Reservoir Performance Analysis Using OFM

OFM is reservoir simulation software from Schlumberger used for reservoir surveillance, production surveillance, and production forecasting. It allows users to view log displays, cross sections, wellbore diagrams, production and injection plots, and Hall plots. An example application shows water cut and oil cut data for wells in the Fourbear structure unit, which can help identify the direction and mechanism of aquifer influx into the reservoir.

Uploaded by

Radu Laurentiu
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views

Reservoir Performance Analysis Using OFM

OFM is reservoir simulation software from Schlumberger used for reservoir surveillance, production surveillance, and production forecasting. It allows users to view log displays, cross sections, wellbore diagrams, production and injection plots, and Hall plots. An example application shows water cut and oil cut data for wells in the Fourbear structure unit, which can help identify the direction and mechanism of aquifer influx into the reservoir.

Uploaded by

Radu Laurentiu
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 48

PRACTICAL

RESERVOIR PERFORMANCE
ANALYSIS & REVIEW
USING OFM

Joe Sinner
Legacy Reserves Operating, LP
2011 Wyoming IOR/EOR Conference
Jackson, WY
September 12-13, 2011
WHAT IS OFM??

• Oil Field Manager


• Licensed software from Schlumberger
• Primary functions:
‒ Reservoir surveillance
‒ Production surveillance
‒ Production forecasting
WHAT IS OFM??

• Database Interface (MS Access)


• Additional functions:
‒ Log displays & cross sections
‒ Wellbore diagrams
RESERVOIR SURVEILLANCE
• Identify aquifer influx mechanism/direction
• Identify dominant fluid flow direction/
well-to-well communication

PRODUCTION/INJECTION SURVEILLANCE
• Production plots
• Hall plots
AQUIFER INFLUX MECHANISM/DIRECTION

Example 1
Fourbear
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1958
FB 63

FB 34
FB 81
FB 31 FB 36
Fourbear Structure Unit

Example 1 FB 67FB 25
FB 84 FB 35

Fourbear FB 69
FB 66
FB 18
FB 77
FB 28

FB 53
FB 64 FB 30
FB 12 FB 73

FB 15 FB 59
FB 74 FB 32
FB 9

FB 8
FB 14 FB 7
FB 58
FB 72
FB 3
FB 10 FB 16
FB 61

FB 19 FB 56
FB 17
FB 85 FB 6
FB 65
FB 75
FB 51
FB 37
FB 22 FB 11
FB 2
FB 27 FB 71
FB 62 FB 24
FB 20
FB 23 FB 21
FB 29
FB 47 FB 42
FB 70

FB 57
FB 38 FB 44FB 13 FB 41

FB 26 FB 52
FB 86

FB 43
FB 48FB 39
FB 5 FB 82

Oil Cut ( % )
FB 45
Water Cut ( % )
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1960
FB 63

FB 34
FB 81
FB 31 FB 36
Fourbear Structure Unit

Example 1 FB 67FB 25
FB 84 FB 35

Fourbear FB 69
FB 66
FB 18
FB 77
FB 28

FB 53
FB 64 FB 30
FB 12 FB 73

FB 15 FB 59
FB 74 FB 32
FB 9

FB 8
FB 14 FB 7
FB 58
FB 72
FB 3
FB 10 FB 16
FB 61

FB 19 FB 56
FB 17
FB 85 FB 6
FB 65
FB 75
FB 51
FB 37
FB 22 FB 11
FB 2
FB 27 FB 71
FB 62 FB 24
FB 20
FB 23 FB 21
FB 29
FB 47 FB 42
FB 70

FB 57
FB 38 FB 44FB 13 FB 41

FB 26 FB 52
FB 86

FB 43
FB 48FB 39
FB 5 FB 82

Oil Cut ( % )
FB 45
Water Cut ( % )
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1962
FB 63

FB 34
FB 81
FB 31 FB 36
Fourbear Structure Unit

Example 1 FB 67FB 25
FB 84 FB 35

Fourbear FB 69
FB 66
FB 18
FB 77
FB 28

FB 53
FB 64 FB 30
FB 12 FB 73

FB 15 FB 59
FB 74 FB 32
FB 9

FB 8
FB 14 FB 7
FB 58
FB 72
FB 3
FB 10 FB 16
FB 61

FB 19 FB 56
FB 17
FB 85 FB 6
FB 65
FB 75
FB 51
FB 37
FB 22 FB 11
FB 2
FB 27 FB 71
FB 62 FB 24
FB 20
FB 23 FB 21
FB 29
FB 47 FB 42
FB 70

