RTOG Module 4 - Management of Change
RTOG Module 4 - Management of Change
Procedure
Revision: 0
Published: [LastReviewDateLabel]
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 1 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
TABLE OF CONTENTS
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 2 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
1.0 PURPOSE
Management of Change (MOC) is a best practice used to ensure that safety, health, and
environmental risks and hazards are properly controlled when an organization makes changes to
their facilities, equipment, operations, or personnel. This module requires that management of
change procedures be developed to address all changes associated with the Land Transportation
business. Management of Change (MOC) is a structured system to manage changes in the Land
Transportation business so that the changes are recognized, communicated, evaluated, approved
and recorded properly.
2.0 SCOPE
This Module provides the procedures and tools required to manage all changes associated with
the Land Transportation business under PETRONAS Chemicals Marketing (Labuan) Ltd (PCML). It
addresses the following areas:
v. Authorized Route
The requirement stated in this module will take precedence if contradictory to PETRONAS Technical
Standard (PTS).
Performance measurements is to ensure that MOC is being done correctly and status of MOC is
being tracked and monitored to minimize any risk involved in MOC. It is also to ensure that
transporter and PCML management is aware on MOC. List of performance management are as per
below;
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 3 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
4) MOC Log Changes is recorded and List of MOC and status summary is NIL
well documented available and updated
5) MOC status To ensure change a) Delivery report during MOC timeline NIL
report management plan is well b) Evidence of status update
executed and properly close communication to PCML after MOC
within timeline timeline is completed
c) Documentation supporting closing
of MOC
7) MOC To avoid MOC being a way List of MOC and justification MOC Trending
reoccurrence to not adhere to RTOG
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 4 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
Below is the procedure and processes for Management of Change (MOC) request as a guideline
for Change originator.
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 5 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
Below are the roles and responsibilities for Management of Change (MOC);
Roles Responsibilities
Area Owner He/She shall be responsible to communicate with all other parties involved
under his/her custodian.
Other department/ division/ 3rd party acknowledgment affected
Third (3rd) Party by/involved in the change request.
Parties involved need to review the change request form and sign off.
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 6 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
MOC shall be applied when the needs of operations demands for some changes. There are
several types of MOC and the classifications are below;
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 7 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
The originator needs to fill in this header request form and attach together with
either one of the MOC form in 6.2 to 6.10 below, depending on type of change. The
request form is separated into 6 parts which are;
Please refer to next page on how to fill the MOC Request Form. For actual form,
please refer to Appendix 6.2 below.
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 8 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
Document No. :
Particular of originator
Changed type (please tick box)
Identification
Description:
Description details
Justification: Please attach drawing or related evidences together with detail timeline and Risk assessment.
Signature Date
3rd party
1.
nt
Remarks:
Change originator (according
to LOA) to sign off during
request
Change Originator; Area Owner ; Approved by;
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 9 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
:
Document No.
S&D MANAGEMENT OF CHANGE (MOC) - REQUEST
FORM (Page 2) Revision No. :
Page No. :
Process
Route
Pilot Task
Equipment
Facility
Write notes for
Transporters Management further
Change package requirements
explanation
Personnel
Procedure
Loading Point
2. Risk/Hazard assessment checklist (refer RHM/SHM):
If yes, please attach:
Route segment Tick () whichever applicable
Site layout and attached new RHM or SHM
Originator: Date
Review
(signature)
Area owner : Date
(name and signature)
Manager : Date
(name and signature)
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 10 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
The form will be used for any change of the current authorized route and a new
authorized route for delivery purposes. Originator must attach this form together
with the MOC Request Form in 6.2 upon submission. Other related documents must
also include in this form for review and reference. For actual form, please refer to
Appendix 6.3.
:
Document No.
S&D MANAGEMENT OF CHANGE (MOC) - Delivery
route change Revision No. :
Document No. and :
Page
revision No. No.
must
align with MOC
request form
Request date : Name : Category :
Sign off
Completion date
1 New route or change to route identified, including primary and alternate route
2 Risk assessment performed prior to first delivery or use of route (please attach
related document)
Agreed completion
date and sign off
3 New route card developed or existing route card updated
Checklist completion confirmation (to attach with the Change Request Form and file)
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 11 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
The form will be used for any change of the current task perform by Pilot,
Transporters and PCML staffs when conducting daily work. Originator must attach
this form together with the MOC Request Form in 6.2 upon submission. Other
related documents must also include in this form for review and reference.
For actual form, please refer to Appendix 6.4.
Document No. :
S&D MANAGEMENT OF CHANGE (MOC) - RTP Task :
change Revision No.
