed to automated used to
Page 3
budget and expenditures in our system we are developing expected to more efficient,
reliable for the servant.
1.3 Symptoms:-
MWU FMGT the finance work system works unsatisfactory and very difficult to work
because their current work system has many problems such as:
In the existing system the transactions are done only manually and there are errors due to
carelessness or oversight that may result in loss to the data and as to the organization. For
an organization, time is very important factor. They works manually, unsatisfactory and
very difficult to work because their current work system has many problems such as lack of
security of data, needs manual calculations using paper, excel and calculator, no fast
retrieval of data time, consume large volume of paper work and more man power, waste of
too many hardware materials and lose of their files. All the necessary records of the above
management activities are kept manually on papers and stored in file cabinet. Such as
Lack of security of data: - all files are kept on cabinets by a box file they are
exposed to theft and other environmental disaster.
More man power is needed: - requires many numbers of peoples to calculate the
transactions like employees overtime work payment during salary time.
Time consuming: - as it was manual using paper and Excel it is difficult to generate daily,
monthly and annually report on timely and it may have errors as they work in quickly.
Page 4
1.5 Beneficiaries of this system is the university itself in which, first, the environment is changed
to a computerized environment, which improves the quality of internal operations like accuracy,
timeliness, reliable, secured, relevant and Some the necessary records of the above management
activities are kept manually on papers and stored in file cabinet.
1.6 Objective
1.6.1 General (Goal) objective
The main objective of this system is to develop a new system which solves the above
mentioned problems with the existing system.
1.6.2 Specific or Immediate objectives
The specific objectives of my project are:-
• To design a user friendly system.
• To make the office works in simple way.
• To increase the time to generate the report of the work.
• To give the service to the employees in short period of time.
• To reduce the human resource of the office.
• To increase to the work efficiency of the department.
• To minimize the loss of records or data
Page 5
1.7 The Study Team
. Maintenance
Since the system is developed for educational purpose there is no hardware that I spent
money to buy. The university covers all the hardware expenses.
Page 6
Software development
Miscellaneous Cost:-
The following table lists the different miscellanies costs that I spent in the process of the
development of the system
CD and DVD _ _
Page 7
1.9 Feasibility Analysis
Resource availability will directly affect the ability to achieve acceptable system, this evaluation
determines whether the software and hardware need for the proposed system is available or not.
The proposed system will feasible because hardware and software are available and are cost
effective.
Page 8
Can the work for the project be done with current equipment existing software technology and
available personal?
This is concerned with specifying equipment in the software that will success fully satisfy the
user requirement.
Resource availability will directly affect the ability to achieve acceptable system, this evaluation
determines whether the software and hardware need for the proposed system is available or not.
The proposed system will feasible because hardware and software are available and are cost
effective.
Time evaluation is the most important consideration in the development of project. The time
schedule required for the developed of this project is very important since more development
time effect machine time, cost and cause delay in the development
2. UNIT TWO
2.1 Methodology and Tools
Page 9
2.1.1 Data collection methodologies
I use observation and interview in order to obtain the information about the practices and
problems of the mwu fmgt, which ultimately assists me in developing the automated
system.
• Observation: - Observation is common methods of scientific research to collect the
data. I use observation to know the existing system, the location of mwu fmgt office,
different sub offices and how office members are handling the work in the office.
• Interview: - Interview is particularly useful for getting the history behind the
participant’s experiences. I used interview to get information about the existing system for
developing my project. The interview will be conducted on the staff member.
2.2 Current system
Overview
The organization performs many activities like:
Provide payroll for employees manually.
Manage all employees in mwu finance.
Also manage resources in mwu finance.
Page 10
Data clerk: the employee’s information is registered and controlled by the data
clerk.
Job applicant: applies to the field he wants to be employed.
Manager of the organization: is a person who commands the rule and regulation
of the organization.
Conclusion
• MWU finance management System is one of the main management system found in
management. After I have completed the project I am sure the problems in the existing system
will overcome. The finance management system process made computerized to design a user
friendly system, reduce the finance of the office, minimize the loss of records or data, minimize
the time consuming to search for records from the file and make it easy to search what we
want, to increase the security of the data by authentication and to increase to the work
efficiency of the department. The problems, which existed in the earlier system, have been
removed to a large extent. And it is expected that this project will go a long way in satisfying
users’ requirements.
Reference
1. Microsoft with Encarta Premium Dictionaries of current English, (2009),University press, 3rd Edition [1].
2. Entre on, Warkenaan Warrken,(2009) [3].
Page 11
3. Introduction to programming logic (2009) [3].
4. The Freedictionary (2007) [7].
5. Pauwels RA, Global strategy for the diagnosis(2005) [6].
6. According to Gordon (2006), computers based information system.
7. Connolly & Begg (2007) [4].
Page 12