FB 57
FB 38 FB 44FB 13 FB 41

FB 26 FB 52
FB 86

FB 43
FB 48FB 39
FB 5 FB 82

Oil Cut ( % )
FB 45
Water Cut ( % )
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1967
FB 63

FB 34
FB 81
FB 31 FB 36
Fourbear Structure Unit

Example 1 FB 67FB 25
FB 84 FB 35

Fourbear FB 69
FB 66
FB 18
FB 77
FB 28

FB 53
FB 64 FB 30
FB 12 FB 73

FB 15 FB 59
FB 74 FB 32
FB 9

FB 8
FB 14 FB 7
FB 58
FB 72
FB 3
FB 10 FB 16
FB 61

FB 19 FB 56
FB 17
FB 85 FB 6
FB 65
FB 75
FB 51
FB 37
FB 22 FB 11
FB 2
FB 27 FB 71
FB 62 FB 24
FB 20
FB 23 FB 21
FB 29
FB 47 FB 42
FB 70

FB 57
FB 38 FB 44FB 13 FB 41

FB 26 FB 52
FB 86

FB 43
FB 48FB 39
FB 5 FB 82

Oil Cut ( % )
FB 45
Water Cut ( % )
AQUIFER INFLUX MECHANISM/DIRECTION

Example 2
Quealy Dome
(Dakota)
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1942

Example 2 Holst 12

Quealy Dome Holst 11 Holst 09

(Dakota)
Holst 13 Holst 08 Holst 10

Holst 07 Wilson 04

Holst 06 Holst 15

Holst 02 Holst 05 Wilson 03

Holst 01 Wilson 01

Holst 04 Wilson 02

Holst Woolf 1

Oil Cut ( % )
Water Cut ( % )
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1944

Example 2 Holst 12

Quealy Dome Holst 11 Holst 09

(Dakota)
Holst 13 Holst 08 Holst 10

Holst 07 Wilson 04

Holst 06 Holst 15

Holst 02 Holst 05 Wilson 03

Holst 01 Wilson 01

Holst 04 Wilson 02

Holst Woolf 1

Oil Cut ( % )
Water Cut ( % )
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1948

Example 2 Holst 12

Quealy Dome Holst 11 Holst 09

(Dakota)
Holst 13 Holst 08 Holst 10

Holst 07 Wilson 04

Holst 06 Holst 15

Holst 02 Holst 05 Wilson 03

Holst 01 Wilson 01

Holst 04 Wilson 02

Holst Woolf 1

Oil Cut ( % )
Water Cut ( % )
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1953

Example 2 Holst 12

Quealy Dome Holst 11 Holst 09

(Dakota)
Holst 13 Holst 08 Holst 10

Holst 07 Wilson 04

Holst 06 Holst 15

Holst 02 Holst 05 Wilson 03

Holst 01 Wilson 01

Holst 04 Wilson 02

Holst Woolf 1

Oil Cut ( % )
Water Cut ( % )
AQUIFER INFLUX MECHANISM/DIRECTION
Date:1/1/1969

Example 2 Holst 12

Quealy Dome Holst 11 Holst 09

(Dakota)
Holst 13 Holst 08 Holst 10

Holst 07 Wilson 04

Holst 06 Holst 15

Holst 02 Holst 05 Wilson 03

Holst 01 Wilson 01

Holst 04 Wilson 02

Holst Woolf 1

Oil Cut ( % )
Water Cut ( % )
DOMINANT FLUID FLOW DIRECTION

Example 3
Kirby Creek
Waterflood
DOMINANT FLUID FLOW DIRECTION

Example 3 Just Prior to Unitization


Kirby Creek Date:10/1/1968

KC 12
KC 9

Waterflood KC 24
KC 26
Kirby Creek Unit

KC 1
KC 17
6

Bubble Map KC 25
0

KC 21
KC 8
KC 20
KC 16
KC 11

of Water Rates KC 13 KC 2
KC 14

(Inj & Prod) KC 27

KC 18
KC 7 0
KC 15

KC 4 KC 22
1 KC 6 KC 3
KC 28
0 0
KC 29
0
Water Rate (Cal Day ) ( bbl/d )
KC 10 KC 19 KC 5
W. Inj Rate (Cal Day ) ( bbl/d ) 122
0
KC 23
DOMINANT FLUID FLOW DIRECTION