Document No. and
Page No.
revision No.must :
align with MOC
request form
Request date : Name : Category :
Truck type
Tick Equipment
() either
Designation : Other
change of new
route or existing
route
Change type : Risk category :
Permanent High Details of Originator
Temporary Medium
Emergency Low Level of risk involved due
to change
2 Upon completion of the above items, obtain approval from appropriate authority
Name, signature and
date after all action
level items has been closed
out/completed
Checklist completion confirmation (to attach with the Change Request Form and file)
Name : Signature : Designation : Date :
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 12 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
The form will be filled for any change of the current equipment used by RTP,
Transporters or PCML staffs when conducting daily job. The equipment change
must comply with minimum RTOG requirement. Originator must specify what type
of equipment change involved. Originator must also attach this form together with
the MOC Request Form in 6.2 upon submission. Other related documents must also
include in this form for review and reference. For actual form, please refer to
Appendix 6.5.
Document No. :
S&D MANAGEMENT OF CHANGE (MOC) - Document
:
Equipment change Revision No.
No. and
revision No.
must align
:
Pagewith
No. MOC
request form
Agreed
2 Training required as a result of new equipment or modification identified and completion date
and sign off
completed (please attach the training communication information i.e. date,
attendance, changes identified)
- New procedure identified has been completed and updated
- Equipment and familiarization and operation training conducted
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 13 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
Checklist completion confirmation (to attach with the Change Request Form and file)
Name : Signature : Designation : Date :
Name, signature and
date after all action
items has been closed
out/completed
The form will be used for any change of the current transporters. Originator must
specify what category of transporters change involved. Originator must also attach
this form together with the MOC Request Form in 6.2 upon submission. Other
related documents must also include in this form for review and reference. For
Document No.
actual form, please refer to Appendix 6.7. and revision No.
must align with
MOC request
form
Tick () category of
:
Transporter change
Document No.
S&D MANAGEMENT OF CHANGE (MOC) -
Details of Originator Level of risk involved due
Transporters Change Revision No.
to change
:
Page No. :
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 14 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
1 Transporter Qualified by HSE using the appropriate Transport Audit Checklist as per
RTOG guidelines
6 Obtain approval for change closeout from the appropriate authority level
The form will be used for any change of the current personnel in charge. Originator
must specify what category of personnel change involved. Originator must also
attach this form together with the MOC Request Form in 6.2 upon submission.
Other related documents must also include in this form for review and reference.
For actual form, please refer to Appendix 6.8.
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 15 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
:
Document No.
S&D MANAGEMENT OF CHANGE (MOC) -
Personnel change Revision No. :
Page No. :
Temporary Medium
Emergency Low Details of Originator
1 Candidate qualified to hold the position based on role criteria and job description
Duration of
2 For Executive and above, Job Handover checklist should be completed Change
The form will be filled for any change of the current work procedure used by RTP,
Transporters and PCML staffs when performing daily job. Originator must specify
what category of work procedure change involved. Originator must also attach
this form together with the MOC Request Form in 6.2 upon submission. Other
related documents must also include in this form for review and reference. For
actual form, please refer to Appendix 6.9.
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 16 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
:
Document No.
S&D MANAGEMENT OF CHANGE (MOC) - Work
Procedure change Revision No. :
Page No. :
- Others
Name, signature and
1. Regulatory compliance review performed on new/updated proceduredate after all action
2. Transport managers are informed and trained on the new procedurehas been closed
items
out/completed
change
3. Other interface parties are informed and communicated on the new
change
Checklist completion confirmation (to attach with the Change Request Form and file)
Name : Signature : Designation : Date :
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 17 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
i) Introduction
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 18 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
Legal reviews
Risk/Hazard Assessment
Incident Prevention Observations
Equipment/Facility compatibility
If after the self-assessment, the Transporters identifies a requirement
that cannot be met within a reasonable time frame, they should
complete the RTOG Waiver Request Form and submit it to the PCML P&P
Head who will:
Approved request will be returned to the PCML HSE Executive who will:
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 19 of 20
OPERATIONAL EXCELLENCE
PCGB MANAGEMENT SYSTEM
(OEMS)
The MOC log shall be kept in a shared file by PCML HSE for future reference.
All approved waiver request shall be updated in the log on timely basis.
S&D P&P Manager shall provide remarks (if any) in the log. This log may
be reviewed in the Transport Safety Committee meeting or any other
platform. For actual form, please refer to Appendix 6.10.
TRANSPORTER :
CONTRACT DETAILS :
LAST UPDATED :
Document Authorisation
Internal
This hard copy document is valid for 48 hours only unless clearly identified as controlled copy.
Date & time printed 14 February 2020, 4:11 PM
Page 20 of 20