Example 3 4 Yrs After Unitization


Date:10/1/1972

Kirby Creek
Waterflood KC 12
KC 9

KC 24
KC 26
Kirby Creek Unit

Bubble Map KC 1
9
KC 17

of Water Rates KC 25
0

KC 21
KC 8
KC 16
KC 11
KC 20

(Inj & Prod) KC 13 KC 2


KC 14

0
KC 27 KC 7 0
KC 15
KC 18

KC 4 KC 22
15 KC 6 KC 3
KC 28
0 0
KC 29
726

KC 10 KC 5
KC 19
Water Rate (Cal Day ) ( bbl/d ) 168
0
W. Inj Rate (Cal Day ) ( bbl/d )
KC 23
DOMINANT FLUID FLOW DIRECTION

Example 3 13 Yrs After Unitization


Date:12/1/1981

Kirby Creek
Waterflood KC 12
KC 9

KC 24
KC 26
Kirby Creek Unit

Bubble Map KC 1
76
KC 17

of Water Rates KC 25
0

KC 21
KC 8
KC 16
KC 11
KC 20

(Inj & Prod) KC 13 KC 2


KC 14

5
KC 27 KC 7 0
KC 15
KC 18

KC 4 KC 22
26 KC 6 KC 3
KC 28
0 0
KC 29
669

KC 10 KC 5
KC 19
Water Rate (Cal Day ) ( bbl/d ) 246
0
W. Inj Rate (Cal Day ) ( bbl/d )
KC 23
DOMINANT FLUID FLOW DIRECTION

Example 3 24 Yrs After Unitization


Date:10/1/1992

Kirby Creek
Waterflood KC 12
KC 9
16
KC 24 0
KC 26
Kirby Creek Unit

Bubble Map KC 1
0
KC 17

of Water Rates KC 25
KC 21
KC 8
KC 16
KC 11
24
KC 20

(Inj & Prod) KC 13


0
17

KC 2
0
KC 14

111 0
KC 27 KC 7 332
0
6 KC 15
0
KC 18

KC 4 KC 22
21 KC 6 KC 3
KC 28
0 0
KC 29
0

KC 10 KC 5
KC 19
Water Rate (Cal Day ) ( bbl/d ) 0 0
W. Inj Rate (Cal Day ) ( bbl/d ) 524
KC 23
DOMINANT FLUID FLOW DIRECTION

Example 3 27+ Yrs After Unitization


Date:3/1/1996

Kirby Creek
Waterflood KC 12
KC 9
58
KC 24 0
KC 26
Kirby Creek Unit

Bubble Map KC 1
0
KC 17
2

of Water Rates KC 25
270

KC 21
0

KC 8
KC 16
KC 11
21
KC 20

(Inj & Prod) KC 13


135
0

KC 2
0
KC 14

132 0
KC 27 KC 7 248
0
53 KC 15
0
KC 18
126
0 KC 4 KC 22
0 KC 6 KC 3
KC 28
229 0
KC 29
507

KC 10 KC 5
KC 19
Water Rate (Cal Day ) ( bbl/d ) 0 91 34
227 0 0
W. Inj Rate (Cal Day ) ( bbl/d )
KC 23
DOMINANT FLUID FLOW DIRECTION

Example 3 40 Yrs After Unitization


Date:10/1/2008

Kirby Creek
Waterflood KC 12
KC 9
77
KC 24 0
0 KC 26
Kirby Creek Unit

Bubble Map
0 0
89
KC 1
KC 17
0
37

of Water Rates KC 25

0
188
184

KC 21
0

KC 8
KC 16

0
34 KC 11
83
125 KC 20

(Inj & Prod) KC 13


0
119
0
0
33

KC 2
0
KC 14

0 0
KC 27 KC 7 0
284
587 0 KC 15
0 394
KC 18 5
0
662 KC 4 KC 22
65 KC 6 KC 3
KC 28 0
0 0 0
36 KC 29
0 107
0
KC 10 679 KC 5
KC 19
Water Rate (Cal Day ) ( bbl/d ) 0 613 30
57 0 0
W. Inj Rate (Cal Day ) ( bbl/d )
KC 23
62
0
DOMINANT FLUID FLOW DIRECTION

Example 3 Cumulatives To Date


Date:6/1/2011

Kirby Creek
Waterflood KC 12
KC 9 0
322 0
KC 24 0
181 KC 26
Kirby Creek Unit

Bubble Map
0 1
425
KC 1
KC 17
180
129

of Water Cum’s KC 25

0
663
1342

KC 21
0

KC 8
KC 16

0
278 KC 11
204
464 KC 20

(Inj & Prod) KC 13


0
109
1263
0
70

KC 2
615
KC 14
0
829 61 150
KC 27 KC 7 1356
587
2028 517 KC 15
0 772
KC 18 30
192 0
1183 KC 4 KC 22
666 KC 6 KC 3
KC 28 0
1542 98 0 0
39 KC 29 0
0 7006
113
KC 10 1566 KC 5
KC 19
0 1481 1565
1734 0 0
KC 23
444
0
DOMINANT FLUID FLOW DIRECTION
0/

Example 4
1 4/ 18
2/ 18
6/ 80
10 /6 0

01-1-G
22/47
02-1-G

30/40
NIU

6/ 16
04-1
10/17
05-1
16/37
06-1
24/37 07-1
15/25

19 20 21 22 23

N2 Flood 21 22 23 15-2 14-2 24 13-3


09-1
7/14
25/30 8/32
33/39 12-1-29

8/ 50 8/ 50 42/47
13-2-G 10-1 08-1
11-1-G 4/14
9/21 7 /2 3
50/60
34/40
16-1-G 15-1-G 14-1-G 13-1-G

in OK
8/ 28 4/ 75 41/56 5 0/ 70 52/76 44/65

24-2
60/63 25-1 27-1
20-2 21-1 23-1
19-2 11/22 26-1-G 7/14
1 6/ 30 36/52 30/37 22/52
0/ 0
32 /6 4 15/20
22-1 24-1-G
39 /4 3
21-2-G 18/30 28-1 29-1
19-1-G 20-1-G
23-2-G 0/6 4/10
51/68 54/64
18-1 44 /7 0

27
16/70
26 25 30 29 28 27 26
28 37-2
46/50
18/24
36-2
40-1 39-2 36-2 35-1-D 34-1
38-2 75/78
68/80 32 /3 8 2/14 5/ 14
0/ 14 43/64
69/82 31-1-G
1 0/ 22 37-1-G 0/8 30-1
39-1-G 38-1-G 33-1-D 32-1 0/8
70/80 36-1 35-2 34-2
5/13 6/12
67/84 70/89 58/68 42/49 10/24

37-3-GH
45-1-G 46-1-G NIU
42-1 44-1
43-1 84/86 74/82 66/74 2/ 10
34/73
72/88 47-1-G
44-2-G
56/61
46-3 48-1 49-1-G 50-1 51-1 52-1
78/89 45-2 46-2
2 3/ 30 9/17 4/11
44-3 70/76 56/68 26/34
78/87 80/88

36 31 32 33 34 35
33 34 35 66/78

59-1-G 58-1-G 57-1-G 56-1-G 55-2-G 54-1-G 53-1


62-1-G 60-1-G
61-1
36/44 12/18 26/36 2/8
11/42 56/69 80/84 70/84 57/59 36/58

NIU
56-2-G 55-1 54-2 NIU
59-2 58-2 57-2
49/65 66/71 42/46 25/34 8/14 / 12
81/92

64-G1 65-1-G
63-2H
63-1-G 64-G2
62/82 66/75
28/38 74/80 67-1G
35

NIU 66-1-G
64-3H 66-G2
67
/

48

60/70 18/40
/

6 /1 3 NIU
/

52/69 68-1-G
65-2ST
60

67-2 20/36 0/6


45/52
/

2
28

65-2
5 4 3
29

74-G2 61/67

3 2 1 6
/

4 9/11
/

45/55
75-1 73-1 72-1 71-2
3/16 74-1 53/64 68/88 38/54 1/ 3
72-2
14/20
69
58

48

82/94
/

10
/

71-1-G
/

70-1
/ 69-1
9/

72/80 54/62
13/16
59
/

76-1 80-1-G
77-1 78-1-G
3/8 79-1-G 42/57
47 4/15 45/62
/ 7 3/ 54/62
20 /2 6
40/
65/ 80-2
57/
1 6/
39/50

11 12 7 8 9 10 11
9 10
4 7/

81-1
16 /2 4
50/ 6/14 0 /7

7 5/
0/

5 5/ 43 /
80 /
47 /

73 /
77 /
15
/
69/ 91/
13 18 17 16 15 14
16 15 14
66/ 8 0/
Date:5/15/1989

DOMINANT FLUID FLOW DIRECTION


Example 4 22
01G01 02G01
23 24
04-01 05-01
19
06-01
07-01
20 21 22

N2 Flood 16-02
15-02 14-02 13-03

13G02
12G01

11G01
10-01
09-01

08-01
16G01 15G01 14G01 13G01

in OK 19-02 20-02 21-01


22-01
23-01
24-02
25-01 26G01 27-01
27 26 25 24G01 30 29 28 27
19G01 20G01 21G02 28-01 29-01
18-01 23G02
40-01 37-02 36-02
39-02 38-02 38-03 37-04 35D01 34-01
39-03

Bubble Map 39G01 38G01


37G01
37G3H 36-01

45-03
35-02 34-02 33D01 32-01
31G01
30-01

42-01 43-3 44-01 47-03

of Gas Rates 43-01 45G01 46G01


44-4 47G01 48-2
34 35 36 31 32 33 34
44G02
43G02 45-02 46-03 46-02 48-01 49G01 50-01 51-01 52-01
44-03 47-02

(Inj & Prod) 62G01 61-01

60-2
60G01

59-02
59G01 58G01

58-02
58-3
57G01

57-02 56G02
56G01

55-01
55G02

54-02
54G01 53-01

63-2H
63G01 64G01
64G02 65G01 66-4

4 64-3H 66G01
66G02 67G01
3 2 1 6 5 4 3
68G01
65-2ST 66-03 67-02
75-01 74-02 73G01 72-01 71-02
74-01
72-02
72-03 71G01 70-01
69-01
76-01 77-01 78G01 80G01
79G01
9 10 11 12 7 8 9 10
Gas Rate (CalDay ) ( Mcf /d ) 80-02
Gas Inj Rate (CalDay ) ( Mcf /d )
81-01
Date:6/15/1993

DOMINANT FLUID FLOW DIRECTION


Example 4 22
01G01 02G01
23 24
04-01 05-01
19
06-01
07-01
20 21 22

N2 Flood
15-02 14-02 13-03 09-01
12G01
16-02
13G02 10-01 08-01
11G01
16G01 15G01 14G01 13G01

in OK 19-02

27
20-02 21-01
22-01
23-01
24-02

24G01
25-01 26G01 27-01

26 25 30 29 28 27
19G01 20G01 21G02 28-01 29-01
18-01 23G02
40-01 37-02 36-02
39-02 38-02 38-03 37-04 35D01 34-01
39-03

Bubble Map
31G01
37G01 30-01
39G01 38G01 37G3H 36-01 35-02 34-02 33D01 32-01

45-03
42-01 43-3 44-01 45G01 46G01 47-03

of Gas Rates
43-01
44-4 47G01 48-2
34 35 36 31 32 33 34
44G02
43G02 45-02 46-03 46-02 48-01 49G01 50-01 51-01 52-01
44-03 47-02

(Inj & Prod) 62G01 61-01

60-2
60G01

59-02
59G01 58G01

58-02
58-3
57G01

57-02 56G02
56G01

55-01
55G02

54-02
54G01 53-01

63-2H
63G01 64G01
64G02 65G01 66-4

4 64-3H 66G01
66G02 67G01
3 2 1 6 5 4 3
68G01
65-2ST 66-03 67-02
75-01 74-02 73G01 72-01 71-02
74-01
72-02
72-03 71G01 70-01
69-01
76-01 77-01 78G01 80G01
79G01
9 10 11 12 7 8 9 10
Gas Rate (CalDay ) ( Mcf /d ) 80-02
Gas Inj Rate (CalDay ) ( Mcf /d )
81-01
Date:7/15/2000

DOMINANT FLUID FLOW DIRECTION


Example 4 22
01G01 02G01
23 24
04-01 05-01
19
06-01
07-01
20 21 22

N2 Flood
15-02 14-02 13-03 09-01
12G01
16-02
13G02 10-01 08-01
11G01
16G01 15G01 14G01 13G01

in OK 19-02

27
20-02 21-01
22-01
23-01
24-02

24G01
25-01 26G01 27-01

26 25 30 29 28 27
19G01 20G01 21G02 28-01 29-01
18-01 23G02
40-01 37-02 36-02
39-02 38-02 38-03 37-04 35D01 34-01
39-03

Bubble Map
31G01
37G01 30-01
39G01 38G01 37G3H 36-01 35-02 34-02 33D01 32-01

45-03
42-01 43-3 44-01 45G01 46G01 47-03

of N2 Cum’s
43-01
44-4 47G01 48-2
34 35 36 31 32 33 34
44G02
43G02 45-02 46-03 46-02 48-01 49G01 50-01 51-01 52-01
44-03 47-02

(Inj & Prod) 62G01 61-01

60-2
60G01

59-02
59G01 58G01

58-02
58-3
57G01

57-02 56G02
56G01

55-01
55G02

54-02
54G01 53-01

63-2H
63G01 64G01
64G02 65G01 66-4

4 64-3H 66G01
66G02 67G01
3 2 1 6 5 4 3
68G01
65-2ST 66-03 67-02
75-01 74-02 73G01 72-01 71-02
74-01
Cum N2 Prod ( MMcf ) 72-02
Cum Gas Inj ( MMcf ) 72-03 71G01 70-01
69-01
76-01 77-01 78G01 80G01
79G01
9 10 11 12 7 8 9 10
80-02

81-01
PRODUCTION PLOTS
Oil Rate (CalDay) ( bbl/d ) EAST BINGER UNIT #37G3H
Binger Operations, LLC
Gas Rate (CalDay) ( Mcf/d )
10000
GOR ( Mcf/bbl )
5000 Gas Inj Rate (CalDay) ( Mcf/d )

1000

500

Pressure test tubing - possible small leak


100

50

Change out tubing & pkr


Perf 96' of OH; Frac OH

Lower pkr to prep for inj

Put on injection
10

1
1998 99 2000 01 02 03 04 05 06 07 08 09 10 11

Axis 1
1000 Cum Oil Prod ( Mbbl ) 100
Cum Gas Prod ( MMcf )
800 Cum N2 Prod ( MMcf ) 80
Axis 2
600 N2 Cut 60
N2 Cut ( % )
400 40

200 20

0 0
1998 99 2000 01 02 03 04 05 06 07 08 09 10 11

3000
Cum Gas Inj ( MMcf )

2400
PRODUCTION PLOTS
Oil Rate (CalDay) ( bbl/d ) EAST BINGER UNIT #36-01
Binger Operations, LLC
Gas Rate (CalDay) ( Mcf/d )
10000
GOR ( Mcf/bbl )
5000

Hot Oil; Bail sand, scale, salt, metal; Fm Cond Treatment


1000

500

100

Replace 2-7/8 Tbg with 2-3/8


Tag - metal junk in N-nipple

50

Attempt to cut off tail pipe


Squeeze Casing Leak

Tag - junk in N-nipple


Restore Treatment
Paraffin Treatment

10
37-3H online
Run Bailer

37-3H CTI

1
1998 99 2000 01 02 03 04 05 06 07 08 09 10 11

Axis 1
3750 Cum Oil Prod ( Mbbl ) 100
Cum Gas Prod ( MMcf )
3000 Cum N2 Prod ( MMcf ) 80
Axis 2
2250 N2 Cut 60
N2 Cut ( % )
1500 40

750 20

0 0
1998 99 2000 01 02 03 04 05 06 07 08 09 10 11

3000
Cum Gas Inj ( MMcf )

2400
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 4 PH
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 02/24/1948 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50

10

Upsize Rod Pump


CTP

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 228.68 Mbbl Cumulativ e Water Produced : 666.49 Mbbl Cumulativ e Gas Produced : 12.82 MMcf
10000
Cumulativ e Oil Produced ( Mbbl )
5000 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 5 (B-031282)
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 07/20/1940 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50

Missing water
production data

10

Clean out & Acidize


Acidize

Acidize
1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 321.01 Mbbl Cumulativ e Water Produced : 1565.21 Mbbl Cumulativ e Gas Produced : 25.82 MMcf
10000
Cumulativ e Oil Produced ( Mbbl )
5000 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK 9 (UNIT B-041616)
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 06/15/1984 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50

Missing water
production data

10
Acid Job w/ Cleanout

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 106.89 Mbbl Cumulativ e Water Produced : 321.66 Mbbl Cumulativ e Gas Produced : 34.84 MMcf
1000
Cumulativ e Oil Produced ( Mbbl )
500 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK 11 (64-12195)
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 03/09/1984 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50

Missing water

Acidize & Replace with IC tubing


10
production data

5
Tbg Leaks
Acidize

RTP
CTI

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 38.22 Mbbl Cumulativ e Water Produced : 203.72 Mbbl Cumulativ e Gas Produced : 11.18 MMcf
1000
Cumulativ e Oil Produced ( Mbbl )
500 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 15
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 10/21/1997 Water Cut ( % )
Plug: * Oil Cut ( % )
100

50

Missing water
production data

10

Acidize & Frac


Acidize

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 72.10 Mbbl Cumulativ e Water Produced : 29.54 Mbbl Cumulativ e Gas Produced : 19.88 MMcf
100
Cumulativ e Oil Produced ( Mbbl )
Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 16
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 08/14/1997 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50 Missing water
production data

10

Acidize & Frac


1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 42.95 Mbbl Cumulativ e Water Produced : 278.14 Mbbl Cumulativ e Gas Produced : 13.81 MMcf
1000
Cumulativ e Oil Produced ( Mbbl )
500 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 17
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 12/28/1993 Water Cut ( % )
Plug: * Oil Cut ( % )
100

50

Missing water
production data
10

Acidize & Frac


Acidize

Acidize

Acidize

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 55.24 Mbbl Cumulativ e Water Produced : 128.94 Mbbl Cumulativ e Gas Produced : 21.49 MMcf
1000
Cumulativ e Oil Produced ( Mbbl )
500 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 19
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 10/13/1994 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50
Convert to ESP, then back to Rods

10

Re-sized ESP & RTP


5

SI
1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 57.08 Mbbl Cumulativ e Water Produced : 1480.61 Mbbl Cumulativ e Gas Produced : 22.56 MMcf
10000
Cumulativ e Oil Produced ( Mbbl )
5000 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 20
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 02/08/1998 Water Cut ( % )
Plug: * Oil Cut ( % )
100

50

10

Acid Frac Well


Perf and Frac

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 50.40 Mbbl Cumulativ e Water Produced : 69.55 Mbbl Cumulativ e Gas Produced : 20.53 MMcf
100
Cumulativ e Oil Produced ( Mbbl )
Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 21
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 11/25/1997 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50

10

5
Acidize

Frac

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 61.07 Mbbl Cumulativ e Water Produced : 464.30 Mbbl Cumulativ e Gas Produced : 16.18 MMcf
1000
Cumulativ e Oil Produced ( Mbbl )
500 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 23
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 02/18/1998 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50

10

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 31.00 Mbbl Cumulativ e Water Produced : 444.47 Mbbl Cumulativ e Gas Produced : 9.62 MMcf
1000
Cumulativ e Oil Produced ( Mbbl )
500 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 24
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 12/26/1997 Water Cut ( % )
Plug: * Oil Cut ( % )
100

50

Missing water
production data
10

5
Acidize

1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 28.30 Mbbl Cumulativ e Water Produced : 181.37 Mbbl Cumulativ e Gas Produced : 11.94 MMcf
1000
Cumulativ e Oil Produced ( Mbbl )
500 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 25
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 01/09/1998 Water Cut ( % )
Plug: * Oil Cut ( % )
1000

500

100

50

10

5
Upsized pump
Acidize

Acidize
1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 60.36 Mbbl Cumulativ e Water Produced : 662.98 Mbbl Cumulativ e Gas Produced : 24.33 MMcf
1000
Cumulativ e Oil Produced ( Mbbl )
500 Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: KIRBY CREEK
Oil Rate (Cal Day ) ( bbl/d )
KIRBY CREEK UNIT 28
Water Rate (Cal Day ) ( bbl/d )
Reserv oir Name: PHOSPHORIA
Spud: 01/22/1998 Water Cut ( % )
Plug: * Oil Cut ( % )
100

50

Missing water
production data

10

Acid-Frac, then Sand Frac


1
2000 01 02 03 04 05 06 07 08 09 10 11

Cumulativ e Oil Produced : 21.51 Mbbl Cumulativ e Water Produced : 39.46 Mbbl Cumulativ e Gas Produced : 7.04 MMcf
100
Cumulativ e Oil Produced ( Mbbl )
Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: MURPHY DOME
SHAD 6
Oil Rate (Cal Day ) ( bbl/d )
Reserv oir Name: TENSLEEP
Water Rate (Cal Day ) ( bbl/d ) Spud: 05/08/1952
Water Cut ( % ) Plug: *
10000 Oil Cut ( % )

5000

1000

500

100

50

10
Reperf Tensleep

Plug Back
Acidize

1
1958 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 2000 02 04 06 08 10

Cumulativ e Oil Produced : 1379.59 Mbbl Cumulativ e Water Produced : 4043.27 Mbbl Cumulativ e Gas Produced : 0.00 MMcf
10000
Cumulativ e Oil Produced ( Mbbl )
5000
Cumulativ e Water Produced ( Mbbl )
PRODUCTION PLOTS
Legacy Reserv es Operating LP
Field Name: MURPHY DOME
SHAD 10
Oil Rate (Cal Day ) ( bbl/d )
Reserv oir Name: TENSLEEP
Water Rate (Cal Day ) ( bbl/d ) Spud: 08/21/1954
Water Cut ( % ) Plug: *
10000 Oil Cut ( % )

5000

1000

500

100

50

10

Polymer Treatment
5

1
1958 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 2000 02 04 06 08 10

5 Cumulativ e Oil Produced : 540.38 Mbbl Cumulativ e Water Produced : 35193.86 Mbbl Cumulativ e Gas Produced : 0.00 MMcf
10
Cumulativ e Oil Produced ( Mbbl )
Cumulativ e Water Produced ( Mbbl )
HALL PLOTS – MONITOR INJECTIVITY
Legacy Reserv es Operating LP. EDSEL UNIT 7
Cumulativ e Oil Produced : 11.46 Mbbl
Field Name: Edsel
Cumulativ e Gas Produced : 0.71 MMcf
Reserv oir Name: MINNELUSA 'B'
Cumulativ e Water Produced : 21.24 Mbbl

Hall Plot Cumulativ e Water Injected : 21020.12 Mbbl


Spud: 05/30/1982 Plug: *

12500000

Cumulativ e Pressure ( PSI*Day s ) Edsel U. 7

10000000

7500000

5000000

2500000

0
0 5000 10000 15000 20000 25000

Cumulativ e Water Injected ( Mbbl )


HALL PLOTS – MONITOR INJECTIVITY
Legacy Reserv es Operating LP. LILY UNIT 3
Cumulativ e Oil Produced : 536.84 Mbbl
Field Name: Lily
Cumulativ e Gas Produced : 0.00 MMcf
Reserv oir Name: MINNELUSA 'A'
Cumulativ e Water Produced : 1788.92 Mbbl

Hall Plot Cumulativ e Water Injected : 2278.49 Mbbl


Spud: 10/31/1984 Plug: *

6000000

Cumulativ e Pressure ( PSI*Day s ) Lily U. 3

4500000

3000000

1500000

0
0 500 1000 1500 2000 2500

Cumulativ e Water Injected ( Mbbl )


ADDITIONAL TOOLS IN THE BOX